CONSIDERING B-1

2W S-1
1750

EQUIVALENT ULTIMATE
B-1
UNIFORM SUPERIMPOSED 4500
R1B-1 R2B-1
LOAD

for WuS-1

ρD = 3.89 KN/m2
ρL = 1.9 KN/m2
ρu = 1.2ρD+1.6ρL
ρu = 1.2(3.89 KN/m2)+1.6(1.9KN/m2)
= 7.708 KN/m2
s = 3.5m
l = 4.5m
WuS-1 = [(ρus)/6][3-(s/l)2]
= {(7.708)(3.5)]/6}[3-(3.5/4.5)2]
= 10.769 KN/m
2WuS-1

B-1
4500
R1B-1 R2B-1

WuB-1 = 2WuS-1 = 21.538 KN/m

for WuB-1
ULTIMATE LOAD FROM
BEAM'S SELF WEIGHT W = ɣth
ɣ = 23.6 KN/m3
t = 0.2 m
h = 0.4 m
W = 23.6(0.2)(0.4)
= 1.888 KN/m
Wu = 1.4W D
WuB-1 = 1.4(1.888 kN/m)
= 2.6432 KN/m

TOTAL ULTIMATE WuT(B-1) = 21.538 + 2.6432 = 24.1812 KN/m

LOAD FOR BEAMS WuT(B-1)


by symmetry:

B-1 Ru1B-1 = Ru2B-1 = RuB-1


4500

Ru1B-1 Ru2B-1
ΣFy = 0
2RuB-1 = WuT(B-1) (4.5)
WuT(B-1) = 24.1812 KN/m = 24.1812(4.5)
RuB-1 = 54.4077 KN
CONSIDERING B-2

1350
EQUIVALENT ULTIMATE W S-3 1075
UNIFORM SUPERIMPOSED B-2
LOAD R1B-2
3500
R2B-2

for WuS-3

ρD = 3.89 KN/m2
ρL = 3.8 KN/m2
ρu = 1.2ρD+1.6ρL
ρu = 1.2(3.89 KN/m2)+1.6(3.8KN/m2)
= 10.748 KN/m2
s = 2.15m
l = 3.5m
WuS-3 = [(ρus)/6][3-(s/l)2]
= {(7.708)(2.15)]/6}[3-(2.15/3.5)2]
= 10.1008 KN/m

WuS-3

B-2
3500
R1B-2 R2B-2

WuB-2 = WuS-3 = 10.1008 KN/m

for WuB-2
ULTIMATE LOAD FROM
BEAM'S SELF WEIGHT W = ɣth
ɣ = 23.6 KN/m3
t = 0.2 m
h = 0.4 m
W = 23.6(0.2)(0.4)
= 1.888 KN/m
Wu = 1.4W D
WuB-2 = 1.4(1.888 kN/m)
= 2.6432 KN/m

TOTAL ULTIMATE WuT(B-2) = 10.1008 + 2.6432 = 12.744 KN/m

LOAD FOR BEAMS WuT(B-2)


by symmetry:
B-2
3500
Ru1B-2 = Ru2B-2 = RuB-2
R1B-2 R2B-2
ΣFy = 0
WuT(B-2) = 12.744 KN/m 2RuB-2 = WuT(B-2) (3.5)
= 12.744(3.5)
RuB-2 = 22.302 KN
CONSIDERING CB-1

EQUIVALENT ULTIMATE W S-3 W S-4


UNIFORM SUPERIMPOSED CB-1
2150
LOAD R1CB-1 R2CB-1

for WuS-4 for WuS-3

ρD = 3.89 KN/m2 ρD = 3.89 KN/m2


ρL = 3.8 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+1.6ρL ρu = 1.2ρD+1.6ρL
ρu = 1.2(3.89 KN/m2)+1.6(3.8KN/m2) ρu = 1.2(3.89 KN/m2)+1.6(3.8KN/m2)
= 10.748 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.15m
WuS-4 = ρu(s) WuS-3 = ρu(s/3)
= 10.748(0.7) = 10.748(2.15/3)
= 7.5236 KN/m = 7.7027 KN/m

WuS-3+WuS-4

CB-1
2150
R1CB-1 R2CB-1

WuCB-1 = 7.7027+7.5236 = 15.2263 KN/m

for WuCB-1
ULTIMATE LOAD FROM
BEAM'S SELF WEIGHT W = ɣth
ɣ = 23.6 KN/m3
t = 0.2 m
h = 0.4 m
W = 23.6(0.2)(0.4)
= 1.888 KN/m
Wu = 1.4W D
WuCB-1 = 1.4(1.888 kN/m)
= 2.6432 KN/m

