g Nuovo Pignone No.

STD-ET-116
PRE-COMMISSIONING Page 1 of 1
FIRENZE FORM

CONTROL & PROTECTION PANELS VERIFICATION

Panel Item:................................................................................................................................................

Service:......................................................................................................................................................
INSTRUMENTS USED FOR TESTING

-Tester

POS. ACTIVITY' VERIF. DATE NOTES


3.1 Preliminary verification
1 Visual inspection
2 Checking of grounding system
3 Cleanliness and bolts tightening verification
4 Auxiliariy circuits operating verification
5 Amperohmeters circuits verification
6 Voltmeters circuits verification.
7 Checking of connection with other systems
8 Control cables connection check.
9 Temperature monitor verification
10 D.C. (110 V.) supply system verification
11 A.C. supply system verification

4.0 Final setup


Power, cables connected and tested.
Control and signalling cables connected to the
temporary terminal boards and tested
The internal checks. mechanical and electrical,
performed
Grounding connections, tested and tightened
The panel and its components, clean
The installation room clean and free from foreign
materials.
The cables trenches, clean and closed.
The internal equipments where the panel lay
(lighting, M.P., ground connection, etc..) ready to put
in service.

Contractor: Nuovo Pignone Client:

.................................................... ..................................................... ....................................................

STD-ET-116 Pag.1 of 1