1 Visual Inspection for Delivered Materials (WHS8 K819x100 - 12600 no.s & Rebar QG Gate # 5 TSF
RFI-5858-QCN-0-0001 RFI-5858-QCN-0-0001 GENERAL APPROVED B-S-B00-1520-501_1 3.0 W W H 26-Apr-12 8.30 AM 29-Apr-12
10mm,12mm,16mm,) Raslaffan
QG Gate # 5 TSF
2 RFI-5858-QCN-0-0002 RFI-5858-QCN-0-0002 GENERAL Visual Inspection of delivered materials a)100 re-bars,ASTM A6415 Gr.60-2.288MT APPROVED
Raslaffan
B-S-B00-1520-501_1 3.0 W W H 1-May-12 8.30 AM 1-May-12
QG Gate # 5 TSF
10 RFI-5858-QCN-0-0011 RFI-5858-QCN-0-0011 GENERAL Visual inspection of delivered materials, Fosroc Nircote Deckgaurd-2 drums (40 liters) APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 21-May-12 8:30 AM 21-May-12
QG Gate # 5 TSF
11 RFI-5858-QCN-0-0012 RFI-5858-QCN-0-0012 GENERAL Visual inspection of delivered materials, Plate 15mm x 1219 x 2438 (4 nos) APPROVED B-S-B00-1520-501_1 3.0 W W H 28-May-12 9.00 AM 28-May-12
Raslaffan
QG Gate # 5 TSF
12 RFI-5858-QCN-0-0013 RFI-5858-QCN-0-0013 GENERAL Visual inspection of delivered materials, WHSB KB x 100-7400 nos APPROVED B-S-B00-1520-002_1 3.0 W W H 28-May-12 9.00 AM 28-May-12
Raslaffan
QG Gate # 5 TSF
13 RFI-5858-QCN-0-0014 RFI-5858-QCN-0-0014 GENERAL Visual inspection of delivered materials, POXITAR-LS (SIKA Part A & Part B) 25kg x 4 APPROVED B-S-B00-1320-002_2 3.0 W W H 31-May-12 9.00 AM 31-May-12
Raslaffan
Visual inspection of delivered materials,
14 (1) Binding Wire - 18 Gauge. QG Gate # 5 TSF
RFI-5858-QCN-0-0015 RFI-5858-QCN-0-0015 GENERAL APPROVED B-S-B00-1320-002_2 3.0 W W H 31-May-12 9.00 AM 31-May-12
(2) Concrete Bonding Agent (ADMIX 255 MB) Raslaffan
(3) PVC Ware Stop (200mm)
15 Visual inspection of delivered materials, HYSD BAR (Size -10mm - 6.993 MT, 14mm - QG Gate # 5 TSF
RFI-5858-QCN-0-0016 RFI-5858-QCN-0-0016 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 3-Jun-12 8.00 AM 3-Jun-12
24.048 MT, 16mm - 38.19 MT. Raslaffan
16 QG Gate # 5 TSF
RFI-5858-QCN-0-0017 RFI-5858-QCN-0-0017 GENERAL Visual Inspection of delivered materials, HYSD BAR (Size-12mm - 24.048 MT) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 3-Jun-12 8.00 AM 3-Jun-12
Raslaffan
QG Gate # 5 TSF
17 RFI-5858-QCN-0-0018 RFI-5858-QCN-0-0018 GENERAL Visual Inspection of delivers materials, Super Cast PVC water stop (150mm) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jun-12 8.00 AM 7-Jun-12
Raslaffan
QG Gate#5 TSF
18 RFI-5858-QCN-0-0019 RFI-5858-QCN-0-0019 GENERAL Visual inspection of delivered materials, Poly Ethylene sheet - 1000 Gauge/0.25mm APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Jun-12 8:30 AM 10-Jun-12
Raslaffan
Visual inspection of delivered materials, HYSD BAR (Size- 10mm - 0.125 MT, 16mm - QG Gate#5 TSF
19 RFI-5858-QCN-0-0020 RFI-5858-QCN-0-0020 GENERAL 11.083 MT & 20mm - 3.088 MT & 25mm - 11.997 MT)
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 13-Jun 9:00 AM 13-Jun-12
QG Gate#5 TSF
20 RFI-5858-QCN-0-0021 RFI-5858-QCN-0-0021 GENERAL Visual inspection of delivered materials, POXITAR-LS (Sika part A & Part B) - 15 Drums. APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 21-Jun-12 8:30 AM 21-Jun-12
21 RFI-5858-QCN-0-0022 RFI-5858-QCN-0-0022 Visual inspection of delivered materials Binding wire 18Gauge - 100 Rolls. APPROVED Blasting & Painting W W H 21-Jun-12
GENERAL B-V-3100-004-0-200-10_0 3.0 21-Jun 8:00 AM
Yard
QG Gate#5 TSF
22 RFI-5858-QCN-0-0023 RFI-5858-QCN-0-0023 GENERAL Visual inspection of delivered materials Garnet Abrasive Material - VV Quick Minerals. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 23-Jun 8:30 AM 23-Jun-12
Raslaffan
Visual inspection of delivered materials Above Ground Coating material - DEKGUARD S- QG Gate#5 TSF
23 RFI-5858-QCN-0-0024 RFI-5858-QCN-0-0024 GENERAL FOSR0C-10 DRUMS (20 Lit. each drum)
APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 25-Jun-12 7:30 AM 25-Jun-12
Raslaffan
QG Gate#5 TSF
28 RFI-5858-QCN-0-0029 RFI-5858-QCN-0-0029 GENERAL Visual inspection of delivered material, HYSD Bar 16mm - 6.973MT & 25mm - 10.537MT CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jun-12 7:30 AM 28-Jun-12
Raslaffan
29 QG Gate#5 TSF
RFI-5858-QCN-0-0030 RFI-5858-QCN-0-0030 GENERAL Visual inspection of delivered material, FOSROC DEKGUARD PRIMER - 17 x 20 LTR APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jun-12 7:30 AM 28-Jun-12
Raslaffan
30 QG Gate#5 TSF
RFI-5858-QCN-0-0031 RFI-5858-QCN-0-0031 GENERAL Visual inspection of Delivered materials, WASHED SAND QTY (25.37 TONS) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jun-12 8:00 AM 28-Jun-12
Raslaffan
31 QG Gate#5 TSF
RFI-5858-QCN-0-0032 RFI-5858-QCN-0-0032 GENERAL Visual inspection of Delivered materials, OPC Cement QTY (50BAGS) CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jun-12 8:00 AM 28-Jun-12
Raslaffan
32 QG Gate # 5 TSF
RFI-5858-QCN-0-0033 RFI-5858-QCN-0-0033 GENERAL Visual inspection of Delivered materials, OPC Cement Qty (50BAGS) CANCELLED B-V-3100-004-0-200-10_0 5.1 a.b.c W W H 1-Jul-12 8:00 AM 1-Jul-12
Raslaffan
QG Gate # 5 TSF
33 RFI-5858-QCN-0-0034 RFI-5858-QCN-0-0034 GENERAL Visual inspection of Delivered materials, HYSD Bar 16mm - 6.973MT & 25mm - 10.537MT APPROVED B-V-3100-004-0-200-10_0 6.4 W W H 1-Jul-12 7.30 AM 1-Jul-12
Raslaffan
QG Gate # 5 TSF
34 RFI-5858-QCN-0-0035 RFI-5858-QCN-0-0035 GENERAL Visual inspection of Delivered materials, FOSROC DEKGUARD PRIMER - 13 x 20LTR APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 2-Jul-12 7:30 AM 2-Jul-12
Raslaffan
37 QG Gate # 5 TSF
RFI-5858-QCN-0-0038 RFI-5858-QCN-0-0038 GENERAL Visual inspection of Delivered materials, Binding Wire 18 Gauge - 150 Rolls. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jul-12 7:30 AM 7-Jul-12
Raslaffan
38 Visual inspection of Delivered materials, Polyethylene sheet 0.25mm The (1000 Gauge ) - QG Gate # 5 TSF
RFI-5858-QCN-0-0039 RFI-5858-QCN-0-0039 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jul-12 7:30 AM 7-Jul-12
50 Rolls. Raslaffan
39 QG Gate # 5 TSF
RFI-5858-QCN-0-0040 RFI-5858-QCN-0-0040 GENERAL Visual inspection of delivered materials, PFC-CHANNEL 100x50x12 M- 8 nos. CANCELLED B-V-3100-004-0-200-10_0 5.0 W W H 9-Jul-12 8:30 AM 8-Jul-12 Not ready for Inspection
Raslaffan
40 QG Gate # 5 TSF
RFI-5858-QCN-0-0041 RFI-5858-QCN-0-0041 GENERAL Visual inspection of delivered materials, Plate 10mm x 1219x2438 - 5 nos. CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 9-Jul-12 8:30 AM 8-Jul-12 Not ready for Inspection
Raslaffan
41 Visual inspection of delivered materials, POXITAR-LS(SIKA PART - A 14 Cans & PART B QG Gate # 5 TSF
RFI-5858-QCN-0-0042 RFI-5858-QCN-0-0042 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 9-Jul-12 7:30 AM 9-Jul-12
- 12 Cans) Raslaffan
QG Gate # 5 TSF
42 RFI-5858-QCN-0-0043 RFI-5858-QCN-0-0043 GENERAL Visual inspection of delivered materials, PFC-CHANNEL 100x50x12 M = 8 nos. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 12-Jul-12 8:30 AM 12-Jul-12
Raslaffan
QG Gate # 5 TSF
43 RFI-5858-QCN-0-0044 RFI-5858-QCN-0-0044 GENERAL Visual inspection of delivered materials, Plate 10mm x 1219x2438 = 5 nos. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 12-Jul-12 8:30 AM 12-Jul-12
Raslaffan
Visual inspection of Delivered materials, POXITAR-LS(SIKA PART-A 1 Cans & PART B - QG Gate # 5 TSF
44 RFI-5858-QCN-0-0045 RFI-5858-QCN-0-0045 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 14-Jul-12 7:30 AM 14-Jul-12
3 Cans). Raslaffan
Visual inspection of delivered materials, HYSD BAR 10mm - 2.719MT, 12mm - 3.601MT QG Gate # 5 TSF
45 RFI-5858-QCN-0-0046 RFI-5858-QCN-0-0046 GENERAL CANCELLED B-V-3100-004-0-200-10_0 4.1.b.c.d.e W W H 15-Jul-12 7:30 AM 15-Jul-12
& 16mm - 6.822MT Raslaffan
46 Visual inspection of Delivered materials, Above Ground Coating material - NITOCOTE QG Gate # 5 TSF
RFI-5858-QCN-0-0047 RFI-5858-QCN-0-0047 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 19-Jul-12 8.00 AM 18-Jul-12
DEK GUARD S-FOSROC-10 DRUMS (20 Lit. each drum) Raslaffan
48 Visual inspection of Delivered materials, 1-UPVC CL "C" DUCT SS - 4" -& 10". (QTY - 4" QG Gate # 5 TSF
RFI-5858-QCN-0-0049 RFI-5858-QCN-0-0049 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 19-Jul-12 8.30 AM 19-Jul-12
-708 MTR, 10"-1938 MTR). Raslaffan
49 Visual inspection of Delivered materials, 1.POXITAR-LS(SIKA PART-A 20 Cans & PART QG Gate # 5 TSF
RFI-5858-QCN-0-0050 RFI-5858-QCN-0-0050 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Jul-12 8.30 AM 21-Jul-12
B -20 Cans) Raslaffan
50 QG Gate # 5 TSF
RFI-5858-QCN-0-0051 RFI-5858-QCN-0-0051 GENERAL Visual inspection of Delivered materials, 1.DEM-22 (1X200 LIT). APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Jul-12 8.00 AM 21-Jul-12
Raslaffan
Visual inspection of Delivered materials, 1.PVC PIPE (55MM x 2.0MM x 4 MTR Grey -200 QG Gate # 5 TSF
51 RFI-5858-QCN-0-0052 RFI-5858-QCN-0-0052 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Jul-12 8.00 AM 21-Jul-12
nos. Raslaffan
Visual inspection of Delivered materials, HYSD BAR 10mm - 2.719MT, 12mm - 3.601MT QG Gate # 5 TSF
52 RFI-5858-QCN-0-0053 RFI-5858-QCN-0-0053 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Jul-12 7:30 AM 21-Jul-12
& 16mm -6.822MT. Raslaffan
Visual inspection of Delivered materials, 1.POXITAR-LS(SIKA PART -a 20 Cans & PART QG Gate # 5 TSF
53 RFI-5858-QCN-0-0054 RFI-5858-QCN-0-0054 GENERAL
B -20 Cans.
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 22-Jul-12 7.30 AM 21-Jul-12
Visual inspection of Delivered materials, 1.REINFORCED CONCRETE PIPE -(100mm QG Gate # 5 TSF
54 RFI-5858-QCN-0-0055 RFI-5858-QCN-0-0055 GENERAL
DIA, 1256mm) x 1855mm)-CLASS M (09 Nos.)
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 22-Jul-12 7.30 AM 22-Jul-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Visual inspection of Delivered materials, 1.REINFORCED CONCRETE PIPE -(1000mm QG Gate # 5 TSF
55 RFI-5858-QCN-0-0056 RFI-5858-QCN-0-0056 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 22-Jul-12 7:45 AM 22-Jul-12
DIA, 1256mm) x 3000mm)-CLASS M (07 Nos.) Raslaffan
56 QG Gate # 5 TSF
RFI-5858-QCN-0-0057 RFI-5858-QCN-0-0057 GENERAL Visual inspection of delivered materials, Binding wire 18Gauge - 100 Rolls. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 23-Jul-12 8:00 AM 23-Jul-12
Raslaffan
57 Visual inspection of delivered materials, Filler Wire ER308LCF TIG SIZE:1.6mm QCON TCF Site
RFI-5858-QCN-0-0058 RFI-5858-QCN-0-0058 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 24-Jul-12 8.00 AM 24-Jul-12
(Metrode) - 10 Kg, Filler Wire ER 308LCF TIG SIZE:2.4mm (Metrode) - 30 Kg. Raslaffan Area
58 QG Gate # 5 TSF
RFI-5858-QCN-0-0059 RFI-5858-QCN-0-0059 GENERAL Plate 15mmx1219x2438 - 1 no.s CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jul-12 8:30 AM 28-Jul-12
Raslaffan
59 Visual inspection of delevered materials, Filler Wire ER 308LCF TIG SIZE:2.4 mm QG Gate # 5 TSF
RFI-5858-QCN-0-0060 RFI-5858-QCN-0-0060 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jul-12 10:00 AM 28-Jul-12
(Metrode) - 20 Kg. Raslaffan
Inspection of delevered materials, REINFORCED CONCRETE PIPE -(1000mm Qcon - TCF Site
60 RFI-5858-QCN-0-0061 RFI-5858-QCN-0-0061 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jul-12 7:00 AM 28-Jul-12
DIA,1256mm x 3000mm)-CLASS M (14 NOS) Barzan Area
Inspection of delevered materials, REINFORCED CONCRETE PIPE -(1000mm Qcon - TCF Site
61 RFI-5858-QCN-0-0062 RFI-5858-QCN-0-0062 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jul-12 7:00 AM 28-Jul-12
DIA,1256mm x 3000mm)-CLASS M (14 NOS) Barzan Area
QG Gate # 5 TSF
62 RFI-5858-QCN-0-0063 RFI-5858-QCN-0-0063 GENERAL Visual inspection of delevered materials, Visual inspection of delevered materials, APPROVED B-S-B00-1520-501_1 3.0 W W H 29-Jul-12 7:30 AM 29-Jul-12
Raslaffan
Visual inspection of delevered materials, HYSD BAR 10mm - 1.879MT, 12mm - QG Gate # 5 TSF
63 RFI-5858-QCN-0-0064 RFI-5858-QCN-0-0064 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Jul-12 7:30 AM 29-Jul-12
6.321MT ,16mm - 13.624MT,20mm-1.531MT & 25mm-1.832 MT Raslaffan
64 QG Gate # 5 TSF
RFI-5858-QCN-0-0065 RFI-5858-QCN-0-0065 GENERAL Visual inspection of Delivered materials, FOSROC DEKGUARD PRIMER - 10 x 20LTR. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 31-Jul-12 7:30 AM 5-Aug-12
Raslaffan
65 QG Gate # 5 TSF
RFI-5858-QCN-0-0066 RFI-5858-QCN-0-0066 GENERAL Visual inspection of delevered materials, Binding wire 18Gauge - 100 Rolls. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 1-Aug-12 8:30 AM 1-Aug-12
Raslaffan
66 Visual inspection of Delivered materials, 1.HARDBOARD 2.5MM THICK (4'X8' JOLLY QG Gate # 5 TSF
RFI-5858-QCN-0-0067 RFI-5858-QCN-0-0067 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 2-Aug-12 7:30 AM 2-Aug-12
BOARD) QTY 1000 NOS Raslaffan
67 QG Gate # 5 TSF
RFI-5858-QCN-0-0068 RFI-5858-QCN-0-0068 GENERAL Visual inspection of delevered materials, 1.DEM-22 (1X200 LIT) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 2-Aug-12 7:45 AM 2-Aug-12
Raslaffan
Visual inspection of delevered materials, MS Flat Bar 150x10x6MTR (Embedded Plate) - QG Gate # 5 TSF
69 RFI-5858-QCN-0-0070 RFI-5858-QCN-0-0070 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 5-Aug-12 8:30 AM 5-Aug-12
20 no.s Raslaffan
Visual inspection of Delivered materials, Above Ground Coating Material -NITOCOTE QG Gate # 5 TSF
70 RFI-5858-QCN-0-0071 RFI-5858-QCN-0-0071 GENERAL CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 7-Aug-12 8:00 AM 7-Aug-12 RFI Description is Wrong
DEK GUARD S-FOSROC-24DRUMS (20 Lit. each drum) Raslaffan
Visual inspection of delevered materials, POXITAR-LS(SIKA PART-A 40 Cans & PART B QG Gate # 5 TSF
71 RFI-5858-QCN-0-0072 RFI-5858-QCN-0-0072 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Aug-12 7:30 AM 7-Aug-12
-40 Cans) Raslaffan
Visual inspection of delevered materials, - Electrode- 3.2 mm Dia, E7018-1H4 R - 102.5 QCON TCF
72 RFI-5858-QCN-0-0073 RFI-5858-QCN-0-0073 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Aug-12 8:00 AM 7-Aug-12
Kgs. Raslaffan Area
73 Visual inspection of delevered materials, HYSD BAR 10mm - 0.019MT, 16mm - 2.283MT, QG Gate # 5 TSF
RFI-5858-QCN-0-0074 RFI-5858-QCN-0-0074 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 8-Aug-12 7:30 AM 8-Aug-12
20mm - 2.635MT,25mm - 2.480MT Raslaffan
74 Visual inspection of Delivered materials, Above Ground Coating Material -NITOCOTE QG Gate # 5 TSF
RFI-5858-QCN-0-0075 RFI-5858-QCN-0-0075 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 8-Aug-12 8:00 AM 8-Aug-12
DEK GUARD S-FOSROC-5 DRUMS (20 Lit. each drum) Raslaffan
76 Visual inspection of Delivered materials, Above Ground Coating Material -NITOCOTE QG Gate # 5 TSF
RFI-5858-QCN-0-0077 RFI-5858-QCN-0-0077 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 9-Aug-12 8:00 AM 9-Aug-12
DEK GUARD S-FOSROC-24DRUMS (20 Lit. each drum) Raslaffan
77 QG Gate # 5 TSF
RFI-5858-QCN-0-0078 RFI-5858-QCN-0-0078 GENERAL Visual inspection of delevered materials, Plate 15mmx1219x2438 - 1 no.s APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 11-Aug-12 8:30 AM 11-Aug-12
Raslaffan
Visual inspection of delevered materials, Electrode- 2.5 mm Dia, E7018-1H4 R - 100.3 QCON BZ-TCF Lay
78 RFI-5858-QCN-0-0079 RFI-5858-QCN-0-0079 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 11-Aug-12 8:00 AM 11-Aug-12
Kgs. Down Yard
Visual inspection of Delivered materials, Above Ground Coating Material -NITOCOTE QG Gate # 5 TSF
79 RFI-5858-QCN-0-0080 RFI-5858-QCN-0-0080 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 13-Aug-12 8:00 AM 14-Aug-12
DEK GUARD S-FOSROC 40 DRUMS (20 Lit. each drum) Raslaffan
Visual inspection of delivered materials, REINFORCED CONCRETE PIPE -(1000mm Barzan alaydown
81 RFI-5858-QCN-0-0082 RFI-5858-QCN-0-0082 GENERAL
DIA,1256mm x 1855mm)-CLASS M (09 NOS)
APPROVED
Raslaffan Area
B-V-3100-004-0-200-10_0 3.0 W W H 15-Aug-12 8:00 AM 16-Aug-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QG Gate # 5 TSF
82 RFI-5858-QCN-0-0083 RFI-5858-QCN-0-0083 GENERAL Visual inspection of Delivered materials, ROUND BAR(18mm x 6 mtr)- 10 nos. APPROVED B-V-3100-004-0-200-10_0 3.0 W W/S H 15-Aug-12 7:30 AM 16-Aug-12
Raslaffan
84 Visual inspection of Delivered materials, NON SHRINK HIXOTROPIC REPAIR MORTAR QG Gate # 5 TSF
RFI-5858-QCN-0-0085 RFI-5858-QCN-0-0085 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 22-Aug-12 7:30 AM 23-Aug-12
WITH FIBER - CONREP 331 TX (5x25 KG) Raslaffan
85 Visual inspection of Delivered materials, Polyethylene Sheet 0.25mm (1000 Gauge) - 70 QG Gate # 5 TSF
RFI-5858-QCN-0-0086 RFI-5858-QCN-0-0086 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 25-Aug-12 7:30 AM 25-Aug-12
Rolls Raslaffan
86 Visual inspection of delivered materials, Concrete Bonding Agent (ADMIX 225 QG Gate # 5 TSF
RFI-5858-QCN-0-0087 RFI-5858-QCN-0-0087 GENERAL APPROVED B-S-B00-1320-002_2 3.0 W W H 25-Aug-12 9:00 AM 25-Aug-12
MB)15X20=300LTS Raslaffan
Qcon BZ - TCF
87 RFI-5858-QCN-0-0088 RFI-5858-QCN-0-0088 GENERAL Visual inspection of delevered materials, Electrode - 2.5mm Dia, E7018-1 55.2 Kgs. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 25-Aug-12 8:00 AM 25-Aug-12
Laydown Yard
Visual inspection of delevered materials, HYSD BAR 10mm - 7.095MT, 12mm - QG Gate # 5 TSF
88 RFI-5858-QCN-0-0089 RFI-5858-QCN-0-0089 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 26-Aug-12 7:30 AM 28-Aug-12
5.075MT ,16mm - 6.822MT & 20mm-1.525MT Raslaffan
Qcon
89 Visual inspection of Delivered materials, Hempel Galvosil 15700-19840 with Curing Agent
RFI-5858-QCN-0-0090 RFI-5858-QCN-0-0090 GENERAL APPROVED -TSCF/PAINTING B-V-3100-004-0-200-10_0 3.0 W W H 26-Aug-12 9:00 AM 26-Aug-12
97170 - 192 Liters, Hempel Thinner 08700 - 60 Liters.
YARD Raslaffan Area
Visual inspection of Delivered materials, NON SHRINK HIXOTROPIC REPAIR MORTAR QG Gate # 5 TSF
91 RFI-5858-QCN-0-0092 RFI-5858-QCN-0-0092 GENERAL APPROVED B-V-3100-004-0-200-10_0 4.2.b W W H 28-Aug-12 7:30 AM 28-Aug-12
- CONREP 370 PF(A+B) (3x4 KG) Raslaffan
QCON TSCF/
Visual inspection of Delivered materials, Hempadurm Zinc 17360-19840 with Curing
92 RFI-5858-QCN-0-0093 RFI-5858-QCN-0-0093 GENERAL APPROVED PAINTING Yard B-V-3100-004-0-200-10_0 3.0 W W H 30-Aug-12 8:00 AM 30-Aug-12
Agent - 10 Liters.
Raslaffan Area
94 QG Gate # 5 TSF
RFI-5858-QCN-0-0095 RFI-5858-QCN-0-0095 GENERAL Visual inspection of Delivered materials, .FOSROC SOLVENT-102 (5LIT=CAN) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Aug-12 7:30 AM 29-Aug-12
Raslaffan
95 Filler Wire - 2.4 mm Dia, ER-70S2 - 310 Kgs, Filler Wire - 1.6 mm Dia, ER-70S2 - 200 QCON BZ- TCF
RFI-5858-QCN-0-0096 RFI-5858-QCN-0-0096 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 30-Aug-12 8:00 AM 30-Aug-12
Kgs, Electrode - 3.2 mm Dia,E7018-1H4R- 102 Kgs. Laydown Yard
QG Gate # 5 TSF
96 RFI-5858-QCN-0-0097 RFI-5858-QCN-0-0097 GENERAL Visual inspection of delevered materials, PVC PIPE-22MM FOR TIE ROD 3MTR LONG APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 2-Sep-12 8:00 AM 2-Sep-12
Raslaffan
Qcon
Visual inspection of Delivered materials, Hempadur Mastic 45881-12170 with Curing
97 TSCF/PAINTING
RFI-5858-QCN-0-0098 RFI-5858-QCN-0-0098 GENERAL Agent - 200 Liters, Hempadur Mastic 45881-12170 with Curing Agent - 200 Liters, APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 2-Sep-12 8:00 AM 2-Sep-12
YARD
Hempel Thinner 08080 - 60 Liters
Raslaffan Area
98 QG Gate # 5 TSF
RFI-5858-QCN-0-0099 RFI-5858-QCN-0-0099 GENERAL Visual inspection of delevered materials, G.I Binding wire 16Gauge (1.6mm) CANCELLED B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
Raslaffan
Visual inspection of delevered materials, CONCRETE CURING COMPOUND -CURE Y QG Gate # 5 TSF
99 RFI-5858-QCN-0-0100 RFI-5858-QCN-0-0100 GENERAL
40(200X1 DRUM)
APPROVED
Raslaffan
B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
100 Visual inspection of delevered materials, WATER BASE RELEASE AGENT DEM-22 QG Gate # 5 TSF
RFI-5858-QCN-0-0101 RFI-5858-QCN-0-0101 GENERAL APPROVED B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
(200X1 DRUM) Raslaffan
QG Gate # 5 TSF
101 RFI-5858-QCN-0-0102 RFI-5858-QCN-0-0102 GENERAL Visual inspection of delevered materials, CONREP 331 TX (10 X 25KG) APPROVED
Raslaffan
B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
QG Gate # 5 TSF
102 RFI-5858-QCN-0-0103 RFI-5858-QCN-0-0103 GENERAL Visual inspection of delevered materials, WATER PROOF TAR ESB (40X 20 LIT) APPROVED B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
Raslaffan
Visual inspection of delevered materials, CONREP 304 VHS (40X25KG) CONREP 360 QG Gate # 5 TSF
103 RFI-5858-QCN-0-0104 RFI-5858-QCN-0-0104 GENERAL APPROVED B-S-B00-1520-501_1 3.0 W W H 5-Sep-12 8:30 AM 5-Sep-12
FFR (20X20) Raslaffan
Qcon-
104 RFI-5858-QCN-0-0105 RFI-5858-QCN-0-0105 GENERAL Visual insoection of Delivered materials, Garnet Abrasive Materil - VVQ Minerals - 10 MT APPROVED TSCF/PANTING Yard B-V-3100-004-0-200-10_0 3.0 W W H 6-Sep-12 8:00 AM 5-Sep-12
Raslaffan Area
Qcon-BZ-TCF
105 RFI-5858-QCN-0-0106 RFI-5858-QCN-0-0106 GENERAL Visual inspection of delevered materials, Electrode - 2.5 mm Dia,E7018-1H4R- 55.2 Kgs. APPROVED Laydown Yard B-V-3100-004-0-200-10_0 3.0 W W H 8-Sep-12 8:00 AM 8-Sep-12
Raslaffan Area
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Visual inspection of Delivered materials, 1. Hempel's Galvosil 15700-19840 with Binder - QCON-
107 RFI-5858-QCN-0-0108 RFI-5858-QCN-0-0108 GENERAL 192 Liters. 2. Hempadur Mastic 45881-12170 with Curing Agent - 200 Liters. 3. Hempel APPROVED TSCF/PAINTING Yard B-V-3100-004-0-200-10_0 3.0 W W H 9-Sep-12 8:30 AM 10-Sep-12
Thinner 08700 - 80 Liters. 4. Hempel Thinner 08080 - 60 Liters. Raslaffan Area
Visual inspection of delevered materials, Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER QCON-ZB-TCF
108 RFI-5858-QCN-0-0109 RFI-5858-QCN-0-0109 GENERAL FOX S EV 50-1)) VAC PAK - 444 kgs Electrode- 3.2 mm Dia, E7018-1H4 R (BOHLER APPROVED Laydown Yard B-V-3100-004-0-200-10_0 3.0 W W H 11-Sep-12 8:00 AM 11-Sep-12
FOX S EV 50-1)) VAC PAK - 396 kgs. Raslaffan Area
109 Visual inspection of delivered materials, Concrete Bonding Agent (ADMIX 225 QG Gate # 5 TSF
RFI-5858-QCN-0-0110 RFI-5858-QCN-0-0110 GENERAL APPROVED B-S-B00-1320-002_2 3.0 W W H 11-Sep-12 9:00 AM 11-Sep-12
MB)15X20=300LTS Raslaffan
111 Visual inspection of delevered materials, HYSD BAR 20mm - 1.008MT & 25mm- QG Gate # 5 TSF
RFI-5858-QCN-0-0112 RFI-5858-QCN-0-0112 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 11-Sep-12 7:30 AM 11-Sep-12
1.0165MT Raslaffan
112 Visual inspection of Delivered materials, Hempadurm Zinc 17360-19840 with Curing Qcon-TSCF/Painting
RFI-5858-QCN-0-0113 RFI-5858-QCN-0-0113 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 15-Sep-12 8:00 AM 15-Sep-12
Agent - 50 Litres, Hempel Thinner 08450 - 40 Litres. Yard Raslaffan Area
QG Gate#5 TSF,
113 RFI-5858-QCN-0-0114 RFI-5858-QCN-0-0114 GENERAL Visual inspection of delevered materials,Binding wire 16Gauge - 150 Rolls CANCELLED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 15-Sep-12 8:30AM 16-Sep-12
Visual inspection of Delivered materials,Polyethylene Sheet 0.25mm (1000 Gauge) - 70 QG Gate#5 TCF,
114 RFI-5858-QCN-0-0115 RFI-5858-QCN-0-0115 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 15-Sep-12 7:30 AM 16-Sep-12
Rolls Raslaffan
Section-1 (D110-
Visual inspection of Delivered materials,HYSD BAR, ASTM A615 Gr60 - 10mm-.0906MT,
115 RFI-5858-QCN-0-0116 RFI-5858-QCN-0-0116 GENERAL APPROVED B70-PR-01), B-V-3100-004-0-200-10_0 3.0 W W H 16-Sep-12 7:30 AM 16-Sep-12
12mm-2.82MT, 16mm-7.302MT, 20mm-4.092MT & 25mm-2.638MT
Raslaffan
QG Gate#5 TSF
117 RFI-5858-QCN-0-0118 RFI-5858-QCN-0-0118 GENERAL Visual inspection of delevered materials,HYSD BAR 16mm - 32MT, ,16mmx12mtr 9pcs CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 19-Sep-12 7.30 AM 19-Sep-12
Raslaffan
QCON-
Visual inspection of Delivered materials,1. Hempathane Enamel Top Coat 55100-27196
118 RFI-5858-QCN-0-0119 RFI-5858-QCN-0-0119 GENERAL APPROVED TSCF/PAINTING B-V-3100-004-0-200-10_0 3.0 W W H 20-Sep-12 8.00 AM 20-Sep-12
Grey Beige(RAL 1019) Base & Curing Agent- 200 Ltrs.2.Hempels Thinner 08080- 80 Ltrs
YARD RAS LASFFAN
Visual inspection of delevered materials,HYSD BAR 10mm - 7.144MT, 12mm - 5.603MT , QG Gate#5 TSF
119 RFI-5858-QCN-0-0120 RFI-5858-QCN-0-0120 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 20-Sep-12 8.00 AM 20-Sep-12
16mm - 6.822MT & 20mm-1.961MT Raslaffan
121 VISUAL INSPECTION OF DELEVERED MATERIALS, BITULEX FILLER BOARD TCF BARZAN
RFI-5858-QCN-0-0122 RFI-5858-QCN-0-0122 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 22-Sep-12 9.30 AM 22-Sep-12
1.22X2.2MTR 18MMTHK. PROJECT Raslaffan
123 VISUAL INSPECTION OF DELIVERED MATERIALS, HYSD BAR 10 MM, 16MM- QG GATE 5 TSF,
RFI-5858-QCN-0-0124 RFI-5858-QCN-0-0124 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 24-Sep-12 8.00 AM 24-Sep-12
2.282MT & 20 MM -1.863MT, 25 MM 1.440MT RASLAFFAN
Gate # 5 Area
124 RFI-5858-QCN-0-0125 RFI-5858-QCN-0-0125 GENERAL Visual inspection of delevered materials, HYSD BAR 16mm - 32MT, ,16mmx12mtr 9pcs CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 27-Sep-12 7:30 AM 27-Sep-12
Raslaffan
125 Visual inspection of delevered materials, 1.REINFORCED CONCRETE PIPE -(1000mm Gate # 5 Area
RFI-5858-QCN-0-0126 RFI-5858-QCN-0-0126 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 27-Sep-12 7:30 AM 27-Sep-12
DIA,1256mm x 1855mm)-CLASS M (03 NOS) SERIAL NO:15,21,36. Raslaffan
QCON-
126 Visual inspection of Delivered materials, Hempels Galvosil-15700-19840-192 Ltrs. TSCF/PAINTING
RFI-5858-QCN-0-0127 RFI-5858-QCN-0-0127 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Sep-12 8:00 AM 29-Sep-12
Hempadur Mastic 45881-12170-200 Ltrs YARD Raslaffan
Aarea
Visual inspection of Delivered materials,HYSD BAR, ASTM A615 Gr60 - 10mm-0.023MT, Section 1 (D110-B70-
127 RFI-5858-QCN-0-0128 RFI-5858-QCN-0-0128 GENERAL
16mm-9.935MT, 20mm-2.517MT & 25mm-4.404MT
APPROVED
PR01), Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 1-Oct-12 7.30 AM 1-Oct-12
QG Gate#5 TCF
128 RFI-5858-QCN-0-0129 RFI-5858-QCN-0-0129 GENERAL Visual inspection of Delivered materials,Binding Wire 16 Gauge - 100Rolls CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 3-Oct-12 7.30 AM 3-Oct-12
Raslaffan
QG Gate#5 TCF
129 RFI-5858-QCN-0-0130 RFI-5858-QCN-0-0130 GENERAL Visual inspection of Delivered materials,Water Proof TAR ESB (20LTR Drum) - 40no.s APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 4-Oct-12 7.30 AM 4-Oct-12
Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
131 Visual inspection of Delivered materials,1. Water Base Release Agent DEM-22 (200LTR QG Gate#5 TCF
RFI-5858-QCN-0-0132 RFI-5858-QCN-0-0132 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 4-Oct-12 7.30 AM 4-Oct-12
Drum) - 1no.2. Concrete Curing Compound - Cure Y40 (200LTR Drum) - 1no. Raslaffan
Gate#5 TCF
132 RFI-5858-QCN-0-0133 RFI-5858-QCN-0-0133 GENERAL Visual inspection of delevered materials, CONREP 304 VHS (16X25KG) , APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Oct-12 7.45 AM 7-Oct-12
Raslaffan
Gate#5 TCF
134 RFI-5858-QCN-0-0135 RFI-5858-QCN-0-0135 GENERAL Visual inspection of Delivered materials,Nitoproof-10 (2 x200 lit) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Oct-12 7:45 AM 7-Oct-12
Raslaffan
QCON
136 RFI-5858-QCN-0-0137 RFI-5858-QCN-0-0137 GENERAL Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -8 MT APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 13-Oct-12 07:00 AM 13-Oct-12
Ras Laffan
137 RFI-5858-QCN-0-0138 RFI-5858-QCN-0-0138 GENERAL Visual inspection of Delivered materials, CONREP 331 TX (30x25 KG) APPROVED GATE-5 Ras Laffan B-V-3100-004-0-200-10_0 3.0 W W H 14-Oct-12 07:30 AM 14-Oct-12
Gate 5 TSF
138 RFI-5858-QCN-0-0139 RFI-5858-QCN-0-0139 GENERAL Visual inspection of delevered materials, 50 x 50 x 6 mtr. Equal Angle - 2 Nos. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 16-Oct-12 10:00 AM 16-Oct-12
Raslaffan
QG Gate#5 TSF
139 RFI-5858-QCN-0-0140 RFI-5858-QCN-0-0140 GENERAL Visual inspection of delevered materials,CONREP 360 FFR (SODAMCO) 29 X 20KG APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 22-Oct-12 8.00 AM 22-Oct-12
Raslaffan
QCON
Visual inspection of Delivered materials. 1. Hempels Galvosil-15700-19840-204Ltrs.
140 RFI-5858-QCN-0-0141 RFI-5858-QCN-0-0141 GENERAL
3.Hempels Thinner 0845- 120 Ltrs. 4.Garnet Abrasive Material - VVQ Minerals -14 MT
APPROVED -TSCF/Painting Yard B-V-3100-004-0-201-02_0 3.0 W W H 23-Oct-12 7:00 AM 23-Oct-12
Raslaffan
Visual inspection of delivered materials, 1. PVC WATER STOP HYDROFOIL-150MM- QG Gate#5 TSF
141 RFI-5858-QCN-0-0142 RFI-5858-QCN-0-0142 GENERAL CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 24-Oct-12 8:00 AM 24-Oct-12
225MTR Raslaffan
QG Gate#5 TSF
142 RFI-5858-QCN-0-0143 RFI-5858-QCN-0-0143 GENERAL Visual inspection of delivered materials, 1.10MMX2.4X4.8MTR WIRE MESH=20NOS CANCELLED B-V-3100-004-0-200-10_0 3.0 W W H 24-Oct-12 8:00 AM 24-Oct-12
Raslaffan
Filler Wire - 2.4 mm Dia, ER-70S2 - 310 Kgs, Filler Wire - 1.6 mm Dia, ER-70S2 - 200 QG Gate#5 TSF
143 RFI-5858-QCN-0-0144 RFI-5858-QCN-0-0144 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 25-Oct-12 9:00 AM 25-Oct-12
Kgs, Electrode - 3.2 mm Dia,E7018-1H4R- 102 Kgs. Raslaffan
144 Filler Wire - 2.4 mm Dia, ER-70S2 - 310 Kgs, Filler Wire - 1.6 mm Dia, ER-70S2 - 200 TSF LAYDOWN QG
RFI-5858-QCN-0-0145 RFI-5858-QCN-0-0145 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 30-Oct-12 7:30 AM 30-Oct-12
Kgs, Electrode - 3.2 mm Dia,E7018-1H4R- 102 Kgs. GATE# 5
145 Visual inspection of delevered materials,CONREP 360 FFR (SODAMCO) 250 X QG Gate#5 TSF
RFI-5858-QCN-0-0146 RFI-5858-QCN-0-0146 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 30-Oct-12 80.00 AM 30-Oct-12
20KG,CONREP 331 TX 25X25 Raslaffan
QCON
146 RFI-5858-QCN-0-0147 RFI-5858-QCN-0-0147 GENERAL Visual inspection of Delivered materials.Hempadur Mastic 45881-12170 -200Ltrs. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 29-Oct-12 07.00 AM 29-Oct-12
Ras Laffan
147 Visual inspection of delevered materials,HYSD BAR 10mm - .779MT, 12mm - 1.215MT , QG Gate#5 TSF
RFI-5858-QCN-0-0148 RFI-5858-QCN-0-0148 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 31-Oct-12 7:30 AM 1-Nov-12
16mm - 16.874MT,20mm-3.641,25mm-12.241 Raslaffan
QG Gate#5 TSF
148 RFI-5858-QCN-0-0149 RFI-5858-QCN-0-0149 GENERAL Visual inspection of delevered materials,HYSD BAR 16mm - 120.01MT,25mm-6.099MT. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 3-Nov-12 7:30AM 4-Nov-12
Raslaffan
149 Visual inspection of Delivered materials.1) Hempathane Enamel Topcoat-RAL 1019-200 QCON
RFI-5858-QCN-0-0150 RFI-5858-QCN-0-0150 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 3-Nov-12 07.00 AM 3-Nov-12
Ltrs;2) Hempels Thinner 08080-60 Ltrs;3) Hempels Thinner 0870-60Ltrs. -TSCF/Painting Yard
Visual inspection of delevered materials, 1. Deformed Steel, 12mm Dia, ASTM A615
QG Gate#5 TSF
152 RFI-5858-QCN-0-0153 RFI-5858-QCN-0-0153 GENERAL Gr.60 - 5.01MT, 2. Deformed Steel, 20mm Dia, ASTM A615 Gr.60 - 18.144MT, 3. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 5-Nov-12 8:30AM 5-Nov-12
Raslaffan
Deformed Steel, 25mm Dia, ASTM A615 Gr.60 - 34.561MT
QG Gate#5 TSF
153 RFI-5858-QCN-0-0154 RFI-5858-QCN-0-0154 GENERAL Visual inspection of delevered materials, CONREP 360 FFR (10X20kg) APPROVED B-S-B00-1520-501_1 3.0 W W H 7-Nov-12 8:30AM 7-Nov-12
Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
155 Visual inspection of delevered materials, 1. Deformed Steel, 20mm Dia, ASTM A615 QG Gate#5 TSF
RFI-5858-QCN-0-0156 RFI-5858-QCN-0-0156 GENERAL APPROVED B-S-B00-1520-501_0 3.0 W W H 7-Nov-12 8:30AM 7-Nov-12
Gr.60 - 10.08MT Raslaffan
QCON
156 RFI-5858-QCN-0-0157 RFI-5858-QCN-0-0157 GENERAL Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -6 MT APPROVED -TSCF/Painting Yard B-S-B00-1520-501_0 3.0 W W H 7-Nov-12 07.00 AM 7-Nov-12
Ras Laffan
Gate#5 TCF
160 RFI-5858-QCN-0-0161 RFI-5858-QCN-0-0161 GENERAL Visual inspection of Delivered materials,Binding Wire (18 Gauge) 200 Roll APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 10-Nov-12 07.45 AM 11-Nov-12
161 Visual inspection of delevered materials, Bitulex Filler Board 1.22x2.2mtr TCF BARZAN
RFI-5858-QCN-0-0162 RFI-5858-QCN-0-0162 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Nov-12 9:30AM 11-Nov-12
18mmthk. PROJECT Raslaffan
Visual inspection of Delivered materials,1. COLORED CONCRERT ADMIX COLOR P TSF LAYDOWN QG
162 RFI-5858-QCN-0-0163 RFI-5858-QCN-0-0163 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Nov-12 8:00 AM 11-Nov-12
PIGMENT SC 130(2X25 KG) GATE# 5
Visual inspection of Delivered materials,1. Above Ground Coating Material -NITOCOTE TSF LAYDOWN QG
164 RFI-5858-QCN-0-0165 RFI-5858-QCN-0-0165 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 11-Nov-12 8:00 AM 11-Nov-12
DEK GUARD S-FOSROC 2 DRUMS (20 Lit. each drum) GATE# 5
QCON
Visual inspection of Delivered materials,1. Hempels Galvosil-15700-19840-
165 RFI-5858-QCN-0-0166 RFI-5858-QCN-0-0166 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 11-Nov-12 7.00 AM 11-Nov-12
36Ltrs.2.Hempathane Enamel Top Coat 5510-RAL 1019-260s.
Ras Laffan
Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)) VAC PAK - 1000
QCON BZ- TCF
166 RFI-5858-QCN-0-0167 RFI-5858-QCN-0-0167 GENERAL kgsElectrode- 3.2 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)) VAC PAK - 500 APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 11-Nov-12 7.30 AM 11-Nov-12
Laydown Yard
kgs.
QCON
Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -20
167 RFI-5858-QCN-0-0168 RFI-5858-QCN-0-0168 GENERAL
MT
APPROVED -TSCF/Painting Yard 3.0 W W H 12-Nov-12 7.00 AM 12-Nov-12
Ras Laffan
B-V-3100-004-0-200-10_0
QG Gate#5 TSF
169 RFI-5858-QCN-0-0170 RFI-5858-QCN-0-0170 GENERAL Visual inspection of delevered materials,HYSD BAR 16mm - 6.658MT,25mm-18.981. APPROVED 3.0 W W H 13-Nov-12 7:30 AM 14-Nov-12
Raslaffan
B-V-3100-004-0-200-10_0
QCON
Visual inspection of Delivered materials,1. Hempels Galvosil-15700-19840-180
170 RFI-5858-QCN-0-0171 RFI-5858-QCN-0-0171 GENERAL APPROVED -TSCF/Painting Yard 3.0 W W H 13-Nov-12 7:00 AM 13-Nov-12
Ltrs.Hempels Thinner 0870-40 Ltrs
Ras Laffan
B-V-3100-004-0-200-10_0
QG Gate#5 TSF
171 RFI-5858-QCN-0-0172 RFI-5858-QCN-0-0172 GENERAL Visual inspection of delevered materials, CONREP 304 VHS (150X25KG) . APPROVED B-S-B00-1520-501_1 3.0 W W H 14-Nov-12 8:30AM 15-Nov-12
Raslaffan
QCON
Visual inspection of Delivered materials,1. Hempadur Mastic 45881-280 Ltrs.2.Hempels
174 RFI-5858-QCN-0-0175 RFI-5858-QCN-0-0175 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 15-Nov-12 7.00 AM 15-Nov-12
Thinner 0845- 160 Ltrs.
Ras Laffan
177 Visual inspection of Delivered materials,1. Hempadur Mastic 48881-12170-400 Ltrs2. QMFY/Painting Yard
RFI-5858-QCN-0-0178 RFI-5858-QCN-0-0178 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 19-Nov-12 9.00 AM 19-Nov-12
Hempadur Zinc 19840 -10 Ltrs Messaieed
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QCON
178 Visual inspection of Delivered materials,1. Hempels Galvosil 1570-19840-240
RFI-5858-QCN-0-0179 RFI-5858-QCN-0-0179 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 19-Nov-12 7.00 AM 20-Nov-12
Ltrs.2.Hempels Thinner 0870- 60 Ltrs.
Ras Laffan
QG Gate#5 TSF
179 RFI-5858-QCN-0-0180 RFI-5858-QCN-0-0180 GENERAL Visual inspection of delevered materials,HYSD BAR 16mm - 4.839MT,25mm-14.226MT. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Nov-12 7:30AM 22-Nov-12
Raslaffan
Visual inspection of delevered materials,1. Deformed Steel, 10mm Dia, ASTM A615 Gr.60 QG Gate#5 TSF
180 RFI-5858-QCN-0-0181 RFI-5858-QCN-0-0181 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Nov-12 8:30AM 22-Nov-12
- 10.00MT, 2. Deformed Steel, 12mm Dia, ASTM A615 Gr.60 - 13.026MT Raslaffan
Visual inspection of Delivered materials. ( 5) Hempels Thinner 0845 -200 Ltrs.1. Hempels QCON
181 RFI-5858-QCN-0-0182 RFI-5858-QCN-0-0182 GENERAL Galvosil 1570-19840-180 Ltrs.2.Hempadur Mastic 45881 - 400 Ltrs, 3.Hempathane APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 21-Nov-12 7.00 AM 22-Nov-12
Enamel Top Coat Grey Beige(RAL 1019)-40 Ltrs, 4.Hempels Thinner 0870- 60 Ltrs. Ras Laffan
QG Gate#5 TSF
182 RFI-5858-QCN-0-0183 RFI-5858-QCN-0-0183 GENERAL Visual inspection of delevered materials,HYSD BAR 10mm - 10.00MT. APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 22-Nov-12 7:30AM 25-Nov-12
QG Gate#5 TSF
183 RFI-5858-QCN-0-0184 RFI-5858-QCN-0-0184 GENERAL Visual inspection of delevered materials,WATER PROOF TAR ESB (30X 20 LIT) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 22-Nov-12 8:30AM 25-Nov-12
Raslaffan
TSF LAYDOWN
184 RFI-5858-QCN-0-0185 RFI-5858-QCN-0-0185 GENERAL Visual inspection of Delivered materials,1.JOINTSEAL PS-1000( 32X4KG). APPROVED GATE -5 RAS B-V-3100-004-0-200-10_0 3.0 W W H 22-Nov-12 7:30 AM 25-Nov-12
LASFFAN
QCON
185 Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -20
RFI-5858-QCN-0-0186 RFI-5858-QCN-0-0186 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 24-Nov-12 07.00 AM 24-Nov-12
MT
Ras Laffan
Visual inspection of delevered materials,HYSD BAR 12mm-5.01MT, 16mm - 10.05MT, QG Gate#5 TSF
189 RFI-5858-QCN-0-0190 RFI-5858-QCN-0-0190 GENERAL
20mm-5.04MT & 25mm-5.0825MT.
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 29-Nov-12 7:30AM 30-Nov-12
QG Gate#5 TSF
191 RFI-5858-QCN-0-0192 RFI-5858-QCN-0-0192 GENERAL Visual inspection of delevered materials,Binding Wire 18G (5Kg x 500 rolls) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Nov-12 7:30AM 30-Nov-12
Raslaffan
QG Gate#5 TSF
192 RFI-5858-QCN-0-0193 RFI-5858-QCN-0-0193 GENERAL Visual inspection of delevered materials,Water Proof TAR ESB - 20Ltr x 10 Drums APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Nov-12 7:30AM 30-Nov-12
Raslaffan
Visual inspection of delivered materials, 1.WATER PROOF SSP-50(4x200ltr Drum) QG Gate#5 TSF
193 RFI-5858-QCN-0-0194 RFI-5858-QCN-0-0194 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 1-Dec-12 9:00 AM 2-Dec-12
SODAMCO. Raslaffan
194 QMFY/Painting
RFI-5858-QCN-0-0195 RFI-5858-QCN-0-0195 GENERAL Visual inspection of Delivered materials,1. Hempels Enamel 5510 - 200 Ltrs. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 1-Dec-12 7:30 AM 1-Dec-12
Yard Messaieed
QCON
Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -20
195 RFI-5858-QCN-0-0196 RFI-5858-QCN-0-0196 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 2-Dec-12 7:00 AM 2-Dec-12
MT
Ras Laffan
Visual inspection of Delivered materials,1. Hempels Mastic 45881-300 Ltrs, 2. Hempels Qcon
196 RFI-5858-QCN-0-0197 RFI-5858-QCN-0-0197 GENERAL Thinner 0845-100 Ltrs, 3. Hempels Thinner 08080-20 Ltrs, 4. Hempathane Enamel Top APPROVED TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 2-Dec-12 7:15 AM 2-Dec-12
Cost 5510-Grey Beige (RAL 1019)200 Litrs. Raslaffan
Visual Inspection of Delivered materials, 1. Hempels Galvosil 1570-19840-300 Ltrs. 2. Qcon TSCF/Painting
197 RFI-5858-QCN-0-0198 RFI-5858-QCN-0-0198 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 4-Dec-12 7:00 AM 4-Dec-12
Hempels Thinner 0870-80 Ltrs. Yard Raslaffan
199 Visual inspection of Delivered materials, 1. Garnet Abrasive Material - VVQ Minerals - 15 QCON
RFI-5858-QCN-0-0200 RFI-5858-QCN-0-0200 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 8-Dec-12 7:30 AM 9-Dec-12
MT -TSCF/Painting Yard
Visual inspection of delevered materials,Filler Wire ER 308LCF TIG SIZE:2.4 mm QCON Barzan TCF
200 RFI-5858-QCN-0-0201 RFI-5858-QCN-0-0201 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 8-Dec-12 9.00 AM 9-Dec-12
(Metrode) - 10 Kg LAYDOWN
Visual inspection of delevered materials,1. Joint Seal PS-1000 GG (4Ltr) - 100 no.s2. QG Gate#5 TSF
203 RFI-5858-QCN-0-0204 RFI-5858-QCN-0-0204 GENERAL
Water Proof TAR ESB (20Ltr) - 50 drums
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 11-Dec-12 7:30AM 12-Dec-12
1. Hempadur Mastic 45881 - 300 Ltrs. 2. Hempels Galvosil 15700 -19840 - 192 Ltrs. 3.
QCON
Hempels Thinner 0870 - 60Ltrs. 4. Hempels Thinner 0845 - 100 Ltrs.5. Hempels Thinner
204 RFI-5858-QCN-0-0206 RFI-5858-QCN-0-0206 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 12-Dec-12 7.30 AM 12-Dec-12
08080 - 100 Ltrs. 6. Hempathane Enamel Top Coat 5510-Grey Beige (RAL 1019) - 300
Ras Laffan
Ltrs.
QCON
207 Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - 20
RFI-5858-QCN-0-0209 RFI-5858-QCN-0-0209 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 13-Dec-12 7:00 AM 13-Dec-12
MT
Ras Laffan
QCON
208 Visual inspection of Delivered materials 1. Hempels Galvosil 15700 - 19840 - 192 Ltrs. 2.
RFI-5858-QCN-0-0210 RFI-5858-QCN-0-0210 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 19-Dec-12 7.30 AM 20-Dec-12
Hempadur Mastic 45881 - 300 Ltrs.
Ras Laffan
QG Gate # 5 TSF
209 RFI-5858-QCN-0-0211 RFI-5858-QCN-0-0211 GENERAL Visual inspection of Delivered materials 1. Binding Wire - 18 Gauge - 300 Roll. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 19-Dec-12 7.30 AM 21-Dec-12
Ras Laffan
Visual inspection of Delivered materials 1. Hempels Galvosil 15700 - 19840 - 216 Ltrs. 2.
Hempadur Mastic 45881 - 380 Ltrs. 3 .Hempels Thinner 0870 - 180 Ltrs. 4. Hempathane QMFY/Painting Yard
210 RFI-5858-QCN-0-0212 RFI-5858-QCN-0-0212 GENERAL
Enamel Top Coat 5510-Grey Beige (RAL 1019) - 500 Ltrs. 5. Hempels Thinner 0845 -
APPROVED
Messaieed
B-V-3100-004-0-200-10_0 3.0 W W H 23-Dec-12 7.15 AM 23-Dec-12
180Ltrs. 6. Hempels Tool Cleaner-9961- 200 Ltrs.
Visual inspection of Delivered materials Electrode- 2.5 mm Dia, E7018-1H4 R - 51 QCON BZ- TCF
211 RFI-5858-QCN-0-0213 RFI-5858-QCN-0-0213 GENERAL
KgsFiller Wire - 2.4 mm Dia, ER-70S2 - 15 Kgs
APPROVED
Laydown Yard
B-V-3100-004-0-201-10_5 3.0 W W H 24-Dec-12 7.15 AM 24-Dec-12
Visual inspection of Delivered materials 1. HYSD BAR 12 MM-3.341 MT;16 MM-14.360 QG Gate # 5 TSF
212 RFI-5858-QCN-0-0214 RFI-5858-QCN-0-0214 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 25-Dec-12 7.30 PM 25-Dec-12
MT;20 MM-4.427 MT. Ras Laffan
QCON
Visual inspection of Delivered materials 1. Hempels Galvosil 15700 - 19840 - 204 Ltrs. 2.
214 RFI-5858-QCN-0-0216 RFI-5858-QCN-0-0216 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 26-Dec-12 7.30 AM 26-Dec-12
Hempadur Mastic 45881 - 300 Ltrs.
Ras Laffan
Visual inspection of Delivered materials 1. Hempels Galvosil 15700 - 19840 - 240 Ltrs. 2.
215 QMFY Painting Yard
RFI-5858-QCN-0-0217 RFI-5858-QCN-0-0217 GENERAL Hempadur Mastic 45881 - 120 Ltrs. 3 .Hempels Thinner 0870 - 100 Ltrs. 4 .Hempels APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 27-Dec-12 7:15 AM 27-Dec-12
Messaieed
Thinner 0845 - 160 Ltrs. 5 .Hempels Thinner 08080 - 40 Ltrs.
QCON
216 RFI-5858-QCN-0-0218 RFI-5858-QCN-0-0218 GENERAL Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - 7 MT APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 27-Dec-12 7:30 AM 27-Dec-12
Ras Laffan
QG Gate # 5 TSF
217 RFI-5858-QCN-0-0219 RFI-5858-QCN-0-0219 GENERAL Visual inspection of Delivered materials 1. Binding Wire - 18 Gauge - 300 Roll. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 27-Dec-12 7:30 AM 28-Dec-12
Ras Laffan
Visual inspection of Delivered materials,Polyethylene Sheet 0.25mm (1000 Gauge) - 30 QG Gate#5 TCF
218 RFI-5858-QCN-0-0220 RFI-5858-QCN-0-0220 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 27-Dec-12 8:00 AM 28-Dec-12
Rolls Raslaffan
219 Electrode- 2.5 mm Dia, E7018-1H4 R - 200.6 Kgs Filler Wire - 2.4 mm Dia, ER-70S2 - QCON BZ- TCF
RFI5858-QCN-0-0221 RFI5858-QCN-0-0221 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 30-Dec-12 8:00 AM 30-Dec-12
130 Kgs Laydown Yard
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
220 Hempadur 85671, Light Red - 200 Ltrs. 2. Hempadur 85671, Off White - 200 Ltrs. 3. QCON-TSCF / Piping
RFI-5858-QCN-0-0222 RFI-5858-QCN-0-0222 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 31-Dec-12 7:15 AM 31-Dec-12
Hempels Thinner 0845 - 100 Ltrs. Yard
1. Hempathane Enamel Top Coat 5510-Grey Beige (RAL 1019) - 340 Ltrs. 2. Hempels
QCON-TSCF / Piping
221 RFI-5858-QCN-0-0223 RFI-5858-QCN-0-0223 GENERAL Thinner 0845 - 60 Ltrs. 3. Hempels Galvosil 15700 - 19840 - 192 Ltrs. 4. Hempadur APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 31-Dec-12 7:30 AM 31-Dec-12
Yard
Mastic 45881 - 240 Ltrs.
QCON
Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - 20
223 RFI-5858-QCN-0-0225 RFI-5858-QCN-0-0225 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 1-Jan-13 7.00 AM 1-Jan-13
MT
Ras Laffan
Inspection of Delivered materials 1. HYSD BAR 12 MM-3.107 MT;16 MM-11.569 MT;20 QG Gate # 5 TSF
224 RFI-5858-QCN-0-0226 RFI-5858-QCN-0-0226 GENERAL
MM-12.212 MT.
APPROVED
Ras Laffan
B-V-3100-004-0-200-10_0 3.0 W W H 1-Jan-13 7.30 AM 2-Jan-13
QG Gate # 5 TSF
225 RFI-5858-QCN-0-0227 RFI-5858-QCN-0-0227 GENERAL Inspection of Delivered materials D10 Welded Wire Mesh-10 mmX2.4X4.8 Mtr) 18 Nos. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 1-Jan-13 8.00 AM 2-Jan-13
Ras Laffan
QCON
Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - 10
226 RFI-5858-QCN-0-0228 RFI-5858-QCN-0-0228 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 7:00 AM 7-Jan-13
MT
Ras Laffan
QCON
227 RFI-5858-QCN-0-0229 RFI-5858-QCN-0-0229 GENERAL 1. Hempels Galvosil 15700 - 19840 - 240 Ltrs. 2. Hempadur Mastic 45881 - 200 Ltrs. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 7:15 AM 7-Jan-13
Ras Laffan
228 Visual inspection of Delivered materials 1. Water Proof Tar ESB- Sodamco- 5 Drum of 20 QG Gate # 5 TSF
RFI-5858-QCN-0-0230 RFI-5858-QCN-0-0230 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 8:00 AM 7-Jan-13
Ltrs.; Ras Laffan
229 Visual inspection of Delivered materials 1. Hardboard 2.5mm Thick 4" x 8 " (Jolly Board)- QG Gate # 5 TSF
RFI-5858-QCN-0-0231 RFI-5858-QCN-0-0231 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 8:00 AM 7-Jan-13
373 nos Ras Laffan
QG Gate # 5 TSF
230 RFI-5858-QCN-0-0232 RFI-5858-QCN-0-0232 GENERAL Visual inspection of Delivered materials 1. JOINT SEAL PRIME PS (1 LTR- 50 CAN) APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 8:00 AM 7-Jan-13
Ras Laffan
Visual inspection of Delivered materials 1. FIBRE BOARD BITUCELL -20MM (4"X 8 ") - QG Gate # 5 TSF
231 RFI-5858-QCN-0-0233 RFI-5858-QCN-0-0233 GENERAL
30 nos
APPROVED
Ras Laffan
B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 8:00 AM 7-Jan-13
Visual inspection of Delivered materials 1. HYSD BAR 16 MM-20.1 MT;20 MM-8.064 QG Gate # 5 TSF
232 RFI-5858-QCN-0-0234 RFI-5858-QCN-0-0234 GENERAL
MT;25 MM-12..198 MT.
APPROVED
Ras Laffan
B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 1.30 PM 8-Jan-13
Visual inspection of Delivered materials Electrode- 2.5 mm Dia, E7018-1H4 R - 1000 Kgs
QCON BZ- TCF
233 RFI-5858-QCN-0-0235 RFI-5858-QCN-0-0235 GENERAL Electrode- 3.2 mm Dia, E7018-1H4 R - 200 Kgs Filler Wire - 2.4 mm Dia, ER-70S2 - 200 APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Jan-13 8:00 AM 8-Jan-13
Laydown Yard
Kgs
MATL RECEIVING INSP of Delivered materials Electrode- 3.2 mm Dia, E7018-1H4 R QCON BZ-TCF
235 RFI-5858-QCN-0-0237 RFI-5858-QCN-0-0237 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Jan-13 9:00 AM 10-Jan-13
(ESAB) - 198.6 Kgs LAYDOWN YARD
QCON
236 Material Received Inspection. 1. Hempels Galvosil - 240 Ltrs. 2. Hempadur Mastic - 200
RFI-5858-QCN-0-0238 RFI-5858-QCN-0-0238 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 10-Jan-13 1:00 PM 10-Jan-13
Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 100 Ltrs.
Ras Laffan
MATL RECEIVING INSP. 1. Hempels Galvosil 15700 - 19840 - 240 Ltrs. 2. Hempadur
QCON
239 RFI-5858-QCN-0-0241 RFI-5858-QCN-0-0241 GENERAL Mastic - 200 Ltrs. 3. Hempathane Enamel Top Coat 5510-Grey Beige (RAL 1019) - 160 APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 14-Jan-2013 7:00 AM 14-Jan-13
-TSCF/Painting Yard
Ltrs.
Section -1 ( culvert
240 MATL RECEIVING INSP. Visual inspection of Delivered materials 1. HYSD BAR 10 MM-
RFI-5858-QCN-0-0242 RFI-5858-QCN-0-0242 GENERAL APPROVED BZRC-003) Ras B-V-3100-004-0-200-10_0 3.0 W W H 15-Jan-13 7:30 AM 18-Jan-13
70 kg ;16 MM- 5057 kg+9287 kg ;20 MM- 7865 kg, 25 MM-12773kg
Laffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
241 MATL RECEIVING inspection of delivered materials, 1.WATER PROOF SSP-50(4x200ltr QG Gate#5 TSF
RFI-5858-QCN-0-0243 RFI-5858-QCN-0-0243 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 20-Jan-13 8:00AM 21-Jan-13
Drum) SODAMCO. Raslaffan
QCON
242 RFI-5858-QCN-0-0244 RFI-5858-QCN-0-0244 GENERAL MATL RECEIVING inspection of Garnet Abrasive Material - VVQ Minerals - 15 Mtof APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 20-Jan-13 7:45 AM 21-Jan-13
-TSCF/Painting Yard
Material Received Inspection1. Hempels Galvosil - 204 Ltrs. 2 .Hempels Thinner 0870 -
QCON
40 Ltrs. 3. Hempadur Mastic - 200 Ltrs. 4 .Hempels Thinner 0845 - 80 Ltrs. 5.
243 RFI-5858-QCN-0-0245 RFI-5858-QCN-0-0245 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 21-Jan-13 7:30 AM 23-Jan-13
Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 100 Ltrs. 6. Hempels Thinner
Ras Laffan
08080 - 20 Ltrs.
QCON
MATL RECEIVING inspection 1. Hempels Galvosil - 300 Ltrs. 2. Hempadur Mastic - 500
244 RFI-5858-QCN-0-0246 RFI-5858-QCN-0-0246 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 21-Jan-13 7.30 AM 27-Jan-13
Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 200 Ltrs.
Messaieed
Section -1 ( culvert
MATL RECEIVING inspection of Delivered materials 1. HYSD BAR 10 MM- 35 kg ;16
245 RFI-5858-QCN-0-0247 RFI-5858-QCN-0-0247 GENERAL
MM- 2259 kg ;20 MM- 3948 kg, 25 MM-6607kg
APPROVED BZRC-003) Ras B-V-3100-004-0-200-10_0 3.0 W W H 22-Jan-13 7.30 AM 23-Jan-13
Laffan
QCON
MATL RECEIVING inspection of Delivered materials,1. Steel Shot - 04 MT2. Steel Grit -
246 RFI-5858-QCN-0-0248 RFI-5858-QCN-0-0248 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 23-Jan-13 7:45 AM 23-Jan-13
01 MT
Messaieed
QCON
MATL RECEIVING inspection of Delivered materials,1. Steel Shot - 04 MT2. Steel Grit -
247 RFI-5858-QCN-0-0249 RFI-5858-QCN-0-0249 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 23-Jan-13 7:00 AM 23-Jan-13
01 MT
Messaieed
QCON
248 Material Received Inspection1. Hempadur Mastic - 160 Ltrs. 2 .Hempels Thinner 0845 -
RFI-5858-QCN-0-0250 RFI-5858-QCN-0-0250 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 26-Jan-13 7:30 AM 26-Jan-13
60 Ltrs.
Ras Laffan
QCON
249 RFI-5858-QCN-0-0251 RFI-5858-QCN-0-0251 GENERAL MATL RECEIVING inspection 1. Hempel's Galvosil - 204 Ltrs. APPROVED -TSCF/Painting B-V-3100-004-0-200-10_0 3.0 W W H 27-Jan-13 7:30 AM 28-Jan-13
Raslaffan
QCON
250 RFI-5858-QCN-0-0252 RFI-5858-QCN-0-0252 GENERAL MATL RECEIVING inspection1. Garnet Abrasive Material - VVQ Minerals - 09 MT APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 27-Jan-13 7:45 AM 28-Jan-13
Ras Laffan
MATL RECEIVING inspection materials Electrode- 2.5 mm Dia, E7018-1H4 R - 800 QCON BZ- TCF
251 RFI-5858-QCN-0-0253 RFI-5858-QCN-0-0253 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 28-Jan-13 8:00 AM 28-Jan-13
KgsElectrode- 3.2 mm Dia, E7018-1H4 R - 400 Kgs Laydown Yard
QG Gate # 5 TSF
252 RFI-5858-QCN-0-0254 RFI-5858-QCN-0-0254 GENERAL MATL RECEIVING inspection materials 1. Binding Wire - 18 Gauge - 300 Roll. APPROVED Gate # 5 Lay down B-V-3100-004-0-200-10_0 3.0 W W H 28-Jan-13 8:00 AM 28-Jan-13
area
MATL RECEIVING inspection materials,Polyethylene Sheet 0.25mm (1000 Gauge) - 100 QG Gate#5 TCF
253 RFI-5858-QCN-0-0255 RFI-5858-QCN-0-0255 GENERAL
Rolls
APPROVED
Raslaffan
B-V-3100-004-0-200-10_0 3.0 W W H 28-Jan-13 8:10 AM 28-Jan-13
Material Received Inspection, 1. Hempels Galvosil - 504 Ltrs. 2. Hempadur Mastic - 300
Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 300 Ltrs. 4. Hempels QMFY/Painting Yard
254 RFI-5858-QCN-0-0256 RFI-5858-QCN-0-0256 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 29-Jan-13 7:00 AM 4-Feb-13
Thinner 0870 - 100 Ltrs. 5 .Hempels Thinner 0845 - 300 Ltrs. 6 .Hempels Thinner 08080 - Messaieed
100 Ltrs.
QCON
MATL RECEIVING inspection materials1. Garnet Abrasive Material - VVQ Minerals - 18
255 RFI-5858-QCN-0-0257 RFI-5858-QCN-0-0257 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 29-Jan-13 7:30 AM 29-Jan-13
MT
Ras Laffan
Material Received Inspection1. Hempels Galvosil - 204 Ltrs. 2. Hempadur Mastic -200
QMFY/Painting Yard
256 RFI-5858-QCN-0-0258 RFI-5858-QCN-0-0258 GENERAL Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 100 Ltrs. 6 .Hempels APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 30-Jan-13 7:00 AM 30-Jan-13
Messaieed
Thinner 08080 - 20 Ltrs. 5 .Hempels Thinner 0845 - 100 Ltrs.
Section -5 ( culvert
257 MATL RECEIVING inspection materials 1. HYSD BAR 10 MM- 54 kg ;16 MM- 6128 kg ;
RFI-5858-QCN-0-0259 RFI-5858-QCN-0-0259 GENERAL APPROVED BZRC-09A) Ras B-V-3100-004-0-200-10_0 3.0 W W H 31-Jan-13 7:30 AM 31-Jan-13
20 MM- 3758 kg, 25 MM-6790kg
Laffan
MATL RECEIVING inspection materials 1. Concrete Curing Compound- CURE Y 40- QG Gate # 5 TSF
258 RFI-5858-QCN-0-0260 RFI-5858-QCN-0-0260 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 3-Feb-13 7:30 AM 4-Feb-13
200Ltrs. 2. Conrep 304 VHS-40x25 Kgs. Area
Section -5 ( culvert
Matl receiving Insp. of Delivered materials 1. HYSD BAR 10 MM- 71 kg ;16 MM- 8609 kg ;
259 RFI-5858-QCN-0-0261 RFI-5858-QCN-0-0261 GENERAL APPROVED BZRC-09A) Ras B-V-3100-004-0-200-10_0 3.0 W W H 4-Feb-13 7:30 AM 6-Feb-13
20 MM- 5739 kg, 25 MM-9421kg
Laffan
Material Received Inspection 1. Hempels Galvosil - 300 Ltrs. 2. Hempadur Mastic -600
261 QMFY / Painting
RFI-5858-QCN-0-0263 RFI-5858-QCN-0-0263 GENERAL Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 300 Ltrs. 4 .Hempels APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 4-Feb-13 7:00 AM 7-Feb-13
Yard Messaieed
Thinner 0845 - 200 Ltrs.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
262 Matl receiving Insp. of Delivered materials 1. HYSD BAR 12 MM- 13919 kg ;16 MM- 8681 Section -5 Ras
RFI-5858-QCN-0-0264 RFI-5858-QCN-0-0264 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 5-Feb-13 7:30 AM 7-Feb-13
kg. Laffan
QG Gate # 5 TSF
263 RFI-5858-QCN-0-0265 RFI-5858-QCN-0-0265 GENERAL Matl receiving Insp. of Delivered materials FIBRE BOARD BITUCELL 20mm X 4" X 8" APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Feb-13 8:00 AM 9-Feb-13
Ras Laffan
Matl receiving Insp. of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - HBK Painting Yard
264 RFI-5858-QCN-0-0266 RFI-5858-QCN-0-0266 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Feb-13 7:30 AM 13-Feb-13
20 MT DOHA
Matl receiving Insp.1. Hempels Galvosil - 192 Ltrs. 2. Hempadur Mastic -200 Ltrs. HBK Painting Yard
265 RFI-5858-QCN-0-0267 RFI-5858-QCN-0-0267 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 7-Feb-13 7:40 AM 13-Feb-13
3.Hempels Thinner 0845 - 120 Ltrs. 4.Hempels Thinner 0845 - 80 Ltrs. DOHA
Material Received Inspection1. Hempels Galvosil - 300 Ltrs. 2. Hempadur Mastic -500
QMFY/Painting Yard 7:00 AM
266 RFI-5858-QCN-0-0268 RFI-5858-QCN-0-0268 GENERAL Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 300 Ltrs. 4 .Hempels APPROVED
Messaieed
B-V-3100-004-0-200-10_0 3.0 W W H 10-Feb-13 13-Feb-13
Thinner 0845 - 200 Ltrs.
QG Gate#5 TSF
267 RFI-5858-QCN-0-0269 RFI-5858-QCN-0-0269 GENERAL Matl receiving Insp. of Delivered materials 1. Conrep 304 VHS-100x25 Kgs. APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Feb-13 7:30 AM 12-Feb-13
Ras Laffan
Matl receiving Insp. of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - HBK Painting Yard
268 RFI-5858-QCN-0-0270 RFI-5858-QCN-0-0270 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Feb-13 11:00 AM 13-Feb-13
120 MT DOHA
Material Received Inspection 1. Hempels Galvosil - 204 Ltrs. 2. Hempadur Mastic -200
269 QCON
RFI-5858-QCN-0-0271 RFI-5858-QCN-0-0271 GENERAL Ltrs. 3. Hempathane Enamel Topcoat Grey Beige (RAL 1019) - 120 Ltrs. 4 .Hempels APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 10-Feb-13 7:00 AM 10-Feb-13
-TSCF/Painting Yard
Thinner 08080 - 20 Ltrs. 5 .Hempels Thinner 0845 - 100 Ltrs.
270 Material Received Inspection of Delivered materials 1. HYSD BAR 16 MM- 8568 kg ;20
RFI-5858-QCN-0-0272 RFI-5858-QCN-0-0272 GENERAL APPROVED Section -5 Raslaffan B-V-3100-004-0-201-10_5 3.0 W W H 11-Feb-13 7:30 AM 12-Feb-13
MM- 7400 kg;25 MM -12278 kg;10 MM -35 kg.
Material Received Inspection1. Hempels Galvosil - 600 Ltrs. 2. Hempadur Mastic -500
271 HBK Painting Yard
RFI-5858-QCN-0-0273 RFI-5858-QCN-0-0273 GENERAL Ltrs. 3.Hempels Thinner 0870 - 240 Ltrs. 4.Hempels Thinner 0845 - 300 Ltrs. 5.Hempels APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 12-Feb-13 10:00 AM 21-Feb-13
DOHA
Thinner 0808 - 240 Ltrs.
Material Received Inspection1. Hempels Galvosil - 492 Ltrs. (6) Hempathane Enamel Top
HBK Painting Yard
272 RFI-5858-QCN-0-0274 RFI-5858-QCN-0-0274 GENERAL coat-Grey Beige(Ral 1019) -500 Ltrs.2. Hempadur Mastic -500 Ltrs. 3.Hempels Thinner APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 16-Feb-13 10:00 AM 4-Mar-13
DOHA
0870 - 200 Ltrs. 4.Hempels Thinner 0845 - 300 Ltrs. 5.Hempels Thinner 0808 - 240 Ltrs.
QCON
Visual inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -
273 RFI-5858-QCN-0-0275 RFI-5858-QCN-0-0275 GENERAL
07MT
APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 16-Feb-13 7.00 AM 17-Feb-13
Ras Laffan
Material Received Inspection 1. Hempadur Mastic - 100 Ltrs. 2. Hempathane Enamel QCON
275 RFI-5858-QCN-0-0277 RFI-5858-QCN-0-0277 GENERAL Topcoat Grey Beige (RAL 1019) - 100 Ltrs. 3 .Hempels Thinner 0845 - 80 Ltrs. 4. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_0 3.0 W W H 18-Feb-13 7:30 AM 19-Feb-13
Hempels Tools Cleaner - 200 Ltrs. Raslaffan
Material Received of Delivered materials 1. HYSD BAR 16 MM- 6.0300 MT ;20 MM- QCON TSF GATE #
276 RFI-5858-QCN-0-0278 RFI-5858-QCN-0-0278 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 19-Feb-13 7:30 AM 22-Feb-13
5.0400 MT ;25 MM -14.231 MT; 5 Ras Laffan
Material Received Inspection of Delivered materials 1. HARD BOARD SHEET 4 X 8 X 3 QCON TSF GATE #
279 RFI-5858-QCN-0-0281 RFI-5858-QCN-0-0281 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 21-Feb-13 7:00 AM 22-Feb-13
MM-1000 SHT. 5 Ras Laffan
Material Received Inspection of Delivered materials 1. HYSD BAR 10 MM-0.129 MT;12 QCON TSF GATE #
280 RFI-5858-QCN-0-0282 RFI-5858-QCN-0-0282 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 21-Feb-13 7:30 AM 22-Feb-13
MM -2.995 MT;16 MM- 12.499 MT ;20 MM- 3.593 MT. 5 Ras Laffan
Material Received Inspection1. Hempadur Mastic - 160 Ltrs. 2. Hempathane Enamel QMFY/Painting Yard
281 RFI-5858-QCN-0-0283 RFI-5858-QCN-0-0283 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-Feb-13 7:00 AM 26-Feb-13
Topcoat Grey Beige (RAL 1019) - 80 Ltrs. Messaieed
282 Material Received Inspection1. Hempathane Enamel Top coat-Grey Beige(Ral 1019) -500 HBK Painting Yard
RFI-5858-QCN-0-0284 RFI-5858-QCN-0-0284 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 24-Feb-13 7:00 AM 26-Feb-13
Ltrs. DOHA
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
283 Material Received Inspection1. Hempels Thinner 0845 - 120 Ltrs.2. Hempadur Mastic - HBK Painting Yard
RFI-5858-QCN-0-0285 RFI-5858-QCN-0-0285 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 26-Feb-13 8:00 AM 28-Feb-13
500 Ltrs. DOHA
QCON
Material Received Inspection of Delivered materials,1. Garnet Abrasive Material - VVQ
284 RFI-5858-QCN-0-0286 RFI-5858-QCN-0-0286 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 27-Feb-13 7:00 AM 27-Feb-13
Minerals - 06 MT
Ras Laffan
Material Received Inspection of Delivered materials 1. HYSD BAR 10 MM-0.129 MT;12 QCON TSF GATE #
285 RFI-5858-QCN-0-0287 RFI-5858-QCN-0-0287 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 26-Feb-13 7:30 AM 27-Feb-13
MM -2.995 MT;16 MM- 12.499 MT ;20 MM- 3.593 MT.25MM 1.19 MT 5 Ras Laffan
Material Received Inspection1. Hempadur Mastic - 500 Ltrs. 2. Hempels Thinner 0845 -
HBK Painting Yard
288 RFI-5858-QCN-0-0290 RFI-5858-QCN-0-0290 GENERAL 140 Ltrs. 3. Hempels Thinner 08080 - 100 Ltrs. 4. Hempathane Enamel Top coat-Grey APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 2-Mar-13 8:00 AM 4-Mar-13
DOHA
Beige(Ral 1019) -500 Ltrs.
Visual inspection of Delivered materials 1. HYSD BAR 16 MM- 2.625MT ;20 MM- 13.781 QCN-TSF QG GATE
289 RFI-5858-QCN-0-0291 RFI-5858-QCN-0-0291 GENERAL APPROVED B-V-3100-004-0-200-01_1 3.0 W W H 4-Mar-13 7:30 PM 5-Mar-13
MT.25MM-4.367MT #5
QCON
291 RFI-5858-QCN-0-0293 RFI-5858-QCN-0-0293 GENERAL Material Received Inspection1. Garnet Abrasive Material - VVQ Minerals - 05 MT APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 5-Mar-13 7:00 AM 6-Mar-13
Ras Laffan
QCON
292 RFI-5858-QCN-0-0294 RFI-5858-QCN-0-0294 GENERAL Material Received Inspection1. Hempels Galvosil - 300 Ltrs. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 5-Mar-13 7:15 PM 6-Mar-13
Ras Laffan
294 RFI-5858-QCN-0-0296 RFI-5858-QCN-0-0296 GENERAL Material Received Inspection. JOINT SEAL PS-1000GG 50X4 LITERS APPROVED QCON TSF GATE # 5 B-V-3100-004-0-200-10_1 3.0 W W H 5-Mar-13 7:30 AM 6-Mar-13
QG Gate # 5 TSF
295 RFI-5858-QCN-0-0297 RFI-5858-QCN-0-0297 GENERAL Inspection of Delivered materials 1. Binding Wire - 18 Gauge - 100 Roll. APPROVED Gate # 5 Lay down B-V-3100-004-0-200-10_0 3.0 W W H 7-Mar-13 8:00 AM 7-Mar-13
area
Material Received Inspection1. Hempadur Mastic - 140 Ltrs. 2. Hempels Thinner 0845 - HBK Painting Yard
296 RFI-5858-QCN-0-0298 RFI-5858-QCN-0-0298 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 9-Mar-2013 7:00 AM 12-Mar-13
60 Ltrs. DOHA
Material Received Inspection1.Bitulex filler board 1.22 x 2.2 x 18mm - 100 nos 2. Hard
297 RFI-5858-QCN-0-0299 RFI-5858-QCN-0-0299 GENERAL APPROVED Gate 5 DOHA B-V-3100-004-0-200-10_1 3.0 W W H 9-Mar-2013 8:00 AM 11-Mar-13
Board Sheet 4x8x3mm - 150 nos, 3.Polythene sheet 1000 Gauge -20 Rol
Material Received Inspection1.Bitumen Emulsion Paint water proof SSP- 50 - 200 liter 2.
298 RFI-5858-QCN-0-0300 RFI-5858-QCN-0-0300 GENERAL APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 9-Mar-2013 8:00 AM 11-Mar-13
Admix 225 MB 3x 200 liters
299 Material Received Inspection1.Conrep 360 FFR 20 KG Bag-150Nos.2. Conrep 331 TX-25
RFI-5858-QCN-0-0301 RFI-5858-QCN-0-0301 GENERAL APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 10-Mar-13 8:00 AM 11-Mar-13
KG Bag-50nos 3.Conrep 304 VHS-25 KG Bags-120 Nos.
Material Received Inspection1.Polythene Sheet 1000 Gauge-79 Roll.2. Water Proof Tar
302 RFI-5858-QCN-0-0304 RFI-5858-QCN-0-0304 GENERAL APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 12-Mar-13 8:00 AM 13-Mar-13
ESB-20 Litrs 40Drum.
303 Material Received Inspection1. Hempels Galvosil - 700 Ltrs. 2. Hempels Thinner 08080 - HBK Painting Yard
RFI-5858-QCN-0-0305 RFI-5858-QCN-0-0305 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 13-Mar-13 8:00 AM 13-Mar-13
60 Ltrs.3.Hempels Thinner-08700-100Ltrs. DOHA
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Material Received Inspection1. Hempadur Mastic - 400 Ltrs. 2. Hempels Thinner 0845 -
304 HBK Painting Yard
RFI-5858-QCN-0-0306 RFI-5858-QCN-0-0306 GENERAL 200 Ltrs. 3. Hempathane Enamel Top coat-Grey Beige (Ral 1019) - 300 Ltrs. 4. Hempels APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 14-Mar-13 8:00 AM 16-Mar-13
SALWA, DOHA
Thinner 08080 - 100 Ltrs.