WuT(CB-1) = 15.2263 + 2.6432 = 17.8695 KN/m


TOTAL ULTIMATE
LOAD FOR BEAMS by symmetry:
WuT(CB-1)
R1CB-1 = R2CB-1 = RCB-1
CB-1
2150
R1CB-1 R2CB-1 ΣFy = 0
2RCB-1 = WuT(CB-1) (2.15)
WuT(CB-1) = 17.8695 KN/m = 17.8695(2.15)
RuCB-1 = 19.2097 KN
A B C
7000 2500

TOP OF ROOF BEAM


RG-2 RG-1
WuT(RG-1)= 13.8782 KN/m
WuT(RG-2)= 14.539 KN/m
WuT(G-4) = 14.8535 KN/m
WuT(G-5) = 28.5787 KN/m
SECOND FLR. LVL. Ru(B-1) = 54.4077 KN
G-5 G-4

GROUND FLR. LVL.

TRANSVERSE FRAME 1

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-1 WuS-2

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


ρD = ρslab + ρFF ρD = ρslab + ρFF
= ɣt + ρFF = ɣt + ρFF
= 23.6(0.1)+1.53 = 23.6(0.1)+1.53
= 3.89 KN/m2 = 3.89 KN/m2
ρL = 1.9 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9) = 1.2(3.89)+1.6(3.8)
= 7.708 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.5m
WuS-1 = ρu(s/3) WuS-2 = ρu(s/3)
= 7.708(3.5/3) = 10.748(2.5/3)
= 8.9927 KN/m = 8.9567 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-4 & WuRG-1 WuRG-2 WuG-5

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.25m
h = 0.4m h = 0.5m h = 0.5m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.5) = 23.6(0.25)(0.5)
= 1.888KN/m = 2.36KN/m = 2.95KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.36) = 1.4(2.95)
= 2.6432 KN/m = 3.304 KN/m = 4.13 KN/m

WuWall1 WuWall2 WuWall3

ɣt = 2.97+2(0.24) ɣt = 2.84+2(0.24) ɣt = 2.97+0.24


= 3.45 KN/m2 = 3.32 KN/m2 = 3.21 KN/m2
h = 3.2m h = 0.7m h = 2.5m
W = ɣth W = ɣth W = ɣth
= 3.45(3.2) = 3.32(0.7) = 3.21(2.5)
= 11.04KN/m = 2.324 KN/m = 8.025 KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(11.04) = 1.4(2.324) = 1.4(8.025)
= 15.456 KN/m = 3.2536 KN/m = 11.235 KN/m

FROM B-1
WuT(B-1) by symmetry:

B-1
Ru1B-1 = Ru2B-1 = RuB-1
Ru1B-1 Ru2B-1
ΣFy = 0
2RuB-1 = WuT(B-1) (4.5)
WuT(B-1) = 24.1812 KN/m
= 24.1812(4.5)
RuB-1 = 54.4077 KN

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-5 CONSIDERING G-4

WuT(G-5) = WuG-5 + WuS-1 + WuWall1 WuT(G-4) = WuG-4 + WuS-2 + WuWall2


= 4.13 + 8.9927 + 15.456 = 2.6432 + 8.9567 + 3.2536
= 28.5787 KN/m = 14.8535 KN/m
CONSIDERING RG-2 CONSIDERING RG-1

WuT(RG-2) = WuRG-2 + WuWall3 WuT(RG-1) = WuRG-1 + WuWall3


= 3.304 + 11.235 = 2.6432 + 11.235
= 14.539 KN/m = 13.8782 KN/m
A B C
7000 2500

TOP OF ROOF BEAM


RG-2 RG-1
WuT(RG-1)= 2.6432 KN/m
WuT(RG-2)= 3.304 KN/m
WuT(G-6) = 20.5566 KN/m
WuT(G-7) = 22.1154 KN/m
SECOND FLR. LVL. 2Ru(B-1) = 108.8154 KN
G-7 G-6

GROUND FLR. LVL.

