Minutes of the 97th State Level Facilitation Cell Meeting

Held on 16th August, 10.30 AM at the IPICOL Conference hall, under the Chairmanship of CMD, IPICOL
Participants: Sri KC Mohanty(GM,SLNA), Smt. Usha Rani Das(GM, IDCO), Sri M.R. Roul,(OPTCL & SLFC Member), Sri P. Panda(CE-cum Addn Sect, DoWR),Sri Chandi Prasad
Das(Env. Scientist, OSPCB, SLFC Member), Sri M Pradhan(Dy.Director, F&B), Sri S.K.Kar(DGM,IPICOL),Sri Malay Panda(IPICOL),Sri. D.K. Senapati(Manager, IPICOL), Sri A.
Panda(Manager, IPICOL), Sri Rajib Dhal(DGM, IPICOL),Sri K.K.Giri, Sri S.K. Panigrahi( Manager, Accounts), Smt. Paridhi Agrawal( Consultant, IPICOL), Sri S.K. Samartha
(Jt.Manager, IPICOL), Sri Tanmaya Pattnaik(Sr. Consultant, IPICOL),Sri P.K.Mishra(EE,Energy Dept.), Sri A.K.Bhuvan(Controller, Legal Metrology), Sri S. Bari (Legal
Metrology), Sri Pranshu Jain(PM,IPA)
The issues pertaining to the following industries were discussedThe issues pertaining to the following industries were discussed and actions taken as follow:
S.No Decision Taken by SLFC Decision Taken by SLFC
Issues Last Action Taken th
(8 August 2017) (16th August 2017)
A Software Development
1 CICG Weekly review of CICG: To be followed up. Documents pending for Legal
(Central Inspection Co-ordination Labou Action: Sr. Consultant Shri TK Pattnaik Metrology and Energy Dept. to be
Dept. F&B OSPCB
Group) r submitted at the earliest.
Unattended
2 0 7
Inspection
Report
0 0 0
Pending
Tagging
4 4 4
Status
2 Software Process development for Being followed up. To be followed up. To be followed up.
Single Window Portal. Action: Sr. Consultant Shri TK Pattnaik Action: Sr. Consultant Shri TK Pattnaik
3 Drafting of Memorandum for Under process. AMS to be used for Single Window AMS to be used for Single Window
SLSWCA/HLCA Agenda Preparation. Agenda Preparation.
Action: AM(SLNA)/DGM(SLNA) Action: AM(SLNA)/DGM(SLNA)
B Land
4 M/s. L.L. Logistics Pvt. Ltd. Being followed up for deposition of To be followed up for deposition of To be followed up for deposition of
To establish a Logistic Park at land cost by September 2017. land cost by the project proponent. land cost by September 2017.
Indranipatna, Chodwar in Cuttack. Action: Nodal Officer Action: Nodal Officer
5 M/s Hindustan Coca Cola Land acquisition is in process. Being Handing over of 22 Acre of land to the Handing over of 22 Acre of land to the
Beverages followed up with LAO Khordha. Project Proponent to be completed by Project Proponent to be completed by
Expansion of non-alcoholic 31.08.2017. Action: GM(IDCO) 31.08.2017. Action: GM(IDCO)
beverage plant at I.E., Khurdha.
6 M/s P & A Bottlers Pvt Ltd Being followed up with the Tehsildar, To be followed up for execution of To be followed up for execution of
Set up of 2.50 lakh hl/annum Odapada for sanction of lease. lease deed at the earliest. lease deed at the earliest.
capacity Brewing Industry at Being followed up for ground breaking Action: GM(IDCO) Action: GM(IDCO)
Dhenkanal. and Implementation schedule. To be followed up for ground breaking To be followed up for ground breaking

