Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

PT.

SRIKAYA PUTRA MAS


CONTRACTOR, ENGINEERING & STEEL MANUFACTURING
Factory: Jl. By Pass Krian Km 28,6 Sidoarjo (61262) – Jawa Timur Phone: (031) 8986191-3 Fax. : (031) 8986190

RADIOGRAPHIC EXAMINATION REPORT


Report No : 001 / RT / YS – XI / 2006
Principal : PT SRIKAYA PUTRA MAS Date : Nov. 23’ 2006
PORONG – SIDOARJO O/C :-
Name of Equipment : BASE OIL TANK TK 57 Serial No :-
User : PT AGIP LUBRINDO PRATAMA Location : GEMPOL
Drawing No :- Examination procedure : ASME V art 2 Acc Criteria : API 650
Part or Weld Diameter Thickness Interest Interpretation Evaluation Remarks
identification inch mm Area Indication Size mm/in Accepted Rejected
T3-1 5 A–B - - Acc -
H3-2 5 A–B - - Acc -
T5-3 5 A-B P - Acc -

T6-4 5 A–B - - Acc -


T3-5 5 A–B - - Acc -
V2-6 5 A–B P - Acc -
T2-7 5 A–B - - Acc -
T2-8 5 A-B P - Acc -

H7-9 5 A–B CP - Acc -


T 2 - 10 5 A–B P - Acc -
T 7 - 11 5 A–B P - Acc -
H 2 - 12 5 A-B - - Acc -

T 4 - 13 5 A–B - - Acc -
T 1 - 14 5 A–B - - Acc -

V 1 - 15 5 A–B - - Acc -
H 1 - 16 5 A–B - - Acc -

T 4 - 16 5 A–B - - Acc -

V 5 - 18 5 A–B - - Acc -
H 1 - 19 5 A–B - - Acc -

T 1 - 20 5 A–B - - Acc -

Indication code : RC = Root Concavity CP = Clustered Porosity CR = Cracks


RUC = Root Under Cut SI = Slag Inclusion UC = Under Cut
IP = Incomplete Penetration SL = Slag In Line CL = Class
P = Porosity LOF = Lag Of Fusion G = Grade
Technique Code : SWSV = Single Wall Single Viewing DWSV = Double Wall Single Viewing DWDV = Double Wall Double Viewing
Total Film : 20 Sheets – ( 4 x 10 ) ‘
Radiation Source : Ir 192 IQI Type : ASTM 1B Screen : Pb. 0,125 mm
Focal Sport Size : 3 x 3 mm IQI Placement : Source side Technique : SWSV
Activity : 28 Ci Film Type : Medium Speed Density : 2.0 – 3.5
SFD : 12 “ In Film Brand : Kodak AA 400 Sensitivity : 2%
Reviewed by Approved by Witnessed by Radiographer
PT. SRIKAYA PUTRA MAS
CONTRACTOR, ENGINEERING & STEEL MANUFACTURING
Factory: Jl. By Pass Krian Km 28,6 Sidoarjo (61262) – Jawa Timur Phone: (031) 8986191-3 Fax. : (031) 8986190

LIQUID PENETRANT EXAMINATION REPORT


Report No : 001 / RT / YS – XI / 2006
Principal : PT SRIKAYA PUTRA MAS Date : Nov. 23’ 2006
PORONG – SIDOARJO O/C :-
Name of Equipment : Serial No :-
User : PT. SUNRISE STEEL Location :
Drawing No :- Acc Criteria : API 650
Part or Weld Thickness Interpretation Evaluation Remarks
Identification mm Type of Indication Size ( mm ) Accepted Rejected
20 - - Acc -

Skecth :

Indication code : LI = Linear Indication RI = Rounded Indikation CR = Cracks


Examination Procedure : SPM
Examination Space/Size : C/S Penetrant : SKL – SP1 Drying Time : 0.5 Minutes
Surface Condition : Smooth Developer : SKD – S2 Dwell Time : 10 Minutes
Surface Temp. : Ambient Post Cleaning : SKC – S Length of Time : 30 Minutes
Reviewed by Approved by Witnessed by Inspected by
PT. SRIKAYA PUTRA MAS
CONTRACTOR, ENGINEERING & STEEL MANUFACTURING
Factory: Jl. By Pass Krian Km 28,6 Sidoarjo (61262) – Jawa Timur Phone: (031) 8986191-3 Fax. : (031) 8986190

You might also like