Matl receiving Insp.Filler Wire - 2.4 mm Dia, ER-70S2 - 75 Kgs. Electrode- 2.5 mm Dia,
QCON BZ- TCF
306 RFI-5858-QCN-0-0308 RFI-5858-QCN-0-0308 GENERAL E7018-1H4 R (BOHLER FOX S EV 50-1)) - 515.2 KgsElectrode- 2.5 mm Dia, E7018-1H4 APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 16-Mar-13 8:00 AM 16-Mar-13
Laydown Yard
R (BOHLER FOX S EV 50-1)) Vac Pac- 400 Kgs
Matl receiving Insp of Delivered materials 1. HYSD BAR 10mm(45kg),16mm(4814 QCON TSF GATE #
307 RFI-5858-QCN-0-0309 RFI-5858-QCN-0-0309 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 16-Mar-13 7:30 AM 16-Mar-13
kg),20mm-7169 kg),25mm(8858 kg) 5 Ras Laffan
QCON
Materials inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals -
310 RFI-5858-QCN-0-0312 RFI-5858-QCN-0-0312 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 20-Mar-13 6:30 AM 21-Mar-13
06 MT
Ras Laffan
311 Materials inspection of Delivered materials 1. HYSD BAR 12mm(1.503 QCON TSF GATE #
RFI-5858-QCN-0-0313 RFI-5858-QCN-0-0313 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 20-Mar-13 7:30 AM 21-Mar-13
Mt),16mm(2.01Mt),20 MM(2.016) 5 Ras Laffan
312 Material Received Inspection1. Hempels Thinner 0845 - 100 Ltrs.2. Hempadur Mastic - HBK Painting Yard
RFI-5858-QCN-0-0314 RFI-5858-QCN-0-0314 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 21-Mar-13 8:00 AM 24-Mar-13
360 Ltrs. SALWA, DOHA
313 Material inspection of Delivered materials 1. Binding Wire - 18 Gauge - ASTM A82-200 QG Gate # 5 TSF
RFI-5858-QCN-0-0315 RFI-5858-QCN-0-0315 GENERAL APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 21-Mar-13 7:30 AM 22-Mar-13
Roll. Ras Laffan
QG Gate # 5 TSF
314 RFI-5858-QCN-0-0316 RFI-5858-QCN-0-0316 GENERAL Metrial inspection of Delivered materials 1. DEKGUARD PRIMER (20X30 CAN) APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-Mar-13 7:30 AM 24-Mar-13
Ras Laffan
Material Received Inspection1. Hempels Galvosil - 144 Ltrs. 2. Hempadur Mastic - 100 QCON
315 RFI-5858-QCN-0-0317 RFI-5858-QCN-0-0317 GENERAL Ltrs. 3. Hempathane Enamel Top coat-Grey Beige (Ral 1019) - 60 Ltrs. 4. Hempels APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 24-Mar-13 7:00 AM 24-Mar-13
Thinner 0870 - 60 Ltrs. Ras Laffan
Visual inspection of Delivered materials 1. WATER PROOF SSP 50-200 Ltr Drum-2nos
QG Gate # 5
316 RFI-5858-QCN-0-0318 RFI-5858-QCN-0-0318 GENERAL 2. ADMIX 225 MB-20ltr Drum-4nos. 3. CONCRETE CURING COMPOUND-Cure Y 40- APPROVED
Raslaffan
B-V-3100-004-0-200-10_1 3.0 W W H 24-Mar-13 7:30 AM 26-Mar-13
200Ltr Drum-1 no
Material Received Inspection1. Hempadur Mastic - 120 Ltrs. 2. Hempels Thinner 0845 -
HBK Painting Yard
318 RFI-5858-QCN-0-0320 RFI-5858-QCN-0-0320 GENERAL 40 Ltrs. 3. Hempathane Enamel Top coat-Grey Beige (Ral 1019) - 300 Ltrs. 4. Hempels APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 27-Mar-13 8:00 AM 30-Mar-13
SALWA, DOHA
Thinner 08080 - 100 Ltrs.
Material Received inspection of Delivered materials 1. HYSD BAR 10mm(192kg), QCON TSF GATE #
319 RFI-5858-QCN-0-0321 RFI-5858-QCN-0-0321 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 27-Mar-13 7:30 AM 30-Mar-13
(12mm(998kg),16mm(13766kg);20mm(10749kg),25mm(1975kg) 5 Ras Laffan
QCON
321 RFI-5858-QCN-0-0323 RFI-5858-QCN-0-0323 GENERAL Material Received Inspection1. Hempels Galvosil - 144 Ltrs. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 3-Apr-13 7:00 AM 4-Apr-13
Ras Laffan
Material Received Inspection1. Hempels Galvosil - 300 Ltrs. 1. Hempadur Mastic - 300
324 HBK Painting Yard
RFI-5858-QCN-0-0326 RFI-5858-QCN-0-0326 GENERAL Ltrs. 2. Hempels Thinner 0845 - 120 Ltrs.3. Hempathane Enamel Top coat-Grey Beige APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 06-Apr-2013 8:00 AM 7-Apr-13
SALWA, DOHA
(Ral 1019) - 160 Ltrs. 4. Hempels Thinner 08080 - 20 Ltrs.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QCON
325 RFI-5858-QCN-0-0327 RFI-5858-QCN-0-0327 GENERAL Material Received Inspection1. Densyl Butyl 30 Tape (4") - 01 Roll APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 07-Apr-2013 7:00 AM 9-Apr-13
Ras Laffan
QCON
Material Received Inspection1. Hempadur Mastic - 100 Ltrs. 2. Hempathane Enamel Top
326 RFI-5858-QCN-0-0328 RFI-5858-QCN-0-0328 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 07-Apr-2013 7:15 AM 9-Apr-13
coat-Grey Beige (Ral 1019) - 60 Ltrs. 3. Hempels Thinner 0845 - 80 Ltrs.
Ras Laffan
Material inspection of Delivered materials CONREP 304 VHS-50X25KG,CONREP 331 QCON TSF GATE #
327 RFI-5858-QCN-0-0329 RFI-5858-QCN-0-0329 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 8-Apr-13 7:00 AM 10-Apr-13
TX -80X25KG,JOINT SEAL 4LIT X 60 CANS 5 Ras Laffan
QG Gate # 5 TSF
328 RFI-5858-QCN-0-0330 RFI-5858-QCN-0-0330 GENERAL Material Inspection of Delivered materials 1. Binding Wire - 18 Gauge - 130 Roll. APPROVED Gate # 5 Lay down B-V-3100-004-0-200-10_0 3.0 W W H 9-Apr-13 7:30 AM 10-Apr-13
area
QCON
333 RFI-5858-QCN-0-0335 RFI-5858-QCN-0-0335 GENERAL Material Received Inspection1. Hempels Galvosil - 144 Ltrs. 2. Thinner 0870 - 40 Ltrs APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 16-Apr-13 7:00 AM 16-Apr-13
Ras Laffan
334 Material inspection of delevered materials,1.REINFORCED CONCRETE PIPE -(1000mm QG Gate#5 TSF
RFI-5858-QCN-0-0336 RFI-5858-QCN-0-0336 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 16-Apr-13 7:30AM 18-Apr-13
DIA,Length 3000mm)-CLASS M (02 NOS, serial no :2293,2294) Raslaffan
Material inspection of delevered materials,1.HDPE PIPE 14"X12MT -2NOS &UPVC QG Gate#5 TSF
335 RFI-5858-QCN-0-0337 RFI-5858-QCN-0-0337 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 20-Apr-13 7:30AM 21-Apr-13
150mm DIA 6" X 6MT -9NOS Raslaffan
QCON
337 RFI-5858-QCN-0-0339 RFI-5858-QCN-0-0339 GENERAL Material Received Inspection1. Hempels Galvosil - 100 Ltrs. APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 22-Apr-13 7:00 AM 23-Apr-13
RasLaffan
Matl receiving Insp.Electrode- 3.2 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)) - QCON BZ- TCF
338 RFI-5858-QCN-0-0340 RFI-5858-QCN-0-0340 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 24-Apr-13 8:30 AM 24-Apr-13
500 Kgs Laydown Yard
Matterial Received Inspection 1. Hempadur Mastic 400 Ltrs. 2. Hampathane Enamel Top
342 RFI-5858-QCN-0-0344 RFI-5858-QCN-0-0344 GENERAL APPROVED HBK Painting Yars B-V-3100-004-0-200-10_1 3.0 W W H 27-Apr-13 7:00 AM 29-Apr-13
coat -Grey Beige (Ral 1019) - 200 Ltrs. 3. Hempels Thinner 0845 - 140 Ltrs.
Material Received Inspection1. Hempels Galvosil - 200 Ltrs. 2. Hempels Thinner 0845 -
346 HBK Painting Yard
RFI-5858-QCN-0-0348 RFI-5858-QCN-0-0348 GENERAL 160 Ltrs. 3. Hempadur Mastic -200 Ltrs. 4. Hempathane Enamel Top coat-Grey Beige APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 30-Apr-13 7:00 AM 3-May-13
SALWA, DOHA
(Ral 1019) -100 Ltrs. 5. Hempels Thinner 08080 -40 Ltrs.
QCON
Material Received Inspection1. Hempels Galvosil - 120 Ltrs. 2. Hempels Thinner 0845-60
347 RFI-5858-QCN-0-0349 RFI-5858-QCN-0-0349 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 30-Apr-13 7:00 AM 30-Apr-13
Ltrs. 3. Hempadur Mastic -140 Ltrs. 4. Hempels Thinner 0870 - 20 Ltrs.
Ras Laffan
Material inspection of delevered materials,1) Nelson shear stud KB 19x100 mm, Qty-250 QG Gate#5 TSF
348 RFI-5858-QCN-0-0350 RFI-5858-QCN-0-0350 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 1-May-13 9:00 AM 2-May-13
nos, 2) Ferrule for WHSB M19x 100- Qty-650 nos. Raslaffan
Matl receiving Insp.Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1) Vac- QCON BZ- TCF
349 RFI-5858-QCN-0-00351 RFI-5858-QCN-0-00351 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 6-May-13 8:30 AM 6-May-13
pac) - 150 Kgs Laydown Yard
Material Received Inspection1. Hempadur Mastic - 260 Ltrs. 2. Hempathane Enamel Top
HBK Painting Yard
351 RFI-5858-QCN-0-00353 RFI-5858-QCN-0-00353 GENERAL coat-Grey Beige (Ral 1019) - 180 Ltrs. 3. Hempels Thinner 0845 - 100 Ltrs. 4. Hempels APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 7-May-13 7:00 AM 8-May-13
SALWA, DOHA
Thinner 08080 - 40 Ltrs. 5. Hempels Galvosil - 150 Ltrs.
352 RFI-5858-QCN-0-00354 RFI-5858-QCN-0-00354 GENERAL Material Received Inspection1.Water Proof TAR ESB 31 x 20 litre APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 8-May-13 8:00 AM 9-May-13
Material Received Inspection1. Hempadur Mastic - 480 Ltrs. 2. Hempathane Enamel Top
353 coat-Grey Beige (Ral 1019) - 180 Ltrs. 3. Hempels Thinner 0845 - 180 Ltrs.4. Hempels HBK Painting Yard
RFI-5858-QCN-0-0355 RFI-5858-QCN-0-0355 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 9-May-13 7:00 AM 14-May-13
Thinner 08080 - 80 Ltrs. 5. Hempels Galvosil - 360 Ltrs. 6. Hempels Thinner 0870 - 160 SALWA, DOHA
Ltrs.
355 RFI-5858-QCN-0-00357 RFI-5858-QCN-0-00357 GENERAL Material Received Inspection1.Hard Board 2.5mmx4"x8"-228 nos APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 11-May-13 8:00 AM 13-May-13
356 RFI-5858-QCN-0-00358 RFI-5858-QCN-0-00358 GENERAL Material Received Inspection1.Filler Board -18mm(Jolly Bitulex) 4'x8'-30nos APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 12-May-13 8:00 AM 15-May-13
Material Received Inspection1. Hempadur Mastic - 160 Ltrs. 2. Hempathane Enamel Top QCON
357 RFI-5858-QCN-0-0359 RFI-5858-QCN-0-0359 GENERAL coat-Grey Beige (Ral 1019) - 40 Ltrs. 3. Hempels Thinner 0845 - 100 Ltrs. 4. Hempels APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 13-May-13 7:00 AM 16-May-13
Thinner 08080 - 60 Ltrs. 5. Hempadur Zinc 17360 - 60 Ltrs. Ras Laffan
Material Received Inspection1. Hempels Galvosil - 120 Ltrs. 2. Hempels Thinner 0870 - HBK Painting
358 RFI-5858-QCN-0-00360 RFI-5858-QCN-0-00360 GENERAL
40 Ltrs.
APPROVED
YardSALWA, DOHA
B-V-3100-004-0-200-10_1 3.0 W W H 15-May-13 7:00 AM 19-May-13
QG Gate # 5 TSF
359 RFI-5858-QCN-0-00361 RFI-5858-QCN-0-00361 GENERAL Material inspection of Delivered materials 1. WATER PROOF SSP 50, 200 Ltr 3 Drums APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 18-May-13 7:30 AM 20-May-13
Ras Laffan
Matl receiving Insp.Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1) Vac- QCON BZ- TCF
360 RFI-5858-QCN-0-00362 RFI-5858-QCN-0-00362 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 20-May-13 8:30 AM 20-May-13
pac) - 596 Kgs Laydown Yard
QCON
Material inspection of Delivered materials,1. Garnet Abrasive Material - VVQ Minerals - 03
361 RFI-5858-QCN-0-00363 RFI-5858-QCN-0-00363 GENERAL APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 22-May-13 7:15 AM 23-May-13
MT
Ras Laffan
QCON
362 RFI-5858-QCN-0-00364 RFI-5858-QCN-0-00364 GENERAL Material inspection of Delivered materials,1. Garnet Abrasive Material - BMC - 10 MT APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 22-May-13 7:30 AM 23-May-13
Ras Laffan
Material inspection of Delivered materials 1. HARD BOARD SHEET 4 X 8 X 3 MM-300 QCON TSF GATE #
363 RFI-5858-QCN-0-00365 RFI-5858-QCN-0-00365 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 22-May-13 7:00 AM 23-May-13
SHT. 5 Ras Laffan
Material inspection of Delivered materials 1. HARD BOARD SHEET 4 X 8 X 3 MM-372 QCON TSF GATE #
364 RFI-5858-QCN-0-00366 RFI-5858-QCN-0-00366 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-May-13 7:00 AM 26-May-13
SHT. 5 Ras Laffan
Material inspection of delevered materials,1.UPVC DUCT CL C SOLVENT SOCKET 6"- 2 QG Gate#5 TSF
365 RFI-5858-QCN-0-00367 RFI-5858-QCN-0-00367 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-May-13 7:30 AM 26-May-13
NOS Raslaffan
366 Matl receiving Insp. M.S.Plate- 3 mm x 4x8ft-Qty-2, M.S.Plate- 5 mm x 4x8ft- Qty-2, QCON BZ- TCF
RFI-5858-QCN-0-00368 RFI-5858-QCN-0-00368 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-May-13 9:00 AM 23-May-13
M.S.Plate- 8 mm x 4x8ft- Qty-2, M.S.Plate- 10 mm x 4x8ft- Qty-3 Laydown Yard
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Material Received Inspection 1. Hempadur Mastic - 360 Ltrs. 2. Hempathane Enamel Top
367 HBK Painting Yard
RFI-5858-QCN-0-00369 RFI-5858-QCN-0-00369 GENERAL coat-Grey Beige (Ral 1019) - 320 Ltrs. 3. Hempels Thinner 0845 - 220 Ltrs. 4. Hempels APPROVED B-V-3100-004-0-200-10_3 3.0 W W H 25-May-13 7:00 AM 27-May-13
SALWA, DOHA
Thinner 08080 - 160 Ltrs. 5. Hempels Galvosil - 180 Ltrs.
Visual inspection of delevered materials,1.CONREP 360 FFR 20X25KG2CONREP 331 QG Gate#5 TSF
369 RFI-5858-QCN-0-00371 RFI-5858-QCN-0-00371 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 29-May-13 7:30 AM 30-May-13
TX (18X25KG) Raslaffan
Material inspection of delevered materials,1) Nelson shear stud KB 19x100 mm, Qty-600 QG Gate#5 TSF
370 RFI-5858-QCN-0-00372 RFI-5858-QCN-0-00372 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 29-May-13 9:00 AM 30-May-13
nos, 2) Ceramic Ferrules :KSN-19 - Qty-600 nos. Raslaffan
Material Received Inspection1. Hempels Galvosil - 120 Ltrs. 3. Hempathane Enamel Top
HBK Painting Yard
371 RFI-5858-QCN-0-00373 RFI-5858-QCN-0-00373 GENERAL coat-Grey Beige (Ral 1019) - 60 Ltrs.2. Hempadur Mastic - 100 Ltrs. 4. Hempels Thinner APPROVED
SALWA, DOHA
B-V-3100-004-0-200-10_1 3.0 W W H 30-May-13 7:00 AM 2-Jun-13
0845 - 80 Ltrs.
Material Received Inspection1. Hempels Galvosil - 60 Ltrs. 2. Hempathane Enamel Top HBK Painting Yard
372 RFI-5858-QCN-0-00374 RFI-5858-QCN-0-00374 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 5-Jun-13 7:00 AM 8-Jun-13
coat-Grey Beige (Ral 1019) - 60 Ltrs. SALWA, DOHA
Material Received Inspection1. Hempadur Mastic - 340 Ltrs. 2. Hempathane Enamel Top
374 HBK Painting Yard
RFI-5858-QCN-0-00376 RFI-5858-QCN-0-00376 GENERAL coat-Grey Beige (Ral 1019) - 100 Ltrs. 3. Hempels Thinner 0845 - 180 Ltrs. 4. Hempels APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 6-Jun-13 7:00 AM 8-Jun-13
SALWA, DOHA
Thinner 08080 - 40 Ltrs. 5. Hempels Galvosil - 60 Ltrs.
375 1) Electrode- 3.2 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)Vac-pac) – Heat QCON BZ TCF Lay
RFI-5858-QCN-0-00377 RFI-5858-QCN-0-00377 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 6-Jun-13 7:00 AM 8-Jun-13
no.12335, 696 kg, down
1) Electrode- 3.2 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)) – Heat no.12586, QCON Lay down,
378 RFI-5858-QCN-0-00380 RFI-5858-QCN-0-00380 GENERAL
102 kg,
APPROVED
Salwa Lay down
B-V-3100-004-0-200-10_1 3.0 W W H 11-Jun-13 8:00 AM 12-Jun-13
381 RFI-5858-QCN-0-00383 RFI-5858-QCN-0-00383 GENERAL Material Received Inspection1.Polythene sheet 1000Gauge(0.25mm) 25 Rol APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 16-Jun-13 8:00 AM 16-Jun-13
Material inspection of Delivered materials 1. HARD BOARD SHEET 4" X 8" X 2.5 MM-300 QCON TSF GATE #
382 RFI-5858-QCN-0-00384 RFI-5858-QCN-0-00384 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 17-Jun-13 7.00 AM 19-Jun-13
SHT. 5 Ras Laffan
Material Received Inspection1. Hempels Galvosil - 100 Ltrs. 2. Hempadur Mastic - 160 HBK Painting Yard
384 RFI-5858-QCN-0-00386 RFI-5858-QCN-0-00386 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 20-Jun-13 7:30 AM 22-Jun-13
Ltrs. SALWA, DOHA
QG Gate#5 TSF
385 RFI-5858-QCN-0-00387 RFI-5858-QCN-0-00387 GENERAL Material inspection of delevered materials, 1.CONREP 331 TX (7X25KG) APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 20-Jun-13 7:30 AM 22-Jun-13
Raslaffan
Visual inspection of Delivered materials 1. HYSD BAR 12mm(1.002 Ton)2.HYSD BAR QCON TSF GATE #
386 RFI-5858-QCN-0-00388 RFI-5858-QCN-0-00388 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 25-Jun-13 7:30 AM 28-Jun-13
16mm(1.005 Ton), 3.HYSD BAR 20mm (1.008 Ton) 5 Ras Laffan
387 Visual inspection of delevered materials,1) Nelson shear stud KB 19x100 mm, Qty-75 QG Gate#5 TSF
RFI-5858-QCN-0-00389 RFI-5858-QCN-0-00389 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 27-Jun-13 9:00AM 28-Jun-13
nos, 2) Ferrule for WHSB M19x 100- Qty-75 nos. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Material Received Inspection1. Hempadur Zinc 17360 - 140 Ltrs. 2. Hempels Thinner QCON
388 RFI-5858-QCN-0-00390 RFI-5858-QCN-0-00390 GENERAL 0845 - 200 Ltrs.3. Hempels Thinner 08080 - 100 Ltrs. 4. Hempathane Enamel Top coat- APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 1-Jul-13 7:30 AM 2-Jul-13
Grey Beige (Ral 1019) - 200 Ltrs. Ras Laffan
Material Received Inspection1. Hempels Galvosil - 80 Ltrs. 2. Hempathane Enamel Top QCON
390 RFI-5858-QCN-0-00392 RFI-5858-QCN-0-00392 GENERAL coat-Grey Beige (Ral 1019) - 60 Ltrs. 3. Hempels Thinner 0870 - 40 Ltrs. 4. Hempels APPROVED -TSCF/Painting Yard B-V-3100-004-0-200-10_1 3.0 W W H 3-Jul-13 7:30 AM 4-Jul-13
Thinner 08080 - 20 Ltrs. 5. Hempels Thinner 0845 - 60 Ltrs. Ras Laffan
Material inspection of delevered materials,1.CONREP 360 FFR 20X25KG 2.CONREP QG Gate#5 TSF
391 RFI-5858-QCN-0-00393 RFI-5858-QCN-0-00393 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 3-Jul-13 7:30 AM 4-Jul-13
304 VHS (100X25KG) 3.CONREP 225 MB (10 x20litr) Raslaffan
1) Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)Vac pack) – Heat QCON BZ TCF Lay
392 RFI-5858-QCN-0-00394 RFI-5858-QCN-0-00394 GENERAL
no.13219, 96 kg,
APPROVED
down
B-V-3100-004-0-200-10_1 3.0 W W H 8-Jul-13 7:00 AM 8-Jul-13
393 RFI-5858-QCN-0-00395 RFI-5858-QCN-0-00395 GENERAL Material Received Inspection 1.Hard Board 2.5mmx4"x8"-500 nos APPROVED QG Gate 5 Raslaffan B-V-3100-004-0-200-10_1 3.0 W W H 9-Jul-13 8:00 AM 11-Jul-13
Visual inspection of delevered materials,1.CONREP 360 FFR 60X25KG2.CONREP 304 Qcon TSF Barzhan
394 RFI-5858-QCN-0-00396 RFI-5858-QCN-0-00396 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 10-Jul-13 7:00 AM 11-Jul-13
VHS (100X25KG) Barzhan TSF
395 1) Electrode- 2.5 mm Dia, E7018-1H4 R (BOHLER FOX S EV 50-1)Vac pack) – Heat QCON BZ TCF Lay
RFI-5858-QCN-0-00397 RFI-5858-QCN-0-00397 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 10-Jul-13 7:00 AM 10-Jul-13
no.13219, 1752 kg, down
Visual inspection of delevered materials,1.UPVC 400mm Dia x 5.8 mtr long-34 Qcon TSF Barzan
400 RFI-5858-QCN-0-00402 RFI-5858-QCN-0-00402 GENERAL
nos,2.UPVC 400 mm Dia x 6 mtr long -7 nos
APPROVED
Barzan
B-V-3100-004-0-200-10_1 3 W W H 22-Jul-13 7:30 AM 24-Jul-13
Material Received Inspection1. Hempels Galvosil - 130 Ltrs. 2. Hempadur Mastic - 180
Ltrs. 3. Hempathane Enamel Top coat-Grey Beige (Ral 1019) - 80 Ltrs. 4. Hempels HBK Painting Yard
402 RFI-5858-QCN-0-00404 RFI-5858-QCN-0-00404 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 23-Jul-13 7:00 AM 23-Jul-13
Thinner 08080 - 80 Ltrs. 5. Hempels Thinner 0845 - 140 Ltrs. 6. Hempels Thinner 0870 - SALWA, DOHA
20 Ltrs.
Visual inspection of Delivered materials 1.Fence & Gate Material (as per attached QCON TSF Barzan
403 RFI-5858-QCN-0-00405 RFI-5858-QCN-0-00405 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 25-Jul-13 7:00 AM 28-Jul-13
Delivery note) Barzan
404 7:00 AM
RFI-5858-QCN-0-00406 RFI-5858-QCN-0-00406 GENERAL Material Received Inspection1.Polythene sheet 1000Gauge(0.25mm) 75 Rol APPROVED Gate 5 Raslafan B-V-3100-004-0-200-10_1 3.0 W W H 30-Jul-13 1-Aug-13
QCON
406 RFI-5858-QCN-0-00408 RFI-5858-QCN-0-00408 GENERAL Visual inspection of Delivered materials, 1. Garnet Abrasive Material - BMC - 20 MT APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 4-Aug-13 7:15 AM 5-Aug-13
-TSCF/Painting Yard
Visual inspection of Delivered materials, Garnet Abrasive Material - VVQ Minerals - 06 QCON
407 RFI-5858-QCN-0-00409 RFI-5858-QCN-0-00409 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 4-Aug-13 7:30 AM 5-Aug-13
MT -TSCF/Painting Yard
1. Hempathane Enamel Top coat-Grey Beige (Ral 1019) - 40 Ltrs. 2. Hempels Thinner
408 0870 - 20 Ltrs. 3. Hempels Thinner 0845 - 100 Ltrs. 4. Hempels Thinner 08080 - 20 Ltrs. HBK Painting Yard
RFI-5858-QCN-0-00410 RFI-5858-QCN-0-00410 GENERAL APPROVED B-V-3100-004-0-200-10_1 3.0 W W H 4-Aug-13 7:40 AM 5-Aug-13
5. Hempadur 85671 - 80 Ltrs. 6. Hempels Galvosil - 50 Ltrs. 7. Hempadur Mastic - 60 SALWA, DOHA
Ltrs.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
409 Material Received Inspection1..Binding wire 18 Gauge -30 Roll2.SIKAFLEX PRO 31 600 Barzan Laydown
RFI-5858-QCN-0-00411 RFI-5858-QCN-0-00411 GENERAL OPEN B-V-3100-004-0-200-10_1 3.0 W W H 5-Aug-13 8:00 AM
ml -5 Pack Raslafan
410 RFI-5858-QCN-1-0001 RFI-5858-QCN-1-0001 CIVIL Sampling for fill material Type_A APPROVED Barzan Off-Plot Area B-V-3100-004-1-201-01_3 3.1.a R W H 4-Jun-12 8.30 AM 4-Jun-12
Review and approval of QIL test report for Back fill Material (Type-A) for the sampled
413 RFI-5858-QCN-1-0004 RFI-5858-QCN-1-0004 CIVIL location PS-08 Stockpile Area-3 APPROVED Barzan Off-Plot Area B-V-3100-004-1-201-01_3 3.1.a R W H 12-Jun-12 8:30 AM 12-Jun-12
Sampling for the excavated fill Material (Type-B) at the sample location PS-08 Stockpile Barzan Off-plot Area:
415 RFI-5858-QCN-1-0006 RFI-5858-QCN-1-0006 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1 b R W H 27-Jun-12 8:30 AM 27-Jun-12
Area-3B (13Cu.M) D100
Check excavation
PS-08-F1 SLD014 TO SLD001-(13 No's),PS-09-F1 SLD071 TO SLD058- (14 No's)
BET Mashrab to
416 RFI-5858-QCN-1-0007 RFI-5858-QCN-1-0007 CIVIL PS-09-F1 SLD038 TO SLD024-14 No's (SLD36 & 37 not included) SLD092,091,090,088 APPROVED B-V-3100-004-1-201-01_2 2.2 R W H 30-Jun-12 8.00 AM 30-Jun-12
Hamla Avenue
(4 no's)
B70 PR 09 (Loop 005),B70 PR 46 (loop 033),PS-08-F2 SLD069,PS-08F2-SLD061
BET.MASHRAB TO
418 Check Excavation - Bottom of Excavation Verification, B70-PS-02-F1 SLD01 TO SLD033
RFI-5858-QCN-1-0009 RFI-5858-QCN-1-0009 CIVIL APPROVED HAMLA Raslaffan B-V-3100-004-1-201-01_3 2.2 R W H 12-Jul-12 9:00 AM 12-Jul-12
= 30 nos ( SLD002&003 Not Included), PS-03-F1 SLD064 TO SLD100 - 36 nos.
Area
Check Excavation - Bottom of Excavation Verification, B70-PS-13 SLD035 TO SLD008 = Hamad to Ras Laffan
419 RFI-5858-QCN-1-0010 RFI-5858-QCN-1-0010 CIVIL
21 nos ( SLD028, 27 022, 021, 018 - Not Included)
APPROVED
Refinery
B-V-3100-004-1-201-01_2 2.2 R W H 12-Jul-12 8:00 AM 12-Jul-12
Sampling for Fill Material Type-A AT Sample Location PS-08 Stock Pile Area 3A- 1 Barzan Off-plot Area
420 RFI-5858-QCN-1-0011 RFI-5858-QCN-1-0011 CIVIL
(63.87cu.m)
APPROVED
D100
B-V-3100-004-1-201-01_3 3.1.a R W H 12-Jul-12 9:30 AM 12-Jul-12
Sampling for Fill Material Type-B AT Sample Location PS-08 Stock Pile Area 3B- 1 Barzan Off-plot Area
421 RFI-5858-QCN-1-0012 RFI-5858-QCN-1-0012 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 12-Jul-12 9:30 AM 12-Jul-12
(239.55cu.m) D100
Check Type Compaction Test of Sleeper foundation 1st layer PS-07-F1 SLD0101 To BET.MASHRAB TO
422 RFI-5858-QCN-1-0013 RFI-5858-QCN-1-0013 CIVIL CANCELLED B-V-3100-004-1-201-01_2 4.2.b R W H 15-Jul-12 3:30 PM 14-Jul-12 Not Ready for Inspection
SLD071 (SLD094,93,85,84,83&82 Not Included)-(25 nos). HAMLA AVENUE
Review and approval of QIL test Report for Back fill Material (Type B) for the sampled Barzan Off-plot Area
423 RFI-5858-QCN-1-0014 RFI-5858-QCN-1-0014 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 21-Jul-12 7:30 AM 21-Jul-12
Location PS-08 Stockpile Area-3B-1. 100
BET.MASHRAB TO
Check Type-B Compaction Test of sleeper foundation 1st layer PS-07-F1 SLD0101 TO
424 RFI-5858-QCN-1-0015 RFI-5858-QCN-1-0015 CIVIL APPROVED HAMLA AVENUE B-V-3100-004-1-201-01_2 4.2.b R W H 25-Jul-12 8.00 AM 25-Jul-12
SLD071 (SLD094,93,85,84,83&82 NOT INCLUDED)-(25 No.S)
Raslaffan Area
425 Review and approval of QIL test for report for Back fill Material (Type-A) for the sampled Barzan Off-plot D100
RFI-5858-QCN-1-0016 RFI-5858-QCN-1-0016 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 25-Jul-12 7.30 AM 25-Jul-12
location PS-08- Stockpile Area-3A-1 Area
Check Excavation-Bottom of Excavation verification Culvert BZRC-009 (Blinding 17 meter QG Gate # 5 TSF
426 RFI-5858-QCN-1-0017 RFI-5858-QCN-1-0017 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 28-Jul-12 8:30 AM 28-Jul-12
Langth) Raslaffan
BET.Mashrab to
Check Type-B Compaction Test of sleeper foundation 2nd layer PS-07-F1 SLD0101
427 RFI-5858-QCN-1-0018 RFI-5858-QCN-1-0018 CIVIL CANCELLED Hamla Avenue B-V-3100-004-1-201-01_2 4.2 R W H 28-Jul-12 1:30 PM 28-Jul-12 Not Ready for Inspection
TO SLD071 (SLD094,93,85,84,83&82 NOT INCLUDED)-(25 No.S)
Raslaffan
BET.MASHRAB TO
429 Check Type-B Compaction Test of Sleeper foundation Final layer PS-07-F1 SLD0101 To
RFI-5858-QCN-1-0020 RFI-5858-QCN-1-0020 CIVIL APPROVED HAMALA AVENUE B-V-3100-004-1-201-01_2 4.2.b R W H 30-Jul-12 2:30 PM 30-Jul-12
SLD071 (SLD094,93,85,84,83 & 82 not Included)-(25 nos)
Raslaffan Area
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
NEAR MASHRAB
431 RFI-5858-QCN-1-0022 RFI-5858-QCN-1-0022 CIVIL Check Excavation-Bottom of Excavation verification DUCTBANK BZDP 005 APPROVED AVENUE SIGNAL B-V-3100-004-1-201-01_2 2.2 R W H 1-Aug-12 8:00 AM 1-Aug-12
RASLAFFAN AREA
Check Excavation - Bottom of Excavation Verification. B70-PS-13 and B70-PS-14, QG Gate # 5 TSF
432 RFI-5858-QCN-1-0023 RFI-5858-QCN-1-0023 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 2-Aug-12 8:00 AM 2-Aug-12
SLD007 to SLD070 = 39 nos ( SLD102, SLD101,SLD081 not included ) Raslaffan
BET.Mashrab to
Check Type-B Compaction Test of sleeper foundation 1st layer PS-07-F1 SLD070 TO
433 RFI-5858-QCN-1-0024 RFI-5858-QCN-1-0024 CIVIL APPROVED Hamla Avenue B-V-3100-004-1-201-01_2 4.2.b R W H 4-Aug-12 8:00 AM 4-Aug-12
SLD042 (SLD044&SLD043-NOT INCLUDED)-(25 No.S)
Raslaffan
Near mashrab
434 RFI-5858-QCN-1-0025 RFI-5858-QCN-1-0025 CIVIL Check Type - A Compaction of Formation Level Prior to blinding Duct Bank BZDP 005 APPROVED Avenue Signal B-V-3100-004-1-201-01_2 2.2 R W H 4-Aug-12 8:00 AM 4-Aug-12
Raslaffan Area
Sampling for Fill Material Type -B AT SAMPLE LOCATION Gate -5, Stock Pipe # BZRC- Barzan Off-Plot Area
436 RFI-5858-QCN-1-0027 RFI-5858-QCN-1-0027 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 7-Aug-12 7:30 AM 7-Aug-12
009 # 1 (120 cu.m) Gate - 5
437 Check Excavation - Bottom of Excavation Verification. B70-PS-14, SLD0079 to SLD057 QG Gate # 5 TSF
RFI-5858-QCN-1-0028 RFI-5858-QCN-1-0028 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 9-Aug-12 8:30 AM 7-Aug-12
= 21 nos ( Except SLD064 and SLD063 ) Raslaffan
Check Type-A Compaction Test of Loof, Pipe Stopper, Bridge and Pipe Sleeper (B70-
438 Section 1 Area:
RFI-5858-QCN-1-0029 RFI-5858-QCN-1-0029 CIVIL PR-03,B70-PR-05 ) (B70-PS-03-SLD018, SLD028 and SLD078) Bridge and (B70-PS-01, APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 12-Aug-12 9:30 AM 12-Aug-12
Raslaffan
SLD002 to SLD005)
439 Check Type-B Compaction Test of sleeper foundation 1st layer B70-PS-07-F1, SLD042 Section 2 Area:
RFI-5858-QCN-1-0030 RFI-5858-QCN-1-0030 CIVIL APPROVED B-V-3100-004-1-201-01_3 4.2.b R W H 13-Aug-12 8:30 AM 13-Aug-12
TO SLD009 = 33 nos ( Except SLD019 ) Raslaffan
Check Type-B Compaction Test of sleeper foundation Last layer B70-PS-07-F1, Section 2 Area:
440 RFI-5858-QCN-1-0031 RFI-5858-QCN-1-0031 CIVIL CANCELLED B-V-3100-004-1-201-01_3 4.2.b R W H 13-Aug-12 8:30 AM 13-Aug-12 Not Ready for Inspection
SLD070 TO SLD045 = 25 nos ( Except SLD069 ) Raslaffan
Check Excavation - Bottom of Excavation Verification. D210-B70-PR-44, F7 = 1 no., F2 = Sulfur Line Area:
441 RFI-5858-QCN-1-0032 RFI-5858-QCN-1-0032 CIVIL
2 nos, F1 = 1 no. and F4 = 1 no. Total 5 nos.
APPROVED
Raslaffan
B-V-3100-004-1-201-01_2 2.2 W W H 14-Aug-12 9:30 AM 14-Aug-12
Review and approval of QIL test for Back fill Material (Type-B) for the sampled location Barzan Off-plot Area
442 RFI-5858-QCN-1-0033 RFI-5858-QCN-1-0033 CIVIL
BZRC-009 Gate - 5
APPROVED
D100
B-V-3100-004-1-201-01_3 3.1.1.b R W H 15-Aug-12 7:30 AM 15-Aug-12
Sampling for Fill Material Type-A at Sample Location Stock Pile# Section 1 PS-03-1 Section-1 Area
443 RFI-5858-QCN-1-0034 RFI-5858-QCN-1-0034 CIVIL APPROVED B-V-3100-004-1-201-01_2 3.1.b R W H 16-Aug-12 7.30 AM 16-Aug-12
(125cu.m) Barzan Off Plot
Check Type-B Compaction Test of sleeper foundation Last layer B70-PS-07-F1, Section 2 Raslaffan
445 RFI-5858-QCN-1-0036 RFI-5858-QCN-1-0036 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 18-Aug-12 9:30 AM 18-Aug-12
SLD070 TO SLD042 = 26 nos ( Except SLD069 ) Area
446 Check Type-B Compaction Test of sleeper foundation Last layer B70-PS-07-F1, Section 2 Raslaffan
RFI-5858-QCN-1-0037 RFI-5858-QCN-1-0037 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 18-Aug-12 9:30 AM 18-Sep-12
SLD041 TO SLD016 = 25 nos ( Except SLD019 ) Area
Check Type-B Compaction Test of sleeper foundation first layer prior final layer B70-PS-
Section 2 Raslaffan
447 RFI-5858-QCN-1-0038 RFI-5858-QCN-1-0038 CIVIL 07, SLD001 to SLD014 = 15 nos and B70-PS-08, SLD070 to SLD093 = 21 nos Except APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 18-Aug-12 9:30 AM 22-Aug-12
Area
SLD087 and SLD086 Total = 36 nos.
Check Excavation - Bottom of Excavation Verification. D210-B70-PR-44, F1, F3, F8, F10 Sulfur Line Raslaffan
448 RFI-5858-QCN-1-0039 RFI-5858-QCN-1-0039 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 22-Aug-12 8:30 AM 22-Aug-12
and F11 = 5 nos. Area
Check Excavation - Bottom of Excavation Verification B70-PS-06, SLD01, SLD04, Section 2 Raslaffan
449 RFI-5858-QCN-1-0040 RFI-5858-QCN-1-0040 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 25-Aug-12 9:00 AM 26-Aug-12
SLD05, SLD06 & SLD08 Area
450 Review and Approval of QIL test for Back fill material. Type - A for the sample Location Baarzan Off-plot
RFI-5858-QCN-1-0041 RFI-5858-QCN-1-0041 CIVIL APPROVED B-V-3100-004-1-201-01_2 3.1.b R W H 25-Aug-12 7:30 AM 25-Aug-12
Sock Pile # Section - 1 PS - 03 - 1 Section 1 Area
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
451 Check Type-B Compaction Test of sleeper foundation first layer prior second layer B70- Section 4 Raslaffan
RFI-5858-QCN-1-0042 RFI-5858-QCN-1-0042 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 25-Aug-12 9:30 AM 25-Aug-12
PS-13, SLD007 to SLLD016 and SLD023 to SLD026 = 14 nos. Area
Check Type-B Compaction Test of sleeper foundation final layer B70-PS-07, SLD001 to Section 2 Raslaffan
452 RFI-5858-QCN-1-0043 RFI-5858-QCN-1-0043 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 25-Aug-12 9:30 AM 25-Aug-12
SLD014 = 14 nos and SLD085 to SLD093 = 7 nos except SLD086 and SLD087 Area
Check Type-A Compaction Test B70-PS-06, SLD01, SLD04, SLD05, SLD06 and Section 2 Raslaffan
454 RFI-5858-QCN-1-0045 RFI-5858-QCN-1-0045 CIVIL CANCELLED B-V-3100-004-1-201-01_2 4.2.b R W H 26-Aug-12 9:30 AM 26-Aug-12
SLD08 = 5 nos. Area
Check Excavation - Bottom of Excavation Verification. B70-PS-10, SLD073 to SLD052 = Section 2 Raslaffan
455 RFI-5858-QCN-1-0046 RFI-5858-QCN-1-0046 CIVIL
20 nos ( Except SLD060 and SLD061 )
APPROVED
Area
B-V-3100-004-1-201-01_2 2.2 W W H 26-Aug-12 8:00 AM 26-Aug-12
Review and Approval of QIL test for Back fill material. Type - B for the sample location Section 1 Area
456 RFI-5858-QCN-1-0047 RFI-5858-QCN-1-0047 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 27-Aug-12 7:30 AM 27-Aug-12
Stock Pipe # 2 (Sulphur Area) Raslaffan
Check Type-B Compaction Test of sleeper foundation first layer prior second layer B70- Section 1 Area
457 RFI-5858-QCN-1-0048 RFI-5858-QCN-1-0048 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 27-Aug-12 8:30 AM 27-Aug-12
PS-03, SLD079 to SLD098 = 20 nos. Raslaffan
458 Check Type-B Compaction Test of sleeper foundation first layer prior final layer B70-PS- Section 2 Area
RFI-5858-QCN-1-0049 RFI-5858-QCN-1-0049 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 28-Aug-12 8:00 AM 28-Aug-12
08, SLD046 to SLD069 = 23 nos except SLD061 Raslaffan
459 Check Excavation - Bottom of Excavation Verification. B70-PS-06, SLD045 to SLD080 = Section 2 Area
RFI-5858-QCN-1-0050 RFI-5858-QCN-1-0050 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 29-Aug-12 8:00 AM 29-Aug-12
33 nos ( Except SLD048, SLD063 and SLD064 ) Raslaffan
Check Type-A Compaction Test B70-PS-06, SLD01, SLD04, SLD05, SLD06 and SLD08 Section 2 Area
461 RFI-5858-QCN-1-0052 RFI-5858-QCN-1-0052 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 29-Aug-12 8:30 AM 29-Aug-12
= 5 nos. Raslaffan
Check Type-B Compaction Test prior second layer B70-PS-03, SLD029 to SLD043 = 15 Section 1 Area
462 RFI-5858-QCN-1-0053 RFI-5858-QCN-1-0053 CIVIL
nos.
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_2 4.2.b R W H 29-Aug-12 9:00 AM 29-Aug-12 Not Ready for Inspection
Check Excavation - Bottom of Excavation Verification. B70-PS-14, SLD055, SL:D056 and Section 4 Area
463 RFI-5858-QCN-1-0054 RFI-5858-QCN-1-0054 CIVIL
SLD019 = 3 nos, SLD018 and SLD081 = 2 nos, PR-19 and PR-64 & PR-65 = 3 nos.
APPROVED
Raslaffan
B-V-3100-004-1-201-01_2 2.2 W W H 30-Aug-12 8:00 AM 30-Aug-12
Check Excavation - Bottom of Excavation Verification. B70-PS-10, SLD053 to SLD027 = Section 3 Area
464 RFI-5858-QCN-1-0055 RFI-5858-QCN-1-0055 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 30-Aug-12 8:30 AM 30-Aug-12
27 nos ( Except SLD036 ) Raslaffan
Check Type-B Compaction Test first layer prior second layer B70-PS-07, PR-09, PR-10 Section 2 Area
465 RFI-5858-QCN-1-0056 RFI-5858-QCN-1-0056 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 30-Aug-12 7:30 PM 30-Aug-12
and PR-46 Raslaffan
Check Excavation - Bottom of Excavation Verification. B70-PS-06, SLD01, SLD04, Section 2 Area
466 RFI-5858-QCN-1-0057 RFI-5858-QCN-1-0057 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 30-Aug-12 8:30 AM 30-Aug-12
SLD05, SLD06 and SLD08 = 5 nos. Raslaffan
Check Type-B Compaction Test second layer of pipe sleeper foundation of B70-PS-03, Section 1 Area
468 RFI-5858-QCN-1-0059 RFI-5858-QCN-1-0059 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 1-Sep-12 8:30 AM 1-Sep-12
SLD079 to SLD098 = 20 nos. Raslaffan
Check Type-B Compaction Test first layer of pipe sleeper foundation of B70-PS-03, Section 1 Area
469 RFI-5858-QCN-1-0060 RFI-5858-QCN-1-0060 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 1-Sep-12 8:30 AM 1-Sep-12
SLD098 to SLD0100 = 3 nos and B70-PS-02, SLD001, SLD004 to SLD009 = 7 nos. Raslaffan
Check Excavation - Bottom of Excavation Verification. D210-B70-PR-44, F3 = 1 no., F5 = Sulfur Line Raslaffan
470 RFI-5858-QCN-1-0061 RFI-5858-QCN-1-0061 CIVIL APPROVED B-V-3100-004-1-201-01_2 2.2 W W H 1-Sep-12 8:30 AM 1-Sep-12
1 no, F9A and F9b = 2 nos. Area
471 Check Type-B Compaction Test second layer of Pipe Stopper foundation B70-PS-06, Section 1 Area
RFI-5858-QCN-1-0062 RFI-5858-QCN-1-0062 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 2-Sep-12 7:30 AM 2-Sep-12
PR-46, B70-PS-07, PR-09 and PR-10, Total = 3 nos prior third layer. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
472 Check Type-B Compaction Test third layer of Pipe Stopper foundation B70-PS-06, PR- Section 1 Area
RFI-5858-QCN-1-0063 RFI-5858-QCN-1-0063 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 2-Sep-12 2:30 AM 2-Sep-12
46, B70-PS-07, PR-09 and PR-10, Total = 3 nos prior fourth layer. Raslaffan
Section 2 Area
473 RFI-5858-QCN-1-0064 RFI-5858-QCN-1-0064 CIVIL Check Type-B Compaction Test final layer of B70-PS-08, SLD084 to SLD046 = 38 nos. APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 2-Sep-12 8:30 AM 2-Sep-12
Raslaffan
Check Type-B Compaction Test first layer B70-PS-13, SLD017 to SLD007 = 11 nos and Section 4 Area
474 RFI-5858-QCN-1-0065 RFI-5858-QCN-1-0065 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 2-Sep-12 8:30 AM 2-Sep-12
B70-PS-14, SLD100 to SLD082 = 18 nos. Raslaffan
Check Type-B Compaction Test fourth layer of Pipe Stopper foundation B70-PS-06, PR- Section 2 Area
475 RFI-5858-QCN-1-0066 RFI-5858-QCN-1-0066 CIVIL APPROVED B-V-3100-004-1-201-01_3 4.2.b R W H 3-Sep-12 2:30 PM 3-Sep-12
46, B70-PS-07, PR-09 and PR-10, Total = 3 nos prior fourth layer. Raslaffan
Check Type - B compaction test first layer prior second layer B70-PS-08, SLD029 to Section 2 Area
476 RFI-5858-QCN-1-0067 RFI-5858-QCN-1-0067 CIVIL
SLD001 = 29 nos.
APPROVED
Raslaffan
B-V-3100-004-1-201-01_2 4.2.b R W H 3-Sep-12 7:30 AM 3-Sep-12
Check Type - A compaction test first layer prior second layer B70-PS-03, SLD028 to Section 1 Area
477 RFI-5858-QCN-1-0068 RFI-5858-QCN-1-0068 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 3-Sep-12 8:00 AM 3-Sep-12
SLD044 Raslaffan
Check Type-B Compaction Test fifth layer of Pipe Stopper foundation B70-PS-06, PR-46, Section 2 Area
478 RFI-5858-QCN-1-0069 RFI-5858-QCN-1-0069 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 4-Sep-12 8:00 AM 4-Sep-12
B70-PS-07, PR-09 and PR-10, Total = 3 nos prior sixth layer Raslaffan
479 4.2.b Check Type - B compaction test first layer of Pipe Sleeper B70-PS-14, SLD080 to Section 4 Area
RFI-5858-QCN-1-0070 RFI-5858-QCN-1-0070 CIVIL APPROVED B-V-3100-004-1-201-01_2 4.2.b R W H 5-Sep-12 8:00 AM 5-Sep-12
SLD065 = 16 nos. prior second layer. Raslaffan
480 Sampling for Fill Material Type-B AT SAMPLE LOCATION ,Stock Pille # Section 3 PS-10- Barzan Ofaf-plot
RFI-5858-QCN-1-0071 RFI-5858-QCN-1-0071 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 5-Sep-12 7:30 AM 5-Sep-12
1 (350 cu.m ) Section 3 Area
481 Check Excavation - Bottom of Excavation Verification. B70-PS-10-F1 : SLD012 To Section 3 Area
RFI-5858-QCN-1-0072 RFI-5858-QCN-1-0072 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 W W H 6-Sep-12 8:30 AM 6-Sep-12
SLD026 ( 15 Foundations ) Raslaffan
4.2.b Check Type-B Compaction Test final layer of Pipe Stopper foundation B70-PS- Section 2 Area
482 RFI-5858-QCN-1-0073 RFI-5858-QCN-1-0073 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 6-Sep-12 8:00 AM 6-Sep-12
06, PR-46, B70-PS-07, PR-09 and PR-10, Total = 3 nos. Raslaffan
Check Type-B Compaction Test of sleeper foundation final layer B70-PS-08-F1, Section 2 Area
483 RFI-5858-QCN-1-0074 RFI-5858-QCN-1-0074 CIVIL
SLD001 to SLD0029 = 28 nos except SLD008
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4.2.b R W H 8-Sep-12 8:00 AM 8-Sep-12
Culvert BZRC-009
484 RFI-5858-QCN-1-0075 RFI-5858-QCN-1-0075 CIVIL 4.2.b Check Type-B Compaction Test first layer up to 5th layer of Culvert BZRC-009 APPROVED
Raslaffan Area
B-V-3100-004-1-201-01_4 4.2.b R W H 7-Sep-12 7:30 AM 7-Sep-12
Culvert BZRC-009
485 RFI-5858-QCN-1-0076 RFI-5858-QCN-1-0076 CIVIL 4.2.b Check Type-B Compaction Test final layer of Culvert BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 8-Sep-12 8:00 AM 8-Sep-12
Raslaffan Area
Section 1- PR-01
Check Excavation - Bottom of Excavation Verification. D110-B70-PR-01, F10=1 nos.,
486 RFI-5858-QCN-1-0077 RFI-5858-QCN-1-0077 CIVIL APPROVED Area B-V-3100-004-1-201-01_4 2.2 R W H 9-Sep-12 7:30 AM 9-Sep-12
F11=1 nos., F12=1 nos., F13=1 nos., F14=1 nos.
Raslaffan
Check Type-B Compaction Test of sleeper foundation final layer B70-PS-09-F1: SLD057 Section 2 Area
487 RFI-5858-QCN-1-0078 RFI-5858-QCN-1-0078 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 9-Sep-12 8:00 AM 9-Sep-12
to SLD071 and SLD087 to SLD092 = 21 nos Raslaffan
Culvert BZRC-009
489 RFI-5858-QCN-1-0080 RFI-5858-QCN-1-0080 CIVIL 4.2.b Check Type-B Compaction Test 10th layer of Culvert BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 9-Sep-12 11:00 AM 9-Sep-12
Raslaffan Area
Culvert BZRC-009
490 RFI-5858-QCN-1-0081 RFI-5858-QCN-1-0081 CIVIL 4.2.b Check Type-B Compaction Test 11th layer of Culvert BZRC-009 CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 9-Sep-12 2:00 PM 9-Sep-12 Cnacelled due to not ready for inspection
Raslaffan Area
Check Type-B Compaction Test of sleeper foundation 1st layer B70-PS-14-F1, SLD0065 Section 4 Area
491 RFI-5858-QCN-1-0082 RFI-5858-QCN-1-0082 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 9-Sep-12 8:00 AM 9-Sep-12
to SLD0080 = 16 nos Raslaffan
492 Check Excavation - Bottom of Excavation Verification. B70-PS-10-F2 : SLD036 & SLD079 Section 3 Area
RFI-5858-QCN-1-0083 RFI-5858-QCN-1-0083 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 W W H 10-Sep-12 9:00 AM 10-Sep-12
= 2 Stoppers and B70-PR-15-F1,F2 = 4 nos (1 loop) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
493 5.2. Check Final Elevation top soil level of Pipe Sleeper area B70-PS-07, from SLD101 to Section 2 Area
RFI-5858-QCN-1-0084 RFI-5858-QCN-1-0084 CIVIL APPROVED B-V-3100-004-1-201-01_4 5.1 R W H 10-Sep-12 9:00 AM 10-Sep-12
SLD054. Raslaffan
5.2. Check Final Visual Inspection of top soil level of Pipe Sleeper area B70-PS-07, from Section 2 Area
494 RFI-5858-QCN-1-0085 RFI-5858-QCN-1-0085 CIVIL APPROVED B-V-3100-004-1-201-01_4 5.2 R W H 10-Sep-12 9:00 AM 10-Sep-12
SLD101 to SLD054. Raslaffan
Culvert BZRC-009
495 RFI-5858-QCN-1-0086 RFI-5858-QCN-1-0086 CIVIL 4.2.b Check Type-B Compaction Test 1st layer of Culvert BZRC-009 (above cover slab) APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 7:00 AM 11-Sep-12
Raslaffan Area
Culvert BZRC-009
496 RFI-5858-QCN-1-0087 RFI-5858-QCN-1-0087 CIVIL 4.2.b Check Type-B Compaction Test 2nd layer of Culvert BZRC-009 (above cover slab) APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 9:00 AM 11-Sep-12
Raslaffan Area
Culvert BZRC-009
497 RFI-5858-QCN-1-0088 RFI-5858-QCN-1-0088 CIVIL 4.2.b Check Type-B Compaction Test final layer of Culvert BZRC-009 CANCELLED
Raslaffan Area
B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 9:00 AM 11-Sep-12 Not ready for inspection
4.2.b Check Type-B Compaction Test first layer of Culvert end BZRC-009 (East side Culvert BZRC-009
498 RFI-5858-QCN-1-0089 RFI-5858-QCN-1-0089 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 7:00 AM 11-Sep-12
end Cluvert wall) Raslaffan Area
Culvert BZRC-009
499 RFI-5858-QCN-1-0090 RFI-5858-QCN-1-0090 CIVIL 4.2.b Check Type-B Compaction Test 2nd layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 9:00 AM 11-Sep-12
Raslaffan Area
501 Check Type-B Compaction Test of sleeper foundation 1st layer B70-PS-07, SLD069 = 1 Section 2 Area
RFI-5858-QCN-1-0092 RFI-5858-QCN-1-0092 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 2:00 PM 11-Sep-12
nos and B70-PS-08, SLD061 = 1 nos Raslaffan
Culvert BZRC-009
503 RFI-5858-QCN-1-0094 RFI-5858-QCN-1-0094 CIVIL 4.2.b Check Type-B Compaction Test 5th Layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 11-Sep-12 4:30 PM 11-Sep-12
Raslaffan Area
Check Type-B Compaction Test of sleeper foundation 2nd layer B70-PS-07, SLD069 = Section 2 Area
504 RFI-5858-QCN-1-0095 RFI-5858-QCN-1-0095 CIVIL
1 nos and B70-PS-08, SLD061 = 1 nos
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4.2.b R W H 12-Sep-12 2:00 PM 12-Sep-12
Check Excavation - Bottom of Excavation Verification D110- V70-PR-01, F8=1 nos, F9 = Section 1 Area
505 RFI-5858-QCN-1-0096 RFI-5858-QCN-1-0096 CIVIL
9 nos, F10=1 nos, F11=1 nos.
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 2.2 R W H 12-Sep-12 8:00 AM 12-Sep-12
Culvert BZRC-009
506 RFI-5858-QCN-1-0097 RFI-5858-QCN-1-0097 CIVIL 4.2.b Check Type-B Compaction Test 7th layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 12-Sep-12 10:30 AM 12-Sep-12
Raslaffan Area
Culvert BZRC-009
507 RFI-5858-QCN-1-0098 RFI-5858-QCN-1-0098 CIVIL 4.2.b Check Type-B Compaction Test 9th layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 12-Sep-12 2:30 PM 12-Sep-12
Raslaffan Area
Culvert BZRC-009
508 RFI-5858-QCN-1-0099 RFI-5858-QCN-1-0099 CIVIL 4.2.b Check Type-B Compaction Test 9th layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 12-Sep-12 4:30 PM 12-Sep-12
Raslaffan Area
Check Type-B Compaction Test of Stopper foundation 3nd layer B70-PS-07, SLD069 = Section 2 Area
510 RFI-5858-QCN-1-0101 RFI-5858-QCN-1-0101 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 7:00 AM 13-Sep-12
1 nos and B70-PS-08, SLD061 = 1 nos Raslaffan
Check Type-B Compaction Test of Stopper foundation 4th layer B70-PS-07, SLD069 = 1 Section 2 Area
511 RFI-5858-QCN-1-0102 RFI-5858-QCN-1-0102 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 10:00 AM 13-Sep-12
nos and B70-PS-08, SLD061 = 1 nos Raslaffan
Check Type-B Compaction Test of Stopper foundation 5th layer B70-PS-07, SLD069 = Section 2 Area
512 RFI-5858-QCN-1-0103 RFI-5858-QCN-1-0103 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 2:00 PM 13-Sep-12
1 nos and B70-PS-08, SLD061 = 1 nos Raslaffan
513 Check Type-B Compaction Test of sleeper foundation 6th layer ( Final Layer ) B70-PS- Section 2 Area
RFI-5858-QCN-1-0104 RFI-5858-QCN-1-0104 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 4:00 PM 13-Sep-12 Not ready for inspection
07, SLD069 = 1 nos and B70-PS-08, SLD061 = 1 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
514 Check Type-B Compaction Test of sleeper foundation final layer B70-PS-09-F1, SLD057 Section 2 Area
RFI-5858-QCN-1-0105 RFI-5858-QCN-1-0105 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 10:00 AM 13-Sep-12
to SLD071 = 15 nos Raslaffan
Check Type-B Compaction Test of Loop Pipe Track Foundations D10-B70-PR-11 1st Section 2 Area
515 RFI-5858-QCN-1-0106 RFI-5858-QCN-1-0106 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 10:00 AM 13-Sep-12 Not ready for inspection
layer Raslaffan
Section 2 Area
516 RFI-5858-QCN-1-0107 RFI-5858-QCN-1-0107 CIVIL Check Type-B Compaction Test of Loop Pipe Track Foundations B70-PR-11 2nd layer CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Sep-12 3:00 PM 13-Sep-12 Not ready for inspection
Raslaffan
Check Final Elevation For Pipe Track Foundations ( Loops) D110-B70-PR-09 & D110- Section 2 Area
517 RFI-5858-QCN-1-0108 RFI-5858-QCN-1-0108 CIVIL CANCELLED B-V-3100-004-1-201-01_4 5.1 R W H 13-Sep-12 7:00 AM 13-Sep-12 Cancelled due to survey report not attached
B70-PR-10 Raslaffan
Check Final Visual Inspection For Pipe Track Foundations ( Loops) D110-B70-PR-09 & Section 2 Area
518 RFI-5858-QCN-1-0109 RFI-5858-QCN-1-0109 CIVIL
D110-B70-PR-46
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 5.2 R W H 13-Sep-12 7:00 AM 13-Sep-12
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 1st Section 2 Area
519 RFI-5858-QCN-1-0110 RFI-5858-QCN-1-0110 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 15-Sep-12 7:00 AM 15-Sep-12
layer Raslaffan
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 2nd Section 2 Area
520 RFI-5858-QCN-1-0111 RFI-5858-QCN-1-0111 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 15-Sep-12 10:00 AM 15-Sep-12
layer Raslaffan
521 4.2.a Check Type-A Compaction test 2nd layer for B70-PS-03, SLD044 to SLD028 prior Section 1 Area
RFI-5858-QCN-1-0112 RFI-5858-QCN-1-0112 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 15-Sep-12 7:30 AM 15-Sep-12
third layer. Raslaffan
522 4.2.a Check Type-A Compaction test First layer for B70-PS-03, SLD028 to SLD003 Section 1 Area
RFI-5858-QCN-1-0113 RFI-5858-QCN-1-0113 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 15-Sep-12 7:30 AM 15-Sep-12
prior 2nd layer. Raslaffan
523 4.2.b. Check Type-B Compaction test First layer for B70-PS-03, SLD078 to SLD055 Section 1 Area
RFI-5858-QCN-1-0114 RFI-5858-QCN-1-0114 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.ab R W H 15-Sep-12 7:30 AM 15-Sep-12
prior 2nd layer. Raslaffan
4.2.b Check Type-B 1st layer for Pre-cast pipe sleepers - Prior 2nd layer B70-PS-09-F1,
525 RFI-5858-QCN-1-0116 RFI-5858-QCN-1-0116 CIVIL SLD001 to SLD016 except SLD007 & SLD008 = 14 nos and B70-PS-10-F1, SLD061 to CANCELLED Section 3, Raslaffan B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 7:00 AM 16-Sep-12 Not ready for inspection
SLD087 = 26 nos
Section 2 ( D110-
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 3rd
526 RFI-5858-QCN-1-0117 RFI-5858-QCN-1-0117 CIVIL
layer
APPROVED B70-PR-11), B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 7.00 AM 16-Sep-12
Raslaffan
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 4th Section 2 ( D110-B70-
527 RFI-5858-QCN-1-0118 RFI-5858-QCN-1-0118 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 11:00 AM 16-Sep-12
layer PR-11), Raslaffan
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 5th Section 2 ( D110-B70-
528 RFI-5858-QCN-1-0119 RFI-5858-QCN-1-0119 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 3:00 PM 16-Sep-12 5th layer not required
layer PR-11), Raslaffan
529 RFI-5858-QCN-1-0120 RFI-5858-QCN-1-0120 CIVIL Check Excavation-bottam vertification D110-B70-PR-01,F1 1NOS F7+1NOS APPROVED Section 1-PR-01 B-V-3100-004-1-201-01_4 2.2 R W H 16-Sep-12 9.00 AM 16-Sep-12
Section 2 ( D110-
530 RFI-5858-QCN-1-0121 RFI-5858-QCN-1-0121 CIVIL Check Final Visual Inspection For Pipe Track Foundations ( Loop) D110-B70-PR-10 CANCELLED B70-PR-10), B-V-3100-004-1-201-01_4 5.2 R W H 16-Sep-12 7:00 AM 16-Sep-12 Surey Report not attached
Raslaffan
Culvert BZRC-009,
531 RFI-5858-QCN-1-0122 RFI-5858-QCN-1-0122 CIVIL 4.2.b Check Type-B Compaction Test 10th layer of Culvert end BZRC-009 APPROVED B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 7:30 AM 16-Sep-12
Raslaffan
Culvert BZRC-009,
532 RFI-5858-QCN-1-0123 RFI-5858-QCN-1-0123 CIVIL 4.2.b Check Type-B Compaction Test final layer of Culvert end BZRC-009 CANCELLED B-V-3100-004-1-201-01_4 4.2.B R W H 16-Sep-12 9:30 AM 16-Sep-12 Not ready for inspection
Raslaffan
Check Type-A Compaction Test under for pipe sleeper B70-PS-06-F1:SLD002 & Section-2 B70-PS-06
533 RFI-5858-QCN-1-0124 RFI-5858-QCN-1-0124 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 16-Sep-12 7.00 AM 16-Sep-12
SLD003+2 nos and B70-PS-07-F1:SLD093 & SLD094+2nos & 07
Check Type-A Compaction Test under foundations for Pipe Track Foundation and pipe
534 RFI-5858-QCN-1-0125 RFI-5858-QCN-1-0125 CIVIL Stopper Foundation B70-PS-10-F2 : SLD036 and SLD079 = 2 nos and D110-B70-PR-15 APPROVED Section 3, Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 16-Sep-12 8:00 AM 16-Sep-12
( loop foundations)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
(Section 3) D110-
Check Excavation - Bottom of Excavation Verification.D110-B70-PR-48 & D110-B70-PR-
536 RFI-5858-QCN-1-0127 RFI-5858-QCN-1-0127 CIVIL APPROVED B70-PR-48 & 14 B-V-3100-004-1-201-01_4 2.2 W W H 17-Sep-12 9:00 AM 17-Sep-12
14
Raslaffan
Check Type-B Compaction Test 1st layer of pipe sleepers - prior 2nd layer B70-PS-13: Section4(B70-PS-
537 RFI-5858-QCN-1-0128 RFI-5858-QCN-1-0128 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 17-Sep-12 3:00 PM 17-Sep-12
SLD029 to SLD035 = 7 nos and B70-PS-14: SLD057 to SLD062 = 6 nos 13 & 14) Raslaffan
Check Type-B Compaction Test of Loop Pipe Track Foundations D110-B70-PR-11 final Section 2 ( D110-
538 RFI-5858-QCN-1-0129 RFI-5858-QCN-1-0129 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 17-Sep-12 2:00 PM 17-Sep-12
layer B70-PR-11) Raslaffan
Check Type-B Compaction Test of first layer Pipe Sleeper B70-PS-09 : SLD034 to
539 RFI-5858-QCN-1-0130 RFI-5858-QCN-1-0130 CIVIL
SLD025 = 10 nos prior second layer.
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 17-Sep-12 8:00 AM 17-Sep-12
Sampling for fill material Type-A at sample loaction,stock pille# Section-3 PS-10-2 (800
541 RFI-5858-QCN-1-0132 RFI-5858-QCN-1-0132 CIVIL APPROVED Barzan Off-Plot B-V-3100-004-1-201-01_4 3.1 R W H 17-Sep-12 7:30 AM 17-Sep-12
cu.m)
542 Soil Compaction Test for Backfilling B70-PS-03 SLD 01 TO SLD 003 - Type A B70-PS-02
RFI-5858-QCN-1-0133 RFI-5858-QCN-1-0133 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W H 17-Sep-12 8.30AM 17-Sep-12
SLD 01 TO SLD 017 - Type A
543 Check Type-A Compaction Test under foundations for Pipe Track Foundation D110- Section 3 Area
RFI-5858-QCN-1-0134 RFI-5858-QCN-1-0134 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 18-Sep-12 8:00 AM 18-Sep-12
B70-PR-48 = 1 loop Raslaffan
544 Check Excavation - Bottom of Excavation Verification. B70-PS-06-F1: SLD031 to SLD027 Section 2 Area
RFI-5858-QCN-1-0135 RFI-5858-QCN-1-0135 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 R W H 18-Sep-12 9:00 AM 18-Sep-12
= 5 nos and D110-B70-PR-47 = 1 no. Raslaffan
Check Type-B Compaction Test of second layer Pipe Sleeper B70-PS-09 : SLD034 to Section 2 Area
545 RFI-5858-QCN-1-0136 RFI-5858-QCN-1-0136 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 18-Sep-12 9:30 AM 18-Sep-12
SLD025 = 10 nos Raslaffan
Section 1 Area
546 RFI-5858-QCN-1-0137 RFI-5858-QCN-1-0137 CIVIL Soi Compaction Test for Backfilling B70-PS-03 SLD 044 To SLD 028 - Type B - 3rd layer. APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4.2.b R W H 18-Sep-12 8:30 AM 18-Sep-12
Soil Compaction Test for Backfilling B70-PS-90 SLD01 to SLD017-1st & 2nd layer (Type- SULPHUR LINE
547 RFI-5858-QCN-1-0138 RFI-5858-QCN-1-0138 CIVIL
A)
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4.2.b R W H 19-Sep-12 9.30 AM 19-Sep-12
Section 2 Area
548 RFI-5858-QCN-1-0139 RFI-5858-QCN-1-0139 CIVIL Check Type-A Compaction Test for pipe track D110-B70-PR-47 APPROVED B-V-3100-004-1-201-01_4 4.2.a H W H 19-Sep-12 8:00 AM 17-Sep-12
Raslaffan
Check excavation bottom of excavation verfication D100 B70-PR-01 pipe rack foundation Pipe Rack PR-01
550 RFI-5858-QCN-1-0141 RFI-5858-QCN-1-0141 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 R W H 19-Sep-12 8.00 AM 19-Sep-12
3-F3,4-F4,5-F5-3 Nos Raslaffan
551 Review and approval of QIL test back fill material Type-B for the sample location sock# Barzan Offplot
RFI-5858-QCN-1-0142 RFI-5858-QCN-1-0142 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 19-Sep-12 7.30 AM 19-Sep-12
Section 1-PS-10#1 Section -3
Soil Compaction Test for Backfilling B70-PS-03 SLD 079 TO SLD 100 - Type B - Final Section 1 Area
552 RFI-5858-QCN-1-0143 RFI-5858-QCN-1-0143 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 19-Sep-12 2.00 PM 19-Sep-12
layer-3rd layer Raslaffan
BET.MASHRAB TO
553 RFI-5858-QCN-1-0144 RFI-5858-QCN-1-0144 CIVIL Soil Compaction Test for Backfilling B70-PS-03 SLD 028 TO SLD 14 - Type B - 3rd layer APPROVED B-V-3100-004-1-201-01_4 3.b S W H 19-Sep-12 2.30 PM 19-Sep-12
HAMALA AVENUE
555 4.2.b Check Type-B Compaction Test first layer north side of duct bank BZDP-005 prior Section 2 Duct Bank
RFI-5858-QCN-1-0146 RFI-5858-QCN-1-0146 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Sep-12 9.00 AM 20-Sep-12
second layer. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
556 4.2.b Check Type-B Compaction Test first layer south side of duct bank BZDP-005 prior Section 2 Duct Bank
RFI-5858-QCN-1-0147 RFI-5858-QCN-1-0147 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Sep-12 4.00 PM 20-Sep-12
second layer. Raslaffan
Soil Compaction Test for Backfilling Pipe rack B70- PR-03 & B70-PR-05 1st layer& 2nd
557 RFI-5858-QCN-1-0148 RFI-5858-QCN-1-0148 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Sep-12 7.30 AM 20-Sep-12
layer (Type B)
CHECK TYPE-B COMPACTION TEST FOR PIPE SLEEPERS - 1ST LAYER PRIOR 2ND
558 RFI-5858-QCN-1-0149 RFI-5858-QCN-1-0149 CIVIL LAYER B70-PS-09: SLD001 TO SLD005 & SLD010 TO SLD016 = 12 NOS B70-PS-10: APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Sep-12 10.00 AM 22-Sep-12
SLD062 TO SLD090 EXCEPT SLD087 = 27 NOS
563 CHECK EXCAVATION-BOTTOM OF EXCAVATION VERIFICATION D110 B70-PS-01 Pipe rack PR-01
RFI-5858-QCN-1-0154 RFI-5858-QCN-1-0154 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 R W H 22-Sep-12 8.00 AM 22-Sep-12
SLD024 TO SLD014 Raslaffan
564 SOIL COMPACTION TEST FOR BACKFILLING PIPE RACK D110 B70- PR-03 & D110-
RFI-5858-QCN-1-0155 RFI-5858-QCN-1-0155 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Sep-12 7.30 AM 22-Sep-12
B70-PR-05 3RD LAYER &(4TH) LAYER - (TYPE B)
565 CHECK TYPE-B COMPACTION TEST OF FIRST LAYER PIPE TRACK D110-B70-PR-10
RFI-5858-QCN-1-0156 RFI-5858-QCN-1-0156 CIVIL CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Sep-12 3.30 PM 22-Sep-12
PRIOR SECOND LAYER
CHECK TYPE-B COMPACTION TEST FOR PIPE SLEEPERS - FINAL LAYER B70-PS-
566 RFI-5858-QCN-1-0157 RFI-5858-QCN-1-0157 CIVIL 13: SLD001 TO SLD017, SLD023 TO SLD026 & SLD029 TO SLD035 = 28 NOS B70-PS- APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Sep-12 3.00 PM 22-Sep-12
14: SLD057 TO SLD062, SLD065 TO SLD100, SLD103 & SLD104 = 43 NOS
SOIL COMPACTION TEST FOR BACKFILLING D210 B70-PS-90 SLD 01 TO SLD 017 - SULPHUR LINE (B70
569 RFI-5858-QCN-1-0160 RFI-5858-QCN-1-0160 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Sep-12 3.00 PM 22-Sep-12
4TH LAYER (TYPE-A) PS 90) Raslaffan
Section 4 Area
571 RFI-5858-QCN-1-0162 RFI-5858-QCN-1-0162 CIVIL Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-65 - 2nd layer APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 8:00 AM 23-Sep-12
Raslaffan
Section 4 Area
573 RFI-5858-QCN-1-0164 RFI-5858-QCN-1-0164 CIVIL Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-65 - final layer CANCELLED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 4:00 PM 23-Sep-12 Not Ready for Inspection
Raslaffan
Check Type-B Compaction Test for Pipe Track D110-B70-PR-10 first layer prior second Section 2 Area
574 RFI-5858-QCN-1-0165 RFI-5858-QCN-1-0165 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 8.00 AM 23-Sep-12
layer. Raslaffan
Check Type-B Compaction Test for Pipe Track D110-B70-PR-10 second layer prior third Section 2 Area
575 RFI-5858-QCN-1-0166 RFI-5858-QCN-1-0166 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 3:30 PM 23-Sep-12
layer. Raslaffan
577 Soil Compaction Test for Backfilling D210 B70-PS-90 SLD 01 TO SLD 017 - 5th layer Sulpher line (B70 PS-
RFI-5858-QCN-1-0168 RFI-5858-QCN-1-0168 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 3.00 PM 23-Sep-12
(Type-A) 90) Area Raslaffan
Soil Compaction Test for Backfilling B70-PS-03 SLD 044 TO SLD 028 - Type B - Final Section 1 Area
578 RFI-5858-QCN-1-0169 RFI-5858-QCN-1-0169 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Sep-12 8.30 AM 23-Sep-12
layer Raslaffan
583 RFI-5858-QCN-1-0174 RFI-5858-QCN-1-0174 CIVIL CHECK TYPE-A COMPACTION TEST OF PIPE TRACK D110-B70-PR-07. APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 24-Sep-12 8.30 AM 24-Sep-12
584 SOIL COMPACTION TEST FOR BACKFILLING D210 B70-PS-90 SLD 01 TO SLD 017 - SULPHUR LINE (B70
RFI-5858-QCN-1-0175 RFI-5858-QCN-1-0175 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4 .2.b R W H 24-Sep-12 3.00 PM 24-Sep-12 Not Ready for Inspection
6TH LAYER (TYPE-A) PS 90) Raslaffan
SOIL COMPACTION TEST FOR BACKFILLING B70-PS-03 SLD 028 TO SLD 001 -
587 RFI-5858-QCN-1-0178 RFI-5858-QCN-1-0178 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 24-Sep-12 3.30 PM 24-Sep-12
TYPE B - FINAL LAYER
SOIL COMPACTION TEST FOR BACKFILLING PIPE RACK D110 B70- PR-03 & B70-
588 RFI-5858-QCN-1-0179 RFI-5858-QCN-1-0179 CIVIL
PR-05 5TH LAYER & FINAL LAYER - (TYPE B)
APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 24-Sep-12 8.30 AM 24-Sep-12
SOIL COMPACTION TEST FOR BACKFILLING B70 - PR - 44 PIPE RACK SULPHUR LINE (B70
589 RFI-5858-QCN-1-0180 RFI-5858-QCN-1-0180 CIVIL
FOUNDATION NO. 4(F2),5 (F1),8(F2 )& 9(F4) 1ST LAYER
APPROVED
- PR - 44) Raslaffan
B-V-3100-004-1-201-01_4 4 .2.b R W H 24-Sep-12 3.00 PM 24-Sep-12
SAMPLING FOR FILL MATERIAL TYPE - B AT SAMPLE LOCATION PR-01 BARZAN OFF PLOT
590 RFI-5858-QCN-1-0181 RFI-5858-QCN-1-0181 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1 b R W H 24-Sep-12 7.30 AM 24-Sep-12
EXCAVATED MATERIAL SECTION 3
Check Type-B Compaction Test for Pipe Track D110-B70-PR-10 Fourth layer (Using
591 RFI-5858-QCN-1-0182 RFI-5858-QCN-1-0182 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 24-Sep-12 9.00 AM 25-Sep-12
excavated material)
Check Type-B Compaction Test for Pipe Track D110-B70-PR-10 Fifth layer (Using
592 RFI-5858-QCN-1-0183 RFI-5858-QCN-1-0183 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 25-Sep-12 4.00 PM 25-Sep-12
excavated material)
593 Soil Compaction Test for Backfilling B70 - PR - 44 Pipe Rack Foundation No. 4(F2),5 SULPHUR LINE (B70
RFI-5858-QCN-1-0184 RFI-5858-QCN-1-0184 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 25-Sep-12 3.00 PM 25-Sep-12
(F1),8(F2 )& 9(F4) 2nd layer (Using for backfill excavated material) - PR - 44) Raslaffan
Check Type-A Compaction Test of third layer for duct bank BZDP-005 prior fourth layer Duct Bank BZDP-
594 RFI-5858-QCN-1-0185 RFI-5858-QCN-1-0185 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 25-Sep-12 8.30 AM 25-Sep-12
half portion east side. (Using excavated material) 005 Raslaffan
Soil Compaction Test for Backfilling D210 B70-PS-90 SLD 01 TO SLD 017 - 6th layer SULPHUR LINE (B70
595 RFI-5858-QCN-1-0186 RFI-5858-QCN-1-0186 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W/R H 25-Sep-12 3.00 PM 25-Sep-12
(Type-A) (Using backfill purchase material) PS 90) Raslaffan
Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110-B70-
596 RFI-5858-QCN-1-0187 RFI-5858-QCN-1-0187 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 25-Sep-12 7.00 AM 25-Sep-12
PR-19 - 1st layer (From "Purchased" Filling Material)
597 Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110-B70-
RFI-5858-QCN-1-0188 RFI-5858-QCN-1-0188 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R H H 25-Sep-12 10.00 AM 25-Sep-12
PR-19 - 2nd layer (From "Purchased" Filling Material)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
598 Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110-B70-
RFI-5858-QCN-1-0189 RFI-5858-QCN-1-0189 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 25-Sep-12 4.00 PM 26-Sep-12
PR-19 - 3rd layer (Backfilling material s from "Purchased" Filling Material)
Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110- Section 4 Area
599 RFI-5858-QCN-1-0190 RFI-5858-QCN-1-0190 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 7:00 AM 26-Sep-12
B70-PR-19 - 4th layer Purchased Backfilling material Raslaffan
Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110- Section 4 Area
600 RFI-5858-QCN-1-0191 RFI-5858-QCN-1-0191 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 10:00 AM 26-Sep-12
B70-PR-19 - 5th layer Purchased Backfilling material Raslaffan
Check Type-B Compaction Test for Pipe Track Foundations D110-B70-PR-64, D110- Section 4 Area
601 RFI-5858-QCN-1-0192 RFI-5858-QCN-1-0192 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 4:00 PM 26-Sep-12
B70-PR-19 - final layer Purchased Backfilling material Raslaffan
Soil Compaction Test for Backfilling B70-PS-03 SLD 055 TO SLD 077 - Type B - Section 1 Area
604 RFI-5858-QCN-1-0195 RFI-5858-QCN-1-0195 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 3:30 PM 26-Sep-12
Final layer(2nd layer) Using Purchased Material Raslaffan
605 Check Type-B Compaction Test for Pipe Stopper B70-PS-06: SLD013, B70-PS-07: Section 2 Area
RFI-5858-QCN-1-0196 RFI-5858-QCN-1-0196 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 8:00 AM 26-Sep-12 Not Ready for Inspection
SLD19 and B70-PS-08: SLD008 first layer prior second layer. Raslaffan
606 Check Type-B Compaction Test for Pipe Track D110-B70-PR-10 Final layer ( Using Section 2 Area
RFI-5858-QCN-1-0197 RFI-5858-QCN-1-0197 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 7:00 AM 26-Sep-12
Excavated Materials ) Raslaffan
Check Type-B Compaction Test for Pipe Stopper B70-PS-06: SLD013, B70-PS-07:
607 Section 2 Area
RFI-5858-QCN-1-0198 RFI-5858-QCN-1-0198 CIVIL SLD19 and B70-PS-08: SLD008 second layer prior third layer. ( Using purchase Type A CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 26-Sep-12 1:00 PM 26-Sep-12 Not Ready for inspection
Raslaffan
materials )
(Section 5) B70-PS-
Check Excavation - Bottom of Excavation Verification. For pipe sleepers B70-PS-15:
609 RFI-5858-QCN-1-0200 RFI-5858-QCN-1-0200 CIVIL
SLD003 to SLD015 = 12 nos For pipe stopper B70-PS-15: SLD004= 1 nos
CANCELLED 15 Area B-V-3100-004-1-201-01_4 2.2 W W H 26-Sep-12 9:00 AM 26-Sep-12 Not Ready for Inspection
Raslaffan
Section 1 (PR-4)
611 RFI-5858-QCN-1-0202 RFI-5858-QCN-1-0202 CIVIL Soil Compaction Test for Backfilling D110-B70-PR-04 1st layer & 2nd layer - Type B APPROVED Area B-V-3100-004-1-201-01_4 4.2.b R W H 27-Sep-12 7:30 AM 27-Sep-12
Raslaffan
Check Type-B Compaction Test for Pre-cast pipe sleepers- final layer B70-PS-09:
Section 3 Area
612 RFI-5858-QCN-1-0203 RFI-5858-QCN-1-0203 CIVIL SLD001 to SLD005 & SLD010 to SLD016 = 12 nos and B70-PS-10: SLD062 to SLD090 APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 27-Sep-12 4:00 PM 27-Sep-12
Raslaffan
except SLD087= 27 nos Purchased Backfilling Materials Used.