Page 1 of 9
and Implementation schedule. and Implementation schedule.
Action: Nodal Officer Action: Nodal Officer
7 M/s Gupta Power Requested to come for discussion on Proponent to be invited for discussion. Proponent to be invited for discussion.
Land for manufacturing unit at 18th. Action: Nodal Officer Action: Nodal Officer
AAPL.
8 M/s Rakhi Agencies Ltd. Being followed up. May be dropped. To be followed up with the project To be followed up with the project
25000 TPA Aluminium Conductor & proponent to deposit the land cost at proponent to deposit the land cost at
Alloy rod manufacturing unit at the earliest.Action: GM (IDCO) the earliest.Action: GM (IDCO)
AAPL.
9 M/S Eastern Nutriments (P) Ltd Being followed up. To be followed up. To be followed up.
Food unit at Ramdaspur, Cuttack, Action: Nodal Officer/ GM(SLNA) Action: Nodal Officer/ GM(SLNA)
with an investment of Rs 75 Crores.
10 M/s Page Industries Ltd Ascertain from AG Office, the case has To be followed up with AG’s office. To be followed up for the court
Garment manufacturing unit At- been posted to 4th week of August. Action: GM(IDCO)/ GM(SLNA) hearing.
Ramdaspur, Dist- Cuttack Action: GM(IDCO)/ GM(SLNA)
11 Midal Cables Ltd. A mail has been sent to the company To be followed up with the project Issue to be dropped until further
to intimate their response at the proponent to deposit the land cost and response from the company.
earliest. May be dropped till their indicate their further course of action,
response. else the issue to be dropped.
Action: Nodal Officer / GM (IDCO)
12 CONCOR Letter sent to CMD, CONCOR. Letter to be sent. To be followed up.
Action: Nodal Officer/GM(SLNA) Action: Nodal Officer/ GM(SLNA)
13 M/s Nezone Tubes Ltd., Being followed up for completion of To be followed up for completion of To be followed up for completion of
Kalinganagar(Tubes and Pipes) road. road. road.
Being followed up for Implementation Action: Nodal Officer/ GM (IDCO) Action: Nodal Officer/ GM (IDCO)
schedule and incentive matter. Implementation schedule to be Implementation schedule to be
provided. Incentive matter to be provided. Incentive matter to be
followed up.Action: Nodal Officer/ followed up.Action: Nodal Officer/ GM
GM (IDCO) (IDCO)
14 M/s. Nezone Tubes (Utkal) Ltd Assessment letter sent. SLFC has accepted the sub-committee To be followed up.
E-vehicle project assessment of the 10.96 Acres of land Action: Nodal Officer
of the 13 Acres of land requested by
the company. The same may be
communicated to IDCO.
Action: Nodal Officer
15 M/s Sadhav group of companies Project Proponent to provide further Proponent to provided further Proponent to provided further
Ship building and maritime repair details for assessment of land. clarification within a week and land clarification within a week and land