TRANSVERSE FRAMES 2, 4, & 6

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-1 WuS-2

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


ρD = ρslab + ρFF ρD = ρslab + ρFF
= ɣt + ρFF = ɣt + ρFF
= 23.6(0.1)+1.53 = 23.6(0.1)+1.53
= 3.89 KN/m2 = 3.89 KN/m2
ρL = 1.9 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9) = 1.2(3.89)+1.6(3.8)
= 7.708 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.5m
WuS-1 = ρu(s/3) WuS-2 = ρu(s/3)
= 7.708(3.5/3) = 10.748(2.5/3)
= 8.9927 KN/m = 8.9567 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-6 & WuRG-1 WuRG-2 WuG-7

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.25m
h = 0.4m h = 0.5m h = 0.5m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.5) = 23.6(0.25)(0.5)
= 1.888KN/m = 2.36KN/m = 2.95KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.36) = 1.4(2.95)
= 2.6432 KN/m = 3.304 KN/m = 4.13 KN/m

FROM B-1
WuT(B-1) by symmetry:

B-1
Ru1B-1 = Ru2B-1 = RuB-1
Ru1B-1 Ru2B-1
ΣFy = 0
2RuB-1 = WuT(B-1) (4.5)
WuT(B-1) = 24.1812 KN/m
= 24.1812(4.5)
2RuB-1 = 108.8154
RuB-1 = 54.4077 KN

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-7 CONSIDERING G-6

WuT(G-7) = WuG-7 + 2WuS-1 WuT(G-6) = WuG-6 + 2WuS-2


= 4.13 + 2(8.9927) = 2.6432 + 2(8.9567)
= 22.1154 KN/m = 20.5566 KN/m

CONSIDERING RG-2 CONSIDERING RG-1

WuT(RG-2) = WuRG-2 WuT(RG-1) = WuRG-1


= 3.304 KN/m = 2.6432 KN/m
A B C
7000 2500

TOP OF ROOF BEAM


RG-2 RG-1
WuT(RG-1)= 2.6432 KN/m
WuT(RG-2)= 3.304 KN/m
WuT(G-6) = 20.5566 KN/m
WuT(G-7) = 37.5714 KN/m
SECOND FLR. LVL. 2Ru(B-1) = 108.8154 KN
G-7 G-6

GROUND FLR. LVL.

TRANSVERSE FRAMES 3 & 5

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-1 WuS-2

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


ρD = ρslab + ρFF ρD = ρslab + ρFF
= ɣt + ρFF = ɣt + ρFF
= 23.6(0.1)+1.53 = 23.6(0.1)+1.53
= 3.89 KN/m2 = 3.89 KN/m2
ρL = 1.9 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9) = 1.2(3.89)+1.6(3.8)
= 7.708 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.5m
WuS-1 = ρu(s/3) WuS-2 = ρu(s/3)
= 7.708(3.5/3) = 10.748(2.5/3)
= 8.9927 KN/m = 8.9567 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-6 & WuRG-1 WuRG-2 WuG-7

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.25m
h = 0.4m h = 0.5m h = 0.5m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.5) = 23.6(0.25)(0.5)
= 1.888KN/m = 2.36KN/m = 2.95KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.36) = 1.4(2.95)
= 2.6432 KN/m = 3.304 KN/m = 4.13 KN/m
WuWall1

ɣt = 2.97+2(0.24)
= 3.45 KN/m2
h = 3.2m
W = ɣth
= 3.45(3.2)
= 11.04KN/m
Wu = 1.4W D
= 1.4(11.04)
= 15.456 KN/m

FROM B-1
WuT(B-1) by symmetry:

B-1
Ru1B-1 = Ru2B-1 = RuB-1
Ru1B-1 Ru2B-1
ΣFy = 0
2RuB-1 = WuT(B-1) (4.5)
WuT(B-1) = 24.1812 KN/m
= 24.1812(4.5)
RuB-1 = 54.4077 KN

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-7 CONSIDERING G-6

WuT(G-7) = WuG-7 + 2WuS-1 +WuWall1 WuT(G-6) = WuG-6 + 2WuS-2


= 4.13 + 2(8.9927) + 15.456 = 2.6432 + 2(8.9567)
= 37.5714 KN/m = 20.5566 KN/m

CONSIDERING RG-2 CONSIDERING RG-1

WuT(RG-2) = WuRG-2 WuT(RG-1) = WuRG-1


= 3.304 KN/m = 2.6432 KN/m
A B C
7000 2500

TOP OF ROOF BEAM WuT(RG-1)= 2.6432 KN/m


RG-2 RG-1
WuT(RG-2)= 3.304 KN/m
WuT(G-6) = 20.5566 KN/m
WuT(G-7).1= 28.5787 KN/m
WuT(G-7).2= 38.6795 KN/m
SECOND FLR. LVL. Ru(B-1) = 54.4077 KN
G-7 G-6 Ru(CB-1) = 19.2097 KN

GROUND FLR. LVL.

