Name of Company: “Orbe Water Refilling Station”

Proprietor: Orbe, Aira Eau Claire

“Production Plan”
1. What are production targets and how will those targets be achieved?

We will maintain a good production and cleanliness of the water through maintaining all apparatuses

and machine of water refilling station. The monitoring schedule will be every six months for the improvement

of the production of purified water, using the past year operating experienced we will continue the good quality

and services of water refilling station and targeting the double profit compare from the past year.

2. What resources do you need to produce your product?

LAND BUILDING EQUIPMENT

LAND: The land is where the station constructed and usually we build the buildings. The required total area

for the water refilling station is 20 X 25 square meter.

BUILDING: The building constructed will be located at the market area.

EQUIPMENT: The equipment for the water refilling station will be the refilling machine and we use the

multimedia sediment filters. This type of filter has replace the conventional sand filters for water refilling

station. Active carbon filters, water softener tank, reverse osmosis membrane, polishing carbon, ultra violet

lamp/sterilizers zone generator.

MATERIALS AND SUPPLIES


The materials and supplies for the water refilling station are the conventional sand filters, active carbon

filters, water softener tank, reverse osmosis membrane, polishing carbon, ultra violet lamp/sterilizers zone

generator, gallons, bottles, and label machine for the bottles and transportation vehicles for some delivery of the

orders.

SITE LAYOUT, CONSTRUCTION PLAN, TIME TABLES

The site of the water refilling station is along the high-way at the center of the public market in

Poblacion Arakan North Cotabato and the site is very suitable for the buyers and for the consumers.

Site of business

PRODUCTION PROCESS

The main process of a water refilling station is dictated by raw water quality. The typical steps are

filtration (several stages) softening and disinfection.

Water Water
Bottles

Product
Water Consumers

Filling and
Capping Refilled
Bottles

Bottled
Water

CONSTRUCTION SCHEDULE

It is important to maintain the construction and production of the water refilling station every six months

to maintain any apparatus and to maintain the cleanliness of the building for the safe and good quality of

product.

ENVIRONMENTAL ASSESSMENT

The environmental assessment of water refilling station is we will be having a proper disposal of unused

bottles or gallons and we will maintain a good quality of the product for the safety of the consumers.

ZONING, POLITICAL INFLUENCES, REGULATIONS

Permits of a Water Refilling Station and Clearances:


 DOH (Department of Health)
 CHD (Center of Health Development)
 WQAP (Water Quality Association of the Phil.)
 Business Permit
 Building Permit
 Zoning Clearance
 DTI Registration
 Health and Safety Clearance
TRANSPORTATION

The transportation of the water refilling station will be free delivery for the orders if they want, and for

the retailer we deliver every Wednesday and we will give 5% discount for the bulk orders.