Professional Documents
Culture Documents
Reviewer ECON
Reviewer ECON
Opportunity cost.
Assumption: capital is fixed and production Fixed costs: costs that do not vary with the
can be only increased by increasing labor. quantity of output produced. Variable costs:
costs that do vary with the quantity of output
produced.
Total cost = FC + VC
RISING MC
Price is fixed.
P < AVC
P < ATC