ELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
‘Month: 30 Jun’2020.
Name :Razan Mehedi Mukul
Desination: General Manager
Date of Reporting: 7 July’ 2020.
‘Working place: Manikgonj District
Days present: 20 Dayes, _Dayslate: 6(COVID-18) Days eave: 4
Special initiative taken to yield good result next month: 1 st Floor civil work
finish,
‘Any outstanding achievement: Soil filing and repairing in the 33.50 land.
Period Detail (Major) Activities Remark |
1 week ‘We are communication with advocate, Manikgon] |
1" day to7™ court, sadder Thana Manikgonj. Repairing the
Kapalipara land. 1" floor roof coasting Is finish.
7 We are having bell in this case. |
2 week ‘Communication with SS. office Ds office. Look|
8" dayto 14" | after Kapalypara land, second time four track sol |
filing to repair the wreckage . Z
Fook Fiderly Initiative far Newelapment (FIN)'s
15" day to 21" | executive comity meeting about made a sale
comity. Iron gate fitting are made in front of the
office, The massanary brick works insite building
ID office Bandutia Manikgon). a
a” week Civil work Lintile shattering, brick masonry, two
22" dayto3ist |coloum making front site of building.
| Communication with SS. officer, Ad, S1&
l advocate. li
is from to submitted by 7* of the next month)
hi by ) 4
Signature of the
Reporting Officer.ELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
Month: 31 May’ 2020.
Name :Razan Mehedi Mukul Date of Reporting: 7 Jun’ 2020.
Desination: General Manager Working place: Manikgon) District
Days present: 1 Dayes, Days late: 0 Days leave: 30
Special Initiative taken to yield good result next month: Coved -19 problem is
‘normal & Communication by mobile CEO & office staff regularly .
‘Any outstanding achievement: Look after the EID office & Kapalypara land.
Period Detail (Major) Activities [Remark
T week Communication with CEO, office staff. 1 st floor
1"dayto7" | civil work is stop. Govd Public holiday cause/
Problem Coved-19.
2 week Second time site engineer contact office staff by
8" dayto 14" | mobile about 1 st floor civil work measurement
Communication with CEO, office staff. 1 st floor
civil work is stop. Govd Public holiday cause/
| Problem Coved-19.
hace — ——_— a i
3" week Repair the EID’s fond site road. Communication
15" day to 21 | with CEO, office staff. 1 st floor civil work is stop.
} | Gowd Public holiday cause Problem Coved-1,
a week Contact with S.1 Shivalaya thana, Manikgonj sador
22" day to 3ist | thana S.1. Communication with CEO, office staff.
Site engineer made 2” bill of 1 st floor civil work.
Gove Public holiday cause/ Problem Coved-19.
(This from to submitted by 7 of the next month)
Signature of the
Reporting OfficerELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
Month: 30 Apri’ 2019.
Name :Razan Mehedi Mukul Date of Reporting: 7 May’ 2020.
Desination: General Manager ‘Working place: Manikgonj District
Days present: 0 Dayes, Days late: No, Daysleave: 30
‘Special initiative taken to yield good result next month: Coved -19 problem is.
normal.
‘Any outstanding achievement: Look after the EIO office & Kapalypara land.
[Period [Detail (Major Activities Remark
week Repairs Kapalypara land, communication ‘with |
1" day to7™™ CEO, office staff. 1 st floor civil work is stop. |
Gove Public holiday cause/ Problem Coved-19.
2 week ‘Communication with CEO, office staff, 1 st
8 day to 14" | civil work is stop. Govd Public holiday cause/| |
Problem Coved-19. |
F week Communication with CEO, office staff. 7 st floor
15" day to 21" | civil work is stop. Govd Public holiday cause/
Probl .
a week Comi ion with CEO, office staff. 1 st floor
22" day to 31st | civil work is stop. Govd Public holiday cause/
Problem Coved-19. First time site engineer
contact office staff by mobile about 1 st floor
Gil work measurement
& —— Bes
(This from to submitted by 7" of the next month)
Radel
‘Signature of the
Reporting OfficerELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
Month: 31. March’2020.
Name :Razan Mehedi Mukul Date of Reporting: 7 Aprl'2020.
Desination: General Manager Working place: Manikgon District
Days present: 25 Dayes, Days late: 0 Days leave: 6
‘Special initiative taken to yield good result next month: 1 st Floor activities is
going.
‘Any outstanding achievement: Earth filing & ground floor civil work is goimg,
tall (Major) Activ
Remark
Date of Miss case, Prise distribution the wener
parson, visited the social welfare office
Shivalaya, Saturia, Manikgonj Sodor & Shohor
social welfare office in manikgom) District.