Page 2 of 9
services unit at Dhamra, Dist- assessment to be placed in the next assessment to be placed in the next
Bhadrak SLFC. Action: Nodal Officer SLFC. Action: Nodal Officer
16 M/s Shahi Exports Private Ltd Being followed up. To be followed up for HLLAC minutes. To be followed up for HLLAC minutes.
Garment unit at Mancheswar Fire issue to be resolved at the earliest. Action: Nodal Officer
Industrial Estate, Bhubaneswar. Action: Nodal Officer
17 M/s Milk Mantra Being followed up. The project proponent to select The project proponent may be asked
Expansion of existing Dairy suitable land. to select suitable land at Ramdaspur.
processing unit from At- Gop, Dist- Action: Nodal Officer/GM(IDCO)/ Action: Nodal Officer/GM(IDCO)/
Puri, and to set up cold chain GM(SLNA) GM(SLNA)
facilities.
18 M/s BPCL Being followed up with Industries To be expedited. To be followed up with Industries
i. CUF project at Meramundali Dept. Action: Nodal Officer/GM(IDCO) Dept.
(Sadashivpur), Dhenkanal Action: Nodal Officer/GM(IDCO)
ii. LPG bottling plant at Balangir
iii. Ethanol Project at Vatli,
Bargarh
19 M/s Oricon Enterprises Ltd Being followed up. To be followed up for HLLAC minutes. To be followed up for HLLAC minutes.
Manufacturing unit of PET Preforms Action: Nodal Officer/GM IDCO Action: Nodal Officer/GM IDCO
for F&B Industries in IE, Khurda
20 M/s Carnival Films Pvt Ltd Being followed up. Proponent to be asked to target one To be followed up.
Exhibition & Family Entertainment location at a time. Action: Nodal Officer
Centre across 30 districts.(Green Action: Nodal Officer
Category)
21 M/s PPL Being followed up. IDCO to put up file regarding the IDCO to put up file regarding the
To expand fertiliser unit at private and govt. land allotted to PPL. private and govt. land allotted to PPL.
Paradeep with investment of Rs. To be followed up for ground breaking. To be followed up for ground breaking.
9459.17 Cr Action: Nodal Officer Action: Nodal Officer
22 M/s Surya Foods and Agro Ltd Being followed up. To be followed up for HLLAC minutes. To be followed up for HLLAC minutes.
Biscuit manufacturing unit of 45000 Action: Nodal Officer Action: Nodal Officer
TPA, At- Khordha Food Park.
23 Proposal for Transfer of MGR land IDCO has been intimated the decision As per the order of the Industries Issue to be dropped.
(part) from M/s OPGC to M/s OCPL of SLFC meeting. Dept., IPICOL has no views to offer in
acquired through IDCO in this matter. The same may be clarified
Sundergarh. to IDCO.Action: Nodal Officer
24 M/s Aditya Alumina Being followed up. Views of the FALTA SEZ to be sought Views of the FALTA SEZ to be sought
Issue of NOC for de-notification of regarding the representation of the regarding the representation of the
SEZ proponent.Action: Nodal Officer proponent.Action: Nodal Officer

Page 3 of 9
25 Unutilised/Misutilized Land Under preparation. Govt. Corporations which have been Govt. Corporations which have been
allotted in Industrial Estates in BMC allotted land in the Industrial Estates allotted land in the Industrial Estates
area in BMC area like Chandaka, Rasulgarh, in BMC area like Chandaka, Rasulgarh,
Mancheswar,Raghunathpur etc. , and Mancheswar,Raghunathpur etc. , and
which are being unutilized or which are being utilised, unutilized or
misutilized , to be identified for futher misutilized , to be identified for futher
discussion.Action: GM(IDCO) discussion. The same to be compiled in
this week.
Action: GM(IDCO)
26 M/s Bhubaneswar Power Pvt Ltd RITES is working on the assessment To be followed up with RITES for To be followed up with RITES for
(BPPL) job. assessment study in 15 days. assessment study in 15 days.
Action: Nodal Officer Action: Nodal Officer
B Water
27 M/s Hindustan Coca Cola Agreement format yet to be finalised. Water Agreement to be finalised. Water Agreement to be finalised.
Beverages Pvt.Ltd. Action: GM(IDCO) Action: GM(IDCO)
28 IDCO Water Supply Being followed up To be followed up for minutes of the Issue to be raised in Senior Officer
Paradeep Water Supply System meeting held on 04/08/2107. Meeting.
Progress Monitoring Action: GM, IDCO Action: GM, IDCO
29 Dept. of Water Resources to Agenda under preparation. Agenda to be drafted for Single Agenda to be drafted for Single
provide data regarding the Window. Window.
capacity, allocation and drawal of Action: SLFC Member, DoWR/ Sri Action: SLFC Member, DoWR/ Sri
water from major river basins. B.B.Dhal. B.B.Dhal.
C Policy & Incentive Matters
30 M/s Parle Agro Food Products Ltd. Being followed up. Incentive matter to be followed up. Incentive matter to be followed up.
Incentive Matter Action: Nodal Officer Action: Nodal Officer

31 M/s OriPlast Ltd. Being followed up. To be followed up for provisional To be followed up for provisional
Expansion & modernisation of priority certificate. priority certificate.
plastic pipe manufacturing unit at To be followed up for provisional To be followed up for provisional
Balasore. ground breaking, implementation ground breaking, implementation
schedule and layout plan. schedule and layout plan.
Action: Nodal Officer Action: Nodal Officer
D Miscellaneous Issues
32 M/s BMW Industries Ltd. The company is pursuing for a tie up To be followed up. To be followed up.
Manufacturing of downstream steel with TATA Steel. More clarity is Action: Nodal Officer/ GM(SLNA) Action: Nodal Officer/ GM(SLNA)
products at KNIC, Jajpur expected by month end.