2 BZDW-005
613 RFI-5858-QCN-1-0204 RFI-5858-QCN-1-0204 CIVIL Check Excavation - Bottom of Excavation Verification. Duct Bank BZDW - 005 APPROVED Ductbank Area B-V-3100-004-1-201-01_4 2.2 R W H 27-Sep-12 1:10 PM 27-Sep-12
Raslaffan
Check Type-B Compaction Test for Pre-cast pipe sleepers - 1st layer B70-PS-10: Section 3 Area
615 RFI-5858-QCN-1-0206 RFI-5858-QCN-1-0206 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 27-Sep-12 4:00 PM 27-Sep-12
SLD027 to SLD059= 32 nos Raslaffan
(Section 5) B70-PS-
618 Check Excavation - Bottom of Excavation Verification. For pipe sleepers B70-PS-15:
RFI-5858-QCN-1-0209 RFI-5858-QCN-1-0209 CIVIL CANCELLED 15 Area B-V-3100-004-1-201-01_4 2.2 W W H 27-Sep-12 9:00 AM 27-Sep-12 Not Ready for Inspection
SLD003 to SLD023 = 20 nos For pipe stopper B70-PS-15: SLD004= 1 nos
Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
619 Check Final Visual Inspection for 3 loops Pipe Track Foundations D110-B70-PR-64, Section 4 Area
RFI-5858-QCN-1-0210 RFI-5858-QCN-1-0210 CIVIL APPROVED B-V-3100-004-1-201-01_4 5.2 S W H 27-Sep-12 4:00 PM 27-Sep-12
D110-B70-PR-19 & D110-B70-PR-65 Raslaffan
Check Final Elevations For 3 loops Pipe Track Foundations D110-B70-PR-64, D110-B70- Section 4 Area
620 RFI-5858-QCN-1-0211 RFI-5858-QCN-1-0211 CIVIL APPROVED B-V-3100-004-1-201-01_4 5.1 R W H 27-Sep-12 4:00 PM 27-Sep-12
PR-19 & D110-B70-PR-65 Raslaffan
Check Type-B Compaction Test for Pre-cast pipe sleepers - Final layer B70-PS-10: Section 3 Area
621 RFI-5858-QCN-1-0212 RFI-5858-QCN-1-0212 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 4:00 PM 29-Sep-12 Not ready for Inspection
SLD027 to SLD059= 32 nos Raslaffan
Check Type-B Backfilling For Pipe Track Foundations ( loop) - 1st layer D110-B70-PR-14 Section 3 Area
624 RFI-5858-QCN-1-0215 RFI-5858-QCN-1-0215 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 8:00 AM 29-Sep-12 Not Ready for Inspection
& D110-B70-PR-15 Raslaffan
Check Type-B Backfilling For Pipe Track Foundations ( loop) - 2nd layer D110-B70-PR-14 Section 3 Area
625 RFI-5858-QCN-1-0216 RFI-5858-QCN-1-0216 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 10:00 AM 29-Sep-12 Not Ready for Inspection
& D110-B70-PR-15 Raslaffan
626 Check Type-B Backfilling For Pipe Track Foundations ( loop) - 3rd layer D110-B70-PR-14 Section 3 Area
RFI-5858-QCN-1-0217 RFI-5858-QCN-1-0217 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 4:00 PM 29-Sep-12 Not Ready for Inspection
& D110-B70-PR-15 Raslaffan
628 Check Type-B Compaction Test for Pipe Stopper B70-PS-06: SLD013, B70-PS-07: Section 2 Area
RFI-5858-QCN-1-0219 RFI-5858-QCN-1-0219 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 7:30 AM 29-Sep-12
SLD19 and B70-PS-08: SLD008 first layer prior second layer. Raslaffan
Check Type-B Compaction Test for Pipe Stopper B70-PS-06: SLD013, B70-PS-07: Section 2 Area
629 RFI-5858-QCN-1-0220 RFI-5858-QCN-1-0220 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 3:30 PM 29-Sep-12
SLD19 and B70-PS-08: SLD008 second layer prior third layer. Raslaffan
Section 1 (PR-04)
631 RFI-5858-QCN-1-0222 RFI-5858-QCN-1-0222 CIVIL Soil Compaction Test for Backfilling B70PR-04 3rd layer & 4th layer - Type B APPROVED Area B-V-3100-004-1-201-01_4 4.2.b R W H 29-Sep-12 7:30 AM 29-Sep-12
Raslaffan
Barzan Off-plot
632 RFI-5858-QCN-1-0223 RFI-5858-QCN-1-0223 CIVIL Sampling for Fill Material Type-B AT Sample Location Section-1 Crossing #7 APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 29-Sep-12 7:30 AM 29-Sep-12
Section 3
635 Check Type-B Backfilling For Pipe Track Foundations ( loop) - 1st layer D110-B70-PR-48,
RFI-5858-QCN-1-0226 RFI-5858-QCN-1-0226 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 30-Sep-12 10:00 AM 30-Sep-12
D110-B70-PR-14 & D110-B70-PR-15
Check Type-B Backfilling For Pipe Track Foundations ( loop) - 2nd layer D110-B70-PR-
636 RFI-5858-QCN-1-0227 RFI-5858-QCN-1-0227 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 30-Sep-12 4:00 PM 30-Sep-12
48, D110-B70-PR-14 & D110-B70-PR-15
638 Soil Compaction Test for Backfilling B70-PR-04 5 layer layer & 6th layer - Type - B Section 1 (PR-04)
RFI-5858-QCN-1-0229 RFI-5858-QCN-1-0229 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 30-Sep-12 7:30 AM 30-Sep-12
Purchased material. Raslaffan Area
639 Soil Compaction Test for Backfilling Stopper Foundation B70-PS-03 SLD078 1st layer Section 1 Raslaffan
RFI-5858-QCN-1-0230 RFI-5858-QCN-1-0230 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 30-Sep-12 9:30 AM 30-Sep-12
layer & 2th layer Purchased material. Area
640 RFI-5858-QCN-1-0231 RFI-5858-QCN-1-0231 CIVIL Check Excavation - Bottom of Excavation Verification.D110-B70-PR-12: F2, F3, F4 and F5 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 2.2 W W W 1-Oct-12 8.30 AM 1-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
641 Check Type-B Backfilling For Pipe Track Foundations ( loop) - 3rd layer D110-B70-PR-
RFI-5858-QCN-1-0232 RFI-5858-QCN-1-0232 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 1-Oct-12 7.00 AM 1-Oct-12
48, D110-B70-PR-14 & D110-B70-PR-15
Check Type-B Backfilling For Pipe Track Foundations ( loop) - 4th layer D110-B70-PR-48,
642 RFI-5858-QCN-1-0233 RFI-5858-QCN-1-0233 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 1-Oct-12 3.00 PM 1-Oct-12
D110-B70-PR-14 & D110-B70-PR-15
Check Type-B Compaction Test for Pipe Sleeper B70-PS-06: SLD013, B70-PS-07:
643 RFI-5858-QCN-1-0234 RFI-5858-QCN-1-0234 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 1-Oct-12 7.30 AM 1-Oct-12
SLD019 and B70-PS-08: SLD008
645 RFI-5858-QCN-1-0236 RFI-5858-QCN-1-0236 CIVIL Check Type-A Compaction Test for Pipe Track D110-B70-PR-12: F2, F3, F4 and F5 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.a R W H 1-Oct-12 7.30 AM 1-Oct-12
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. SULPHUR LINE (B70
646 RFI-5858-QCN-1-0237 RFI-5858-QCN-1-0237 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Oct-12 7.00 AM 1-Oct-12
4(F2),5 (F1),8(F2 )& 9(F4) -7 th layer(Final layer) - PR - 44) Raslaffan
648 Check Type-B Backfilling For Pipe Track Foundations ( loop) - 5th layer D110-B70-PR-48,
RFI-5858-QCN-1-0239 RFI-5858-QCN-1-0239 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Oct-12 7.00 AM 2-Oct-12
D110-B70-PR-14 & D110-B70-PR-15
649 Check Type-B Backfilling For Pipe Track Foundations ( loop) - Final layer D110-B70-PR-
RFI-5858-QCN-1-0240 RFI-5858-QCN-1-0240 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Oct-12 4.00 PM 2-Oct-12
48, D110-B70-PR-14 & D110-B70-PR-15
650 Check Type-B Compaction Test final layer for Pipe Sleeper B70-PS-06: SLD013, B70-
RFI-5858-QCN-1-0241 RFI-5858-QCN-1-0241 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Oct-12 7.30 AM 2-Oct-12
PS-07: SLD019 and B70-PS-08: SLD008 ( Using excavated Materials )
Check Type-A Compaction Test for Duct Bank BZDP-005 sixth layer prior seven layer. BZDP-005 Duct Bank
651 RFI-5858-QCN-1-0242 RFI-5858-QCN-1-0242 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.a R W H 2-Oct-12 7.30 AM 2-Oct-12
( Using Purchase Materials ) Raslaffan
Check Type-A Compaction Test for Duct Bank BZDP-005 seven layer ( Using Purchase BZDP-005 Duct Bank
652 RFI-5858-QCN-1-0243 RFI-5858-QCN-1-0243 CIVIL
Materials )
APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4 .2.a R W H 2-Oct-12 4.00 PM 2-Oct-12
Check Type-B Compaction Test for Pre-cast pipe sleepers - Final layer B70-PS-10:
653 RFI-5858-QCN-1-0244 RFI-5858-QCN-1-0244 CIVIL
SLD027 to SLD059= 32 nos
APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 2-Oct-12 4.00 PM 2-Oct-12
Check Type-B Compaction Test of Pipe Sleeper B70-PS-06: SLD037 TO SLD045 = 9 nos
654 RFI-5858-QCN-1-0245 RFI-5858-QCN-1-0245 CIVIL and B70-PS-06: SLD001 to SLD010 = 10 nos firts layer prior second layer ( Using APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 2-Oct-12 9.00 AM 2-Oct-12
excavated Materials )
Soil Compaction Test for Backfilling Stopper Foundations B70- PS-03 SLD078 3rd layer &
655 RFI-5858-QCN-1-0246 RFI-5858-QCN-1-0246 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 2-Oct-12 7.30 AM 2-Oct-12
4th layer
Soil Compaction Test for Backfilling B70 - PR - 44 Pipe Rack Foundation No. 6(F3),7 (F1) SULPHUR LINE (B70
656 RFI-5858-QCN-1-0247 RFI-5858-QCN-1-0247 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 2-Oct-12 7.00 AM 2-Oct-12
1st layer& 2nd layer - PR - 44) Raslaffan
657 Check Type-B Backfilling For Pipe Sleepers - 1st layer B70-PS-10: SLD012 to SLD025 =
RFI-5858-QCN-1-0248 RFI-5858-QCN-1-0248 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 3-Oct-12 10.00 AM 3-Oct-12
14 nos
658 RFI-5858-QCN-1-0249 RFI-5858-QCN-1-0249 CIVIL Check Excavation - Bottom of Excavation Verification For Duct Bank BZDW 006 APPROVED (Section 3) Raslaffan B-V-3100-004-1-201-01_4 2.2 W W W 3-Oct-12 9.00 AM 3-Oct-12
Check Type-A Compaction Test for Duct Bank BZDP-005 8th layer ( Using Purchase BZDP-005 Duct Bank
659 RFI-5858-QCN-1-0250 RFI-5858-QCN-1-0250 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4.2.a R W H 3-Oct-12 2.00 PM 3-Oct-12
Materials ) Raslaffan
Check Type-B Compaction Test of Pipe Sleeper B70-PS-08: SLD037 TO SLD045 = 9 nos
660 RFI-5858-QCN-1-0251 RFI-5858-QCN-1-0251 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 3-Oct-12 4.00 PM 3-Oct-12
and B70-PS-06: SLD001 to SLD010 = 10 nos second layer ( Using excavated Materials )
661 Check Excavation - Bottom of Excavation Verification. For pipe sleepers B70-PS-15:
RFI-5858-QCN-1-0252 RFI-5858-QCN-1-0252 CIVIL APPROVED (Section 5) Raslaffan B-V-3100-004-1-201-01_4 2.2 W W W 3-Oct-12 9.00 AM 3-Oct-12
SLD033 to SLD040 = 8 nos For Pipe Track Foundation ( loop) B70-PR-20
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
662 Check Excavation-Bottom of Excavation verification DUCT BANK BZDP 002& DUCT
RFI-5858-QCN-1-0253 RFI-5858-QCN-1-0253 CIVIL APPROVED SECTION1 Raslaffan B-V-3100-004-1-201-01_2 2.2 R W W 3-Oct-12 6.40 AM 3-Oct-12
BANK BZDW 001
SULPHUR LINE
Soil Compaction Test for Backfilling B70 - PR - 44 Pipe Rack Foundation No. 6(F3),7 (F1)
663 RFI-5858-QCN-1-0254 RFI-5858-QCN-1-0254 CIVIL APPROVED (B70 - PR - 44) B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Oct-12 7.25 AM 3-Oct-12
4th layer,5th layer&6th layer
Raslaffan
Check Final Elevations For Loop Pipe Track Foundations D110-B70-PR-48, D110-B70-
664 RFI-5858-QCN-1-0255 RFI-5858-QCN-1-0255 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 5.1 R W H 3-Oct-12 7.00 AM 3-Oct-12
PR-14 & D110-B70-PR-15
Check Final Visual Inspection For Loop Pipe Track Foundations D110-B70-PR-48, D110-
665 RFI-5858-QCN-1-0256 RFI-5858-QCN-1-0256 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 5.2 S W H 3-Oct-12 7.00 AM 3-Oct-12
B70-PR-14 & D110-B70-PR-15
666 RFI-5858-QCN-1-0257 RFI-5858-QCN-1-0257 CIVIL Soil Compaction Test for Backfilling Stopper Foundations B70- PS-03 SLD078 5th layer APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Oct-12 7.30 AM 3-Oct-12
Soil Compaction Test for Backfilling Stopper Foundations B70- PS-02 SLD018 1st&2nd
667 RFI-5858-QCN-1-0258 RFI-5858-QCN-1-0258 CIVIL APPROVED Section-1 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Oct-12 7.30 AM 3-Oct-12
layer
Check Type-B Backfilling For Pipe Sleepers - 2nd layer B70-PS-10: SLD012 to SLD025 =
668 RFI-5858-QCN-1-0259 RFI-5858-QCN-1-0259 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 4-Oct-12 4.00 PM 4-Oct-12
14 nos
669 Check Type-B Compaction Test for Culvert BZRC-009 west side first layer up to third
RFI-5858-QCN-1-0260 RFI-5858-QCN-1-0260 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 4-Oct-12 9.00 AM 4-Oct-12
layer.
670 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. SULPHUR LINE (B70
RFI-5858-QCN-1-0261 RFI-5858-QCN-1-0261 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 4-Oct-12 7.25 AM 4-Oct-12
6(F3),7 (F1) 7th layer ( final layer) - PR - 44) Raslaffan
671 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. SULPHUR LINE (B70
RFI-5858-QCN-1-0262 RFI-5858-QCN-1-0262 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 4-Oct-12 9.00 AM 4-Oct-12
2(F7),10 (F3),11(F8) 1st & 2nd layer - PR - 44) Raslaffan
Check Type-B Backfilling For Pipe Sleepers - 1st layer B70-PS-16: SLD061, SLD062 &
674 RFI-5858-QCN-1-0265 RFI-5858-QCN-1-0265 CIVIL
SLD063
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 4-Oct-12 7.00 AM 4-Oct-12
Check Type-B Backfilling For Pipe Sleepers - 2nd layer B70-PS-16: SLD061, SLD062 &
675 RFI-5858-QCN-1-0266 RFI-5858-QCN-1-0266 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 4-Oct-12 10.00 AM 4-Oct-12
SLD063
5.2. Check Final Elevations of Pipe Sleeper B70-PS-07: SLD053 to SLD001 = 51 nos
676 RFI-5858-QCN-1-0267 RFI-5858-QCN-1-0267 CIVIL Except SLD044 and SLD045 and B70-PS-08: SLD093 to SLD058 = 34 nos except APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.2 R W H 4-Oct-12 3.00 PM 4-Oct-12
SLD087 and SLD086
5.2. Check Final Visual Inspection of Pipe Sleeper B70-PS-06: SLD053 to SLD001 = 51
677 RFI-5858-QCN-1-0268 RFI-5858-QCN-1-0268 CIVIL nos Except SLD044 and SLD043 and B70-PS-08: SLD093 to SLD058 = 34 nos APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.2 R W H 4-Oct-12 3.00 PM 4-Oct-12
except SLD087 and SLD086
Culvert BZRC-009
679 RFI-5858-QCN-1-0270 RFI-5858-QCN-1-0270 CIVIL Check Type-B Compaction Test for Culvert BZRC-009 west side 6th layer to 8th layer CANCELLED B-V-3100-004-1-201-01_4 4.2.b R W H 6-Oct-12 9.00 AM 6-Oct-12 Not ready for inspection
Raslaffan
682 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. SULPHUR LINE (B70
RFI-5858-QCN-1-0273 RFI-5858-QCN-1-0273 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 5-Oct-12 9.30 AM 5-Oct-12
2(F7),10 (F3),11(F8) 3rd layer & 4th layer - PR - 44) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
683 Soil Compaction Test for Backfilling B70-PS-02 SLD 001 TO SLD 033 & B70-PS-01 SLD SECTION1
RFI-5858-QCN-1-0274 RFI-5858-QCN-1-0274 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 7-Oct-12 7:30 AM 7-Oct-12
002,SLD 003& SLD004 - Type B - 1st layer Raslaffan
Soil Compaction Test for Backfilling Stopper Foundations D110 B70- PS-02 SLD018 3rd SECTION 1
685 RFI-5858-QCN-1-0276 RFI-5858-QCN-1-0276 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 7-Oct-12 7:00 AM 7-Oct-12
&4th layer Raslaffan
Check Type-B Compaction Test of Pipe Sleeper B70-PS-06: SLD035 TO SLD050 =15
686 RFI-5858-QCN-1-0277 RFI-5858-QCN-1-0277 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 7-Oct-12 10:30 AM 7-Oct-12
nos first layer prior second layer.
Review and approval of QIL test report for Back fill Material (Type-A) for the sampled
687 RFI-5858-QCN-1-0278 RFI-5858-QCN-1-0278 CIVIL
location Section-3 Stockpile PS-10 # 2
APPROVED Barzan Off-Plot Area B-V-3100-004-1-201-01_4 3.1.a R W H 7-Oct-12 7:30 AM 8-Oct-12
Culvert BZRC-009
688 RFI-5858-QCN-1-0279 RFI-5858-QCN-1-0279 CIVIL Check Type-B Compaction Test for Culvert BZRC-009 west side 6th layer and 7th layer APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 7-Oct-12 2:00 PM 7-Oct-12
Raslaffan
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. 10 SULPHUR LINE
689 RFI-5858-QCN-1-0280 RFI-5858-QCN-1-0280 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 7-Oct-12 9:30 AM 7-Oct-12
(F3),11(F8) 5th layer & 6th layer (B70 - PR - 44)
690 Check Type-B Compaction Test of Pipe Sleeper B70-PS-06: SLD035 TO SLD050 =15
RFI-5858-QCN-1-0281 RFI-5858-QCN-1-0281 CIVIL APPROVED Section2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 8-Oct-12 8:30 AM 8-Oct-12
nos second layer.
692 Check Excavation-Bottom of Excavation verification B70 - PS -03 Pipe Sleeper SLD01
RFI-5858-QCN-1-0283 RFI-5858-QCN-1-0283 CIVIL APPROVED SECTION 1 B-V-3100-004-1-201-01_4 2.2 R W H 8-Oct-12 7:00 AM 8-Oct-12
TO SLD043(SLD 027- NOT INCLUDED) & PS- 04 SLD 027 TO SLD020
Check Type - A under foundation For Pipe Sleepers B70-PS-09 : SLD007 & SLD008 = 2
693 RFI-5858-QCN-1-0284 RFI-5858-QCN-1-0284 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.a R W H 8-Oct-12 8:00 AM 8-Oct-12
nos B70-PS-10: SLD010, SLD011, SLD060 & SLD061 = 4 nos
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. 10 SULPHUR LINE
694 RFI-5858-QCN-1-0285 RFI-5858-QCN-1-0285 CIVIL
(F3)-7th layer,11(F8) 7th layer & 8th layer
APPROVED
(B70 - PR - 44)
B-V-3100-004-1-201-01_4 4 .2.b R W H 8-Oct-12 8:30 AM 8-Oct-12
Sampling for Fill Material Type - A at Sample Location, Stock # Section 3 PS-10-3 (900 Barzan Off-Plot
695 RFI-5858-QCN-1-0286 RFI-5858-QCN-1-0286 CIVIL
cu.m)
APPROVED
Section 3
B-V-3100-004-1-201-01_4 3.1.a R W H 8-Oct-12 8:00 AM 8-Oct-12
Sampling for Fill Material Type - A at Sample Location, Stock Pipe # Section 3 PS-10-4 Barzan Off-Plot
696 RFI-5858-QCN-1-0287 RFI-5858-QCN-1-0287 CIVIL APPROVED B-V-3100-004-1-201-01_4 3.1.b R W H 8-Oct-12 8:00 AM 8-Oct-12
(1200 cu.m) Section 3
Soil Compaction Test for Backfilling B70-PS-02 SLD 001 TO SLD 033 & B70-PS-01 SLD SECTION 1
697 RFI-5858-QCN-1-0288 RFI-5858-QCN-1-0288 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 9-Oct-12 2:30 PM 9-Oct-12
002,SLD 003& SLD004 - Type B - 2nd layer Raslaffan
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. 2 SULPHUR LINE
698 RFI-5858-QCN-1-0289 RFI-5858-QCN-1-0289 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 9-Oct-12 8:30 AM 9-Oct-12
(F7)-1st,2nd & 3rd layer (B70 - PR - 44)
699 RFI-5858-QCN-1-0290 RFI-5858-QCN-1-0290 CIVIL Check Final Elevation For Pipe Sleepers B70-PS-16: SLD061, SLD062 & SLD063 CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_4 5.1 R W H 9-Oct-12 9:00 AM 9-Oct-12 Not ready for inspection
Soil Compaction Test for Backfilling Stopper Foundations D110 B70- PS-02 SLD018 & SECTION 1
700 RFI-5858-QCN-1-0291 RFI-5858-QCN-1-0291 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 9-Oct-12 9:30 AM 9-Oct-12
PS-03 SLD078 - Final layer (5th layer) Raslaffan
701 RFI-5858-QCN-1-0292 RFI-5858-QCN-1-0292 CIVIL Check Final Visual Inspection For Pipe Sleepers B70-PS-16: SLD061, SLD062 & SLD063 CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_4 5.2 S W H 9-Oct-12 9:00 AM 9-Oct-12
Culvert BZRC-009
702 RFI-5858-QCN-1-0293 RFI-5858-QCN-1-0293 CIVIL Check Type-B Compaction Test for Culvert BZRC-009 west side 10th layer APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 9-Oct-12 2:00 PM 9-Oct-12
Raslaffan
7:00 AM
703 Check Type - B Compaction Test For Pipe Stoppers - 1st and 2nd layer B70-PS-10:
RFI-5858-QCN-1-0294 RFI-5858-QCN-1-0294 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 10-Oct-12 to 10-Oct-12
SLD036 & SLD079 = 2 nos
4:00 AM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
704 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No. 2 SULPHUR LINE
RFI-5858-QCN-1-0295 RFI-5858-QCN-1-0295 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 10-Oct-12 8:30 AM 10-Oct-12
(F7)- 4th,5th & 6thlayer (B70 - PR - 44)
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No.3 (F5)- SULPHUR LINE
705 RFI-5858-QCN-1-0296 RFI-5858-QCN-1-0296 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 10-Oct-12 8:45 AM 10-Oct-12
1st,2nd & 3rd layer (B70 - PR - 44)
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & Stopper B70-
706 RFI-5858-QCN-1-0297 RFI-5858-QCN-1-0297 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 2.2 W W W 10-Oct-12 9:00 AM 10-Oct-12
PS-15: SLD071, SLD072, SLD073 = 3 nos B70-PS-15: SLD070 = 1 nos
Soil Compaction Test for Backfilling Stopper Foundations D110 B70- PS-03 SLD018 1st SECTION 1
707 RFI-5858-QCN-1-0298 RFI-5858-QCN-1-0298 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 10-Oct-12 7:00 AM 10-Oct-12
&2nd layer Raslaffan
7:00 AM
Check Type - B Compaction Test For Pipe Stoppers - 3rd, 4th & 5th layer B70-PS-10:
708 RFI-5858-QCN-1-0299 RFI-5858-QCN-1-0299 CIVIL
SLD036 & SLD079 = 2 nos
APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 11-Oct-12 To 11-Oct-12
4:30 PM
Soil Compaction Test for Backfilling Stopper Foundation D110 B70- PS-03 SLD018 3rd & SECTION 1
710 RFI-5858-QCN-1-0301 RFI-5858-QCN-1-0301 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 11-Oct-12 8:00 AM 11-Oct-12
4th layer Raslaffan
711 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No.3 (F5)- SULPHUR LINE
RFI-5858-QCN-1-0302 RFI-5858-QCN-1-0302 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 11-Oct-12 8:45 AM 11-Oct-12
4th,5th & 6th layer (B70 - PR - 44)
712 Check Type A Compaction Test for west side of Culvert BZRC-009 ( Crossing # 40 at Crossing # 40
RFI-5858-QCN-1-0303 RFI-5858-QCN-1-0303 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2 R W H 11-Oct-12 7:00 AM 11-Oct-12
QG Gate # 5 ) - Prior laying of Prime Cate. Raslaffan Aarea
713 Check Laying of Asphalt Base Course For West side of Culvert BZRC-009 ( Crossing # Crossing # 40
RFI-5858-QCN-1-0304 RFI-5858-QCN-1-0304 CIVIL CANCELLED B-V-3100-004-1-201-03_5 4.2.2 S W H 13-Oct-12 3:00 PM 13-Oct-12
40 at QG Gate 5 ) - 1st layer prior 2nd layer Raslaffan
Check Type - B Compaction Test For Pipe Stoppers - Final layer B70-PS-10: SLD036 &
714 RFI-5858-QCN-1-0305 RFI-5858-QCN-1-0305 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 12-Oct-12 7:00 AM 12-Oct-12
SLD079 = 2 nos
Check Preparation & Compaction Workis for west of side of Culvert BZRC-009 ( Crossing Craossing # 40
715 RFI-5858-QCN-1-0306 RFI-5858-QCN-1-0306 CIVIL
# 40 at QG Gate 5 )
APPROVED
Raslaffan Area
B-V-3100-004-1-201-03_5 2.0 S W H 11-Oct-12 9:00 AM 11-Oct-12
7:00 AM
716 Check Type - B Compaction Test For Pipe Stoppers - 1st layer & 2nd layer B70-PS-06:
RFI-5858-QCN-1-0307 RFI-5858-QCN-1-0307 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 12-Oct-12 To 12-Oct-12
SLD074 to SLD088 except SLD083 = 13 nos
4:30 PM
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation SULPHUR LINE
717 RFI-5858-QCN-1-0308 RFI-5858-QCN-1-0308 CIVIL
No.12(F9A&F9B),13(F11),14 (F10)- 1st & 2nd layer
APPROVED
(B70 - PR - 44)
B-V-3100-004-1-201-01_4 4.2.b R W H 13-Oct-12 8:00 AM 13-Oct-12
Soil Compaction Test for Backfilling Stopper Foundation D110 B70- PS-03 SLD018 5th SECTION 1
718 RFI-5858-QCN-1-0309 RFI-5858-QCN-1-0309 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 13-Oct-12 9:00 AM 13-Oct-12
layer Raslaffan
Check Laying of Asphalt Base Course For West side of Culvert BZRC-009 ( Crossing # Crossing # 40
719 RFI-5858-QCN-1-0310 RFI-5858-QCN-1-0310 CIVIL
40 at QG Gate 5 ) - 1st layer prior 2nd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-03_5 4.2.2 S W H 14-Oct-12 3:00 PM 14-Oct-12
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation SULPHUR LINE
720 RFI-5858-QCN-1-0311 RFI-5858-QCN-1-0311 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 14-Oct-12 7:30 AM 14-Oct-12
No.12(F9A&F9B),13(F11),14 (F10)- 3rd,4th&5th layer (B70 - PR - 44)
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
721 RFI-5858-QCN-1-0312 RFI-5858-QCN-1-0312 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W W 14-Oct-12 9:00 AM 14-Oct-12
B70-PR-12 ( F1) & D110-B70-PR-13 ( loop)
Review and Approval of QIL test for Back fill material .Type -A &B for the sample location Barzan Off-plot
722 RFI-5858-QCN-1-0313 RFI-5858-QCN-1-0313 CIVIL APPROVED B-V-3100-004-0-201-01_4 3.1,a,b R W H 14-Oct-12 08:00AM 14-Oct-12
Stock Pile # Section 3 - PS - 10 # 2 & Section 1 Crossing -7 Section 3
Check Type-B Compaction Test For Pipe Sleepers- 1st layer B70-PS-16: SLD076 to
723 RFI-5858-QCN-1-0314 RFI-5858-QCN-1-0314 CIVIL SLD089 & SLD092 to SLD099 = 22 nos B70-PS-15: SLD003, SLD005 & SLD007 to APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 15-Oct-12 5:00 PM 15-Oct-12
SLD016 = 12 nos
724 Check Laying of Asphalt Base Course For West side of Culvert BZRC-009 ( Crossing # Crossing # 40
RFI-5858-QCN-1-0315 RFI-5858-QCN-1-0315 CIVIL APPROVED B-V-3100-004-1-201-03_5 4.2.2 S W H 15-Oct-12 9:00 AM 15-Oct-12
40 at QG Gate 5 ) - 2nd layer Raslaffan
725 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation SULPHUR LINE
RFI-5858-QCN-1-0316 RFI-5858-QCN-1-0316 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2 b R W H 15-Oct-12 7:30 AM 15-Oct-12
No.12(F9A&F9B),13(F11),14 (F10)- 6th,7th& 8th layer (B70 - PR - 44)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
726 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation SULPHUR LINE
RFI-5858-QCN-1-0317 RFI-5858-QCN-1-0317 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2 b R W H 16-Oct-12 7:30 AM 16-Oct-12
No.12(F9A&F9B),14 (F10)- 9th,10th layer. (B70 - PR - 44)
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers, Stopper & Track
Section 2 & 5
727 RFI-5858-QCN-1-0318 RFI-5858-QCN-1-0318 CIVIL ( loop ) B70-PS-09: SLD074 To SLD086= 13 nos, B70-PS-09: SLD054 B70-PS-09: APPROVED B-V-3100-004-1-201-01_4 2.2 R W W 16-Oct-12 8:00 AM 16-Oct-12
Raslaffan
SLD051 to SLD056 = 5 nos. B70-PS-16: SLD075 = 1 nos, D110-B70-PR-67 = 1 loop
Check Final Elevations For Pipe Sleepers & Stoppers ( B70-PS-06: SLD001 To SLD031
728 RFI-5858-QCN-1-0319 RFI-5858-QCN-1-0319 CIVIL = 31 nos), (B70-PS-07: SLD019 & SLD069= 2 nos), (B70-PS-08: SLD001 To SLD029, CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.1 R W H 17-Oct-12 8:00 AM 17-Oct-12 Survey Report Missing
SLD037 To SLD057 & SLD061= 51 nos),
Check Final Visual Inspection for Pipe Sleepers & Stoppers (B70-PS-06; SLD 001 TO
729 RFI-5858-QCN-1-0320 RFI-5858-QCN-1-0320 CIVIL SLD 031= 31 Nos), (B70-PS-07; SLD 19 & SLD 069=2 Nos), B70-PS-08; SLD 001 TO APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.2 S W H 17-Oct-12 8.00 AM 17-Oct-12
SLD 029, SLD 037 TO SLD 057 & SLD 061= 51 Nos)
Check Final Elevations For Pipe Sleepers & Stoppers( B70-PS-09: SLD001 To SLD005,
SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To SLD092 = Section 2 & 3
730 RFI-5858-QCN-1-0321 RFI-5858-QCN-1-0321 CIVIL
43 nos)(B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To SLD086, &
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_4 5.1 R W H 17-Oct-12 8:00 AM 17-Oct-12
SLD088 To SLD090 = 75 nos)
Check Final Visual Inspection For Pipe Sleepers & Stoppers ( B70-PS-09: SLD001 To
SLD005, SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To Section 2 & 3
731 RFI-5858-QCN-1-0322 RFI-5858-QCN-1-0322 CIVIL CANCELLED B-V-3100-004-1-201-01_4 5.2 S W H 17-Oct-12 8:00 AM 17-Oct-12
SLD092 = 43 nos) (B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To Raslaffan
SLD086, & SLD088 To SLD090 = 75 nos)
Check Laying of Asphalt Binder & Surface Course For West side of Culvert BZRC-009 Crossing # 40
732 RFI-5858-QCN-1-0323 RFI-5858-QCN-1-0323 CIVIL APPROVED B-V-3100-004-1-201-03_5 4.2.4 S W H 17-Oct-12 9:00 AM 17-Oct-12
( Crossing # 40 at QG Gate 5 ) Raslaffan
Check Type-B Compaction Test For Pre-Cast Pipe Sleepers - 1st & 2nd layer B70-PS-06: 7:00 AM
733 RFI-5858-QCN-1-0324 RFI-5858-QCN-1-0324 CIVIL SLD064, B70-PS-07: SLD093, SLD094, SLD043, SLD044, B70-PS-08: SLD086 & APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 17-Oct-12 To 17-Oct-12
SLD087 = 7 nos 5:00 PM
7:00 AM
735 Check Type-B Compaction Test for Pipe Stoppers - 1st & 2nd layer B70-PS-13: SLD018
RFI-5858-QCN-1-0326 RFI-5858-QCN-1-0326 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 18-Oct-12 To 18-Oct-12
& B70-PS-14:SLD081
3:00 PM
7:45 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.15
738 RFI-5858-QCN-1-0329 RFI-5858-QCN-1-0329 CIVIL
(F14),14(F13) 1st & 2nd layer
APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 18-Oct-12 TO 18-Oct-12
4:30:00 PM
6:00 AM
Check Type-B Compaction Test for Pipe Track ( loop) D110-B70-PR-07 - 1st, 2nd & 3rd
739 RFI-5858-QCN-1-0330 RFI-5858-QCN-1-0330 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 19-Oct-12 To 19-Oct-12
Layer
4:00 PM
Check Type - B Compaction Test for Pipe Sleepers - 1st & 2nd layers B70-PS-09: 6:00 AM
740 RFI-5858-QCN-1-0331 RFI-5858-QCN-1-0331 CIVIL SLD006 To SLD009 = 4 nos B70-PS-10: SLD010, SLD011, SLD026, SLD060, SLD061, APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 19-Oct-12 To 19-Oct-12
SLD087 = 6 nos 4:00 PM
6:00 AM
Check Type-B Compaction Test for Pipe Stoppers - 3rd, 4th & 5th layers B70-PS-13:
741 RFI-5858-QCN-1-0332 RFI-5858-QCN-1-0332 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 19-Oct-12 To 19-Oct-12
SLD018 & B70-PS-14:SLD081
3:00 PM
742 Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.15
RFI-5858-QCN-1-0333 RFI-5858-QCN-1-0333 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 19-Oct-12 7:45 AM 19-Oct-12
(F14),14(F13) 3rd & 4th layer
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.13
743 RFI-5858-QCN-1-0334 RFI-5858-QCN-1-0334 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 19-Oct-12 9:45 AM 19-Oct-12
(F12),12(F10) 1st &2nd layer
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.15
744 RFI-5858-QCN-1-0335 RFI-5858-QCN-1-0335 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Oct-12 2:00 PM 20-Oct-12
(F14),14(F13) 5th & 6th layer
6:00 AM
Check Type-B Compaction Test for Pipe Track ( loop) D110-B70-PR-07 - 4th, 5th & Final
745 RFI-5858-QCN-1-0336 RFI-5858-QCN-1-0336 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Oct-12 To 21-Oct-12
Layer
4:00 PM
6:00 AM
746 Check Type-B Compaction Test for Pipe Stoppers - Final layer B70-PS-13: SLD018 &
RFI-5858-QCN-1-0337 RFI-5858-QCN-1-0337 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 20-Oct-12 To 20-Oct-12
B70-PS-14:SLD081
3:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
747 Review and approval of QIL test report for Back fill Material (Typee-A & Typee-B) for the
RFI-5858-QCN-1-0338 RFI-5858-QCN-1-0338 CIVIL APPROVED Barzan Off-plot Area B-V-3100-004-1-201-02_4 3.1.a.b R W H 20-Oct-12 7:30 AM 20-Oct-12
sampled location Section - 3 Stockpile PS-10 # 3 & Stockpile PS- 10 #4
Check Type-B Compaction Test for Pipe Track ( loop) D110-B70-PR-13 & D110-B70-PR-
748 RFI-5858-QCN-1-0339 RFI-5858-QCN-1-0339 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 21-Oct-12 6:00 AM To 5:00 PM 21-Oct-12
47 1st, 2nd & 3rd Layers
Check Final Visual Inspection For Pipe Sleepers & Stoppers( B70-PS-09: SLD001 To
SLD005, SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To Section 2 & 3
749 RFI-5858-QCN-1-0340 RFI-5858-QCN-1-0340 CIVIL CANCELLED B-V-3100-004-1-201-01_4 5.1 R W H 21-Oct-12 8:00 AM 21-Oct-12 Not redy for Inspection
SLD092 = 43 nos)(B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To Raslaffan
SLD086, & SLD088 To SLD090 = 75 nos)
Check Final Visual Inspection For Pipe Sleepers & Stoppers ( B70-PS-09: SLD001 To
SLD005, SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To Section 2 & 3
750 RFI-5858-QCN-1-0341 RFI-5858-QCN-1-0341 CIVIL CANCELLED B-V-3100-004-1-201-01_4 5.2 S W H 21-Oct-12 8:00 AM 21-Oct-12 Not redy for Inspection
SLD092 = 43 nos) (B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To Raslaffan
SLD086, & SLD088 To SLD090 = 75 nos)
Check Type-A Compaction Test For East side of Culvert BZRC-009 ( Crossing # 40 at Crossing # 40
751 RFI-5858-QCN-1-0342 RFI-5858-QCN-1-0342 CIVIL
QG Gate 5 ) - Prior laying of Prime Coat
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_4 4.2 R W H 21-Oct-12 3:00 PM 21-Oct-12 Not redy for Inspection
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.15 PR - 01 Raslaffan
752 RFI-5858-QCN-1-0343 RFI-5858-QCN-1-0343 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2 b R W H 21-Oct-12 to 21-Oct-12
(F14)- 7th layer, 14(F13)-7th & 8th layer Area
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.13 PR - 01 Raslaffan
753 RFI-5858-QCN-1-0344 RFI-5858-QCN-1-0344 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2 b R W H 21-Oct-12 to 21-Oct-12
(F12),12(F10) 3rd,4th,5th layer Area
4:30 PM
754 Check Preparation & Compaction Works For East side of Culvert BZRC-009 ( Crossing # Crossing # 40
RFI-5858-QCN-1-0345 RFI-5858-QCN-1-0345 CIVIL APPROVED B-V-3100-004-1-201-03_5 2.0 S W H 21-Oct-12 3:00 PM 30-Dec-12
40 at QG Gate 5 ) Raslaffan
755 Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & 1 Stopper B70-
RFI-5858-QCN-1-0346 RFI-5858-QCN-1-0346 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W H 21-Oct-12 8:00 AM 30-Oct-12
PS-16: SLD035 To SLD044 = 10 nos
6:00 AM
756 Check Type-B Compaction Test for Pipe Track ( loop) D110-B70-PR-13 & D110-B70-PR-
RFI-5858-QCN-1-0347 RFI-5858-QCN-1-0347 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 22-Oct-12 To 22-Oct-12
47 4th, 5th & Final Layers
5:00 PM
Check Type-B Compaction Test For Pipe Sleepers- 2nd layer (Final) B70-PS-16: SLD076
757 RFI-5858-QCN-1-0348 RFI-5858-QCN-1-0348 CIVIL to SLD089 & SLD092 to SLD099 = 22 nos B70-PS-15: SLD003, SLD005 & SLD007 to APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 22-Oct-12 4:00 PM 23-Oct-12
SLD016 = 12 nos
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.13
758 RFI-5858-QCN-1-0349 RFI-5858-QCN-1-0349 CIVIL
(F12),12(F10)6th, 7th & 8th layer
APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 22-Oct-12 4:30 PM 22-Oct-12
Check Final Elevations For Pipe Sleepers B70-PS-06: SLD035 To SLD061 & SLD064 To
SLD088 except SLD083 = 49 nosB70-PS-07: SLD093,SLD094, SLD043 & SLD044 = 4 Section 2 & 3
759 RFI-5858-QCN-1-0350 RFI-5858-QCN-1-0350 CIVIL
nos, B70-PS-08: SLD086 & SLD087 = 2 nos, B70-PS-09: SLD006 TO SLD009 / B70-PS-
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_4 5.1 R W H 22-Oct-12 8:00 AM 22-Oct-12
10: SLD010, SLD011, SLD026, SLD060, SLD061 & SLD087 = 10 nos
Check Final Visual Inspection For Pipe Sleepers B70-PS-06: SLD035 To SLD061 &
Section 2 & 3
760 RFI-5858-QCN-1-0351 RFI-5858-QCN-1-0351 CIVIL SLD064 To SLD088 except SLD083 = 49 nos B70-PS-07: SLD093,SLD094, SLD043 & APPROVED B-V-3100-004-1-201-01_4 5.2 S W H 22-Oct-12 8:00 AM 22-Oct-12
Raslaffan
SLD044 = 4 nos, B70-PS-08: SLD086 & SLD087 = 2 nos.
Soil Compaction Test for formation level prior to blinding D110 B70 - PR - 01 Pipe Rack
761 RFI-5858-QCN-1-0352 RFI-5858-QCN-1-0352 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 22-Oct-12 3:30 PM 22-Oct-12
Foundation No.1 (F1)-Type-A
6:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.9
762 RFI-5858-QCN-1-0353 RFI-5858-QCN-1-0353 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Oct-12 to 23-Oct-12
(F9),10(F10),11(F11)-1st layer
4:50 PM
763 Check Preparation & Compaction Works For East side of Culvert BZRC-009 ( Crossing # Crossing # 40
RFI-5858-QCN-1-0354 RFI-5858-QCN-1-0354 CIVIL APPROVED B-V-3100-004-1-201-03_5 2.0 R W H 23-Oct-12 1:00 PM 23-Oct-12
40 at QG Gate 5 ) Raslaffan
Check Class B Compaction Test For East side of Culvert BZRC-009 ( Crossing # 40 at Crossing # 40
764 RFI-5858-QCN-1-0355 RFI-5858-QCN-1-0355 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2 R W H 23-Oct-12 1:00 PM 23-Oct-12
QG Gate 5 ) - Prior laying of Prime Coat Raslaffan
Soil Compaction Test for formation level prior to blinding- Type-A B70 - PS -04 Stopper SECTION1 (B70
765 RFI-5858-QCN-1-0356 RFI-5858-QCN-1-0356 CIVIL CANCELLED B-V-3100-004-2-201-01_4 4 .2.b R W H 23-Oct-12 2:30 PM 23-Oct-12 Not Ready for Inspection
foundation SLD015 PS-04) Raslaffan
7:00 AM
Check Type-B Compaction Test For Pre-Cast Pipe Sleepers - 1st & 2nd layer B70-PS-09:
766 RFI-5858-QCN-1-0357 RFI-5858-QCN-1-0357 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 23-Oct-12 To 23-Oct-12
SLD076 To SLD078, SLD082 To SLD086 = 8 nos
5:00 PM
768 Check Excavation-Bottom of Excavation verification B70 - PS -04 Stopper foundation SECTION1
RFI-5858-QCN-1-0359 RFI-5858-QCN-1-0359 CIVIL APPROVED B-V-3100-004-1-201-02_4 2.2 R W H 24-Oct-12 7:00 AM 30-Oct-12
SLD015 Raslaffan
Check Type-A Compaction Test under Blinding For Pre-Cast Pipe Sleepers B70-PS-06:
770 RFI-5858-QCN-1-0361 RFI-5858-QCN-1-0361 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.A R W H 24-Oct-12 7:00 AM 24-Oct-12
SLD062 & SLD063 = 2 nos B70-PS-09: SLD072,SLD073, SLD035 & SLD036 = 4 nos
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.9
771 RFI-5858-QCN-1-0362 RFI-5858-QCN-1-0362 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 24-Oct-12 8:30 AM 24-Oct-12
(F9),10(F10),11(F11) - 2nd,3rd & 4th Layer
07:00 AM
Check Type-B Compaction Test For Pipe Stoppers - 1st & 2nd layer B70-PS-06: SLD081
772 RFI-5858-QCN-1-0363 RFI-5858-QCN-1-0363 CIVIL
& SLD048 = 2 nos
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 25-Oct-12 To 25-Oct-12
05:00 PM
07:00 AM
Check Type-B Compaction Test For Pipe Sleepers - 1st & 2nd layer B70-PS-09: SLD055,
773 RFI-5858-QCN-1-0364 RFI-5858-QCN-1-0364 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 25-Oct-12 To 25-Oct-12
SLD056, SLD074, SLD075, SLD079, SLD080 & SLD081 = 7 nos
05:00 PM
Check Final Elevations For Pipe Track Foundations ( loops) D110-B70-PR-07, 13, 47 = 3
774 RFI-5858-QCN-1-0365 RFI-5858-QCN-1-0365 CIVIL CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.1 R W H 25-Oct-12 8:00 AM 3-Nov-12
loops
775 Check Final Visual Inspection For Pipe Track Foundations ( Loops) D110-B70-PR-07, 13,
RFI-5858-QCN-1-0366 RFI-5858-QCN-1-0366 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 5.2 S W H 25-Oct-12 8:00 AM 25-Oct-12
47 = 3 loops
Check Final Visual Inspection For Pipe Sleepers & Stoppers( B70-PS-09: SLD001 To
776 SLD005, SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To Section 2 & 3
RFI-5858-QCN-1-0367 RFI-5858-QCN-1-0367 CIVIL APPROVED B-V-3100-004-1-201-01_4 5.1 R W H 25-Oct-12 8:00 AM 25-Oct-12
SLD092 = 43 nos)(B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To Raslaffan
SLD086, & SLD088 To SLD090 = 75 nos)
6:30 AM
777 Check Excavation-Bottom of Excavation verification B70 PS -90 F2 Pipe Sleeper SULPHUR AREA-
RFI-5858-QCN-1-0368 RFI-5858-QCN-1-0368 CIVIL APPROVED B-V-3100-004-1-201-02_4 2.2 R W H 25-Oct-12 to 3-Nov-12
SLD001,SLD005,SLD006,SLD013,SLD014 B70 PS 90
4:50 PM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation No.9
778 RFI-5858-QCN-1-0369 RFI-5858-QCN-1-0369 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 25-Oct-12 7:00 AM 25-Oct-12
(F9),10(F10),11(F11) - 5th,6th & 7th Layer
07:00 AM
Check Type-B Compaction Test For Pipe Stoppers - 3rd layer B70-PS-06: SLD081 &
779 RFI-5858-QCN-1-0370 RFI-5858-QCN-1-0370 CIVIL
SLD048 = 2 nos
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 29-Oct-12 To 29-Oct-12
05:00 PM
7:00 AM
Check Type-B Compaction Test For Pipe Stoppers 4th,5th Final Layer B70-PS-06:
780 RFI-5858-QCN-1-0371 RFI-5858-QCN-1-0371 CIVIL
SLD081 & SLD048 = 2 nos
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 30-Oct-12 To 30-Oct-12
5:00 PM
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers, Stopper & Loop
781 RFI-5858-QCN-1-0372 RFI-5858-QCN-1-0372 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W H 30-Oct-12 7:00 AM 5-Nov-12
B70-PS-16: SLD001 To SLD017 = 17 nosD110-B70-PR-21 = 1 loop
6:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation
782 RFI-5858-QCN-1-0373 RFI-5858-QCN-1-0373 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 29-Oct-12 to 30-Oct-12
3(F3),4(F4) 1st & 2nd Layer
4:50 PM
784 Check Laying of Asphalt Base Course For East side of Culvert BZRC-009 ( Crossing # 40 Crossing # 40
RFI-5858-QCN-1-0375 RFI-5858-QCN-1-0375 CIVIL APPROVED B-V-3100-004-1-201-03_5 4.2.2 S W H 29-Oct-12 7:00 PM 30-Oct-12
at QG Gate 5 ) - 1st layer prior 2nd layer Raslaffan
Check dune sand filling around under ground lines Crossing #101 A,B&C- Desalination SECTION1
785 RFI-5858-QCN-1-0376 RFI-5858-QCN-1-0376 CIVIL APPROVED B-V-3100-004-1-201-02_4 4.2.e R W H 28-Oct-12 10:00 AM 30-Oct-12
line -Desalintion line
SECTION1
786 RFI-5858-QCN-1-0377 RFI-5858-QCN-1-0377 CIVIL Soil Compaction Test for Backfilling Crossing #101 A,B&C- Desalination line APPROVED
-Desalination line
B-V-3100-004-2-201-01_4 4 .2.b R W H 28-Oct-12 2:30 PM 30-Oct-12
6:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR - 01 Pipe Rack Foundation
787 RFI-5858-QCN-1-0378 RFI-5858-QCN-1-0378 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 30-Oct-12 to 30-Oct-12
3(F3),4(F4),3rd,4th & 5th Layer
4:50 PM
Check Laying of Asphalt Base Course For East side of Culvert BZRC-009 ( Crossing # 40 Crossing # 40
788 RFI-5858-QCN-1-0379 RFI-5858-QCN-1-0379 CIVIL
at QG Gate 5 ) - 2nd layer
CANCELLED
Raslaffan
B-V-3100-004-1-201-03_5 4.2.2 S W H 30-Oct-12 7:00 PM 30-Oct-12
7:00 AM
789 RFI-5858-QCN-1-0380 RFI-5858-QCN-1-0380 CIVIL Check Type-A Compaction Test For Duct Bank BZDW 005 - 1st Layer APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.a R W H 31-Oct-12 To 31-Oct-12
5:00 PM
Check Laying of Asphalt Base Course For East side of Culvert BZRC-009 ( Crossing # 40 Crossing # 40
790 RFI-5858-QCN-1-0381 RFI-5858-QCN-1-0381 CIVIL APPROVED B-V-3100-004-1-201-03_5 4.2.2 S W H 31-Oct-12 7:00 AM 3-Nov-12
at QG Gate 5 ) - 2nd layer Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
Section 2 & 3
792 RFI-5858-QCN-1-0383 RFI-5858-QCN-1-0383 CIVIL Check Type-A Compaction Test For Duct Bank BZDW 005 - 2nd,3rd & 4th layer APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 1-Nov-12 To 3-Nov-12
Raslaffan
5:00 PM
Check Laying of Asphalt Binder Course For East side of Culvert BZRC-009 ( Crossing # Crossing # 40
793 RFI-5858-QCN-1-0384 RFI-5858-QCN-1-0384 CIVIL CANCELLED B-V-3100-004-1-201-01_5 4.2.4 S W H 1-Nov-12 9:00 AM 1-Nov-12
40 at QG Gate 5 ) Raslaffan
6:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation 3
794 RFI-5858-QCN-1-0385 RFI-5858-QCN-1-0385 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 1-Nov-12 to 3-Nov-12
(F3),4(F4) Final Layer (7th Layer )
4:50 PM
07:00 AM
795 Check Type-A Compaction Test For Duct Bank BZDW 005 - 5th, 6th & 7th layer Section 2 & 3
RFI-5858-QCN-1-0386 RFI-5858-QCN-1-0386 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.a R W H 2-Nov-12 To 4-Nov-12
BZDW 006 - 1st,2nd & 3rd layer Raslaffan
05:00 PM
6:30 AM
796 Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation G.L 5
RFI-5858-QCN-1-0387 RFI-5858-QCN-1-0387 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Nov-12 to 4-Nov-12
(F5), 6 (F6),7 (F7)& 8 (F8) - 4th,5th & 6th Layer
4:50 PM
Soil Compaction Test For backfilling B70 - PS -03 Pipe Sleeper SLD01 TO SECTION1 (B70
797 RFI-5858-QCN-1-0388 RFI-5858-QCN-1-0388 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Nov-12 8:30 AM 4-Nov-12
SLD043(SLD 027&SLD 029- NOT INCLUDED) & PS- 04 SLD 027 TO SLD020 (1st layer) PS-04&05)
Soil Compaction Test for Backfilling B70 PS -90 F1 Pipe Sleeper 7:45 AM
798 RFI-5858-QCN-1-0389 RFI-5858-QCN-1-0389 CIVIL SLD002,004,007,008,010,011,012,015,&016 -9Nos F3 - SLD003,SLD009&SLD017 APPROVED SULPHUR LINE B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Nov-12 to 4-Nov-12
-5Nos , F4- BLOCK-12NoS - 1st Layer 4:30 AM
07:00 AM
799 Check Type-B Compaction Test For Pipe Stopper - 1st, 2nd & 3rd layer B70-PS-15:
RFI-5858-QCN-1-0390 RFI-5858-QCN-1-0390 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Nov-12 To 4-Nov-12
SLD004 = 1 nos
05:00 PM
07:00 AM
800 Check Type-B Compaction Test For Pipe Stopper - 4th & Final layer B70-PS-15: SLD004
RFI-5858-QCN-1-0391 RFI-5858-QCN-1-0391 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 3-Nov-12 To 4-Nov-12
= 1 nos
05:00 PM
07:00 AM
801 RFI-5858-QCN-1-0392 RFI-5858-QCN-1-0392 CIVIL Check Type-A Compaction Test For Duct Bank BZDW 006 4th,5th & 6th Layer APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.a R W H 3-Nov-12 To 4-Nov-12
05:00 PM
6:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation G.L 5
802 RFI-5858-QCN-1-0393 RFI-5858-QCN-1-0393 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 2-Nov-12 to 4-Nov-12
(F5), 6 (F6),7 (F7)& 8 (F8) 1st,2nd & 3rd layer
4:50 PM
803 RFI-5858-QCN-1-0394 RFI-5858-QCN-1-0394 Check Excavation - Bottom of Excavation Verification For Pipe Sleepers, Stopper B70- 6-Nov-12
CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W H 4-Nov-12 7:00 AM
PS-16: SLD001 To SLD002 = 2 nosB70-PS-17: SLD071 To SLD083 = 13 nos
Soil Compaction Test for Backfilling B70 PS -90 F1 Pipe Sleeper 7:45 AM
SULPHUR LINE
804 RFI-5858-QCN-1-0395 RFI-5858-QCN-1-0395 CIVIL SLD002,004,007,008,010,011,012,015,&016 -9Nos F3 - SLD003,SLD009&SLD017 APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4 .2.b R W H 4-Nov-12 to 4-Nov-12
-5Nos , F4- BLOCK-12NoS 4:30 PM
6.30AM
805 Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation G.L 5 (F5),
RFI-5858-QCN-1-0396 RFI-5858-QCN-1-0396 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4 .2.b R W H 4-Nov-12 to 4-Nov-12
6 (F6),7 (F7)& 8 (F8)
4.50 PM
806 Soil Compaction Test For backfilling B70 - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD SECTION1 (B70
RFI-5858-QCN-1-0397 RFI-5858-QCN-1-0397 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 4-Nov-12 8.30 AM 4-Nov-12
027&SLD 029- NOT INCLUDED) & PS- 04 SLD 027 TO SLD020 PS-04&05)
808 Check Laying of Asphalt Binder Course For East side of Culvert BZRC-009 ( Crossing # Crossing # 40
RFI-5858-QCN-1-0399 RFI-5858-QCN-1-0399 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.4 S W H 5-Nov-12 9:00 PM 6-Nov-12
40 at QG Gate 5 ) Raslaffan
Check Type-B Compaction Test For Pipe Stoppers - 1st layer B70-PS-15: SLD017 To
809 RFI-5858-QCN-1-0400 RFI-5858-QCN-1-0400 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 5-Nov-12 4:00 PM 5-Nov-12
SLD063 except SLD028,SLD029 & SLD056 = 44 nos
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -02 Pipe Rack Foundation No 1 (F2) SECTION 1
810 RFI-5858-QCN-1-0401 RFI-5858-QCN-1-0401 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2.b R W H 5-Nov-12 to 5-Nov-12
& 2 (F1) - 1st & 2nd Layer Raslaffan
4:50 PM
9:00 AM
Check Type-B Compaction Test For Pipe Stopper - 1st & 2nd layer B70-PS-06: SLD083 =
811 RFI-5858-QCN-1-0402 RFI-5858-QCN-1-0402 CIVIL
1 nos
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 5-Nov-12 To 5-Nov-12
4:00 PM
812 Soil Compaction Test for Formation level prior to blinding -Type-A D110 B70 - PR -01
RFI-5858-QCN-1-0403 RFI-5858-QCN-1-0403 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 5-Nov-12 2:30 PM 5-Nov-12
Pipe Rack Foundation 2 (F2)
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation 10
813 RFI-5858-QCN-1-0404 RFI-5858-QCN-1-0404 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 5-Nov-12 to 5-Nov-12
(F10),11 (F11)-8th & Final Layer
4:30 PM
Crossing # 32
814 RFI-5858-QCN-1-0405 RFI-5858-QCN-1-0405 CIVIL Check Excavation - Bottom of Excavation Verification For East Side of Culvert BZRC-006 APPROVED B-V-3100-004-1-201-01_4 2.2 R W H 6-Nov-12 11:00 AM 7-Nov-12
Raslaffan
7:45AM
SULPHUR LINE
815 RFI-5858-QCN-1-0406 RFI-5858-QCN-1-0406 CIVIL Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No 1 (F6) APPROVED
Raslaffan
B-V-3100-004-1-201-01_4 4 .2.b R W H 6-Nov-12 to 6-Nov-12
4:30 PM
7:45AM
SULPHUR LINE
816 RFI-5858-QCN-1-0407 RFI-5858-QCN-1-0407 CIVIL Soil Compaction Test for Backfilling B70 PS -90 F2 Pipe Sleeper SLD001 APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 6-Nov-12 to 6-Nov-12
Raslaffan
4:30 PM
817 RFI-5858-QCN-1-0408 RFI-5858-QCN-1-0408 CIVIL Check Type-A Compaction Test For Duct Bank BZDW 006 - 7th layer APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_4 4.2.a R W H 6-Nov-12 7:00 AM 6-Nov-12
9:00 AM
Check Type-B Compaction Test For Pipe Stopper - 2nd,3rd, 4th layer ( Final) B70-PS-06:
822 RFI-5858-QCN-1-0413 RFI-5858-QCN-1-0413 CIVIL
SLD083 = 1 nos
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 7-Nov-12 To 7-Nov-12
4:00 PM
Soil Compaction Test For backfilling - Type A 4th, 5th & 6th Layer DUCT BANK BZDW 7:00 AM
SECTION1
823 RFI-5858-QCN-1-0414 RFI-5858-QCN-1-0414 CIVIL 001 APPROVED B-V-3100-004-1-201-01_4 4 .2 a R W H 7-Nov-12 to 7-Nov-12
Raslaffan
4:30 AM
7:45 AM
Soil Compaction Test for Backfilling D110 B70 - PR -02 Pipe Rack Foundation No 1 (F2) SECTION 1
824 RFI-5858-QCN-1-0415 RFI-5858-QCN-1-0415 CIVIL CANCELLED B-V-3100-004-1-201-01_4 4 .2.b R W H 7-Nov-12 to 7-Nov-12 Not Ready for Inspection
& 2 (F1) Raslaffan
4:50 PM
7:45 AM
Soil Compaction Test for Backfilling B70 PS -90 F2 Pipe Sleeper SLD001 4th 5th & 6th SULPHUR LINE
825 RFI-5858-QCN-1-0416 RFI-5858-QCN-1-0416 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 7-Nov-12 to 7-Nov-12
Layer Raslaffan
4:30 PM
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & Stopper B70- Section 3 & 5
826 RFI-5858-QCN-1-0417 RFI-5858-QCN-1-0417 CIVIL APPROVED B-V-3100-004-1-201-01_4 2.2 R W H 7-Nov-12 7:00 AM 7-Nov-12
PS-17: SLD051 To SLD060 = 10 nos B70-PS-10: SLD001 To SLD006 = 6 nos Raslaffan
7:45 AM
827 Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No 1 (F6), SULPHUR LINE
RFI-5858-QCN-1-0418 RFI-5858-QCN-1-0418 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.b R W H 7-Nov-12 to 7-Nov-12
4th 5th & 6th Layer Raslaffan
4:30 PM
7:00 AM
Soil Compaction Test For backfilling DUCT BANK BZDW 001 SECTION1
829 RFI-5858-QCN-1-0420 RFI-5858-QCN-1-0420 CIVIL APPROVED B-V-3100-004-1-201-01_4 4.2a R W H 8-Nov-12 to 8-Nov-12
Type B- 7th 8th & 9th Layer Raslaffan
4:30 PM
7:00 AM
Check Type-B Compaction Test For Pipe Track Foundations - – 1st & 2nd layers D110-
830 RFI-5858-QCN-1-0421 RFI-5858-QCN-1-0421 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 8-Nov-12 To 8-Nov-12
B70-PR-12: F1, F2, F3, F4, F5 = 5 nos
5:00 PM
831 Check final Elevations of Grading B70 - PS -03 Pipe Sleeper SLD055 TO SLD100 B70 - SECTION1 7:00 AM
RFI-5858-QCN-1-0422 RFI-5858-QCN-1-0422 CIVIL APPROVED B-V-3100-004-1-201-02_4 5.1 R W H 8-Nov-12 8-Nov-12
PS -02 Pipe Sleeper SLD01 TO SLD033, B70 - PS -01 Pipe Sleeper SLD002 TO SLD004 Raslaffan
Check final Visual inspection of Grading B70 - PS -03 Pipe Sleeper SLD055 TO SLD100
832 7:00 AM
RFI-5858-QCN-1-0423 RFI-5858-QCN-1-0423 CIVIL B70 - PS -02 Pipe Sleeper SLD01 TO SLD033, B70 - PS -01 Pipe Sleeper SLD002 TO APPROVED SECTION1 Raslaffan B-V-3100-004-1-201-02_4 5.2 S W H 8-Nov-12 8-Nov-12
SLD004
7:00 AM
833 Check Type-B Compaction Test For Pipe Track Foundations - – 3rd & 4th layers D110-
RFI-5858-QCN-1-0424 RFI-5858-QCN-1-0424 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 9-Nov-12 To 12-Nov-12
B70-PR-12: F1, F2, F3, F4, F5 = 5 nos
12:00 PM
7:00 AM
Check Type-B Compaction Test For Pipe Track Foundations - – 5th, 6th & 7th -(Final
834 RFI-5858-QCN-1-0425 RFI-5858-QCN-1-0425 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 4.2.b R W H 10-Nov-12 To 12-Nov-12
Layer) D110-B70-PR-12: F1, F2, F3, F4, F5 = 5 nos
5:00 PM
Soil Compaction Test for Backfilling D210 B70 - PR - 44 Pipe Rack Foundation No 1 (F6)
835 RFI-5858-QCN-1-0426 RFI-5858-QCN-1-0426 CIVIL APPROVED SULPHUR LINE B-V-3100-004-1-201-01_4 4 .2.b R W H 9-Nov-12 7:00 AM 12-Nov-12
Final Layer / B70-PS-90 F2 Pipe Sleeper SLD001 - Final Layer
7:00 AM
SECTION1
836 RFI-5858-QCN-1-0427 RFI-5858-QCN-1-0427 CIVIL Soil Compaction Test For backfilling DUCT BANK BZDW 001 10th & Final Layer APPROVED B-V-3100-004-1-201-01_4 4 .2.a R W H 9-Nov-12 to 12-Nov-12
Raslaffan
11:30 AM
7:00 AM
Soil Compaction Test For backfilling DUCT BANK BZDP 002 1st,2nd & 3rd Layer SECTION1
837 RFI-5858-QCN-1-0428 RFI-5858-QCN-1-0428 CIVIL APPROVED B-V-3100-004-1-201-01_4 4 .2.a R W H 10-Nov-12 to 12-Nov-12
Raslaffan
4:30 AM
838 Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & Stopper B70-
RFI-5858-QCN-1-0429 RFI-5858-QCN-1-0429 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 2.2 R W H 10-Nov-12 7:00 AM 12-Nov-12
PS-17: SLD021 To SLD035 = 15 nos
Check Type-B Compaction Test For Pipe Track Foundations - 1st layerB70-PS-06: 7:00 AM
839 RFI-5858-QCN-1-0430 RFI-5858-QCN-1-0430 CIVIL SLD062 & SLD063 = 2 nos/ B70-PS-09: SLD051 To SLD053, SLD035 To SLD038, APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 11-Nov-12 To 12-Nov-12
SLD072, SLD073 = 9 nos 5:00 PM
7:00 AM
Soil Compaction Test For backfilling DUCT BANK BZDP 002 - Type A below sleper
841 RFI-5858-QCN-1-0432 RFI-5858-QCN-1-0432 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-01_4 4 .2 a R W H 11-Nov-12 to 12-Nov-12
4th,5th & 6th layer
4:30 PM
7:00 AM
SECTION1
842 RFI-5858-QCN-1-0433 RFI-5858-QCN-1-0433 CIVIL Soil Compaction Test For backfilling DUCT BANK BZDP 002 - Tyoe-A 7th Layer APPROVED
Raslaffan
4.2a R W H 12-Nov-12 to 12-Nov-12
4:30 PM
B-V-3100-004-1-201-01_5
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & Stopper B70-
843 RFI-5858-QCN-1-0434 RFI-5858-QCN-1-0434 CIVIL PS-13: SLD020,SLD022, SLD027, SLD028 = 4 nos B70-PS-14: SLD063, SLD064, APPROVED Section 4 Raslaffan 2.2 R W H 12-Nov-12 7:00 AM 12-Nov-12
SLD101, SLD102 = 4 nos
B-V-3100-004-1-201-01_5
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Review and approval of QIL test report for Back fill Material (Type-A-(Class B) & Type-B)
Barzan Off-plot
844 RFI-5858-QCN-1-0435 RFI-5858-QCN-1-0435 CIVIL for the sampled location Section-1 Stockpile PS-03 # 1 & Stockpile PR-#01 & APPROVED 3.1a&b R W H 12-Nov-12 7:30 AM 12-Nov-12
BARZAN
CALIFORNIA BEARING RATIO - location Section-1 Stockpile PS-03 # 1
B-V-3100-004-1-201-01_5
7:00 AM
SECTION1
845 RFI-5858-QCN-1-0436 RFI-5858-QCN-1-0436 CIVIL Soil Compaction Test For backfilling - Type B DUCT BANK BZDP 002 8th Layer APPROVED
Raslaffan
4.2b R W H 13-Nov-12 to 13-Nov-12
4:30 PM
B-V-3100-004-1-201-01_5
Check Type-B Compaction Test For Pipe Track Foundations - 2nd layerB70-PS-06:
846 RFI-5858-QCN-1-0437 RFI-5858-QCN-1-0437 CIVIL SLD062 & SLD063 = 2 nos/ B70-PS-09: SLD051 To SLD053, SLD035 To SLD038, APPROVED Section 2 Raslaffan 4.2.b R W H 13-Nov-12 7:00 AM 13-Nov-12
SLD072, SLD073 = 9 nos
B-V-3100-004-1-201-01_5
7:00 AM
847 Check Type-B Compaction Test For Pipe Track Foundations -1st & 2nd layerB70-PS-09: Section 2 & 3
RFI-5858-QCN-1-0438 RFI-5858-QCN-1-0438 CIVIL APPROVED 4.2.b R W H 13-Nov-12 To 13-Nov-12
SLD0022, SLD023 = 2 nos, B70-PS-10: SLD001 To SLD009 = 9 nos Raslaffan
B-V-3100-004-1-201-01_5 5:00 PM
Check Excavation - Bottom of Excavation Verification For Pipe Sleepers & LoopB70-PS-
848 RFI-5858-QCN-1-0439 RFI-5858-QCN-1-0439 CIVIL APPROVED Section 5 Raslaffan 2.2 R W H 13-Nov-12 7:00 AM 13-Nov-12
17: SLD020 To SLD003 = 18 nosD110-B70-PR-68
B-V-3100-004-1-201-01_5
849 RFI-5858-QCN-1-0440 RFI-5858-QCN-1-0440 CIVIL Check Final Visual Inspection For Pipe Track Foundations D110-B70-PR-12 = 5 nos APPROVED Section 2 Raslaffan 5.2 S W H 13-Nov-12 8:00 AM 13-Nov-12
B-V-3100-004-1-201-01_5
7:00 AM
850 Soil Compaction Test For backfilling - Type B DUCT BANK BZDP 002 SECTION1
RFI-5858-QCN-1-0441 RFI-5858-QCN-1-0441 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 14-Nov-12 to 14-Nov-12
Raslaffan
4:30 PM
7:30 AM
851 SECTION 1
RFI-5858-QCN-1-0442 RFI-5858-QCN-1-0442 CIVIL Soil Compaction Test for Backfilling Tybe - B Stopper Foundation B70 - PS -04 F2 SLD015 CANCELLED B-V-3100-004-1-201-01_5 4.2b R W H 14-Nov-12 to 13-Nov-12 Not Ready for Inspection
Raslaffan
4:50 PM
7:00 AM
Check Type-B Compaction Test For Pipe Stopper - 1st, 2nd, & 3rd layer B70-PS-09:
852 RFI-5858-QCN-1-0443 RFI-5858-QCN-1-0443 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 14-Nov-12 To 14-Nov-12
SLD054
5:00 PM
7:00 AM
Soil Compaction Test For backfilling - Type B DUCT BANK BZDP 002 SECTION1
853 RFI-5858-QCN-1-0444 RFI-5858-QCN-1-0444 CIVIL CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2b R W H 15-Nov-12 to 14-Nov-12
4:30 PM
7:30 AM
SECTION 1
854 RFI-5858-QCN-1-0445 RFI-5858-QCN-1-0445 CIVIL Soil Compaction Test for Backfilling Stopper Foundation B70 - PS -04 F2 SLD015 1st layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2b R W H 15-Nov-12 to 15-Nov-12
4:50 PM
7:00 AM
Check Type-B Compaction Test For Pipe Stopper - 4th, 5th & 6th layer B70-PS-09:
855 RFI-5858-QCN-1-0446 RFI-5858-QCN-1-0446 CIVIL
SLD054
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Nov-12
To
15-Nov-12
5:00 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -01 SECTION1
856 RFI-5858-QCN-1-0447 RFI-5858-QCN-1-0447 CIVIL
SLD001,SLD005,SLD014 TO SLD023,B70 PS -02 SLD034& B70 PS 03 SLD027,SLD029
CANCELLED
Raslaffan
B-V-3100-004-2-201-01_5 4.2b R W H 15-Nov-12 to 14-Nov-12
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -02 Pipe Rack Foundation No 1 (F2) SECTION 1
857 RFI-5858-QCN-1-0448 RFI-5858-QCN-1-0448 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 15-Nov-12 to 15-Nov-12
& 2 (F1) - type B, 5th & final layer Raslaffan
4:50 PM
7:30 AM
858 Soil Compaction Test for Backfilling-Type-B Pipe Rack Foundation D210 B70 - PR - SULPHUR LINE
RFI-5858-QCN-1-0449 RFI-5858-QCN-1-0449 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 16-Nov-12 TO 16-Nov-12
45 & D210 B70 - PR - 71 Raslaffan
11:00 AM
7:30 AM
Soil Compaction Test for Backfilling-Type-B Pipe Rack Foundation D210 B70 - PR - SULPHUR LINE
859 RFI-5858-QCN-1-0450 RFI-5858-QCN-1-0450 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 17-Nov-12 TO 17-Nov-12
45 & D210 B70 - PR - 71- 2nd 3rd layer Raslaffan
4:30 PM
7:30 AM
860 Soil Compaction Test for Backfilling-Type-B Sleeper Foundation B70 PS 90 F2
RFI-5858-QCN-1-0451 RFI-5858-QCN-1-0451 CIVIL APPROVED SULPHUR LINE B-V-3100-004-1-201-01_5 4.2b R W H 16-Nov-12 TO 16-Nov-12
SLD005,SLD006,SLD013,SLD014 - 1st layer
11:00 AM
7:30 AM
861 Soil Compaction Test for Backfilling-Type-B Sleeper Foundation B70 PS 90 F2 SULPHUR LINE
RFI-5858-QCN-1-0452 RFI-5858-QCN-1-0452 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 17-Nov-12 TO 17-Nov-12
SLD005,SLD006,SLD013,SLD014 - 2d 3rd layer Raslaffan
4:30 PM
862 Section 4 Cr # 25
RFI-5858-QCN-1-0453 RFI-5858-QCN-1-0453 CIVIL Check Excavation - Bottom of Excavation Verification For Duct Bank BZDP 007 CANCELLED B-V-3100-004-1-201-01_5 2.1 R W H 17-Nov-12 8:00 AM 15-Nov-12
Raslaffan
7:30 AM
863 Soil Compaction Test for Backfilling Stopper Foundation B70 - PS -04 F2 SLD015 - SECTION 1
RFI-5858-QCN-1-0454 RFI-5858-QCN-1-0454 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 17-Nov-12 TO 17-Nov-12
2nd layer Raslaffan
4:50 PM
7:30 AM
864 Soil Compaction Test for Backfilling-Type-B Sleeper Foundation B70 PS 90 F2 SULPHUR LINE
RFI-5858-QCN-1-0455 RFI-5858-QCN-1-0455 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 18-Nov-12 to 18-Nov-12
SLD005,SLD006,SLD013,SLD014 Raslaffan
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling-Type-B Pipe Rack Foundation D210 B70 - PR - 45 & SULPHUR LINE
865 RFI-5858-QCN-1-0456 RFI-5858-QCN-1-0456 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 18-Nov-12 to 18-Nov-12
D210 B70 - PR - 71 Raslaffan
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -01 SECTION1
866 RFI-5858-QCN-1-0457 RFI-5858-QCN-1-0457 CIVIL APPROVED B-V-3100-004-2-201-01_5 4.2b R W H 18-Nov-12 to 18-Nov-12
SLD001,SLD005,SLD014 TO SLD023,B70 PS -02 SLD034& B70 PS 03 SLD027,SLD029 Raslaffan
4:30 PM
7:30:00 AM
Soil Compaction Test for Backfilling (Type B) Stopper Foundation B70 - PS -04 F2 SECTION 1
867 RFI-5858-QCN-1-0458 RFI-5858-QCN-1-0458 CIVIL
SLD015- 3RD & 4TH Layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2b R W H 18-Nov-12 to 18-Nov-12
4:50 PM
Barzan Off-plot
868 RFI-5858-QCN-1-0459 RFI-5858-QCN-1-0459 CIVIL Sampling for Fill Material Type-B AT SAMPLE Location Section -4 BZRC 006 (100 cu.m ) APPROVED
Section 4
B-V-3100-004-1-201-01_5 3.1.b R W H 18-Nov-12 8.00AM 18-Nov-12
Section 4 Cr # 25
869 RFI-5858-QCN-1-0460 RFI-5858-QCN-1-0460 CIVIL Check Excavation - Bottom of Excavation Verification For Duct Bank BZDP 007 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 2.1 R W H 18-Nov-12 8:00 AM 17-Nov-12
7:30 AM
Soil Compaction Test for Backfilling-Type-B Pipe Rack Foundation D210 B70 - PR - 45 & SULPHUR LINE
870 RFI-5858-QCN-1-0461 RFI-5858-QCN-1-0461 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 19-Nov-12 to 19-Nov-12
D210 B70 - PR - 71 FINAL LAYER Raslaffan
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling-Type-B Sleeper Foundation B70 PS 90 F2 SULPHUR LINE
871 RFI-5858-QCN-1-0462 RFI-5858-QCN-1-0462 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 19-Nov-12 to 19-Nov-12
SLD005,SLD006,SLD013,SLD014 Raslaffan
4:30 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -01
872 RFI-5858-QCN-1-0463 RFI-5858-QCN-1-0463 CIVIL CANCELLED SECTION1 Raslaffan B-V-3100-004-2-201-01_5 4.2b R W H 19-Nov-12 to 18-Nov-12
SLD001,SLD005,SLD014 TO SLD023,B70 PS -02 SLD034& B70 PS 03 SLD027,SLD029
4:30 PM
7:30 AM
873 SECTION 1
RFI-5858-QCN-1-0464 RFI-5858-QCN-1-0464 CIVIL Soil Compaction Test for Backfilling Stopper Foundation B70 - PS -04 F2 SLD015 APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 19-Nov-12 to 19-Nov-12
Raslaffan
4:50 PM
874 Sampling for Fill Material Type-B (Excavated Material) AT SAMPLE Location Section -1 Barzan Off-plot
RFI-5858-QCN-1-0465 RFI-5858-QCN-1-0465 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 19-Nov-12 8.00 AM 19-Nov-12
-PR-06 Section 3 Raslaffan
875 Section 4 Cr # 25
RFI-5858-QCN-1-0466 RFI-5858-QCN-1-0466 CIVIL Check Excavation - Bottom of Excavation Verification For Duct Bank BZDP 007 APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 19-Nov-12 10:00 AM 19-Nov-12
Raslaffan
Check Compaction test for Pipe Track Foundations ( Loops ) - 1st, 2nd & 3rd layer D110-
876 RFI-5858-QCN-1-0467 RFI-5858-QCN-1-0467 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Nov-12 7:00 AM 19-Nov-12
B70-PR-20, PR-67, PR-21
7:00 AM
Crossing # 32
877 RFI-5858-QCN-1-0468 RFI-5858-QCN-1-0468 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 1st & 2nd layer CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 20-Nov-12 To 19-Nov-12
5:00 PM
Check Compaction test Type -B for Pipe Sleepers - 2nd layer B70-PS-16: SLD070 To
878 RFI-5858-QCN-1-0469 RFI-5858-QCN-1-0469 CIVIL
SLD101 except SLD073 & SLD074 = 30 B70-PS-15: SLD003 To SLD073 = 68 nos
CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Nov-12 10:00 AM 19-Nov-12
Check Final Elevation For Pipe Sleepers & Stopper B70-PS-06: SLD083, SLD062,
SLD063, SLD048 & SLD081 = 4 nos B70-PS-09: SLD023, SLD024, SLD035 To SLD038, Section 2 & 3
879 RFI-5858-QCN-1-0470 RFI-5858-QCN-1-0470 CIVIL
SLD051 To SLD056, SLD072 & SLD086 = 27 nos, B70-PS-10: SLD001 To SLD009 = 9
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 5.1 R W H 20-Nov-12 7:00 AM 20-Nov-12
nos
Check Final Visual Inspection For Pipe Sleepers & Stopper B70-PS-06: SLD083,
SLD062, SLD063, SLD048 & SLD081 = 4 nos B70-PS-09: SLD023, SLD024, SLD035 To Section 2 & 3
880 RFI-5858-QCN-1-0471 RFI-5858-QCN-1-0471 CIVIL APPROVED B-V-3100-004-1-201-01_5 5.2 S W H 20-Nov-12 7:00 AM 20-Nov-12
SLD038, SLD051 To SLD056, SLD072 & SLD086 = 27 nos, B70-PS-10: SLD001 To Raslaffan
SLD009 = 9 nos
7:30 AM
SECTION 1
881 RFI-5858-QCN-1-0472 RFI-5858-QCN-1-0472 CIVIL Soil Compaction Test for Backfilling Stopper Foundation B70 - PS -04 F2 SLD015 CANCELLED B-V-3100-004-1-201-01_5 4.2b R W H 20-Nov-12 to 19-Nov-12
Raslaffan
4:50 PM
Soil Compaction Test For Formation level prior to blinding-Type A D110-B70-PR -06 Pipe
882 RFI-5858-QCN-1-0473 RFI-5858-QCN-1-0473 CIVIL APPROVED SECTION1 PR-06 B-V-3100-004-2-201-01_5 4.2a R W H 21-Nov-12 7:00 AM 21-Nov-12
Rack Foundation No 3,4&5
7:00 AM
Check Compaction test for Pipe Track Foundations ( Loops ) - 1st, 2nd & 3rd layer D110-
883 RFI-5858-QCN-1-0474 RFI-5858-QCN-1-0474 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 21-Nov-12 To 21-Nov-12
B70-PR-67
5:00 PM
7:00 AM
884 Crossing # 32
RFI-5858-QCN-1-0475 RFI-5858-QCN-1-0475 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 1st, 2nd & 3rd layer APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 21-Nov-12 To 21-Nov-12
Raslaffan
5:00 PM
Check Compaction test Type-B for Pipe Track Foundations ( Loops ) - 4th & 5th layer
886 RFI-5858-QCN-1-0477 RFI-5858-QCN-1-0477 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b H W H 22-Nov-12 7:00 AM To 5:00 PM 22-Nov-12
D110-B70-PR-20, D110-B70-PR-67
7:00 AM
Crossing # 32
887 RFI-5858-QCN-1-0478 RFI-5858-QCN-1-0478 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 5th, & 6th layers APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 22-Nov-12 To 22-Nov-12
Raslaffan
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30 AM
Check Compaction Test Type-B For Pipe Stopper - 1st, 2nd & 3rd & 4th layer B70-PS-15:
888 RFI-5858-QCN-1-0479 RFI-5858-QCN-1-0479 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 22-Nov-12 To 22-Nov-12
SLD070 = 1 nos
5:00 PM
1:30 PM
Soil Compaction Test for Backfilling D110-B70-PR -01 Pipe Rack Foundation 1
889 RFI-5858-QCN-1-0480 RFI-5858-QCN-1-0480 CIVIL
(F1)1st,2nd,3rd,4th,5th& Final Layer 2 (F2)1st,2nd,3rd,4th,5th,6th & Final Layer
APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_4 4.2b R W H 22-Nov-12 to 22-Nov-12
4:30 PM
Check final Elevations of Grading B70 - PS -03 Pipe Sleeper SLD01 TO SLD043 & PS-
890 RFI-5858-QCN-1-0481 RFI-5858-QCN-1-0481 CIVIL
04 SLD 027 TO SLD020
APPROVED SECTION1 Raslaffan B-V-3100-004-1-201-02_5 5.1 R W H 22-Nov-12 8:00 AM 22-Nov-12
Check final Visual Inspection of Grading B70 - PS -03 Pipe Sleeper SLD01 TO SLD043 &
891 RFI-5858-QCN-1-0482 RFI-5858-QCN-1-0482 CIVIL
PS- 04 SLD 027 TO SLD020
APPROVED SECTION1 Raslaffan B-V-3100-004-1-201-02_5 5.2 S W H 22-Nov-12 8:30 AM 22-Nov-12
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110- Section 5 Cr # 41
892 RFI-5858-QCN-1-0483 RFI-5858-QCN-1-0483 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 22-Nov-12 10:00 AM 22-Nov-12
B70-PR-22: F1 & F2 Raslaffan
7:00 AM
Crossing # 32
893 RFI-5858-QCN-1-0484 RFI-5858-QCN-1-0484 CIVIL Check Compaction Test Type-A Culvert BZRC-006 End Wall East Side - 1st & 2nd layer APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 22-Nov-12 To 22-Nov-12
Raslaffan
5:00 PM
Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation 1 (F1)
894 RFI-5858-QCN-1-0485 RFI-5858-QCN-1-0485 CIVIL APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 23-Nov-12 7.30 AM 24-Nov-12
& 2 (F2)- 3rd & 4th Layer & F1 fifth layer
895 Crossing # 32
RFI-5858-QCN-1-0486 RFI-5858-QCN-1-0486 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 7th, 8th layers CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 23-Nov-12 7:00 AM To 3:00 PM 22-Nov-12
Raslaffan
896 Check Compaction Test Type-B Culvert BZRC-006 East Side - 7 th & 8 th layers - upto Crossing # 32
RFI-5858-QCN-1-0487 RFI-5858-QCN-1-0487 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 24-Nov-12 7:00 AM To 5:00 PM 24-Nov-12
top of wall Raslaffan
897 Check Compaction Test Type-B For Pipe Stopper - 3rd & 4th layer B70-PS-15:
RFI-5858-QCN-1-0488 RFI-5858-QCN-1-0488 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 24-Nov-12 6:30 AM To 5:00 PM 24-Nov-12
SLD070 = 1 nos
Soil Compaction Test for Backfilling Stopper Foundation B70 - PS -04 F2 SLD015,
898 RFI-5858-QCN-1-0489 RFI-5858-QCN-1-0489 CIVIL APPROVED SECTION 1 B-V-3100-004-1-201-01_5 4.2b R W H 23-Nov-12 7.30 AM 24-Nov-12
FINAL LAYER
Check Compaction test Type-B for Pipe Track Foundations ( Loops ) - 1st, 2nd, 3rd, 4th
899 RFI-5858-QCN-1-0490 RFI-5858-QCN-1-0490 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 24-Nov-12 7:00 AM To 5:00 PM 22-Nov-12
layer D110-B70-PR-21
Check Compaction Test Type - B For Cast-in- Situ B70-PS-09: SLD021 ( 1st, 2nd, 3rd
900 RFI-5858-QCN-1-0491 RFI-5858-QCN-1-0491 CIVIL CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 24-Nov-12 7:00 AM To 5:00 PM 22-Nov-12
& 4th layer)
902 Check final Visual Inspection of Grading Sleeper Foundation B70 PS 90 SLD001
RFI-5858-QCN-1-0493 RFI-5858-QCN-1-0493 CIVIL APPROVED SULPHUR AREA B-V-3100-004-1-201-02_5 5.2 S W H 24-Nov-12 8.30 AM 24-Nov-12
TO SLD017 & Blocks-(12 NoS)
903 Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation 1 (F1)
RFI-5858-QCN-1-0494 RFI-5858-QCN-1-0494 CIVIL APPROVED PR - 01 B-V-3100-004-1-201-01_5 4.2b R W H 24-Nov-12 7.30 AM to 4.30 PM 24-Nov-12
& 2 (F2) , F1 FINAL LAYER & F2- 5TH LAYER
904 RFI-5858-QCN-1-0495 RFI-5858-QCN-1-0495 CIVIL Soil Compaction Test For backfilling Type - B B70-PS-09 SLD021 & SLD022 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 25-Nov-12 7:00 AM To 4:30 PM 25-Nov-12
Check Compaction Test Type - B for Pipe Sleepers - 1st & 2nd layer B70-PS-14:
905 RFI-5858-QCN-1-0496 RFI-5858-QCN-1-0496 CIVIL SLD055, SLD056, SLD063, SLD064, SLD101, SLD102 = 6 nos B70-PS-13: SLD027, APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 25-Nov-12 6:30 AM To 5:00 PM 25-Nov-12
SLD028, SLD019, SLD020, SLD022 = 5 nos
Crossing # 32
906 RFI-5858-QCN-1-0497 RFI-5858-QCN-1-0497 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 9th & 10th layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 25-Nov-12 7:00 AM To 5:00 PM 25-Nov-12
908 RFI-5858-QCN-1-0499 RFI-5858-QCN-1-0499 CIVIL Soil Compaction Test For backfilling Type - B B70-PS-09 SLD021 & SLD022 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 26-Nov-12 7:00 AM To 4:30 PM 26-Nov-12
Crossing # 32
909 RFI-5858-QCN-1-0500 RFI-5858-QCN-1-0500 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 12th & 13th layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 26-Nov-12 7:00 AM To 5:00 PM 26-Nov-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
910 RFI-5858-QCN-1-0501 RFI-5858-QCN-1-0501 CIVIL Soil Compaction Test for Backfilling D110 B70 - PR -01 Pipe Rack Foundation 2 (F2) APPROVED PR - 01 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 26-Nov-12 7:30 AM 26-Nov-12
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -01 SECTION 1
911 RFI-5858-QCN-1-0502 RFI-5858-QCN-1-0502 CIVIL
SLD001,SLD005,SLD014 TO SLD023,B70 PS -02 SLD034& B70 PS 03 SLD027,SLD029
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 26-Nov-12 7:30 AM to 4:30 PM 26-Nov-12
Sampling for Fill Material Type-A AT SAMPLE Location- Section - 4 - BZDW 007 Barzan Off-plot
912 RFI-5858-QCN-1-0503 RFI-5858-QCN-1-0503 CIVIL
V=300Cubic
APPROVED
Section 3
B-V-3100-004-1-201-01_5 3.1.a R W H 26-Nov-12 8.00AM 26-Nov-12
Check Final Visual Inspection For Pipe Track Foundations ( Loops) D110-B70-PR-20, 67 Crossing # 32
913 RFI-5858-QCN-1-0504 RFI-5858-QCN-1-0504 CIVIL
= 2 loops
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 5.2 S W H 26-Nov-12 1:00 PM 26-Nov-12
Check Compaction test Type -B for Pipe Sleepers - First layer prior second layer B70-PS-
914 RFI-5858-QCN-1-0505 RFI-5858-QCN-1-0505 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 26-Nov-12 7:30 AM 26-Nov-12
16: SLD059 to SLD001 = 56 nos ( Except SLD042, SLD018 and SLD019 )
Check Compaction test Type -B for Pipe Track D110-B70-PR-21 First and Second layer
915 RFI-5858-QCN-1-0506 RFI-5858-QCN-1-0506 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 26-Nov-12 7:30 AM 26-Nov-12
prior Third layer
Check Compaction test Type -B for Pipe Sleepers - First layer prior second layer B70-PS-
916 RFI-5858-QCN-1-0507 RFI-5858-QCN-1-0507 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-2-201-01_5 4.2b R W H 27-Nov-12 9:00 AM 27-Nov-12
17: SLD072 to SLD083 = 12 nos
7:00 AM
918 Crossing # 32
RFI-5858-QCN-1-0509 RFI-5858-QCN-1-0509 CIVIL Check Compaction Test Type-B Culvert BZRC-006 East Side - 14th & 15th layer APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 27-Nov-12 To 27-Nov-12
Raslaffan
5:00 PM
919 Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations &
RFI-5858-QCN-1-0510 RFI-5858-QCN-1-0510 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 27-Nov-12 7:00 AM 27-Nov-12
Sleepers D110-B70-PR-18: F16 & F15 B70-PS-13: SLD045 To SLD050 = 6 nos
920 RFI-5858-QCN-1-0511 RFI-5858-QCN-1-0511 CIVIL Check Compaction test Type -A for Pipe Track D110-PR-22: F3 APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 27-Nov-12 9:00 AM 27-Nov-12
Review and approval of QIL test report for Back fill Material (Type-B) for the sampled
921 RFI-5858-QCN-1-0512 RFI-5858-QCN-1-0512 CIVIL APPROVED Barzan Off-Plot Area B-V-3100-004-1-201-01_5 3.1a&b R W H 28-Nov-12 7:30 AM 28-Nov-12
Location Section - 1 Stockpile Section 1 PR-06 & Stockpile Section - 4-BZRC-006
922 RFI-5858-QCN-1-0513 RFI-5858-QCN-1-0513 CIVIL Check Compaction test Type -B for Pipe Track D110-B70-PR-21 Fourth layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 28-Nov-12 7:30 AM 28-Nov-12
7:00 AM
Soil Compaction Test For backfilling Type - B B70-PS-09 SLD021 & SLD022- FINAL
923 RFI-5858-QCN-1-0514 RFI-5858-QCN-1-0514 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 28-Nov-12 To 28-Nov-12
LAYER
4:30 PM
924 Soil Compaction Test For backfilling - Type B DUCT BANK BZDP 002 SECTION 1
RFI-5858-QCN-1-0515 RFI-5858-QCN-1-0515 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 28-Nov-12 7:00 AM 28-Nov-12
Raslaffan
925 Check Compaction test Type -B for Pipe Sleepers - Second layer B70-PS-16: SLD059 to
RFI-5858-QCN-1-0516 RFI-5858-QCN-1-0516 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 28-Nov-12 8:00 AM 28-Nov-12
SLD043 = 17 nos and SLD041 to SLD029 = 13 nos
926 RFI-5858-QCN-1-0517 RFI-5858-QCN-1-0517 CIVIL Check Excavation - Bottom of Excavation Verification.D110-B70-PR-22 : F3 APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 29-Nov-12 9:30 AM 29-Nov-12
Check Compaction test Type -B for Cast-in- Situ Pipe Stopper B70-PS-17: SLD042 first,
927 RFI-5858-QCN-1-0518 RFI-5858-QCN-1-0518 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 1-Dec-12 2:30 PM 1-Dec-12
second and third layer.