TRANSVERSE FRAME 7

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-1 WuS-2 WuS-3

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


ρD = ρslab + ρFF ρD = ρslab + ρFF ρD = ρslab + ρFF
= ɣt + ρFF = ɣt + ρFF = ɣt + ρFF
= 23.6(0.1)+1.53 = 23.6(0.1)+1.53 = 23.6(0.1)+1.53
= 3.89 KN/m2 = 3.89 KN/m2 = 3.89 KN/m2
ρL = 1.9 KN/m2 ρL = 3.8 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9) = 1.2(3.89)+1.6(3.8) = 1.2(3.89)+1.6(3.8)
= 7.708 KN/m2 = 10.748 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.5m s = 2.15m
WuS-1 = ρu(s/3) WuS-2 = ρu(s/3) l = 3.5m
= 7.708(3.5/3) = 10.748(2.5/3) WuS-3 = [(ρus)/6][3-(s/l)2]
= 8.9927 KN/m = 8.9567 KN/m ={(10.748)(2.15)]/6}
[3-(2.15/3.5)2]
= 10.1008 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-6 & WuRG-1 WuRG-2 WuG-7

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.25m
h = 0.4m h = 0.5m h = 0.5m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.5) = 23.6(0.25)(0.5)
= 1.888KN/m = 2.36KN/m = 2.95KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.36) = 1.4(2.95)
= 2.6432 KN/m = 3.304 KN/m = 4.13 KN/m
WuWall1 WuWall2

ɣt = 2.97+2(0.24) ɣt = 2.84+2(0.24)
= 3.45 KN/m2 = 3.32 KN/m2
h = 3.2m h = 0.7m
W = ɣth W = ɣth
= 3.45(3.2) = 3.32(0.7)
= 11.04KN/m = 2.324 KN/m
Wu = 1.4W D Wu = 1.4W D
= 1.4(11.04) = 1.4(2.324)
= 15.456 KN/m = 3.2536 KN/m

FROM B-1 FROM CB-1


WuT(B-1) by symmetry: by symmetry:
WuT(CB-1)

B-1
Ru1B-1 = Ru2B-1 = RuB-1 CB-1
1505
R1CB-1 = R2CB-1 = RCB-1
Ru1B-1
ΣFy = 0
Ru2B-1
R1CB-1 ΣFy = 0
R2CB-1

2RuB-1 = WuT(B-1) (4.5) 2R = WuT(CB-1) (2.15)


WuT(B-1) = 24.1812 KN/m WuT(CB-1) = 17.8695 KN/m CB-1
= 24.1812(4.5) = 17.8695(2.15)
RuB-1 = 54.4077 KN RuCB-1 = 19.2097 KN

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-7 CONSIDERING G-6 CONSIDERING RG-2

WuT(G-7).1 = WuG-7 + WuS-1 + WuWall1 WuT(G-6) = WuG-6 + 2WuS-2 WuT(RG-2) = WuRG-2


= 4.13 + 8.9927 + 15.456 = 2.6432 + 2(8.9567) = 3.304 KN/m
= 28.5787 KN/m = 20.5566 KN/m
WuT(G-7).2 = WuG-7 + WuS-1 + WuS-3 + WuWall1 CONSIDERING RG-1
= 4.13 + 8.9927 + 10.1008 + 15.456
= 38.6795 KN/m WuT(RG-1) = WuRG-1
= 2.6432 KN/m
A B C
7000 2500

TOP OF ROOF BEAM


RG-2 RG-1
WuT(RG-1)= 13.8782 KN/m
WuT(RG-2)= 14.539 KN/m
WuT(G-4) = 14.8535 KN/m
WuT(G-5) = 19.586 KN/m
SECOND FLR. LVL.
G-5 G-4

GROUND FLR. LVL.