Page 4 of 9
E New Projects
33 New Projects Briefed by GM (SLNA) Being followed up for the following New proposals to be submitted to To be followed up for the following
proposals: CMD, IPICOL latest by 18.08.2017 by proposals:
1. CER Coal(Logistics)-MKP AMS. 1. CER Coal(Logistics)-MKP
2. Gemini Edible Oil-SKK Action: Nodal Officers 2. Gemini Edible Oil-SKK
3. Hindalco Downstream-SKK 3. Hindalco Downstream-SKK
4. Hindalcosmelter expansion-SKK 4. Hindalcosmelter expansion-SKK
5. West Coast Paper- KKG 5. West Coast Paper- KKG
6. NDR Logistics-MKP 6. NDR Logistics-MKP
7. Centuary India(Mattress)-KKG 7. Centuary India(Mattress)-KKG
8. Kothari Garments-KKG 8. Kothari Garments-KKG
9. Vedanta Refinery Expansion-SKK 9. Vedanta Refinery Expansion-SKK
10. Vedanta Downstream Park-SKK 10. Vedanta Downstream Park-SKK
11. LT elevator- AP 11. LT elevator- AP
12. Shravan shipping-MKP 12. Shravan shipping-MKP
13. Vijayanagaram Biotech-SKK 13. Vijayanagaram Biotech-SKK
14. IOCL-MKP 14. IOCL-MKP
15. ITC- SKK 15. ITC- SKK
16. Jamipol Ltd.- AP 16. Jamipol Ltd.- AP
Action: Nodal Officers
SOP for Noal Officers to be re-visited
keeping in mind the BMR and the new
PEAL form. FAQs to be drafted.
Action: GM/SLNA
34 M/s CER Coal Pvt. Ltd. The project proponent has been asked The Project Proponent to be asked to The Project Proponent to be asked to
Private Freight Terminal (PFT) at to provide the financial details to meet clarify the observation of IPICOL. clarify the observation of IPICOL.
Chhatrapur, Ganjam under Khurda the equity part. Action: Nodal Officer Action: Nodal Officer
Road Division of East Coast Railway.
F Ground Breaking /Inauguration
35 M/s Smartchem Technologies Ltd Being followed up. To be followed up for ground breaking To be followed up for ground breaking
To set up manufacturing facility for by Nov’17. by Nov’17.
Ammonia, Nitric Acid, Ammonium Action: Nodal Officer Action: Nodal Officer
Nitrate Solution and Technical
Ammonium Nitrate at Paradeep.
36 M/s Welspun Being followed up. To be followed up for ground breaking To be followed up for ground breaking
0.27 MTPA long product (steel) in September 2017 and proposal for in September 2017 and proposal for
facilities centre at Dosingha, near private industrial park by end of July. private industrial park.