Sampling for Fill Material Type-B (Excavated Material) AT SAMPLE Location Section -3, Barzan Off-plot
928 RFI-5858-QCN-1-0520 RFI-5858-QCN-1-0520 CIVIL
stock pile # 3 & PR-18
APPROVED
Section 3
B-V-3100-004-1-201-01_5 3.1.b R W H 2-Dec-12 8.00AM 4-Dec-12
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
929 RFI-5858-QCN-1-0521 RFI-5858-QCN-1-0521 CIVIL
B70-PR-18: F13
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 2-Dec-12 6:30 AM 4-Dec-12
930 RFI-5858-QCN-1-0522 RFI-5858-QCN-1-0522 CIVIL Check Excavation - Bottom of Excavation Verification For Culvert West Side BZRC 006 CANCELLED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 2-Dec-12 10:30 AM 4-Dec-12
Check Compaction Test For Type-A ( Under Foundation) For Pipe Track Foundations
931 RFI-5858-QCN-1-0523 RFI-5858-QCN-1-0523 CIVIL
D110-B70-PR-18: F13
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 2-Dec-12 7:30 AM 4-Dec-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
932 RFI-5858-QCN-1-0524 RFI-5858-QCN-1-0524 CIVIL Check Excavation - Bottom of Excavation Verification For Culvert West Side BZRC 006 APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 3-Dec-12 9:30 AM 4-Dec-12
Soil Compaction Test For Formation level prior to blinding-Type A D110 B70 PR 06 Pipe
933 RFI-5858-QCN-1-0525 RFI-5858-QCN-1-0525 CIVIL
Rack Foundation No 7
APPROVED SECTION1 PR-06 B-V-3100-004-2-201-01_5 4.2a R W H 3-Dec-12 7:00 AM 4-Dec-12
Check Compaction test Type -B for Pipe Sleeper Foundation B70-PS-17: SLD051 to
934 RFI-5858-QCN-1-0526 RFI-5858-QCN-1-0526 CIVIL
SLD060 = 9 nos prior second layer.
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 3-Dec-12 7:30 AM 4-Dec-12
7:00 AM
Soil Compaction Test for Backfilling Type B D110 B70 - PR -06 Pipe Rack Foundation
937 RFI-5858-QCN-1-0529 RFI-5858-QCN-1-0529 CIVIL APPROVED PR-06 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Dec-12 to 6-Dec-12
4(F4) - 1st 2nd & 3rd Layer
4:30 PM
Check Compaction test Type -B for Cast-in- Situ Pipe Stopper B70-PS-17: SLD042 and
938 RFI-5858-QCN-1-0530 RFI-5858-QCN-1-0530 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Dec-12 7:30 AM 6-Dec-12
B70-PR-21 Fourth Layer.
939 Check Compaction test Type -B for Pipe Sleeper Foundation B70-PS-17: SLD022 to
RFI-5858-QCN-1-0531 RFI-5858-QCN-1-0531 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Dec-12 7:30 AM 6-Dec-12
SLD035 = 14 nos. prior backfilling.
940 Check Compaction test Type -B for Pipe Sleepers - Second layer B70-PS-16: SLD028
RFI-5858-QCN-1-0532 RFI-5858-QCN-1-0532 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Dec-12 8:00 AM 6-Dec-12
to SLD007 = 20 nos except SLD018 and SLD019.
941 Check Excavation-Bottom of Excavation verification D110 B70 PR- 08 Pipe Rack SECTION 2
RFI-5858-QCN-1-0533 RFI-5858-QCN-1-0533 CIVIL APPROVED B-V-3100-004-1-201-02_5 2.2 R W H 5-Dec-12 7:00 AM 7-Dec-12
foundations 1(F2) & 2 (F1) Raslaffan
7:00 AM
Soil Compaction Test for Backfilling D110 B70 - PR -06 Pipe Rack Foundation 4(F4) -
943 RFI-5858-QCN-1-0535 RFI-5858-QCN-1-0535 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 5-Dec-12 to 7-Dec-12
4th,5th & 6th Layer
4:30 PM
7:00 AM
Soil Compaction Test for Backfilling D110 B70 - PR -06 Pipe Rack Foundation 4(F4) - 7th,
944 RFI-5858-QCN-1-0536 RFI-5858-QCN-1-0536 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 6-Dec-12 TO 7-Dec-12
8th & Final Layer
4:30 PM
7:30 AM
945 RFI-5858-QCN-1-0537 RFI-5858-QCN-1-0537 CIVIL Check Compaction Test For Type-B For Duct Bank BZDP 007 - 1st & 2nd layer CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 6-Dec-12 To 5-Dec-12
5:00 PM
947 Check Compaction test Type -B for Cast-in- Situ Pipe Stopper B70-PS-17: SLD042 and
RFI-5858-QCN-1-0539 RFI-5858-QCN-1-0539 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 6-Dec-12 8:30 AM 7-Dec-12
B70-PR-21 Fifth Layer.
948 Check Compaction test Type -B for Pipe Sleeper Foundation B70-PS-17: SLD016 to
RFI-5858-QCN-1-0540 RFI-5858-QCN-1-0540 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 6-Dec-12 2:30 PM 7-Dec-12
SLD003 = 14 nos
949 RFI-5858-QCN-1-0541 RFI-5858-QCN-1-0541 CIVIL Check Excavation - Bottom of Excavation Verification.D110-B70-PR-22 : F4 and F5 APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 8-Dec-12 2:00 PM 12-Dec-12
7:30 AM
950 RFI-5858-QCN-1-0542 RFI-5858-QCN-1-0542 CIVIL Check Compaction Test Type-A For Duct Bank BZDP 007 - 1,2nd,3rd layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 8-Dec-12 To 10-Dec-12
5:00 PM
Check Final Elevations For Pipe Sleepers & Stoppers B70-PS-13: SLD001 To SLD035
951 RFI-5858-QCN-1-0543 RFI-5858-QCN-1-0543 CIVIL
B70-PS-14: SLD055 To SLD104
APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 5.1 R W H 8-Dec-12 8:00 AM 10-Dec-12
Check Final Visual Inspection For Pipe Sleepers & StoppersB70-PS-13: SLD001 To
952 RFI-5858-QCN-1-0544 RFI-5858-QCN-1-0544 CIVIL
SLD035 B70-PS-14: SLD055 To SLD104
APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 5.2 S W H 8-Dec-12 8:00 AM 10-Dec-12
6:00 AM
953 RFI-5858-QCN-1-0545 RFI-5858-QCN-1-0545 CIVIL Check Compaction Test Type-A For Duct Bank BZDP 007 - 4th layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 9-Dec-12 To 10-Dec-12
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
954 RFI-5858-QCN-1-0546 RFI-5858-QCN-1-0546 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 10-Dec-12 4:00 PM 12-Dec-12
1(F1) - 1st, & 2nd Layer
6:00 AM
955 RFI-5858-QCN-1-0547 RFI-5858-QCN-1-0547 CIVIL Check Compaction Test Type-A For Duct Bank BZDP 007 - 6th, 7th layer CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 10-Dec-12 To 11-Dec-12
5:00 PM
Soil Compaction Test for Backfilling- Type B D110-B70- PR -06 Pipe Rack Foundation
956 RFI-5858-QCN-1-0548 RFI-5858-QCN-1-0548 CIVIL
1(F1),2(F2) ,3(F3)& 5(F5), - F1 3rd, 4th Layer, F2, F3 & F5- 1st 2nd 3rd Layer
APPROVED PR - 06 B-V-3100-004-1-201-01_5 4.2b R W H 11-Dec-12 4:00 PM 12-Dec-12
Retaining Wall
957 RFI-5858-QCN-1-0549 RFI-5858-QCN-1-0549 CIVIL Check Compaction test Type A for Retaining wall prior blinding. APPROVED
Section 6 Raslaffan
B-V-3100-004-1-201-01_5 4.2.a R W H 11-Dec-12 7:30 AM 12-Dec-12
Check Excavation - Bottom of Excavation Verification.Retaining wall blinding 75.00 Retaining Wall
958 RFI-5858-QCN-1-0550 RFI-5858-QCN-1-0550 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 11-Dec-12 8:30 AM 12-Dec-12
meters length. Section #6 Raslaffan
6:00 AM
959 RFI-5858-QCN-1-0551 RFI-5858-QCN-1-0551 CIVIL Check Compaction Test Type-A For Duct Bank BZDP 007 - 5th layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 11-Dec-12 To 12-Dec-12
5:00 PM
7:00 AM
Soil Compaction Test for Backfilling- Type-B D110 B70 - PR -06 Pipe Rack Foundation
960 RFI-5858-QCN-1-0552 RFI-5858-QCN-1-0552 CIVIL APPROVED PR - 06 B-V-3100-004-1-201-01_5 4.2b R W H 12-Dec-12 to 14-Dec-12
1(F1)5th,6th & 7th Layer and 2(F2),3(F3)&5(F5) 4th,5th & 6th Layer
4:30 PM
6:00 AM
961 RFI-5858-QCN-1-0553 RFI-5858-QCN-1-0553 CIVIL Check Compaction Test Type-A & B For Duct Bank BZDP 007 - 8th & 9th layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 12-Dec-12 To 14-Dec-12
5:00 PM
962 RFI-5858-QCN-1-0554 RFI-5858-QCN-1-0554 CIVIL Check Excavation - Bottom of Excavation Verification For Culvert BZRC-008 CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 12-Dec-12 3:30 PM 11-Dec-12
7:00 AM
963 Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -09 SLD039
RFI-5858-QCN-1-0555 RFI-5858-QCN-1-0555 CIVIL CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 12-Dec-12 To 11-Dec-12
TO SLD050 & B70 - PS -08 SLD036
4:30 PM
965 RFI-5858-QCN-1-0557 RFI-5858-QCN-1-0557 CIVIL Check Excavation-Bottom of Excavation verification CULVERT BZRC 004 CANCELLED SECTION1 B-V-3100-004-1-201-02_5 2.2 R W H 13-Dec-12 3:00 PM 12-Dec-12
6:00 AM
966 RFI-5858-QCN-1-0558 RFI-5858-QCN-1-0558 CIVIL Check Compaction Test Type-A & B For Duct Bank BZDP 007 -7th & 8th layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a/b R W H 13-Dec-12 To 12-Dec-12
5:00 PM
1:00 PM
967 RFI-5858-QCN-1-0559 RFI-5858-QCN-1-0559 CIVIL Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 & F15 CANCELLED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 13-Dec-12 TO 13-Dec-12
4:30 PM
968 RFI-5858-QCN-1-0560 RFI-5858-QCN-1-0560 CIVIL 5.2. Check Final Elevation top soil level of Pipe Track D110-B70-PR-21. APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 5.2 R W H 13-Dec-12 10:00 AM 16-Dec-12
969 RFI-5858-QCN-1-0561 RFI-5858-QCN-1-0561 CIVIL 5.2. Check Final Visual Inspection of top soil level of Pipe Track D110-B70-PR-21 APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_4 5.2 R W H 13-Dec-12 10:00 AM 16-Dec-12
970 RFI-5858-QCN-1-0562 RFI-5858-QCN-1-0562 CIVIL Check Excavation - Bottom of Excavation Verification For Culvert BZRC-008 CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 13-Dec-12 10:00 AM 12-Dec-12
7:30 AM
Soil Compaction Test for Backfilling- Type B D110-B70 - PR -06 Pipe Rack Foundation
971 RFI-5858-QCN-1-0563 RFI-5858-QCN-1-0563 CIVIL APPROVED PR - 06 B-V-3100-004-1-201-01_5 4.2b R W H 13-Dec-12 to 16-Dec-12
2(F2),3(F3)&5(F5)-7th & 8th Layer
4:00 PM
7:00 AM
Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -09 SLD039
972 RFI-5858-QCN-1-0564 RFI-5858-QCN-1-0564 CIVIL
TO SLD050 & B70 - PS -08 SLD036, 1st & final layers
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 15-Dec-12 To 16-Dec-12
4:30 PM
6:00 AM
973 RFI-5858-QCN-1-0565 RFI-5858-QCN-1-0565 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 - 10th & 11th layer CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Dec-12 To 13-Dec-12
5:00 PM
7:00 AM
Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 &
974 RFI-5858-QCN-1-0566 RFI-5858-QCN-1-0566 CIVIL
F15, 1st Layer
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Dec-12 to 16-Dec-12
4:30 PM
7:00 AM
975 RFI-5858-QCN-1-0567 RFI-5858-QCN-1-0567 CIVIL Check Compaction Test Type-B For Culvert - Except End Side ( West Side) BZRC - 006 CANCELLED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Dec-12 to 13-Dec-12
4:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
Check Excavation - Boottom of Excavation Verification for 2 Culverts BZRC-008 & BRRC-
977 RFI-5858-QCN-1-0569 RFI-5858-QCN-1-0569 CIVIL
004
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 15-Dec-12 To 18-Dec-12
4:30 PM
6:00 AM
978 RFI-5858-QCN-1-0570 RFI-5858-QCN-1-0570 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 16-Dec-12 To 16-Dec-12
5:00 PM
7:00 AM
Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 &
979 RFI-5858-QCN-1-0571 RFI-5858-QCN-1-0571 CIVIL
F15 - 2nd Layer
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 16-Dec-12 to 18-Dec-12
4:30 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
980 RFI-5858-QCN-1-0572 RFI-5858-QCN-1-0572 CIVIL CANCELLED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 17-Dec-12 to 16-Dec-12
1(F1),2(F2),3(F3),5(F5)&10(F9)
4:30 PM
Check Compaction test Type -B for Pipe Stopper B70-PS-17: SLD002 first and second
981 RFI-5858-QCN-1-0573 RFI-5858-QCN-1-0573 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Dec-12 7:30 AM 16-Dec-12
layer prior third layer.
6:00 AM
982 RFI-5858-QCN-1-0574 RFI-5858-QCN-1-0574 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Dec-12 To 16-Dec-12
5:00 PM
7:00 AM
983 RFI-5858-QCN-1-0575 RFI-5858-QCN-1-0575 CIVIL Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 & F15 CANCELLED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Dec-12 to 16-Dec-12
4:30 PM
6:00 AM
984 RFI-5858-QCN-1-0576 RFI-5858-QCN-1-0576 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 19-Dec-12 To 21-Dec-12
5:00 PM
7:00 AM
985 Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 &
RFI-5858-QCN-1-0577 RFI-5858-QCN-1-0577 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 19-Dec-12 TO 21-Dec-12
F15 - 3rd & 4th Layer
4:30 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
986 RFI-5858-QCN-1-0578 RFI-5858-QCN-1-0578 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 19-Dec-12 TO 21-Dec-12
1(F1),2(F2),3(F3),5(F5) Final Layer &10(F9) 1st & 2nd Layer
4:30 PM
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
987 RFI-5858-QCN-1-0579 RFI-5858-QCN-1-0579 CIVIL APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 19-Dec-12 8:00 AM 22-Dec-12
B70-PR-18: F10
6:00 AM
988 RFI-5858-QCN-1-0580 RFI-5858-QCN-1-0580 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007-10th layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Dec-12 To 22-Dec-12
5:00 PM
7:00 AM
Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F16 &
989 RFI-5858-QCN-1-0581 RFI-5858-QCN-1-0581 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Dec-12 TO 22-Dec-12
F15- 5th & final layer
4:30 PM
990 Check Compaction Test Type-A For Pipe Track Foundations - Below Foundation D110-
RFI-5858-QCN-1-0582 RFI-5858-QCN-1-0582 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 20-Dec-12 7:00 AM 22-Dec-12
B70-PR-18: F10
6:30 AM
991 RFI-5858-QCN-1-0583 RFI-5858-QCN-1-0583 CIVIL Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006 - 1st & 2nd layer APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Dec-12 TO 22-Dec-12
4:30 PM
992 Check Excavation - Bottom of Excavation Verification.Retaining wall blinding 63.00 Retaining Wall
RFI-5858-QCN-1-0584 RFI-5858-QCN-1-0584 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 20-Dec-12 8:30 AM 22-Dec-12
meters length. Section #6 Raslaffan
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
993 RFI-5858-QCN-1-0585 RFI-5858-QCN-1-0585 CIVIL APPROVED PR - 06 B-V-3100-004-1-201-01_5 4.2b R W H 20-Dec-12 TO 22-Dec-12
10(F9) - 3rd & 4th layer
4:30 PM
6:00 AM
Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F13 - 1st
994 RFI-5858-QCN-1-0586 RFI-5858-QCN-1-0586 CIVIL
& 2nd layer
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 21-Dec-12 To 22-Dec-12
2:30 PM
7:00 AM
Cr # 32
995 RFI-5858-QCN-1-0587 RFI-5858-QCN-1-0587 CIVIL Check Compaction Test Type-B For Culvert (West Side) BZRC-006 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 21-Dec-12 TO 20-Dec-12
3:30 PM
996 RFI-5858-QCN-1-0588 RFI-5858-QCN-1-0588 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 - Final layer CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 22-Dec-12 3:00 PM 20-Dec-12
6:30 AM
Check Compaction Test Type-B For Pipe Track Foundations D110-B70-PR-18: F13 -
997 RFI-5858-QCN-1-0589 RFI-5858-QCN-1-0589 CIVIL
Final layer
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 22-Dec-12 TO 23-Dec-12
2:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30 AM
Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006- 3RD AND 4TH
998 RFI-5858-QCN-1-0590 RFI-5858-QCN-1-0590 CIVIL APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 22-Dec-12 TO 23-Dec-12
LAYER
4:30 PM
Check Compaction test Type -B for Pipe Track D110-B70-PR-22: F1 and F2 first layer
999 RFI-5858-QCN-1-0591 RFI-5858-QCN-1-0591 CIVIL
and second layer & third layer.
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 22-Dec-12 8:30 AM 23-Dec-12
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
1000 RFI-5858-QCN-1-0592 RFI-5858-QCN-1-0592 CIVIL
B70-PR-18: F5, F6, F7 & F9
APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 22-Dec-12 8:00 AM 23-Dec-12
7:00 AM
Soil Compaction Test for Backfilling- Type-B D110-B70 - PR -06 Pipe Rack Foundation
1001 RFI-5858-QCN-1-0593 RFI-5858-QCN-1-0593 CIVIL
10(F9)- 5th,6th & 7th Layer ,9(F6) & 6(F6)- 1st,2nd & 3rd Layer
APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 22-Dec-12 to 23-Dec-12
4:30 PM
6:30 AM
1003 RFI-5858-QCN-1-0595 RFI-5858-QCN-1-0595 CIVIL Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006-5,6,7 LAYER APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 23-Dec-12 TO 23-Dec-12
4:30 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
1004 RFI-5858-QCN-1-0596 RFI-5858-QCN-1-0596 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 23-Dec-12 TO 23-Dec-12
10(F9)- Final Layer ,9(F6)&6(F6)- 4th,5th,6th Layer
4:30 PM
1005 RFI-5858-QCN-1-0597 RFI-5858-QCN-1-0597 CIVIL Check Compaction test Type -B for Pipe Track D110-B70-PR-22: F1 and F2 - 4, 5 LAYER APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 23-Dec-12 8:00 AM 23-Dec-12
1006 RFI-5858-QCN-1-0598 RFI-5858-QCN-1-0598 CIVIL Check Compaction test Type -B for Pipe Track D110-B70-PR-68 1st layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 23-Dec-12 1:30 PM 25-Dec-12
1007 RFI-5858-QCN-1-0599 RFI-5858-QCN-1-0599 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 - Final layer CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 23-Dec-12 3:00 PM 22-Dec-12
1008 RFI-5858-QCN-1-0600 RFI-5858-QCN-1-0600 CIVIL Check Compaction test Type -B for Pipe Stopper B70-PS-17: SLD002 , 1st 2nd, 3rd layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 23-Dec-12 9:30 AM 26-Dec-12
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
1009 RFI-5858-QCN-1-0601 RFI-5858-QCN-1-0601 CIVIL CANCELLED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 24-Dec-12 to 23-Dec-12
10(F9),9(F6)&6(F6)
4:30 PM
6:30 AM
1010 RFI-5858-QCN-1-0602 RFI-5858-QCN-1-0602 CIVIL Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006, 9, 10 layer APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 24-Dec-12 to 25-Dec-12
4:30 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002 SECTION 1
1011 RFI-5858-QCN-1-0603 RFI-5858-QCN-1-0603 CIVIL CANCELLED B-V-3100-004-2-201-01_5 4.2b R W H 24-Dec-12 to 23-Dec-12
TO SLD014 Raslaffan
4:30 PM
6:30 AM
1012 Soil Compaction Test for Backfilling Type B D110-B7-PR-06 Pipe Rack Foundation 9(F6)
RFI-5858-QCN-1-0604 RFI-5858-QCN-1-0604 CIVIL CANCELLED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 25-Dec-12 to 25-Dec-12
& 6(F6)
4:30 PM
7:30 AM
1013 Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002
RFI-5858-QCN-1-0605 RFI-5858-QCN-1-0605 CIVIL APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 25-Dec-12 To 25-Dec-12
TO SLD014, 1st layer
4:30 PM
6:30 AM
1014 RFI-5858-QCN-1-0606 RFI-5858-QCN-1-0606 CIVIL Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006, 10,11 Layer APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 25-Dec-12 to 25-Dec-12
4:30 PM
Retaining Wall
1015 RFI-5858-QCN-1-0607 RFI-5858-QCN-1-0607 CIVIL Check Compaction test Type A for Retaining wall prior blinding. CANCELLED B-V-3100-004-1-201-01_5 4.2.a R W H 25-Dec-12 8:00 AM 24-Dec-12
Section 6 Raslaffan
1016 RFI-5858-QCN-1-0608 RFI-5858-QCN-1-0608 CIVIL Check Compaction Test Type-B For Duct Bank BZDP 007 - Final layer APPROVED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 25-Dec-12 8:00 AM 25-Dec-12
Check Compaction test Type B first layer prior second layer of Pipe Track D110-B70-PR-
1017 RFI-5858-QCN-1-0609 RFI-5858-QCN-1-0609 CIVIL
68
CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 25-Dec-12 7:30 AM 25-Dec-12
7:00 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
1018 RFI-5858-QCN-1-0610 RFI-5858-QCN-1-0610 CIVIL
9(F6) & 6(F6) - 7th & Final Layer
APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 26-Dec-12 to 28-Dec-12
4:30 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002 SECTION 1
1019 RFI-5858-QCN-1-0611 RFI-5858-QCN-1-0611 CIVIL
TO SLD014
CANCELLED
Raslaffan
B-V-3100-004-2-201-01_5 4.2b R W H 26-Dec-12 to 26-Dec-12
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Excavation - Bottom of Excavation Verification.Retaining wall blinding 56.00 Retaining Wall
1020 RFI-5858-QCN-1-0612 RFI-5858-QCN-1-0612 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 26-Dec-12 1:15 PM 1-Jan-13
meters length. Section #6 Raslaffan
1021 RFI-5858-QCN-1-0613 RFI-5858-QCN-1-0613 CIVIL Check Compaction test Type B 2nd layer of Pipe Track D110-B70-PR-68. APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 26-Dec-12 7:30 AM 28-Dec-12
Check Compaction test Type B first layer and second layer of Pipe Stopper B70-PS-17:
1022 RFI-5858-QCN-1-0614 RFI-5858-QCN-1-0614 CIVIL
SLD057 prior third layer.
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 26-Dec-12 9:30 AM 28-Dec-12
6:30 AM
1023 RFI-5858-QCN-1-0615 RFI-5858-QCN-1-0615 CIVIL Check Compaction Test Type-B For Culvert ( West Side) BZRC - 006 APPROVED Cr # 32 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 26-Dec-12 to 28-Dec-12
4:30 PM
Soil Compaction Test for Backfilling - Grading of Access Road Type A (final layer)
1024 RFI-5858-QCN-1-0616 RFI-5858-QCN-1-0616 CIVIL APPROVED Section-2 Raslaffan B-V-3100-004-1-201-01_5 4.2a R W H 26-Dec-12 8:30 AM 28-Dec-12
Sleeeper Foundations B70 - PS -09 SLD039 TO SLD050
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002
1025 RFI-5858-QCN-1-0617 RFI-5858-QCN-1-0617 CIVIL APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 27-Dec-12 TO 28-Dec-12
TO SLD014
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
1026 RFI-5858-QCN-1-0618 RFI-5858-QCN-1-0618 CIVIL APPROVED PR - 06 B-V-3100-004-1-201-01_5 4.2b R W H 27-Dec-12 TO 28-Dec-12
7(F7) & 8(F8) - 1 st & 2nd Layer
4:30 PM
7:30 AM
1027 Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
RFI-5858-QCN-1-0619 RFI-5858-QCN-1-0619 CIVIL APPROVED PR - 06 Raslaff B-V-3100-004-1-201-01_5 4.2b R W H 29-Dec-12 to 1-Jan-13
7(F7) & 8(F8) - 3rd,4th & 5th Layer
4:30PM
7:30 AM
1028 Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002 SECTION 1
RFI-5858-QCN-1-0620 RFI-5858-QCN-1-0620 CIVIL CANCELLED B-V-3100-004-2-201-01_5 4.2b R W H 29-Dec-12 to 28-Dec-12
TO SLD014 Raslaffan
4:30PM
1029 Check Compaction test Type B of Pipe Track D110-B70-PR-68 prior third, fourth layer
RFI-5858-QCN-1-0621 RFI-5858-QCN-1-0621 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 29-Dec-12 7:30 AM 29-Dec-12
and final layer.
Check Compaction test Type B of Pipe Stopper B70-PS-17: SLD057 third layer to final
1030 RFI-5858-QCN-1-0622 RFI-5858-QCN-1-0622 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 29-Dec-12 7:30 AM 29-Dec-12
layer.
Check Compaction test Type B of Pipe Track D110-PR-22 : F3 first, second and third
1031 RFI-5858-QCN-1-0623 RFI-5858-QCN-1-0623 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 29-Dec-12 8:00 AM 29-Dec-12
layer.
Check final Elevations of Grading Sleeper Foundations B70 - PS -09 SLD039 TO SLD050 SECTION 2
1032 RFI-5858-QCN-1-0624 RFI-5858-QCN-1-0624 CIVIL APPROVED B-V-3100-004-1-201-02_5 5.1 R W H 29-Dec-12 8:00 AM 1-Jan-13
& B70 PS -08 SLD036 Raslaffan
Check final Elevations of GradingSleeper Foundations B70 - PS -09 SLD039 TO SLD050 SECTION 2
1033 RFI-5858-QCN-1-0625 RFI-5858-QCN-1-0625 CIVIL APPROVED B-V-3100-004-1-201-02_4 5.1 R W H 29-Dec-12 8:20 AM 1-Jan-13
& B70 PS -08 SLD036 Raslaffan
1034 Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
RFI-5858-QCN-1-0626 RFI-5858-QCN-1-0626 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 29-Dec-12 1:30 PM 1-Jan-13
B70-PR-18:F4 G.L 16/A-B & F4 G.L 17/A-B
Review and approval of QIL test report for Back fill Material ( Type-B) for the sampled
1035 Barzan Off-plot
RFI-5858-QCN-1-0627 RFI-5858-QCN-1-0627 CIVIL location Section-3 Stockpile Section 3- Stockpile Section #3 & Section-4 Stockpile - PR- APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 30-Dec-12 7.30AM 1-Jan-13
BARZAN
18
7:30 AM
1036 Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002 SECTION 1
RFI-5858-QCN-1-0628 RFI-5858-QCN-1-0628 CIVIL APPROVED B-V-3100-004-2-201-01_5 4.2b R W H 30-Dec-12 to 2-Jan-13
TO SLD014 Raslaffan
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -06 Pipe Rack Foundation
1037 RFI5858-QCN-1-0629 RFI5858-QCN-1-0629 CIVIL APPROVED PR - 06 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 30-Dec-12 to 2-Jan-13
7(F7) & 8(F8) - 6th,7th & Final Layer
4:30 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002
1038 RFI-5858-QCN-1-0630 RFI-5858-QCN-1-0630 CIVIL
TO SLD014
CANCELLED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 31-Dec-12 to 31-Dec-12
4:30 PM
Check Compaction test Type B of Pipe Track D110-B70-PR-68 prior third, fourth layer
1039 RFI-5858-QCN-1-0631 RFI-5858-QCN-1-0631 CIVIL
and final layer.
CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 31-Dec-12 7:30 AM 31-Dec-12
Check Compaction test Type B of Pipe Stopper B70-PS-17: SLD057 third layer to final
1040 RFI-5858-QCN-1-0632 RFI-5858-QCN-1-0632 CIVIL
layer.
CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 31-Dec-12 7:30 AM 31-Dec-12
1041 RFI-5858-QCN-1-0633 RFI-5858-QCN-1-0633 CIVIL Check Compaction test Type B of Pipe Track D110-PR-22 : F3 first, second, third layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 31-Dec-12 8:00 AM 3-Jan-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Compaction test Type B of Pipe Track D110-B70-PR-22: F4 first layer, second and
1042 RFI-5858-QCN-1-0634 RFI-5858-QCN-1-0634 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 31-Dec-12 7:30 AM 3-Jan-13
third layer.
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
1043 RFI-5858-QCN-1-0635 RFI-5858-QCN-1-0635 CIVIL
B70-PR-18: F1 G.L 18/A-B & F3: G.L 19/A-B
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 31-Dec-12 11:00 PM 3-Jan-13
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
1044 RFI-5858-QCN-1-0636 RFI-5858-QCN-1-0636 CIVIL
B70-PR-18: F2 G.L 20/A-B & F1: G.L 21/A-B
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 1-Jan-13 7:00 AM 3-Jan-13
Check Compaction test Type B of Pipe Track D110-B70-PR-22: F4 fourth layer and final
1045 RFI-5858-QCN-1-0637 RFI-5858-QCN-1-0637 CIVIL
layer.
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 1-Jan-13 8:00 AM 2-Jan-13
1046 RFI-5858-QCN-1-0638 RFI-5858-QCN-1-0638 CIVIL Check Compaction test Type B of Pipe Track D110-PR-22 : F3 final layer. APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 1-Jan-13 8:00 AM 2-Jan-13
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -08 Pipe Rack Foundation
1047 RFI-5858-QCN-1-0639 RFI-5858-QCN-1-0639 CIVIL CANCELLED SECTION 2 PR - 08 B-V-3100-004-1-201-01_5 4.2b R W H 1-Jan-13 4:30 PM 1-Jan-13
1(F2),2(F1)
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -04 SLD002
1048 RFI-5858-QCN-1-0640 RFI-5858-QCN-1-0640 CIVIL CANCELLED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 1-Jan-13 TO 1-Jan-13
TO SLD014
4:30 PM
1050 RFI-5858-QCN-1-0642 RFI-5858-QCN-1-0642 CIVIL Check Compaction test Type A of Pipe Track D110-B70-PR-23: F1 APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.1.a R W H 2-Jan-13 8:00 AM 4-Jan-13
7:30 AM
Soil Compaction Test for Backfilling- Type B D110 B70 - PR -08 Pipe Rack Foundation
1052 RFI-5858-QCN-1-0644 RFI-5858-QCN-1-0644 CIVIL APPROVED SECTION 2 PR - 08 B-V-3100-004-1-201-01_5 4.2b R W H 2-Jan-13 TO 3-Jan-13
1(F2),2(F1)-1st ,2nd & 3rd Layer
4:30 PM
Check Compaction test Type B of Pipe Track D110-PR-22 : F5 first layer secend and third
1053 RFI-5858-QCN-1-0645 RFI-5858-QCN-1-0645 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 2-Jan-13 8:00 AM 3-Jan-13
layer.
7:30 AM
1056 Soil Compaction Test for Backfilling- Type B D110 B70 - PR -08 Pipe Rack Foundation
RFI-5858-QCN-1-0648 RFI-5858-QCN-1-0648 CIVIL APPROVED SECTION 2 PR - 08 B-V-3100-004-1-201-01_5 4.2b R W H 3-Jan-13 TO 5-Jan-13
1(F2),2(F1), 4th,5th & final layer
4:30 PM
1057 Check Compaction test Type B of Pipe Track D110-PR-22 : F5 fourth to final layer (4,5, &
RFI-5858-QCN-1-0649 RFI-5858-QCN-1-0649 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 3-Jan-13 8:00 AM 5-Jan-13
final Layer)
7:30 AM
1058 Soil Compaction Test for Backfilling- Type B D110 B70 - PR -08 Pipe Rack Foundation
RFI-5858-QCN-1-0650 RFI-5858-QCN-1-0650 CIVIL CANCELLED SECTION 2 PR - 08 B-V-3100-004-1-201-01_5 4.2b R W H 5-Jan-13 TO 5-Jan-13
1(F2),2(F1)
4:30 PM
Check Excavation - Bottom of Excavation Verification For Pipe Track Foundations D110-
1059 RFI-5858-QCN-1-0651 RFI-5858-QCN-1-0651 CIVIL B70-PR-18: F14 D110-B70-PR-63 & pipe sleepers - stoppers: B70-PS-12: SLD006 to APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 5-Jan-13 11:00 AM 8-Jan-13
SLD0012/ B70-PS-13: SLD044
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL
1062 RFI-5858-QCN-1-0654 RFI-5858-QCN-1-0654 CIVIL
- FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
CANCELLED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 6-Jan-13 4:30 PM 6-Jan-13
Check Compaction Test Type-A For Pipe Sleepers - Below Foundations B70-PS-12:
1063 RFI-5858-QCN-1-0655 RFI-5858-QCN-1-0655 CIVIL
SLD007 to SLD011
APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 6-Jan-13 9:30 AM 6-Jan-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Sampling for Fill Material Type-D AT SAMPLE Location Section3 -, stock pile # 1- BZRC- Barzan Off-plot
1064 RFI-5858-QCN-1-0656 RFI-5858-QCN-1-0656 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1d R W H 6-Jan-13 8:00 AM 6-Jan-13
004 Section 5
Sampling for Fill Material Type-B AT SAMPLE Location Section -, stock pile # 1- BZRC- Barzan Off-plot
1065 RFI-5858-QCN-1-0657 RFI-5858-QCN-1-0657 CIVIL
008
APPROVED
Section 5
B-V-3100-004-1-201-01_5 3.1.b R W H 6-Jan-13 8:00 AM 17-Jan-13
Sampling for Fill Material around underground lines (dune sand) stockpile location # Barzan Off-plot
1066 RFI-5858-QCN-1-0658 RFI-5858-QCN-1-0658 CIVIL
section 1
APPROVED
Section 3
B-V-3100-004-1-201-01_5 3.1g R W H 6-Jan-13 8:00 AM 6-Jan-13
Review and approval of QIL test report for Back fill Material ( Type-A) for the sampled Barzan Off-plot
1067 RFI-5858-QCN-1-0659 RFI-5858-QCN-1-0659 CIVIL
location Section-4 - Stockpile BZDP-007
APPROVED
BARZAN
B-V-3100-004-1-201-01_5 3.1.a R W H 6-Jan-13 7:30 AM 6-Jan-13
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL
1068 RFI-5858-QCN-1-0660 RFI-5858-QCN-1-0660 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 7-Jan-13 TO 7-Jan-13
- FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
4:30 PM
Soil Compaction Test For backfilling-Type A Sleeper Foundations B70 - PS -04 SLD002 7:30 AM
1069 RFI-5858-QCN-1-0661 RFI-5858-QCN-1-0661 CIVIL APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 7-Jan-13 7-Jan-13
TO SLD014
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL 7:30 AM
1071 RFI-5858-QCN-1-0663 RFI-5858-QCN-1-0663 CIVIL - FROM EAST SIDE (3.15M PORTION ONLY) , 1, 2 LAYER (SOUTH SIDE) 3 LAYER APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 7-Jan-13 TO 8-Jan-13
BOTH SIDE 4:30 PM
1072 Check Compaction test Type B of Pipe Track D110-B70-PR-23: F1 and D10-B70-PR-24:
RFI-5858-QCN-1-0664 RFI-5858-QCN-1-0664 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 7-Jan-13 2:30 PM 8-Jan-13
F2 third layer fourth to final layer
1073 Check Excavation - Bottom of Excavation Verification For Pipe Sleepers B70-PS-13:
RFI-5858-QCN-1-0665 RFI-5858-QCN-1-0665 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 7-Jan-13 11:00 AM 10-Jan-13
SLD039 To SLD042 = 4 nos
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL
1074 RFI-5858-QCN-1-0666 RFI-5858-QCN-1-0666 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 9-Jan-13 to 9-Jan-13
- FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
4:30 PM
6:00 AM
1075 RFI-5858-QCN-1-0667 RFI-5858-QCN-1-0667 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 9-Jan-13 TO 9-Jan-13
5:00 PM
7:30 AM
Soiil Compaction Test for Backfillling Type B Hamal Culvert BZRC 004 BASE & wall - HAMLA CULVERT
1077 RFI-5858-QCN-1-0669 RFI-5858-QCN-1-0669 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 10-Jan-13 to 11-Jan-13
from east site 3rd, 2nd & 1st (3.15M portiomn Only) AREA
4:30 PM
1078 RFI-5858-QCN-1-0670 RFI-5858-QCN-1-0670 CIVIL Check Compaction test Type B of Pipe Track D110-B70-PR-24: F2 1st,2nd & 3rd Layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a W W H 10-Jan-13 8:00 AM 11-Jan-13
6:00 AM
1079 RFI-5858-QCN-1-0671 RFI-5858-QCN-1-0671 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 10-Jan-13 TO 10-Jan-13
5:00 PM
1080 RFI-5858-QCN-1-0672 RFI-5858-QCN-1-0672 CIVIL Check final Elevations of Grading Sleeper Foundations B70 - PS -04 SLD002 TO SLD014 APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.1 R W H 10-Jan-13 8:00 AM 11-Jan-13
Check final Visual Inspection of Grading Sleeper Foundations B70 - PS -04 SLD002 TO
1081 RFI-5858-QCN-1-0673 RFI-5858-QCN-1-0673 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.2 S W H 10-Jan-13 8:30 AM 11-Jan-13
SLD014
7:30
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE &
1082 RFI-5858-QCN-1-0674 RFI-5858-QCN-1-0674 CIVIL
WALL - FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
APPROVED HAMLA CULVERT B-V-3100-004-1-201-02_5 4.2.b R W H 11-Jan-13 TO 13-Jan-13
4:30 PM
1083 RFI-5858-QCN-1-0675 RFI-5858-QCN-1-0675 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 RASLAFFAN B-V-3100-004-2-201-01_5 4.2.B R W H 11-Jan-13 11:30 AM 13-Jan-13
7:00 AM
1084 RFI-5858-QCN-1-0676 RFI-5858-QCN-1-0676 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 12-Jan-13 TO 13-Jan-13
5:00 PM
1085 RFI-5858-QCN-1-0677 RFI-5858-QCN-1-0677 CIVIL Check Excavation-Bottom of Excavation verification CULVERT BZRC 003 APPROVED SECTION1 B-V-3100-004-1-201-02_5 2.2 R W H 12-Jan-13 3:55 PM 14-Jan-13 with bibin
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL
1086 RFI-5858-QCN-1-0678 RFI-5858-QCN-1-0678 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 12-Jan-13 to 13-Jan-13
- FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
4:30 PM
1087 RFI-5858-QCN-1-0679 RFI-5858-QCN-1-0679 CIVIL Check Compaction test Type B of Pipe Track D110-B70-PR-24: F2 4th,5th & 6th Layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 12-Jan-13 8:00 AM 13-Jan-13
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 BASE & WALL
1088 RFI-5858-QCN-1-0680 RFI-5858-QCN-1-0680 CIVIL
- FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 13-Jan-13 TO 14-Jan-13
4:30 PM
7:00 AM
1089 RFI-5858-QCN-1-0681 RFI-5858-QCN-1-0681 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 13-Jan-13 TO 13-Jan-13
5:00 PM
Check type-B filed density & layer thickness for Pipe Track D110-B70PR-24: F2 7th,8th &
1090 RFI-5858-QCN-1-0682 RFI-5858-QCN-1-0682 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 13-Jan-13 9:00 AM 14-Jan-13
Final Layer
7:30 AM
Soil Compaction Test for Backfilling - Type A HAMLA CULVERT BZRC 004 BASE &
1091 RFI-5858-QCN-1-0683 RFI-5858-QCN-1-0683 CIVIL CANCELLED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2.b R W H 14-Jan-2013 to 13-Jan-13
WALL - FROM EAST SIDE 3rd, 2nd & 1st (3.15m Protion Only)
4:30 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70PR-23: F2. 1st,2nd
1092 RFI-5858-QCN-1-0684 RFI-5858-QCN-1-0684 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 14-Jan-2013 to 14-Jan-13
& 3rd Layer
5:00 PM
7:00 AM
1093 RFI-5858-QCN-1-0685 RFI-5858-QCN-1-0685 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 14-Jan-2013 to 14-Jan-13
5:00 PM
1094 Check Excavation - Bottom of Excavation Verification prior to Type D filling at loose soil Crossing #29,
RFI-5858-QCN-1-0686 RFI-5858-QCN-1-0686 CIVIL CANCELLED B-V-3100-004-1-201-01_5 2.1 R W H 14-Jan-2013 10:00 AM 14-Jan-13
location for the foundation F8/Grid 12 of B70-PR-18 Section 4 Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM EAST
1096 RFI-5858-QCN-1-0688 RFI-5858-QCN-1-0688 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 15-Jan-13 TO 15-Jan-13
SIDE 1st BASE & WALL (1.9 M PORTION )
4:30 PM
7:30
Check Compaction Test Type-B backfilling for B70-PR-18 - F9/Grid 11, F7/Grid 13 - 1st & Crossing #29,
1097 RFI-5858-QCN-1-0689 RFI-5858-QCN-1-0689 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 15-Jan-13 to 15-Jan-13
2nd Layer Section 4 Raslaffan
16.30
Check Compaction Test Type-A - Below Foundation for sleepers SLD001 to SLD005 of
1098 RFI-5858-QCN-1-0690 RFI-5858-QCN-1-0690 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 15-Jan-13 6:30 AM 15-Jan-13
B70-PS-12
Check Excavation - Bottom of Excavation Verification prior to lean concrete for sleepers
1099 RFI-5858-QCN-1-0691 RFI-5858-QCN-1-0691 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 15-Jan-13 6:30 AM 17-Jan-13 BIBIN
SL001 to SLD005 of B70-PS-12
7:00 AM
1100 Check type-B filed density & layer thickness for Pipe Track D110-B70PR-23: F2. 4th,5th &
RFI-5858-QCN-1-0692 RFI-5858-QCN-1-0692 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Jan-13 to 15-Jan-13
6th Layer
5:00 PM
7:00 AM
1101 RFI-5858-QCN-1-0693 RFI-5858-QCN-1-0693 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 15-Jan-13 TO 15-Jan-13
5:00 PM
7:00 AM
1102 RFI-5858-QCN-1-0694 RFI-5858-QCN-1-0694 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-02_5 4.2.b R W H 16-Jan-13 TO 18-Jan-13
5:00 PM
7:30 AM
Check Compaction Test Type-B backfilling for D100-B70-PR-18 - F9/Grid 11, F7/Grid 13, Crossing #29,
1103 RFI-5858-QCN-1-0695 RFI-5858-QCN-1-0695 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 16-Jan-13 to 18-Jan-13
F6/Grid 14, F5/Grid 15 - 3rd & 4th Layer Section 4 Raslaffan
16.30 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70PR-23: F2 7th,8th &
1104 RFI-5858-QCN-1-0696 RFI-5858-QCN-1-0696 CIVIL
Final Layer
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 16-Jan-13 TO 17-Jan-13
5:00 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-15: SLD028, 7:00 AM
1105 RFI-5858-QCN-1-0697 RFI-5858-QCN-1-0697 CIVIL SLD029, B70-PS-16: SLD018, SLD019 SLD073 and SLD074 and Pipe Stopper B70-PS- APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 16-Jan-13 TO 17-Jan-13
17: SLD057, SLD021, SLD002 5:00 PM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM EAST 7:30 AM
1106 RFI-5858-QCN-1-0698 RFI-5858-QCN-1-0698 CIVIL SIDE 1st BASE & WALL (1.9 M PORTION ) (1,2,3 LAYER -TYPE B & 2, FINAL LAYER - APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 16-Jan-13 TO 17-Jan-13
TYPE A) 4:30 PM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -03 SLD051 &
1107 RFI-5858-QCN-1-0699 RFI-5858-QCN-1-0699 CIVIL
SLD052
CANCELLED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 16-Jan-13 7:30 AM 16-Jan-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM EAST
1108 RFI-5858-QCN-1-0700 RFI-5858-QCN-1-0700 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 17-Jan-13 TO 17-Jan-13
SIDE 1st BASE & WALL (1.9 M PORTION )
4:30 PM
7:00 AM
1109 RFI-5858-QCN-1-0701 RFI-5858-QCN-1-0701 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Jan-13 TO 17-Jan-13
5:00 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-15: SLD028, 7:00 AM
1111 RFI-5858-QCN-1-0703 RFI-5858-QCN-1-0703 CIVIL SLD029, B70-PS-16: SLD018, SLD019 SLD073 and SLD074 and Pipe Stopper B70-PS- APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Jan-13 to 17-Jan-13
17: SLD057, SLD021, SLD002 5:00 PM
7:00 AM
1112 RFI-5858-QCN-1-0704 RFI-5858-QCN-1-0704 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008 , 12TH layer APPROVED Location: Cr # 38 B-V-3100-004-1-201-01_5 4.2b R W H 18-Jan-13 to 19-Jan-13
12:00 AM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - FROM
1113 RFI-5858-QCN-1-0705 RFI-5858-QCN-1-0705 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 18-Jan-13 TO 19-Jan-13
EAST SIDE 1st BASE & WALL (1.9 M PORTION ), 7,8th layer
4:30 AM
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM EAST
1114 RFI-5858-QCN-1-0706 RFI-5858-QCN-1-0706 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 20-Jan-13 TO 21-Jan-13
SIDE 1st BASE & WALL (1.9 M PORTION ), 12th final layer
4:30PM
7:30 AM
1115 Soil Compaction Test for BackfillingD110 B70 - PS -01 Stopper Foundation SLD 012, 4,5
RFI-5858-QCN-1-0707 RFI-5858-QCN-1-0707 CIVIL APPROVED SECTION 1 B-V-3100-004-1-201-01_5 4.2b R W H 20-Jan-13 TO 21-Jan-13
final layer
4:30 PM
7:30 AM
1116 Soil Compaction Test for Backfilling D110 B70 - PR -70 Pipe Rack Foundation Pedestal SECTION 1 PR -70
RFI-5858-QCN-1-0708 RFI-5858-QCN-1-0708 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 20-Jan-13 TO 21-Jan-13
(F2) - 1no.s, 1st,2nd & 3rd layer
4:30 PM
7:00 AM
1117 RFI-5858-QCN-1-0709 RFI-5858-QCN-1-0709 CIVIL Check type-B filed density & layer thickness for culvert east side BZRC - 008, 13th layer APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 19-Jan-13 TO 19-Jan-13
5:00 PM
7.30
Check Compaction Test Type-B backfilling for 110-B70-PR-18 - GL:-14&15/F6 & F5 - Crossing #29,
1118 RFI-5858-QCN-1-0710 RFI-5858-QCN-1-0710 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 19-Jan-13 to 19-Jan-13
1st,2nd & 3rd Layer and GL:-11 & 13/F9 & F7 - 4th,5th & Final Layer Section 4 Raslaffan
16.30
7:00 AM
1119 RFI-5858-QCN-1-0711 RFI-5858-QCN-1-0711 CIVIL Check type-A filed density & layer thickness for culvert east side BZRC - 008, 1,2 layer APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 20-Jan-13 TO 21-Jan-13
5:00 PM
Soil Compaction Test for BackfillingD110 B70 - PS -01 Sleeper Foundation SLD 011,SLD 7:30 AM
1120 RFI-5858-QCN-1-0712 RFI-5858-QCN-1-0712 CIVIL 012,SLD013 & SLD024, Stoper FDN-SLD-12, 1,2,3th layer, SLD 11,13,24-1th and final APPROVED SECTION 1 B-V-3100-004-1-201-01_5 4.2b R W H 19-Jan-13 TO 19-Jan-13
layer 4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM EAST
1121 RFI-5858-QCN-1-0713 RFI-5858-QCN-1-0713 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 19-Jan-13 TO 19-Jan-13
SIDE 1st BASE & WALL (1.9 M PORTION ), 9,10,11th layer
4:30 PM
1122 Check Excavation - Bottom of Excavation Verification prior to lean concrete for PR-18 F8/
RFI-5858-QCN-1-0714 RFI-5858-QCN-1-0714 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 20-Jan-13 6:30 AM 22-Jan-13
Grid 12
1123 Check Excavation - Bottom of Excavation Verification prior to lean concrete for sleepers
RFI-5858-QCN-1-0715 RFI-5858-QCN-1-0715 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W W 20-Jan-13 6:30 AM 22-Jan-13
SLD043, SLD052, SLD53 of B70-PS-13
7:30
1124 Check Compaction Test Type-B backfilling for F9/Grid 11- Final layer , F6/Grid 14, Crossing #29,
RFI-5858-QCN-1-0716 RFI-5858-QCN-1-0716 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 20-Jan-13 to 21-Jan-13
F5/Grid 15 - 4th,5th & Final layer of D110-B70-PR-18 Section 4 Raslaffan
16:30
7:00 AM
1125 RFI-5858-QCN-1-0717 RFI-5858-QCN-1-0717 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70PR-68 3,4,5th layer APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 20-Jan-13 to 21-Jan-13
5:00 PM
Review and approval of QIL test report for Back fill Material ( Type-B) for the sampled
location Section-5 - Stockpile BZRC-008 & Dune Sand Stockpile # Section -1 Barzan Off-plot
1126 RFI-5858-QCN-1-0718 RFI-5858-QCN-1-0718 CIVIL
(Desalinated line) & Back fill Material ( Type-D) for the sampled location Section-4-
APPROVED
BARZAN
B-V-3100-004-1-201-01_5 3.1b,d,g R W H 20-Jan-13 7.30 AM 21-Jan-13
Stockpile BZRC-004
7:00 AM
1127 RFI-5858-QCN-1-0720 RFI-5858-QCN-1-0720 CIVIL Check soil compaction test for sub base 200mm granular class B material APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 21-Jan-13 to 22-Jan-13
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S 1st, 2nd and 3rd Retaining Wall
1128 RFI-5858-QCN-1-0721 RFI-5858-QCN-1-0721 CIVIL
panel., 1,2th final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 21-Jan-13 to 22-Jan-13
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70PR-68 and Final
1129 RFI-5858-QCN-1-0722 RFI-5858-QCN-1-0722 CIVIL
layer
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 21-Jan-13 to 22-Jan-13
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -70 Pipe Rack Foundation Pedestal SECTION 1 PR -70
1130 RFI-5858-QCN-1-0723 RFI-5858-QCN-1-0723 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 21-Jan-13 TO 22-Jan-13
1(F1),2 (F2) - 2no.s, 2(F2)- 4th,5th & final layer, 1(F1)-1,2,3th layer
4:30 AM
7:30 AM
1131 RFI-5858-QCN-1-0724 RFI-5858-QCN-1-0724 CIVIL Soil Compaction Test for BackfillingD110 B70 - PS -01 Stopper Foundation SLD 012 CANCELLED SECTION 1 B-V-3100-004-1-201-01_5 4.2b R W H 21-Jan-13 TO 21-Jan-13
4:30 AM
7:30 AM
Check Compaction Test Type-B backfilling for F6/Grid 14, F5/Grid 15 of B70-PR-18, Crossing #29, Section
1132 RFI-5858-QCN-1-0725 RFI-5858-QCN-1-0725 CIVIL
final layer
CANCELLED
4
B-V-3100-004-1-201-01_5 4.2b R W H 21-Jan-13 TO 21-Jan-13
4:30 AM
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -70 Pipe Rack Foundation 1(F1) 1 SECTION 1 PR -70
1133 RFI-5858-QCN-1-0726 RFI-5858-QCN-1-0726 CIVIL
No. 4th,5th & 6th Layer
APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 22-Jan-13 TO 22-Jan-13
4:30 PM
7:00 AM
1134 RFI-5858-QCN-1-0727 RFI-5858-QCN-1-0727 CIVIL Check soil compaction test for sub base 200mm granular class B material APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 22-Jan-13 TO 23-Jan-13
5:00 PM
BZRC-009A
1135 RFI-5858-QCN-1-0728 RFI-5858-QCN-1-0728 CIVIL Check Excavation : Bottom of excavation verification:For curb stone in BZRC-008 APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 22-Jan-13 7:30 AM 28-Jan-13
Raslaffan
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S 1st, 2nd, 3rd panel Retaining Wall
1136 RFI-5858-QCN-1-0729 RFI-5858-QCN-1-0729 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 22-Jan-13 to 22-Jan-13
and 4th panel Raslaffan
5:00 PM
1137 BZRC-009A
RFI-5858-QCN-1-0730 RFI-5858-QCN-1-0730 CIVIL Check Excavation : Bottom of excavation verification:BZRC-09A west side CANCELLED B-V-3100-004-2-201-02_5 2.1 R W H 22-Jan-13 4:00 PM 22-Jan-13
Raslaffan
1138 Check Excavation - Bottom of Excavation Verification prior to lean concrete for PR-18 F8/
RFI-5858-QCN-1-0731 RFI-5858-QCN-1-0731 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W W 22-Jan-13 6:30 AM 24-Jan-13
Grid 12
10:30 AM
1139 Crossing #29,
RFI-5858-QCN-1-0732 RFI-5858-QCN-1-0732 CIVIL Check Compaction Test Type-B backfilling for B70-PS-12-SLD001 to SLD11 APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 22-Jan-13 to 22-Jan-13
Section 4 Raslaffan
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling D110 B70 - PR -70 Pipe Rack Foundation 1(F1) 7th SECTION 1 PR -70
1140 RFI-5858-QCN-1-0733 RFI-5858-QCN-1-0733 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 23-Jan-13 to 24-Jan-13
Layer & Final Layer
4:30 PM
10:30
Crossing #29,
1141 RFI-5858-QCN-1-0734 RFI-5858-QCN-1-0734 CIVIL Check Compaction Test Type-B backfilling for B70-PS-12- SLD001 TO SLD11 APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 23-Jan-13 to 24-Jan-13
Section 4 Raslaffan
16.30
BZRC-009A
1142 RFI-5858-QCN-1-0735 RFI-5858-QCN-1-0735 CIVIL Check Excavation : Bottom of excavation verification:RBZRC-09A west side CANCELLED B-V-3100-004-2-201-02_5 2.1 R W W 23-Jan-13 3:00 PM 23-Jan-13
Raslaffan
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S 1st, 2nd, 3rd panel Retaining Wall
1143 RFI-5858-QCN-1-0736 RFI-5858-QCN-1-0736 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 23-Jan-13 to 24-Jan-13
and 4th panel and 5th panel Raslaffan
5:00 PM
7:00 AM
1144 Retaining Wall
RFI-5858-QCN-1-0737 RFI-5858-QCN-1-0737 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S 5th and 6th panel APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 24-Jan-13 to 25-Jan-13
Raslaffan
5:00 PM
8:30
1145 Check Compaction Test Type-B backfilling for B70-PS-13- SLD045 TO SLD51 - 1ST and
RFI-5858-QCN-1-0738 RFI-5858-QCN-1-0738 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 24-Jan-13 to 25-Jan-13
final layer
16:30
BZRC-009A
1147 RFI-5858-QCN-1-0740 RFI-5858-QCN-1-0740 CIVIL Check Excavation : Bottom of excavation verification: RBZRC-09A west side CANCELLED B-V-3100-004-1-201-02_5 4.12.1 R W W 24-Jan-13 2:00 PM 24-Jan-13
Raslaffan
8:00 AM
1148 RFI-5858-QCN-1-0741 RFI-5858-QCN-1-0741 CIVIL Check Compaction Test Type-B backfilling for B70-PS-13-SLD039 TO SLD42 APPROVED Section 4 Raslaffan B-V-3100-004-1-201-02_5 4.2.b R W H 25-Jan-13 TO 26-Jan-13
12:00 AM
7:00 AM
Retaining Wall
1150 RFI-5858-QCN-1-0743 RFI-5858-QCN-1-0743 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S 5th and 6th panel APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 26-Jan-13 to 28-Jan-13
5:00 PM
BZRC-009A
1151 RFI-5858-QCN-1-0744 RFI-5858-QCN-1-0744 CIVIL Check Excavation : Bottom of excavation verification:RBZRC-09A west side APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W W 26-Jan-13 7:00 AM 26-Jan-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -03 SLD051 &
1153 RFI-5858-QCN-1-0746 RFI-5858-QCN-1-0746 CIVIL
SLD052
APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 26-Jan-13 TO 28-Jan-13
4:30 PM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD014 to
1154 RFI-5858-QCN-1-0747 RFI-5858-QCN-1-0747 CIVIL SLD034 except SLD022 and SLD035 SLD038 to SLD042 and SLD052 to SLD064 except APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 27-Jan-13 7:30 AM 28-Jan-13
SLD058 = 36 nos
Check Excavation - Bottom of Excavation Verification prior to lean concrete for B70-PR-
1156 RFI-5858-QCN-1-0749 RFI-5858-QCN-1-0749 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W W 27-Jan-13 7:30 AM 28-Jan-13
18 F12/Grid- 4&5
8.00
Check Compaction Test Type-B backfilling for D110-B70-PR-18 F10/Grid-10 - 1st,2nd &
1157 RFI-5858-QCN-1-0750 RFI-5858-QCN-1-0750 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 27-Jan-13 to 28-Jan-13
3rd Layer
16.30
7:00 AM
Retaining Wall
1158 RFI-5858-QCN-1-0751 RFI-5858-QCN-1-0751 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S 5th and 6th panel APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 27-Jan-13 to 28-Jan-13
Raslaffan
5:00 PM
1160 Check final Visual Inspection of Grading Sleeper Foundations B70 - PS -01
RFI-5858-QCN-1-0753 RFI-5858-QCN-1-0753 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.2 S W H 27-Jan-13 8:30 AM 28-Jan-13
SLD001,SLD005,SLD011 TO SLD024
7:30 AM
1161 Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -03 SLD051 &
RFI-5858-QCN-1-0754 RFI-5858-QCN-1-0754 CIVIL APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 28-Jan-13 TO 28-Jan-13
SLD052
4:30 PM
7:00 AM
Check Compaction Test Type-B backfilling for D100-B70-PR-18 F10/Grid-10 - 4th,5th &
1162 RFI-5858-QCN-1-0755 RFI-5858-QCN-1-0755 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 28-Jan-13 to 30-Jan-13
6th Layer,F4/Grid-16&17 - 1st,2nd & 3rd Layer
16:30 PM
Sampling for Excavated Material Type-B AT SAMPLE Location Section -5 Retaining wall Barzan Off-plot
1163 RFI-5858-QCN-1-0756 RFI-5858-QCN-1-0756 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 28-Jan-13 8.00AM 28-Jan-13
East to west Section 3
Sampling for FILL Material Type-A(Class B Per QCS) AT SAMPLE Location Section -5 Barzan Off-plot
1164 RFI-5858-QCN-1-0757 RFI-5858-QCN-1-0757 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1.a R W H 28-Jan-13 8.30AM 28-Jan-13
Near Halul Culvert. Section 3
Soil Compaction Test for Backfilling- Type B LAFAN CULVERT BZRC 006. 200mm
1165 RFI-5858-QCN-1-0758 RFI-5858-QCN-1-0758 CIVIL APPROVED LAFAN CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 28-Jan-13 2:30 PM 30-Jan-13
granullar fill-clas B
7:00 AM
1166 Retaining Wall
RFI-5858-QCN-1-0759 RFI-5858-QCN-1-0759 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S 5th and 6th panel APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 28-Jan-13 to 28-Jan-13
Raslaffan
5:00 PM
1167 Crossing 44
RFI-5858-QCN-1-0760 RFI-5858-QCN-1-0760 CIVIL Check Excavation : Bottom of excavation verification:D110-B70-PR-25: F1 APPROVED B-V-3100-004-2-201-02_5 2.1 R W W 28-Jan-13 8:30 AM 30-Jan-13
Raslaffan
7:00 AM
Retaining Wall
1169 RFI-5858-QCN-1-0762 RFI-5858-QCN-1-0762 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 29-Jan-13 to 29-Jan-13
Raslaffan
5:00 PM
Check Compaction Test Type-B backfilling for D110-B70-PR-18 F1/Grid-21&18 - 1st & 7:00 AM
1170 RFI-5858-QCN-1-0763 RFI-5858-QCN-1-0763 CIVIL 2nd Layer, F2/Grid-20 - 1st & 2nd Layer, F3/Grid-19 - 1st & 2nd Layer, F4/Grid-16&17 - APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 29-Jan-13 to 29-Jan-13
4th,5th & Final Layer 16:30 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 5 - final layer, Retaining Wall
1171 RFI-5858-QCN-1-0764 RFI-5858-QCN-1-0764 CIVIL
pannel 6- 5th,6th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 30-Jan-13 to 30-Jan-13
5:00 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundation B70 - PS -04 SLD 001,
1172 RFI-5858-QCN-1-0765 RFI-5858-QCN-1-0765 CIVIL
1,2nd final layer.
APPROVED SECTION1 B-V-3100-004-2-201-01_5 4.2b R W H 30-Jan-13 TO 30-Jan-13
4:30 PM
Check Final Elevations For Pipe Track D110-B70-PR-22: F1, F2, F3, F4, F5 and F6 Section 6 Crossing
1173 RFI-5858-QCN-1-0766 RFI-5858-QCN-1-0766 CIVIL
D110-B70-PR-23: F1 and F2, D110-B70-PR-24: F1 and F2
APPROVED
41 and 42 Raslaffan
B-V-3100-004-1-201-01_5 5.1 R W H 30-Jan-13 2:00 PM 2-Feb-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Final visual Inspection For Pipe Track D110-B70-PR-22: F1, F2, F3, F4, F5 and F6 Section 6 Crossing
1174 RFI-5858-QCN-1-0767 RFI-5858-QCN-1-0767 CIVIL APPROVED B-V-3100-004-1-201-01_5 5.1 R W H 30-Jan-13 2:00 PM 2-Feb-13
D110-B70-PR-23: F1 and F2, D110-B70-PR-24: F1 and F2 41 and 42 Raslaffan
7:00 AM
Check Compaction Test Type-B backfilling for D110-B70-PR-18 F1/Grid-21&18, F2/Grid- Section 4 PR-18
1175 RFI-5858-QCN-1-0768 RFI-5858-QCN-1-0768 CIVIL
20, F3/Grid-19 - 3rd & 4th Layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 30-Jan-13 to 1-Feb-13
16:30
1176 RFI-5858-QCN-1-0769 RFI-5858-QCN-1-0769 CIVIL Check Excavation : Bottom of excavation verification:D110-B70-PR-49 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 2.1 R W W 31-Jan-13 8:00 AM 1-Feb-13
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 6 west side - Retaining Wall
1177 RFI-5858-QCN-1-0770 RFI-5858-QCN-1-0770 CIVIL
1,2nd final layer, panel 7 east side - 1,2&3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 31-Jan-13 to 8-Feb-13
5:00 PM
SECTION 1
1178 RFI-5858-QCN-1-0771 RFI-5858-QCN-1-0771 CIVIL Check final Elevations of Grading Sleeper Foundations B70 - PS -04 SLD001 APPROVED B-V-3100-004-1-201-02_5 5.1 R W H 31-Jan-13 8:00 AM 31-Jan-13
Raslaffan
SECTION 1
1179 RFI-5858-QCN-1-0772 RFI-5858-QCN-1-0772 CIVIL Check final Visual Inspection of Grading Sleeper Foundations B70 - PS -04 SLD001 APPROVED B-V-3100-004-1-201-02_5 5.2 S W H 31-Jan-13 8:30 AM 31-Jan-13
Raslaffan
Check Compaction Test Type-B backfilling for D110-B70-18 F1/grd-18,21th -5th final 7:00 AM
SECTION 4
1180 RFI-5858-QCN-1-0773 RFI-5858-QCN-1-0773 CIVIL layer, PR-18-F3/GRD-19-5th final layer, B70-PS-13 SLD 51,52 1st layer, D110-PR-18 APPROVED B-V-3100-004-1-201-02_5 4.2.b R W H 31-Jan-13 to 31-Jan-13
Raslaffan
F10/ GRD-10, F2/GRD 20 final layer.D110-B70-PR-63 4:30 PM
7:00 AM
1181 Check Compaction Test Type-B backfilling for B70-PS-13 SLD-51&52, PR63. PR63-
RFI-5858-QCN-1-0774 RFI-5858-QCN-1-0774 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 2-Feb-13 to 2-Feb-13
1,2nd layer, scd51&52 final layer
16:30 PM
7:00 AM
1182 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD17 to Retaining Wall
RFI-5858-QCN-1-0775 RFI-5858-QCN-1-0775 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 2-Feb-13 to 2-Feb-13
SLD034 = 17 nos Raslaffan
5:00 PM
7:00 AM
1183 Retaining Wall
RFI-5858-QCN-1-0776 RFI-5858-QCN-1-0776 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S. Panel-7 - 4th layer APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 2-Feb-13 to 2-Feb-13
Raslaffan
5:00 PM
1184 RFI-5858-QCN-1-0777 RFI-5858-QCN-1-0777 CIVIL Check final Elevations of Grading Sleeper Foundations B70 - PS -03 SLD 051 & SLD 052 APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.1 R W H 3-Feb-13 8:00 AM 3-Feb-13
Check final Visual Inspection of Grading Sleeper Foundations B70 - PS -03 SLD 051 &
1185 RFI-5858-QCN-1-0778 RFI-5858-QCN-1-0778 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.2 S W H 3-Feb-13 8:30 AM 3-Feb-13
SLD 052
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD17 to
1186 RFI-5858-QCN-1-0779 RFI-5858-QCN-1-0779 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 3-Feb-13 to 3-Feb-13
SLD034 = 17 nos
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-7 west side - Retaining Wall
1187 RFI-5858-QCN-1-0780 RFI-5858-QCN-1-0780 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 3-Feb-13 to 3-Feb-13
1,2nd layer, Panel -7 east side - 5,6th layer Raslaffan
5:00 PM
6:30
1188 Check Compaction Test Type-B backfilling for B70-PS-13 SLD-044 - 1st Layer, D11-B70-
RFI-5858-QCN-1-0781 RFI-5858-QCN-1-0781 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 3-Feb-13 to 3-Feb-13
PR-63 - 3rd Layer, D110-B70-PR-18 F14/Grid-3 - 1st Layer.
16:30
1189 Soil Compaction Test For backfilling-Type A Sleeper Foundations B70 - PS -03 SLD051 & SECTION -1
RFI-5858-QCN-1-0782 RFI-5858-QCN-1-0782 CIVIL APPROVED B-V-3100-004-2-201-01_5 4.2.b R W H 4-Feb-13 7:30 AM 13-Feb-13
SLD052 Raslaffan
1190 Soil Compaction Test for Backfilling- Type B LAFAN CULVERT BZRC 006 EAST SIDE
RFI-5858-QCN-1-0783 RFI-5858-QCN-1-0783 CIVIL APPROVED LAFAN CULVERT B-V-3100-004-1-201-01_5 4.2.b R W H 4-Feb-13 4:00 PM 7-Feb-13
PORTION. Final layer (Prior to class B)
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD17 to
1191 RFI-5858-QCN-1-0784 RFI-5858-QCN-1-0784 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 4-Feb-13 to 4-Feb-13
SLD034 = 17 nos
5:00 PM
7:00 AM
Retaining Wall
1192 RFI-5858-QCN-1-0785 RFI-5858-QCN-1-0785 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 4-Feb-13 to 4-Feb-13
5:00 PM
Crossing #44
1194 RFI-5858-QCN-1-0787 RFI-5858-QCN-1-0787 CIVIL Check Excavation : Bottom of excavation verification:D110-B70-PR-25: F2 and F3 APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W H 4-Feb-13 2:00 PM 27-Feb-13
6.30
Check Compaction Test Type-B backfilling for B70-PS-13 SLD-044, PR63, PS13-scd044-
1195 RFI-5858-QCN-1-0788 RFI-5858-QCN-1-0788 CIVIL
2,3,4th layer, PR63-4,5th layer
APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Feb-13 to 8-Feb-13
16.30
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30
Check Compaction Test Type-B backfilling for B70-PS-13 SLD-044 - 5th & Final Layer,
1196 RFI-5858-QCN-1-0789 RFI-5858-QCN-1-0789 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 5-Feb-13 to 10-Feb-13
D110-B70-PR-63 - Final Layer, D110-B70-PR-18 F14/Grid-3 - 2nd & 3rd Layer.
16:30
Review and approval of QIL test report for Excavated Material ( Type-B) for the sampled Barzan Off-plot
1197 RFI-5858-QCN-1-0790 RFI-5858-QCN-1-0790 CIVIL
location Section-5 - Stockpile Retaining wall East to west
APPROVED
BARZAN
B-V-3100-004-1-201-01_5 3.1.b R W H 5-Feb-13 7:30AM 10-Feb-13
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-6 east side- 7:00 AM
Retaining Wall
1198 RFI-5858-QCN-1-0791 RFI-5858-QCN-1-0791 CIVIL final layer. Panel-7 east side-7th final layer & west side final layer, Panel -8 east side- APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 5-Feb-13 to 10-Feb-13
1,2nd layer, Panel-9 east side-1st layer 5:00 PM
7:00 AM
Soil Compaction Test For backfilling Type - B- 1st layer. Sleeper Foundations B70 - PS
1199 RFI-5858-QCN-1-0792 RFI-5858-QCN-1-0792 CIVIL
-07 SLD082,SLD083,SLD084,SLD085 & B70 - PS -06 SLD032,SLD033,SLD034
APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 5-Feb-13 To 10-Feb-13
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - FROM MASHRAB
1200 RFI-5858-QCN-1-0793 RFI-5858-QCN-1-0793 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 5-Feb-13 To 10-Feb-13
WEST SIDE 2nd& 3rd BASE Portion. South side-1,2,3rd layer CULVERT
4:30 PM
Soil Compaction Test for Sub Base - Type A (Granular fill material) LAFAN CULVERT
1201 RFI-5858-QCN-1-0794 RFI-5858-QCN-1-0794 CIVIL APPROVED LAFAN CULVERT B-V-3100-004-1-201-01_5 4.2a R W H 5-Feb-13 9:30 AM 10-Feb-13
BZRC 006 EAST SIDE PORTION (class-B)
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 8 east side- Retaining Wall
1202 RFI-5858-QCN-1-0795 RFI-5858-QCN-1-0795 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 6-Feb-13 to 10-Feb-13
3,4th layer, Panel-9 east side-2,3rd layer Raslaffan
5:00 PM
7:30
1203 Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
RFI-5858-QCN-1-0796 RFI-5858-QCN-1-0796 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 6-Feb-13 to 10-Feb-13
SIDE. Nort side-1,2,3rd layer, South side - 4th layer CULVERT
4:30 PM
7:00 AM
1204 Soil Compaction Test For backfilling Type - B - final layer. Sleeper Foundations B70 - PS
RFI-5858-QCN-1-0797 RFI-5858-QCN-1-0797 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 6-Feb-13 To 10-Feb-13
-07 SLD082,SLD084,SLD085 & B70 - PS -06 SLD032,SLD033,SLD034
4:30 PM
6:30
1205 Check Compaction Test Type-B backfilling for D110-B70-PR-18- F14/Grid-3, F14 - 4th
RFI-5858-QCN-1-0798 RFI-5858-QCN-1-0798 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 6-Feb-13 to 10-Feb-13
Layer
16:30
Barzan Off-plot
1206 RFI-5858-QCN-1-0799 RFI-5858-QCN-1-0799 CIVIL Sampling for Fill Material Type-A AT SAMPLE Location Section -3, stock pile # 4 APPROVED B-V-3100-004-1-201-01_5 3.1 b R W H 7-Feb-13 8:00 AM 7-Feb-13
Section 3
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 8th east side- Retaining Wall
1207 RFI-5858-QCN-1-0800 RFI-5858-QCN-1-0800 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 7-Feb-13 to 7-Feb-13
5,6,7th layer, Panel-9th east side-4,5th layer Raslaffan
5:00 PM
6.30 AM
Check Compaction Test Type-B backfilling for D110-B70-PR-18-F8/Grid-12 - 1st Layer,
1208 RFI-5858-QCN-1-0801 RFI-5858-QCN-1-0801 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 7-Feb-13 to 7-Feb-13
F14/Grid-3 Final Layer.
16.30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1209 RFI-5858-QCN-1-0802 RFI-5858-QCN-1-0802 CIVIL CANCELLED B-V-3100-004-1-201-01_5 4.2b R W H 7-Feb-13 TO 7-Feb-13
SIDE CULVERT
4:30 PM
1210 Check Excavation-Bottom of Excavation verification CULVERT BZRC 004 - WEST SIDE
RFI-5858-QCN-1-0803 RFI-5858-QCN-1-0803 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-02_5 2.2 R W H 7-Feb-13 4:00 PM 11-Feb-13
PORTION
1211 Check Excavation - Bottom of Excavation Verification prior to lean concrete for B70-PS-
RFI-5858-QCN-1-0804 RFI-5858-QCN-1-0804 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 7-Feb-13 10:00 AM 7-Feb-13
13 SLD038, SLD053, SLD054
MASHRAB 7:30 AM
1212 Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC 003 -
RFI-5858-QCN-1-0805 RFI-5858-QCN-1-0805 CIVIL APPROVED CULVERT B-V-3100-004-1-201-01_5 4.2.b R W H 8-Feb-13 TO 11-Feb-13
WEST SIDE. South side 5th layer, north side-4th layer
Raslaffan 11:00 AM
6:30 AM
Check Compaction Test Type-B backfilling for D110-B70-PR-18-F8/Grid-12 - 2nd & 3rd TO
1213 RFI-5858-QCN-1-0806 RFI-5858-QCN-1-0806 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 8-Feb-13 11-Feb-13
Layer. 11:30 AM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1214 RFI-5858-QCN-1-0807 RFI-5858-QCN-1-0807 CIVIL
SIDE. South side 7th layer, north side 5,6th layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2b R W H 9-Feb-13 TO 11-Feb-13
4:30 AM
6:30 AM
Check Compaction Test Type-B backfilling for D110-B70-PR-18-F8/Grid-12 - 4,5 & 6th
1215 RFI-5858-QCN-1-0808 RFI-5858-QCN-1-0808 CIVIL
layer
APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 9-Feb-13 to 11-Feb-13
16:30 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-8 east side- Retaining Wall
1216 RFI-5858-QCN-1-0809 RFI-5858-QCN-1-0809 CIVIL
final layer, Panel-9 east side-6,7,8th layer, Panel-10 east side-1,2,3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 9-Feb-13 to 11-Feb-13
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD034,
1217 RFI-5858-QCN-1-0810 RFI-5858-QCN-1-0810 CIVIL
SLD035, SLD037 to SLD042 and SLD051 to SLD053 = 11 nos. 1st layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 10-Feb-13 to 13-Feb-13
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-9 east side Retaining Wall
1218 RFI-5858-QCN-1-0811 RFI-5858-QCN-1-0811 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 10-Feb-13 to 13-Feb-13
final layer, Panel 10 east side 4th layer Raslaffan
5:00 PM
6:30 AM
1219 RFI-5858-QCN-1-0812 RFI-5858-QCN-1-0812 CIVIL Check Compaction Test Type-B backfilling for B70-PR-18-F8/Grid-12 - Final layer APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 10-Feb-13 to 13-Feb-13
16:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1220 RFI-5858-QCN-1-0813 RFI-5858-QCN-1-0813 CIVIL
SIDE. North side 6,7,8th layer, South side-8th layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2b R W H 10-Feb-13 to 13-Feb-13
4:30 PM
Review and approval of QIL test report for Back fill Material CLASS " B" ( Type-A) for the
1221 RFI-5858-QCN-1-0814 RFI-5858-QCN-1-0814 CIVIL
sampled location Section-5 - Stockpile Near HALUL Culvert
APPROVED Barzan Off-plot AREA B-V-3100-004-1-201-01_5 3.1.a R W H 10-Feb-13 7:30 AM 13-Feb-13
Review and approval of QIL test report for Asphalt core sample for culvert BZRC-008
1222 RFI-5858-QCN-1-0815 RFI-5858-QCN-1-0815 CIVIL APPROVED Barzan Off-plot AREA B-V-3100-004-1-201-01_5 4.2.6 R R H 10-Feb-13 7:30 AM 10-Feb-13
(East side),BZRC-004 (East side), & BZRC-009 (Both side)
7:00 AM
Check Type-B filed density & layer thickness for Pipe Sleeper B70-PS-18: SLD018 to
1223 RFI-5858-QCN-1-0816 RFI-5858-QCN-1-0816 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 10-Feb-13 TO 10-Feb-13
SLD27 = 10 nos. 1,2nd layer
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD034,
1224 RFI-5858-QCN-1-0817 RFI-5858-QCN-1-0817 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 11-Feb-13 to 11-Feb-13
SLD035, SLD037 to SLD042 and SLD051 to SLD053 = 11 nos.
