I. GENERAL INFORMATION
Blocks : 05-2 & 05-3
Basin : Nam Con Son
G&G:
- Special seismic interpretation for HT-MT reservoirs.
- Condensate banking mitigation study.
- Infill drilling study.
Drilling and Completion:
- Well intervention works: PLT Logging on HT-1P ongoing
- Preparing add-on perforations for HT-6P
- Continue Maintenance Program for Ex-stock D&C Equipment in Vung Tau
Supply Base.
- Working on 05-2-KCB-1X Exploration Well Basis of Design / Engineering
Production:
• Average gas production: 5.973 MMscm/d
• Average condensate production: 7772 stb/d
- NTR
WTC - Tower B
Strawinskylaan 1725
1077 XX Amsterdam
The Netherlands
Tel: +31 20 719 6000
Fax: +31 20 570 7170
Block 114
• General
o Eni 50% (operator), Essar 50%.
• G&G
o G & G studies ongoing.
o Prospect evaluation ongoing.
• Seismic activities
o 3D PSDM finished.
• Drilling activities
o Preparation for drilling ongoing.
Block 116
• General
o Eni 100% (operator).
• G&G
o G & G studies ongoing.
• Seismic activities
o Interpretation of new 3D seismic in progress.
• Drilling activities
o NTR.
Block 120
• General
o Eni 66.67 % (operator), Kris Energy 33.33 %.
Block 122
• General
o Eni 100% (operator).
• G&G
o Prospect evaluation in progress.
• Seismic activities
o Final 3D PSTM interpretation ongoing.
• Drilling activities
o NTR.
Block 124
• General
o Eni 60% (operator), Santos 40%.
• Seismic activities
o Final 3D PSTM interpretation ongoing.
• Drilling activities
o NTR
Subsurface:
Preparing data and calculation for TGT RAR update (ULBH & 5.1 reservoirs and
TGT-H4 fault block).
Water shut-off and additional perforation proposals sent out 8th January.
Personnel:
NTR.
Suite 2001 Me Linh Point Tower 2 Ngo Duc Ke District 1 Ho Chi Minh City Vietnam Page 1
Telephone (84-8) 3829-9359 Facsimile (84-8) 3822 6106
Suite 2006, 20F Me Linh Point Tower, 2 Ngo Duc Ke St., Dist. 1, Ho Chi Minh City – Vietnam
Tel: (848) 3823 9525 - Fax: (848) 3823 9526
General:
NTR
Subsurface:
Monitoring and supporting CNV-5P-ST2 well clean-up using gas lift. Tentatively producing
4K blpd with 65-70% WCT.
HSE:
Personnel:
NTR.
Suite 2001 Me Linh Point Tower 2 Ngo Duc Ke District 1 Ho Chi Minh City Vietnam Page 1
Telephone (84-8) 3829-9359 Facsimile (84-8) 3822 6106
PETRONAS CARIGALI OVERSEAS SDN. BHD.
(A wholly-owned subsidiary of PETRONAS Carigali Sdn. Bhd.)
ROYAL CENTRE, TOWER B, 235 NGUYEN VAN CU STREET, DISTRICT 1,
HO CHI MINH CITY, VIETNAM
Tel: 84-8-38333575 – Fax: 84-8-38309955
PRODUCTION
BLOCKS 102&106
Thai Binh Project:
Participating interest:
• Average production of Thai Binh in December 2019 was 14.29
- PCOSB: 57.14%
MMscf/d.
- PVEP: 20%
- SPC: 22.86%
SUBSURFACE STUDY
• NTR
DEVELOPMENT
Ham Rong project
• To be updated upon divestment completion.
HSE & • NTR
Personnel • NTR
Open
PETROVIETNAM EXPLORATION PRODUCTION CORPORATION LTD
PETROVIETNAM DOMESTIC EXPLORATION PRODUCTION
OPERATING COMPANY LIMITED
15th Floor, Phu My Hung Petroleum Finance Trade Center Tel: (84-28) 5416 5050 / 5051
12 Tan Trao, Tan Phu Ward, District 7, HCMC Fax: (84-28) 5416 0616 / 0626
S. R Vietnam Email:pvep.poc@pvep.com.vn
- Stable gas production from Lan Tay, Lan Do and Phong Lan Dai gas
fields.
- Completed gas compressor engine change out as plan – both gas
compressors is running.
- Preparation for PLDCC-1X well is on-going. Planned spud in Q2 2019.
- Daily Production Rate:
Lan Tay:
+ Gas production: ~ 0.96 mmscmd
+ Condensate production: ~ 351.00 bcpd
Lan Do:
+ Gas production: ~ 5.39 mmscmd
+ Condensate production: ~ 210.00 bcpd
PLD:
+ Gas production: ~ 2.66 mmscmd
+ Condensate production: ~ 137.00 bcpd
Akhnaf Sayfullin
Chief Geologist
Suite 1304, Me Linh Point Tower, 2 Ngo Duc Ke Street, Ho Chi Minh City, Vietnam. Tel: +84-28-3824-6123 Fax: +84-28-3824-6122
General Information
HSE
NTR
Exploration
Personnel
NTR
Page 1 of 1
Registered Office: Britannia Corporate Management Limited, 196 Raleigh Quay, Governor Harbour, Grand Cayman, Cayman Islands, KY1 1104
VRJ Petroleum Company
3 Le Quy Don St., Ward 1, Vung Tau City
Telephone 0254-3510834, Facsimile 0254-3510835
Joint development of Nam Rong (Block 09-1) – Doi Moi (Block 09-3) United Area (NR-DM)
Participation: JV Vietsovpetro (operator) - 50%, VRJ - 50%
2. General
FDP update in progress.
3. Production
VRJ’s average oil production rate 1,740 BOPD (50% of NR-DM production), water cut
55% vol.
17 production wells are in operation with artificial gaslift.
Water injection to the NR-DM Basement 2,500 BWPD.
4. Administration
NTR
5. HSE
No accident or incident.
Kirill Skvortsov
General Director
Address: 105 Le Loi, Vung Tau
Tel: (84) (64) 3839-871
Fax: (84) (64) 3839-857
Monthly Scout Meeting Report
Joint Venture VIETSOVPETRO’s Activities in Dec., 2018
4th Jan. 2019
2. G&G activities:
Block 09-3/12:
- Carrying on Tieback CA TAM wells, EPCI for Ca Tam #1 WHP and pipelines
ongoing
- Carrying on interpretation 796 km2 3D Seismic on block 09-3/12
- Continue Prospects inventory and drilling Exploration Well CT-6X
Block 16-1/15:
- The CV-1X (The Golden Tiger) exploration well drilling was completed with good
result in Lower Miocene
- Work Program and Budget 2019 was completed
- Ongoing for Prospects evaluation
Block 12/11:
- Updating and Interpretation PSDM seismic TN-HA-E cluster
- Carrying on block evaluation phase 01 and Quyt A, F, C and E-F
- Continue Prospects inventory and well proposal TN-4X
- Work Program and Budget 2019 was completed
Block 04-3:
- Number of production wells: 03
- Production: gas - 390,000 SCMPD, condensate - 180 SCMPD
Block 42:
- Operator (PVEP) to report.
Block 09-1:
• Bach Ho field:
- Workover: 4 wells (701, 709, 2001B)
- Production daily average: 7731 tons/d;
- Water injection daily average: 12,223 m3/d.
• Rong field:
- Finish drilling 01 exploration well R 55.
- Production daily average: 1810 tons/d
- Water injection daily average: 3800 m3/d.