TRANSVERSE FRAME 8

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS

WuS-2

ɣ = 23.6 KN/m3
ρD = ρslab + ρFF
= ɣt + ρFF
= 23.6(0.1)+1.53
= 3.89 KN/m2
ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(3.8)
= 10.748 KN/m2
s = 2.5m
WuS-2 = ρu(s/3)
= 10.748(2.5/3)
= 8.9567 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-4 & WuRG-1 WuRG-2 WuG-5

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.25m
h = 0.4m h = 0.5m h = 0.5m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.5) = 23.6(0.25)(0.5)
= 1.888KN/m = 2.36KN/m = 2.95KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.36) = 1.4(2.95)
= 2.6432 KN/m = 3.304 KN/m = 4.13 KN/m

WuWall1 WuWall2 WuWall3

ɣt = 2.97+2(0.24) ɣt = 2.84+2(0.24) ɣt = 2.97+0.24


= 3.45 KN/m2 = 3.32 KN/m2 = 3.21 KN/m2
h = 3.2m h = 0.7m h = 2.5m
W = ɣth W = ɣth W = ɣth
= 3.45(3.2) = 3.32(0.7) = 3.21(2.5)
= 11.04KN/m = 2.324 KN/m = 8.025 KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(11.04) = 1.4(2.324) = 1.4(8.025)
= 15.456 KN/m = 3.2536 KN/m = 11.235 KN/m

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-5 CONSIDERING G-4

WuT(G-5) = WuG-5 + WuWall1 WuT(G-4) = WuG-4 + WuS-2 + WuWall2


= 4.13 + 15.456 = 2.6432 + 8.9567 + 3.2536
= 19.586 KN/m = 14.8535 KN/m

CONSIDERING RG-2 CONSIDERING RG-1

WuT(RG-2) = WuRG-2 + WuWall3 WuT(RG-1) = WuRG-1 + WuWall3


= 3.304 + 11.235 = 2.6432 + 11.235
= 14.539 KN/m = 13.8782 KN/m
1 4500
2 4500
3 4500
4 4500
5 4500
6 4500
7 4500
8

TOP OF ROOF BEAM


RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

WuT(RG-1)= 2.6432 KN/m


WuT(G-3) = 28.8682 KN/m
WuT(G-3a) = 20.7424 KN/m
SECOND FLR. LVL.
G-3 G-3 G-3 G-3 G-3 G-3 G-3a

GROUND FLR. LVL.

LONGITUDINAL FRAME A

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS

WuS-1

ɣ = 23.6 KN/m3
ρD = ρslab + ρFF
= ɣt + ρFF
= 23.6(0.1)+1.53
= 3.89 KN/m2
ρL = 1.9 KN/m2
ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9)
= 7.708 KN/m2
s = 3.5m
l = 4.5m
WuS-1 = [(ρus)/6][3-(s/l)2]
= {(7.708)(3.5)]/6}[3-(3.5/4.5)2]
= 10.769 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-3 WuG-3a WuRG-1

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


t = 0.2m t = 0.2m t = 0.2m
h = 0.4m h = 0.8m h = 0.4m
W = ɣth W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 23.6(0.2)(0.8) = 23.6(0.2)(0.4)
= 1.888KN/m = 3.776 KN/m = 1.888KN/m
Wu = 1.4W D Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(3.776) = 1.4(1.888)
= 2.6432 KN/m = 5.2864 KN/m = 2.6432 KN/m

WuWall1

ɣt = 2.97+2(0.24)
= 3.45 KN/m2
h = 3.2m
W = ɣth
= 3.45(3.2)
= 11.04KN/m
Wu = 1.4W D
= 1.4(11.04)
= 15.456 KN/m

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-3 CONSIDERING G-3a CONSIDERING RG-1

WuT(G-3) = WuG-3 + WuS-1 + WuWall1 WuT(G-3a) = WuG-3a + WuWall1 WuT(RG-1) = WuRG-1


= 2.6432 + 10.769 + 15.456 = 5.2864 + 15.456 = 2.6432 KN/m
= 28.8682 KN/m = 20.7424 KN/m
1 4500
2 4500
3 4500
4 4500
5 4500
6 4500
7 4500
8

TOP OF ROOF BEAM


RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1
WuT(RG-1)= 2.6432 KN/m
WuT(G-2).1= 40.921 KN/m
WuT(G-2).2= 22.3987 KN/m
WuT(G-2).3= 14.696 KN/m
SECOND FLR. LVL. RuB-2 = 22.302 KN/m
G-2 G-2 G-2 G-2 G-2 G-2 G-2

GROUND FLR. LVL.