Transfer the signboard and distribution the
blanket in the Elderly Initiative for Development
(€1D)’s benefice
2 week ‘Survey the EID’s Kapalypara land, miscues,
8"dayto14" | meeting with S. P office. Monitoring the S.S.S
office, D.s.s office, civil work activities is going
the EID office Bandutia Manikgon).
3 week ‘We try to collection Survey report & Rabish. Visit
1S" dayto21" | the social welfare office Shivalaya, Saturia,
Manikgonj sodor & shohor social welfare office in
‘manikgomj District. Transfer the signboard and
distribution the blanket in the Elderly initiative
for Development (E1D)’s beneficiaries in. Bandutia
‘Manikgonj. Meeting with develops temporary
comity and community people. Schoo! class
room's wall is making. Monitoring the D.s.s office
and EC member of EID.
a week Palisading work, Clam making & Building
| 22% day to 31st | structure activities is going in the EID office
| Bandutia Manikgonj, COVID-19 problem Meeting
with contractor closed civil work.
(This from to submited by 7" of the next month) Pala —
‘Signature of the
Reporting OfficerELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
‘Month: 29 February’2020.
Name :Razan Mehedi Mukul Date of Reporting: 7 March’2020.
Desination: General Manager Working place: Manikgonj District
Days present: 25 Dayes, _Daystate: 0 Days leave: 4
‘Special initiative taken to yield good result next month: 1 st Floor activities is
going.
‘Any outstanding achievement: Earth filing & 2 nd floor calm work is goimg.
Period Detail (Major) Act —__Tremark
T" week ‘We are communication with advocate, Manikgonj | i
Y"dayto7™ — | court, sadder Thana Manikgonj. Meeting with |
| local community about EID’s present situation, |
| Building structure activities is going in the EID |
| office Bandutia Manikgonj. We are having bell in
this case
2 week Social welfare Officers visit the E1D’s Bandutia
8" dayto14” | office. Look after Kapalypara land, miscues.
meeting with S.5S office D.s.s office.
37 week Civil work activities Is going in the EID office |
415% day to 21" | Bandutia Manikgoni. We try to collection Survey | |
report & Rabish. Visit the social welfare office
Shivalaya, Saturia, Manikgonj sodor & shohor |
social welfare office in manikgomj District. |
‘Transfer the signboard and distribution the
blanket in the Eldery Initiative for Development
(C10)'s beneficiaries in Bandutia Manikgonj-
Meeting with develops temporary comity and
community people. School class room's wall is
making. Monitoring the D.ss office and EC
___| member of E10.
a week EID’s spores with benefiari in kapalipara land.
| 22" day to 31st | Made 2 radimate wall Palisading work, Clam
making & Building structure activities is going in
L___| the 10 office Bandutia Manikgoni.
(This from to submitted by 7" of the next month)
soleus” ‘of the
Reporting OfficerELDERLY INITIAIVE FOR DEVELOPMENT (EID)
MONTHLY ACTIVITY REPORT
‘Month: 31 January’2020.
Name :Razan Mehedi Mukul Date of Reporting: 7 February'2020.
Desination: General Manager ‘Working place: Manikgonj District
Days present: 18 Dayes, Dayslate:4 Days leave: 9
‘Special initiative taken to yield good result next month: 1 st Floor activities is
going.
Any outstanding achieverner
arth fling & ground floor civil work is goimg.
Detail (Major) Activities Remark
T" week 1 floor Roof, Earth filling & 1 st floor civil work is
T*dayto7™ —_| going. Clam making & Building structure activities
is going in the EID office Bandutia Manikgonj.
Meeting with D. s. s office manikgonj. Meeting
with local councillor & Community people about
EID problem,
FF week Survey the EI0’S Kapalypara land, miscues,
8" day to 14" | meeting with 5. P office. Monitoring the SSS
office, D.ss office, civil work activities is going
| the EID office Manikgonj. Ms. Halal, Mofiz,
Shafaly, Ashraf, Uzzll, Santu, Chanchan & other
| people attacked E10's General manager. In that
time E10’ staff local people & police rescued him
and admitted in. Marikgonj Sadar Hospital. £10’s
General manager proceeded against the
| attackers in Manikgonj Sadar Police Station. After
| that Mr Sentu & Shamima cased against CEO,
General manager, Contractor & others.
3 week st floor’s work is going on. We have tried to
| 15" day to 21" _| collect survey report & rabish. Case is going on.
4 week Building structure activities is going in the EID
22" day to 31st | office Bandutia Manikgonj. 1° floor roof coasting
[is finish, We are having bell in this case.
| 23/01/2020 Another case in manikgon) court.
(This from to submitted by 7* of the next month) Balat—
Signature of the
Reporting Officer