5:00 PM
7:00 AM
1225 Check type-B filed density & layer thickness for Retaining wall N- S. Panel - 9 west side Retaining Wall
RFI-5858-QCN-1-0818 RFI-5858-QCN-1-0818 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 11-Feb-13 to 11-Feb-13
1,2nd layer, Panel10 west side 1,2nd layer Raslaffan
5:00 PM
7:30
1227 Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
RFI-5858-QCN-1-0820 RFI-5858-QCN-1-0820 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 11-Feb-13 AM 13-Feb-13
SIDE. South side - 9,10,11th layer, North side-9,10,11th layer CULVERT
TO 4:30
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1229 RFI-5858-QCN-1-0822 RFI-5858-QCN-1-0822 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 12-Feb-13 TO 14-Feb-13
SIDE. 12,13th layer CULVERT
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1230 RFI-5858-QCN-1-0823 RFI-5858-QCN-1-0823 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 13-Feb-13 TO 14-Feb-13
SIDE. 14th,15th final layer CULVERT
4:30 AM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD054 to
1231 RFI-5858-QCN-1-0824 RFI-5858-QCN-1-0824 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 13-Feb-13 to 14-Feb-13
SLD064 = 10 nos - 1st layer
5:00 PM
1232 Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD0010 to
RFI-5858-QCN-1-0825 RFI-5858-QCN-1-0825 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 13-Feb-13 8:30 AM 14-Feb-13
SLD015 = 6 nos
7:00 AM
1233 Check type-B filed density & layer thickness for Retaining wall N- S. panel-9 west side- Retaining Wall
RFI-5858-QCN-1-0826 RFI-5858-QCN-1-0826 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 13-Feb-13 to 13-Feb-13
final layer, Panel-10-west side-final layer, Panel-10-east side-5th layer Raslaffan
5:00 PM
7:00 AM
1234 Check type-B filed density & layer thickness for Cast-in- Situ Pipe Track D110B70-PR-25: Crossing 44
RFI-5858-QCN-1-0827 RFI-5858-QCN-1-0827 CIVIL CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 13-Feb-13 to 13-Feb-13
F1 Raslaffan
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD054 to
1235 RFI-5858-QCN-1-0828 RFI-5858-QCN-1-0828 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 14-Feb-13 to 14-Feb-13
SLD064 = 10 nos
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 10 east side Retaining Wall
1236 RFI-5858-QCN-1-0829 RFI-5858-QCN-1-0829 CIVIL
6,7,8th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 14-Feb-13 to 16-Feb-13
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-25: F1. 1,2&3rd
1237 RFI-5858-QCN-1-0830 RFI-5858-QCN-1-0830 CIVIL
layer
APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 14-Feb-13 to 16-Feb-13
5:00 PM
Soil Compaction Test for Backfilling- Class B (Granular Material)MASHRAB CULVERT MASHRAB
1238 RFI-5858-QCN-1-0831 RFI-5858-QCN-1-0831 CIVIL
BZRC 003 - WEST SIDE - ROAD PORTION
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2b R W H 14-Feb-13 1:30 PM 16-Feb-13
Soil Compaction Test for Backfilling- Class AMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1239 RFI-5858-QCN-1-0832 RFI-5858-QCN-1-0832 CIVIL
SIDE - ROAD PORTION
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2b R W H 14-Feb-13 8:30 AM 16-Feb-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9:00 AM
Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -09
1241 RFI-5858-QCN-1-0834 RFI-5858-QCN-1-0834 CIVIL
SLD017,SLD018& SLD019
CANCELLED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 14-Feb-13 TO 14-Feb-13
4:30 PM
MASHRAB
Soil Compaction Test for Backfilling- Class A MASHRAB CULVERT BZRC 003 -
1242 RFI-5858-QCN-1-0835 RFI-5858-QCN-1-0835 CIVIL
WEST SIDE - ROAD PORTION. 15,16TH LAYER
APPROVED CULVERTCULVERT B-V-3100-004-1-201-01_5 4.2b R W H 15-Feb-13 8:30 AM 19-Feb-13
Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
1243 RFI-5858-QCN-1-0836 RFI-5858-QCN-1-0836 CIVIL
SIDE. Granular fill
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2b R W H 16-Feb-13 TO 16-Feb-13
4:30 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD054 to
1244 RFI-5858-QCN-1-0837 RFI-5858-QCN-1-0837 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Feb-13 to 16-Feb-13
SLD064 = 10 nos. 2nd layer
5:00 PM
7:00 AM
1247 Check type-A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD022,
RFI-5858-QCN-1-0840 RFI-5858-QCN-1-0840 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Feb-13 To 16-Feb-13
SLD043 and SLD058. 1st layer
5:00 PM
7:00 AM
1248 Check type - A filed density & Layer thickness for Pipe Sleeper B70-PS-22 SLD54 to
RFI-5858-QCN-1-0841 RFI-5858-QCN-1-0841 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Feb-13 to 16-Feb-13
SLD064 10 nos.
5:00 AM
7:00 AM
1249 Check type-B filed density & layer thickness for Retaining wall N- S. 10th panel, 9th final Retaining Wall
RFI-5858-QCN-1-0842 RFI-5858-QCN-1-0842 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 16-Feb-13 To 16-Feb-13
layer Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-25: F1. 4,5th
1250 RFI-5858-QCN-1-0843 RFI-5858-QCN-1-0843 CIVIL APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Feb-13 To 16-Feb-13
final layer
5:00 PM
6:00 AM
1251 RFI-5858-QCN-1-0844 RFI-5858-QCN-1-0844 CIVIL Check Compaction Test Type-B For Pipe Track Foundation D110-B70-PR-18: F12 CANCELLED Cr # 25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 16-Feb-13 To 16-Feb-13
5:00 PM
Retaining Wall
1252 RFI-5858-QCN-1-0845 RFI-5858-QCN-1-0845 CIVIL Check Excavation : Bottom verification:Retaining ditch blinding 30 meters length APPROVED B-V-3100-004-2-201-02_5 2.1 R W W 16-Feb-13 8:30 AM 16-Feb-13
Raslaffan
1254 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-16: SLD001 to
RFI-5858-QCN-1-0847 RFI-5858-QCN-1-0847 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_5 5.2 S W H 16-Feb-13 1:30 PM 16-Feb-13 Work not Ready for inspection
SLD063 = 63 nos
7:30 AM
1255 Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -09
RFI-5858-QCN-1-0848 RFI-5858-QCN-1-0848 CIVIL APPROVED Section 3 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 17-Feb-13 TO 19-Feb-13
SLD017,SLD018& SLD019. 1st final layer
4:30 PM
7:30 AM
1256 Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC 003 - WEST MASHRAB
RFI-5858-QCN-1-0849 RFI-5858-QCN-1-0849 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 17-Feb-13 to 19-Feb-13
SIDE. Final layer CULVERT
4:30 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD054 to
1257 RFI-5858-QCN-1-0850 RFI-5858-QCN-1-0850 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 17-Feb-13 to 19-Feb-13
SLD064 = 10 nos. Final layer
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD022,
1258 RFI-5858-QCN-1-0851 RFI-5858-QCN-1-0851 CIVIL
SLD043 and SLD058. 2nd layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 17-Feb-13 to 19-Feb-13
5:00 PM
7:00 AM
1259 RFI-5858-QCN-1-0852 RFI-5858-QCN-1-0852 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49. 1st layer APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 17-Feb-13 to 19-Feb-13
5:00 PM
7:00 AM
Retaining Wall
1260 RFI-5858-QCN-1-0853 RFI-5858-QCN-1-0853 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 17-Feb-13 to 17-Feb-13 Work not Ready for inspection
5:00 PM
Check Excavation : Bottom verification:Pipe Sleeper B70-PS-20: SLD037 to SLD047 = 11 Retaining Wall
1261 RFI-5858-QCN-1-0854 RFI-5858-QCN-1-0854 CIVIL
nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W W 17-Feb-13 1:30 PM 21-Feb-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
1262 RFI-5858-QCN-1-0855 RFI-5858-QCN-1-0855 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-25: F1 CANCELLED PR-25 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Feb-13 to 17-Feb-13 Work not Ready for inspection
5:00 PM
6:00 AM
Check Compaction Test Type-B For Pipe Track Foundation D110-B70-PR-18: F12 - 1st &
1266 RFI-5858-QCN-1-0859 RFI-5858-QCN-1-0859 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Feb-13 To 19-Feb-13
2nd layer
5:00 PM
6:00 AM
Check Compaction Test Type-B For pipe sleepers B70-PS-13: SLD38, SLD43, SLD53,
1267 RFI-5858-QCN-1-0860 RFI-5858-QCN-1-0860 CIVIL APPROVED section 4 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 17-Feb-13 To 19-Feb-13
SLD54. first panel layer
5:00 PM
1268 RFI-5858-QCN-1-0861 RFI-5858-QCN-1-0861 CIVIL Check bottom of excavation for Duct Bank BZDW 007 APPROVED Cr # 37 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W W 17-Feb-13 9:00 AM 21-Feb-13
7:00 AM
1269 Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD055 to
RFI-5858-QCN-1-0862 RFI-5858-QCN-1-0862 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Feb-13 to 18-Feb-13 RE-ISSUE
SLD064 = 10 nos
5:00 PM
7:00 AM
1270 Check type-A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD022,
RFI-5858-QCN-1-0863 RFI-5858-QCN-1-0863 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Feb-13 to 21-Feb-13
SLD043 and SLD058
5:00 PM
7:00 AM
1271 RFI-5858-QCN-1-0864 RFI-5858-QCN-1-0864 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Feb-13 to 21-Feb-13
5:00 PM
7:00 AM
Retaining Wall
1272 RFI-5858-QCN-1-0865 RFI-5858-QCN-1-0865 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 18-Feb-13 to 21-Feb-13
Raslaffan
5:00 PM
6:00 AM
Check Compaction Test Type-B For Pipe Track Foundation D110-B70-PR-18: F12 - Final
1273 RFI-5858-QCN-1-0866 RFI-5858-QCN-1-0866 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 18-Feb-13 To 21-Feb-13
layer
5:00 PM
1274 RFI-5858-QCN-1-0867 RFI-5858-QCN-1-0867 CIVIL Check bottom of excavation for pipe track foundation D110-B70-PR-18: F11 APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W H 18-Feb-13 10:30 AM 25-Feb-13
7:00 AM
1275 RFI-5858-QCN-1-0868 RFI-5858-QCN-1-0868 CIVIL Check compaction test type-A below blinding of Duct Bank BZDW 007 - East Side APPROVED Cr # 37 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Feb-13 To 21-Feb-13
4:30 PM
7:00 AM
1277 BZRC-09A
RFI-5858-QCN-1-0870 RFI-5858-QCN-1-0870 CIVIL Check type-B filed density & layer thickness for Culvert BZRC-09A ( North and South side APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 18-Feb-13 to 21-Feb-13
Raslaffan
5:00 PM
1282 RFI-5858-QCN-1-0875 RFI-5858-QCN-1-0875 CIVIL Check bottem excavation for culvert BZRC-005 APPROVED Cr # 23 Raslaffan B-V-3100-004-1-201-01_5 2.1 R W W 18-Feb-13 1:00 PM 21-Feb-13
7:00 AM
Check type-A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD022,
1283 RFI-5858-QCN-1-0876 RFI-5858-QCN-1-0876 CIVIL
SLD043 and SLD058. 5th, 6th layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 19-Feb-13 to 19-Feb-13
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
1284 RFI-5858-QCN-1-0877 RFI-5858-QCN-1-0877 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49. 4,5,6th layer APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 19-Feb-13 to 19-Feb-13
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. panel-11 east side Retaining Wall
1285 RFI-5858-QCN-1-0878 RFI-5858-QCN-1-0878 CIVIL
1,2nd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 19-Feb-13 to 19-Feb-13
5:00 PM
1:00 PM
Check type-B filed density & layer thickness for Cast-in- Situ Pipe Track D110B70-PR-25: Crossing 44
1286 RFI-5858-QCN-1-0879 RFI-5858-QCN-1-0879 CIVIL
F2 and F3
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 19-Feb-13 to 19-Feb-13 Work not Ready for inspection
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Culvert BZRC-09A ( North and South side BZRC-09A
1287 RFI-5858-QCN-1-0880 RFI-5858-QCN-1-0880 CIVIL
and End Wall ). 4,5,6th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 19-Feb-13 to 19-Feb-13
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD022,
1289 RFI-5858-QCN-1-0882 RFI-5858-QCN-1-0882 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 20-Feb-13 to 21-Feb-13
SLD043 and SLD058. final layer
5:00 PM
7:00 AM
1290 RFI-5858-QCN-1-0883 RFI-5858-QCN-1-0883 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49. 7th layer APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 20-Feb-13 to 21-Feb-13
5:00 PM
7:00 AM
1291 Retaining Wall
RFI-5858-QCN-1-0884 RFI-5858-QCN-1-0884 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 20-Feb-13 to 20-Feb-13 Work not Ready for inspection
Raslaffan
5:00 PM
7:00 AM
1292 Check type-B filed density & layer thickness for Cast-in- Situ Pipe Track D110B70-PR-25: Crossing 44
RFI-5858-QCN-1-0885 RFI-5858-QCN-1-0885 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 20-Feb-13 to 21-Feb-13
F2 and F3. 1,2nd layer Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Culvert BZRC-09A ( North and South side BZRC-09A
1294 RFI-5858-QCN-1-0887 RFI-5858-QCN-1-0887 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 20-Feb-13 to 23-Feb-13
and End Wall ). 7,8,9,10TH LAYER Raslaffan
5:00 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49. FINAL
1296 RFI-5858-QCN-1-0890 RFI-5858-QCN-1-0890 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 21-Feb-13 to 23-Feb-13
LAYER
5:00 PM
1298 Check final visual inspection for pipe track foundations D110-B70-PR-18: F16, F15, F14,
RFI-5858-QCN-1-0892 RFI-5858-QCN-1-0892 CIVIL APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 5.2 S W H 18-Feb-13 8:30 AM 18-Feb-13
F13, F10, F8
1299 RFI-5858-QCN-1-0893 RFI-5858-QCN-1-0893 CIVIL Check Excavation : Bottom verification:Pipe Stopper D110-B70-PR-69: APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 2.1 R W H 21-Feb-13 1:30 PM 21-Feb-13
7:00 AM
1300 Check type-B filed density & layer thickness for Cast-in- Situ Pipe Track D110B70-PR-25: Crossing 44
RFI-5858-QCN-1-0894 RFI-5858-QCN-1-0894 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 21-Feb-13 to 23-Feb-13
F2 and F3. 3,4,5th layer Raslaffan
5:00 PM
7:00 AM
BZRC-09A
1301 RFI-5858-QCN-1-0895 RFI-5858-QCN-1-0895 CIVIL Check Type B filed density & layer thickness for Culvert BZRC-09A. 11,12,13th layer APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 21-Feb-13 to 23-Feb-13
Raslaffan
11:30 AM
BZRC-09A
1302 RFI-5858-QCN-1-0896 RFI-5858-QCN-1-0896 CIVIL Check Granular Material class B filed density & layer thickness for Culvert BZRC-09A APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 21-Feb-13 9:30 AM 21-Feb-13
Review and approval of QIL test report for Back fill Material ( Type-A) for the sampled Barzan Off-plot
1303 RFI-5858-QCN-1-0897 RFI-5858-QCN-1-0897 CIVIL
location Section-7 - Stockpile #1 and Section-3 - Stockpile #4
APPROVED
BARZAN
B-V-3100-004-1-201-01_5 3.1.a R W H 21-Feb-13 7:30AM 21-Feb-13
7:00 AM
1304 RFI-5858-QCN-1-0898 RFI-5858-QCN-1-0898 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-49 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 23-Feb-13 to 23-Feb-13 cancelled reissued
5:00 PM
7:00 AM
Retaining Wall
1306 RFI-5858-QCN-1-0900 RFI-5858-QCN-1-0900 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 23-Feb-13 to 25-Feb-13
Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Cast-in- Situ Pipe Track D110B70-PR-25: Crossing 44
1307 RFI-5858-QCN-1-0901 RFI-5858-QCN-1-0901 CIVIL
F2 and F3. FINAL LAYER
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 23-Feb-13 to 24-Feb-13
5:00 PM
7:30 PM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
1308 RFI-5858-QCN-1-0902 RFI-5858-QCN-1-0902 CIVIL
SIDE 2nd &3rd BASE & WALL (15m&7.5 M PORTION ). 1,2,3rd Layer
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 23-Feb-13 to 25-Feb-13
4:30 PM
6:00 AM
Check Compaction Test Type-B For pipe sleepers B70-PS-15: SLDSLD074, SLD075, section 5 ( East side
1309 RFI-5858-QCN-1-0903 RFI-5858-QCN-1-0903 CIVIL
SLD076. 1st and final layer
APPROVED
of Halul) Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 23-Feb-13 To 24-Feb-13
5:00 PM
Barzan Off-plot
1310 RFI-5858-QCN-1-0904 RFI-5858-QCN-1-0904 CIVIL Sampling for Excavated Material Type-B AT SAMPLE Location Section -7, stock pile # 2 APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 23-Feb-13 8:00AM 23-Feb-13
Section 7
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. panel 13 east Retaining Wall
1312 RFI-5858-QCN-1-0906 RFI-5858-QCN-1-0906 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 24-Feb-13 to 24-Feb-13
side1,2nd layer, panel -11 east side 5,6th layer Raslaffan
5:00 PM
7:30 AM
1313 Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
RFI5858-QCN-1-0907 RFI5858-QCN-1-0907 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 24-Feb-13 TO 24-Feb-13
SIDE 2nd &3rd BASE & WALL (15m&7.5 M PORTION ). 4,5&6th layer
4:30 PM
1315 Check Excavation : Bottom verification:Pipe Sleeper B70-PS-23: SLD014 and Pipe
RFI-5858-QCN-1-0909 RFI-5858-QCN-1-0909 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 2.1 R W H 25-Feb-13 1:40 PM 1-Mar-13
Sleeper B70-PS-24: SLD021 to SLD030 = 10 nos
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-11-east side Retaining Wall
1316 RFI-5858-QCN-1-0910 RFI-5858-QCN-1-0910 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 25-Feb-13 to 27-Feb-13
7,8th laye, Panel-12-east side 5,6th layer Raslaffan
5:00 PM
Crossing 44
1317 RFI-5858-QCN-1-0911 RFI-5858-QCN-1-0911 CIVIL Check Excavation : Bottom verification:Pipe Track D110-B70-PR-25: F4 APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 25-Feb-13 1:30 PM 1-Mar-13
Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
1318 RFI-5858-QCN-1-0912 RFI-5858-QCN-1-0912 CIVIL CANCELLED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2.b R W H 25-Feb-13 to 25-Feb-13 CANCELLED DUE TO ERECTION OF CULVERT COVER SLAB
SIDE 2nd &3rd BASE & WALL (15m&7.5 M PORTION )
4:30 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-11-east side Retaining Wall
1319 RFI-5858-QCN-1-0913 RFI-5858-QCN-1-0913 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 26-Feb-13 to 26-Feb-13
9,10th layer, Panel-12-east side 7,8th layer Raslaffan
5:00 PM
1320 Check scarifying ( subgrade preparation) prior filling of type B for pipe sleepers B70-PS- Tank Farm
RFI-5858-QCN-1-0914 RFI-5858-QCN-1-0914 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.1 S W H 26-Feb-13 9:00 AM 26-Feb-13
26: SLD017 to SLD080 Raslaffan
7:30 AM
1321 Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
RFI-5858-QCN-1-0915 RFI-5858-QCN-1-0915 CIVIL CANCELLED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 26-Feb-13 TO 26-Feb-13 CANCELLED DUE TO ERRECTION OF PIPING
SIDE 2nd &3rd BASE & WALL (15m&7.5 M PORTION )
4:30 PM
7:00 AM
1322 Check type-B filed density & layer thickness for Retaining wall N- S. panel-13 east side Retaining Wall
RFI-5858-QCN-1-0916 RFI-5858-QCN-1-0916 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 27-Feb-13 to 2-Mar-13
3,4,5th layer. Panel-12 east side 9,10th layer. Panel -11 east side 11th layer Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-12 east side Retaining Wall
1325 RFI-5858-QCN-1-0919 RFI-5858-QCN-1-0919 CIVIL
11th layer, Panel-13 east side 6,7,8,9th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 28-Feb-13 to 2-Mar-13
5:00 PM
Check Excavation-Bottom of Excavation verification CULVERT BZRC 003 EAST SIDE SECTION - 1
1326 RFI-5858-QCN-1-0920 RFI-5858-QCN-1-0920 CIVIL
PORTION
APPROVED
Raslaffan
B-V-3100-004-1-201-02_5 2.2 R W H 28-Feb-13 3:00 PM 2-Mar-13
section 4 & 5
1327 RFI-5858-QCN-1-0921 RFI-5858-QCN-1-0921 CIVIL Check final elevations for pipe sleepers B70-PS-15: SLD074 To SLD076 APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 5.1 R W H 28-Feb-13 7:30 AM 5-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
section 4 & 5
1328 RFI-5858-QCN-1-0922 RFI-5858-QCN-1-0922 CIVIL Check final visual inspection for pipe sleepers B70-PS-15: SLD074 To SLD076 APPROVED B-V-3100-004-1-201-01_5 5.1 R W H 28-Feb-13 7:30 AM 28-Feb-13
Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
1329 RFI-5858-QCN-1-0923 RFI-5858-QCN-1-0923 CIVIL
SIDE 2nd &3rd BASE & WALL (15m&7.5 M PORTION ). 7th layer
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 28-Feb-13 TO 28-Feb-13
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
1331 RFI-5858-QCN-1-0925 RFI-5858-QCN-1-0925 CIVIL
SIDE END & WALL (2.8 M PORTION ). 1,2,3rd layer
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 2-Mar-13 TO 4-Mar-13
4:30 PM
Check Excavation : Bottom verification:Retaining wall blinding for ditch 9th, 10th and 11th Retaining N- S
1332 RFI-5858-QCN-1-0926 RFI-5858-QCN-1-0926 CIVIL APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 2-Mar-13 1:30 PM 15-Mar-13
panel Raslaffan
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel-2,3,4,5 east Retaining Wall
1333 RFI-5858-QCN-1-0927 RFI-5858-QCN-1-0927 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 2-Mar-13 To 4-Mar-13
side of ditch 1st layer. Panel-13 east side 10,11th layer Raslaffan
5:00 PM
Review and approval of QIL test report for Back fill Material ( Type-B) for the sampled Barzan Off-plot
1334 RFI-5858-QCN-1-0928 RFI-5858-QCN-1-0928 CIVIL APPROVED B-V-3100-004-1-201-01_4 3.1.b R W H 2-Mar-13 7:30AM 2-Mar-13
location Section-7 - Stockpile #2 BARZAN
7:00 AM
1335 RFI-5858-QCN-1-0929 RFI-5858-QCN-1-0929 CIVIL Check compaction test type - B for halul culvert road crossing BZRC-008. 1,2nd layer APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 2-Mar-13 To 4-Mar-13
5:00 PM
7:30 PM
1336 RFI-5858-QCN-1-0930 RFI-5858-QCN-1-0930 CIVIL Check compaction test type B for hulul culvert Road crossing BZRC-008 CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 28-Feb-13 to 1-Mar-13 cancelled work not ready
5:00 PM
7:00 AM
1337 Check type-B filed density & layer thickness for Retaining wall N- S. Panel-13 east side Retaining Wall
RFI-5858-QCN-1-0931 RFI-5858-QCN-1-0931 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 3-Mar-13 to 5-Mar-13
12th layer, Panel-6 east side of ditch 1st layer Raslaffan
5:00 PM
1:00 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD006 to
1338 RFI-5858-QCN-1-0932 RFI-5858-QCN-1-0932 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 3-Mar-13 to 3-Mar-13
SLD017 = 12 nos. 1st layer
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BHAMLA CULVERT BZRC 004 - FROM WEST
1339 RFI-5858-QCN-1-0933 RFI-5858-QCN-1-0933 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 3-Mar-13 to 3-Mar-13
SIDE BASE & WALL. 8,9,10th layer
4:30 PM
7:00 AM
1340 RFI-5858-QCN-1-0934 RFI-5858-QCN-1-0934 CIVIL Check compaction test type - B for halul culvert road crossing BZRC-008. 3&4th layer APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 3-Mar-13 To 5-Mar-13
5:00 PM
7:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -05 SECTION - 1
1341 RFI-5858-QCN-1-0935 RFI-5858-QCN-1-0935 CIVIL CANCELLED B-V-3100-004-2-201-01_5 4.2b R W H 3-Mar-13 to 3-Mar-13 cancelled work not ready
SLD003,SLD004 & SLD005 Raslaffan
4:30 PM
7:00 AM
1342 Check compaction test type - B for halul culvert road crossing BZRC-008. 5,6th layer
RFI-5858-QCN-1-0936 RFI-5858-QCN-1-0936 CIVIL APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 4-Mar-13 To 6-Mar-13
south of base wall, 1,2nd layer north of base wall
5:00 PM
7:30 AM
1343 Soil Compaction Test for Backfilling Type B HAMLA CULVERT BZRC 004 -FROM WEST HAMALA CULVERT
RFI-5858-QCN-1-0937 RFI-5858-QCN-1-0937 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 4-Mar-13 To 6-Mar-13
SIDE BASE & WALL. 11,12th layer AREA
4:30 PM
7:00 AM
1344 Check type-B filed density & layer thickness for Retaining wall N- S. panel 2 to 6 east side Retaining Wall
RFI-5858-QCN-1-0938 RFI-5858-QCN-1-0938 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 4-Mar-13 to 6-Mar-13
of pitch 2nd layer Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD006 to
1345 RFI-5858-QCN-1-0939 RFI-5858-QCN-1-0939 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 4-Mar-13 to 6-Mar-13
SLD017 = 12 nos. 2nd layer
5:00 PM
Check compaction test for grading as below details - Excavated Materials - type B: B70- 7:00 AM
Tank Farm ( Area 1)
1346 RFI-5858-QCN-1-0940 RFI-5858-QCN-1-0940 CIVIL PS-25: SLD001, SLD002 & B70-PS-26: SLD071 To SLD092 - 1st layer ( final) - CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 4-Mar-13 To 4-Mar-13 cancelled technicians absent
Purchased Materials - type A: B70-PS-26: SLD023 to SLD071. 1st layer 5:00 PM
Check final elevations for pipe track foundations D110-B70-PR-18: F16, F15, F14, F13,
1347 RFI-5858-QCN-1-0941 RFI-5858-QCN-1-0941 CIVIL
F10, F8
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 5.1 R W H 4-Mar-13 8:30 AM 7-Mar-13
Check final visual inspection for pipe track foundations D110-B70-PR-18: F16, F15, F14,
1348 RFI-5858-QCN-1-0942 RFI-5858-QCN-1-0942 CIVIL
F13, F10 & F8
APPROVED Cr # 29 Raslaffan B-V-3100-004-1-201-01_5 5.2 R W H 4-Mar-13 8:30 AM 4-Mar-13
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD006 to
1350 RFI-5858-QCN-1-0944 RFI-5858-QCN-1-0944 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 5-Mar-13 to 5-Mar-13 cancelled work not ready
SLD017 = 12 nos.
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel 7,8 east side of Retaining Wall
1351 RFI-5858-QCN-1-0945 RFI-5858-QCN-1-0945 CIVIL
detch a lba 1st layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 5-Mar-13 to 7-Mar-13
5:00 PM
Check final elevations for pipe sleepers B70-PS-12: SLD001 To SLD011, B70-PS-13: section 4 & 5
1352 RFI-5858-QCN-1-0946 RFI-5858-QCN-1-0946 CIVIL
SLD038 To SLD054,
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 5.1 R W H 5-Mar-13 4:30 PM 11-Mar-13
Check final visual inspection for pipe sleepers B70-PS-12: SLD001 To SLD011, B70-PS- section 4 & 5
1353 RFI-5858-QCN-1-0947 RFI-5858-QCN-1-0947 CIVIL
13: SLD038 To SLD054,
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 5.1 R W H 5-Mar-13 4:00 PM 9-Mar-13
7:00 AM
Check compaction test type - B for halul culvert road crossing BZRC-008. 9,8th layer-
1354 RFI-5858-QCN-1-0948 RFI-5858-QCN-1-0948 CIVIL APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 5-Mar-13 To 7-Mar-13
south side of base work, 3rd layer north side of base work
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B & Class B, HAMLA CULVERT BZRC 004 -
1356 RFI-5858-QCN-1-0950 RFI-5858-QCN-1-0950 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 5-Mar-13 to 9-Mar-13
FROM WEST SIDE BASE & WALL. Type-B 13th layer, Class-B, 1st lsyer
4:30 PM
Check compaction test for grading as below details - Excavated Materials - type B: B70- 7:00 AM
1357 Tank Farm ( Area 1)
RFI-5858-QCN-1-0951 RFI-5858-QCN-1-0951 CIVIL PS-25: SLD001, SLD002 & B70-PS-26: SLD071 To SLD092 - 1st layer ( final) - CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 5-Mar-13 To 5-Mar-13 cancelled technicians absent
Raslaffan
Purchased Materials - type A: B70-PS-26: SLD023 to SLD071 5:00 PM
6:30 AM
1358 RFI-5858-QCN-1-0952 RFI-5858-QCN-1-0952 CIVIL Check Compaction test type B for halul culvert road Crossing BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 8-Mar-13 to 11-Mar-13
5:00 PM
7:30 AM
1359 Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - FROM
RFI-5858-QCN-1-0953 RFI-5858-QCN-1-0953 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 7-Mar-13 to 11-Mar-13
WEST SIDE END PORTION
4:30 PM
9:30 AM
Soil Compaction Test for Backfilling- Class B (Road Portion)HAMLA CULVERT BZRC
1360 RFI-5858-QCN-1-0954 RFI-5858-QCN-1-0954 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 6-Mar-13 TO 9-Mar-13
004 - FROM WEST SIDE. 2nd layer
4:30 PM
6:30 AM
Check compaction test type - B for halul culvert road crossing BZRC-008. North side of
1361 RFI-5858-QCN-1-0955 RFI-5858-QCN-1-0955 CIVIL APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 6-Mar-13 To 9-Mar-13
base wall 4,5,6&7th layer, South side of base wall 10,11th layer
5:30 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD001 to
1362 RFI-5858-QCN-1-0956 RFI-5858-QCN-1-0956 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 6-Mar-13 to 9-Mar-13
SLD003 = 3 nos and SLD006 to SLD017 = 12 nos. final layer
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Retaining wall N- S. Panel ,2,3,4,5 east Retaining Wall
1363 RFI-5858-QCN-1-0957 RFI-5858-QCN-1-0957 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 6-Mar-13 to 6-Mar-13
side of pitch final layer. Panel 7 & 8, 2nd layer Raslaffan
5:00 PM
8:00 AM
1364 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-25: F4. 1 & 2nd
RFI-5858-QCN-1-0958 RFI-5858-QCN-1-0958 CIVIL APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 6-Mar-13 to 9-Mar-13
layer
5:00 PM
Check compaction test for grading/filling as below details - Excavated Materials - type B:
1365 Tank Farm ( Area 1)
RFI-5858-QCN-1-0959 RFI-5858-QCN-1-0959 CIVIL B70-PS-25: SLD001, SLD002 & B70-PS-26: SLD071 To SLD092 - 1st layer ( final) - APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 6-Mar-13 7:00 AM 9-Mar-13
Raslaffan
Purchased Materials - type A: B70-PS-26: SLD023 to SLD071. 1st layer
BZRC-009A
1367 RFI-5858-QCN-1-0961 RFI-5858-QCN-1-0961 CIVIL Check Excavation : Bottom of excavation verification:BZRC-09A East side CANCELLED B-V-3100-004-2-201-02_5 2.1 R W H 7-Mar-13 4:30 PM 7-Mar-13 cancelled
Raslaffan
7:00 AM
Retaining Wall
1368 RFI-5858-QCN-1-0962 RFI-5858-QCN-1-0962 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.b R W H 7-Mar-13 to 7-Mar-13 cancelled work not ready
5:00 PM
7:00 AM
1369 RFI-5858-QCN-1-0963 RFI-5858-QCN-1-0963 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-25: F4 APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 7-Mar-13 to 10-Mar-13
5:00 PM
6:30 AM
1370 RFI-5858-QCN-1-0964 RFI-5858-QCN-1-0964 CIVIL Check compaction test type - B for halul culvert road crossing BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 7-Mar-13 To 11-Mar-13
5:30 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD001 to 7:00 AM
1371 RFI-5858-QCN-1-0965 RFI-5858-QCN-1-0965 CIVIL SLD003 = 3 nos and SLD006 to SLD017 = 12 nos B70-PS-23 : SLD010 to SLD019 = 10 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 7-Mar-13 to 11-Mar-13
nos 5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for Backfilling- Class B (Granular material)HAMLA CULVERT BZRC
1372 RFI-5858-QCN-1-0966 RFI-5858-QCN-1-0966 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 7-Mar-13 7:30 AM 11-Mar-13
004 - WEST SIDE ROAD PORTION
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
1373 RFI-5858-QCN-1-0967 RFI-5858-QCN-1-0967 CIVIL
END PORTION
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 9-Mar-2013 7:30 AM 11-Mar-13
Check Excavation-Bottom of Excavation verification HIGH MAST LIGHT POLE SOUTH SECTION 3
1374 RFI-5858-QCN-1-0968 RFI-5858-QCN-1-0968 CIVIL
SIDE OF CULVERT BZRC 004
APPROVED
RASLAFFAN
B-V-3100-004-1-201-01_5 2.2 R W H 7-Mar-13 8:00 PM 7-Mar-13
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD001 to 7:00 AM
1375 RFI-5858-QCN-1-0969 RFI-5858-QCN-1-0969 CIVIL SLD003 = 3 nos and SLD006 to SLD017 = 12 nos B70-PS-23 : SLD010 to SLD019 = 10 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 9-Mar-2013 to 12-Mar-13
nos and SLD002 to SLD009 = 8 nos. 5:00 PM
BZRC-009A
1376 RFI-5858-QCN-1-0970 RFI-5858-QCN-1-0970 CIVIL Check Excavation : Bottom of excavation verification:BZRC-09A East side APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 9-Mar-2013 8:00 AM 12-Mar-13
Raslaffan
7:00 AM
Retaining Wall
1377 RFI-5858-QCN-1-0971 RFI-5858-QCN-1-0971 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 9-Mar-2013 to 9-Mar-13 cancelled work not ready
Raslaffan
5:00 PM
Check compaction test for halul culvert road crossing BZRC-008 Type - B : west side Sub 6:00 AM
1378 RFI-5858-QCN-1-0972 RFI-5858-QCN-1-0972 CIVIL base 2 layers granular class A (250 mm per layer) - ( below asphalt) Sub base 1 layer APPROVED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 9-Mar-2013 To 12-Mar-13
granular class B (200 mm) - ( below asphalt) 5:30 PM
1379 Soil Compaction Test for Formation level prior to blinding - Type A D110 B70 - PR -16
RFI-5858-QCN-1-0973 RFI-5858-QCN-1-0973 CIVIL APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_5 4.2b R W H 9-Mar-2013 7:30 AM 11-Mar-13
Pipe Rack Foundation 2(F2)
1380 Check Excavation-Bottom of Excavation verification D110 B70 PR 16 Pipe Rack SECTION - 1 PR -16
RFI-5858-QCN-1-0974 RFI-5858-QCN-1-0974 CIVIL APPROVED B-V-3100-004-2-201-01_5 4.2a R W H 9-Mar-2013 1:30 PM 9-Mar-13
Foundation 2(F2),3(F3)&4(F4) Raslaffan
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-23: SLD002 to 7:00 AM
1381 RFI-5858-QCN-1-0975 RFI-5858-QCN-1-0975 CIVIL SLD0221 = 20 nos except SLD014 and B70-PS-24: SLD001 to SLD003 = 3 nos, SLD019 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 10-Mar-13 to 12-Mar-13
to SLDSLD030 = 12 nos 5:00 PM
6:00 AM
Check compaction test type-B for halul culvert road crossing BZRC-008 (Purchased
1382 RFI-5858-QCN-1-0976 RFI-5858-QCN-1-0976 CIVIL CANCELLED Cr # 38 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 10-Mar-13 To 10-Mar-13 cancelled reissued RFI
Materials)
5:30 PM
7:00 AM
Retaining Wall
1383 RFI-5858-QCN-1-0977 RFI-5858-QCN-1-0977 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 10-Mar-13 to 12-Mar-13
Raslaffan
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
1384 RFI-5858-QCN-1-0978 RFI-5858-QCN-1-0978 CIVIL CANCELLED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 10-Mar-13 to 10-Mar-13 cancelled work not ready
END PORTION
4:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-23: SLD002 to
1385 RFI-5858-QCN-1-0979 RFI-5858-QCN-1-0979 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 11-Mar-13 to 12-Mar-13
SLD013 = 12 nos except SLD014 and B70-PS-24: SLD019 to SLDSLD030 = 12 nos
5:00 PM
7:00 AM
1386 Retaining Wall
RFI-5858-QCN-1-0980 RFI-5858-QCN-1-0980 CIVIL Check type-B filed density & layer thickness for Retaining wall N- S CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 11-Mar-13 to 11-Mar-13
Raslaffan
5:00 PM
7:00 AM
1387 Check compaction test for grading/filling as below details - Purchased Materials - type A: Tank Farm ( Area 1)
RFI-5858-QCN-1-0981 RFI-5858-QCN-1-0981 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 11-Mar-13 To 12-Mar-13
B70-PS-26: SLD017 to SLD071 (access road + barzan corridor) Raslaffan
4:00 PM
7:00 AM
1389 RFI-5858-QCN-1-0983 RFI-5858-QCN-1-0983 CIVIL Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -07 SLD083 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_5 4.2b R W H 11-Mar-13 To 12-Mar-13
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
1390 RFI-5858-QCN-1-0984 RFI-5858-QCN-1-0984 CIVIL
END PORTION
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 11-Mar-13 TO 12-Mar-13
4:30 PM
Soil Compaction Test for Formation level prior to blinding - Type A D110 B70 - PR -16
1391 RFI-5858-QCN-1-0985 RFI-5858-QCN-1-0985 CIVIL
Pipe Rack Foundation 3(F3)-Prior to blinding
APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_4 4.2.b R W H 11-Mar-13 7:30 AM 12-Mar-13
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
1392 RFI-5858-QCN-1-0986 RFI-5858-QCN-1-0986 CIVIL
END PORTION
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 12-Mar-13 TO 15-Mar-13
4:30 AM
EAST SIDE OF
1393 RFI-5858-QCN-1-0987 RFI-5858-QCN-1-0987 CIVIL Soil Compaction Test for formation level prior to blinding - Type A DUCT BANK BZDW 004 APPROVED
MASHRAB CULVERT
B-V-3100-004-1-201-01_5 4.2a R W H 12-Mar-13 7:30 AM 15-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD019 to
1394 RFI-5858-QCN-1-0988 RFI-5858-QCN-1-0988 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 12-Mar-13 to 15-Mar-13
SLD030 = 12 nos
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD009 to
1395 RFI-5858-QCN-1-0989 RFI-5858-QCN-1-0989 CIVIL
SLD018 = 10 nos
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 12-Mar-13 to 15-Mar-13
5:00 PM
Retaining Wall N- S
1396 RFI-5858-QCN-1-0990 RFI-5858-QCN-1-0990 CIVIL Check Excavation : Bottom of excavation verification:Retaining Wall N- S APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W H 12-Mar-13 2:00 PM 15-Mar-13
D110-B70-PR-26
1397 RFI-5858-QCN-1-0991 RFI-5858-QCN-1-0991 CIVIL Check Excavation : Bottom of excavation verification:D110-B70-PR-26 APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W H 12-Mar-13 1:30 PM 15-Mar-13
EAST SIDE OF
1399 RFI-5858-QCN-1-0993 RFI-5858-QCN-1-0993 CIVIL Check Excavation-Bottom of Excavation verification DUCT BANK BZDW 004 APPROVED B-V-3100-004-1-201-02_5 2.2 R W H 12-Mar-13 8:00 AM 12-Mar-13
MASHRAB CULVERT
9:30 AM
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70 - PS -05 SECTION - 1
1400 RFI-5858-QCN-1-0994 RFI-5858-QCN-1-0994 CIVIL APPROVED B-V-3100-004-2-201-01_5 4.2b R W H 12-Mar-13 TO 15-Mar-13
SLD003,SLD004 & SLD005 RASLAFFAN
4:30 AM
7:30 AM
1401 Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
RFI-5858-QCN-1-0995 RFI-5858-QCN-1-0995 CIVIL APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 13-Mar-13 TO 15-Mar-13
END PORTION
4:30 PM
7:00 AM
1402 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: SLD019 to
RFI-5858-QCN-1-0996 RFI-5858-QCN-1-0996 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 13-Mar-13 to 15-Mar-13
SLD030 = 12 nos and Pipe Stopper SLD018
5:00 PM
7:00 AM
1403 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD009 to
RFI-5858-QCN-1-0997 RFI-5858-QCN-1-0997 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 13-Mar-13 to 15-Mar-13
SLD018 = 10 nos and SLD037 to SLD049 = 13 nos
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
7:00 AM
B70-PS-26: SLD017 to SLD050 & B70-PS-27: SLD030 to SLD042 (access road + barzan Tank Farm ( Area 1)
1404 RFI-5858-QCN-1-0998 RFI-5858-QCN-1-0998 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 13-Mar-13 To 17-Mar-13
corridor). B70-PS-26: SLD 17 to SLD 050 (corrider) 3rd layer & final layer. B70-PS-27: Raslaffan
4:00 PM
SLD 030 to SLD 042 (acces road) 1st layer (corrider) 1.2nd layer
7:00 AM
1405 RFI-5858-QCN-1-0999 RFI-5858-QCN-1-0999 CIVIL Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: 1st & 2nd Layer APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 14-Mar-13 to 14-Mar-13
5:00 PM
7:00 AM
1406 RFI-5858-QCN-1-1000 RFI-5858-QCN-1-1000 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-32 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 14-Mar-13 to 14-Mar-13
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH HAMAD CULVERT
1407 RFI-5858-QCN-1-1001 RFI-5858-QCN-1-1001 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 14-Mar-13 TO 15-Mar-13
SIDE PORTION OF HAMAD ROAD Rasllafan
4:30 PM
7:00 AM
1408 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD019 to Section - 6
RFI-5858-QCN-1-1002 RFI-5858-QCN-1-1002 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 14-Mar-13 to 14-Mar-13
SLD024 = 6 nos 1st Layer Raslaffan
5:00 PM
7:00 AM
1409 Soil Compaction Test for Backfilling - Type - B HAMAD CULVERT BZRC - 005 OUTH HAMAD CULVERT
RFI-5858-QCN-1-1003 RFI-5858-QCN-1-1003 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.b R W H 15-Mar-13 TO 18-Mar-13
SIDE PORTION OF HAMAD ROAD 4,5 & 6th layer RASLAFFAN AREA
3:00 PM
7:30 AM
1410 Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH HAMAD CULVERT
RFI-5858-QCN-1-1004 RFI-5858-QCN-1-1004 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 16-Mar-13 TO 18-Mar-13
SIDE PORTION OF HAMAD ROAD, 7th & 8th layer Rasllafan
4:30 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-24: and Pipe 7:00 AM
1411 RFI-5858-QCN-1-1005 RFI-5858-QCN-1-1005 CIVIL Stopper SLD018 - 4th & 5th final layer, and B70-PS-23: SLD014 ( Pipe Stopper )-3,4,5th APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Mar-13 to 18-Mar-13
layer 5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD019 to
1412 RFI-5858-QCN-1-1006 RFI-5858-QCN-1-1006 CIVIL
SLD024 = 6 nos-final layer, and SLD037 to SLD049 = 13 nos-1st layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Mar-13 to 18-Mar-13
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
7:00 AM
B70-PS-27: SLD002 to SLD042 (access road + barzan corridor).B70-PS-27: SLD030 to Tank Farm ( Area 1)
1413 RFI-5858-QCN-1-1007 RFI-5858-QCN-1-1007 CIVIL
SLD042 coridor area 3rd layer, B70-PS-27: SLD030 to SLD042 accept road 2nd final
APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.a R W H 16-Mar-13 To 18-Mar-13
4:00 PM
layer, B70-PS-26: SLD 004 to SLD009 corridor area 1st layer
Check scarifying for subgrade B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to Tank Farm (Area 2
1414 RFI-5858-QCN-1-1008 RFI-5858-QCN-1-1008 CIVIL
SLD087
CANCELLED
phase 1) Raslaffan
B-V-3100-004-1-201-01_5 4.1 S W H 16-Mar-13 7:00 AM 16-Mar-13
Oqda culvert
1415 RFI-5858-QCN-1-1009 RFI-5858-QCN-1-1009 CIVIL Check bottom of excavation verification for Oqda culvert BZRC-012 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_5 2.1 R W H 16-Mar-13 9:00 AM 16-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check bottom of excavation verification for pipe sleepers & PS-26: SLD043 to SLD071 = Tank Farm ( Area 1)
1416 RFI-5858-QCN-1-1010 RFI-5858-QCN-1-1010 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 16-Mar-13 9:00 AM 16-Mar-13
total 23 nos. B X CGPT SLD-047, 048, 049, 056, 64, 65 Raslaffan
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-32, 1ST & 2nd
1417 RFI-5858-QCN-1-1011 RFI-5858-QCN-1-1011 CIVIL
layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 16-Mar-13 to 18-Mar-13
5:00 PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-17: SLD064, Section 5 and
1418 RFI-5858-QCN-1-1012 RFI-5858-QCN-1-1012 CIVIL
SLD065 and SLD070 = 3 nos and B70-PS-19: SLD007 to SLD010 = 4 nos
APPROVED
Section 6 Raslaffan
B-V-3100-004-2-201-02_5 2.1 R W H 16-Mar-13 2:00 PM 18-Mar-13
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-32. 3rd & 4th
1419 RFI-5858-QCN-1-1013 RFI-5858-QCN-1-1013 CIVIL
layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 17-Mar-13 to 18-Mar-13
5:00 PM
7:00 AM
Check compaction test for grading/filling as below details - Purchased Materials - type A: Tank Farm ( Area 1)
1420 RFI-5858-QCN-1-1014 RFI-5858-QCN-1-1014 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 17-Mar-13 To 18-Mar-13
B70-PS-27: SLD0021 to SLD030 (access road + barzan corridor) 1st layer Raslaffan
4:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD001 to
1421 RFI-5858-QCN-1-1015 RFI-5858-QCN-1-1015 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 17-Mar-13 to 17-Mar-13
SLD006 = 6 nos and B70-PS-20: SLD037 to SLD049 = 13 nos.
5:00 PM
Oqda culvert
1422 RFI-5858-QCN-1-1016 RFI-5858-QCN-1-1016 CIVIL Check bottom of excavation verification for Oqda culvert BZRC-012 CANCELLED B-V-3100-004-1-201-01_5 2.1 R W H 17-Mar-13 1:30 PM 17-Mar-13 Not ready for inspection
Raslaffan
7:30 AM
1423 Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH
RFI-5858-QCN-1-1017 RFI-5858-QCN-1-1017 CIVIL APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_5 4.2b R W H 17-Mar-13 TO 17-Mar-13
SIDE PORTION OF HAMAD ROAD 9,10,11th layer
4:30 PM
1424 SECTION - 2
RFI-5858-QCN-1-1018 RFI-5858-QCN-1-1018 CIVIL Check final Elevations of Grading Sleeper Foundations B70 - PS -07 SLD083 APPROVED B-V-3100-004-1-201-02_5 5.1 R W H 17-Mar-13 8:00 AM 20-Mar-13
Rasllafan
1425 SECTION - 2
RFI-5858-QCN-1-1019 RFI-5858-QCN-1-1019 CIVIL Check final Visual Inspection Sleeper Foundations B70 - PS -07 SLD083 APPROVED B-V-3100-004-1-201-02_5 5.2 R W H 17-Mar-13 8:20 AM 17-Mar-13
Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH HAMAD CULVERT
1426 RFI-5858-QCN-1-1020 RFI-5858-QCN-1-1020 CIVIL APPROVED B-V-3100-004-1-201-01_5 4.2b R W H 18-Mar-13 TO 18-Mar-13
SIDE PORTION OF HAMAD ROAD. 12th layer Rasllafan
4.30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-32, 5th final
1427 RFI-5858-QCN-1-1021 RFI-5858-QCN-1-1021 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Mar-13 to 20-Mar-13
layer
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-23: SLD014. final
1428 RFI-5858-QCN-1-1022 RFI-5858-QCN-1-1022 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Mar-13 to 20-Mar-13
layer
5:00 PM
7:00 AM
Check compaction test for grading/filling as below details - Purchased Materials - type A: Tank Farm ( Area 1)
1429 RFI-5858-QCN-1-1023 RFI-5858-QCN-1-1023 CIVIL CANCELLED B-V-3100-004-1-201-01_5 4.2.a R W H 18-Mar-13 To 18-Mar-13 cancelled
B70-PS-27: SLD0021 to SLD042 (access road + barzan corridor) Raslaffan
4:00 PM
7:00 AM
1431 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD001 to
RFI-5858-QCN-1-1025 RFI-5858-QCN-1-1025 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Mar-13 to 18-Mar-13
SLD007 = 7 nos, 1st layer
5:00 PM
9:00 AM
1432 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-17: SLD045 to
RFI-5858-QCN-1-1026 RFI-5858-QCN-1-1026 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 18-Mar-13 to 20-Mar-13
SLD047 = 3 nos., SLD049 to SLD050 = 2 nos and SLD061 to SLD063 = 3 nos. 1st layer
5:00 PM
Check Preparation for subgrade B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 Tank Farm (Area 2
1434 RFI-5858-QCN-1-1028 RFI-5858-QCN-1-1028 CIVIL
to SLD087
APPROVED
phase 1) Raslaffan
B-V-3100-004-1-201-01_5 4.1 S W H 18-Mar-13 7:00 AM 18-Mar-13
Sampling for back fill Material Type-B AT SAMPLE Location Section -, stock pile # BZRC- Barzan Off-plot
1435 RFI-5858-QCN-1-1029 RFI-5858-QCN-1-1029 CIVIL
003
APPROVED
Section - 1 Raslaffan
B-V-3100-004-1-201-01_5 3.1.b R W H 18-Mar-13 8:00AM 19-Mar-13
7:00 AM
Soil Compaction Test for Backfilling- Type B D110-B70-PR-18 Pipe Rack Foundation F11 SECTION 4 PR -
1436 RFI-5858-QCN-1-1030 RFI-5858-QCN-1-1030 CIVIL
- 1st layer
APPROVED
18
B-V-3100-004-1-201-01_5 4.2b R W H 18-Mar-13 TO 20-Mar-13
4:30 PM
8:00 AM
1437 RFI-5858-QCN-1-1031 RFI-5858-QCN-1-1031 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-32 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 19-Mar-13 to 19-Mar-13 cancelled re issued
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD025.
1438 RFI-5858-QCN-1-1032 RFI-5858-QCN-1-1032 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.b R W H 19-Mar-13 to 20-Mar-13
1st,2nd,3rd layer
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH HAMAD CULVERT
1439 RFI-5858-QCN-1-1033 RFI-5858-QCN-1-1033 CIVIL
SIDE PORTION OF HAMAD ROAD, 13th & 14th layer
APPROVED
RASLAFFAN
B-V-3100-004-1-201-01_5 4.2b R W H 19-Mar-13 TO 21-Mar-13
4:30 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B D110-B70-PR -18 Pipe Rack Foundation SECTION - 4 PR -
1440 RFI-5858-QCN-1-1034 RFI-5858-QCN-1-1034 CIVIL
F11 2nd & 3rd layer
APPROVED
18 Rasllafan
B-V-3100-004-1-201-01_5 4.2b R W H 19-Mar-13 TO 20-Mar-13
4:30 PM
Soil Compaction Test for formation level prior to blinding - Type A DUCT BANK BZDP SECTION 4 CR#
1441 RFI-5858-QCN-1-1035 RFI-5858-QCN-1-1035 CIVIL
009 (12M PORTION)
APPROVED
35
B-V-3100-004-1-201-01_5 4.2b R W H 19-Mar-13 7:00 AM 20-Mar-13
Retaining Wall N- S
1442 RFI-5858-QCN-1-1036 RFI-5858-QCN-1-1036 CIVIL Check Excavation : Bottom of excavation verification:Sum Pit of Retaining Wall N- S. APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 19-Mar-13 1:30 PM 21-Mar-13
Raslaffan
Crossing 44
1443 RFI-5858-QCN-1-1037 RFI-5858-QCN-1-1037 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-25: F5 APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 19-Mar-13 1:00 PM 20-Mar-13
Raslaffan
Crossing # 44
1444 RFI-5858-QCN-1-1038 RFI-5858-QCN-1-1038 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-25: F5 APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 19-Mar-13 1:30 PM 21-Mar-13
Raslaffan
1445 Check Excavation-Bottom of Excavation verification Sleeper foundation B70 PS- 09 SECTION - 2
RFI-5858-QCN-1-1039 RFI-5858-QCN-1-1039 CIVIL APPROVED B-V-3100-004-1-201-02_5 2.2 R W H 19-Mar-13 9:30 AM 24-Mar-13
SLD020 Raslaffan
Check compaction test for grading/filling as below details - Purchased Materials - type A: 7:00 AM
1446 Tank Farm ( Area 1)
RFI-5858-QCN-1-1040 RFI-5858-QCN-1-1040 CIVIL B70-PS-27: SLD0021 to SLD030 (barzan corridor) 2nd layer, SLD030 to 042 (corridor) APPROVED B-V-3100-004-1-201-01_5 4.2.a R W H 19-Mar-13 To 21-Mar-13
Raslaffan
4th final layer 4:00 PM
Check bottom of excavation verification for pipe sleepers B70-PS-26: SLD0025 To Tank Farm ( Area 1)
1448 RFI-5858-QCN-1-1042 RFI-5858-QCN-1-1042 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 19-Mar-13 1:30 PM 21-Mar-13
SLD043 Raslaffan
Check bottom excavation verification for pipe sleepers B70-PS-26: SLD025 to SLD043. Tank Farm ( Area 1)
1449 RFI-5858-QCN-1-1043 RFI-5858-QCN-1-1043 CIVIL APPROVED B-V-3100-004-1-201-01_5 2.1 R W H 19-Mar-13 9:00 AM 19-Mar-13
Except SLD036,43, B70-PS-26: SLD047 Raslaffan
7:00 AM
Soil Compaction Test for Backfilling- Type B D110-B70- PR-18 Pipe Rack Foundation SECTION - 4 PR -
1450 RFI-5858-QCN-1-1044 RFI-5858-QCN-1-1044 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2b R W H 20-Mar-13 TO 23-Mar-13
F11, 4th,5th & Final layer 18 Rasllafan
4:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH HAMAD CULVERT
1451 RFI-5858-QCN-1-1045 RFI-5858-QCN-1-1045 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2b R W H 20-Mar-13 TO 20-Mar-13
SIDE PORTION OF HAMAD ROAD. 15th final layer Rasllafan
4:30 PM
7:00 AM
1452 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD025. 4th,
RFI-5858-QCN-1-1046 RFI-5858-QCN-1-1046 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 20-Mar-13 to 23-Mar-13
5th final layer
5:00 PM
8:00 AM
1453 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-17: SLD045 to
RFI-5858-QCN-1-1047 RFI-5858-QCN-1-1047 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 20-Mar-13 to 23-Mar-13
SLD047 = 3 nos., SLD049 to SLD050 = 2 nos and SLD061 to SLD063 = 3 nos. final layer
5:00 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD008 to
1457 RFI-5858-QCN-1-1051 RFI-5858-QCN-1-1051 CIVIL
SLD011 = 5 nos
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 21-Mar-13 to 24-Mar-13
5:00 PM
Soil Compaction Test for Backfilling- Granular Class B MaterialHAMAD CULVERT BZRC
1458 RFI-5858-QCN-1-1052 RFI-5858-QCN-1-1052 CIVIL
005 - SOUTH SIDE PORTION OF HAMAD ROAD. Sub base level
APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2b R W H 21-Mar-13 10:30 AM 24-Mar-13
Soil Compaction Test for Backfilling- Type B HAMAD CULVERT BZRC 005 - SOUTH
1459 RFI-5858-QCN-1-1053 RFI-5858-QCN-1-1053 CIVIL
SIDE PORTION OF HAMAD ROAD. 16th final layer
APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2b R W H 21-Mar-13 7:00 AM 21-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Crossing # 44
1460 RFI-5858-QCN-1-1054 RFI-5858-QCN-1-1054 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-25: F6 APPROVED B-V-3100-004-2-201-02_5 2.1 R W H 21-Mar-13 1:30 PM 21-Mar-13
Raslaffan
Crossing 44
1461 RFI-5858-QCN-1-1055 RFI-5858-QCN-1-1055 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-25: F6 APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.a R W H 21-Mar-13 10:00 AM 24-Mar-13
7:00 AM
SECTION 4 PR -
1462 RFI-5858-QCN-1-1056 RFI-5858-QCN-1-1056 CIVIL Soil Compaction Test for Backfilling- Type BD110 B70 - PR -18 Pipe Rack Foundation F11 CANCELLED
18
B-V-3100-004-1-201-01_6 4.2b R W H 21-Mar-13 TO 21-Mar-13 cancelled reissued RFI
4:30 PM
1:00 PM
1463 RFI-5858-QCN-1-1057 RFI-5858-QCN-1-1057 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-69 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 21-Mar-13 to 21-Mar-13 cancelled work not ready
5:00 PM
Barzan Off-plot
1464 RFI-5858-QCN-1-1058 RFI-5858-QCN-1-1058 CIVIL Sampling for back fill Material Type- B AT SAMPLE Location Section -3, stock pile # 6 APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 21-Mar-13 8:00AM 21-Mar-13 witnessed
Section :3
8:00 AM
Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -09 SLD020.
1465 RFI-5858-QCN-1-1059 RFI-5858-QCN-1-1059 CIVIL APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_6 4.2b R W H 21-Mar-13 To 24-Mar-13
1st final layer
10:30 AM
1468 Soil Compaction Test for Backfilling- Granular Class B Material HAMAD CULVERT HAMAD CULVERT
RFI-5858-QCN-1-1062 RFI-5858-QCN-1-1062 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Mar-13 10:30 AM 22-Mar-13 cancelled
BZRC 005 - SOUTH SIDE PORTION OF HAMAD ROAD RASLAFFAN AREA
1469 RFI-5858-QCN-1-1063 RFI-5858-QCN-1-1063 CIVIL Check final Elevations of Grading D110-B70-PR-001 Piperack Foundation GL 1-15/A-B APPROVED SECTION1 B-V-3100-004-1-201-02_5 5.1 R W H 23-Mar-13 9:00 AM 31-Mar-13
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD008 to
1470 RFI-5858-QCN-1-1064 RFI-5858-QCN-1-1064 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 23-Mar-13 to 23-Mar-13 cancelled
SLD011 = 4 nos
5:00 PM
9:00 AM
1471 RFI-5858-QCN-1-1065 RFI-5858-QCN-1-1065 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-69 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_5 4.2.a R W H 23-Mar-13 to 23-Mar-13 cancelled
5:00 PM
Soil Compaction Test for Backfilling- Granular Class B MaterialHAMAD CULVERT BZRC
1472 RFI-5858-QCN-1-1066 RFI-5858-QCN-1-1066 CIVIL CANCELLED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 23-Mar-13 10:00 AM 22-Mar-13
005 - SOUTH SIDE PORTION OF HAMAD ROAD
7:30 AM
1474 Soil Compaction Test for Backfilling - Type B-1st, 2nd & 3rd layer DUCT BANK BZDW EAST SIDE OF
RFI-5858-QCN-1-1068 RFI-5858-QCN-1-1068 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2a R W H 24-Mar-13 TO 27-Mar-13
004 MASHRAB CULVERT
4:30 PM
7:30 AM
1475 EAST SIDE OF
RFI-5858-QCN-1-1069 RFI-5858-QCN-1-1069 CIVIL Soil Compaction Test for Backfilling - Type B-1st & 2nd layer DUCT BANK BZDW 007 APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 24-Mar-13 TO 27-Mar-13
MASHRAB CULVERT
4:30 PM
1476 Check final Visual Inspection& Elevations of Grading D110-B70-PS-05 Pipe Sleeper
RFI-5858-QCN-1-1070 RFI-5858-QCN-1-1070 CIVIL APPROVED SECTION1 B-V-3100-004-1-201-02_6 5.1&5.2 S W H 24-Mar-13 9:00 AM 30-Mar-13
Foundation SLD003 TO SLD008
9:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-26 and 69,
1477 RFI-5858-QCN-1-1071 RFI-5858-QCN-1-1071 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Mar-13 to 27-Mar-13
1st,2nd & 3rd layer
5:00 PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-17: SLD067 to Section 5 and
1478 RFI-5858-QCN-1-1072 RFI-5858-QCN-1-1072 CIVIL
SLD069 = 3 nos
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 24-Mar-13 2:00 PM 4-Apr-13
Check final Visual Inspection& Elevations of Grading Sleeper Foundations B70 - PS -09
1479 RFI-5858-QCN-1-1073 RFI-5858-QCN-1-1073 CIVIL
SLD020
APPROVED SECTION2 B-V-3100-004-1-201-02_6 5.1&5.2 S W H 24-Mar-13 8:00 AM 24-Mar-13
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD008 to
1481 RFI-5858-QCN-1-1075 RFI-5858-QCN-1-1075 CIVIL
SLD011 = 4 nos final layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Mar-13 to 27-Mar-13
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
EAST SIDE OF
1482 RFI-5858-QCN-1-1076 RFI-5858-QCN-1-1076 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW 004 CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 25-Mar-13 TO 25-Mar-13 cancelled non available of technician
MASHRAB CULVERT
4:30 PM
7:30 AM
WEST SIDE OF
1483 RFI-5858-QCN-1-1077 RFI-5858-QCN-1-1077 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW 007 CANCELLED
HALUL CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 25-Mar-13 TO 25-Mar-13 cancelled non available of technician
4:30 PM
Review and approval of QIL test report for Back fill Material (Type-A-& Class B) for the
Barzan Off-plot
1484 RFI-5858-QCN-1-1078 RFI-5858-QCN-1-1078 CIVIL sampled location Section-3 Stockpile #5 & Stockpile Near Halul culvert CALIFORNIA APPROVED
BARZAN
B-V-3100-004-1-201-01_6 3.1.a R W H 25-Mar-13 7:30AM 30-Mar-13
BEARING RATIO
9:00 AM
1486 RFI-5858-QCN-1-1080 RFI-5858-QCN-1-1080 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-26 and 69 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Mar-13 to 25-Mar-13 cancelled non available of technician
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
Tank Farm ( Area 2
1488 RFI-5858-QCN-1-1082 RFI-5858-QCN-1-1082 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan CANCELLED B-V-3100-004-1-201-01_5 4.2.a R W H 25-Mar-13 7:00 AM 25-Mar-13 cancelled non available of technician
phase 1) Raslaffan
corridor) 1st layer
1489 Check Laying,Compaction & Sampling of CBM2- 2nd LayerHAMAD CULVERT BZRC 005
RFI-5858-QCN-1-1083 RFI-5858-QCN-1-1083 CIVIL APPROVED HAMAD CULVERT B-V-3100-004-1-201-03_7 4.2.2 S W H 25-Mar-13 7:30 AM 25-Mar-13
- SOUTH SIDE ROAD PORTION OF HAMAD CULVERT
7:30 AM
1490 EAST SIDE OF
RFI-5858-QCN-1-1084 RFI-5858-QCN-1-1084 CIVIL Soil Compaction Test for Backfilling - Type B-4th & 5th layer DUCT BANK BZDW 004 APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 26-Mar-13 TO 28-Mar-13
MASHRAB CULVERT
4:30 PM
7:30 AM
1491 WEST SIDE OF
RFI-5858-QCN-1-1085 RFI-5858-QCN-1-1085 CIVIL Soil Compaction Test for Backfilling - Type B-3rd & 4th layer DUCT BANK BZDW 007 APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 26-Mar-13 TO 26-Mar-13
HALUL CULVERT
4:30 PM
Check bottom of excavation verification for stopper & loops B70-PS-26: SLD088/ B70-PR- Tank Farm Area 1
1493 RFI-5858-QCN-1-1087 RFI-5858-QCN-1-1087 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 26-Mar-13 10:30 AM 30-Mar-13
50, 51 & 34 Raslaffan
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-26 and 69-4th,
1494 RFI-5858-QCN-1-1088 RFI-5858-QCN-1-1088 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 26-Mar-13 to 28-Mar-13
5th & Final layer
5:00 PM
1495 RFI-5858-QCN-1-1089 RFI-5858-QCN-1-1089 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B70-PR-30: F1 and F2 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 26-Mar-13 7:30 AM 28-Mar-13
Check compaction test for grading/filling as below details - Purchased Materials - type A:
1496 Tank Farm ( Area 2
RFI-5858-QCN-1-1090 RFI-5858-QCN-1-1090 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan CANCELLED B-V-3100-004-1-201-01_5 4.2.a R W H 26-Mar-13 7:00 AM 26-Mar-13 cancelled unavailabillity of technician
phase 1) Raslaffan
corridor) 1st layer
7:30 AM
1497 WEST SIDE OF
RFI-5858-QCN-1-1091 RFI-5858-QCN-1-1091 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 007. 5th layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 27-Mar-13 TO 30-Mar-13
HALUL CULVERT
4:30 PM
7:30 AM
1498 WEST SIDE OF
RFI-5858-QCN-1-1092 RFI-5858-QCN-1-1092 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004 CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 27-Mar-13 TO 27-Mar-13 cancelled work not ready
HALUL CULVERT
4:30 PM
9:00 AM
Check type-B filed density & layer thickness for Pipe Stopper B70-PS-17: SLD066. 1st
1500 RFI-5858-QCN-1-1094 RFI-5858-QCN-1-1094 CIVIL
layer
APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 27-Mar-13 to 27-Mar-13
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
Tank Farm ( Area 2
1501 RFI-5858-QCN-1-1095 RFI-5858-QCN-1-1095 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan APPROVED
phase 1) Raslaffan
B-V-3100-004-1-201-01_5 4.2.a R W H 27-Mar-13 7:00 AM 31-Mar-13
corridor) 1st layer
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1503 RFI-5858-QCN-1-1097 RFI-5858-QCN-1-1097 CIVIL
SIDE
CANCELLED
CULVERT
B-V-3100-004-1-201-01_5 4.2.b R W H 27-Mar-13 TO 27-Mar-13 cancelled work not ready
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.3.2 Check compressive strength@7 Days for CBM2 (Cube testing as per BS EN
1504 RFI-5858-QCN-1-1098 RFI-5858-QCN-1-1098 CIVIL APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_7 4.3.2 S W H 28-Mar-13 2:00 PM 28-Mar-13
-12390-3) Hamad culvert BZRC-005 (south side road portion)
7:30 AM
WEST SIDE OF
1505 RFI-5858-QCN-1-1099 RFI-5858-QCN-1-1099 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 007. 6th & 7th layer APPROVED
HALUL CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 28-Mar-13 TO 31-Mar-13
4:30 PM
7:30 AM
WEST SIDE OF
1506 RFI-5858-QCN-1-1100 RFI-5858-QCN-1-1100 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004 CANCELLED
HALUL CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 28-Mar-13 TO 28-Mar-13 CANCELLED
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1507 RFI-5858-QCN-1-1101 RFI-5858-QCN-1-1101 CIVIL
SIDE. 1st layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2.b R W H 28-Mar-13 TO 31-Mar-13
4:30 PM
9:00 AM
Check type-B filed density & layer thickness for Pipe Stopper B70-PS-17: SLD066. 2nd &
1509 RFI-5858-QCN-1-1103 RFI-5858-QCN-1-1103 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 28-Mar-13 to 31-Mar-13
3rd layer
5:00 PM
Check field density & layer thickness - 1st layer B70-PS-26: SLD025 To SLD071 except 7:00 AM
Tank Farm ( Area 1)
1510 RFI-5858-QCN-1-1104 RFI-5858-QCN-1-1104 CIVIL SLD048, SLD049, SLD064, SLD065, SLD061, SLD056 & SLD036 = 40 nos Purchased APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 28-Mar-13 To 31-Mar-13
Raslaffan
Materials - type B. 1st layer 4:00 PM
7:30 AM
1511 Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
RFI-5858-QCN-1-1105 RFI-5858-QCN-1-1105 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 30-Mar-13 TO 1-Apr-13
SIDE. 2nd layer CULVERT
4:30 PM
7:30 AM
1512 WEST SIDE OF
RFI-5858-QCN-1-1106 RFI-5858-QCN-1-1106 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004 CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 30-Mar-13 TO 30-Mar-13 cancelled work not ready
HALUL CULVERT
4:30 PM
7:30 AM
1513 WEST SIDE OF
RFI-5858-QCN-1-1107 RFI-5858-QCN-1-1107 CIVIL Soil Compaction Test for Backfilling - Type A DUCT BANK BZDW - 007, 8th final layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 30-Mar-13 TO 1-Apr-13
HALUL CULVERT
4:30 PM
8:00 AM
1514 RFI-5858-QCN-1-1108 RFI-5858-QCN-1-1108 CIVIL Check type-B filed density & layer thickness for Pipe Stopper B70-PS-17: SLD066 CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 30-Mar-13 to 30-Mar-13 cancelled work not ready
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
Tank Farm ( Area 2
1515 RFI-5858-QCN-1-1109 RFI-5858-QCN-1-1109 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 30-Mar-13 7:00 AM 30-Mar-13 cancelled unavailabillity of technician
phase 1) Raslaffan
corridor) 2nd layer
Check bottom of excavation verification for stopper & loops B70-PS-26: SLD075, SLD056 Tank Farm Area 1
1516 RFI-5858-QCN-1-1110 RFI-5858-QCN-1-1110 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 30-Mar-13 9:30 AM 4-Apr-13
& SLD036. Raslaffan
1518 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-23: SLD002 to
RFI-5858-QCN-1-1112 RFI-5858-QCN-1-1112 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 5.2 S W H 30-Mar-13 4:00 PM 2-Apr-13
SLD022 = 21 nos.
1519 Sampling for back fill Material Type-A AT SAMPLE Location Section -, stock pile # Barzan Off-plot
RFI-5858-QCN-1-1113 RFI-5858-QCN-1-1113 CIVIL CANCELLED B-V-3100-004-1-201-01_5 3.1.a R W H 30-Mar-13 8:00 AM 30-Mar-13 CANCELLED
Section -7#2 Section 1
10:00 AM
1520 BZRC-009A
RFI-5858-QCN-1-1114 RFI-5858-QCN-1-1114 CIVIL Check type-B filed density & layer thickness for BZRC-009A. 1st & 2nd layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 31-Mar-13 to 1-Apr-13
Raslaffan
5:00 PM
10:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1521 RFI-5858-QCN-1-1115 RFI-5858-QCN-1-1115 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 31-Mar-13 to 31-Mar-13 cancelled work not ready
PS-17: SLD064 to SLD070 = 7 nos
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
Tank Farm ( Area 2
1522 RFI-5858-QCN-1-1116 RFI-5858-QCN-1-1116 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan APPROVED
phase 1) Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 31-Mar-13 7:00 AM 31-Mar-13
corridor) 2nd layer
Check bottom of excavation verification for pipe sleepers B70-PS-26: SLD001 To Tank Farm Area 1
1523 RFI-5858-QCN-1-1117 RFI-5858-QCN-1-1117 CIVIL
SLD003/B70-PS-27: SLD022 To SLD042 except SLD031, SLD040 & SLD041 = 21 nos
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 31-Mar-13 1:30 PM 31-Mar-13 cancelled work not ready
7:30 AM
EAST SIDE OF
1524 RFI-5858-QCN-1-1118 RFI-5858-QCN-1-1118 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004, 6TH LAYER APPROVED
MASRAB CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 31-Mar-13 TO 1-Apr-13
4:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1525 RFI-5858-QCN-1-1119 RFI-5858-QCN-1-1119 CIVIL
SIDE. 3rd & 4th layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_5 4.2.b R W H 31-Mar-13 TO 1-Apr-13
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1526 RFI-5858-QCN-1-1120 RFI-5858-QCN-1-1120 CIVIL CANCELLED B-V-3100-004-1-201-01_5 4.2.b R W H 01-Apr-2013 TO 1-Apr-13 cancelled work not ready
SIDE CULVERT
4:30 PM
7:30 AM
EAST SIDE OF
1527 RFI-5858-QCN-1-1121 RFI-5858-QCN-1-1121 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004. 7th & 8th layer APPROVED
MASRAB CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 01-Apr-2013 TO 4-Jan-13
4:30 PM
7:00 AM
BZRC-009A
1528 RFI-5858-QCN-1-1122 RFI-5858-QCN-1-1122 CIVIL Check type-B filed density & layer thickness for BZRC-009A. 3,4,5th layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 01-Apr-2013 to 1-Apr-13
5:30 PM
Check bottom of excavation verification for pipe sleepers B70-PS-26: SLD001 To Tank Farm Area 1
1531 RFI-5858-QCN-1-1125 RFI-5858-QCN-1-1125 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 01-Apr-2013 10:30 AM 4-Apr-13
SLD003/B70-PS-27: SLD022 To SLD042 except SLD031, SLD040 & SLD041 = 21 nos Raslaffan
4.3.2 Check compressive strength@7 Days for CBM2 (Cube testing as per BS EN
1532 RFI-5858-QCN-1-1126 RFI-5858-QCN-1-1126 CIVIL APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_7 4.3.2 S W H 01-Apr-2013 2:00 PM 1-Apr-13
-12390-3) Hamad culvert BZRC-005 (south side road portion)
7:00 AM
1533 Tank Farm ( Area 1)
RFI-5858-QCN-1-1127 RFI-5858-QCN-1-1127 CIVIL Check field density & layer thickness B70-PR-50 (Loop) Purchased Materials - type B CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 01-Apr-2013 To 1-Apr-13 cancelled work not ready
Raslaffan
5:00 PM
7:30 AM
1534 Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
RFI-5858-QCN-1-1128 RFI-5858-QCN-1-1128 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 2-Apr-13 TO 4-Apr-13
SIDE. 4th to 10th layer CULVERT
4:30 PM
7:30 AM
1535 EAST SIDE OF
RFI-5858-QCN-1-1129 RFI-5858-QCN-1-1129 CIVIL Soil Compaction Test for Backfilling - Type B DUCT BANK BZDW - 004. 9th layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-Apr-13 TO 4-Apr-13
MASRAB CULVERT
4:30 PM
7:00 AM
Check field density & layer thickness B70-PR-50 (Loop) Purchased Materials - type B. Tank Farm ( Area 1)
1536 RFI-5858-QCN-1-1130 RFI-5858-QCN-1-1130 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 2-Apr-13 To 4-Apr-13
1st, 2nd & 3rd layer Raslaffan
5:00 PM
7:00 AM
BZRC-009A
1537 RFI-5858-QCN-1-1131 RFI-5858-QCN-1-1131 CIVIL Check type-B filed density & layer thickness for BZRC-009A. 6TH & 10th layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-Apr-13 to 4-Apr-13
Raslaffan
5:30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1538 RFI-5858-QCN-1-1132 RFI-5858-QCN-1-1132 CIVIL CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 2-Apr-13 to 2-Apr-13 cancelled work not ready
PS-17: SLD064 to SLD070 = 7 nos
5:00 PM
1540 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-24: SLD001 to
RFI-5858-QCN-1-1134 RFI-5858-QCN-1-1134 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 5.2 S W H 2-Apr-13 4:00 PM 6-Apr-13
SLD030 = 28 nos except SLD004 and SLD005.
