Term 1 Test 27 June 2013 Deferred
Term 1 Test 27 June 2013 Deferred
School of Business
DEPARTMENT OF OPERATIONS AND SUPPLY CHAIN MANAGEMENT
Instruction: There are three (3) questions in this exam, answer all (60marks).
You are allowed to illustrate your arguments with relevant practical examples.
QUESTION 1
Steel Works Foundry Limited is a private company operating in the industrial area of
Kitwe town. It is specialized in the manufacture of Mill Balls supplied to Konkola
Copper Mines Plc and Mopani Copper Mines Plc. The Mill Balls are used in the milling
operation to crash and grind copper containing rocks and ores into smaller particles used
in the process of making copper concentrates.
The following table of parameters has been extracted from the production department
monthly report:
Steel Works Foundry Ltd
May Production Report
2nd June 2013
Line A Line B Line C Line D
Production/day 2,000 2,000 2,000 2,000
Day Shift (hrs) 8 8 8 8
Afternoon Shift (hrs) 6 5 4 3
Night Shift (hrs) 8 8 8 8
Labor (Shopfloor) 95 80 75 94
Month Calendar (days) 30 30 30 30
Required:
(c) Compare the profits using the least profitable line as the base case. (10Marks)
QUESTION 2
QUESTION 3
How can you improve labor productivity from low to high say 0.2 to 0.9 units per man-
hour? (10Marks)