Giften George, PMP – Construction Planning Specialist

Objective ____________________________________________________________________________________
I am a PMP Certified Professional with 15 years experience including High Rise Building, Oil
& Gas, Power, and Marine Projects, looking for a challenging role in Construction Projects.
At any given point of time, I will have answer to 4 basic questions
 What is the Project Progress?
 What activities are going on in the project?
 What are the most critical activities in the project?
 What is the time and cost estimate to complete?
Note: I have transferable Iqama - General Mechanical Engineer, Saudi Council of Engineers
Certified, willing to relocate and available to join immediately. Preferred location - Red Sea
Coast
Areas of Specialization ________________________________________________________________________
Scope Management :
 Familiarity with construction Drawings, Specifications and Contracts
 Scope Definition and Scope Creep Monitoring
 Development and maintenance of work breakdown structure
Schedule Management :
 Familiarity with data sources for schedule development
 Collaboration of engineering, procurement and construction schedule logic
 Analysis and Development of Baseline, Recovery and Rebaseline Schedules
 Updates and Measurement of Project Schedule Progress
Cost Monitoring :
 Resource and Equipment Requirements
 Project Cost Estimation
 Collection of Cost Data and Monitoring of Costs
Interface with Site :
 Planning in coordination with Construction Team
 Coordination with Subcontractor to synchronize with project objectives
 Implementation of Work Authorization System
 Issuance of Weekly & Monthly Work Plans
 Productivity Monitoring
Reporting :
 Templates for Data Collection and Periodic Progress Reporting
 Earned Value Analysis and Project Performance Reporting
 Dashboard using Key Performance Indicators and S-Curves
Change Management :
 Organized documentation and planned record keeping to support potential Changes and Claims
 Variance Analysis and timely notification to client, consultant and subcontractors
 Baseline Change Management - Extension of Time Claims and Prolongation Cost
Employment History __________________________________________________________________________
1. Beijing Construction and Engineering Group - Saudi Arabia
Working Period : January 2013 to June 2020
Designation : Planning Manager
Project : Royal Commission Headquarter Building, Yanbu
Consultant : Saudi Arabian Parsons Ltd
Client : Royal Commission for Jubail and Yanbu
Giften George

 Worked in High Rise Building Construction Project


 Establish Contract Scope and assist Project Manager to identify and avoid Scope Creep
 Establish Integrated Master Schedule in P6 reflecting subcontractor schedules
 Establish Data Collection Procedures and Templates for Project Progress Measurement
 Develop Change Management Procedure to deal with Cost and Delay Events & Claims
 Develop Dashboard using Earned Value analysis, S curves and Key Performance Inicators
 Estimate and monitor Resource & Cost
 Develop Quantity Trackers for Concrete Pour, Steel Structure, Precast, Stone Cladding and Façade installation
 Update Project Progress, Measure Project Performance & Perform Earned Value Analysis
 Collects data and updates and produces scheduling reports
 Identify and investigate project schedule variance
 Assess the impacts of design/construction changes and and perform Variance Analysis
 Manage Project Reporting
 Provide Project Controls Management, including Baseline Change Management
 Interface with Client, Consultant, and Subcontractors in order keep project on track
 Contractual Letters to Client, Consultant, and Subcontractors

2. Dodsal Engineering & Construction Pte Ltd - Abu Dhabi


Working Period : December 2009 to February 2012
Designation : Senior Planning Engineer
Project 2 : Ruwais Refinery Expansion Project
Client : ADNOC
 Prepare Project Master Schedule & detailed working schedules using Primavera P6.2
 Prepare Invoicing Estimate (Cash Flow)
 Prepare Manpower & Equipment Histogram
 Monitor issue of monthly working plan to Construction Team including Time Schedule & Quantities
 Monitor Project Progress and manpower, equipment & material requirements
 Monitor Civil, Structural, Piping, Painting, Electrical & Instrumentation Productivities
 Monitor Daily, Weekly & Monthly Reporting to Client & Head Office
 Report to Project Control Manager & supervise 1 Planning Engineer
Project 1 : Ruwais Sulphur Expansion Project (RSE-III) – EPCC Project
Client : GASCO
 Updating of Project Master Schedule in Primavera P3
 Prepare & update detailed short term Construction schedules in Microsoft Project
 Daily, Weekly & Monthly Progress Reporting to Client & Head Office
 Prepare Major & Minor Shutdown schedules and live monitoring of the same
 Manpower & Equipment Tracking
 Monthly Progress Certification, Milestones achievement Monitoring & Invoicing
3. KLG Systel Ltd - Delhi, India
Working Period : March 2008 to November 2009
Designation : Enterprise Project Management Consultant
Project 3 : Implementation of Primavera at NTPC Ltd
Client : NTPC (National Thermal Power Corporation) Ltd
 Implementation of Primavera at NTPC Head Office, New Delhi
 Master Network, Level-2 Networks preparation for Dadri Power Plant expansion project
 Project Management Core Module, Web Module & Timesheets Configuration (version 6.2.1)
 Preparing Procedures for Project Plan preparation to Progress updation
 Customized Reports – ex: Engineering Delay, Delay Analysis, Exception Reports etc.
 Integration of Primavera with internal software of NTPC for engineering data auto-updation
 Integration of NTPC and BHEL (Contractor) databases for Main Plant Package progress updating
 Primavera P6.2.1 Core, Web & Timesheets module Training
Giften George