Page 5 of 9
Dhamra. Action: Nodal Officer Action: Nodal Officer
37 M/s KTL Logistics Being followed up for ground breaking. To be followed up for ground breaking. To be followed up for ground breaking.
Action: Nodal Officer/ GM (IDCO) Action: Nodal Officer/ GM (IDCO)
38 M/s. Bharat Biotech Being followed up. To be followed up for ground breaking. To be followed up for ground breaking.
Manufacturing of vaccines at Odisha Action: Nodal Officer Action: Nodal Officer
Biotech Park at Andharua.
39 Ramco Cement The representative met GM on To be followed up for ground breaking To be followed up for ground breaking
Change of location from inside IMFA 11.8.2017 and agreed for the ground in September. in September.
complex, Choudwar, Cuttack to breaking. Requested to give the Implementation schedule to be Implementation schedule to be
Hardidaspur, Jajpur consent letter. Requested to submit assessed; to be followed up for layout assessed; to be followed up for layout
the layout plan. plan. plan.
Action: Nodal Officer Action: Nodal Officer
40 M/s Balasore Alloys Notice invoking Corporate Guarantee To be followed up. To be followed up.
Expansion of Ferro Alloy Plant and has been issued. Waiting for the Action: DGM(Inv) Action: DGM(Inv)
installation of Chrome Ore response. To be followed up for implementation To be followed up for implementation
Beneficiation Plant at Sukinda. Being followed up. schedule and layout plan. schedule and layout plan.
Action: Nodal Officer Action: Nodal Officer
41 M/s Coastal Corporation Ltd. Being followed up. To be followed up. To be followed up.
Shrimp Processing unit at- Sea Food Action: Nodal Officer Action: Nodal Officer
Park, Deras, Dist- Khordha.
42 M/s Emami Paper Mills Ltd. Being followed up. To be followed up for implementation To be followed up for implementation
Expansion of Multilayer Coated schedule& ground breaking. schedule& ground breaking.
Boards manufacturing plant at Action: Nodal Officer Action: Nodal Officer
Balgopalpur Industrial Estate, dist.-
Balasore.
43 M/s Indo Nissin Foods Private Ltd Being followed up. To be followed up for ground breaking. To be followed up for ground breaking.
expansion of its Instant Noodle unit Action: Nodal Officer Action: Nodal Officer
at- Industrial Estate, Khordha.
G Compliance(Documents, Layout
Plan, Implementation Schedule)
44 M/s Gitanjali Gems Ltd. Being followed up. To be followed up for submission of Issue pertaining to the proponent may
Issue : Land Board Resolution before being placed be sorted out at the earliest and Board
to SLSWCA. Resolution may be submitted.
Action: Nodal Officer Action: Nodal Officer
45 M/s NLC Thermal Project Being followed up. Minutes of the 3rd inter-ministerial Minutes of the 3rd inter-ministerial
3200 MW Thermal Power plant, committee meeting is awaited. committee meeting is awaited.
At:Tareikela, Dist:Jharsuguda Action: Nodal Officer Action: Nodal Officer

Page 6 of 9
Letters pertaining to the decision of
the committee to be sent.
Action: GM(SLNA)
46 M/S OCL Cement Being followed up. To be followed up for ground breaking, To be followed up for ground breaking,
Expansion of Clinker & Cement unit implementation schedule and layout implementation schedule and layout
at Rajgangpur plan. Action: Nodal Officer plan. Action: Nodal Officer
47 M/s IDL Chemicals Being followed up. To be followed up for implementation To be followed up for implementation
Emulsion Bulk Matrix units at Barbil, schedule and layout plan. schedule and layout plan.
Talcher and Jharsuguda. Action: Nodal Officer Action: Nodal Officer
48 M/s Jayashree Chemicals Being followed up. To be followed up for implementation To be followed up for implementation
Manufacturing of MCA, CAC, PAC, schedule and layout plan. schedule and layout plan.
SBS and HCL at Chhatrapur, Ganjam. Action: Nodal Officer Action: Nodal Officer
49 M/s. Grasim Industries Ltd. Being followed up. Clarification to be sought for the Clarification to be sought for the
Expansion Caustic Soda implementation schedule submitted by implementation schedule submitted by
manufacturing at Jayshree, Ganjam. the company. Action: Nodal Officer the company. Action: Nodal Officer
50 M/s JSW Steel DPR, Layout plan etc submitted by To be followed up. To be followed up.
JSW. MECON will give its offer. Being Action: Nodal Officer Action: Nodal Officer
followed up.
51 M/s JSW Slurry Pipeline Being followed up. To be followed up. To be followed up.
Action: Nodal Officer Action: Nodal Officer
52 M/s Texport Industries Being followed up. Clarification to be sought on the layout Clarification to be sought on the layout
Garment manufacturing unit at plan submitted by the company. To be plan submitted by the company.
Ramdaspur complied by 10th Aug 2017 Action: Nodal Officer
Action: Nodal Officer
53 M/s NMDC A joint meeting between OMC & To be followed up for implementation NMDC to put proposal to OMC
2 MTPA Pellet Plant and Iron Ore NMDC is being arranged. schedule and layout plan. A meeting to regarding the project.
processing plant at Dhamra. be arranged between OMC and NMDC. Action: Nodal Officer
Action: Nodal Officer
54 M/s HPCL Being followed up for Implementation To be followed up. To be followed up.
LPG Bottling Plant at Raygada. schedule. Action: Nodal Officer Action: Nodal Officer
55 M/s NALCO Being followed up. To be followed up for implementation To be followed up for implementation
expansion smelter plant at Nalco schedule and layout plan. schedule and layout plan.
Nagar, with inv. of Rs.10,000 crores Action: Nodal Officer Action: Nodal Officer
56 M/s Topaz Solar Private Ltd.(Green Being followed up. Minutes awaited of the 3rd inter- Minutes awaited of the 3rd inter-
Category) ministerial committee meeting. ministerial committee meeting.
120 MW/Year SolarPV module Action: Nodal Officer Action: Nodal Officer
manufacturing unit at Bhubaneswar