1541 Review and apptoval of QIL test report for back fill Material (Type-B) for the sampled
RFI-5858-QCN-1-1135 RFI-5858-QCN-1-1135 CIVIL APPROVED Barzan Off-Plot Area B-V-3100-004-1-201-01_6 3.1.b R W H 3-Apr-13 7:30 AM 4-Apr-13
location Section - 1 Stockpile - BZRC-003
7:00 AM
1542 BZRC-009A
RFI-5858-QCN-1-1136 RFI-5858-QCN-1-1136 CIVIL Check type-B filed density & layer thickness for BZRC-009A. 11th final layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 3-Apr-13 to 6-Apr-13
Raslaffan
5:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1543 RFI-5858-QCN-1-1137 RFI-5858-QCN-1-1137 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 3-Apr-13 TO 5-Apr-13
SIDE. 11,12,13th layer CULVERT
4:30 PM
7:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1544 RFI-5858-QCN-1-1138 RFI-5858-QCN-1-1138 CIVIL
2(F2),3(F3)- 1st,2nd & 3rd layer 4(F4),5(F5) - 1st & 2nd layer
APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 3-Apr-13 TO 5-Apr-13
5:00 AM
7:00 AM
Check field density & layer thickness B70-PR-50 (Loop) Purchased Materials - type B. Tank Farm ( Area 1)
1545 RFI-5858-QCN-1-1139 RFI-5858-QCN-1-1139 CIVIL
PR-50 4th & 5th layer. PR-51 1,2,3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 3-Apr-13 To 6-Mar-13
5:00 PM
BZRC-009A
1546 RFI-5858-QCN-1-1140 RFI-5858-QCN-1-1140 CIVIL Check Class B Granular Material filed density & layer thickness for BZRC-009A. Subbase APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 3-Apr-13 3:30 PM 5-Apr-13
Barzan Off-plot
1547 RFI-5858-QCN-1-1141 RFI-5858-QCN-1-1141 CIVIL Sampling for back fill Material Type-A AT SAMPLE Location - Stock pile # Section -7 # 2 APPROVED
Section 1
B-V-3100-004-1-201-01_5 3.1.a R W H 3-Apr-13 8:00AM 4-Apr-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
1548 RFI-5858-QCN-1-1142 RFI-5858-QCN-1-1142 CIVIL Check Excavation-Bottom of Excavation verification B70- BL-01 Anchor block APPROVED SECTION1 B-V-3100-004-1-201-02_6 2.2 R W H 3-Apr-13 4:00 PM 3-Apr-13
7:00 AM
BZRC-009A
1549 RFI-5858-QCN-1-1143 RFI-5858-QCN-1-1143 CIVIL Check type-B filed density & layer thickness for BZRC-009A. 4th & 7th layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 4-Apr-13 to 7-Apr-13
5:30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1550 RFI-5858-QCN-1-1144 RFI-5858-QCN-1-1144 CIVIL
PS-17: SLD064 to SLD070 = 7 nos
CANCELLED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 4-Apr-13 to 4-Apr-13 cancelled work not ready
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type BMASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1552 RFI-5858-QCN-1-1146 RFI-5858-QCN-1-1146 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Apr-13 TO 6-Apr-13
SIDE (ROAD PORTION). 14th layer CULVERT
6:30 PM
Soil Compaction Test for Backfilling- Granular material Class B MASHRAB CULVERT MASHRAB
1553 RFI-5858-QCN-1-1147 RFI-5858-QCN-1-1147 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Apr-13 4:30 PM 7-Apr-13
BZRC - 003 - EAST SIDE (ROAD PORTION). 1,2nd layer CULVERT
7:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1554 RFI-5858-QCN-1-1148 RFI-5858-QCN-1-1148 CIVIL APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 4-Apr-13 TO 7-Apr-13
2(F2),3(F3) - 4th & 5th layer,4(F4),5(F5) - 3&4th layer
5:00 PM
7:00 AM
1555 Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDW 009 (12M SECTION 4 CR#
RFI-5858-QCN-1-1149 RFI-5858-QCN-1-1149 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Apr-13 TO 7-Apr-13
PORTION). 1&2 layer 35
5:00 PM
7:00 AM
1556 Check field density & layer thickness B70-PR-51 (Loop) Purchased Materials - type B. 4th Tank Farm ( Area 1)
RFI-5858-QCN-1-1150 RFI-5858-QCN-1-1150 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Apr-13 To 7-Apr-13
& Final layer Raslaffan
5:00 PM
1557 Check bottom of excavation verification for pipe sleepers B70-PS-27: SLD008 To SLD019 Tank Farm Area 1
RFI-5858-QCN-1-1151 RFI-5858-QCN-1-1151 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 4-Apr-13 10:00 AM 9-Apr-13
except SLD011 = 11 nos Raslaffan
Check compaction test for gradinglfiklling as below details Purchased Matrials - Type-A
Tank farm (Area 2
1558 RFI-5858-QCN-1-1152 RFI-5858-QCN-1-1152 CIVIL B70-PS-28 SLD01 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + Barzan APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 4-Apr-13 7:00 AM 7-Apr-13
phase 1)
Corridor) 3rd layer
7:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1559 RFI-5858-QCN-1-1153 RFI-5858-QCN-1-1153 CIVIL APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 06-Apr-13 TO 8-Apr-13
2(F2),3(F3),4(F4),5(F5) - Final layer
4:00 PM
Soil Compaction Test for Backfilling- Granular material Class B - 3rd and final layer MASHRAB
1560 RFI-5858-QCN-1-1154 RFI-5858-QCN-1-1154 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 06-Apr-13 7:30 AM 6-Apr-13
MASHRAB CULVERT BZRC - 003 - EAST SIDE (ROAD PORTION) CULVERT
7:00 AM
Check field density & layer thickness B70-PR-34 (Loop) Purchased Materials - type B - Tank Farm ( Area 1)
1561 RFI-5858-QCN-1-1155 RFI-5858-QCN-1-1155 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 06-Apr-13 To 8-Apr-13
1st & 4th layer Raslaffan
5:00 PM
1562 RFI-5858-QCN-1-1156 RFI-5858-QCN-1-1156 CIVIL Sampling for back fill Material Type-B AT SAMPLE Location Section - 3 Stock Pile #7 APPROVED Barzan Off-plot Area B-V-3100-004-1-201-01_5 3.1.b R W H 06-Apr-13 8:00 AM 7-Apr-13
7:30 AM
1563 Soil Compaction Test for Backfilling- type- B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
RFI-5858-QCN-1-1157 RFI-5858-QCN-1-1157 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 06-Apr-13 TO 6-Apr-13 cancelled work not ready
SIDE (END PORTION) CULVERT
6:00 PM
7:00 AM
1564 BZRC-009A
RFI-5858-QCN-1-1158 RFI-5858-QCN-1-1158 CIVIL Check type-B filed density & layer thickness for BZRC-009A ( End Wall ) 8th final layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 06-Apr-13 to 8-Apr-13
Raslaffan
5:30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1565 RFI-5858-QCN-1-1159 RFI-5858-QCN-1-1159 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 06-Apr-13 to 8-Apr-13
PS-17: SLD064 to SLD070 = 7 nos. 1st layer. B70-PS-17 SLD066 4th layer
5:00 PM
1566 RFI-5858-QCN-1-1160 RFI-5858-QCN-1-1160 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W W 06-Apr-13 4:00 PM 6-Apr-13 cancelled work not ready
7:00 AM
Check field density & layer thickness B70-PR-34 (Loop) Purchased Materials - type B. 5th Tank Farm ( Area 1)
1570 RFI-5858-QCN-1-1164 RFI-5858-QCN-1-1164 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 07-Apr-2013 To 9-Apr-13
Final layer Raslaffan
5:00 PM
1571 RFI-5858-QCN-1-1165 RFI-5858-QCN-1-1165 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010. east side APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 07-Apr-2013 1:00 PM 12-Apr-13
7:30 AM
Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1572 RFI-5858-QCN-1-1166 RFI-5858-QCN-1-1166 CIVIL
SIDE (END PORTION). 5,6,7th layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_6 4.2.b R W H 07-Apr-2013 to 9-Apr-13
6:00 PM
7:00 AM
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDW 009 (12M SECTION 4 CR#
1573 RFI-5858-QCN-1-1167 RFI-5858-QCN-1-1167 CIVIL
PORTION). 3,4,5th layer
APPROVED
35
B-V-3100-004-1-201-01_6 4.2.b R W H 07-Apr-2013 TO 9-Apr-13
5:00 PM
9:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1574 RFI-5858-QCN-1-1168 RFI-5858-QCN-1-1168 CIVIL APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 07-Apr-2013 TO 9-Apr-13
1(F1). 1st layer
5:00 PM
Check bottom of excavation verification for pipe track foundation & pipe stopper D110- Tank Farm Area 1
1575 RFI-5858-QCN-1-1169 RFI-5858-QCN-1-1169 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 07-Apr-2013 10:30 AM 12-Apr-13
B70-PR-52 & B70-PS-27: SLD031 Raslaffan
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1576 RFI-5858-QCN-1-1170 RFI-5858-QCN-1-1170 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 8-Apr-13 to 10-Apr-13
PS-17: SLD064 to SLD070 = 7 nos. final layer
5:00 PM
Check field density & layer thickness for pipe sleepers - 1st layer B70-PS-25: SLD001 To 7:00 AM
1578 Tank Farm ( Area 1)
RFI-5858-QCN-1-1172 RFI-5858-QCN-1-1172 CIVIL SLD003/B70-PS-26: SLD072 To SLD092, SLD061, SLD017 To SLD022 Purchased APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Apr-13 To 10-Apr-13
Raslaffan
Materials - type B. 1st layer 5:00 PM
7:30 AM
1579 Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
RFI-5858-QCN-1-1173 RFI-5858-QCN-1-1173 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Apr-13 TO 8-Apr-13 cancelled
SIDE (END PORTION) CULVERT
6:00 PM
7:00 AM
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (12M SECTION 4 CR#
1580 RFI-5858-QCN-1-1174 RFI-5858-QCN-1-1174 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Apr-13 TO 10-Apr-13
PORTION) - 6th layer 35
5:00PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Sleeper and Pipe Stopper B70-B70-
1581 RFI-5858-QCN-1-1175 RFI-5858-QCN-1-1175 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 8-Apr-13 to 8-Apr-13 cancelled
PS-24: SLD004 and SLD005
5:00 PM
9:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1582 RFI-5858-QCN-1-1176 RFI-5858-QCN-1-1176 CIVIL APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 8-Apr-13 TO 10-Apr-13
1(F1). 2nd & 3rd layer
5:00 PM
8:00 AM
1585 Soil Compaction Test For backfilling Type - B Sleeper Foundations B70 - PS -16
RFI-5858-QCN-1-1179 RFI-5858-QCN-1-1179 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 8-Apr-13 To 10-Apr-13
SLD100,SLD101,SLD102 &SLD103. 1st final layer
4:30 PM
7:00 AM
1586 Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDW 009 (12M SECTION 4 CR#
RFI-5858-QCN-1-1180 RFI-5858-QCN-1-1180 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 9-Apr-13 TO 9-Apr-13
PORTION) 35
5:00 PM
9:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1587 RFI-5858-QCN-1-1181 RFI-5858-QCN-1-1181 CIVIL CANCELLED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 9-Apr-13 TO 9-Apr-13
1(F1)
5:00 AM
3:30 PM
Soil Compaction Test for Backfilling- Type B HAMLA CULVERT BZRC 004 - WEST SIDE
1590 RFI-5858-QCN-1-1184 RFI-5858-QCN-1-1184 CIVIL
END PORTION. 1st final layer
APPROVED HAMLA CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 9-Apr-13 TO 12-Apr-13
4:30 PM
Check bottom of excavation verification for pipe sleepers & track foundations (loops) B70- Tank Farm Area 1
1591 RFI-5858-QCN-1-1185 RFI-5858-QCN-1-1185 CIVIL
PS-26: SLD064, SLD065, SLD048 & SLD049/B70-PS-27: D110-B70-PR-35
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W W 9-Apr-13 10:00 AM 14-Apr-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Final Elevations:Check Final Elevation of Pipe Sleeper and Pipe Stopper B70-PS-17:
1592 RFI-5858-QCN-1-1186 RFI-5858-QCN-1-1186 CIVIL APPROVED Section 5 Raslaffan B-V-3100-004-1-201-01_6 5.1 S W H 9-Apr-13 4:30 PM 12-Apr-13
SLd045 to SLD070 = 15 nos
7:00 AM
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (12M SECTION 4 CR#
1594 RFI-5858-QCN-1-1188 RFI-5858-QCN-1-1188 CIVIL
PORTION). 7th final layer
APPROVED
35
B-V-3100-004-1-201-01_6 4.2.b R W H 10-Apr-13 TO 12-Apr-13
5:00 PM
9:00 AM
Soil Compaction Test for backfilling - Type B D110 B70 - PR -16 Pipe Rack Foundation
1595 RFI-5858-QCN-1-1189 RFI-5858-QCN-1-1189 CIVIL
1(F1) - 4th & 5th final layer
APPROVED SECTION 3 PR - 16 B-V-3100-004-1-201-01_6 4.2.b R W H 10-Apr-13 TO 12-Apr-13
5:00 PM
7:30 AM
EAST SIDE OF
1596 RFI-5858-QCN-1-1190 RFI-5858-QCN-1-1190 CIVIL Soil Compaction Test for Backfilling - Type A DUCT BANK BZDW - 004.10th layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 10-Apr-13 TO 14-Apr-13
MASRAB CULVERT
4:30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-30: F1 and F2,
1597 RFI-5858-QCN-1-1191 RFI-5858-QCN-1-1191 CIVIL APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Apr-13 to 12-Apr-13
F2 & F4. F1 & F2 1st & 2nd layer. F3 & F4 1st & 2nd layer
5:00 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F1 and F2.
1598 RFI-5858-QCN-1-1192 RFI-5858-QCN-1-1192 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Apr-13 to 12-Apr-13
1st, 2nd, 3rd layer
5:00 PM
1599 Final Elevations:Check Final Elevation of Pipe Sleeper B70-PS-20: SLD037 to SLD049 =
RFI-5858-QCN-1-1193 RFI-5858-QCN-1-1193 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 5.1 S W H 10-Apr-13 3:30 PM 14-Apr-13
13 nos
1600 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-20: SLD037 to
RFI-5858-QCN-1-1194 RFI-5858-QCN-1-1194 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 5.2 S W H 10-Apr-13 3:30 PM 12-Apr-13
SLD049 = 13 nos
1601 Check final Visual Inspection& Elevations of Grading Sleeper Foundations B70 - PS -16
RFI-5858-QCN-1-1195 RFI-5858-QCN-1-1195 CIVIL APPROVED SECTION5 CR#39 B-V-3100-004-1-201-02_6 5.1&5.2 R/S W H 10-Apr-13 8:00 AM 10-Apr-13
SLD100,SLD101,SLD102 &SLD103
1:30 PM
Check type-B filed density & layer thickness for Pipe Track B70-PS-20: SLD004 to
1602 RFI-5858-QCN-1-1196 RFI-5858-QCN-1-1196 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Apr-13 to 12-Apr-13
SLD008 = 5 nos. 1st layer
5:30 PM
Review and approval of QIL test report for Back fill Material (Type-B) for the sampled Barzan Off-plot
1603 RFI-5858-QCN-1-1197 RFI-5858-QCN-1-1197 CIVIL APPROVED B-V-3100-004-1-201-01_6 3.1.b R W H 10-Apr-13 7:30AM 12-Apr-13
location Section-3 Stockpile #06 BARZAN
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-30: F1, F2, F3
1604 RFI-5858-QCN-1-1198 RFI-5858-QCN-1-1198 CIVIL APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 11-Apr-13 to 14-Apr-13
and F4. F1 & F2 - 3rd layer, F3 & F4 - 3rd & 4th layer
5:00 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F1 and F2.
1605 RFI-5858-QCN-1-1199 RFI-5858-QCN-1-1199 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 11-Apr-13 to 14-Apr-13
4th and 5th layer
5:00 PM
7:30 AM
1606 Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
RFI-5858-QCN-1-1200 RFI-5858-QCN-1-1200 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-Apr-13 TO 14-Apr-13
SIDE (END PORTION). 8th, 9th & 10th layer CULVERT
6:00 PM
Check field density & layer thickness for pipe sleepers - 2nd layer (final) B70-PS-25:
SLD003 To SLD001/PS-26: SLD014 To SLD092 except SLD023, SLD024, SLD036, Tank Farm ( Area 1)
1609 RFI-5858-QCN-1-1203 RFI-5858-QCN-1-1203 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-Apr-13 10:00 AM 14-Apr-13
SLD048, SLD049, SLD056, SLD064, SLD065, SLD075 & SLD088 Purchased Materials - Raslaffan
type B
7:00 AM
Check field density & layer thickness for pipe stopper & track (loop) D110-B70-PR-52 & Tank Farm ( Area 1)
1610 RFI-5858-QCN-1-1204 RFI-5858-QCN-1-1204 CIVIL
B70-PS-26: SLD088 Purchased Materials - type-B. 1st layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 12-Apr-13 To 14-Apr-13
5:00 PM
9:00 AM
Retaining Wall N- S
1611 RFI-5858-QCN-1-1205 RFI-5858-QCN-1-1205 CIVIL Check type-B filed density & layer thickness for Retaining Wall N- S. 1st & 2nd layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 11-Apr-13 to 14-Apr-13
5:00 PM
Check compaction test for grading/filling as below details - Purchased Materials - type A:
Tank Farm ( Area 2
1612 RFI-5858-QCN-1-1206 RFI-5858-QCN-1-1206 CIVIL B70-PS-28: SLD001 to SLD027 & B70-PS-29: SLD049 to SLD087 (access road + barzan APPROVED
phase 1) Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 11-Apr-13 8:30 AM 14-Apr-13
corridor) 4th layer - final
Check EGL scarifying/preparation prior filling/grading B70-PS-29: SLD001 To SLD047 & Tank Farm ( Area 2
1613 RFI-5858-QCN-1-1207 RFI-5858-QCN-1-1207 CIVIL
B70-PS-30: SLD057 To SLD072 (access road + barzan corridor)
APPROVED
phase 2) Raslaffan
B-V-3100-004-1-201-01_6 4.1 S W H 11-Apr-13 7:30 AM 13-Apr-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1614 RFI-5858-QCN-1-1208 RFI-5858-QCN-1-1208 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Apr-13 TO 14-Apr-13
SIDE (END PORTION). 11,12,13th layer CULVERT
6:00 PM
Soil Compaction Test for Backfilling - Type B & A DUCT BANK BZDW - 004.1th,12th final EAST SIDE OF
1615 RFI-5858-QCN-1-1209 RFI-5858-QCN-1-1209 CIVIL
layer
APPROVED
MASRAB CULVERT
B-V-3100-004-1-201-01_6 4.2.a R W H 13-Apr-13 7:30 AM 15-Apr-13
8:00 AM
Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F1, F2, F3
1618 RFI-5858-QCN-1-1212 RFI-5858-QCN-1-1212 CIVIL APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 12-Apr-13 to 14-Apr-13
and F4. F1&F2-4th layer, F3&F4 - 5th layer
5:00 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F1, F2. 6th
1619 RFI-5858-QCN-1-1213 RFI-5858-QCN-1-1213 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 12-Apr-13 to 14-Apr-13
final layer
5:00 PM
8:00 AM
Retaining Wall N- S
1620 RFI-5858-QCN-1-1214 RFI-5858-QCN-1-1214 CIVIL Check type-B filed density & layer thickness for Retaining Wall N- S. 3rd layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 12-Apr-13 to 14-Apr-13
Raslaffan
5:00 PM
7:00 AM
1621 Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F1, F2, F3
RFI-5858-QCN-1-1215 RFI-5858-QCN-1-1215 CIVIL CANCELLED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 13-Apr-13 to 13-Apr-13 cancelled
and F4 ( Filling )
5:30 PM
7:00 AM
1622 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F1, F2 and
RFI-5858-QCN-1-1216 RFI-5858-QCN-1-1216 CIVIL CANCELLED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 13-Apr-13 to 13-Apr-13 cancelled work not ready
F3
5:30 PM
7:00 AM
1623 Check type-B filed density & layer thickness for Retaining Wall N- S. south corner area Retaining Wall N- S
RFI-5858-QCN-1-1217 RFI-5858-QCN-1-1217 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 13-Apr-13 to 15-Apr-13
4th & 5th layer Raslaffan
5:00 PM
7:00 AM
Check field density & layer thickness for pipe stopper & track (loop) D110-B70-PR-52 & Tank Farm ( Area 1)
1625 RFI-5858-QCN-1-1219 RFI-5858-QCN-1-1219 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Apr-13 To 15-Apr-13
B70-PS-26: SLD088 Purchased Materials - type-B. 2,3rd layer Raslaffan
5:00 PM
Review and approval of QIL test report for Back fill Material (Type-A & B for the sampled Barzan Off-plot
1626 RFI-5858-QCN-1-1220 RFI-5858-QCN-1-1220 CIVIL APPROVED B-V-3100-004-1-201-01_6 3.1a.b R W H 13-Apr-13 7:30AM 14-Apr-13
location Section-3 Stockpile #07 & Section-7 Stockpile #03 BARZAN
Barzan Off-plot
1627 RFI-5858-QCN-1-1221 RFI-5858-QCN-1-1221 CIVIL Sampling for back fill Material Type-A AT SAMPLE Location Section -3, stock pile # 8 APPROVED B-V-3100-004-1-201-01_5 3.1.a R W H 13-Apr-13 8:00AM 14-Apr-13
Section 1
7:00 AM
1628 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F3 & F4
RFI-5858-QCN-1-1222 RFI-5858-QCN-1-1222 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 14-Apr-13 to 17-Apr-13
1st,2nd & 3rd layer
5:30 PM
7:00 AM
1629 Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F1, F2, F3
RFI-5858-QCN-1-1223 RFI-5858-QCN-1-1223 CIVIL APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 14-Apr-13 to 17-Apr-13
and F4 ( Filling ). 5th & 6th layer
5:30 PM
7:00 AM
1630 Retaining Wall N- S
RFI-5858-QCN-1-1224 RFI-5858-QCN-1-1224 CIVIL Check type-B filed density & layer thickness for Retaining Wall N- S. 6th, 7th & 8th layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 14-Apr-13 to 17-Apr-13
Raslaffan
5:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-25: F5 and F6.
1631 RFI-5858-QCN-1-1225 RFI-5858-QCN-1-1225 CIVIL APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 14-Apr-13 to 15-Apr-13
1ST & 4TH LAYER
5:30 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD013 to 7:00 AM
1632 RFI-5858-QCN-1-1226 RFI-5858-QCN-1-1226 CIVIL SLD017 = 5 nos, and B70-PS-20: SLD050, SLD051 and SLD026 to SLD031 = 6 nos. 1st APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 14-Apr-13 to 17-Apr-13
layer 5:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1633 RFI-5858-QCN-1-1227 RFI-5858-QCN-1-1227 CIVIL
SIDE (END PORTION). 14th & 15th layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_6 4.2b R W H 14-Apr-13 TO 17-Apr-13
6:00 PM
Check field density & layer thickness for pipe stopper & track (loop) D110-B70-PR-52 & 7:00 AM
Tank Farm ( Area 1)
1634 RFI-5858-QCN-1-1228 RFI-5858-QCN-1-1228 CIVIL B70-PS-26: SLD088 Purchased Materials - type-B. PR-52 - 4th & 5th layer, SLD088 - 4th APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 14-Apr-13 To 17-Apr-13
& final layer 5:00 PM
Section 6 ( Crossing
1635 RFI-5858-QCN-1-1229 RFI-5858-QCN-1-1229 CIVIL Check Excavation : Bottom of excavation verification:Duct Bank BZDP-010 APPROVED
53 ) Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W W 14-Apr-13 3:00 PM 18-Apr-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Inspection of sand bedding prior to backfilling Desalination line Crossing # 101B(Barzan SECTION1
1637 RFI-5858-QCN-1-1231 RFI-5858-QCN-1-1231 CIVIL
corridor portion only)
APPROVED
DESALINATION LINE
B-V-3100-004-2-201-01_6 4.2d,e R W H 14-Apr-13 3:30 PM 15-Apr-13
7:30 AM
Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1639 RFI-5858-QCN-1-1233 RFI-5858-QCN-1-1233 CIVIL
SIDE (END PORTION). Final layer
APPROVED
CULVERT
B-V-3100-004-1-201-01_6 4.2b R W H 15-Apr-13 TO 17-Apr-13
6:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 101B(Barzan SECTION1
1641 RFI-5858-QCN-1-1235 RFI-5858-QCN-1-1235 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 15-Apr-13 TO 15-Apr-13 RFI cancelled do to excavated
corridor portion only). 1st & 2nd layer DESALINATION LINE
6:00 PM
7:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F3. F4 4th
1642 RFI-5858-QCN-1-1236 RFI-5858-QCN-1-1236 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 to 17-Apr-13
layer, d110-B70-PR-27 F5 1st, 2nd & 3rd layer
5:30 PM
7:00 AM
1643 RFI-5858-QCN-1-1237 RFI-5858-QCN-1-1237 CIVIL Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F4 ( Filling ) APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 to 17-Apr-13
5:30 PM
7:00 AM
1644 Check type-B filed density & layer thickness for Retaining Wall N- S. 9th. 10th, 11th & 12 Retaining Wall N- S
RFI-5858-QCN-1-1238 RFI-5858-QCN-1-1238 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 to 17-Apr-13
th layer (D110-Dike-001 (NS) Raslaffan
5:00 PM
7:00 AM
1645 Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-25: F5 and F6.
RFI-5858-QCN-1-1239 RFI-5858-QCN-1-1239 CIVIL APPROVED PR-25 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 to 17-Apr-13
5 th & 8th layer
5:30 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-19: SLD013 to 7:00 AM
1646 RFI-5858-QCN-1-1240 RFI-5858-QCN-1-1240 CIVIL SLD017 = 5 nos, and B70-PS-20: SLD050, SLD051 and SLD026 to SLD031 = 6 nos. final APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 to 17-Apr-13
layer 5:30 PM
Check field density & layer thickness for filling/grading - 1st layer B70-PS-29: SLD001 To
Tank Farm ( Area 2
1648 RFI-5858-QCN-1-1242 RFI-5858-QCN-1-1242 CIVIL SLD047 & B70-PS-30: SLD057 To SLD072 (access road + barzan corridor) Pusrchased APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 15-Apr-13 7:30 AM 16-Apr-13
phase 2) Raslaffan
materials - type-A
7:00 AM
Soil Compaction Test for Backfilling- Type B Sleeper foundation B70 PS- 08 SLD0035. SECTION 2
1649 RFI-5858-QCN-1-1243 RFI-5858-QCN-1-1243 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2b R W H 16-Apr-13 TO 17-Apr-13
1st and final layer Raslaffan
5:00 PM
7:00 AM
1650 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F3, F4 and
RFI-5858-QCN-1-1244 RFI-5858-QCN-1-1244 CIVIL APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 16-Apr-13 to 17-Apr-13
F5. Pr-27 F3 & F4 5th layer, PR-27 F5 - 4th layer
5:30 PM
7:00 AM
1651 Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F1, F2, F3
RFI-5858-QCN-1-1245 RFI-5858-QCN-1-1245 CIVIL CANCELLED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 16-Apr-13 to 16-Apr-13 cancelled
and F4 ( Filling )
5:30 PM
7:00 AM
1652 Check type-B filed density & layer thickness for Retaining Wall N- S. 13th layer (Ditch Retaining Wall N- S
RFI-5858-QCN-1-1246 RFI-5858-QCN-1-1246 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 16-Apr-13 to 17-Apr-13
blwding level) Panel 8,9,10,11,12 Ditch area 1st layer Raslaffan
5:00 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B Sleeper foundation B70-PS- 05 SLD001 & SECTION 2
1653 RFI-5858-QCN-1-1247 RFI-5858-QCN-1-1247 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2b R W H 16-Apr-13 TO 17-Apr-13
SLD002. 1st final layer Raslaffan
5:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 101B(Barzan SECTION1
1654 RFI-5858-QCN-1-1248 RFI-5858-QCN-1-1248 CIVIL
corridor portion only)
CANCELLED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2b R W H 16-Apr-13 TO 16-Apr-13 cancelled
6:00 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B MASHRAB CULVERT BZRC - 003 - EAST MASHRAB
1655 RFI-5858-QCN-1-1249 RFI-5858-QCN-1-1249 CIVIL
SIDE (END PORTION)
CANCELLED
CULVERT
B-V-3100-004-1-201-01_6 4.2b R W H 16-Apr-13 TO 16-Apr-13 cancelled
6:00 PM
7:00 AM
Check field density & layer thickness for pipe stopper & track (loop) D110-B70-PR-52 Tank Farm ( Area 1)
1656 RFI-5858-QCN-1-1250 RFI-5858-QCN-1-1250 CIVIL
( Final layer) & B70-PS-26: SLD075 & SLD056 (1st to 4th layer)
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 16-Apr-13 To 17-Apr-13
5:00 PM
7:00 AM
Soil Compaction Test for Backfilling- Type B Sleeper foundation B70 PS- 11 SLD001. 1st SECTION 3
1657 RFI-5858-QCN-1-1251 RFI-5858-QCN-1-1251 CIVIL
& final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2b R W H 16-Apr-13 TO 17-Apr-13
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:00 AM
1658 RFI-5858-QCN-1-1252 RFI-5858-QCN-1-1252 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-27: F5. 5th layer APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 17-Apr-13 to 17-Apr-13
5:30 PM
7:00 AM
Check type-A filed density & layer thickness for Pipe Track D110-B27-PR-30: F3 and F4 (
1659 RFI-5858-QCN-1-1253 RFI-5858-QCN-1-1253 CIVIL
Filling ). Final layer
APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 17-Apr-13 to 17-Apr-13
5:30 PM
1660 RFI-5858-QCN-1-1254 RFI-5858-QCN-1-1254 CIVIL Check final Elevations of Grading Sleeper Foundations B70 - PS -08 SLD035 APPROVED SECTION2 B-V-3100-004-1-201-02_6 5.1&5.2 S W H 17-Apr-13 8:00 AM 18-Apr-13
1:00 PM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD002,
1661 RFI-5858-QCN-1-1255 RFI-5858-QCN-1-1255 CIVIL
SLD003 and SLD032 to SLD036 = 7 nos. 1st & final layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 17-Apr-13 to 17-Apr-13
5:30 PM
Check field density & layer thickness for filling/grading - 2nd layer B70-PS-29: SLD001 To
Tank Farm ( Area 2
1662 RFI-5858-QCN-1-1256 RFI-5858-QCN-1-1256 CIVIL SLD047 & B70-PS-30: SLD057 To SLD072 (access road + barzan corridor) Pusrchased CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 17-Apr-13 2:30 PM 17-Apr-13 cancelled work not ready
phase 2) Raslaffan
materials - type-A
8:00 AM
Soil Compaction Test For backfilling Type - B Sleeper foundation B70 PS 15
1663 RFI-5858-QCN-1-1257 RFI-5858-QCN-1-1257 CIVIL APPROVED Section 4 Raslaffan B-V-3100-004-1-201-01_6 4.2b W W H 17-Apr-13 To 17-Apr-13
SLD088,SLD089,SLD090. 1st & final layer
4:30 PM
8:00 AM
1665 Soil Compaction Test For backfilling Type - B Sleeper foundation B70 PS 15
RFI-5858-QCN-1-1259 RFI-5858-QCN-1-1259 CIVIL CANCELLED Section 4 Raslaffan B-V-3100-004-1-201-01_6 4.2b R W H 18-Apr-13 To 18-Apr-13 cancelled re issued material
SLD088,SLD089,SLD090
4:30 PM
7:00 AM
1667 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-20: SLD002,
RFI-5858-QCN-1-1261 RFI-5858-QCN-1-1261 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 18-Apr-13 to 18-Apr-13 cancelled re issued material
SLD003 and SLD032 to SLD036 = 7 nos
5:30 PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Stopper B70-PS-26: SLD056 and Rank Farm ( Area
1668 RFI-5858-QCN-1-1262 RFI-5858-QCN-1-1262 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 18-Apr-13 to 20-Apr-13
SLD075. Final layer 1 ) Raslaffan
5:30 PM
Check final Visual Inspection& Elevations of Grading Sleeper Foundations B70 - PS - 05 SECTION 2
1669 RFI-5858-QCN-1-1263 RFI-5858-QCN-1-1263 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 18-Apr-13 2:00 PM 20-Apr-13
SLD001 & SLD002 Raslaffan
Check final Visual Inspection& Elevations of Grading D110-B70-PR-44 Piperack SULPHUR AREA PR
1670 RFI-5858-QCN-1-1264 RFI-5858-QCN-1-1264 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 18-Apr-13 9:00 AM 22-Apr-13
Foundation GL 1-14/A-B 44
Check final Visual Inspection& Elevations of Grading Sleeper Foundations B70 - PS - 11 SECTION 2
1671 RFI-5858-QCN-1-1265 RFI-5858-QCN-1-1265 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 18-Apr-13 2:00 PM 22-Apr-13
SLD001 Raslaffan
1:00 PM
1672 Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-26: SLD065, Tank Farm
RFI-5858-QCN-1-1266 RFI-5858-QCN-1-1266 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 18-Apr-13 to 21-Apr-13
SLD064, SLD049, SLD048 =4no, 1st final layer Raslaffan
5:30 PM
1673 Final Elevations:Check Final Elevation of Pipe Sleeper B70-PS-25: SLD001 to SLD003 = Tank Farm
RFI-5858-QCN-1-1267 RFI-5858-QCN-1-1267 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.1 S W H 20-Apr-13 4:00 PM 21-Apr-13
3 nos and B70-PS-26 : SLD037 to SLD092 = 56 nos Raslaffan
1674 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-25: SLD001 to Tank Farm
RFI-5858-QCN-1-1268 RFI-5858-QCN-1-1268 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.2 S W H 20-Apr-13 4:00 PM 22-Apr-13
SLD003 = 3 nos and B70-PS-26 : SLD032 to SLD092 = 56 nos Raslaffan
7:30 AM
Soil Compaction Test for Backfilling - Type B HALUL CULVERT BZRC - 008 END
1675 RFI-5858-QCN-1-1269 RFI-5858-QCN-1-1269 CIVIL APPROVED HALUL CULVERT B-V-3100-004-1-201-01_6 4.2a R W H 20-Apr-13 TO 21-Apr-13
PORTION. Final layer
4:30 PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-29: SLD055 to Tank Farm
1676 RFI-5858-QCN-1-1270 RFI-5858-QCN-1-1270 CIVIL
SLD087 = 31 nos
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 20-Apr-13 1:30 PM 21-Apr-13
7:00 AM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-18: SLD018 to
1677 RFI-5858-QCN-1-1271 RFI-5858-QCN-1-1271 CIVIL
SLD028 = 10 nos. 2 layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 20-Apr-13 to 21-Apr-13
9:30AM
SECTION1 7:30 AM
Soil Compaction Test for Backfilling- Type B B70- BL-01 Anchor block & Tie in portion 1st
1678 RFI-5858-QCN-1-1272 RFI-5858-QCN-1-1272 CIVIL
& 2nd layer
APPROVED DESALINATION TIE B-V-3100-004-1-201-01_6 4.2b R W H 20-Apr-13 TO 21-Apr-13
IN 6:00 PM
Check final Visual Inspection& Elevations of Grading Loop foundations D210 B70 PR 71 SULPHUR AREA
1680 RFI-5858-QCN-1-1274 RFI-5858-QCN-1-1274 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 20-Apr-13 8:00 AM 22-Apr-13
& D210 B70 PR 45 PR-45&PR-71
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-27: F3, F4 and
1683 RFI-5858-QCN-1-1277 RFI-5858-QCN-1-1277 CIVIL
F5. final layer
APPROVED PR-27 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 20-Apr-13 to 21-Apr-13
5:00 PM
1684 RFI-5858-QCN-1-1278 RFI-5858-QCN-1-1278 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-31: F1 APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 21-Apr-13 2:00 PM 24-Apr-13
Check Excavation-Bottom of Excavation verification D110- B70- STN-74 Pipe Rack EAST OF PR18
1685 RFI-5858-QCN-1-1279 RFI-5858-QCN-1-1279 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2b R W H 21-Apr-13 7:30 AM 24-Apr-13
Foundation No 1/A-B (F1)-2 Nos B70- STN-74
Check Excavation-Bottom of Excavation verification Pipe Sleeper Foundation D110- B70 SECTION 4
1686 RFI-5858-QCN-1-1280 RFI-5858-QCN-1-1280 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2b R W H 21-Apr-13 6:30 AM 24-Apr-13
-PS -13 SLD036 Raslaffan
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to
1687 Tank Farm
RFI-5858-QCN-1-1281 RFI-5858-QCN-1-1281 CIVIL SLD048 = 48 nos and B70-PS-30: SLD057 to SLD072 = 16 nos ( Grading Filling ). 2nd APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 21-Apr-13 7:30 AM 22-Apr-13
Raslaffan
layer
1689 Soil Compaction Test for Backfilling- Type A D110- B70- STN-74 Pipe Rack Foundation SECTION 4 B70-
RFI-5858-QCN-1-1283 RFI-5858-QCN-1-1283 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2a R W H 21-Apr-13 10:00 AM 22-Apr-13
No 1/A-B (F1) - 2 Nos STN-74
Check Excavation : Bottom of excavation verification:Retaining Wall N- S ( Corner and Retaining Wall N- S
1690 RFI-5858-QCN-1-1284 RFI-5858-QCN-1-1284 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 21-Apr-13 2:00 PM 29-Apr-13
Lasr Potion ) Raslaffan
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-26: SLD001 to 7:30AM
Tank Farm
1691 RFI-5858-QCN-1-1285 RFI-5858-QCN-1-1285 CIVIL SLD002 = 2 nos, B70-PS-27: SLD022 to SLD042 = 25 nos and SLD007 to SLD019 = 12 APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 22-Apr-13 TO 23-Apr-13
Raslaffan
nos. First Layer 5:30 PM
7:30 AM
Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
1693 RFI-5858-QCN-1-1287 RFI-5858-QCN-1-1287 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 22-Apr-13 to 23-Apr-13
48 nos and B70-PS-30: SLD057 to SLD072 = 16 nos ( Grading Filling ). 3rd layer Raslaffan
5:30 PM
1694 Sampling for back fill Material Type-A & CLASS- B AT SAMPLE Location - Stock pile # Barzan Off-plot
RFI-5858-QCN-1-1288 RFI-5858-QCN-1-1288 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1.a R W H 22-Apr-13 8:00 AM 22-Apr-13
Section -3 # 8 Section 1
1695 RFI-5858-QCN-1-1289 RFI-5858-QCN-1-1289 CIVIL Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-18: SLD017 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 23-Apr-13 1:30 PM 27-Apr-13
7:30AM
1696 Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
RFI-5858-QCN-1-1290 RFI-5858-QCN-1-1290 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 23-Apr-13 to 23-Apr-13
48 nos and B70-PS-30: SLD057 to SLD072 = 16 nos ( Grading Filling ) Raslaffan
5:30PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-28: SLD001 to Tank Farm
1697 RFI-5858-QCN-1-1291 RFI-5858-QCN-1-1291 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 23-Apr-13 1:30 PM 28-Apr-13
SLD026 = 24 nos except SLD008 and SLD022 Raslaffan
7:30 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-53. 1st & 2nd Tank Farm
1698 RFI-5858-QCN-1-1292 RFI-5858-QCN-1-1292 CIVIL
and 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 23-Apr-13 to 24-Apr-13
5:30 PM
10:30AM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-26: Tank Farm
1699 RFI-5858-QCN-1-1293 RFI-5858-QCN-1-1293 CIVIL
SLD023, SLD024 and SLD036 = 3 nos. 1st layer B70-PS-26 SLD036 2nd & 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 23-Apr-13 to 24-Apr-13
5:30PM
7:30 AM
Check type-B filed density & layer thickness for Pipe Track B70-PS-17: SLD001, SLD002,
1701 RFI-5858-QCN-1-1295 RFI-5858-QCN-1-1295 CIVIL
SLD035 and SLD036 = 4 nos-1st layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 25-Apr-13
5:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
1:30 PM
1702 RFI-5858-QCN-1-1296 RFI-5858-QCN-1-1296 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDP-010. 1st, 2nd & 3rd layer APPROVED BZDP-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 25-Apr-13
5:30 PM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-26: 7:30AM
Tank Farm
1703 RFI-5858-QCN-1-1297 RFI-5858-QCN-1-1297 CIVIL SLD023, SLD024 = 2 nos-final layer and B70-PS-29: SLD064 to SLD079-1st layer, B70- APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 25-Apr-13
PS-26 SLD036(Stopper)-4th,5th & final layer 5:30PM
1:30 PM
Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
1704 RFI-5858-QCN-1-1298 RFI-5858-QCN-1-1298 CIVIL
48 nos-4th layer and ( Grading Filling )
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 25-Apr-13
5:30PM
8:30 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-35 and PR-53. Tank Farm
1705 RFI-5858-QCN-1-1299 RFI-5858-QCN-1-1299 CIVIL
D110-B27-PR-35 - 1st & 2nd layer, D110-B27-PR-53 - 4th & 5th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 25-Apr-13
5:30 PM
7:30 AM
Soil Compaction Test for Backfilling- Type B Protection slab (Above CSF-RLC 24" water
1706 RFI-5858-QCN-1-1300 RFI-5858-QCN-1-1300 CIVIL APPROVED Section 2 CR #10 A B-V-3100-004-1-201-01_6 4.2b R W H 24-Apr-13 TO 25-Apr-13
line)- 1st final layer
5:00 AM
7:30AM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-27: Tank Farm
1707 RFI-5858-QCN-1-1301 RFI-5858-QCN-1-1301 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 24-Apr-13 to 24-Apr-13 cancelled work not ready
SLD007 to SLD021 = 15 nos Raslaffan
5:30PM
Check type-B filed density & layer thickness for Pipe Track and B70-PS-18: SLD011 to Section 6 7:30 AM
1708 RFI-5858-QCN-1-1302 RFI-5858-QCN-1-1302 CIVIL SLD033 = 22 nos Except SLD017-1st layer, B70-PS-17 SLD001, SLD002, SLD035 & APPROVED ( Retaining Wall E-W ) B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
SLD036 final layer Raslaffan 5:30 PM
1709 RFI-5858-QCN-1-1303 RFI-5858-QCN-1-1303 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-31: F2 APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 25-Apr-13 2:00 PM 28-Apr-13
7:30AM
1711 Check type B filed density & layer thickness for Culvert BZRC-010 ( End Wall East Side ).
RFI-5858-QCN-1-1305 RFI-5858-QCN-1-1305 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
1st & 2nd layer
5:30PM
7:30 AM
1712 RFI-5858-QCN-1-1306 RFI-5858-QCN-1-1306 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDP-010. 3rd,4th & 5th layer APPROVED BZDP-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
5:30 PM
8:30 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-35 - 3rd & 4th Tank Farm
1713 RFI-5858-QCN-1-1307 RFI-5858-QCN-1-1307 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
layer Raslaffan
5:30 PM
8:30 AM
Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
1714 RFI-5858-QCN-1-1308 RFI-5858-QCN-1-1308 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
48 nos - 5th layer Raslaffan
5:30PM
7:30AM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper and B70-PS- Tank Farm
1715 RFI-5858-QCN-1-1309 RFI-5858-QCN-1-1309 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 25-Apr-13 to 25-Apr-13
27: SLD007 to SLD042 = 36 nos - Final layer Raslaffan
5:30PM
1716 Final Elevations:Check Final Elevation of Pipe Sleeper B70-PS-26: SLD014 to SLD036 = Tank Farm
RFI-5858-QCN-1-1310 RFI-5858-QCN-1-1310 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.1 S W H 25-Apr-13 4:00 PM 28-Apr-13
23 nos Raslaffan
1717 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-26 : SLD014 to Tank Farm
RFI-5858-QCN-1-1311 RFI-5858-QCN-1-1311 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.2 S W H 25-Apr-13 4:00 PM 25-Apr-13
SLD036 = 23 nos Raslaffan
Section 6 7:30 AM
1718 Check type-B filed density & layer thickness for Pipe Track B70-PS-18: SLD011 to
RFI-5858-QCN-1-1312 RFI-5858-QCN-1-1312 CIVIL APPROVED ( Retaining Wall E-W ) B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 28-Apr-13
SLD033 = 22 nos Except SLD017 - Final layer
Raslaffan 5:30 PM
7:30 AM
1719 RFI-5858-QCN-1-1313 RFI-5858-QCN-1-1313 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDP-010 -6th layer APPROVED BZDP-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 28-Apr-13
5:30 PM
7:30AM
Check type B filed density & layer thickness for Culvert BZRC-010 ( End Wall East Side ).
1720 RFI-5858-QCN-1-1314 RFI-5858-QCN-1-1314 CIVIL
4th, 5th & 6th layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 28-Apr-13
5:30PM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-28:
7:30AM
SLD001 to SLD026 = 24 nos except SLD008 & 22, B70-PS-29: SLD064 to SLD087 = 23 Tank Farm
1723 RFI-5858-QCN-1-1317 RFI-5858-QCN-1-1317 CIVIL
nos, B70-PS-28 SLD001 to SLD026 except SLD008 & 22 - 1st layer, B70-PS-29 SLD064
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 28-Apr-13
5:30PM
to 079 - 2nd layer, B70-PS-29 SLD081 to 087 - 1st layer
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
8:30 AM
Check type-B filed density & layer thickness for Pipe Sleeper B70-PS-27- SLD0011 & 031 Tank Farm
1724 RFI-5858-QCN-1-1318 RFI-5858-QCN-1-1318 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 28-Apr-13
1st,2nd & 3rd Layer Raslaffan
5:30 PM
SECTION4 DIKE
Soil Compaction Test For formation level prior to blinding - Type A D110-DIKE-003(W-
1725 RFI-5858-QCN-1-1319 RFI-5858-QCN-1-1319 CIVIL
BZRC) WEST SIDE RETAINING WALL-BOTH SIDE
APPROVED 003(W-BZRC) B-V-3100-004-1-201-01_6 4.2b R W H 27-Apr-13 9:00 AM 28-Apr-13
Raslaffan
8:30 AM
Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
1726 RFI-5858-QCN-1-1320 RFI-5858-QCN-1-1320 CIVIL
48 nos and B70-PS-30: SLD057 to SLD072 = 16 nos ( Grading Filling )
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 27-Apr-13 to 27-Apr-13 cancelled work not ready
5:30PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-27: SLD003 to Tank Farm
1727 RFI-5858-QCN-1-1321 RFI-5858-QCN-1-1321 CIVIL
SLD006 = 4 nos SLD020, SLD021, SLD039, SLD040 and SLD041 = 5 nos
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 27-Apr-13 1:30 PM 29-Apr-13
Sampling for back fill Material Type-A & Type -B AT SAMPLE Location Section -3, stock Barzan Off-plot
1728 RFI-5858-QCN-1-1322 RFI-5858-QCN-1-1322 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1a.b R W H 28-Apr-13 8:00 AM 28-Apr-13
pile # 10(Type B) & Section -7, stock pile #3(Type-A) Section 3&7
1729 RFI-5858-QCN-1-1323 RFI-5858-QCN-1-1323 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-29: F1 APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 28-Apr-13 1:30 PM 1-May-13
7:30 AM
1731 RFI-5858-QCN-1-1325 RFI-5858-QCN-1-1325 CIVIL Check type B filed density & layer thickness for Culvert BZRC-010 ( End Wall East Side ) CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 28-Apr-13 to 28-Apr-13 cancelled work not ready
5:30 PM
8:30 AM
1732 Check filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to SLD048 = Tank Farm
RFI-5858-QCN-1-1326 RFI-5858-QCN-1-1326 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 28-Apr-13 to 28-Apr-13 cancelled work not ready
48 nos and B70-PS-30: SLD057 to SLD072 = 16 nos ( Grading Filling ) Raslaffan
5:30 PM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-27:
1:30 PM
1733 SLD011 to SLD031 = 40 nos B70-PS-28: SLD001 to SLD026 axept SLD008, SLD022 Tank Farm
RFI-5858-QCN-1-1327 RFI-5858-QCN-1-1327 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 28-Apr-13 to 1-May-13
and B70-PS-29: SLD055 to SLD062 = 8 nos and SLD064 to SLD079 = 16 nos and Raslaffan
5:30 PM
SLD081 to SLD087 = 7 nos.
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-31: F1.
1734 RFI-5858-QCN-1-1328 RFI-5858-QCN-1-1328 CIVIL APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 29-Apr-13 to 1-May-13
1st,2nd,3rd & 4th layer
5:30 PM
Check type B filed density & layer thickness for Pipe Sleeper and Stopper B70-PS-27:
SLD003 to SLD006 = 4 nos, SLD020,SLD021 SLS039, SLD040, SLD041 = 5 nos - 1st &
7:30AM
final layer.B70-PS-28: SLD001 to SLD007 = 7 nos SLD009 to SLD021 = 13 nos, SLDB23 Tank Farm
1735 RFI-5858-QCN-1-1329 RFI-5858-QCN-1-1329 CIVIL
to SLD026 = 4 nos - final layer and B70-PS-29: SLD055 to SLD062 = 8 nos - 2nd & final
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 29-Apr-13 to 1-May-13
1:00 PM
layer, SLD064 to SLD079 = 16 nos and SLD081 to SLD087 = 7 nos. PS-27 purchased,
PS-28 Excavated
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-30: SLD035 to Tank Farm
1736 RFI-5858-QCN-1-1330 RFI-5858-QCN-1-1330 CIVIL CANCELLED B-V-3100-004-1-201-01_6 2.1 R W H 29-Apr-13 1:30 PM 29-Apr-13 cancelled work not ready
SLD051 = 15 nos Raslaffan
1:00PM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). 7th & 8th
1737 RFI-5858-QCN-1-1331 RFI-5858-QCN-1-1331 CIVIL
layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 29-Apr-13 to 30-Apr-13
5:30PM
8:00 AM
1738 RFI-5858-QCN-1-1332 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-31: F1.
RFI-5858-QCN-1-1332 CIVIL APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 30-Apr-13 to 1-May-13
5th,6th7th & 8th layer
5:30 PM
9:30 AM
1739 RFI-5858-QCN-1-1333 RFI-5858-QCN-1-1333 CIVIL Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ) CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 30-Apr-13 to 30-Apr-13 cancelled work not ready
5:30PM
Tank Farm
1740 RFI-5858-QCN-1-1334 RFI-5858-QCN-1-1334 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-28: SLD022 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 30-Apr-13 8:00 AM 4-May-13
Raslaffan
8:30 AM
Check type-B filed density & layer thickness for Pipe Track D110-B27-PR-35 and PR-53. Tank Farm
1741 RFI-5858-QCN-1-1335 RFI-5858-QCN-1-1335 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 30-Apr-13 to 1-May-13
final layer Raslaffan
5:30 PM
Final Elevations:Check Final Elevation of Pipe Sleeper B70-PS-26: SLD001 and SLD002
Tank Farm
1742 RFI-5858-QCN-1-1336 RFI-5858-QCN-1-1336 CIVIL = 2 nos, B70-PS-27: SLD003 to SLD042 = 40 nosB70-PS-28: SLD001 to SLD026 = 24 APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 5.1 S W H 30-Apr-13 4:00 PM 4-May-13
nos except SLD008 & SLD022, and B70-PS-29: SLD055 to SLD087 = 31 nos
Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-26: SLD001 and
SLD002 = 2 nos, B70-PS-27: SLD003 to SLD042 = 40 nos B70-PS-28: SLD001 to Tank Farm
1743 RFI-5858-QCN-1-1337 RFI-5858-QCN-1-1337 CIVIL
SLD026 = 24 nos except SLD008 & SLD022, and B70-PS-29: SLD055 to SLD087 = 31
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 5.2 S W H 30-Apr-13 4:00 PM 1-May-13
nos
Check Excavation-Bottom of Excavation verification D110 B70 PR 75 Pipe Rack SECTION1 CR#5
1746 RFI-5858-QCN-1-1340 RFI-5858-QCN-1-1340 CIVIL APPROVED B-V-3100-004-1-201-02_6 2.2 R W H 1-May-13 3:00 PM 7-May-13
Foundation No 1-2 /A-B (F1 -2NoS) PR-75
9:30AM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ).1st & 2nd
1747 RFI-5858-QCN-1-1341 RFI-5858-QCN-1-1341 CIVIL
layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 2-May-13 to 4-May-13
5:30PM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-31: F2. D110-
1748 RFI-5858-QCN-1-1342 RFI-5858-QCN-1-1342 CIVIL
B70-PR-31 - F1-final layer. D110-70-PR-31 - F2 1st, 2nd, 3rd layer
APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 2-May-13 3:30 PM 4-May-13
BZDW-008
1749 RFI-5858-QCN-1-1343 RFI-5858-QCN-1-1343 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDW-008 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 2-May-13 4:00 PM 2-May-13 cancelled work not ready
9:30 AM
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22; SLD012,
1752 RFI-5858-QCN-1-1346 RFI-5858-QCN-1-1346 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 2-May-13 to 2-May-13 cancelled work not ready
SLD13, SLD036, SLD037, SLD044 SLD045, SLD046 and SLD051 = 8 nos
5:30PM
1753 Check type A filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD001 to Tank Farm
RFI-5858-QCN-1-1347 RFI-5858-QCN-1-1347 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-May-13 7:00 AM 4-May-13
SLD047 = 44 nos except stopper. Final 6th layer Raslaffan
7:30 AM
1754 Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). 3rd,4th &
RFI-5858-QCN-1-1348 RFI-5858-QCN-1-1348 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H TO 6-May-13
5th layer 3-May-13
3:30 PM
8:00 AM
1755 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-31: F2. 4th &
RFI-5858-QCN-1-1349 RFI-5858-QCN-1-1349 CIVIL APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H TO 6-May-13
5th layer 3-May-13
3:30 PM
8:00 AM
1756 RFI-5858-QCN-1-1350 RFI-5858-QCN-1-1350 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDW-008 CANCELLED BZDW-008Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H TO 3-May-13 cancelled work not ready
3-May-13
3:30 PM
7:30AM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). 6th, 7th
1757 RFI-5858-QCN-1-1351 RFI-5858-QCN-1-1351 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 to 6-May-13
& 8th layer
5:30PM
8:00 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-31: F2. 6th, 7th
1758 RFI-5858-QCN-1-1352 RFI-5858-QCN-1-1352 CIVIL APPROVED PR-31 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 to 6-May-13
& 8th layer
5:30 PM
8:00 AM
BZDW-008
1759 RFI-5858-QCN-1-1353 RFI-5858-QCN-1-1353 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDW-008. 1st, 2nd & 3rd layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 to 6-May-13
Raslaffan
5:30 PM
1:00 PM
1760 Soil Compaction Test for Backfilling- Type B D110- B70- STN-74 Pipe Rack Foundation SECTION 4 B70-
RFI-5858-QCN-1-1354 RFI-5858-QCN-1-1354 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-May-13 TO 6-May-13
No 1/A-B (F1) - 2 Nos. 1st layer STN-74
4:30 PM
8:30 AM
1761 Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22; SLD012,
RFI-5858-QCN-1-1355 RFI-5858-QCN-1-1355 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 to 6-May-13
SLD13-1st & final layer, SLD036-1st & 2nd layer, SLD037-1st, 2nd & final layer
5:30 PM
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD001 1:30 PM
1762 Tank Farm
RFI-5858-QCN-1-1356 RFI-5858-QCN-1-1356 CIVIL to SLD047 = 41 nos excpet pipe stopper B70-PS-30: SLD063 to SLD065 = 3 nos and CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 to 4-May-13 cancelled work not ready
Raslaffan
SLD069 to SLd072 = 4 nos prior backfilling 5:30 PM
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD047 to Tank Farm
1763 RFI-5858-QCN-1-1357 RFI-5858-QCN-1-1357 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 4-May-13 8:30 AM 6-May-13
SLD051 = 28 nos except Pipe Stopper SLD034 - 1st layer Raslaffan
7:30 AM
Soil Compaction Test for Backfilling- Type B D110- B70- STN-74 Pipe Rack Foundation SECTION 4 B70-
1765 RFI-5858-QCN-1-1359 RFI-5858-QCN-1-1359 CIVIL
No 1/A-B (F1) - 2 Nos. 2nd, 3rd & 4th layer
APPROVED
STN-74
B-V-3100-004-1-201-01_6 4.2.b R W H 5-May-13 TO 7-May-13
4:30 PM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). Base 7:30AM
1766 RFI-5858-QCN-1-1360 RFI-5858-QCN-1-1360 CIVIL well both side - 9th layer, End portion 9th, 10th & 11th layer & Road portion 10th & 11th APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 5-May-13 to 7-May-13
layer 5:30PM
8:00 AM
BZDW-008
1767 RFI-5858-QCN-1-1361 RFI-5858-QCN-1-1361 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDW-008. 4th & 5th layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 5-May-13 to 7-May-13
5:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD029 to Tank Farm
1768 RFI-5858-QCN-1-1362 RFI-5858-QCN-1-1362 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 5-May-13 9:30AM 7-May-13
SLD046 = 16 nos except Pipe Stopper SLD034. (SLD029 to SLD046 - 1st layer) Raslaffan
Check final Visual Inspection& Elevations of Grading Piperack D110-B70-PR-09 ,D110- SECTION - 2
1769 RFI-5858-QCN-1-1363 RFI-5858-QCN-1-1363 CIVIL
B70-PR-10 &D110-B70-PR-11
APPROVED
Raslaffan
B-V-3100-004-1-201-02_6 5.1&5.2 S W H 5-May-13 8:30 AM 11-May-13
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-30: SLD021 to Tank Farm
1770 RFI-5858-QCN-1-1364 RFI-5858-QCN-1-1364 CIVIL
SLD051 = 28 nos except stopper SLD034
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 5-May-13 7:30 AM 9-May-13
7:30 AM
Soil Compaction Test for Backfilling- Type B D110- B70- STN-74 Pipe Rack Foundation SECTION 4 B70-
1771 RFI-5858-QCN-1-01365 RFI-5858-QCN-1-01365 CIVIL
No 1/A-B (F1) - 2 Nos. 5th & final layer
APPROVED
STN-74
B-V-3100-004-1-201-01_6 4.2.b R W H 6-May-13 TO 8-May-13
4:30 PM
7:30AM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). 12th &
1772 RFI-5858-QCN-1-01366 RFI-5858-QCN-1-01366 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 6-May-13 to 8-May-13
13th, 14th layer (END Portion), 12th & final layer (Road Portion)
5:30PM
8:00 AM
BZDW-008
1773 RFI-5858-QCN-1-01367 RFI-5858-QCN-1-01367 CIVIL Check type-B filed density & layer thickness for Duct Bank BZDW-008. final layer APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 6-May-13 to 8-May-13
Raslaffan
5:30 PM
1:30PM
Check Granular Class A sub-base filed density & layer thickness for Culvert BZRC-010
1774 RFI-5858-QCN-1-01368 RFI-5858-QCN-1-01368 CIVIL CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 6-May-13 to 6-May-13 cancelled work not ready
( East Side )
5:30PM
1775 Check Excavation : Bottom of excavation verification:Pipe Track Foundation D110-B70- Tank Farm
RFI-5858-QCN-1-01369 RFI-5858-QCN-1-01369 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1.. R W H 6-May-13 1:30 PM 9-May-13
PR-36: F2 and D110-B70-PR-38 Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD001 8:30AM
1776 Tank Farm
RFI-5858-QCN-1-01370 RFI-5858-QCN-1-01370 CIVIL to SLD047 = 41 nos excpet pipe stopper, SLD004,005,006,035 & 036 B70-PS-30: APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 6-May-13 to 8-May-13
Raslaffan
SLD063 to SLD065 = 3 nos prior backfilling - 1st & 2nd layer 5:30PM
8:30AM
1777 Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD029 to Tank Farm
RFI-5858-QCN-1-01371 RFI-5858-QCN-1-01371 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 6-May-13 to 8-May-13
SLD051 = 28 nos except Pipe Stopper SLD034 - 2nd layer Raslaffan
5:30PM
8:00 AM
Soil Compaction Test For backfilling Type - B Sleeper foundation B70-PS-18
1778 RFI-5858-QCN-1-01372 RFI-5858-QCN-1-01372 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 6-May-13 To 8-May-13
SLD010,SLD009,SLD008,,SLD007,SLD006,SLD005 - 1st & final layer
4:30 PM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-010 ( East Side ). 15th
1779 RFI-5858-QCN-1-01373 RFI-5858-QCN-1-01373 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 7-May-13 to 8-May-13
layer end portion
5:30 PM
7:30 AM
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-29: F1 - 1st,
1780 RFI-5858-QCN-1-01374 RFI-5858-QCN-1-01374 CIVIL APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 7-May-13 to 8-May-13
2nd & 3rd layer
:5:30 PM
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-30: SLD001 to Tank Farm
1781 RFI-5858-QCN-1-01375 RFI-5858-QCN-1-01375 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 7-May-13 7:30 AM 14-May-13
SLD028 = 26 nos except stopper SLD004 and SLD019 Raslaffan
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD029 to 8:30 AM
1782 Tank Farm
RFI-5858-QCN-1-01376 RFI-5858-QCN-1-01376 CIVIL SLD049 = 26 nos except Pipe Stopper SLD034, B70-PS-30: SLD029 to SLD049 except APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 7-May-13 to 9-May-13
Raslaffan
SLD034 final layer, below foundation. 5:30 PM
1783 Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-010
RFI-5858-QCN-1-01377 RFI-5858-QCN-1-01377 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 7-May-13 9:00 AM 8-May-13
( East Side )
1784 SECTION - 1
RFI-5858-QCN-1-01378 RFI-5858-QCN-1-01378 CIVIL Inspection of sand bedding prior to backfilling Desalination line Crossing # 101&100 APPROVED B-V-3100-004-2-201-01_6 4.2d,e R W H 7-May-13 2:30 PM 9-May-13
DESALINATION LINE
Soil Compaction Test For backfilling - Type B Sleeper foundation B70-PS-14 SLD050 TO SECTION - 4
1785 RFI-5858-QCN-1-01379 RFI-5858-QCN-1-01379 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-May-13 1:00 PM, 4:30 PM 11-May-13
SLD054 - 1st layer Raslaffan
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-29: F1. 4th, 5th
1786 RFI-5858-QCN-1-01380 RFI-5858-QCN-1-01380 CIVIL
& 6th layer
APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 8-May-13 7:30 AM, 5:30 PM 11-May-13
Barzan Off-plot
1787 RFI-5858-QCN-1-01381 RFI-5858-QCN-1-01381 CIVIL Sampling for Excavated Material Type -B AT SAMPLE Location Section -1, stock pile #- 01 APPROVED
Section - 1
B-V-3100-004-1-201-01_5 3.1.b R W H 8-May-13 8:00 AM 11-May-13
Check Laying,Compaction & Sampling of CBM2- First, Second and Third layer RAS
1788 RFI-5858-QCN-1-01382 RFI-5858-QCN-1-01382 CIVIL
LAFFAN CULVERT BZRC 010 - EAST SIDE ROAD PORTION
APPROVED BZRC-010 B-V-3100-004-1-201-03_7 4.2.2 S W H 8-May-13 7:30 AM, 4:00 PM 11-May-13
1789 RFI-5858-QCN-1-01383 RFI-5858-QCN-1-01383 CIVIL Check type-D layer thickness for Culvert BZRC-012 APPROVED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 3.1.d R W H 8-May-13 8:30 AM 13-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
1790 RFI-5858-QCN-1-01384 RFI-5858-QCN-1-01384 CIVIL Check type-B filed density & layer thickness for Culvert BZRC-012 CANCELLED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 8-May-13 9:30 AM, 5:30 PM 8-May-13 cancelled work not ready
Check Excavation : Bottom of excavation verification:Pipe Track Foundation D110-B70- Tank Farm
1791 RFI-5858-QCN-1-01385 RFI-5858-QCN-1-01385 CIVIL
PR-36: F3
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 8-May-13 1:30 PM 13-May-13
Check type B filed density & layer thickness for Precast Pipe Sleeper, B70-PS-30: Tank Farm
1794 RFI-5858-QCN-1-01388 RFI-5858-QCN-1-01388 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 8-May-13 8:30 AM, 5:30 PM 11-May-13
SLD063 to SLD065 = 3 nos and SLD069 to SLD072 = 4 nos - 1st & 2nd layer Raslaffan
Check type A filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001 Tank Farm
1795 RFI-5858-QCN-1-01389 RFI-5858-QCN-1-01389 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 8-May-13 8:30 AM, 5:30PM 8-May-13
to SLD028 = 27 nos Raslaffan
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-38. 1st & 2nd Tank Farm
1796 RFI-5858-QCN-1-01390 RFI-5858-QCN-1-01390 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 8-May-13 8:00 AM, 5:30 PM 11-May-13
layer Raslaffan
1797 RFI-5858-QCN-1-01391 RFI-5858-QCN-1-01391 CIVIL Check type-B filed density & layer thickness for Culvert BZRC-012 CANCELLED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 9-May-13 8:30 AM to 5:30 PM 9-May-13 cancelled work not ready
1798 Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-38. 3rd & 4th Tank Farm
RFI-5858-QCN-1-01392 RFI-5858-QCN-1-01392 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 9-May-13 8:00 AM to 5:30 PM 13-May-13
layer Raslaffan
1799 Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-29: SLD063. Tank Farm
RFI-5858-QCN-1-01393 RFI-5858-QCN-1-01393 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 9-May-13 1:30 PM 15-May-13
And pipe track D110-B70-Pr-36: F1 Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD001
to SLD003 = 3 nos, SLD006 to SLD012 = 6 nos, SLD014 to SLD031 = 18 nos, SLD033 to Tank Farm
1800 RFI-5858-QCN-1-01394 RFI-5858-QCN-1-01394 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 9-May-13 8:30 AM to 5:30 PM 9-May-13 cancelled work not ready
SLD044 = 12 nos, SLD046 and SLD047 = 2 nos and B70-PS-30: SLD063 to SLD065 = 3 Raslaffan
nos, and SLD069 to SLD072 = 7 nos
Check type A filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD014 Tank Farm
1801 RFI-5858-QCN-1-01395 RFI-5858-QCN-1-01395 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 9-May-13 8:30 AM to 5:30 PM 13-May-13
to SLD028 = 14 nos except SLD019 - 1st layer Raslaffan
SECTION - 1
1802 RFI-5858-QCN-1-01396 RFI-5858-QCN-1-01396 CIVIL Inspection of sand bedding prior to backfilling Desalination line Crossing # 99 &98 APPROVED B-V-3100-004-2-201-01_6 4.2d,e R W H 9-May-13 2:30 PM 15-May-13
DESALINATION LINE
Soil Compaction Test For backfilling - Type B Sleeper foundation B70- PS-14 SLD050 TO SECTION - 4
1803 RFI-5858-QCN-1-01397 RFI-5858-QCN-1-01397 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-May-13 7:00 AM 13-May-13
SLD054 - final layer Raslaffan
1804 RFI-5858-QCN-1-01398 RFI-5858-QCN-1-01398 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-33: F4 APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 11-May-13 1:30 PM 16-May-13
1805 Check type A filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD014 Tank Farm
RFI-5858-QCN-1-01399 RFI-5858-QCN-1-01399 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 11-May-13 8:30 AM to 5:30 PM 13-May-13
to SLD028 = 14 nos except SLD019 - 2nd layer Raslaffan
1806 Check type-B filed density & layer thickness for Culvert BZRC-012, 1st & 2nd layer above
RFI-5858-QCN-1-01400 RFI-5858-QCN-1-01400 CIVIL APPROVED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 11-May-13 8:30 AM to 5:30 PM 13-May-13
type D materals
Tank Farm
1808 RFI-5858-QCN-1-01402 RFI-5858-QCN-1-01402 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-38 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 11-May-13 8:00 AM to 5:30 PM 11-May-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Stopper B70-PS-28: SLD022- 1st Tank Farm
1809 RFI-5858-QCN-1-01403 RFI-5858-QCN-1-01403 CIVIL
layer (Excavated)
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 11-May-13 8:30 AM to 5:30 PM 15-May-13
Soil Compaction Test for backfilling - Type B D110 -B70- PR-75 Pipe Rack Foundation
1810 RFI-5858-QCN-1-01404 RFI-5858-QCN-1-01404 CIVIL
1(F1)&2(F1). 1st, 2nd, 3rd layer
APPROVED SECTION 1 PR - 75 B-V-3100-004-1-201-01_6 4.2.b R W H 11-May-13 7:30 AM TO 5:00 PM 13-May-13
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD001
to SLD003 = 3 nos, SLD006 to SLD012 = 6 nos, SLD014 to SLD031 = 18 nos and B70- Tank Farm
1811 RFI-5858-QCN-1-01405 RFI-5858-QCN-1-01405 CIVIL
PS-30: SLD063 to SLD065 = 3 nos, and SLD069 to SLD072 = 7 nos. B70-PS-29 SLD033
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 11-May-13 8:30 AM to 5:30 PM 15-May-13
to SLD047 except SLD035,036 & 048 final layer. B70-PS-29 SLD06 1st, 2nd layer
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-29: SLD049 to Tank Farm
1812 RFI-5858-QCN-1-01406 RFI-5858-QCN-1-01406 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 11-May-13 7:30 AM 15-May-13
SLD054 = 6 nos Raslaffan
1814 RFI-5858-QCN-1-01408 RFI-5858-QCN-1-01408 CIVIL Check type-B filed density & layer thickness for Culvert BZRC-012 - 3rd layer APPROVED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 12-May-13 7:30 AM to 5:30 PM 15-May-13
Tank Farm
1815 RFI-5858-QCN-1-01409 RFI-5858-QCN-1-01409 CIVIL Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-38 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 12-May-13 8:00 AM to 5:30 PM 12-May-13 CANCELLED RE ISSUED RFI
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: Tank Farm
1816 RFI-5858-QCN-1-01410 RFI-5858-QCN-1-01410 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 12-May-13 7:30 AM to 5:30 PM 15-May-13
SLD063 to SLD065 = 3 nos, SLD069 to SLD072 = 4 nos - final layer Raslaffan
Soil Compaction Test for backfilling - Type B D110 -B70- PR-75 Pipe Rack Foundation
1817 RFI-5858-QCN-1-01411 RFI-5858-QCN-1-01411 CIVIL APPROVED SECTION 1 PR - 75 B-V-3100-004-1-201-01_6 4.2.b R W H 12-May-13 7:30 AM to 5:00 PM 15-May-13
1(F1)&2(F1). 4th layer
Check type A filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD014 Tank Farm
1818 RFI-5858-QCN-1-01412 RFI-5858-QCN-1-01412 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 12-May-13 7:30 AM to 5:30 PM 15-May-13
to SLD028 = 14 nos, except stopper SLD019 - final layer Raslaffan
1819 Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD035 Tank Farm
RFI-5858-QCN-1-01413 RFI-5858-QCN-1-01413 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 12-May-13 7:30 AM to 5:30 PM 15-May-13
to SLD051 = 20 nos except stopper and SLD044,043,042 first layer Raslaffan
1820 Check Excavation : Bottom of excavation verification:Pipe Sleeper and Pipe Stopper B70- Tank Farm
RFI-5858-QCN-1-01414 RFI-5858-QCN-1-01414 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 13-May-13 1:30 PM 16-May-13
PS-26: SLD004 to SLD013 = 10 nos Raslaffan
1821 RFI-5858-QCN-1-01415 RFI-5858-QCN-1-01415 CIVIL Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-012 CANCELLED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 13-May-13 8:00 AM to 5:30 PM 13-May-13 cancelled work not ready
Check type B filed density & layer thickness for Cast-in- Situ Pipe Stopper B70-PS-28: Tank Farm
1822 RFI-5858-QCN-1-01416 RFI-5858-QCN-1-01416 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-May-13 7:30 AM to 5:30 PM 14-May-13
SLD022- 2nd layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29:
SLD001, SLD006 to SLD012 = 6 nos SLD014 to SLD022 = 9 nos, SLD025 to SLD031 = 7 Tank Farm
1823 RFI-5858-QCN-1-01417 RFI-5858-QCN-1-01417 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 13-May-13 7:30 AM to 5:30 PM 13-May-13 cancelled work not ready
nos, SLD033 to SLD035 = 3 nos, SLD038 to SLD040 = 3 nos SLD043 to SLD047 = 5 nos Raslaffan
and B70-PS-30: SLD063 to SLD065 = 3 nos, SLD069 to SLD072 = 4 nos
Check Excavation-Bottom of Excavation verification FOC Cable Trench B70 PS 05 SLD SECTION - 1
1824 RFI-5858-QCN-1-01418 RFI-5858-QCN-1-01418 CIVIL APPROVED B-V-3100-004-1-201-02_6 2.2 R W H 13-May-13 7:00 AM 18-May-13
001 TO SLD 008,B70 PS 06 SLD 001 TO SLD 088, B70 PS 07 SLD 101 TO SLD044 Raslaffan
Barzan Off-plot
1825 RFI-5858-QCN-1-01419 RFI-5858-QCN-1-01419 CIVIL Sampling for Excavated Material Type -B AT SAMPLE Location Section -1, stock pile #- 02 APPROVED B-V-3100-004-1-201-01_5 3.1.b R W H 13-May-13 8:00 AM 15-May-13
Section : 1
1826 SECTION - 1
RFI-5858-QCN-1-01420 RFI-5858-QCN-1-01420 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 101. 1st layer APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 14-May-13 7:30 AM to 5:00 PM 16-May-13
DESALINATION LINE
1827 Soil Compaction Test For backfilling - Type B Sleeper foundation B70 PS 13 SLD036 TO SECTION - 4
RFI-5858-QCN-1-01421 RFI-5858-QCN-1-01421 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 14-May-13 2:00 PM to 4.30 PM 16-May-13
SLD037, 1st & final layer Raslaffan
1828 Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-012 -
RFI-5858-QCN-1-01422 RFI-5858-QCN-1-01422 CIVIL APPROVED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 14-May-13 8:00 AM to 5:30 PM 16-May-13
4th layer
Check type B filed density & layer thickness for Cast-in- Situ Pipe Stopper B70-PS-28: Tank Farm
1830 RFI-5858-QCN-1-01424 RFI-5858-QCN-1-01424 CIVIL
SLD022
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 14-May-13 7:30 AM to 5:30 PM 14-May-13 cancelled work not ready
Review and approval of QIL test report for Back fill Material (Type-A & B,& CLASS-B &
Barzan Off-plot
1831 RFI-5858-QCN-1-01425 RFI-5858-QCN-1-01425 CIVIL CBR) for the sampled location Section-3 Stockpile #10 & Section-7 Stockpile #03-Type APPROVED
BARZAN
B-V-3100-004-1-201-01_6 3.1.a.b R W H 14-May-13 7:30 AM 19-May-13
-A
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD049 Tank Farm
1832 RFI-5858-QCN-1-01426 RFI-5858-QCN-1-01426 CIVIL
to SLD054 = 11 nos
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 14-May-13 1:30 PM to 5:30 PM 14-May-13 cancelled work not ready
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD033 Tank Farm
1833 RFI-5858-QCN-1-01427 RFI-5858-QCN-1-01427 CIVIL
to SLD41 = 8 nos except SLD034 SLD45 to SLD051 = 7 nos - Final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 14-May-13 8:00 AM to 5:30 PM 16-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Excavation : Bottom of excavation verification:Pipe Sleeper and Pipe Stopper B70- Tank Farm
1834 RFI-5858-QCN-1-01428 RFI-5858-QCN-1-01428 CIVIL CANCELLED B-V-3100-004-1-201-01_6 2.1 R W H 14-May-13 8:00 AM 14-May-13 cancelled work not ready
PS-30: SLD001 to SLD003 = 3 nos and SLD005 to SLD010 = 6 nos Raslaffan
4.3.2 Check compressive strength@7 Days for CBM2 (Cube testing as per BS EN
1835 RFI-5858-QCN-1-01429 RFI-5858-QCN-1-01429 CIVIL -12390-3) CBM2- First, Second and Third layer RAS LAFFAN CULVERT BZRC 010 - APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_7 4.3.2 S W H 15-May-13 10:00 AM 15-May-13
EAST SIDE ROAD PORTION
1836 RFI-5858-QCN-1-01430 RFI-5858-QCN-1-01430 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-33: F3 APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 15-May-13 1:30 PM 21-May-13
1837 RFI-5858-QCN-1-01431 RFI-5858-QCN-1-01431 CIVIL Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-012 CANCELLED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-May-13 8:00 AM to 5:30 PM 15-May-13 cancelled work not ready
Check type A filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
1838 RFI-5858-QCN-1-01432 RFI-5858-QCN-1-01432 CIVIL APPROVED Tank Farm Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-May-13 8:30 AM to11:00 AM 18-May-13
to SLD013 = 10 nos, except SLD04,11,012, 1st,2nd and final layer - below foundation
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD046
1839 RFI-5858-QCN-1-01433 RFI-5858-QCN-1-01433 CIVIL to SLD051 = 7 nos SLD041 to SLD036 = 6 nos SLD035, SLD033 to SLD030 = 5 nos and CANCELLED Tank Farm Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-May-13 8:00 AM to 5:30 PM 15-May-13 cancelled work not ready
28 = 1 no
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F3, 1st
1840 RFI-5858-QCN-1-01434 RFI-5858-QCN-1-01434 CIVIL APPROVED Tank Farm Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 15-May-13 8:00 AM to 5:30 PM 18-May-13
layer above type D
1841 Sampling for Excavated Material Type -A & Class-B AT SAMPLE Location Section -3, Barzan Off-plot
RFI-5858-QCN-1-01435 RFI-5858-QCN-1-01435 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1.a R W H 15-May-13 8:00 AM 18-May-13
stock pile #- 11 Section - 1
1842 Soil Compaction Test for backfilling - Type B D110 -B70- PR-75 Pipe Rack Foundation
RFI-5858-QCN-1-01436 RFI-5858-QCN-1-01436 CIVIL APPROVED SECTION 1PR - 75 B-V-3100-004-1-201-01_6 4.2.b R W H 15-May-13 7:30 AM to 5:00 PM 18-May-13
1(F1) - 5th layer
1843 Soil Compaction Test for backfilling - Grading Work Type - B Crossing # 5 Pipe Rack PR-
RFI-5858-QCN-1-01437 RFI-5858-QCN-1-01437 CIVIL APPROVED SECTION - 1 CR#5 B-V-3100-004-1-201-01_6 4.2.a R W H 15-May-13 7:30 AM to 5:00 PM 18-May-13
75 Foundation 1(F1) Portion, 1st layer
Soil Compaction Test for Backfilling-Type BDesalination line Crossing # 101. 2nd & 3rd SECTION - 1
1844 RFI-5858-QCN-1-01438 RFI-5858-QCN-1-01438 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 15-May-13 7:30 AM to 5:00 PM 18-May-13
layer DESALINATION LINE
SECTION - 1
1845 RFI-5858-QCN-1-01439 RFI-5858-QCN-1-01439 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 101, - final layer APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 16-May-13 7:30 AM to 5:00 PM 19-May-13
DESALINATION LINE
Soil Compaction Test for backfilling - Type B( FTR No. ) FTR-QCN-2-0034 D110 -B70- SECTION 1 PR - 75
1847 RFI-5858-QCN-1-01441 RFI-5858-QCN-1-01441 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 16-May-13 7:30 AM to 5:00 PM 19-May-13
PR-75 Pipe Rack Foundation 1(F1). 6th layer Raslaffan
1848 Soil Compaction Test for backfilling - Grading Work Type B (FTR No- ) FTR-QCN-2-0034 SECTION 1 CR#5
RFI-5858-QCN-1-01442 RFI-5858-QCN-1-01442 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 16-May-13 7:30 AM to 5:00 PM 19-May-13
Crossing # 5 Pipe Rack Foundation 1(F1) Portion-2nd layer Raslaffan
1849 Check Excavation-Bottom of Excavation verification D110 - B70- PR-73 Pipe Rack SECTION - 4
RFI-5858-QCN-1-01443 RFI-5858-QCN-1-01443 CIVIL CANCELLED B-V-3100-004-2-201-01_6 2.1 R W H 16-May-13 8:30 AM 16-May-13 cancelled work not ready
Foundation 1(F1) Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-26: SLD004 Tank Farm
1851 RFI-5858-QCN-1-01445 RFI-5858-QCN-1-01445 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 16-May-13 9:30 AM to 5:30 PM 16-May-13 cancelled work not ready
to SLD013 = 9 nos except SLD011 Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-29: SLD049 Tank Farm
1852 RFI-5858-QCN-1-01446 RFI-5858-QCN-1-01446 CIVIL
to SLD054 = 6 nos, 1st & 2nd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 16-May-13 7:30 AM to 5:30 PM 19-May-13
Check type-B filed density & layer thickness for Pipe Track D110-B70-PR-38. 3rd & 4th Tank Farm
1853 RFI-5858-QCN-1-01447 RFI-5858-QCN-1-01447 CIVIL
layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 16-May-13 8:00 AM to 5:30 PM 19-May-13
Tank Farm
1854 RFI-5858-QCN-1-01448 RFI-5858-QCN-1-01448 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-29: SLD080 APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 16-May-13 1:30 PM 23-May-13
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION - 4 PR -
1855 RFI-5858-QCN-1-1449 RFI-5858-QCN-1-1449 CIVIL
1(F1 F2). 1st layer
APPROVED
17 Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 16-May-13 7:00 AM to 5:00 PM 19-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION - 4 PR -
1856 RFI-5858-QCN-1-01450 RFI-5858-QCN-1-01450 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 18-May-13 7:00 AM to 5:00 PM 20-May-13
1(F1 F2)- 2nd & 3rd & 4th layer 17
Soil Compaction Test for backfilling - Grading Work Type B (FTR No- ) Crossing # 5 Pipe
1857 RFI-5858-QCN-1-01451 RFI-5858-QCN-1-01451 CIVIL
Rack Foundation 1(F1) Portion - final layer
APPROVED SECTION - 1 CR#5 B-V-3100-004-1-201-01_6 4.2.a R W H 18-May-13 7:30 AM to 5:00 PM 20-May-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F1, F2 and Tank Farm
1858 RFI-5858-QCN-1-01452 RFI-5858-QCN-1-01452 CIVIL
F3 and D110-B70-PR-38 Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 17-May-13 8:00 AM to 3:30 PM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F2 and F3,
Tank Farm
1859 RFI-5858-QCN-1-01453 RFI-5858-QCN-1-01453 CIVIL & PR-38 D110-B70-PS-36 - F2-1st layer, D110-B70-PR-36-F3-3rd layer, D110-B70-PR- APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 18-May-13 8:00 AM to 5:30 PM 20-May-13
38-final layer
Check Excavation : Bottom of excavation verification: F1 and Pipe Track D110-B70-PR- PR-28 and PR-33
1860 RFI-5858-QCN-1-01454 RFI-5858-QCN-1-01454 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 18-May-13 1:30 PM 21-May-13
33: F2 Raslaffan
Tank Farm
1861 RFI-5858-QCN-1-01455 RFI-5858-QCN-1-01455 CIVIL Check type-B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD063 CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 18-May-13 7:30 AM to 5:30 PM 18-May-13 cancelled work not ready
Raslaffan
Tank Farm
1862 RFI-5858-QCN-1-01456 RFI-5858-QCN-1-01456 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-29: SLD045 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 18-May-13 1:30 PM 21-May-13
Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-28:
1864 Tank Farm
RFI-5858-QCN-1-01458 RFI-5858-QCN-1-01458 CIVIL SLD022, B70-PS-29: SLD049 to SLD054 = 6 nos-final layer, B70-PS-28 SLD022 - 3rd APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 18-May-13 7:30 AM to 5:30 PM 20-May-13
Raslaffan
layer
1865 SECTION - 1
RFI-5858-QCN-1-01459 RFI-5858-QCN-1-01459 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100 APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 18-May-13 7:30 AM to 5:00 PM 20-May-13
DESALINATION LINE
SECTION - 1
1866 RFI-5858-QCN-1-01460 RFI-5858-QCN-1-01460 CIVIL Inspection of sand bedding prior to backfilling Desalination line Crossing # 102 APPROVED B-V-3100-004-2-201-01_6 4.2.d.e R W H 19-May-13 2:30 PM 20-May-13
DESALINATION LINE
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION - 4 PR -
1867 RFI-5858-QCN-1-01461 RFI-5858-QCN-1-01461 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 7:00 AM to 5:00 PM 19-May-13 cancelled work not ready
1(F1 F2) 17
Check type-A filed density & layer thickness for Pipe Sleeper B70-PS-29: SLD004 and Tank Farm
1868 RFI-5858-QCN-1-01462 RFI-5858-QCN-1-01462 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 19-May-13 8:30 AM 21-May-13
SLD005 - 1st & 2nd layer Raslaffan
Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-29: SLD032 Tank Farm
1869 RFI-5858-QCN-1-01463 RFI-5858-QCN-1-01463 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 19-May-13 1:30 PM 23-May-13
and Pipe Sleeper. Raslaffan
1870 Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100 & 99 (Half SECTION - 1
RFI-5858-QCN-1-01464 RFI-5858-QCN-1-01464 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 7:30 AM to 5:00 PM 21-May-13
portion- east side) - 1st & 2nd layer DESALINATION LINE
1871 Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F1, F2 (F1- Tank Farm
RFI-5858-QCN-1-01465 RFI-5858-QCN-1-01465 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 8:00 AM to 5:30 PM 21-May-13
1st, 2nd & 3rd layer, F2-2nd layer) and Pipe Track D110-B70-PR-55. - 1st layer Raslaffan
1872 Check type-B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD063- 1st Tank Farm
RFI-5858-QCN-1-01466 RFI-5858-QCN-1-01466 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 19-May-13 7:30 AM to 5:30 PM 21-May-13
layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-27: SLD001 Tank Farm
1873 RFI-5858-QCN-1-01467 RFI-5858-QCN-1-01467 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 8:30 AM to 5:30 PM 19-May-13 cancelled work not ready
and SLD002 Raslaffan
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM
1874 RFI-5858-QCN-1-01468 RFI-5858-QCN-1-01468 CIVIL
NORTH SIDE 1st,2nd& 3rd PORTION OF HAMAD ROAD
CANCELLED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 2:00 PM to 5:00 PM 19-May-13 cancelled work not ready
1875 RFI-5858-QCN-1-01469 RFI-5858-QCN-1-01469 CIVIL Wet Lean Mix Concrete 2 Placing and Compaction of BZRC-010 - esst side road protion APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_8 4.4.2 S W H 19-May-13 2:00 PM 21-May-13
Soil Compaction Test For backfilling Type - B D110-B70-PS-18 Pipe Stopper Foundation Section - 6
1876 RFI-5858-QCN-1-01470 RFI-5858-QCN-1-01470 CIVIL
Pedestal SLD017-1st, 2nd, 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 19-May-13 8:00 AM To 4:30 PM 21-May-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100 & 99 (East SECTION - 1
1877 RFI-5858-QCN-1-01471 RFI-5858-QCN-1-01471 CIVIL
side Half portion ) - 3rd layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 7:30 AM to 5:00 PM 22-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for backfilling - Type B( FTR No. ) D110 -B70- PR-75 Pipe Rack SECTION 1 PR - 75
1878 RFI-5858-QCN-1-01472 RFI-5858-QCN-1-01472 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 7:30 AM to 5:00 PM 22-May-13
Foundation 2(F1). 5t & 6th final layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD003 Tank Farm
1879 RFI-5858-QCN-1-01473 RFI-5858-QCN-1-01473 CIVIL
and SLD005 to SLD010 = 7 nos
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 1:30 PM to 5:30 PM 20-May-13 cancelled work not ready
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION 4 PR - 17
1881 RFI-5858-QCN-1-01475 RFI-5858-QCN-1-01475 CIVIL
1(F1 F2) - 5th & 6th final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 7:00 AM to 5:00 PM 22-May-13
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM
1882 RFI-5858-QCN-1-01476 RFI-5858-QCN-1-01476 CIVIL APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 2:00 PM to 5:00 PM 22-May-13
NORTH SIDE 1st,2nd& 3rd PORTION OF HAMAD ROAD. 1st layer
Tank Farm
1883 RFI-5858-QCN-1-01477 RFI-5858-QCN-1-01477 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-54 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 20-May-13 1:30 PM 23-May-13
Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F2 - 3rd Tank Farm
1884 RFI-5858-QCN-1-01478 RFI-5858-QCN-1-01478 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 8:00 AM to 5:30 PM 22-May-13
layer Raslaffan
1885 Soil Compaction Test For backfilling Type - B D110-B70-PS-18 Pipe Stopper Foundation Section - 6
RFI-5858-QCN-1-01479 RFI-5858-QCN-1-01479 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 8:00 AM To 4:30 PM 22-May-13
SLD017. 4th, 5th & 6th layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper and Stopper B70-
1886 Tank Farm
RFI-5858-QCN-1-01480 RFI-5858-QCN-1-01480 CIVIL PS-26: SLD004 to SLD013 = 10 nos (PS-26) 1st layer B70-PS-27: SLD001 and SLD002 APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-May-13 8:30 AM to 5:30 PM 22-May-13
Raslaffan
= 2 nos - 1st layer, B70-PS-29: SLD063-2nd layer
1887 Check Excavation-Bottom of Excavation verification D110 - B70- PR-73 Pipe Rack SECTION - 4
RFI-5858-QCN-1-01481 RFI-5858-QCN-1-01481 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 20-May-13 1:00 PM 25-May-13
Foundation 1(F1) & 2(F2) Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper and Stopper B70- Tank Farm
1888 RFI-5858-QCN-1-01482 RFI-5858-QCN-1-01482 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 8:30 AM to 5:30 PM 23-May-13
PS-27: SLD001 and SLD002 = 2 nos - final layer Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100 & 99 (East SECTION -1
1889 RFI-5858-QCN-1-01483 RFI-5858-QCN-1-01483 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 7:30 AM to 5:00 PM 23-May-13
side Half portion ) - 4th layer DESALINATION LINE
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F3 - final Tank Farm
1890 RFI-5858-QCN-1-01484 RFI-5858-QCN-1-01484 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 8:00 AM to 5:30 PM 23-May-13
layer and Pipe Track D110-B70-PR-55-2nd layer Raslaffan
Check Excavation : Bottom of excavation verification:Pipe Stopper and Pipe Sleeper Tank Farm
1891 RFI-5858-QCN-1-01485 RFI-5858-QCN-1-01485 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 21-May-13 1:30 PM 25-May-13
B70-PS-29: SLD036 and SLD037 Raslaffan
1892 Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001 Tank Farm
RFI-5858-QCN-1-01486 RFI-5858-QCN-1-01486 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 7:30 M to 5:30 PM 21-May-13 cancelled work not ready
and SLD002 = 2 nos and SLD005 to SLD010 = 6 nos Raslaffan
1893 RFI-5858-QCN-1-01487 RFI-5858-QCN-1-01487 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-29: F2 APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 21-May-13 1:40 PM 23-May-13
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM
1894 RFI-5858-QCN-1-01488 RFI-5858-QCN-1-01488 CIVIL NORTH SIDE 1st,2nd& 3rd PORTION OF HAMAD ROAD(EAST SIDE) - 2nd,3rd&4th APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 7:00 AM to 5:00 PM 23-May-13
layer, (west side) - 1st & 2nd layer
Soil Compaction Test For backfilling Type - B D110-B70-PS-18 Pipe Stopper Foundation Section - 6
1895 RFI-5858-QCN-1-01489 RFI-5858-QCN-1-01489 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 21-May-13 7:00 AM To 4:30 PM 23-May-13
SLD017 - final layer Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100(Included SECTION - 1
1896 RFI-5858-QCN-1-01490 RFI-5858-QCN-1-01490 CIVIL
CP portion Near Road crossing ) & Crossing # 99 (East side Half portion ) - 5th layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 22-May-13 7:00 AM to 5:00 PM 23-May-13
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM
1897 RFI-5858-QCN-1-01491 RFI-5858-QCN-1-01491 CIVIL NORTH SIDE 1st,2nd& 3rd PORTION OF HAMAD ROAD - 5th & 6th layer (east side), APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 22-May-13 7:00 AM to 5:00 PM 23-May-13
3rd & 4th layer (west side)
Tank Farm
1898 RFI-5858-QCN-1-01492 RFI-5858-QCN-1-01492 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-30: SLD068 APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 22-May-13 1:30 PM 25-May-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F4-1st, 2nd
1899 RFI-5858-QCN-1-01493 RFI-5858-QCN-1-01493 CIVIL
& 3rd layer
APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 22-May-13 8:00 AM to 5:30 PM 23-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type B filed density & layer thickness for Precast Pipe Sleeper and Stopper B70- Tank Farm
1900 RFI-5858-QCN-1-01494 RFI-5858-QCN-1-01494 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 22-May-13 7:30 AM to 5:30 PM 23-May-13
PS-26: SLD011 - 1st,2nd & 3rd layer = 2 nos and B70-PS-29: SLD063-3rd & 4th layer Raslaffan
Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-012 -
1901 RFI-5858-QCN-1-01495 RFI-5858-QCN-1-01495 CIVIL
5th, 6th & final layer
APPROVED BZRC-012 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 22-May-13 7:00 AM to 5:30 PM 23-May-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-55 - 3rd & 4th Tank Farm
1902 RFI-5858-QCN-1-01496 RFI-5858-QCN-1-01496 CIVIL
layer, D110-B70-PR-36 - F1 & F2 - final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 22-May-13 7:00 AM to 5:30 PM 23-May-13
Check type D material for filling of Base of Pipe Stopper B70-PS28: SLD008, B70-PS-29: Tank Farm
1903 RFI-5858-QCN-1-01497 RFI-5858-QCN-1-01497 CIVIL
SLD013, SLD032, SLD045 SLD080 prior backfilling.