Project 2 : Implementation of Primavera at TYCO Fire & Security


Client : TYCO Fire & Security Ltd
 Project Management Core Module Configuration (version 6.2.1)
 Project Plan preparation for CCTV & ACS Projects, Delhi International Airport Limited (DIAL) Project
 Resource, Cost Assignments, S-Curve generation on weightage basis
 Reports Configuration
 Primavera P6.2.1 Core module Training
Project 1 : Implementation of Primavera at Avantha Power
Client : Avantha Power & Infrastructure Ltd
 Implementation of Primavera P6V7 at Avantha Power, Gurgaon
 Master Network, L2 packages preparation for power plant expansion project of Korba West Power Co Ltd
 Project Management Module, Web Module Configuration (version P6v7)
 Preparing Procedures for Project Plan preparation to Progress updating
 Customized Dashboards for executives in Primavera Web
 Customized Delay analysis reports

Primavera training imparted to other Companies


 Primavera P6 Core module Training to NHPC, Gurgaon - 5 days
 Primavera P6 Core module Training at Alpine Samsung, New Delhi - 5 days
 Primavera P6 Core, Web & Timesheets module Training at Jindal Steel & Power, Orissa - 7 days
 Primavera P6 Core module Training at L&T, Faridabad - 5 days
 Primavera P5 Core module Training at Chandigarh Engineering College, Chandigarh - 3 days
 Primavera P6.1 Core module Training at Samsung Heavy Industries, Noida - 5 days
 Primavera P6.2 Core module Training support at Emaar MGF, Delhi - 5 days
 Primavera P6V7 Core module Training at ITER India, Ahmedabad - 5 days
4. Sri Sabari Engineers - Jamnagar, India
Working Period : June 2007 to February 2008
Designation : Planning Engineer
Project Planning for Piping Works & Equipment Erection
 Resource planning & Project material & consumables inventory tracking
 Spool & pipe shifting, Scaffolding, Laying of Pipes, Alignment & Supporting
 Fit-up & Welding, NDT, Hydro-test
 Static equipment, pumps, fin fan coolers erection
 Heat exchangers, EOT cranes, compressors erection
Coordination with Client (Reliance) and site
 Collection of latest revised drawings
 Submission of weekly, monthly plans & daily progress reports
 Billing on monthly progress basis, Scope change amendments
 Issue of daily plan, latest drawings & collecting back old drawings
 Keeping track of Store material
5. Miscellaneous Experiences
Working Period : August 2004 to April 2007
 Worked in Macawer Beekay, Bluent Engineering, IBM Daksh & HCL Technologies BPO
 Voice based Technical Support to US & UK customers
6. Grace Infotech Pvt Ltd - Chennai, India
Working Period : August 2003 to April 2004
Designation : Engineer Trainee - CAD
 Develop 2D drawings & 3D models using AutoCAD
 Rendering AutoCAD 3D files using 3D Studio Max
Giften George

Academic Qualifications & Certifications _________________________________________________________


 B. Tech (Mechanical Engineering) from BCET, Pondicherry University in 2003 (72.5%)
 Piping Engineering from IIT Mumbai (Short Term Course), 2007
 Primavera Certification from KLG Systel Ltd, 2008
 Project Management Professional from PMI, 2020
Personal Particulars ___________________________________________________________________________
 Languages Known : English, Hindi, Malayalam, Tamil & Arabic (Beginner)