1. Visually inspect all gages and indicators for proper diesel engine
conditions
that no foreign objects are lying on, in, or around the package
4. Check for lube oil or fuel leakage around the engine, determine
faults immediately :
Page 1 of 3
Maintenance – Peaking Power Plant
Petrogas (Basin) Ltd.
8. Check the fuel supply and pressure to ensure the diesel supplay
contamination
chafing lines.
11. Inspect the electrical system visually as follows and correct any
faults immediately :
Check and provide rust and mildew attached to the battery head
/ battery
Check the water level of the battery for the starter motor
13. Walk around inspection to check for any possible leaks, tools and
Page 2 of 3
Maintenance – Peaking Power Plant
Petrogas (Basin) Ltd.
14. Start-up unit, record important parameters for base line data and
COMPLETION REMARKS/NOTES: