Professional Documents
Culture Documents
Cassiar - Weak Ground Presentation
Cassiar - Weak Ground Presentation
Cassiar - Weak Ground Presentation
CASSIAR INCLINE
CAVE MINE –
LESSONS LEARNED
Presented by: Jarek Jakubec
CASSIAR
CASSIAR MINE, BC
VANCOUVER
CAVING 2014
CASSIAR
WEAKEST ROCK
MASS OF ALL
CAVING MINES
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASIAR MINE, BC CHRYSOTILE
CASSIARSEAMS
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR – UNDERCUT BLASTING
• Undercut blast holes were 50mm, undercut rings were drilled to a maximum
height of 13m. In total 8 holes were drilled in the fan with 1m burden and
1.5m spacing. There were cases of drillholes being pre-loaded two weeks.
• Holes were pneumatically loaded with AMFO over the leg wires of electric
caps (needed special permission from mining inspectorate). Pre-loading sg
was 0.84 g/cm3 and this increased to 0.95-1.05 loaded. Toe priming was
initially exercised to ensure complete breaking and to minimize cut-offs.
Because of no major problem was experienced with blasting later collar
priming was introduced. Instantaneous blasting caps were used for every
hole and the delays required between rings were programmed on CIL
sequential blasting machine. Pre-loading and pre-priming was required
because of movement in weak rock mass was anticipated. Because of
problem with contamination with plastic NONEL blasting techniques could
not be introduced.
• Hand-drilled slash techniques was used to establish a breaking slot because
of difficulty of rising in the highly sheared serpentinite. 2.7 m3 LHD units
were used to pull out the swell from each blast until the drawpoint brow was
reached. Lag of 3-4 rings were kept between the adjacent undercut tunnels.
CAVING 2014
CASSIAR – UNDERCUT BLASTING
CAVING 2014
CASSIAR - UNDERCUTTING
CAVING 2014
CASSIAR – PRODUCTION RATES
6,000
5,000
4,000
tones/day
3,000
2,000
1,000
0
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
months
CAVING 2014
CASIAR MINE, BC CHRYSOTILE
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
After the
deformation
CAVING 2014
CASSIAR
CAVING 2014
CASIAR MINE, BC GROUND SUPPORT FAILURE 1350 N
CASIAR MINE, BC CHRYSOTILE
CAVING 2014
CASIAR MINE, BC WELDED MESH FAILURE
Failed in tension at
the weld
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR – DRAWPOINT ARCHES
CAVING 2014
CASSIAR - BULLNOSES
CAVING 2014
CASSIAR – GROUND SUPPORT
CAVING 2014
CASIAR MINE, BC GROUND SUPPORT 1350 SOUTH
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR – FLOOR SUPPORT
CAVING 2014
CASSIAR – CHAIN LINK MESH
CAVING 2014
CASSIAR – CHAIN LINK MESH
CAVING 2014
CASSIAR – ROADHEADER EXCAVATION
CAVING 2014
CASSIAR - INSTRUMENTATION
CAVING 2014
CASSIAR
DRAWPOINT # 2
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
DRAWPOINT # 9
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
DRAWPOINT # 16
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
• THE KEY ISSUE IS NOT LET GROUND RELAX AND PROVIDE 360° SUPPORT
CAVING 2014
CASSIAR
CAVING 2014
CASSIAR
CAVING 2014