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 22-May-13 8:00 AM 22-May-13
Check final Visual Inspection& Elevations of Grading D110-B70-PS-18 Pipe Sleeper SECTION - 6
1904 RFI-5858-QCN-1-01498 RFI-5858-QCN-1-01498 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 22-May-13 8:00 AM 25-May-13
Foundation SLD001 TO SLD010 & SLD017 Raslaffan
Check type B filed density & layer thickness Pipe Stopper B70-PS28: SLD008, B70-PS- Tank Farm
1905 RFI-5858-QCN-1-01499 RFI-5858-QCN-1-01499 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 22-May-13 8:30 AM to 5:30 PM 22-May-13 cancelled work not ready
29: SLD013, SLD032, SLD045 SLD080 and B70-PS-30: SLD068 prior backfilling. Raslaffan
1907 Soil Compaction Test for formation level prior to blinding- Type A D110 - B70- PR-73 SECTION 4 PR - 73
RFI-5858-QCN-1-01501 RFI-5858-QCN-1-01501 CIVIL CANCELLED B-V-3100-004-1-201-02_6 4.2.a R W H 22-May-13 7:30 AM 22-May-13 cancelled
Pipe Rack Foundation 1(F1) Raslaffan
1908 Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F3 and F4 -
RFI-5858-QCN-1-01502 RFI-5858-QCN-1-01502 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:30 AM to 5:30 PM 26-May-13
4th, 5th & final layer (F$), 1st layer
1909 Check type B filed density & layer thickness for Pipe Track D110-B70-PR-54 - 1st, 2nd & Tank Farm
RFI-5858-QCN-1-01503 RFI-5858-QCN-1-01503 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:00 AM to 5:30 PM 26-May-13
3rd layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper and Pipe Stopper Tank Farm
1910 RFI-5858-QCN-1-01504 RFI-5858-QCN-1-01504 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:30 AM to 5:30 PM 26-May-13
B70-PS-29: SLD063 - final layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper and Stopper B70-
Tank Farm
1911 RFI-5858-QCN-1-01505 RFI-5858-QCN-1-01505 CIVIL PS-26: SLD004 to SLD013 = 10 nos -2nd and final layer except stoper SLD011, SL011 - APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:30 AM to 5:30 PM 26-May-13
Raslaffan
4th & 5th layer
Tank Farm
1912 RFI-5858-QCN-1-01506 RFI-5858-QCN-1-01506 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-28: SLD008 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 23-May-13 1:30 PM 26-May-13
Raslaffan
Crossing # 56
1913 RFI-5858-QCN-1-01507 RFI-5858-QCN-1-01507 CIVIL Check Excavation : Bottom of excavation verification:Duct Bank BZDP-011 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 23-May-13 1:30 PM 26-May-13
Raslaffan
1914 Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 100(Included SECTION1
RFI-5858-QCN-1-01508 RFI-5858-QCN-1-01508 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:30 AM to 5:00 PM 23-May-13 cancelled work not ready
CP portion Near Road crossing ) & Crossing # 99 (East side Half portion ) DESALINATION LINE
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM
1915 RFI-5858-QCN-1-01509 RFI-5858-QCN-1-01509 CIVIL NORTH SIDE 1st,2nd& 3rd PORTION OF HAMAD ROAD-1st, 2nd, 3rd layer (End APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:00 AM to 5:00 PM 26-May-13
protion), 5th,6th,7th layer (west side), 7th,8th layer (East side)
1916 Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation
RFI-5858-QCN-1-01510 RFI-5858-QCN-1-01510 CIVIL CANCELLED SECTION 4 PR - 17 B-V-3100-004-1-201-01_6 4.2.b R W H 23-May-13 7:00 AM to 5:00 PM 23-May-13 cancelled work not ready
2(F3,F4)
Soil Compaction Test For backfilling Type - B D110 RW-002 E-W Retaining wall 1st,2nd& Section6 D110 RW-
1917 RFI-5858-QCN-1-01511 RFI-5858-QCN-1-01511 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b W W H 23-May-13 7:00 AM To 4:30 PM 3-May-13 cancelled work not ready
3rd panel (South Side Portion) 002 E-W Raslaffan
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - FROM HAMAD CULVERT
1918 RFI-5858-QCN-1-01512 RFI-5858-QCN-1-01512 CIVIL
NORTH SIDE 8th,9th&10th layer PORTION OF HAMAD ROAD
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 24-May-13 7:00 AM to 5:00 PM 24-May-13
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation Section - 4 PR - 17
1919 RFI-5858-QCN-1-01513 RFI-5858-QCN-1-01513 CIVIL
2(F3,F4)
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 24-May-13 7:00 AM to 5:00 PM 24-May-13 cancelled work not ready
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation
1920 RFI-5858-QCN-1-01514 RFI-5858-QCN-1-01514 CIVIL
2(F3,F4) -1st, 2nd and 3rd layer
APPROVED SECTION 4 PR - 17 B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:00 AM to 5:00 PM 26-May-13
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - NORTH
1921 RFI-5858-QCN-1-01515 RFI-5858-QCN-1-01515 CIVIL
SIDE PORTION OF HAMAD ROAD
CANCELLED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:00 AM to 5:00 PM 25-May-13 cancelled work not ready
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102,Crossing # SECTION - 1
1922 RFI-5858-QCN-1-01516 RFI-5858-QCN-1-01516 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:30 AM to 5:00 PM 25-May-13 cancelled work not ready
100(Included CP portion Near Road crossing ) & Crossing # 99 (East side Half portion ) DESALINATION LINE
Soil Compaction Test For backfilling Type - B D110 RW-002 E-W Retaining wall 1st,2nd& Section6 D110 RW-
1923 RFI-5858-QCN-1-01517 RFI-5858-QCN-1-01517 CIVIL
3rd panel (South Side Portion)
CANCELLED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:00 AM To 4:30 PM 25-May-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F3 -2nd, 3rd
1925 RFI-5858-QCN-1-01519 RFI-5858-QCN-1-01519 CIVIL
& 4th layer
APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:30 AM to 5:30 PM 26-May-13
Check type B filed density & layer thickness for Precast Pipe Stopper B70-PS-26: Tank Farm
1926 RFI-5858-QCN-1-01520 RFI-5858-QCN-1-01520 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:30 AM to 5:30 PM 26-May-13
SLD011 - 6th & final layer Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-54 and PR-55 - Tank Farm
1927 RFI-5858-QCN-1-01521 RFI-5858-QCN-1-01521 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:00 AM to 5:30 PM 26-May-13
4th layer (PR-54), 5th layer (PR-55) Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: Tank Farm
1928 RFI-5858-QCN-1-01522 RFI-5858-QCN-1-01522 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:30 AM to 5:30 PM 25-May-13 cancelled work not ready
SLD058, SLD059, SLD060 SLD066, SLD067 = 5 nos Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
1929 Tank Farm
RFI-5858-QCN-1-01523 RFI-5858-QCN-1-01523 CIVIL to SLD003 = 3 nos SLD005 to SLD010 = 6 nos, SLD015, SLD017, SLD018 = 3 nos, APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 7:30 AM to 5:30 PM 26-May-13
Raslaffan
SLD020 to SLD024 = 5 nos, SLD027 to SLD031 = 5 nos-1st layer
1930 Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD032, Tank Farm
RFI-5858-QCN-1-01524 RFI-5858-QCN-1-01524 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 25-May-13 1:30 PM to 5:30 PM 25-May-13 cancelled work not ready
SLD045 and SLD080 Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102,Crossing # SECTION - 1
1932 RFI-5858-QCN-1-01526 RFI-5858-QCN-1-01526 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:30 AM to 5:00 PM 26-May-13 cancelled work not ready
100(Included CP portion Near Road crossing ) & Crossing # 99 (East side Half portion ) DESALINATION LINE
Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION - 4 PR -
1933 RFI-5858-QCN-1-01527 RFI-5858-QCN-1-01527 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:00 AM to 5:00 PM 28-May-13
2(F3,F4)-4th,5th,6th layer 17
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - NORTH
1934 RFI-5858-QCN-1-01528 RFI-5858-QCN-1-01528 CIVIL CANCELLED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:00 AM to 5:00 AM 26-May-13 cancelled work not ready
SIDE PORTION OF HAMAD ROAD
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F3 - 5th &
1935 RFI-5858-QCN-1-01529 RFI-5858-QCN-1-01529 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:30 AM to 5:30 PM 28-May-13
6th layer
1936 Check type B filed density & layer thickness for Pipe Track D110-B70-PR-54 and PR-55- Tank Farm
RFI-5858-QCN-1-01530 RFI-5858-QCN-1-01530 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:00 AM to 5:30 PM 28-May-13
5th layer (PR-54), final layer (PR-55) Raslaffan
1937 Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD032, Tank Farm
RFI-5858-QCN-1-01531 RFI-5858-QCN-1-01531 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:30 AM to 5:30 PM 28-May-13
SLD045, SLD080 - 1st layer for SLD-032,045,080, 2nd layer for SLD-080 Raslaffan
1938 Soil Compaction Test For backfilling Type - B D110 RW-002 E-W Retaining wall 2nd& 3rd Section6 D110 RW-
RFI-5858-QCN-1-01532 RFI-5858-QCN-1-01532 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:00 AM To 4:30 PM 28-May-13
panel (South Side Portion) - 1st layer 002 E-W Raslaffan
Tank Farm
1939 RFI-5858-QCN-1-01533 RFI-5858-QCN-1-01533 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-40 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 26-May-13 8:30 AM 29-May-13
Raslaffan
4.4.3 Check compressive strength@7 Days for(C-10) (Cube testing as per BS EN -12390-
1940 RFI-5858-QCN-1-01534 RFI-5858-QCN-1-01534 CIVIL
3) Wet Lean Mix Concrete 2 at BZRC-010 East side Road Portion
APPROVED RMQ Lab Raslaffan B-V-3100-004-1-201-03_8 4.4.3 S W H 26-May-13 2:00 PM 26-May-13
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
Tank Farm
1941 RFI-5858-QCN-1-01535 RFI-5858-QCN-1-01535 CIVIL to SLD003 = 3 nos SLD005 to SLD0106 nos, SLD015, SLD017, SLD018 = 3 nos, CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 26-May-13 7:30 AM to 5:30 PM 26-May-13 cancelled work not ready
SLD020 to SLD024 = 5 nos, SLD027 to SLD031 = 5 nos
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 and F3 -
1942 RFI-5858-QCN-1-01536 RFI-5858-QCN-1-01536 CIVIL
1st layer (F2), final layer (F3)
APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:30 AM to 5:30 PM 29-May-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102 - 1st & 2nd SECTION - 1
1943 RFI-5858-QCN-1-01537 RFI-5858-QCN-1-01537 CIVIL
layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:30 AM to 5: PM 29-May-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC - 005 - NORTH
1944 RFI-5858-QCN-1-01538 RFI-5858-QCN-1-01538 CIVIL APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:00 AM to 5:00 PM 29-May-13
SIDE PORTION OF HAMAD ROAD - 11th & 12th layer
Soil Compaction Test For backfilling Type - B D110 RW-002 E-W Retaining wall 1st,2nd& Section6 D110 RW-
1945 RFI-5858-QCN-1-01539 RFI-5858-QCN-1-01539 CIVIL
3rd panel (South Side Portion)
CANCELLED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:00 AM To 4:30 PM 27-May-13 cancelled work not ready
Inspection of sand bedding prior to backfilling Desalination line Crossing # 97 & Crossing SECTION - 1
1946 RFI-5858-QCN-1-01540 RFI-5858-QCN-1-01540 CIVIL
# 98
APPROVED
DESALINATION LINE
B-V-3100-004-2-201-01_6 4.2.d,e R W H 27-May-13 3:30 PM 29-May-13
Tank Farm
1947 RFI-5858-QCN-1-01541 RFI-5858-QCN-1-01541 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-54 and PR-55 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:00 AM to 5:30 PM 27-May-13 cancelled reissued RFI
Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD032,
Tank Farm
1948 RFI-5858-QCN-1-01542 RFI-5858-QCN-1-01542 CIVIL SLD045, SLD080-2nd & 3rd layer and Pipe Sleeper B70-PS-29: SLD005, SLD036, APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:30 AM to 5:30 PM 29-May-13
Raslaffan
SLD037, SLD073, SLD074, SLD086 and SLD087 = 7 nos-1st & 2nd layer
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
Tank Farm
1949 RFI-5858-QCN-1-01543 RFI-5858-QCN-1-01543 CIVIL to SLD003 = 3 nos SLD005 to SLD010 = 6 nos, SLD015, SLD017, SLD018 = 3 nos, CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 27-May-13 7:30 AM to 5:30 PM 27-May-13 cancelled work not ready
Raslaffan
SLD020 to SLD024 = 5 nos, SLD027 to SLD031 = 5 nos
Check final Visual Inspection& Elevations of Grading Sleeper foundation D110-B70 -PS- SECTION - 4
1950 RFI-5858-QCN-1-01544 RFI-5858-QCN-1-01544 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 27-May-13 8:00 AM 27-May-13
13 SLD036 TO SLD037 Raslaffan
1951 Check final Visual Inspection& Elevations of Grading Piperack D110-B70-PR-07 ,D110- SECTION - 2
RFI-5858-QCN-1-01545 RFI-5858-QCN-1-01545 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 27-May-13 8:30 AM 27-May-13
B70-PR-08 &D110-B70-PR-46 Rasllaffan
1952 Final Elevations:Check Final Elevation of Pipe Sleeper B70-PS-26: SLD004 to SLD013 = Tank Farm
RFI-5858-QCN-1-01546 RFI-5858-QCN-1-01546 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.1 S W H 27-May-13 4:00 PM 27-May-13
10 nos / grade elevation Raslaffan
1953 Final Elevations:Check Final Visual Inspection of Pipe Sleeper B70-PS-26: SLD004 to Tank Farm
RFI-5858-QCN-1-01547 RFI-5858-QCN-1-01547 CIVIL APPROVED B-V-3100-004-1-201-01_6 5.2 S W H 27-May-13 4:00 PM 27-May-13
SLD013 = 10 nos Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 - 2nd &
1954 RFI-5858-QCN-1-01548 RFI-5858-QCN-1-01548 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:30 AM to 5:30 PM 29-May-13
3rd layer
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102 - 3rd & 4th SECTION - 1
1955 RFI-5858-QCN-1-01549 RFI-5858-QCN-1-01549 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:30 AM to 5:00 PM 29-May-13
layer DESALINATION LINE
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - NORTH HAMAD CULVERT
1956 RFI-5858-QCN-1-01550 RFI-5858-QCN-1-01550 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:00 AM To 4:00 PM 29-May-13
SIDE PORTION OF HAMAD ROAD - 13th, 14th & final layer Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-37, PR-40 and Tank Farm
1957 RFI-5858-QCN-1-01551 RFI-5858-QCN-1-01551 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:00 AM to 5:30 PM 28-May-13 cancelled work not ready
PR-54 Raslaffan
1958 Soil Compaction Test for Backfilling- Granular Class B MaterialHAMAD CULVERT BZRC HAMAD CULVERT
RFI-5858-QCN-1-01552 RFI-5858-QCN-1-01552 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 4:00 PM 28-May-13 cancelled work not ready
005 - NORTH SIDE PORTION OF HAMAD ROAD Raslaffan
1959 Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD032, Tank Farm
RFI-5858-QCN-1-01553 RFI-5858-QCN-1-01553 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:30 AM to 5:30 PM 29-May-13
SLD045, 2 nos - 4th & final layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
1960 to SLD003 = 3 nos SLD005 to SLD010 = 6 nos, SLD015, SLD017, SLD018 = 3 nos, Tank Farm
RFI-5858-QCN-1-01554 RFI-5858-QCN-1-01554 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 28-May-13 7:30 AM to 5:30 PM 28-May-13 cancelled not ready
SLD020, SLD021, SLD032 = 3 nos SLD058, SLD059, SLD060, SLD066 and SLD067 = 5 Raslaffan
nos
Check final Visual Inspection& Elevations of Grading Sleeper foundation D110-B70-PS- SECTION - 6
1962 RFI-5858-QCN-1-01556 RFI-5858-QCN-1-01556 CIVIL
19 SLD017 & D110-B70-PS-20 SLD001
APPROVED
Raslaffan Raslaffan
B-V-3100-004-1-201-02_6 5.1&5.2 S W H 28-May-13 4:00 PM 28-May-13
SECTION-1
1963 RFI-5858-QCN-1-01557 RFI-5858-QCN-1-01557 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102 - 5th layer APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 29-May-13 7:30 AM to 5:00 PM 31-May-13
Soil Compaction Test for Backfilling- Granular Class B MaterialHAMAD CULVERT BZRC HAMAD CULVERT
1964 RFI-5858-QCN-1-01558 RFI-5858-QCN-1-01558 CIVIL
005 - NORTH SIDE PORTION OF HAMAD ROAD
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 29-May-13 7:00 AM 29-May-13
Check Excavation-Bottom of Excavation verification D110 - B70- PR-28 Pipe Rack SECTION 4
1965 RFI-5858-QCN-1-01559 RFI-5858-QCN-1-01559 CIVIL
Foundation 2(F2)
APPROVED
Raslaffan
B-V-3100-004-2-201-01_6 4.2.b R W H 29-May-13 1:00 PM 2-Jun-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Laying,Compaction & Sampling of CBM2HAMAD CULVERT BZRC 005 - NORTH HAMAD CULVERT
1966 RFI-5858-QCN-1-01560 RFI-5858-QCN-1-01560 CIVIL APPROVED B-V-3100-004-1-201-03_7 4.2.2 S W H 29-May-13 7:30 AM 29-May-13
SIDE ROAD PORTION OF HAMAD CULVERT Raslaffan
1967 RFI-5858-QCN-1-01561 RFI-5858-QCN-1-01561 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 29-May-13 7:30 AM to 5:30 PM 29-May-13 cancelled work not ready
Review and approval of QIL test report for Back fill Material (Type- B for the sampled Barzan Off-plot
1968 RFI-5858-QCN-1-01562 RFI-5858-QCN-1-01562 CIVIL
location Section-1Stockpile #02
APPROVED
BARZAN
B-V-3100-004-1-201-01_6 3.1.b R W H 29-May-13 7:30 AM 2-Jun-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-37-1st layer, Tank Farm
1969 RFI-5858-QCN-1-01563 RFI-5858-QCN-1-01563 CIVIL
PR-40 - 1st & 2nd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 29-May-13 7:00 AM to 5:30 PM 31-May-13
Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD013, B70- Tank Farm
1970 RFI-5858-QCN-1-01564 RFI-5858-QCN-1-01564 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 29-May-13 2:30 PM to 5:30 P\M 29-May-13 cancelled work not ready
PS-30: SLD068 and Pipe Sleeper B70-PS-29: SLD004 Raslaffan
1973 SECTION1
RFI-5858-QCN-1-01567 RFI-5858-QCN-1-01567 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102 - 6th layer APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:30 AM to 5:00 PM 31-May-13
DESALINATION LINE
1974 Soil Compaction Test for backfilling - Type B D110- B70 - PR -17 Pipe Rack Foundation SECTION - 4 PR -
RFI-5858-QCN-1-01568 RFI-5858-QCN-1-01568 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:00 AM to 5:00 PM 31-May-13
2(F3,F4) -7th, 8th & final layer 17 Raslaffan
1975 RFI-5858-QCN-1-01569 RFI-5858-QCN-1-01569 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:30 AM to 5:30 PM 30-May-13 cancelled work not ready
1976 RFI-5858-QCN-1-01570 RFI-5858-QCN-1-01570 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-28: F1 APPROVED PR-28 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 30-May-13 1:30 PM 2-Jun-13
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-36:F1, F2 and Tank Farm
1977 RFI-5858-QCN-1-01571 RFI-5858-QCN-1-01571 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 30-May-13 7:30 AM to 5:30 PM 30-May-13 cancelled work not ready
F3 ( Grading ) Raslaffan
1978 RFI-5858-QCN-1-01572 RFI-5858-QCN-1-01572 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-29: F2 CANCELLED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:30 AM to 5:30 PM 30-May-13 cancelled work not ready
Tank Farm
1979 RFI-5858-QCN-1-01573 RFI-5858-QCN-1-01573 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-40 - 3rd layer APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:00 AM to 5:30 PM 31-May-13
Raslaffan
1980 Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD013, B70- Tank Farm
RFI-5858-QCN-1-01574 RFI-5858-QCN-1-01574 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:30 AM to 5:30 PM 30-May-13 cancelled work not ready
PS-30: SLD068 and Pipe Sleeper B70-PS-29: SLD004 Raslaffan
1981 Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001 Tank Farm
RFI-5858-QCN-1-01575 RFI-5858-QCN-1-01575 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 30-May-13 7:30 AM to 5:30 PM 31-May-13
to SLD058 to SLD060 = 3 nos SLD066 and SLD067 = 2 nos - 1st, 2nd & final layer Raslaffan
1982 Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-30: SLD016, Tank Farm
RFI-5858-QCN-1-01576 RFI-5858-QCN-1-01576 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 30-May-13 1:30 PM 3-Jun-13
SLD012 and SLD032 = 3 nos Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102 (Anchor SECTION - 1
1983 RFI-5858-QCN-1-01577 RFI-5858-QCN-1-01577 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 7:30 AM to 5:00 PM 3-Jun-13
block area) - 3rd layer DESALINATION LINE
Soil Compaction Test for Backfilling- Type- B HAMAD CULVERT BZRC 005 - Concrete
HAMAD CULVERT
1984 RFI-5858-QCN-1-01578 RFI-5858-QCN-1-01578 CIVIL paving portion(Near L Cover ) & 3m Un Paved center portion(Between two Road) - 1st APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 7:00 AM to 5:00 PM 3-Jun-13
and final layer
1985 RFI-5858-QCN-1-01579 RFI-5858-QCN-1-01579 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-29: F2 CANCELLED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 8:30 AM to 5:30 PM 1-Jun-13 cancelled work not ready
1986 RFI-5858-QCN-1-01580 RFI-5858-QCN-1-01580 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 7:30 AM to 5:30 PM 1-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36: F4, PR- Tank Farm
1987 RFI-5858-QCN-1-01581 RFI-5858-QCN-1-01581 CIVIL
56, PR-57 and PR-58
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 1:30 PM to 5:30 PM 1-Jun-13 cancelled work not ready
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-37 - 2nd and Tank Farm
1988 RFI-5858-QCN-1-01582 RFI-5858-QCN-1-01582 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 7:00 AM to 5:30 PM 3-Jun-13
3rd layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-30: SLD001
Tank Farm
1989 RFI-5858-QCN-1-01583 RFI-5858-QCN-1-01583 CIVIL to SLD010 = 9 nos except SLD004, SLD015, SLD017, SLD018, SLD020, SLD021, APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jun-13 7:30 AM to 5:30 PM 3-Jun-13
Raslaffan
SLD022, SLD023, SLD024 = 9 nos, SLD027 to SLD031 = 4 nos - final layer
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102& 98,99 - 1st SECTION - 1
1990 RFI-5858-QCN-1-01584 RFI-5858-QCN-1-01584 CIVIL
& 2nd layer (98 & 99 2nd half portion), 4th layer (102-B70-BL-01)
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 2-Jun-13 7:30 AM to 5:00 PM 3-Jun-13
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-28: Tank Farm
1991 RFI-5858-QCN-1-01585 RFI-5858-QCN-1-01585 CIVIL
SLD016, SLD017 = 2 nos B70-PS-29: SLD002, SLD003 and SLD004 = 3 nos
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 2-Jun-13 7:30 AM to 5:30 PM 2-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 - 5th, 6th
1992 RFI-5858-QCN-1-01586 RFI-5858-QCN-1-01586 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 2-Jun-13 7:30 AM to 5:30 PM 3-Jun-13
& final layer
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-36:F1, F2 and Tank Farm
1993 RFI-5858-QCN-1-01587 RFI-5858-QCN-1-01587 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-Jun-13 7:30 AM to 5:30 PM 3-Jun-13
F3 ( Grading ) Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36: F4, PR- Tank Farm
1994 RFI-5858-QCN-1-01588 RFI-5858-QCN-1-01588 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 2-Jun-13 7:30 AM to 5:30 PM 2-Jun-13 cancelled work not ready
37, PR-40, PR-56, PR-57 and PR-58 Raslaffan
Soil Compaction Test For backfilling - Type B Sleeper foundation B70 PS 12 SLD012 - SECTION - 4
1995 RFI-5858-QCN-1-01589 RFI-5858-QCN-1-01589 CIVIL APPROVED B-V-3100-004-1-201-01-R 4.2.b R W H 2-Jun-13 9:00 AM to 4:30 PM 3-Jun-13
1st layer Raslaffan
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70-PS - 03 SLD 044 & SECTION - 1
1996 RFI-5858-QCN-1-01590 RFI-5858-QCN-1-01590 CIVIL
SLD 045 - 1st & 2nd layer
APPROVED
Raslaffan
B-V-3100-004-2-201-01_6 4.2.b R W H 2-Jun-13 9:30 AM to 5:00 PM 3-Jun-13
Check type B filed density & layer thickness for Pipe Stopper B70-PS-28: SLD008, B70- Tank Farm
1997 RFI-5858-QCN-1-01591 RFI-5858-QCN-1-01591 CIVIL
PS-29: SLD013, and B70-PS-30: SLD068 - 1st & 2nd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 2-Jun-13 7:30 AM to 5:30 PM 3-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102,5th,6th,7th SECTION - 1
1998 RFI-5858-QCN-1-01592 RFI-5858-QCN-1-01592 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 7:30 AM to 5:00 PM 4-Jun-13
layer (B70-BL-01- anchor block area) DESALINATION LINE
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 03 SLD 049 SECTION - 1
1999 RFI-5858-QCN-1-01593 RFI-5858-QCN-1-01593 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 3-Jun-13 6:00 AM to 5:15 PM 4-Jun-13
& SLD 050 - 1st layer Raslaffan
2000 RFI-5858-QCN-1-01594 RFI-5858-QCN-1-01594 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F2 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 7:30 AM to 5:30 PM 3-Jun-13 cancelled re issued rfi
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36:-1st & Tank Farm
2001 RFI-5858-QCN-1-01595 RFI-5858-QCN-1-01595 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 7:30 AM to 5:30 PM 4-Jun-13
2nd layer F4, PR-40-4th layer , PR-57 - 1st layer and PR-58-1st layer Raslaffan
Check type B filed density & layer thickness for Pipe Stopper B70-PS-28:-3rd & 4th, final Tank Farm
2002 RFI-5858-QCN-1-01596 RFI-5858-QCN-1-01596 CIVIL
layer, SLD008, B70-PS-29: SLD013 and B70-PS-30: SLD068 - 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 7:30 AM to 5:30 PM 4-Jun-13
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-28:
Tank Farm
2003 RFI-5858-QCN-1-01597 RFI-5858-QCN-1-01597 CIVIL SLD016, SLD017 = 2 nos B70-PS-29: SLD002, SLD003 and SLD004 = 3 nos, -1st & 2nd APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 7:30 AM to 5:30 PM 4-Jun-13
layer and B70-PS-30: SLD011, SLD016, SLD032 and SLD033 = 4 nos - 1st & final layer
Soil Compaction Test For backfilling - Type B Sleeper foundation D110-B70- PS-14 SECTION - 4
2004 RFI-5858-QCN-1-01598 RFI-5858-QCN-1-01598 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 3-Jun-13 8:00 AM to 4:30 PM 4-Jun-13
SLD011 TO SLD019 -1st layer (except SLD-016) Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102(TIE IN SECTION - 1
2005 RFI-5858-QCN-1-01599 RFI-5858-QCN-1-01599 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 7:30 AM to 5:00 PM 5-Jun-13
Portion)-8th & 9th layer DESALINATION LINE
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 03 SLD 049 SECTION -1
2006 RFI-5858-QCN-1-01600 RFI-5858-QCN-1-01600 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 4-Jun-13 6:00 AM to 5:15 PM 5-Jun-13
& SLD 050 -2nd & final layer Raslaffan
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70-PS - 03 SLD SECTION - 1
2007 RFI-5858-QCN-1-01601 RFI-5858-QCN-1-01601 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 4-Jun-13 8:30 AM 5-Jun-13
044,SLD 045 & B70-PS-12 SLD 012 - final layer Raslaffan
2008 RFI-5858-QCN-1-01602 RFI-5858-QCN-1-01602 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-29: F2 CANCELLED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 9:30 AM to 5:30 PM 4-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36-3rd
2009 RFI-5858-QCN-1-01603 Tank Farm
RFI-5858-QCN-1-01603 CIVIL layer, F4, PR-37-4th & final layer, PR-40 - final layer, PR-56 - 1st & 2nd layer,and PR-58 - APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 7:30 AM to 5:30 PM 5-Jun-13
Raslaffan
2nd & 3rd layer
2010 Check type B filed density & layer thickness for Pipe StopperB70-PS-29: SLD013 and Tank Farm
RFI-5858-QCN-1-01604 RFI-5858-QCN-1-01604 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 7:30 AM to 5:30 PM 5-Jun-13
B70-PS-30: SLD068 - 4th and final layer Raslaffan
Check type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-28:
2011 Tank Farm
RFI-5858-QCN-1-01605 RFI-5858-QCN-1-01605 CIVIL SLD016, SLD017 = 2 nos B70-PS-29: SLD002, SLD003 and SLD004 = 3 nos, - final APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 7:30 AM to 5:30 PM 5-Jun-13
Raslaffan
layer
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for backfilling Type - B D110 RW-002 E-W Retaining wall 3rd panel Section - 6 D110 RW-
2012 RFI-5858-QCN-1-01606 RFI-5858-QCN-1-01606 CIVIL
(South side Portion) - 2nd layer
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 4-Jun-13 7:00 AM to 4:30 PM 5-Jun-13
Soil Compaction Test For backfilling - Type B Stopper foundation B70- PS-14 SLD016 - SECTION - 4
2013 RFI-5858-QCN-1-01607 RFI-5858-QCN-1-01607 CIVIL
1st, 2nd & 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 8:00 AM to 4:30 PM 6-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102(TIE IN SECTION - 1
2014 RFI-5858-QCN-1-01608 RFI-5858-QCN-1-01608 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:30 AM to 5:00 PM 6-Jun-13
Portion),-1th layer DESALINATION LINE
Soil Compaction Test for backfilling- Type B D110 - B70- PR-73 Pipe Rack Foundation
2015 RFI-5858-QCN-1-01609 RFI-5858-QCN-1-01609 CIVIL APPROVED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:30 AM to 4:30 PM 5-Jun-13
1(F1)& 2(F2) - 1st & 2nd layer
Soil Compaction Test For backfilling Type - B D110 RW-003 Between North& South Section4 D110 RW-
2016 RFI-5858-QCN-1-01610 RFI-5858-QCN-1-01610 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:00 AM To 4:30 PM 6-Jun-13
Retaining wall (Inside portion) - 1st & 2nd layer 003 Raslaffan
4.3.2 Check compressive strength@7 Days for CBM2 (Cube testing as per BS EN
2017 RFI-5858-QCN-1-01611 RFI-5858-QCN-1-01611 CIVIL APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_7 4.3.2 S W H 5-Jun-13 2:00 PM 5-Jun-13
-12390-3) CBM2- 1st & 2nd Layer Hamad culvert BZRC-005 (North side road portion)
Check Laying of Asphalt Binder Course & Surface Course HAMAD CULVERT BZRC005
2018 RFI-5858-QCN-1-01612 RFI-5858-QCN-1-01612 CIVIL
NORTH SIDE PORTION
APPROVED HAMAD CULVERT B-V-3100-004-1-201-01_6 5.2.4 S W H 5-Jun-13 7:00 AM 8-Jun-13
2019 RFI-5858-QCN-1-01613 RFI-5858-QCN-1-01613 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-011 CANCELLED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 5-Jun-13 1:40 PM 5-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36: F4,-
Tank Farm
2020 RFI-5858-QCN-1-01614 RFI-5858-QCN-1-01614 CIVIL 4th,5th & final layer, D110-B70-PR-56-3rd, 4th & final layer, S110-B70-PR-57 -4th & final APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:30 AM to 5:30 PM 6-Jun-13
Raslaffan
layer
Check type B filed density & layer thickness for Pipe Stopper B70-PS-29: SLD013 and Tank Farm
2021 RFI-5858-QCN-1-01615 RFI-5858-QCN-1-01615 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:30 AM to 5:30 PM 5-Jun-13 cancelled reissued RFI
B70-PS-30: SLD068 Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-29: F2 - 1st,
2022 RFI-5858-QCN-1-01616 RFI-5858-QCN-1-01616 CIVIL APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 9:30 AM to 5:30 PM 6-Jun-13
2nd & 3rd layer
Soil Compaction Test For backfilling Type - B D110 RW-002 E-W Retaining wall 1st,2nd& Section6 D110 RW-
2023 RFI-5858-QCN-1-01617 RFI-5858-QCN-1-01617 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 5-Jun-13 7:00 AM To 4:30 PM 6-Jun-13
3rd panel (South & North Side Portion) - 3rd layer 002 E-W Raslaffan
Soil Compaction Test For backfilling-Type B Sleeper Foundations B70-PS - 03 SLD 049 &
2024 RFI-5858-QCN-1-01618 RFI-5858-QCN-1-01618 CIVIL
SLD 050
CANCELLED SECTION - 1 B-V-3100-004-2-201-01_6 4.2.b R W H 5-Jun-13 8:30 AM 5-Jun-13 cancelled work not ready
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 3rd Section6 D110-RW-
2025 RFI-5858-QCN-1-01619 RFI-5858-QCN-1-01619 CIVIL
panel (South & North Side Portion) - 4th, 5th & 6th layer
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 7:00 AM To 4:30 PM 6-Jun-13
Soil Compaction Test for backfilling- Type B D110 - B70- PR-73 Pipe Rack Foundation
2026 RFI-5858-QCN-1-01620 RFI-5858-QCN-1-01620 CIVIL APPROVED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 7:30 AM to 4:30 PM 8-Jun-13
1(F1)& 2(F2) - 3rd layer
Soil Compaction Test For backfilling - Type B Stopper foundation B70- PS-14 SLD016 - SECTION - 4
2027 RFI-5858-QCN-1-01621 RFI-5858-QCN-1-01621 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 8:00 AM to 4.30 PM 8-Jun-13
4th layer Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2028 RFI-5858-QCN-1-01622 RFI-5858-QCN-1-01622 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 7:00 AM To 4:30 PM 6-Jun-13 cancelled work not ready
Retaining wall (Inside portion) 003 Raslaffan
Soil Compaction Test For backfilling- Type B Sleeper Foundations B70-PS - 03 SLD 049 SECTION - 1
2029 RFI-5858-QCN-1-01623 RFI-5858-QCN-1-01623 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 6-Jun-13 6:00 AM to 4:30 PM 8-Jun-13
& SLD 050 - 1st, 2nd & final layer Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-29: F2 - 4th
2030 RFI-5858-QCN-1-01624 RFI-5858-QCN-1-01624 CIVIL
layer
APPROVED PR-29 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 7:30 AM to 5:30 PM 6-Jun-13
Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-28: SLD027 Tank Farm
2031 RFI-5858-QCN-1-01625 RFI-5858-QCN-1-01625 CIVIL
and B70-PS-30: SLD057, SLD061 and SLD062
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 6-Jun-13 1:30 PM 11-Jun-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-PR-36: F4, Tank Farm
2032 RFI-5858-QCN-1-01626 RFI-5858-QCN-1-01626 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 6-Jun-13 7:30AM to 5:30PM 6-Jun-13 cancelled work not ready
D110-B70-PR-56, S110-B70-PR-57 and D110-B70-PR-58 Raslaffan
2034 RFI-5858-QCN-1-01628 RFI-5858-QCN-1-01628 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-011 APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 6-Jun-13 1:40 PM 11-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing # 102(TIE IN SECTION1
2035 RFI-5858-QCN-1-01629 RFI-5858-QCN-1-01629 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 7:30 AM to 5:00 PM 9-Jun-13
Portion),Crossing #99(west half portion) & Crossing #98 - 11th, 12th & 13th layer DESALINATION LINE
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-28, F1 & F2 - PR-28 and PR-29
2036 RFI-5858-QCN-1-01630 RFI-5858-QCN-1-01630 CIVIL
1st, 2nd layer and D110-B70-PR-29: F2 - 5th & 6th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 7:30 AM to 5:30 PM 9-Jun-13
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-29: F1 and Pipe
2037 RFI-5858-QCN-1-01631 RFI-5858-QCN-1-01631 CIVIL
Sleeper B70-PS-22: SLD050 - 1st & final layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 8-Jun-13 7:30 AM to 5:30 PM 9-Jun-13
2038 RFI-5858-QCN-1-01632 RFI-5858-QCN-1-01632 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 8-Jun-13 3:00 PM 8-Jun-13 cancelled work not ready
2039 RFI-5858-QCN-1-01633 RFI-5858-QCN-1-01633 CIVIL Check type B filed density & layer thickness for Duct Bank BZDP-011 CANCELLED BZDP-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 1:30 PM to 5:30 PM 8-Jun-13 cancelled work not ready
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2040 RFI-5858-QCN-1-01634 RFI-5858-QCN-1-01634 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 7:00 AM to 4:30 PM 9-Jun-13
Retaining wall (Inside portion) - 3rd, 4th & 5th layer 003 Raslaffan
Soil Compaction Test for backfilling- Type B D110 - B70- PR-73 Pipe Rack Foundation
2041 RFI-5858-QCN-1-01635 RFI-5858-QCN-1-01635 CIVIL APPROVED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 7:30 AM to 4:30 PM 9-Jun-13
1(F1)& 2(F2) -4th, 5th, 6th layer
Soil Compaction Test For backfilling - Type B Stopper foundation B70- PS-14 SLD016 - SECTION4
2042 RFI-5858-QCN-1-01636 RFI-5858-QCN-1-01636 CIVIL
5th & 6th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 8:00 AM to 4:30 PM 9-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 3rd panel Section6 D110-RW-
2043 RFI-5858-QCN-1-01637 RFI-5858-QCN-1-01637 CIVIL
(South & North Side Portion) - 7th layer
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jun-13 7:00 AM To 4:30 PM 9-May-13
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 04 SLD 019
2044 RFI-5858-QCN-1-01638 RFI-5858-QCN-1-01638 CIVIL APPROVED SECTION1 B-V-3100-004-2-201-01_6 4.2.b R W H 8-Jun-13 6:00 AM to 5:15 PM 9-May-13
to SLD 016 - 1st layer
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-28: F1 & F2 -
2045 RFI-5858-QCN-1-01639 RFI-5858-QCN-1-01639 CIVIL APPROVED PR-28 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jun-13 7:30 AM to 5:30 PM 10-Jun-13
4th, 5th & 6th layer
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-29: F1 and Pipe
2046 RFI-5858-QCN-1-01640 RFI-5858-QCN-1-01640 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 9-Jun-13 7:30 AM to 5:30 PM 9-Jun-13 cancelled work not ready
Sleeper B70-PS-22: SLD051 SLD051, SLD046, SLD045 and SLD044
Check final Visual Inspection& Elevations of Grading Sleeper foundation B70-PS - 03 SECTION - 1
2047 RFI-5858-QCN-1-01641 RFI-5858-QCN-1-01641 CIVIL CANCELLED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 9-Jun-13 2:00 PM 9-Jun-13 cancelled work not ready
SLD 044,SLD 045,SLD 049 & SLD 050 Raslaffan
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 04 SLD 019 SECTION - 1
2048 RFI-5858-QCN-1-01642 RFI-5858-QCN-1-01642 CIVIL
to SLD 016 -2nd layer
APPROVED
Raslaffan
B-V-3100-004-2-201-01_6 4.2.b R W H 9-Jun-13 6:00 AM to 5:00 PM 10-Jun-13
Soil Compaction Test for backfilling- Type B D110 - B70- PR-73 Pipe Rack Foundation
2049 RFI-5858-QCN-1-01643 RFI-5858-QCN-1-01643 CIVIL
1(F1)& 2(F2) - 7th & 8th layer
APPROVED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jun-13 7:30 AM to 4:30 PM 10-Jun-13
Soil Compaction Test For backfilling - Type B Stopper foundation B70- PS-14 SLD016 - SECTION4
2050 RFI-5858-QCN-1-01644 RFI-5858-QCN-1-01644 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jun-13 8:00 AM to 4.30 PM 10-Jun-13
final layer Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2051 RFI-5858-QCN-1-01645 RFI-5858-QCN-1-01645 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jun-13 7:00 AM To 4:30 PM 10-Jun-13
Retaining wall (Inside portion) - 6th & 7th layer 003 Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 3rd panel Section6 D110-RW-
2052 RFI-5858-QCN-1-01646 RFI-5858-QCN-1-01646 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jun-13 7:00 AM To 4:30 PM 9-Jun-13 cancelled work not ready
(South Side Portion) 002 E-W Raslaffan
2053 RFI-5858-QCN-1-01647 RFI-5858-QCN-1-01647 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 9-Jun-13 3:30 PM 9-Jun-13 cancelled work not ready
Check type A filed density & layer thickness for Pipe Sleeper B70-PS-22:
2054 RFI-5858-QCN-1-01648 RFI-5858-QCN-1-01648 CIVIL
SLD064,SLD051 SLD050, SLD046, SLD045 and SLD044 ( Grading )- 1st layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Jun-13 7:30 AM to 5:30 PM 11-Jun-13
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-28: F1 and PR-28 and PR-29
2055 RFI-5858-QCN-1-01649 RFI-5858-QCN-1-01649 CIVIL
D110-B70-PR-29: F2 ( Grading ) - final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jun-13 7:30 AM to 5:30 PM 11-Jun-13
2056 RFI-5858-QCN-1-01650 RFI-5858-QCN-1-01650 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 10-Jun-13 3:30 PM 10-Jun-13 cancelled work not ready
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 04 SLD 019 SECTION - 1
2057 RFI-5858-QCN-1-01651 RFI-5858-QCN-1-01651 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 10-Jun-13 6:00 AM to 5:00 PM 12-Jun-13
to SLD 016 - 3rd layer Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2058 RFI-5858-QCN-1-01652 RFI-5858-QCN-1-01652 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jun-13 7:00 AM To 4:30 PM 10-Jun-13 cancelled work not ready
Retaining wall (Inside portion) 003 Raslaffan
Soil Compaction Test for backfilling- Type B D110 - B70- PR-73 Pipe Rack Foundation SECTION 4 PR - 73
2059 RFI-5858-QCN-1-01653 RFI-5858-QCN-1-01653 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jun-13 7:30 AM to 4:30 PM 11-Jun-13
1(F1)& 2(F2) - final layer Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 5th panel Section6 D110-RW-
2060 RFI-5858-QCN-1-01654 RFI-5858-QCN-1-01654 CIVIL
- 1st, 2nd & 3rd layer
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jun-13 7:00 AM To 4:30 PM 11-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #102(Road side & SECTION1
2061 RFI-5858-QCN-1-01655 RFI-5858-QCN-1-01655 CIVIL
B70-BL-01- anchor block) - final layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 11-Jun-13 7:30 AM to 5:00 PM 13-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2062 RFI-5858-QCN-1-01656 RFI-5858-QCN-1-01656 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-Jun-13 7:00 AM to 4:30 PM 13-Jun-13
Retaining wall (Inside portion) - 8th & 9th layer 003 Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 5th&6th Section6 D110-RW-
2063 RFI-5858-QCN-1-01657 RFI-5858-QCN-1-01657 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-Jun-13 7:00 AM to 4:30 PM 13-Jun-13
panel - 5th panel - 4th layer, 6th panel - 1st layer 002 E-W Raslaffan
Check type A filed density & layer thickness for Pipe Sleeper B70-PS-22:
2064 RFI-5858-QCN-1-01658 RFI-5858-QCN-1-01658 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 11-Jun-13 7:30 AM to 5:30 PM 13-Jun-13
SLD064,SLD051 SLD050, SLD046, SLD045 and SLD044 ( Grading ) - 2nd & final layer
2065 RFI-5858-QCN-1-01659 RFI-5858-QCN-1-01659 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 11-Jun-13 1:30 PM 11-Jun-13 cancelled work not ready
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 04 SLD 019
2066 RFI-5858-QCN-1-01660 RFI-5858-QCN-1-01660 CIVIL
to SLD 016 - final layer
APPROVED SECTION1 B-V-3100-004-2-201-01_6 4.2.b R W H 11-Jun-13 6:00 AM to 5:00 PM 13-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2067 RFI-5858-QCN-1-01661 RFI-5858-QCN-1-01661 CIVIL
portion),Crossing #98 & Crossing #97
CANCELLED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 12-Jun-13 7:30 AM to 5:00 PM 12-Jun-13 cancelled work not ready
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2068 RFI-5858-QCN-1-01662 RFI-5858-QCN-1-01662 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 12-Jun-13 7:00 AM To 4:30 PM 13-Jun-13
Retaining wall (Inside portion) - 10th layer. D110-Dike-003 access ramp (west) 003 Raslaffan
Check type A filed density & layer thickness for Pipe Sleeper B70-PS-22: ,SLD046,
2069 RFI-5858-QCN-1-01663 RFI-5858-QCN-1-01663 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 12-Jun-13 7:30 AM to 5:30 PM 12-Jun-13 cancelled re issued rfi
SLD045 and SLD044 ( Grading )
Tank Farm
2070 RFI-5858-QCN-1-01664 RFI-5858-QCN-1-01664 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-42: F5, F3 APPROVED B-V-3100-004-1-201-01_6 2.1.. R W H 12-Jun-13 9:00 AM 19-Jun-13
Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 7th&6th Section6 D110-RW-
2071 RFI-5858-QCN-1-01665 RFI-5858-QCN-1-01665 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 12-Jun-13 7:00 AM To 4:30 PM 13-Jun-13
panel - 1st layer (7th panel), 2nd & 3rd layer (6th layer) south face off wall 002 E-W Raslaffan
2072 RFI-5858-QCN-1-01666 RFI-5858-QCN-1-01666 CIVIL Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-22: SLD064 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 12-Jun-13 3:00 PM 19-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2073 RFI-5858-QCN-1-01667 RFI-5858-QCN-1-01667 CIVIL
portion) - 3rd layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jun-13 7:30 AM to 5:00 PM 16-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-003 Between North& South Section4 D110-RW-
2074 RFI-5858-QCN-1-01668 RFI-5858-QCN-1-01668 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jun-13 7:00 AM To 4:30 PM 19-Jun-13
Retaining wall (Inside portion)-FINAL LAYER 003 Raslaffan
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall Section6 D110-RW-
2075 RFI-5858-QCN-1-01669 RFI-5858-QCN-1-01669 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jun-13 7:00 AM To 4:30 PM 16-Jun-13
6th,7th,8th panel & - 4th layer (panel), 2nd layer (panel-7), 1st layer (Panel-8) 002 & 001 Raslaffan
2076 RFI-5858-QCN-1-01670 RFI-5858-QCN-1-01670 CIVIL Check Excavation : Bottom of excavation verification:Culvert BZRC-010 APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 13-Jun-13 3:30 PM 19-Jun-13
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD057, Tank Farm
2077 RFI-5858-QCN-1-01671 RFI-5858-QCN-1-01671 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jun-13 7:30 AM to 5:30 PM 14-Jun-13
SLD061 and SLD062 - 1st & 2nd layer Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F4 and
Tank Farm
2078 RFI-5858-QCN-1-01672 RFI-5858-QCN-1-01672 CIVIL D110-B70-PR-58. D110-B70-PR-36 - F4 - 1st & 2nd layer, D110-B70-PR-58 - 3rd & 4th APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jun-13 7:30 AM to 5:30 PM 16-Jun-13
layer
Tank Farm
2079 RFI-5858-QCN-1-01673 RFI-5858-QCN-1-01673 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-30; SLD054 APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 13-Jun-13 8:00 AM 19-Jun-13
Check Type B filed density & layer thicknees for Duct Bank BZDP-011 - 1st, 2nd, 3rd &
2080 RFI-5858-QCN-1-01674 RFI-5858-QCN-1-01674 CIVIL APPROVED BZDP-011 B-V-3100-004-1-201-01_6 4.2.b S W H 14-Jun-13 7:30 AM to 5:30 PM 16-Jun-13
4th layer
2081 RFI-5858-QCN-1-01675 RFI-5858-QCN-1-01675 CIVIL Check type B filed density & layer thickness for Duct Bank BZDP-011 - 5th & 6th layer APPROVED BZDP-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 15-Jun-13 7:30 AM to 5:30 PM 16-Jun-13
2082 RFI-5858-QCN-1-01676 RFI-5858-QCN-1-01676 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-33: F1 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 15-Jun-13 3:30 PM 15-Jun-13 cancelled work not ready
Soil Compaction Test for Backfilling- Type B Desalination lineCrossing #98 & Crossing SECTION1
2084 RFI-5858-QCN-1-01678 RFI-5858-QCN-1-01678 CIVIL
#97 - 1st layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 7:30 AM to 5:00 PM 16-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 7th&8th
Section6 D110-RW-
2085 RFI-5858-QCN-1-01679 RFI-5858-QCN-1-01679 CIVIL panel & D110-RW-001 N- S Retaining wall South corner, panel-13 ditch -12th layer, APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 15-Jun-13 7:00 AM to 4:30 PM 16-Jun-13
Panel-7-4th layer, Panel-8-2nd layer
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-36: F4 and Tank Farm
2086 RFI-5858-QCN-1-01680 RFI-5858-QCN-1-01680 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 15-Jun-13 7:30 AM to 5:30 PM 16-Jun-13
D110-B70-PR-58 - 3rd,4th & final layer (PR-36), Final layer - PR-58 Raslaffan
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD057, Tank Farm
2087 RFI-5858-QCN-1-01681 RFI-5858-QCN-1-01681 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 15-Jun-13 7:30 AM to 5:30 PM 16-Jun-13
SLD061 and SLD062 -final layer Raslaffan
Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-42: F2= 1 Tank Farm
2088 RFI-5858-QCN-1-01682 RFI-5858-QCN-1-01682 CIVIL APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 15-Jun-13 1:30 PM 19-Jun-13
nos Raslaffan
Tank Farm
2093 RFI-5858-QCN-1-01687 RFI-5858-QCN-1-01687 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-42: F2 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 16-Jun-13 1:30 PM 25-Jun-13
Raslaffan
2094 RFI-5858-QCN-1-01688 RFI-5858-QCN-1-01688 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-33: F1 APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 16-Jun-13 3:30 PM 19-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2096 RFI-5858-QCN-1-01690 RFI-5858-QCN-1-01690 CIVIL
portion),Crossing #98 & Crossing #97 - 2nd layer, 2nd & 3rd layer (#98), 4th layer (#99)
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 16-Jun-13 7:30 AM to 5:00 PM 19-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 8th panel Section6 D110-RW-
2097 RFI-5858-QCN-1-01691 RFI-5858-QCN-1-01691 CIVIL
- 3rd & 4th layer
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 16-Jun-13 7:00 AM to 4:30 PM 19-Jun-13
2099 RFI-5858-QCN-1-01693 RFI-5858-QCN-1-01693 CIVIL Check type B filed density & layer thickness for Duct Bank BZDP-011 - 7th layer APPROVED BZDP-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 16-Jun-13 7:30 AM to 5:30 PM 19-Jun-13
Check type A filed density & layer thickness for Pipe Stopper B70-PS-22: SLD003 -
2100 RFI-5858-QCN-1-01694 RFI-5858-QCN-1-01694 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 16-Jun-13 9:00 AM 19-Jun-13
bottom of blinding
2101 RFI-5858-QCN-1-01695 RFI-5858-QCN-1-01695 CIVIL Check type B filed density & layer thickness for Duct Bank BZDP-011 final layer APPROVED BZDP-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 17-Jun-13 7:30 AM to 5:30 PM 19-Jun-13
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2102 RFI-5858-QCN-1-01696 RFI-5858-QCN-1-01696 CIVIL
portion),Crossing #98 & Crossing #97, #99 -5th layer, #98-4th layer, #97-3rd layer
APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 17-Jun-13 7:30 AM to 5:00 PM 19-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall
6th,7th,8th panel & D110-RW-001 N- S Retaining wall South corner. D110-RW-002-EW- Section6 D110-RW-
2103 RFI-5858-QCN-1-01697 RFI-5858-QCN-1-01697 CIVIL
6th & 7th layer (north side)-1st & 2nd layer, D110-RW-001-NS-1st & final layer (13th
APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 17-Jun-13 7:00 AM To 4:30 PM 19-Jun-13
panel bitch area)
2105 RFI-5858-QCN-1-01699 RFI-5858-QCN-1-01699 CIVIL Check Excavation : Bottom of excavation verification:Pipe Stopper B70-PS-31: SLD004 APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 17-Jun-13 1:30 PM 25-Jun-13
SECTION - 1
2106 RFI-5858-QCN-1-01700 RFI-5858-QCN-1-01700 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing #98 - 5th layer APPROVED DESALINATION LINE B-V-3100-004-1-201-01_6 4.2.b R W H 18-Jun-13 7:30 AM to 5:00 PM 20-Jun-13
RASLAFFAN
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall
Section6 D110-RW-
2107 RFI-5858-QCN-1-01701 RFI-5858-QCN-1-01701 CIVIL 6th,7th,8th panel & D110-RW-001 N- S Retaining wall South corner. Panel -6&7 - north APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 18-Jun-13 7:00 AM to 4:30 PM 20-Jun-13
002 E-W Raslaffan
side - final layer, Panel 8&9 - north side - 1st & 2nd layer, Panel 9 - south side - 1st layer
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD047,
2109 RFI-5858-QCN-1-01703 RFI-5858-QCN-1-01703 CIVIL
SLD048, SLD049 and SLD065
CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 18-Jun-13 9:30 AM to 5:30 PM 18-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD004,
2110 RFI-5858-QCN-1-01704 RFI-5858-QCN-1-01704 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 18-Jun-13 1:30 PM to 5:30 PM 18-Jun-13 cancelled work not ready
SLD005 and SLD006
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD055 and
2111 RFI-5858-QCN-1-01705 RFI-5858-QCN-1-01705 CIVIL APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 18-Jun-13 7:30 AM to 5:30 PM 20-Jun-13
SLD056 - 1st & final layer
Tank Farm
2112 RFI-5858-QCN-1-01706 RFI-5858-QCN-1-01706 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-59 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 18-Jun-13 1:30 PM 25-Jun-13
Raslaffan
Soil Compaction Test For backfilling- Grading Sleeper Foundations B70-PS - 04 SLD 019 SECTION - 1
2113 RFI-5858-QCN-1-01707 RFI-5858-QCN-1-01707 CIVIL APPROVED B-V-3100-004-2-201-01_6 4.2.b R W H 18-Jun-13 8:00 AM to 5:00 PM 20-Jun-13
to SLD 016 - 1st & 2nd & final layer Raslaffan
SECTION1
2114 RFI-5858-QCN-1-01708 RFI-5858-QCN-1-01708 CIVIL Soil Compaction Test for Backfilling- Type B Desalination line Crossing #97 - 4th layer APPROVED
DESALINATION LINE
B-V-3100-004-1-201-01_6 4.2.b R W H 19-Jun-13 7:30 AM to 5:00 PM 20-Jun-13
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall 9th panel
Section6 D110-RW-
2115 RFI-5858-QCN-1-01709 RFI-5858-QCN-1-01709 CIVIL - final layer (NS), 2nd & 3rd layer (South side), Panel #8 - north side - final layer, Panel APPROVED
002 E-W Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 19-Jun-13 7:00 AM to 4:30 PM 20-Jun-13
#10 - north side - 1st, 2nd & final layer
Check type A filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD047,
2116 RFI-5858-QCN-1-01710 RFI-5858-QCN-1-01710 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 19-Jun-13 7:30 AM to 5:30 PM 20-Jun-13
SLD048, SLD049 - 1st & final layer
Soil Compaction Test For backfilling - Type B Sleeper Foundations B70-PS - 04 SLD 019 SECTION -1
2117 RFI-5858-QCN-1-01711 RFI-5858-QCN-1-01711 CIVIL CANCELLED B-V-3100-004-2-201-01_6 4.2.b R W H 19-Jun-13 8:00 AM to 5:00 PM 19-Jun-13 cancelled reissued RFI
to SLD 016 Raslaffan
Soil Compaction Test For backfilling Type - B Sleeper foundation B70-PS-21 SLD001 TO
2118 RFI-5858-QCN-1-01712 RFI-5858-QCN-1-01712 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 19-Jun-13 8:00 AM to 4:30 PM 20-Jun-13
SLD004 - 1st & final layer
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2119 RFI-5858-QCN-1-01713 RFI-5858-QCN-1-01713 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-Jun-13 7:30 AM to 5:00 PM 26-Jun-13
portion),Crossing #98 - 6TH LAYER DESALINATION LINE
Soil Compaction Test For Formation level prior to blinding Type - A D110-RW-004(E- Section4 D110-RW-
2120 RFI-5858-QCN-1-01714 RFI-5858-QCN-1-01714 CIVIL
BZRC) EAST RETAINING WALL (Besides of Protection Slab Portion)
APPROVED
004 Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 20-Jun-13 9:00 AM 25-Jun-13
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-23: SLD001 and
2122 RFI-5858-QCN-1-01716 RFI-5858-QCN-1-01716 CIVIL B70-PS-22: SLD002, SLD004, SLD005 SLD006 and Type A for B70-PS-22: SLD002 and APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 20-Jun-13 7:30 AM to 5:30 PM 25-Jun-13
SLD065 - 1st & final layer
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-30: F1 and F2
2124 RFI-5858-QCN-1-01718 RFI-5858-QCN-1-01718 CIVIL APPROVED PR-30 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 22-Jun-13 7:30 AM to 5:30 PM 6-Jul-13
( Grading )
Soil Compaction Test For backfilling Type - B D110-RW-002 E-W Retaining wall10th &11 Section6 D110-RW-
2125 RFI-5858-QCN-1-01719 RFI-5858-QCN-1-01719 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Jun-13 7:00 AM to 4:30 PM 25-Jun-13
th panel 1st & 2nd layer 002 E-W Raslaffan
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD002,
2126 RFI-5858-QCN-1-01720 RFI-5858-QCN-1-01720 CIVIL
SLD004, SLD005 SLD006 and Type A for B70-PS-22: SLD065
CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 22-Jun-13 7:30 AM to 5:30 PM 20-Jun-13 cancelled re issued rfi
Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-61 and Tank Farm
2127 RFI-5858-QCN-1-01721 RFI-5858-QCN-1-01721 CIVIL
Pipe Stopper B70-PS-30: SLD034
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1.. R W H 22-Jun-13 7:30 AM 25-Jun-13
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION 4 CR#
2128 RFI-5858-QCN-1-01722 RFI-5858-QCN-1-01722 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Jun-13 7:00 AM to 5:00 PM 25-Jun-13
PORTION) - 1st & 2nd layer 35
Check type B filed density & layer thickness for Pipe Stopper ( Base ) B70-PS-30: Tank Farm
2129 RFI-5858-QCN-1-01723 RFI-5858-QCN-1-01723 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Jun-13 7:30 AM to 9:30 AM 25-Jun-13
SLD004 1st & 2nd layer Raslaffan
Check final Visual Inspection& Elevations of Grading D110 -B70- PR-75 Pipe Rack
2130 RFI-5858-QCN-1-01724 RFI-5858-QCN-1-01724 CIVIL APPROVED SECTION1 PR-75 B-V-3100-004-1-201-02_6 5.1&5.2 S W H 22-Jun-13 3:00 PM 11-Jul-13
Foundation 1 (F1) &2(F1)
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2131 RFI-5858-QCN-1-01725 RFI-5858-QCN-1-01725 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Jun-13 7:30 AM to 5:00 PM 22-Jun-13 cancelled work not ready
portion),Crossing #98 & Crossing #97 DESALINATION LINE
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD002,
2132 RFI-5858-QCN-1-01726 RFI-5858-QCN-1-01726 CIVIL
SLD004, SLD005 SLD006 and Pipe Stopper B70-PS-22: SLD003
CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 23-Jun-13 7:30 AM to 5:30 PM 23-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD054 - Tank Farm
2133 RFI-5858-QCN-1-01727 RFI-5858-QCN-1-01727 CIVIL
1st,2nd & 3rd layer and Pipe Track D110-B70-PR-59 - 1st, 2nd & 3rd layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 23-Jun-13 7:30 AM to 5:30 PM 25-Jun-13
Check type B filed density & layer thickness for Retaining Wall E-W ( 10th and 11th
Retaining Wall E-W
2136 RFI-5858-QCN-1-01730 RFI-5858-QCN-1-01730 CIVIL panel ) Panel-11 & Panel 10 south side 3rd layer, Panel 11 north side - 1st layer, Panel APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 23-Jun-13 7:30 AM to 5:30 PM 25-Jun-13
Raslaffan
12 north side - 1st layer
Check final Visual Inspection& Elevations of Grading Sleeper Foundations B70-PS - 04 SECTION - 1
2137 RFI-5858-QCN-1-01731 RFI-5858-QCN-1-01731 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 23-Jun-13 2:00 PM 2-Jul-13
SLD 019 to SLD 016 Raslaffan
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION 4 CR#
2138 RFI-5858-QCN-1-01732 RFI-5858-QCN-1-01732 CIVIL
PORTION) -3r layer
APPROVED
35
B-V-3100-004-1-201-01_6 4.2.b R W H 23-Jun-13 7:00 AM to 5:00 PM 25-Jun-13
2139 RFI-5858-QCN-1-01733 RFI-5858-QCN-1-01733 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Jun-13 8:30 AM to 5:30 PM 24-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-22: SLD002,
2140 RFI-5858-QCN-1-01734 RFI-5858-QCN-1-01734 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 24-Jun-13 7:30 AM to 5:30 PM 24-Jun-13 cancelled re issued rfi
SLD004, SLD005 SLD006 and Pipe Stopper B70-PS-22: SLD003
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD054-4th Tank Farm
2141 RFI-5858-QCN-1-01735 RFI-5858-QCN-1-01735 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 24-Jun-13 7:30 AM to 5:30 PM 25-Jun-13
layer and Pipe Track D110-B70-PR-59-4th & 5th layer Raslaffan
Soil Compaction Test for Backfilling- Type B Desalination line Crossing #99(west half SECTION1
2142 RFI-5858-QCN-1-01736 RFI-5858-QCN-1-01736 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 24-Jun-13 7:30 AM to 5:00 PM 26-Jun-13
portion),Crossing #98 & Crossing #97 - final layer DESALINATION LINE
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION 4 CR#
2143 RFI-5858-QCN-1-01737 RFI-5858-QCN-1-01737 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 24-Jun-13 7:00 AM to 5:00 PM 25-Jun-13
PORTION) - 4th, 5th, & 6th layer 35
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-30: SLD042 Tank Farm
2144 RFI-5858-QCN-1-01738 RFI-5858-QCN-1-01738 CIVIL
and SLD045
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 24-Jun-13 8:00 AM 2-Jul-13
Check type D aggregates filed density & layer thickness for Pipe Track D110-B70-PR-42:
2145 RFI-5858-QCN-1-01739 RFI-5858-QCN-1-01739 CIVIL
F2 = 1 nos, F3 = 2 nos and F5 = 1 no.
APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2 R W H 24-Jun-13 2:30 PM to 5:30 PM 27-Jun-13
Check type B filed density & layer thickness for Retaining Wall E-W ( 12th panel ) - 1st &
Retaining Wall E-W
2146 RFI-5858-QCN-1-01740 RFI-5858-QCN-1-01740 CIVIL 2nd layer(south side), Panel 9 - 4th layer (s.side), Panel 10,11-4th layer (S.side), APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 24-Jun-13 7:30 AM to 5:30 PM 25-Jun-13
Raslaffan
Panel1&2-1st layer(N.Side)
SECTION4
2147 RFI-5858-QCN-1-01741 RFI-5858-QCN-1-01741 CIVIL Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -012 SLD013 CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 25-Jun-13 9:30 AM to 5:00 PM 25-Jun-13 cancelled work not ready
Raslaffan
2148 RFI-5858-QCN-1-01742 RFI-5858-QCN-1-01742 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 CANCELLED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Jun-13 7:30 AM to 5:30 PM 25-Jun-13 cancelled work not ready
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD054, Pipe
Tank Farm
2149 RFI-5858-QCN-1-01743 RFI-5858-QCN-1-01743 CIVIL Sleeper B70-PS-30: SLD042 & SLD045 and PS-30 SLD054 - 5th & final layer, PS-30 APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 25-Jun-13 7:30 AM to 5:30 PM 28-Jun-13
Raslaffan
SLD042 & 45 - 1st layer
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION 4 CR#
2150 RFI-5858-QCN-1-01744 RFI-5858-QCN-1-01744 CIVIL
PORTION) - 7th layer
APPROVED
35
B-V-3100-004-1-201-01_6 4.2.b R W H 25-Jun-13 7:00 AM to 5:00 PM 28-Jun-13
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD004 and
2151 RFI-5858-QCN-1-01745 RFI-5858-QCN-1-01745 CIVIL
SLD034
CANCELLED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Jun-13 1:30 PM to 5:30 PM 25-Jun-13 cancelled work not ready
2152 RFI-5858-QCN-1-01746 RFI-5858-QCN-1-01746 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F5 CANCELLED PR-42 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 25-Jun-13 7:30 AM to 5:30 PM 25-Jun-13 cancelled work not ready
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION - 4 CR#
2153 RFI-5858-QCN-1-01747 RFI-5858-QCN-1-01747 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 26-Jun-13 7:00 AM to 5:00 PM 26-Jun-13 cancelled work not ready
PORTION) 35
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -012 SLD013 SECTION - 4
2154 RFI-5858-QCN-1-01748 RFI-5858-QCN-1-01748 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 26-Jun-13 7:30 AM to 5.00 PM 28-Jun-13
1st & final layer Raslaffan
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD042 and
2155 RFI-5858-QCN-1-01749 RFI-5858-QCN-1-01749 CIVIL APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 26-Jun-13 7:30 AM to 5:30 PM 28-Jun-13
SLD045 - final layer
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Tank Farm
2156 RFI-5858-QCN-1-01750 RFI-5858-QCN-1-01750 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-59 - final Layer APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 26-Jun-13 7:30 AM to 5:30 PM 28-Jun-13
Check type B filed density & layer thickness for Retaining Wall E-W and South side 12th,
Retaining Wall E-W
2157 RFI-5858-QCN-1-01751 RFI-5858-QCN-1-01751 CIVIL 13th panel, Panel 12 - 3rd, 4th layer (south side), Panel 13 -1st, 2nd & 3rd layer (South APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 27-Jun-13 7:30 AM to 5:30 PM 2-Jul-13
side)
Soil Compaction Test for FormatioBackfilling- Type B DUCT BANK BZDP 009 (5.4M SECTION - 4 CR#
2158 RFI-5858-QCN-1-01752 RFI-5858-QCN-1-01752 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 27-Jun-13 7:00 AM to 5:00 PM 27-Jun-13 cancelled work not ready
PORTION) 35
Check final Visual Inspection& Elevations of Grading Sleeper foundation D110-B70 -PS- SECTION - 4
2159 RFI-5858-QCN-1-01753 RFI-5858-QCN-1-01753 CIVIL APPROVED B-V-3100-004-1-201-02_6 5.1&5.2 S W H 27-Jun-13 10:00 AM 2-Jul-13
12 SLD013 Raslaffan
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 1st &
2160 RFI-5858-QCN-1-01754 RFI-5858-QCN-1-01754 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 27-Jun-13 8:00 AM to 5:30 PM 2-Jul-13
2nd layer
Tank Farm
2161 RFI-5858-QCN-1-01755 RFI-5858-QCN-1-01755 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-59 CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 27-Jun-13 7:30 AM to 5:30 PM 27-Jun-13 cancelled reissued RFI
Raslaffan
Check type B filed density & layer thickness for Pipe Sleeper and Piper stopper B70-PS-
2162 RFI-5858-QCN-1-01756 RFI-5858-QCN-1-01756 CIVIL
30: SLD004 3rd, 4th and final layer
APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 27-Jun-13 7:30 AM to 5:30 PM 2-Jul-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 - 3rd &
2163 RFI-5858-QCN-1-01757 RFI-5858-QCN-1-01757 CIVIL
4th layer
APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 29-Jun-13 8:00 AM to 5:30 PM 2-Jul-13
Check type D aggregates filed density & layer thickness for Pipe Track D110-B70-PR-42:
2164 RFI-5858-QCN-1-01758 RFI-5858-QCN-1-01758 CIVIL APPROVED Section 7 Raslaffan B-V-3100-004-1-201-01_6 4.2 R W H 29-Jun-13 8:00 AM 2-Jul-13
F2 = 2 nos
2165 RFI-5858-QCN-1-01759 RFI-5858-QCN-1-01759 CIVIL Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD004 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 29-Jun-13 7:30 AM to 5:30 PM 29-Jun-13
Tank Farm
2166 RFI-5858-QCN-1-01760 RFI-5858-QCN-1-01760 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-41 APPROVED B-V-3100-004-1-201-01_6 2.1 R W H 29-Jun-13 7:00 AM 2-Jul-13
Raslaffan
Check type B filed density & layer thickness for Retaining Wall E-W 5th, 6th, 7th, 13th and
14th panel, Panel-5 south side 5th lyaer, Panel -6 south side 5th layer, Panel-14 south Retaining Wall E-W
2167 RFI-5858-QCN-1-01761 RFI-5858-QCN-1-01761 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 29-Jun-13 7:30 AM to 5:30 PM 2-Jul-13
side 1st layer, panel -13 south side 4th layer, Panel-5 north side 1st layer, Panel-3 north Raslaffan
side 1st layer, Panel -1 north side 2nd layer, Panel -2 north side 2nd layer
Tank Farm
2168 RFI-5858-QCN-1-01762 RFI-5858-QCN-1-01762 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-39 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 30-Jun-13 8:00 AM 30-Jun-13 cancelled work not ready
Tank Farm
2169 RFI-5858-QCN-1-01763 RFI-5858-QCN-1-01763 CIVIL Check type B filed density & layer thickness for Pipe Track D110-B70-PR-41 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 1-Jul-13 1:30 PM to 5:30 PM 1-Jul-13 cancelled work not ready
Check type D and B filed density & layer thickness for Pipe Track D110-B70-PR-61: F1 Tank Farm
2172 RFI-5858-QCN-1-01766 RFI-5858-QCN-1-01766 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-Jul-13 9:30 AM to 5:30 PM 4-Jul-13
and D110-B70-PR-41 - 1st & 2nd layer Raslaffan
Check type D and B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD034 - Tank Farm
2173 RFI-5858-QCN-1-01767 RFI-5858-QCN-1-01767 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 2-Jul-13 9:30 AM to 5:30 PM 4-Jul-13
1st & 2nd layer Raslaffan
9:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 - 5th &
2174 RFI-5858-QCN-1-01768 RFI-5858-QCN-1-01768 CIVIL
6th layer
APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 3-Jul-13 to 6-Jul-13
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD034 and Tank Farm
2175 RFI-5858-QCN-1-01769 RFI-5858-QCN-1-01769 CIVIL
Pipe Track D110-B70-PR-41 - 3rd & 4th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 3-Jul-13 to 6-Jul-13
5:30 PM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-33: F1 - final
2176 RFI-5858-QCN-1-01770 RFI-5858-QCN-1-01770 CIVIL APPROVED PR-33 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 4-Jul-13 7:30 AM to 5:30 PM 7-Jul-13
layer
Check type B filed density & layer thickness for Pipe Stopper B70-PS-30: SLD034 and Tank Farm
2177 RFI-5858-QCN-1-01771 RFI-5858-QCN-1-01771 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 4-Jul-13 7:30 AM to 5:30 PM 7-Jul-13
Pipe Track D110-B70-PR-41 - 5th & final layer, B70-PS-30 SLD034 - final layer Raslaffan
Check type B filed density & layer thickness for Retaining Wall E-W 5th, 6th and 14th Retaining Wall E-W
2178 RFI-5858-QCN-1-01772 RFI-5858-QCN-1-01772 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 4-Jul-13 7:30 AM to 5:30 PM 7-Jul-13
panel - 5th & 6th layer (Panel-5 & 6), 2nd & 3rd layer (Panel-14), 2nd layer (Panel-11) Raslaffan
Review and approval of QIL test report of MDD & OMC for Back fill Material (Type- B for Barzan Off-plot
2179 RFI-5858-QCN-1-01773 RFI-5858-QCN-1-01773 CIVIL APPROVED B-V-3100-004-1-201-01_3 3.1.b R W H 4-Jul-13 7:30 AM 6-Jul-13
the sampled location Section-6 ,PR-33-F1) BARZAN
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-39: and Tank Farm
2181 RFI-5858-QCN-1-01775 RFI-5858-QCN-1-01775 CIVIL
Pipe Sleeper B70-PS-30: SLD025 and SLD026
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 6-Jul-13 8:00 AM 10-Jul-13
Sampling for Backfill Material Type -B & Type-A AT SAMPLE Location Section -6, stock Barzan Off-plot
2182 RFI-5858-QCN-1-01776 RFI-5858-QCN-1-01776 CIVIL APPROVED B-V-3100-004-1-201-01_5 3.1,a,b R W H 6-Jul-13 8:00 AM 10-Jul-13
pile #- 01 & Section -7, stock pile #- 04(Type-A) Section :6 &7
Check type B filed density & layer thickness for Retaining Wall E-W 8th, 9th and 10th 7:30 AM
Retaining Wall E-W
2183 RFI-5858-QCN-1-01777 RFI-5858-QCN-1-01777 CIVIL panel. Panel -5, 5th layer (South side)-2nd & final layer (North side), Panel-1 & 11 - final APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 7-Jul-13 to 10-Jul-13
Raslaffan
layer north side 5:30 PM
1:30 PM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F2 = 3 nos Tank Farm
2184 RFI-5858-QCN-1-01778 RFI-5858-QCN-1-01778 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jul-13 to 10-Jul-13
and F3 = 2 nos, F2-G/5&7 - 1st & 2nd layer, F3- G/6 - 1stlayer Raslaffan
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD025 and Tank Farm
2185 RFI-5858-QCN-1-01779 RFI-5858-QCN-1-01779 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jul-13 to 10-Jul-13
SLD026 - 1st & final layer Raslaffan
5:30 PM
Tank Farm
2186 RFI-5858-QCN-1-01780 RFI-5858-QCN-1-01780 CIVIL Check type D filed density & layer thickness for Pipe Track D110-B70-PR-39 ( Base ) APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 8-Jul-13 9:30 AM 10-Jul-13
7:30 AM
Retaining Wall E-W
2187 RFI-5858-QCN-1-01781 RFI-5858-QCN-1-01781 CIVIL Check type B filed density & layer thickness for Retaining Wall E-W 10th and 11th panel CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 8-Jul-13 to 8-Jul-13 cancelled work not ready
5:30 PM
7:30 AM
Check type D filed density & layer thickness for Culvert BZRC-011 ( 10.70 meters ) and
2188 RFI-5858-QCN-1-01782 RFI-5858-QCN-1-01782 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 8-Jul-13 to 8-Jul-13
6.70 meters
10:30 AM
9:30 AM
2189 RFI-5858-QCN-1-01783 RFI-5858-QCN-1-01783 CIVIL Check type D and layer thickness for Culvert BZRC-010 APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 9-Jul-13 to 13-Jul-13
5:30 PM
7:30 AM
2190 RFI-5858-QCN-1-01784 RFI-5858-QCN-1-01784 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011 CANCELLED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 9-Jul-13 to 9-Jul-13 cancelled work not ready
5:30 PM
2191 RFI-5858-QCN-1-01785 RFI-5858-QCN-1-01785 CIVIL Check Excavation-Bottom of Excavation verification DUCT BANK BZDP 006 APPROVED SECTION 2 CR# 15 B-V-3100-004-1-201-02_5 2.2 R W H 9-Jul-13 8:00 AM 17-Jul-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F2 = 3 nos 7:30 AM
Tank Farm
2192 RFI-5858-QCN-1-01786 RFI-5858-QCN-1-01786 CIVIL and F3 = 2 nos. D110-B70-PR-42 F3 - 2nos - 1st 2nd layer, D110-B70-PR-42 F2 - 2nos APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jul-13 to 11-Jul-13
- 3rd 4th layer, (F3 Grid -3&6, F2 - Grid 2 & 5) 5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD025 and Tank Farm
2193 RFI-5858-QCN-1-01787 RFI-5858-QCN-1-01787 CIVIL
SLD026
CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 9-Jul-13 to 9-Jul-13 cancelled FDT already done
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Retaining Wall E-W 10th, 11th and panel Retaining Wall E-W
2194 RFI-5858-QCN-1-01788 RFI-5858-QCN-1-01788 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.a R W H 9-Jul-13 to 11-Jul-13
9th, 10th, 11th south side - 5th layer Raslaffan
5:30 PM
7:30 AM
Soil Compaction Test for backfilling- Grading Type A D110 - B70- PR-73 Pipe Rack
2196 RFI-5858-QCN-1-01790 RFI-5858-QCN-1-01790 CIVIL APPROVED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jul-13 to 10-Jul-13
Foundation 1(F1)& 2(F2) 1st & final layer
4:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 (end portion west
2197 RFI-5858-QCN-1-01791 RFI-5858-QCN-1-01791 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Jul-13 to 13-Jul-13
side) 1st layer
11:30 AM
7:30 AM
2198 RFI-5858-QCN-1-01792 RFI-5858-QCN-1-01792 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011 CANCELLED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 10-Jul-13 to 10-Jul-13 cancelled work not ready
11:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F2 = 3 nos 7:30 AM
Tank Farm
2199 RFI-5858-QCN-1-01793 RFI-5858-QCN-1-01793 CIVIL and F3 = 2 nos. Grid 5,7 - F2 - 5th layer, Grid 2 - F2 - 1st & 2nd layer, Grid 3,6 - F3 - 3rd APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 10-Jul-13 to 13-Jul-13
& 4th layer 11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ) - 2ND &
2201 RFI-5858-QCN-1-01795 RFI-5858-QCN-1-01795 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 11-Jul-13 to 16-Jul-13
3RD Layer (west side end)
11:30 AM
7:30 AM
2202 RFI-5858-QCN-1-01796 RFI-5858-QCN-1-01796 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011 - 1st layer APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 11-Jul-13 to 14-Jul-13
11:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F2 = 3 nos 7:30 AM
Tank Farm
2203 RFI-5858-QCN-1-01797 RFI-5858-QCN-1-01797 CIVIL and F3 = 2 nos and D110-B70-PR-61. PR-42 - F2 Grid 2 - 3rd, 4th layer, PR-42 F3 Grid APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 11-Jul-13 to 14-Jul-13
Raslaffan
6- 5th layer, PR-61 1st & 2nd layer 11:30 AM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Soil Compaction Test for backfilling- Grading Type A D110 - B70- PR-73 Pipe Rack
2204 RFI-5858-QCN-1-01798 RFI-5858-QCN-1-01798 CIVIL
Foundation 1(F1)& 2(F2)
CANCELLED SECTION 4 PR - 73 B-V-3100-004-1-201-01_6 4.2.b R W H 11-Jul-13 7:30 AM 11-Jul-13 FDT already done final layer
2205 RFI-5858-QCN-1-01799 RFI-5858-QCN-1-01799 CIVIL Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-22: SLD001 CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 2.1 R W H 13-Jul-13 8:00 AM 13-Jul-13 cancelled work not ready
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ). 4th & 5th
2206 RFI-5858-QCN-1-01800 RFI-5858-QCN-1-01800 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 13-Jul-13 to 14-Jul-13
layer west side end portion
11:30 AM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-011. south side base wall -
2207 RFI-5858-QCN-1-01801 RFI-5858-QCN-1-01801 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_6 4.2.a R W H 13-Jul-13 to 13-Jul-13
1st,2nd,3rd layer, North side 2nd layer
11:30 AM
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-61 - 3rd & 4th Tank Farm
2208 RFI-5858-QCN-1-01802 RFI-5858-QCN-1-01802 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jul-13 to 13-Jul-13
layer Raslaffan
11:30 AM
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F5 and Tank Farm
2209 RFI-5858-QCN-1-01803 RFI-5858-QCN-1-01803 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jul-13 to 13-Jul-13 cancelled work not ready
D110-B70-PR-39 ( East Side ) Raslaffan
11:30 AM
Tank Farm
2210 RFI-5858-QCN-1-01804 RFI-5858-QCN-1-01804 CIVIL Check Excavation : Bottom of excavation verification: Pipe Track D110-B70-PR-61 CANCELLED
Raslaffan
B-V-3100-004-1-201-01_6 2.1 R W H 13-Jul-13 8:00 AM 13-Jul-13 cancelled work not ready
8:30 AM
Check type B filed density & layer thickness for Pipe Stopper B70-PS-22: SLD003 and
2211 RFI-5858-QCN-1-01805 RFI-5858-QCN-1-01805 CIVIL
Pipe Sleeper B70-PS-22: SLD011
CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 13-Jul-13 to 13-Jul-13 cancelled work not ready
11:30 AM
7:30AM
Check Type B filed density & layer thickness for Culvert BZRC-010 - 1st layer south side
2212 RFI-5858-QCN-1-01806 RFI-5858-QCN-1-01806 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 14-Jul-13 to 16-Jul-13
wall
5:30PM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-011, East & west side - 1st
2213 RFI-5858-QCN-1-01807 RFI-5858-QCN-1-01807 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 14-Jul-13 to 16-Jul-13
& 2nd layer, North & south side - 4th layer
11:30 AM
Check Excavation : Bottom of excavation verification:Pipe Track Pipe Stopper B70-PS-30: Tank Farm
2214 RFI-5858-QCN-1-01808 RFI-5858-QCN-1-01808 CIVIL APPROVED B-V-3100-004-1-201-01_7 2.1 R W H 14-Jul-13 8:00 AM 17-Jul-13
SLD019 Raslaffan
2215 RFI-5858-QCN-1-01809 RFI-5858-QCN-1-01809 CIVIL Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-22: SLD001 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_7 2.1 R W H 14-Jul-13 8:00 AM 16-Jul-13
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-39 - 1st & 2nd Tank Farm
2216 RFI-5858-QCN-1-01810 RFI-5858-QCN-1-01810 CIVIL
layer and D110-B70-PR-61 - 5th & final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 14-Jul-13 to 16-Jul-13
11:30 AM
8:00 AM
Check type B filed density & layer thickness for Pipe Stopper B70-PS-22: SLD003 &
2217 RFI-5858-QCN-1-01811 RFI-5858-QCN-1-01811 CIVIL
SLD011 pipe sleeper, SLD011 - 1st & final layer, SLD033 - 3rd layer
APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 14-Jul-13 to 16-Jul-13
11:30 AM
7:30 AM
Check type B filed density & layer thickness for Retaining Wall E-W 12th - south side 5th Retaining Wall E-W
2218 RFI-5858-QCN-1-01812 RFI-5858-QCN-1-01812 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.a R W H 14-Jul-13 to 16-Jul-13
layer Raslaffan
11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. 2nd layer south side
2219 RFI-5858-QCN-1-01813 RFI-5858-QCN-1-01813 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 15--Jun-13 to 17-Jul-13
base wall
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-011. east west side 3rd &
2220 RFI-5858-QCN-1-01814 RFI-5858-QCN-1-01814 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 15--Jun-13 to 17-Jul-13
4th layer, north south side 5th layer
11:30 AM
8:00 AM
Check type B filed density & layer thickness for Pipe Stopper B70-PS-22: SLD003. 4th
2221 RFI-5858-QCN-1-01815 RFI-5858-QCN-1-01815 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_6 4.2.b R W H 15--Jun-13 to 17-Jul-13
&5th layer
11:30 AM
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F5, D110- Tank Farm
2222 RFI-5858-QCN-1-01816 RFI-5858-QCN-1-01816 CIVIL
B70-PR-39, D110-B70-PR-42 FS 1st, 2nd layer, D110-B70-PR-39 3rd, 4th layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.b R W H 15--Jun-13 to 18-Jul-13
11:30 AM
Tank Farm
2223 RFI-5858-QCN-1-01817 RFI-5858-QCN-1-01817 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-60 APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 2.1 R W H 15--Jun-13 8:00 AM 17-Jul-13
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. North side 1st & 2nd
2224 RFI-5858-QCN-1-01818 RFI-5858-QCN-1-01818 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 16-Jul-13 to 18-Jul-13
layer, South side 3rd layer
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-011. East west side 5th
2225 RFI-5858-QCN-1-01819 RFI-5858-QCN-1-01819 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 16-Jul-13 to 18-Jul-13
layer, North south side 6th layer.
