Owner : PT PERTAMINA EP

Project : PEMBANGUNAN FASILITAS PRODUKSI PAKUGAJAH


Contract No. : 1341/EP0000/2015-S0
Doc. No. : PGDP-02-PL-C-900-A360-003
CONTRACTOR’S REPLY TO COMPANY’S COMMENTS Prepared by : Gede Resa Udayana
(Ref. No. PGDP-T-CJPJ-0042) Checked by : Made Kertiyasa
Approved by : Made Kertiyasa
SUBJECT: Pipe Stress Analysis Calculation Report For 4” Condensate Trunkline From SPG Kuang To Tie-In No.
TP-03 SP Kuang Utara Dated : 05-Sep-2016

No. Item Company’s Comments Contractor’s Reply Discussion & Result


The stress analysis result shows that
the stress induced in the pipe is below
allowable limit for all load cases
Is the soil resistance enough to
1. Conclusion considered. However, it is
handle the stress.
recommended for the civil engineer to
evaluate the load in all of the above
ground pipeline.