This document contains a price quotation for bridge foundation work and materials. It lists 6 jobs with descriptions of the pipe sizes and locations. The total price quoted is Rp. 136,500,000. The quotation is addressed to PT. BCK and dated December 9, 2019 in Bandar Lampung, and signed by Usman Sudarsah.
This document contains a price quotation for bridge foundation work and materials. It lists 6 jobs with descriptions of the pipe sizes and locations. The total price quoted is Rp. 136,500,000. The quotation is addressed to PT. BCK and dated December 9, 2019 in Bandar Lampung, and signed by Usman Sudarsah.
This document contains a price quotation for bridge foundation work and materials. It lists 6 jobs with descriptions of the pipe sizes and locations. The total price quoted is Rp. 136,500,000. The quotation is addressed to PT. BCK and dated December 9, 2019 in Bandar Lampung, and signed by Usman Sudarsah.