Page 7 of 9
57 M/s. Ultratech Cement Limited Invited for the meeting on 18th to The proponent to be called for a To be followed up.
Cement Grinding plant at Cuttack. discuss on GB and sharing of Railway discussion at IPICOL. To be raised in Action: Nodal Officer
siding with BPCL. inter-ministerial committee meeting.
Action: Nodal Officer
58 M/s Indo Nissin Foods Private Ltd Being followed up. To be followed up for implementation To be followed up for implementation
expansion of its Instant Noodle unit schedule and layout plan. schedule and layout plan.
at- Industrial Estate, Khordha. Action: Nodal Officer Action: Nodal Officer
59 M/s Sakura Premier Solar Being followed up. To be followed up. To be followed up.
250 MW/Year Solar cell Action: Nodal Officer Action: Nodal Officer
manufacturing unit, At: Khurda.
60 M/s BeeKay Steel Land Assessment Being followed up. To be followed up. To be followed up.
Action: Nodal Officer Action: Nodal Officer
61 M/s. Ambuja Cements Limited Invited the representative to come for To be followed up for implementation To be followed up for implementation
1.5 MTPA Cement grinding unit near the discussion on 17th. schedule and layout plan. schedule and layout plan.
Jharsuguda. Action: Nodal Officer Action: Nodal Officer
62 M/s Chettinad Cement Corporation The minutes of SLSWCA meeting SLSWCA minutes awaited. To be followed up for implementation
Private Limited circulated to the project proponent. Action: Nodal Officer schedule and layout plan.
2MTPA Cement Plant at Kalinga Requested the company to submit the Action: Nodal Officer
Nagar Industrial Complex, Jajpur. implementation schedule and layout
plan.
63 M/s RamkyEnviro Engineers Ltd. The minutes of SLSWCA meetings SLSWCA minutes awaited. To be followed up for implementation
Integrated common hazardous circulated to the project proponent. Action: Nodal Officer schedule and layout plan.
waste treatment, storage and Action: Nodal Officer
disposal facility at Katikela in the
district of Jharsuguda
64 M/s Indian Rare Earths Ltd The minutes of SLSWCA meeting are SLSWCA minutes awaited. SLSWCA minutes awaited.
Rare Earth Theme Park at- Bodaputi, circulated. Action: Nodal Officer Action: Nodal Officer
Chatrapur, dist- Ganjam
65 M/s NEEPCO The minutes of SLSWCA meetings SLSWCA minutes awaited. To be followed up for implementation
200 MW Solar Power plant At: circulated to the project proponent. Action: Nodal Officer schedule and layout plan.
Babandha, Dist: Dhenkanal Action: Nodal Officer

Page 8 of 9
66 M/s Kader Investment and Trading Further clarifications regarding the
Co (P) Ltd financial status of the company may be
Shrimp Processing and Freezing furnished.
pant At- Sea Food Park, Deras, Dist-
Khordha
Approved.

Sd/-

Rajib Dhal
DGM,SLNA

Page 9 of 9