LONGITUDINAL FRAME B

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-1 WuS-2 WuS-3

ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3 ɣ = 23.6 KN/m3


ρD = ρslab + ρFF ρD = ρslab + ρFF ρD = ρslab + ρFF
= ɣt + ρFF = ɣt + ρFF = ɣt + ρFF
= 23.6(0.1)+1.53 = 23.6(0.1)+1.53 = 23.6(0.1)+1.53
= 3.89 KN/m2 = 3.89 KN/m2 = 3.89 KN/m2
ρL = 1.9 KN/m2 ρL = 3.8 KN/m2 ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(1.9) = 1.2(3.89)+1.6(3.8) = 1.2(3.89)+1.6(3.8)
= 7.708 KN/m2 = 10.748 KN/m2 = 10.748 KN/m2
s = 3.5m s = 2.5m s = 2.15m
l = 4.5m l = 3.5m l = 3.5m
WuS-1 = [(ρus)/6][3-(s/l)2] WuS-2 = [(ρus)/6][3-(s/l)2] WuS-3 = ρu(s/3)
= {(7.708)(3.5)]/6}[3-(3.5/4.5)2] = = 10.748(2.15/3)
= 10.769 KN/m {(10.748)(2.5)]/6}[3-(2.5/4.5)2] = 7.7027 KN/m
= 12.0528 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-2 & WuRG-1 WuWall1

ɣ = 23.6 KN/m3 ɣt = 2.97+2(0.24)


t = 0.2m = 3.45 KN/m2
h = 0.4m h = 3.2m
W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 3.45(3.2)
= 1.888KN/m = 11.04KN/m
Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(11.04)
= 2.6432 KN/m = 15.456 KN/m

FROM B-2
by symmetry:
WuT(B-2)

Ru1B-2 = Ru2B-2 = RuB-2


B-2
3500
ΣFy = 0
R1B-2 R2B-2 2RuB-2 = WuT(B-2) (3.5)
= 12.744(3.5)
WuT(B-2) = 12.744 KN/m RuB-2 = 22.302 KN

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-2 CONSIDERING G-2 CONSIDERING RG-1

WuT(G-2).1 = WuG-2 + WuWall1 + WuS-1 + WuS-2 WuT(G-2).3 = WuG-2 + WuS-2 WuT(RG-1) = WuRG-1
= 2.6432 + 15.456 + 10.769 + 12.0528 = 2.6432 + 12.0528 = 2.6432 KN/m
= 40.921 KN/m = 14.696 KN/m
WuT(G-2).2 = WuG-2 + WuS-2 + WuS-3
= 2.6432 + 12.0528 + 7.7027
= 22.3987 KN/m
1 4500
2 4500
3 4500
4 4500
5 4500
6 4500
7 4500
8

TOP OF ROOF BEAM


RG-1 RG-1 RG-1 RG-1 RG-1 RG-1 RG-1

WuT(RG-1)= 2.6432 KN/m


WuT(G-1) = 17.9496 KN/m

SECOND FLR. LVL.


G-1 G-1 G-1 G-1 G-1 G-1 G-1

GROUND FLR. LVL.

LONGITUDINAL FRAME C

EQUIVALENT ULTIMATE UNIFORM LOAD


FOR THE SUPERIMPOSED DEAD AND LIVE LOADS
WuS-2

ɣ = 23.6 KN/m3
ρD = ρslab + ρFF
= ɣt + ρFF
= 23.6(0.1)+1.53
= 3.89 KN/m2
ρL = 3.8 KN/m2
ρu = 1.2ρD+ 1.6ρL
= 1.2(3.89)+1.6(3.8)
= 10.748 KN/m2
s = 2.5m
l = 3.5m
WuS-2 = [(ρus)/6][3-(s/l)2]
= {(10.748)(2.5)]/6}[3-(2.5/4.5)2]
= 12.0528 KN/m
FACTORED DEAD LOADS FROM BEAM'S SELF-WEIGHT
AND WALLS ACTING ALONG THE BEAM

WuG-1 & WuRG-1 WuWall2

ɣ = 23.6 KN/m3 ɣt = 2.84+2(0.24)


t = 0.2m = 3.32 KN/m2
h = 0.4m h = 0.7m
W = ɣth W = ɣth
= 23.6(0.2)(0.4) = 3.32(0.7)
= 1.888KN/m = 2.324 KN/m
Wu = 1.4W D Wu = 1.4W D
= 1.4(1.888) = 1.4(2.324)
= 2.6432 KN/m = 3.2536 KN/m

EQUIVALENT ULTIMATE UNIFORM LOADS

CONSIDERING G-1 CONSIDERING RG-1

WuT(G-1) = WuG-1 + WuWall2 + WuS-2 WuT(RG-1) = WuRG-1


= 2.6432 + 3.2536 + 12.0528 = 2.6432
= 17.9496 KN/m