5:30 PM
8:00 AM
Check type B filed density & layer thickness for Pipe Stopper B70-PS-22: SLD003. final
2226 RFI-5858-QCN-1-01820 RFI-5858-QCN-1-01820 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_7 4.2.b R W H 16-Jul-13 to 18-Jul-13
layer.
11:30 AM
Tank Farm
2227 RFI-5858-QCN-1-01821 RFI-5858-QCN-1-01821 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-61 CANCELLED B-V-3100-004-1-201-01_7 2.1 R W H 16-Jul-13 8:00 AM 16-Jul-13 cancelled work not ready
Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. west side. North
2229 RFI-5858-QCN-1-01823 RFI-5858-QCN-1-01823 CIVIL
south side 4th, 5th layer, North side 3rd layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 17-Jul-13 to 20-Jul-08
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Culvert BZRC-011. east west side 6th &
2230 RFI-5858-QCN-1-01824 RFI-5858-QCN-1-01824 CIVIL APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 17-Jul-13 to 20-Jul-08
7th layer, North south side 7th layer
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-42: D110-B70- Tank Farm
2231 RFI-5858-QCN-1-01825 RFI-5858-QCN-1-01825 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 17-Jul-13 to 20-Jul-08
PR-42 F5 final layer. Raslaffan
11:30 AM
8:00 AM
Tank Farm
2232 RFI-5858-QCN-1-01826 RFI-5858-QCN-1-01826 CIVIL Check type D filed density & layer thickness for Pipe Stopper B70-PS-30: SLD019 ( Base ) APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 17-Jul-13 to 20-Jul-08
Raslaffan
11:30 AM
7:00 AM
SECTION 2 CR#
2233 RFI-5858-QCN-1-01827 RFI-5858-QCN-1-01827 CIVIL Soil Compaction Test for Backfilling- Type B DUCT BANK BZDP 006. 1st & 2nd layer APPROVED B-V-3100-004-1-201-01_7 4.2b R W H 17-Jul-13 to 20-Jul-08
15
5:00 PM
Barzan Off-plot
2234 RFI-5858-QCN-1-01828 RFI-5858-QCN-1-01828 CIVIL Sampling for Excavated Material Type -B AT SAMPLE Location Section -1 & 2, APPROVED
Section :1 &2
B-V-3100-004-1-201-01_5 3.1.b R W H 18-Jul-13 8:00 AM 21-Jul-13
7:00 AM
SECTION 2 CR#
2235 RFI-5858-QCN-1-01829 RFI-5858-QCN-1-01829 CIVIL Soil Compaction Test for Backfilling- Type B DUCT BANK BZDP 006. 3rd layer APPROVED
15
B-V-3100-004-1-201-01_7 4.2.b R W H 18-Jul-13 to 21-Jul-13
5:00 PM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. north & south side
2236 RFI-5858-QCN-1-01830 RFI-5858-QCN-1-01830 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 18-Jul-13 to 21-Jul-13
6th & 7th layer
5:30 PM
7:30 AM
2237 RFI-5858-QCN-1-01831 RFI-5858-QCN-1-01831 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011. 8th & 9th layer around APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 18-Jul-13 to 21-Jul-13
5:30 PM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-39 (West 7:30 AM
Tank Farm
2238 RFI-5858-QCN-1-01832 RFI-5858-QCN-1-01832 CIVIL Side ) and Pipe Sleeper B70-PS-29 : SLD047. Type A D110-B70-PR-39 west side 1st APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 18-Jul-13 to 18-Jul-13
Raslaffan
layer, PS-29 SLD047 1st & 2nd layer 11:30 AM
7:00 AM
SECTION 2 CR#
2239 RFI-5858-QCN-1-01833 RFI-5858-QCN-1-01833 CIVIL Soil Compaction Test for Backfilling- Type A DUCT BANK BZDP 006 - 4th layer APPROVED B-V-3100-004-1-201-01_7 4.2b R W H 20-Jul-13 to 21-Jul-13
15
5:00 PM
7:30 AM
BZRC-010 Raslaffan
2240 RFI-5858-QCN-1-01834 RFI-5858-QCN-1-01834 CIVIL Check type B filed density & layer thickness for Culvert BZRC-010 CANCELLED
Area
B-V-3100-004-1-201-01_7 4.2.a R W H 19-Jul-13 to 19-Jul-13 Cancelled Due to Hot weather
5:30 AM
7:30 AM
BZRC-011 Raslaffan
2241 RFI-5858-QCN-1-01835 RFI-5858-QCN-1-01835 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011 CANCELLED
Area
B-V-3100-004-1-201-01_7 4.2.a R W H 19-Jul-13 to 19-Jul-13 Cancelled Due to Hot weather
5:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 north south 8th & 9th
2242 RFI-5858-QCN-1-01836 RFI-5858-QCN-1-01836 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 20-Jul-13 to 21-Jul-13
layer
5:30 PM
7:30 AM
2243 RFI-5858-QCN-1-01837 RFI-5858-QCN-1-01837 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011 CANCELLED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 20-Jul-13 to 20-Jul-13 cancelled due to red flag
5:30 PM
7:30 AM
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-39 ( West Tank Farm
2244 RFI-5858-QCN-1-01838 RFI-5858-QCN-1-01838 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 20-Jul-13 to 21-Jul-13
Side ) and 2nd layer Raslaffan
11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. Road portion 10th
2246 RFI-5858-QCN-1-01840 RFI-5858-QCN-1-01840 CIVIL
layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 21-Jul-13 to 23-Jul-13
5:30 PM
7:30 AM
2247 RFI-5858-QCN-1-01841 RFI-5858-QCN-1-01841 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011. 10th layer APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 21-Jul-13 to 23-Jul-13
5:30 PM
Check Excavation : Bottom of excavation verification:Pipe Track and Pipe Sleeper B70- Tank Farm
2248 RFI-5858-QCN-1-01842 RFI-5858-QCN-1-01842 CIVIL APPROVED B-V-3100-004-1-201-01_7 2.1 R W H 21-Jul-13 8:00 AM 24-Jul-13
PS-30: SLD011 and SLD048. B70-PS-29 SLD048 Raslaffan
7:30 AM
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-39. (East & Tank Farm
2249 RFI-5858-QCN-1-01843 RFI-5858-QCN-1-01843 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.b R W H 21-Jul-13 to 21-Jul-13 cancelled
west side) Raslaffan
11:30 AM
7:00 AM
SECTION 2 CR#
2250 RFI-5858-QCN-1-01844 RFI-5858-QCN-1-01844 CIVIL Soil Compaction Test for Backfilling- Type A DUCT BANK BZDP 006. 5th & 6th layer APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 21-Jul-13 to 23-Jul-13
15
5:00 PM
7:00 AM
SECTION 2 CR#
2251 RFI-5858-QCN-1-01845 RFI-5858-QCN-1-01845 CIVIL Soil Compaction Test for Backfilling- Type A DUCT BANK BZDP 006. 7th & 8th layer APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 22-Jul-13 to 25-Jul-13
15
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010. west side end portion
2253 RFI-5858-QCN-1-01847 RFI-5858-QCN-1-01847 CIVIL
6th, 7th layer, west side Road portion 11th layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 22-Jul-13 to 25-Jul-13
5:30PM
7:30 AM
2254 RFI-5858-QCN-1-01848 RFI-5858-QCN-1-01848 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011. 11th layer & 12th layer APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 22-Jul-13 to 25-Jul-13
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Track and d110-B70-PR-60 1st & Tank Farm
2255 RFI-5858-QCN-1-01849 RFI-5858-QCN-1-01849 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 22-Jul-13 to 25-Jul-13
2nd layer Raslaffan
11:30 AM
Tank Farm
2256 RFI-5858-QCN-1-01850 RFI-5858-QCN-1-01850 CIVIL Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-42: F4 CANCELLED B-V-3100-004-1-201-01_7 2.1 R W H 22-Jul-13 8:00 AM 22-Jul-13 cancelled
Raslaffan
7:00 AM
2257 RFI5858-QCN-1-01851 RFI5858-QCN-1-01851 CIVIL Soil Compaction Test for Backfilling- Type A DUCT BANK BZDP 006 -final layer APPROVED SECTION 2 CR# 15 B-V-3100-004-1-201-01_7 4.2.b R W H 23-Jul-13 to 27-Jul-13
5:00 PM
7:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD036 SECTION - 4
2258 RFI-5858-QCN-1-01852 RFI-5858-QCN-1-01852 CIVIL
TO SLD020. Final layer (SLD021 not inculded)
APPROVED
Raslaffan
B-V-3100-004-1-201-01-R 4.2.b R W H 23-Jul-13 to 27-Jul-13
5:00 PM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 -12th layer Road
2259 RFI-5858-QCN-1-01853 RFI-5858-QCN-1-01853 CIVIL
portion
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 23-Jul-13 to 27-Jul-13
5:30 PM
7:30 AM
2260 RFI-5858-QCN-1-01854 RFI-5858-QCN-1-01854 CIVIL Check type B filed density & layer thickness for Culvert BZRC-011. 12th, 13th & 14th layer APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 23-Jul-13 to 27-Jul-13
5:30 PM
7:30 AM
Check type B filed density & layer thickness for Pipe Track ( Est and West ) and D110- Tank Farm
2261 RFI-5858-QCN-1-01855 RFI-5858-QCN-1-01855 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 23-Jul-13 to 27-Jul-13
B70-PR-60 -3rd & 4th layer Raslaffan
11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Pipe Stopper and Sleeper B70-PS-30: Tank Farm
2262 RFI-5858-QCN-1-01856 RFI-5858-QCN-1-01856 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.a R W H 23-Jul-13 to 27-Jul-13
SLD011 and SLD011 - 1st layer Raslaffan
11:30 AM
Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-42: F4. Tank Farm
2263 RFI-5858-QCN-1-01857 RFI-5858-QCN-1-01857 CIVIL APPROVED B-V-3100-004-1-201-01_7 2.1 R W H 23-Jul-13 8:00 AM 27-Jul-13
B70-PS-30 SLD013 & SLD014 Raslaffan
7:00 AM
Soil Compaction Test For backfilling Type - B D110-RW 003(W-BZRC) West Retaining Section4 D110-RW-
2265 RFI-5858-QCN-1-01859 RFI-5858-QCN-1-01859 CIVIL
Wall South side 8th Panel - 1st layer
APPROVED
003 Raslaffan
B-V-3100-004-1-201-01_7 4.2.b R W H 24-Jul-13 To 27-Jul-13
4:30 PM
7:30 AM
2266 RFI-5858-QCN-1-01860 RFI-5858-QCN-1-01860 CIVIL Check Type B filed density & layer thickness for Culvert BZRC-010. 8th layer end portion APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 24-Jul-13 to 27-Jul-13
8 :30 AM
7:30 AM
2267 RFI-5858-QCN-1-01861 RFI-5858-QCN-1-01861 CIVIL Check filed density & layer thickness for Culvert BZRC-011-class A - 1st & 2nd layer APPROVED BZRC-011 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 24-Jul-13 to 5-Aug-13
5:30 PM
Check Granular Class A sub-base filed density & layer thickness for Culvert BZRC-010
2268 RFI-5858-QCN-1-01862 RFI-5858-QCN-1-01862 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 24-Jul-13 9:00 AM 30-Jul-13
( West Side )
2:00 PM
Check Laying,Compaction & Sampling of CBM2- First, Second and Third layer RAS
2269 RFI-5858-QCN-1-01863 RFI-5858-QCN-1-01863 CIVIL CANCELLED BZRC-010 B-V-3100-004-1-201-03_7 4.2.2 S W H 24-Jul-13 to 24-Jul-13 cancelled
LAFFAN CULVERT BZRC 010 - WEST SIDE ROAD PORTION
5:00 PM
9;30 AM
2270 RFI-5858-QCN-1-01864 RFI-5858-QCN-1-01864 CIVIL Check Granular Class B sub-base filed density & layer thickness for Culvert BZRC-011 APPROVED BZRC-011 Raslaffan RB-V-3100-004-1-201-01_7 4.2.a R W H 24-Jul-13 to 31-Jul-13
5:00 PM
Check Type B filed density & layer thickness for Precast Pipe Stopper and Sleeper B70- 7:30 AM
Tank Farm
2271 RFI-5858-QCN-1-01865 RFI-5858-QCN-1-01865 CIVIL PS-30: SLD019, SLD011 and SLD048. B70-PS-30 SLD019 - 1st layer, B70-PS-29 APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 4.2.a R W H 24-Jul-13 to 27-Jul-13
SLD048 - 1st layer 11:30 AM
7:30 AM
Check type A filed density & layer thickness for Pipe Track D110-B70-PR-39 ( East and Tank Farm
2272 RFI-5858-QCN-1-01866 RFI-5858-QCN-1-01866 CIVIL APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 24-Jul-13 to 27-Jul-13
West ) - 3rd layer Raslaffan
11:30 AM
Check Excavation : Bottom of excavation verification:Pipe Track D110-B70-PR-61: North Tank Farm
2273 RFI-5858-QCN-1-01867 RFI-5858-QCN-1-01867 CIVIL APPROVED B-V-3100-004-1-201-01_7 2.1 R W H 24-Jul-13 8:00 AM 28-Jul-13
Side Raslaffan
7:00 AM
SECTION4
2274 RFI-5858-QCN-1-01868 RFI-5858-QCN-1-01868 CIVIL Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD021 CANCELLED B-V-3100-004-1-201-01_7 4.2.b R W H 24-Jul-13 to 24-Jul-13 cancelled
Raslaffan
5:00 PM
7:00 AM
Soil Compaction Test For backfilling Type - B D110-RW-003 Retaining wall 8th panel. 2nd Section4 D110-RW-
2275 RFI-5858-QCN-1-01869 RFI-5858-QCN-1-01869 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 25-Jul-13 To 28-Jul-13
& 3rd layer 003 Raslaffan
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Laying,Compaction & Sampling of CBM2- First, Second and Third layer RAS
2277 RFI-5858-QCN-1-01871 RFI-5858-QCN-1-01871 CIVIL
LAFFAN CULVERT BZRC 010 - WEST SIDE ROAD PORTION
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-03_7 4.2.2 S W H 25-Jul-13 7:00 AM 25-Jul-13
Check type B filed density & layer thickness for Pipe Track D110-B70-PR-39 ( West ) and 7:30 AM
Tank Farm
2279 RFI-5858-QCN-1-01873 RFI-5858-QCN-1-01873 CIVIL d110-B70-PR-42: F2 and F3. D110-B70-PR-39 west side final layer, D110-B70-PR-42 F2 APPROVED B-V-3100-004-1-201-01_6 4.2.b R W H 25-Jul-13 to 28-Jul-13
Raslaffan
& F3 5th layer 11:30 AM
Check Type B filed density & layer thickness for Precast Pipe Stopper and Sleeper B70-
7:30 AM
PS-30: SLD019, SLD011 SLD013, SLD014 and B70-PS-29: SLD048. B70-PS-30 - Tank Farm
2280 RFI-5858-QCN-1-01874 RFI-5858-QCN-1-01874 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.a R W H 25-Jul-13 to 28-Jul-13
SLD19 - 2nd & 3rd layer, SLD13 & 14 - 1st layer, SLD11,13&14 - final layer, B70-PS-29 - Raslaffan
11:30 AM
SLD048 final layer
7:00 AM
Soil Compaction Test For backfilling Type - B Sleeper foundations B70 PS- 08 SLD0030 Section - 2
2282 RFI-5858-QCN-1-01876 RFI-5858-QCN-1-01876 CIVIL
TO SLD0034. 1st & final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 4.2.b R W H 27-Jul-13 to 29-Jul-13
11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ). End wall
2283 RFI-5858-QCN-1-01877 RFI-5858-QCN-1-01877 CIVIL
portion 9th & 10th layer
APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 27-Jul-13 to 29-Jul-13
5:30PM
Check Bottom of Excavation verification Sleeper foundation B70-PS-15 SLD096 SLD097 SECTION - 4
2284 RFI-5858-QCN-1-01878 RFI-5858-QCN-1-01878 CIVIL APPROVED B-V-3100-004-1-201-02_7 2.2 R W H 27-Jul-13 8:00 AM 30-Jul-13
SLD099 & SLD0101 Raslaffan
Check Bottom of Excavation verification D110 - B70- PR-66 Pipe Rack Foundation SECTION - 4
2285 RFI-5858-QCN-1-01879 RFI-5858-QCN-1-01879 CIVIL APPROVED B-V-3100-004-2-201-01_7 4.2.b R W H 27-Jul-13 8:10 PM 30-Jul-13
1(F1,F2) & 2(F1,F2) Raslaffan
2286 RFI-5858-QCN-1-01880 RFI-5858-QCN-1-01880 CIVIL Wet Lean Mix Concrete 2 Placing and Compaction of BZRC-010 ( West Side ) CANCELLED BZRC-010 Raslaffan B-V-3100-004-1-201-01_8 4.4.2 S W H 27-Jul-13 7:30 AM 25-Jul-13 cancelled
Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-25: SLD004 Tank Farm
2287 RFI-5858-QCN-1-01881 RFI-5858-QCN-1-01881 CIVIL APPROVED B-V-3100-004-1-201-01_7 2.1 R W H 27-Jul-13 8:00 AM 30-Jul-13
amd SLD005 Raslaffan
7:30 AM
Check Type B filed density & layer thickness for Precast Pipe Stopper B70-PS-30: Tank Farm
2288 RFI-5858-QCN-1-01882 RFI-5858-QCN-1-01882 CIVIL
SLD019. 4th & final layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 4.2.a R W H 27-Jul-13 to 29-Jul-13
11:30 AM
Check final Visual Inspection& Elevations of Grading Sleeper foundation B70 PS- 08 SECTION - 2
2290 RFI-5858-QCN-1-01884 RFI-5858-QCN-1-01884 CIVIL OPEN B-V-3100-004-1-201-02_7 5.1&5.2 R/S W H 28-Jul-13 11:00 AM
SLD0030 TO SLD0034 Raslaffan
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ) -11th,
2291 RFI-5858-QCN-1-01885 RFI-5858-QCN-1-01885 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 28-Jul-13 to 30-Jul-13
12th layer
5:30PM
7:30 AM
Check Type B filed density & layer thickness for Precast Pipe Stopper B70-PS-22:
2292 RFI-5858-QCN-1-01886 RFI-5858-QCN-1-01886 CIVIL CANCELLED Section 6 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 28-Jul-13 to 28-Jul-13 cancelled work not ready
SLD001
5:00PM
2293 RFI-5858-QCN-1-01887 RFI-5858-QCN-1-01887 CIVIL Check Excavation : Bottom of excavation verification:Pipe Sleeper B70-PS-22: SLD008 APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_7 2.1 R W H 28-Jul-13 8:00 AM 30-Jul-13
7:30 AM
Tank Farm
2294 RFI-5858-QCN-1-01888 RFI-5858-QCN-1-01888 CIVIL Check Type D layer thickness for Pipe Track D110-B70-PR-61 APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 4.2.a R W H 28-Jul-13 to 30-Jul-13
5:30 PM
2298 RFI-5858-QCN-1-01892 RFI-5858-QCN-1-01892 CIVIL Wet Lean Mix Concrete 2 Placing and Compaction of BZRC-010 ( West Side ) APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_8 4.4.2 S W H 29-Jul-13 7:00 AM 29-Jul-13
7:30 AM
2299 RFI-5858-QCN-1-01893 RFI-5858-QCN-1-01893 CIVIL Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ). 13th layer APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 29-Jul-13 to 31-Jul-13
5:30PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9:30 AM
Check Type B filed density & layer thickness for Pipe Sleeper B70-PS-25: SLD004 and Tank Farm
2301 RFI-5858-QCN-1-01895 RFI-5858-QCN-1-01895 CIVIL
SLD005 - 1st layer
APPROVED
Raslaffan
B-V-3100-004-1-201-01_6 4.2.a R W H 29-Jul-13 to 31-Jul-13
11:30AM
7:30 AM
Check Type B filed density & layer thickness for Culvert BZRC-010 ( End Wall ) - final
2302 RFI-5858-QCN-1-01896 RFI-5858-QCN-1-01896 CIVIL APPROVED BZRC-010 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 30-Jul-13 to 1-Aug-13
layer
5:30PM
7:30 AM
Check Type B filed density & layer thickness for Precast Pipe Stopper B70-PS-22:
2303 RFI-5858-QCN-1-01897 RFI-5858-QCN-1-01897 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 30-Jul-13 to 1-Aug-13
SLD001 - 1st & final layer
5:00PM
7:30 AM
Check Type B filed density & layer thickness for Pipe Sleeper B70-PS-25: SLD004 and Tank Farm
2304 RFI-5858-QCN-1-01898 RFI-5858-QCN-1-01898 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.a R W H 30-Jul-13 to 1-Aug-13
SLD005 - final layer Raslaffan
11:30AM
7:30 AM
Check Type A filed density & layer thickness for Pipe Sleeper B70-PS-30: SLD002 to Tank Farm
2305 RFI-5858-QCN-1-01899 RFI-5858-QCN-1-01899 CIVIL CANCELLED B-V-3100-004-1-201-01_6 4.2.a R W H 30-Jul-13 to 30-Jul-13 cancelled
SLD009 ( Grading ) Raslaffan
11:30AM
7:00 AM
Soil Compaction Test For backfilling Type - B D110-RW-003 Retaining wall 8th panel -4th Section4 D110-RW-
2307 RFI-5858-QCN-1-01901 RFI-5858-QCN-1-01901 CIVIL
& final layer
APPROVED
003 Raslaffan
B-V-3100-004-1-201-01_7 4.2.b R W H 30-Jul-13 To 1-Aug-13
11:30 AM
7:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD003 SECTION4
2309 RFI-5858-QCN-1-01903 RFI-5858-QCN-1-01903 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 31-Jul-13 to 3-Aug-13
TO SLD010,SLD021,&B70-PS -015 SLD091 TO SLD095 - 1st layer Raslaffan
5.00 PM
7:30 AM
Check Type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-22:
2310 RFI-5858-QCN-1-01904 RFI-5858-QCN-1-01904 CIVIL APPROVED Section 6 Raslaffan B-V-3100-004-1-201-01_7 4.2.a R W H 31-Jul-13 to 31-Jul-13
SLD008 and SLD010 -1st & 2nd layer
5:00 PM
7:30 AM
Tank Farm
2312 RFI-5858-QCN-1-01906 RFI-5858-QCN-1-01906 CIVIL Check Type D layer thickness for Pipe Track D110-B70-PR-42: F4 ( base ) APPROVED
Raslaffan
B-V-3100-004-1-201-01_7 4.2.a R W H 31-Jul-13 to 31-Jul-13
5:30PM
4.3.2 Check compressive strength@7 Days for CBM2 (Cube testing as per BS EN
2313 RFI-5858-QCN-1-01907 RFI-5858-QCN-1-01907 CIVIL
-12390-3)Culvert BZRC-010 of West side Road Portion.
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_8 4.3.2 S W H 1-Aug-13 10:30 AM 1-Aug-13
5.2 Check Final Visual Inspection For D210-B70-PR-44,D210-B70-PR-45 & D210-B70- Barzan Raslaffan
2314 RFI-5858-QCN-1-01908 RFI-5858-QCN-1-01908 CIVIL OPEN B-V-3100-004-2-201-03_8 5.2 S W H 1-Aug-13 7:30 AM
PR-71. Area
7:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD003 SECTION-4
2315 RFI-5858-QCN-1-01909 RFI-5858-QCN-1-01909 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.b R W H 1-Aug-13 to
TO SLD010,SLD021,&B70-PS- 015 SLD091 TO SLD097,SLD099,SLD101 Raslaffan
5:00 PM
7:30 AM
Check Type B filed density & layer thickness for Precast Pipe Sleeper B70-PS-22: Section - 6
2316 RFI-5858-QCN-1-01910 RFI-5858-QCN-1-01910 CIVIL CANCELLED B-V-3100-004-1-201-01_7 4.2.a R W H 1-Aug-13 to 1-Aug-13 Final layer has done before (cancelled)
SLD008 and SLD010 Raslaffan
11:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014
7:00 AM
,SLD021,&B70-PS- 015 SLD091 TO SLD097,SLD099,SLD101 - B70-PS-14 SLD021 - 4th SECTION - 4
2317 RFI-5858-QCN-1-01911 RFI-5858-QCN-1-01911 CIVIL APPROVED B-V-3100-004-1-201-01_7 4.2.b R W H 3-Aug-13 to 6-Aug-13
& final layer, B70-PS-15 SLD096 - 1st & 2nd layer, B70-PS-15 SLD099, SLD101 - 2nd Raslaffan
5.00 PM
layer
7:30 AM
Soil Compaction Test for backfilling Type B D110 - B70- PR-66 Pipe Rack Foundation
2318 RFI-5858-QCN-1-01912 RFI-5858-QCN-1-01912 CIVIL
1(F1,F2) & 2(F1,F2)-1st & 2nd layer
APPROVED SECTION 4 PR - 66 B-V-3100-004-1-201-01_7 4.2.b R W H 3-Aug-13 to 6-Aug-13
4:30 PM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD003 7:00 AM
SECTION4
2320 RFI-5858-QCN-1-01914 RFI-5858-QCN-1-01914 CIVIL TO SLD010,SLD021,&B70-PS- 015 SLD091 TO SLD101. B70-PS-15 SLD098 & SLD100 APPROVED B-V-3100-004-1-201-01_7 4.2-b W W H 4-Aug-13 to 6-Aug-13
Raslaffan
- 1st & final layer, B70-PS-15 SLD096, SLD099, SLD101-3rd & 4th layer 5:00 PM
4.4.3 Check compressive strength@7 Days for Wet Lean Mix(C10) (Cube testing as per
2321 RFI-5858-QCN-1-01915 RFI-5858-QCN-1-01915 CIVIL APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-03_8 4.4.3 S W H 5-Aug-13 10:30 AM 5-Aug-13
BS EN -12390-3)Culvert BZRC-010 of West side Road Portion.
Soil Compaction Test For backfilling for Final Elevation D110-RW-004(E-BZRC) EAST
RETAINING WALL NORTH & SOUTH SIDE PANELS (INSIDE PORTION ) D110-RW- Section - 4
2322 RFI-5858-QCN-1-01916 RFI-5858-QCN-1-01916 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.b R W H 5-Aug-13 7:30 AM
003(W-BZRC) WEST RETAINING WALL NORTH & SOUTH SIDE PANELS (INSIDE Raslaffan
PORTION ) Purchased
7:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD003 SECTION - 4
2323 RFI-5858-QCN-1-01917 RFI-5858-QCN-1-01917 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.b R W H 5-Aug-13 to
TO SLD010,SLD021,&B70-PS- 015 SLD091 TO SLD097,SLD098,SLD100,SLD101 Raslaffan
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
Check Type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F4 and Tank Farm
2326 RFI-5858-QCN-1-01920 RFI-5858-QCN-1-01920 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.a R W H 5-Aug-13 to
D110-B70-PR-61: ( North Side ) Raslaffan
11:30 AM
7:30 AM
Check Type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F4 and Tank Farm
2327 RFI-5858-QCN-1-01921 RFI-5858-QCN-1-01921 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.a R W H 6-Aug-13 to
D110-B70-PR-61: ( North Side ) Raslaffan
11:30AM
7:30 AM
Soil Compaction Test for backfilling- Type B D110 - B70- PR-66 Pipe Rack Foundation
2328 RFI-5858-QCN-1-01922 RFI-5858-QCN-1-01922 CIVIL OPEN SECTION 4 PR - 66 B-V-3100-004-1-201-01_7 4.2.b R W H 6-Aug-13 to
1(F1,F2) & 2(F1,F2)
4:30 PM
Check Laying of Asphalt Base Course D110-RW-003(W-BZRC) WEST RETAINING SECTION4 D110-
2329 RFI-5858-QCN-1-01923 RFI-5858-QCN-1-01923 CIVIL OPEN B-V-3100-004-2-201-03_8 4.2.2 S W H 6-Aug-13 7:30 AM
WALL ACCESS WAY ROAD RW-003(W-BZRC)
7:00 AM
Soil Compaction Test For backfilling - Type B Sleeper Foundation B70-PS -014 SLD003 SECTION - 4
2330 RFI-5858-QCN-1-01924 RFI-5858-QCN-1-01924 CIVIL
TO SLD010,SLD021,&B70-PS- 015 SLD091 TO SLD097,SLD098,SLD100,SLD101
OPEN
Raslaffan
B-V-3100-004-1-201-01_7 4.2.b R W H 6-Aug-13 to
5.00 PM
7:30 AM
Check Type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F4 and Tank Farm
2333 RFI-5858-QCN-1-01927 RFI-5858-QCN-1-01927 CIVIL OPEN B-V-3100-004-1-201-01_7 4.2.a R W H 7-Aug-13 to
D110-B70-PR-61: ( North Side ) Raslaffan
11:30 AM
7:30 AM
Retaining Wall E-W
2335 RFI-5858-QCN-1-01931 RFI-5858-QCN-1-01931 CIVIL Check type B filed density & layer thickness for Retaining Wall E-W 11th, 12th, 13th OPEN B-V-3100-004-1-201-01_7 4.2.a R W H 11-Aug-13 to
Raslaffan
5:30 PM
7:30 AM
Tank Farm
2336 RFI-5858-QCN-1-01932 RFI-5858-QCN-1-01932 CIVIL Check Type B filed density & layer thickness for Pipe Track D110-B70-PR-42: F4 OPEN
Raslaffan
B-V-3100-004-1-201-01_7 4.2.a R W H 11-Aug-13 to
5:30 PM
Khaild Cement
2337 RFI-5858-QCN-2-0001 RFI-5858-QCN-2-0001 CONCRETE Plant visit for LTSC for pre-cast concrete (khalid cement industries complex W.L.L) APPROVED __ __ __ __ __ 26-Mar-12 8.00 AM 26-Mar-12
Industries W.L.L
Khaild Cement
2338 RFI-5858-QCN-2-0002 RFI-5858-QCN-2-0002 CONCRETE Trial Mix for Concrete Mix-A APPROVED __ __ __ __ __ 2-Apr-12 8.00 AM 3-Apr-12
Industries W.L.L
2339 Material Sampling for Coarse Aggregates (20mm,10mm),Washed Sand,Cement,micro- Khaild Cement
RFI-5858-QCN-2-0003 RFI-5858-QCN-2-0003 CONCRETE APPROVED __ __ __ __ __ 4-Apr-12 10.00 AM 4-Apr-12
Silica,Water Admixture Industries W.L.L
Visual inspection of Suds Welding Prior to Galvanizing (TAG sleeper PS-033-F1 (39nos), & QG Gate # 5 TSF
2342 RFI-5858-QCN-2-0006 RFI-5858-QCN-2-0006 CONCRETE
PS-03F2 (2nos) Sleeper PS-04-F1 (16nos) Sleeper PS-05F1 (8nos)
APPROVED B-V-3100-004-2-208-01_0 2.3.8 W H H 30-Apr-12 9.00 AM 30-Apr-12
Raslaffan
ITP item 4.a Form work for pipe sleeper footing (PS-07-F1=50 nos)
QG Gate # 5 TSF
2343 RFI-5858-QCN-2-0007 RFI-5858-QCN-2-0007 CONCRETE Itp item 4.1b-Reinforcement for pipe sleeper footing APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 30-Apr-12 2.00 PM 30-Apr-12
ITP item 4.1d-Cleaning for pipe sleeper footing
ITP item 4.1-Form work for pipe sleeper footing (50 nos)
QG Gate # 5 TSF
2346 RFI-5858-QCN-2-0011 RFI-5858-QCN-2-0011 CONCRETE ITP item 4.1b-Reinforcement for pipe sleeper footing (50 nos) APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 6-May-12 1.30 PM 6-May-12
ITP 4.1d Cleaning for pipe sleeper footing (50 nos) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP Item 4.1b-Check Reinforcement for Pipe Sleeper Pedestal (PS-07-F1=50 Nos) Prior
Shuttering QG Gate # 5 TSF
2349 RFI-5858-QCN-2-0014 RFI-5858-QCN-2-0014 CONCRETE
ITP Item 4.1e-Check Construction Joints/Expansion Joints
APPROVED
Raslaffan
B-V-3100-004-2-201-02_1 4.1 W W H 9-May-12 9.00 AM 9-May-12
(If applicable=PS-07-F1=50 nos) Prior Shuttering
ITP item 4.1a-Form work for pipe sleeper footing (PS-08-F1)=28 nos
ITP item 4.1b-Re-inforcement for pipe sleeper footing
QG Gate # 5 TSF
2351 RFI-5858-QCN-2-0016 RFI-5858-QCN-2-0016 CONCRETE (PS-08F1)=28 nos APPROVED B-V-3100-004-2-201-02_1 4.1 W W H 11-May-12 8:30 AM 11-May-12
ITP item 4.1d-Cleaning for pipe sleeper footing (PS-08-F1)=28 nos(Including concrete Raslaffan
sleeper)
2354 RFI-5858-QCN-2-0019 RFI-5858-QCN-2-0019 CONCRETE 28 Day Compression Strength for the Trial Mix for Mix-A carried out at KCIC, Slawa. APPROVED QIL,Salwa B-V-3100-004-2-201-02_1 7.2 S W H 14-May-12 10:00 AM 14-May-12
ITP item 4.1-Check form work for pipe sleeper pedestal (PS-07-F1) 50 nos
ITP item 4.1b-Check reinforcement for pipe sleeper pedestal
(PS-07-F1) 50nos
2355 QG Gate # 5 TSF
RFI-5858-QCN-2-0020 RFI-5858-QCN-2-0020 CONCRETE ITP item 4.1c-Check embedded items for pipe sleeper pedestal APPROVED B-V-3100-004-2-201-02_1 4.1 W W H 15-May-12 1.30 PM 15-May-12
(PS-07-F1) 50nos Raslaffan
ITP item 4.1d-Cleaning for pipe sleeper pedestal (PS-07-F)
50nos (including concrete spacer)
2356 5.1 Concrete placement request for 50nos pipe sleeper pedestal (PS-07-F1) including QG Gate # 5 TSF
RFI-5858-QCN-2-0021 RFI-5858-QCN-2-0021 CONCRETE CANCELLED B-V-3100-004-2-201-02_1 5.1 W W H 15-May-12 3.30 PM 15-May-12 Not Casted
concrete spacer Raslaffan
QG Gate # 5 TSF
2358 RFI-5858-QCN-2-0023 RFI-5858-QCN-2-0023 CONCRETE 6.4 Completion of 14 days curing for pipe sleeper footing PS-07-F1 (50 nos) APPROVED B-V-3100-004-2-201-02_1 6.4 W W H 16-May-12 8.30 PM 16-May-12
Raslaffan
ITP item 4.1 Pre-pour - Check reinforcement and construction joints of pipe sleeper QG Gate # 5 TSF
2359 RFI-5858-QCN-2-0024 RFI-5858-QCN-2-0024 CONCRETE APPROVED B-V-3100-004-2-201-02_1 4.1 W W H 16-May-12 9.30 PM 16-May-12
footing PS-07-F1 (49nos) and PS-08-F1 (01nos) prior shuttering Raslaffan
ITP Item 4.1 Pre-pour -Check Reinforcement and construction joints for pipe sleeper QG Gate # 5 TSF
2360 RFI-5858-QCN-2-0025 RFI-5858-QCN-2-0025 CONCRETE APPROVED B-V-3100-004-2-201-02_1 4.1 W W H 18-May-12 8.30 AM 18-May-12
pedestal PS-08-F1 (28 nos) prior shuttering Raslaffan
5.1 Concrete placement request for 50nos pipe sleeper pedestal (PS-07-F1) including QG Gate # 5 TSF
2361 RFI-5858-QCN-2-0026 RFI-5858-QCN-2-0026 CONCRETE
concrete spacer
APPROVED
Raslaffan
B-V-3100-004-2-201-02_1 4.1 W W H 17-May-12 5.30 PM 17-May-12
6.3 Check form removal of pipe sleeper footing and pedestal QG Gate # 5 TSF
2363 RFI-5858-QCN-2-0028 RFI-5858-QCN-2-0028 CONCRETE APPROVED B-V-3100-004-2-201-02_1 6.3 W W H 20-May-12 7.30 AM 20-May-12
PS-07-F1 (50 nos) Raslaffan
6.4 Completion of 14 days curing for pipe sleeper footing PS-07-F1 (49 nos) & PS-08-F1 (1 QG Gate # 5 TSF
2364 RFI-5858-QCN-2-0029 RFI-5858-QCN-2-0029 CONCRETE nos) APPROVED B-V-3100-004-2-201-02_1 6.4 S W H 21-May-12 8.00 AM 21-May-12
Raslaffan
5.1 Concrete Placement Request for 50 nos Pipe Sleeper PS-07-F1 (49 nos) and PS-08-F1 QG Gate # 5 TSF 5.1
2367 RFI-5858-QCN-2-0032 RFI-5858-QCN-2-0032 CONCRETE APPROVED B-V-3100-004-2-201-02_1 W W H 23-May-12 8.30 AM 23-May-12
(1 no) including concrete spacer Raslaffan a.b.c.d
6.3 Check From Removal of Pipe Sleeper Footing and Pedestal PS-07-F1 = 49 nos. and QG Gate # 5 TSF
2368 RFI-5858-QCN-2-0033 RFI-5858-QCN-2-0033 CONCRETE
PS-08-F1 = 1 on.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 6.3 S W H 25-May-12 8.30 AM 25-May-12
Pre - Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Pipe QG Gate # 5 TSF
2369 RFI-5858-QCN-2-0034 RFI-5858-QCN-2-0034 CONCRETE
Sleeper Pedestal PS-08-F1= 28 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.c.d W W H 26-May-12 8.30 AM 26-May-12
5.1 Concrete Placement Request for Pipe Sleeper Pedestal PS-08-F1 =18 nos including QG Gate # 5 TSF
2370 RFI-5858-QCN-2-0035 RFI-5858-QCN-2-0035 CONCRETE
concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 5.1 W W H 26-May-12 3.30 AM 26-May-12
Visual Inspection of studs welding Prior to galvanizing Tags - sleeper PS-16-F1 (91nos.), QG Gate # 5 TSF
2371 RFI-5858-QCN-2-0036 RFI-5858-QCN-2-0036 CONCRETE APPROVED B-V-3100-004-2-208-01_0 2.3.8 W H H 27-May-12 8.30 AM 27-May-12
PS-16-F2(02nos.), PS-17-F1(49nos) PS-17-F2(01nos.) Raslaffan
QG Gate # 5 TSF
2372 RFI-5858-QCN-2-0037 RFI-5858-QCN-2-0037 CONCRETE Completion of 14 days curing for Pipe Sleeper Footing PS-08-F1 =28 nos APPROVED B-V-3100-004-2-201-02_2 6.4 S W H 28-May-12 8.30 AM 28-May-12
Raslaffan
6.3 Check from Removal of Pipe Sleeper Footing and Pedestal PS-07-F1 = 49 nos. and PS- QG Gate # 5 TSF
2373 RFI-5858-QCN-2-0038 RFI-5858-QCN-2-0038 CONCRETE
08-F1 = 1 no.
CANCELLED B-V-3100-004-2-201-02_2 6.3 S W H 28-May-12 8.30 AM 28-May-12
Raslaffan
7.2 Check compressive strength @ 28 days (Cubs testing as per BS-1881) for Pipe Sleeper
2376 RFI-5858-QCN-2-0041 RFI-5858-QCN-2-0041 CONCRETE Footing PS-07-F1 = 50 nos. APPROVED Salwa B-V-3100-004-2-201-02_2 7.2 W W H 29-May-12 8.30 AM 29-May-12
Visual inspection of Studs welding prior Galvanizing Tags - BZRC-004(8 nos), BZRC-005 (7
QG Gate # 5 TSF
2377 RFI-5858-QCN-2-0042 RFI-5858-QCN-2-0042 CONCRETE nos), BZRC-008(9 nos), BZRC-009A(6 nos), BZRC-010(7 nos), BZRC-011(3 nos), BZRC- APPROVED B-V-3100-004-2-208-01_0 2.3.8 W W H 31-May-12 8.30 AM 31-May-12
012(04 nos) Raslaffan
Final Inspection of Galvanized Embedded Plates, Embedded Plates -PS-06-F1(71 nos), PS-
QG Gate # 5 TSF
2378 RFI-5858-QCN-2-0043 RFI-5858-QCN-2-0043 CONCRETE 06-F2(03 nos), PS-07-F1(95 nos), PS-07-F2(02 nos), PS-08-F1(85 nos), PS-08-F2(02 nos), APPROVED B-V-3100-004-2-208-01_0 5.0 W H H 2-Jun-12 8.30 AM 2-Jun-12
PS-09-F1(41 nos), TOTAL - 299 n Raslaffan
QG Gate # 5 TSF
2379 RFI-5858-QCN-2-0044 RFI-5858-QCN-2-0044 CONCRETE 6.4 Completion of 14 Days curing for Pipe Sleeper Pedestal PS-07-F1 = 50 nos. APPROVED B-V-3100-004-1-201-01_2 6.4 S W H 1-Jun-12 8.30 AM 1-Jun-12
Raslaffan
9.1 Check surface Preparation of Pipe Sleeper footing and Pedestal PS-07-F1 = 50 nos QG Gate # 5 TSF
2380 RFI-5858-QCN-2-0045 RFI-5858-QCN-2-0045 CONCRETE APPROVED B-V-3100-004-2-201-02_2 9.1 S W H 1-Jun-12 8.30 AM 1-Jun-12
Prior Protective coating. Raslaffan
2381 7.2 Check Compressive Strength @ 28 Days (Cubs testing as per BS-1881) for Pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0046 RFI-5858-QCN-2-0046 CONCRETE APPROVED B-V-3100-004-2-201-02_2 7.2 S W H 3-Jun-12 2.00 PM 3-Jun-12
Sleeper Footing PS-07-F1 = 49 nos. and PS-08-F1 = 1 nos. Raslaffan
2382 Visual Inspection of studs welding prior to Galvanizing Tags- Pipe Sleeper PS-13-FI(44 QG Gate # 5 TSF
RFI-5858-QCN-2-0047 RFI-5858-QCN-2-0047 CONCRETE APPROVED B-V-3100-004-2-208-01_0 2.3.8 W W H 4-Jun-12 8.30 AM 7-Jun-12
nos), PS-13-F2(01nos) PS-14-F1(54 nos) & PS-14-F2(01 nos) Raslaffan
2383 Pre Pouring Check Formwork, Reinforcement, Embedded items and cleaning of Pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0048 RFI-5858-QCN-2-0048 CONCRETE
Footing PS-08-F1 = 20 nos and PS-22-F1 = 40 nos.Prior concreting.
APPROVED B-V-3100-004-2-201-02_2 4.1 a.b.c.d W W H 4-Jun-12 7.00 AM 4-Jun-12
Raslaffan
5.1 Concrete Placement Request for Pipe Sleeper Footing PS-08-F1 = 20 nos. and PS-22- QG Gate # 5 TSF
2384 RFI-5858-QCN-2-0049 RFI-5858-QCN-2-0049 CONCRETE
F1 = 40 nos. including concrete spacer.
APPROVED B-V-3100-004-2-201-02_2 5.1 a.b.c W W H 4-Jun-12 7.30 AM 4-Jun-12
Raslaffan
Check Surface Below Grade and Above Grade, (Protective Coating, First Coat ) of Pipe QG Gate # 5 TSF 9.2. &
2385 RFI-5858-QCN-2-0050 RFI-5858-QCN-2-0050 CONCRETE Sleeper Footing and Pedestal PS-07-F1 = 50 nos. Prior to Final Coat. APPROVED
Raslaffan
B-V-3100-004-2-201-02_2
9.3.a
S W H 4-Jun-12 8.00 AM 4-Jun-12
Visual Inspection of studs welding prior to Galvanizing Tags- Pipe Sleeper PS-90-FI(9
QG Gate # 5 TSF
2386 RFI-5858-QCN-2-0051 RFI-5858-QCN-2-0051 CONCRETE nos), PS-90-F2(05 nos), PS-90-F3(02 nos), PS-90-F4(12 nos), Pipe Sleeper PS-51F1(62 APPROVED
Raslaffan
B-V-3100-004-2-208-01_0 2.3.8 W H H 6-Jun-12 8.30 AM 6-Jun-12
nos), PS-15-F2(1 nos).
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Pipe Sleeper Footing PS- QG Gate # 5 TSF
2387 RFI-5858-QCN-2-0052 RFI-5858-QCN-2-0052 CONCRETE 02-F1 = 30 nos Prior Concreting APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.d W W H 6-Jun-12 7.00 AM 6-Jun-12
5.1 Concrete Placement Request for Pipe Sleeper Footing PS-02-F1 = 30 nos. Including QG Gate # 5 TSF
2388 RFI-5858-QCN-2-0053 RFI-5858-QCN-2-0053 CONCRETE Concrete spacer APPROVED
Raslaffan
B-V-3100-004-1-201-01_2 5.1 a.b.c W W H 6-Jun-12 7.00 AM 6-Jun-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1 Check surface Preparation of Pipe Sleeper Footing and pedestal PS-07-F1 = 49 nos. QG Gate # 5 TSF
2389 RFI-5858-QCN-2-0054 RFI-5858-QCN-2-0054 CONCRETE APPROVED B-V-3100-004-2-201-02_2 9.1 S W H 7-Jun-12 7.30 AM 7-Jun-12
and PS-08-F1 = 1 nos. Prior Protective coating . (First Coat) Raslaffan
7.2 Check Compressive Strength @ 28 Days (Cube testing as per BS 1881)for Pipe QG Gate # 5 TSF
2390 RFI-5858-QCN-2-0055 RFI-5858-QCN-2-0055 CONCRETE
Sleeper Footing PS-08-F1 = 28 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 7.2 S W H 9-Jun-12 2:30 PM 9-Jun-12
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Pipe Sleeper Footing QG Gate # 5 TSF
2391 RFI-5858-QCN-2-0056 RFI-5858-QCN-2-0056 CONCRETE
PS-30-F2 = 35 nos.Prior Concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.d W W H 9-Jun-12 7:30 AM 9-Jun-12
QG Gate # 5 TSF
2392 RFI-5858-QCN-2-0057 RFI-5858-QCN-2-0057 CONCRETE 5.1 Concrete Placement Request for Pipe Sleeper Footing PS-30-F2 = 35 nos APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 5.1.a.b.c W H H 9-Jun-12 7:30 AM 9-Jun-12
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Pipe Sleeper Footing QG Gate # 5 TSF
2393 RFI-5858-QCN-2-0058 RFI-5858-QCN-2-0058 CONCRETE APPROVED B-V-3100-004-2-201-02_2 5.1.a.b.d W W H 9-Jun-12 7:30 AM 9-Jun-12
PS-08-F1 = 36 nos. and PS-09-F1 = 14 nos. Prior Concreting. Raslaffan
Concrete Placement Request for Pipe Sleeper Footing PS-08-F1 = 36 nos and PS-09-F1 QG Gate # 5 TSF
2394 RFI-5858-QCN-2-0059 RFI-5858-QCN-2-0059 CONCRETE APPROVED B-V-3100-004-2-201-02_2 5.1.a.b.c W H H 9-Jun-12 7:30 AM 9-Jun-12
= 14 nos including Concrete Spacer. Raslaffan
6.4 Completion of 14 days curing for Pipe Sleeper Pedestal PS-07-F1 = 49 nos and PS- QG Gate # 5 TSF
2395 RFI-5858-QCN-2-0060 RFI-5858-QCN-2-0060 CONCRETE APPROVED B-V-3100-004-2-201-02_2 6.4 S W H 8-Jun-12 8:30 AM 8-Jun-12
08-F1 =1 nos. Raslaffan
2396 Pre - Pouring Check Formworks, Construction joints for pipe sleepr footing PS-22-F1=40 QG Gate # 5 TSF
RFI-5858-QCN-2-0061 RFI-5858-QCN-2-0061 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 W W H 10-Jun-12 7:30 AM 10-Jun-12
nos prior shuttering. Raslaffan
2397 5.1 Concrete Placement Request for 50 nos. Pipe Sleeper Footing PS-09-F1 including QG Gate # 5 TSF 5.1
RFI-5858-QCN-2-0062 RFI-5858-QCN-2-0062 CONCRETE APPROVED B-V-3100-004-2-201-02_2 W W H 11-Jun-12 7:30 AM 11-Jun-12
Concrete spacer. Raslaffan a. b.c
Visual inspection of Studs welding Prior to Galvanizing Tags - Pipe Sleeper PS-01-FI(16
nos), PS-01-F2(01 nos), PS-04-F1(10 nos), PS-04-F2(1 nos) PS-06-F1(14 nos), PS-07-
2398 F1(04 nos), PS-08-F1(06 nos), Pipe Sleeper PS-09-F1(23 nos), & PS-09-F2(1 nos), PS- QG Gate # 5 TSF
RFI-5858-QCN-2-0063 RFI-5858-QCN-2-0063 CONCRETE APPROVED B-V-3100-004-2-208-01_0 2.3.8 W H H 12-Jun-12 8:30 AM 12-Jun-12
09-F3(1 nos), PS-10-F1(3 nos), PS-13-F1(8 nos), PS-13-F2(1 nos), PS-15-F1(25nos), Raslaffan
PS-15-F2(1 nos), PS-15-F3(1 nos), PS-30-F2(22 nos), PS-30-F3(2 nos), PS-31-F1(8
nos), PS-32-F1(13 nos) & PS-32-F2(1 nos).
Final Inspection of galvanized Embedded Plants. a) PS-22-F1-32 nos. b) PS-22-F2-01
QG Gate # 5 TSF
2399 RFI-5858-QCN-2-0064 RFI-5858-QCN-2-0064 CONCRETE nos. c) PS-23-F1-21 nos, d) PS-23-F2-01 nos, e) PS-24-F1-29 nos, f) PS-24-F1-01 nos, APPROVED B-V-3100-004-2-208-01_0 5.0 W H H 12-Jun-12 8:00 AM 12-Jun-12
Raslaffan
g) PS-26 -F1-11 nos, h) PS-26-F2-04 nos, i) PS-26-F3-61 nos.
QG Gate # 5 TSF
2400 RFI-5858-QCN-2-0065 RFI-5858-QCN-2-0065 CONCRETE 6.4 Completion of 14 days curing for Precast Pipe Pedestal PS-08-F1 = 28 nos APPROVED B-V-3100-004-2-201-02_0 4.1a.b.c.d S W H 12-Jun-12 8:00 AM 12-Jun-12
Raslaffan
Pre -Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Precast QG Gate # 5 TSF
2401 RFI-5858-QCN-2-0066 RFI-5858-QCN-2-0066 CONCRETE APPROVED B-V-3100-004-2-201-02_0 4.1a.b.c.d W W H 12-Jun-12 7:30 AM 12-Jun-12
Pipe Sleeper Pedestal PS-22-F1 = 40 nos. Raslaffan
5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-22-F1 = 40 nos. QG Gate # 5 TSF
2402 RFI-5858-QCN-2-0067 RFI-5858-QCN-2-0067 CONCRETE APPROVED B-V-3100-004-2-201-02_0 5.1a.b.c W W H 12-Jun-12 7:30 AM 12-Jun-12
including concrete spacer Raslaffan
2403 4.1 Pre - Pouring Check Reinforcement and Construction joints for Precast Pipe Sleeper QG Gate # 5 TSF
RFI-5858-QCN-2-0068 RFI-5858-QCN-2-0068 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 b.e W W H 13-Jun-12 7:30 AM 13-Jun-12
Pedestal PS-22-F1 = 40 nos and PS-08-F1 = 20 nos Prior shuttering Raslaffan
2404 Check Setting Out, line/Level PS-07-F1 SLD0101 to SLD0 042 - 51 nos. BET. MASHRAB TO
RFI-5858-QCN-2-0069 RFI-5858-QCN-2-0069 CONCRETE APPROVED B-V-3100-004-2-201-02_2 3.a S W H 14-Jun-12 8:30 AM 14-Jun-12
(SLD094,93,85,84,83,82,44,43-Not included) HAMLA AVENUE
2405 Check Lean Concrete Pouring PS-07-F1 SLD0101 to SLD0 042 - 51 nos. BET. MASHRAB TO
RFI-5858-QCN-2-0070 RFI-5858-QCN-2-0070 CONCRETE CANCELLED B-V-3100-004-2-201-02_2 3.b S W H 14-Jun-12 8:30 AM 14-Jun-12
(SLD094,93,85,84,83,82,44,43-Not included HAMLA AVENUE
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast QG Gate#5 TSF
2406 RFI-5858-QCN-2-0071 RFI-5858-QCN-2-0071 CONCRETE APPROVED B-V-3100-004-2-201-02_2 7.2 S W H 14-Jun-12 2:30 PM 14-Jun-12
Pipe Sleeper Pedestal PS-07-F1 =50 nos Raslaffan
6.3 Check From Removal of Precast Pipe Sleeper Footing and Pedestal PS-22-F1 = 40 QG Gate#5 TSF
2407 RFI-5858-QCN-2-0072 RFI-5858-QCN-2-0072 CONCRETE
nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 6.3 S W H 14-Jun-12 7:30 AM 14-Jun-12
Visual inspection of studs welding Prior to Galvanizing Tags - Pipe Sleeper PS-14-FI(20
nos), PS-14-F2(01 nos), PS-14-F4(1 nos), PS-14-F5(1 nos), PS-16-F1(4 nos), PS-17-
F1(22 nos), PS-17-F2(2 nos), Pipe Sleeper PS-20-F1(9 nos), & PS-22-F1(22 nos), PS- QG Gate#5 TSF
2408 RFI-5858-QCN-2-0073 RFI-5858-QCN-2-0073 CONCRETE
22-F2(2 nos), PS-25-F1(5 nos), PS-26-F3(15 nos), PS-26-F2(1 nos), PS-33-F1(6 nos),
APPROVED
Raslaffan
B-V-3100-004-2-208-01_0 2.3.8 W H H 16-Jun-12 8:30 AM 16-Jun-12
PS-33-F2(1 nos), PS-29-F2(27 nos), PS-29-F3(2 nos), PS-28-F1(5 nos), PS-28-F2 (1
nos), & PS-32-F1(1 nos).
Pre Pouring Checks, Reinforcement, and cleaning of Precast Pipe Sleeper Footing PS- QG Gate#5 TSF
2409 RFI-5858-QCN-2-0074 RFI-5858-QCN-2-0074 CONCRETE
09-F1 = 3 nos and PS-10-F1 = 27 nos. Prior Concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.d W W H 15-Jun-12 8:30 AM 15-Jun-12
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-09-F1 = 27 nos. QG Gate#5 TSF
2410 RFI-5858-QCN-2-0075 RFI-5858-QCN-2-0075 CONCRETE
including Concrete Spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 7.2 W H H 16-Jun-12 7:30 AM 16-Jun-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.2 Check Surface Below Grade Check Protective Coating ( First Coat ) of Precast Pipe QG Gate#5 TSF
2411 RFI-5858-QCN-2-0076 RFI-5858-QCN-2-0076 CONCRETE APPROVED B-V-3100-004-2-201-02_2 9.2 a S W H 15-Jun-12 8:30 AM 15-Jun-12
Sleeper Footing PS-07-F1 = 49 nos and PS-08-F1 = 1 nos. Prior to Final Coat. Raslaffan
4.1 Pre Pouring Check Reinforcement and Construction joints for Precast Pipe Sleeper QG Gate#5 TSF
2412 RFI-5858-QCN-2-0077 RFI-5858-QCN-2-0077 CONCRETE
Pedestal PS-09-F1 = 50 nos. Prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 b.e W W H 15-Jun-12 8:30 AM 15-Jun-12
Check Lean Concrete Pouring PS-07-F1 SLD0101 to SLD0 042 - 51 nos. BET. MASHRAB TO
2413 RFI-5858-QCN-2-0078 RFI-5858-QCN-2-0078 CONCRETE
(SLD094,93,85,84,83,82,44,43-Not included
APPROVED
HAMLA AVENUE
B-V-3100-004-2-201-02_2 3.b S W H 16-Jun-12 8:30 AM 16-Jun-12
Pre Pouring Checks, Formworks Embedded Items, and cleaning of Precast Pipe Sleeper QG Gate#5 TSF
2414 RFI-5858-QCN-2-0079 RFI-5858-QCN-2-0079 CONCRETE
Footing PS-02-F1 = 30 nos Prior Concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.d W W H 17-Jun-12 7:00 AM 17-Jun-12
5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-02-F1 = 30 nos. QG Gate#5 TSF
2415 RFI-5858-QCN-2-0080 RFI-5858-QCN-2-0080 CONCRETE APPROVED B-V-3100-004-2-201-02_2 5.1 a.b.c W H H 17-Jun-12 7:30 AM 17-Jun-12
including Concrete Spacer. Raslaffan
9.2 Check Surface Below Grade Check Protective Coating ( First Coat ) of Precast Pipe QG Gate#5 TSF
2416 RFI-5858-QCN-2-0081 RFI-5858-QCN-2-0081 CONCRETE APPROVED B-V-3100-004-2-201-02_2 9.2 a S W H 17-Jun-12 7:30 AM 17-Jun-12
Sleeper Footing PS-08-F1 = 28 nos Prior to Final Coat. Raslaffan
2418 Pre Pouring Reinforcement, Construction joint and cleaning of Precast Pipe Sleeper QG Gate#5 TSF
RFI-5858-QCN-2-0083 RFI-5858-QCN-2-0083 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 b.d.e W W H 18-Jun-12 7:30 AM 18-Jun-12
Pedestal PS-09-F1 = 50 nos. Prior shuttering. Raslaffan
2419 Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast QG Gate#5 TSF
RFI-5858-QCN-2-0084 RFI-5858-QCN-2-0084 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 a.b.c.d W W H 18-Jun-12 7:00 AM 18-Jun-12
Pipe Sleeper Pedestal PS-08-F1 = 36 nos. and PS-09-F1 = 14 nos Prior concreting. Raslaffan
2420 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-08-F1 = 26 nos QG Gate#5 TSF
RFI-5858-QCN-2-0085 RFI-5858-QCN-2-0085 CONCRETE APPROVED B-V-3100-004-2-201-02_2 5.1 a.b.c W H H 18-Jun-12 7:30 AM 18-Jun-12
and PS-09-F1 = 14 nos including Concrete Spacer. Raslaffan
Concrete Placement Request for Precast Culvert Base = 5 nos, 3 nos with Pipe Sleeper, QG Gate#5 TSF
2422 RFI-5858-QCN-2-0087 RFI-5858-QCN-2-0087 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W H 19-Jun-12 7:30 AM 19-Jun-12
Precast Culvert Type A = 11 nos. and Type B = 2 nos, Prior concreting. Raslaffan
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing PS-08-F1=19 nos and QG Gate#5 TSF
2423 RFI-5858-QCN-2-0088 RFI-5858-QCN-2-0088 CONCRETE APPROVED B-V-3100-004-2-201-02_2 6.4 S W H 19-Jun-12 8:00 AM 19-Jun-12
PS-22-F1 = 40 nos. Raslaffan
2425 7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast QG Gate#5 TSF
RFI-5858-QCN-2-0090 RFI-5858-QCN-2-0090 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 20-Jun-12 2:30 AM 20-Jun-12
Pipe Sleeper Pedestal PS-07-F = 49 nos and PS-08-F1 = 1 nos. Raslaffan
2426 6.3 Check Form Removal of Precast Pipe Sleeper Footing and Pedestal PS-08-F1 = 36 QG Gate#5 TSF
RFI-5858-QCN-2-0091 RFI-5858-QCN-2-0091 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 20-Jun-12 8:00 AM 20-Jun-12
nos. and PS-09-F1 = 14 nos. Raslaffan
2427 Check Setting Out, Line/Leval PS-07-F1 SLD41 to DLD001 = 40 nos, PS-08-F1 SLD093 BTM.mashrab to
RFI-5858-QCN-2-0092 RFI-5858-QCN-2-0092 CONCRETE APPROVED B-V-3100-004-2-201-02_2 3.a S W H 20-Jun-12 10:00 AM 20-Jun-12
to SLD082 = 10 nos, (LD087,86-Not included) hamal avenue
4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joints for Precast Pipe QG Gate#5 TSF
2428 RFI-5858-QCN-2-0093 RFI-5858-QCN-2-0093 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 21-Jun-12 7:00 AM 21-Jun-12
Sleeper Pedestal PS-30-F2 = 35 nos Prior shuttering . Raslaffan
8.1 Check Marking and curing snd confirm readiness prior to shifting / lifting of Pecast QG Gate#5 TSF
2429 RFI-5858-QCN-2-0094 RFI-5858-QCN-2-0094 CONCRETE
Pipe Sleeper PS-07-F1 = 49 nos and PS-08-F1 = 29 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.1 R W H 21-Jun-12 7:30 AM 21-Jun-12
Check Surface Below Grade Protective Coating (Final Coat) of Precast Pipe Sleeper QG Gate#5 TSF
2430 RFI-5858-QCN-2-0095 RFI-5858-QCN-2-0095 CONCRETE
PS-07-F1 = 49 nos. and PS-08-F1 = 29 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 S W H 21-Jun-12 7:30 AM 21-Jun-12
Check Lean Concrete Pouring PS-07-F1 SLD047 to SLD001 = 44 nos, (SLD043 & 44-Not BTM.mashrab to
2431 RFI-5858-QCN-2-0096 RFI-5858-QCN-2-0096 CONCRETE
included) PS-08-F1 SLD093 TO SLD082 = 10 nos, (SLD087 & 86-Not included)
APPROVED
hamal avenue
B-V-3100-004-2-201-02_2 3.b S W H 21-Jun-12 7:30 AM 21-Jun-12
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast QG Gate#5 TSF
2432 RFI-5858-QCN-2-0097 RFI-5858-QCN-2-0097 CONCRETE
Pipe Sleeper Pedestal PS-09-F1 = 50 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 4.1 a.b.c.d W W H 21-Jun-12 9:30 AM 21-Jun-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QG Gate#5 TSF
2433 RFI-5858-QCN-2-0098 RFI-5858-QCN-2-0098 CONCRETE 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-09-F1 = 50 nos. CANCELLED B-V-3100-004-2-201-02_4 5.1 a.b.c W H H 21-Jun-12 2:30 PM 21-Jun-12
Raslaffan
Final Inspection of galvanized Embedded Plates a) PS-16-F1 = 19 nos, b) PS-16-F2 = 02 QG Gate#5 TSF
2434 RFI-5858-QCN-2-0099 RFI-5858-QCN-2-0099 CONCRETE
nos, c) PS-17-F1 = 49 nos, d) PS-17-F2 = 01 nos, e) BZRC-009(05 nos) Total - 148 nos.
APPROVED
Raslaffan
B-V-3100-004-2-208-01_0 5.0 W W H 23-Jun-12 8:30 AM 23-Jun-12
6.4 Completion of 14 days curing for Pipe Sleeper Footing PS-02-F1 = 30 nos and PS-08- QG Gate#5 TSF
2435 RFI-5858-QCN-2-0100 RFI-5858-QCN-2-0100 CONCRETE
F1 on.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.2 S W H 22-Jun-12 8:30 AM 22-Jun-12
8.1 Check Marking and curing snd confirm readiness prior to shifting / lifting of Precast QG Gate#5 TSF
2436 RFI-5858-QCN-2-0101 RFI-5858-QCN-2-0101 CONCRETE
Pipe Sleeper PS-07-F1 = 50 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.1 R W H 22-Jun-12 8:30 AM 22-Jun-12
QG Gate#5 TSF
2437 RFI-5858-QCN-2-0102 RFI-5858-QCN-2-0102 CONCRETE Check Form Removal of Precast Pipe Sleeper Footing and Pedestal PS-02-F1 = 30 nos, APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 22-Jun-12 8:30 AM 22-Jun-12
Raslaffan
QG Gate#5 TSF
2438 RFI-5858-QCN-2-0103 RFI-5858-QCN-2-0103 CONCRETE 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-09-F1 = 50 nos. APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 23-Jun-12 7:30 AM 23-Jun-12
Raslaffan
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast QG Gate#5 TSF
2439 RFI-5858-QCN-2-0104 RFI-5858-QCN-2-0104 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 23-Jun-12 2:30 PM 23-Jun-12
Pipe Sleeper Pedestal PS-08-F1 = 28 nos. Raslaffan
2440 4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joints for Precast Pipe QG Gate#5 TSF
RFI-5858-QCN-2-0105 RFI-5858-QCN-2-0105 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 b.d.e W W H 24-Jun-12 7:30 AM 24-Jun-12
Sleeper Pedestal PS-09-F1 = 3 nos. and PS-10-F1 = 27 nos prior shuttering. Raslaffan
2441 6.4 Completion of 14 days curing for precast pipe sleeper footing PS-08-F1=36 no's and QG Gate#5 TSF
RFI-5858-QCN-2-0106 RFI-5858-QCN-2-0106 CONCRETE APPROVED B-V-3100-004-2-201-02_2 6.4 S W H 25-Jun-12 8.00 AM 25-Jun-12
PS-09-F1=14nos (total 50 no's) Raslaffan
2442 Pre Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast QG Gate#5 TSF
RFI-5858-QCN-2-0107 RFI-5858-QCN-2-0107 CONCRETE APPROVED B-V-3100-004-0-200-10_0 3.0 W W H 26-Jun-12 7:30 AM 26-Jun-12
Pipe Sleeper Pedestal PS-30-F2 = 33 nos. Raslaffan
QG Gate#5 TSF
2443 RFI-5858-QCN-2-0108 RFI-5858-QCN-2-0108 CONCRETE 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-30-F2 = 33 nos. APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.c.d W W/S H 26-Jun-12 7:30 AM 25-Jun-12
Raslaffan
6.3 Check Form Removal of precast Pipe Sleeper Footing and Pedestal PS-09-F1 = 50 QG Gate#5 TSF
2444 RFI-5858-QCN-2-0109 RFI-5858-QCN-2-0109 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W H 26-Jun-12 8:00 AM 26-Jun-12
nos, Raslaffan
Pre Pouring Reinforcement, Embedded items, Construction joint and cleaning of Precast QG Gate#5 TSF
2445 RFI-5858-QCN-2-0110 RFI-5858-QCN-2-0110 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 26-Jun-12 8:30 AM 26-Jun-12
Culvert Wall (BZRC-009) = 10 nos Prior shuttering. Raslaffan
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast
2447 QG Gate#5 TSF
RFI-5858-QCN-2-0112 RFI-5858-QCN-2-0112 CONCRETE Pipe Sleeper Pedestal PS-08-F1 = 20 nos. PS-09-F1 = 3 nos and PS-10-F1 = 27 nos. APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.c.d W W H 28-Jun-12 7:00 AM 28-Jun-12
Raslaffan
Prior Concreting.
2448 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-08-F1 = 20 nos, QG Gate#5 TSF
RFI-5858-QCN-2-0113 RFI-5858-QCN-2-0113 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W H H 28-Jun-12 7:30 AM 28-Jun-12
PS-09-F1 = 3 nos and PS-10-F1 = 27 nos. including concrete spacer. Raslaffan
2449 9.1 Check Surface preparation of Pipe Sleeper footing and pedestal PS-22-F1 = 40 nos, QG Gate#5 TSF
RFI-5858-QCN-2-0114 RFI-5858-QCN-2-0114 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 28-Jun-12 7:30 AM 28-Jun-12
prior protective coating (First Coat) Raslaffan
Pre - Pouring Check Reinforcement, Embeded items cleaning and Expansion joint QG Gate#5 TSF 4.1 a.
2450 RFI-5858-QCN-2-0115 RFI-5858-QCN-2-0115 CONCRETE APPROVED B-V-3100-004-2-201-02_4 W W H 28-Jun-12 7:30 AM 28-Jun-12
preparation of Precast Pipe Culvert Cover Type B Wall 2 nos. Prior shuttering. Raslaffan b.d.e
QG Gate#5 TSF
2451 RFI-5858-QCN-2-0116 RFI-5858-QCN-2-0116 CONCRETE 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing PS-09-F1 = 50 nos. APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 28-Jun-12 8:00 AM 28-Jun-12
BET.MASHRAB TO
Check Setting Out, Line/Level PS-08-F1 SLD081 TO SLD046 - 35 nos. PS-08-F1 -
2452 RFI-5858-QCN-2-0117 RFI-5858-QCN-2-0117 CONCRETE
SLD029 TO SLD015 - 15 nos.
APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_2 3.a S W H 28-Jun-12 9:30 AM 28-Jun-12
Area
BET.MASHRAB TO
Check Lean Concrete Pouring PS-08-F1 SLD084 TO SLD046 - 38 nos, PS-08-F1
2453 RFI-5858-QCN-2-0118 RFI-5858-QCN-2-0118 CONCRETE
SLD029 To SLD015 - 15 nos.
APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_2 3.b S W H 28-Jun-12 1:30 PM 28-Jun-12
Area
Section 2
2455 RFI-5858-QCN-2-0120 RFI-5858-QCN-2-0120 CONCRETE 6.4 Completion of 14 days for precast pipe sleeper pedestal PS-22-F1 (40 No's) APPROVED B-V-3100-004-2-201-02_2 6.4 S W H 29-Jun-12 8.00 AM 29-Jun-12
Bet.Mashrab
QG Gate # 5 TSF
2456 RFI-5858-QCN-2-0121 RFI-5858-QCN-2-0121 CONCRETE 6.3 Check form removal of pre-cast pipe sleeper footing and pedestal PS-30-F2 (33 no's) APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 6.3 S W H 30-Jun-12 8.30 AM 30-Jun-12
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
2457 RFI-5858-QCN-2-0122 RFI-5858-QCN-2-0122 CONCRETE
Footing PS-31-F1 = 25 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 a.b.c.d W W H 1-Jul-12 7:00 AM 1-Jul-12
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-31-F1 = 25 QG Gate # 5 TSF
2458 RFI-5858-QCN-2-0123 RFI-5858-QCN-2-0123 CONCRETE
nos.and concret spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 1-Jul-12 7.30 AM 1-Jul-12
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Precast Pipe Track QG Gate # 5 TSF
2459 RFI-5858-QCN-2-0124 RFI-5858-QCN-2-0124 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 1-Jul-12 7:00 AM 1-Jul-12
Foundation PR-09 = 4 nos, PR-10 = 4 nos and PR-46 = 4 nos Prior to concreting Raslaffan
5.1 Concrete Placement Request for Precast Pipe Track Foundation for PR-09 = 4 nos, QG Gate # 5 TSF
2460 RFI-5858-QCN-2-0125 RFI-5858-QCN-2-0125 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 1-Jul-12 7.30 AM 1-Jul-12
PR-10 = 4 nos and PR-46 = 4 nos, and concrete spacer Raslaffan
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast QG Gate # 5 TSF
2461 RFI-5858-QCN-2-0126 RFI-5858-QCN-2-0126 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.e.d W W H 1-Jul-12 7:00 AM 1-Jul-12
Culvert Pipe Foundation BZRC-009 = 1 nos prior to concreting. Raslaffan
2462 5.1 Concrete Placement Request for Precast Culvert Foundation BZRC-009 = 1 nos. and QG Gate # 5 TSF
RFI-5858-QCN-2-0127 RFI-5858-QCN-2-0127 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 1-Jul-12 7.30 AM 1-Jul-12
concrete spacer Raslaffan
2463 9.2 Check Surface Below Grade a. Check Protective Coating (First Coat) of Precast Pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0128 RFI-5858-QCN-2-0128 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 a S W H 2-Jul-12 7:30 AM 2-Jul-12
Sleeper Footing PS-22-F1 = 39 nos. Prior to final Coat. Raslaffan
2464 6.3 Check From Removal of precast Pipe Sleeper Footing and Pedestal PS-08-F1 = 20 QG Gate # 5 TSF
RFI-5858-QCN-2-0129 RFI-5858-QCN-2-0129 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 2-Jul-12 8:00 AM 2-Jul-12
nos, PS-09-F1 = nos. and PS-10-F1 = 27 nos. Raslaffan
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast
2465 RFI-5858-QCN-2-0130 RFI-5858-QCN-2-0130 CONCRETE APPROVED QIL Doha B-V-3100-004-2-201-02_4 7.2 S W H 2-Jul-12 2:30 PM 2-Jul-12
Pipe Sleeper Footing PS-08-F1 = 20 nos and PS-22-F1 = 40 nos.
BET Mashrab to
Check Erection for precast Sleeper PS-07-F1 SLD0101 TO SLD0 042 = 51 nos (SLD094,
2466 RFI-5858-QCN-2-0131 RFI-5858-QCN-2-0131 CONCRETE APPROVED Hamla Avenue B-V-3100-004-2-201-02_2 8.2 S W H 3-Jul-12 8:30 AM 3-Jul-12
93, 85, 84, 83, 82, 44, 43-Not included).
Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning for Precast Culvert Wall QG Gate # 5 TSF
2467 RFI-5858-QCN-2-0132 RFI-5858-QCN-2-0132 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 4-Jul-12 7:00 AM 4-Jul-12
BZRC-009 = 10 non and Culvert Wall Type B = 2 nos. Prior concreteting. Raslaffan
5.1 Concrete Placement Request for Precastal Culvert Wall BZRC-009 = 10 nos and QG Gate # 5 TSF
2468 RFI-5858-QCN-2-0133 RFI-5858-QCN-2-0133 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 4-Jul-12 7:30 AM 4-Jul-12
Culvert Cover Wall Type B - 2 nos and concrete spacer Raslaffan
2469 7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast Ready Mix Qatar
RFI-5858-QCN-2-0134 RFI-5858-QCN-2-0134 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 4-Jul-12 2:30 PM 4-Jul-12
Pipe Sleeper Footing PS-02-F1 = 30. nos. Raslaffan Area
2471 6.4 Completion of 14 days curing for Pipe Sleeper Footing PS-09-F1 = 3 nos and PS-10- QG Gate # 5 TSF
RFI-5858-QCN-2-0136 RFI-5858-QCN-2-0136 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 5-Jul-12 7:30 AM 5-Jul-12
F1 = 27 nos. Raslaffan
QG Gate # 5 TSF
2472 RFI-5858-QCN-2-0137 RFI-5858-QCN-2-0137 CONCRETE 6.4 Completion of 14 days curing for Pipe Sleeper Pedestal PS-02-F1 = 30 nos. APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 5-Jul-12 7:30 AM 5-Jul-12
Raslaffan
6.4 Completion of 14 days curing for Pipe Sleeper Pedestal PS-08-F1 = 36 nos. and PS- QG Gate # 5 TSF
2473 RFI-5858-QCN-2-0138 RFI-5858-QCN-2-0138 CONCRETE
09-F1 = 14 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 5-Jul-12 7:30 AM 5-Jul-12
9.2 Check Surface Below Grade. (a) Check Protective Coating (Final Coat) of Precast QG Gate # 5 TSF
2474 RFI-5858-QCN-2-0139 RFI-5858-QCN-2-0139 CONCRETE
Pipe Sleeper Footing PS-22-F1 = 39 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 5-Jul-12 8:00 AM 5-Jul-12
Pre - pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
2475 RFI-5858-QCN-2-0140 RFI-5858-QCN-2-0140 CONCRETE
Footing PS-10-F1 = 50 nos Prior Concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 7-Jul-12 7:00 AM 7-Jul-12
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-10-F1 = 50 nos QG Gate # 5 TSF
2476 RFI-5858-QCN-2-0141 RFI-5858-QCN-2-0141 CONCRETE
and concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 7-Jul-12 7:30 AM 7-Jul-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast
Ready Mix Qatar
2477 RFI-5858-QCN-2-0142 RFI-5858-QCN-2-0142 CONCRETE Pipe Sleeper Footing PS-08-F1 = 36 nos, PS-09-F1 = 14 nos and PS-30-F2 = 35 nos. APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 7-Jul-12 2:30 PM 7-Jul-12
Raslaffan Area
Total numbers = 85 nos.
9.1 Check Surface preparation of Pipe Sleeper Footing and pedestal PS-02-F1 = 30 nos, QG Gate # 5 TSF
2478 RFI-5858-QCN-2-0143 RFI-5858-QCN-2-0143 CONCRETE
PS-08-F1 = 36 nos and PS-09-F1 = 14 nos. prior first coating
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 6-Jul-12 8:30 AM 6-Jul-12
6.4 Completion of 14 days curing for precast Culvert Base = 5 nos, Culvert Covert Type A QG Gate # 5 TSF
2479 RFI-5858-QCN-2-0144 RFI-5858-QCN-2-0144 CONCRETE
= 11 nos and Type B = 2 nos. of BZRC - 009.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 6-Jul-12 8:30 AM 6-Jul-12
Check Lean Concrete Pouring PS-08-F1 SLD014 To SLD01 = 13 nos, PS-09-F1 SLD071 BET.MASHRAB TO
2480 RFI-5858-QCN-2-0145 RFI-5858-QCN-2-0145 CONCRETE To SLD058 = 14 nos, SLD092,091,090, 088 = 4 nos,B70 PR 09 (Loop 500)- (4 nos) B70 APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_2 3.a S W H 8-Jul-12 10:00 AM 8-Jul-12
PR 46(LOOP 033)-)(4 nos) PS-07-F2 SLD069, PS-08-F2 SLD061 Area
Check Lean Concrete Pouring PS-08-F1 SLD014 To SLD01 = 13 nos, PS-09-F1 SLD071 BET.MASHRAB TO
2481 RFI-5858-QCN-2-0146 RFI-5858-QCN-2-0146 CONCRETE To SLD058 = 14 nos, SLD092,091,090, 088 = 4 nos,B70 PR 09 (Loop 500)- (4 nos) B70 CANCELLED HAMLA Raslaffan B-V-3100-004-2-201-02_2 3.b S W H 8-Jul-12 1:30 PM 8-Jul-12 Nopt Casted ( Concreting Cancelled)
PR 46(LOOP 033)-)(4 nos) PS-07-F2 SLD069, PS-08-F2 SLD061 Area
Pre - pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
2482 RFI-5858-QCN-2-0147 RFI-5858-QCN-2-0147 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 8-Jul-12 7:00 AM 8-Jul-12
Footing PS-10-F1 = 35 nos, PS-11-F1 = 1 nos, PS-12-F1 = 12 nos and PS-13-F1 = 2 nos. Raslaffan
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-10-F1 = 35 nos, QG Gate # 5 TSF
2483 RFI-5858-QCN-2-0148 RFI-5858-QCN-2-0148 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 8-Jul-12 7:30 AM 8-Jul-12
PS-11-F1 = 1 nos, PS-12-F1 = 12 nos and PS-13-F1 =2 nos and concrete spacer. Raslaffan
2484 4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joints for Precast pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0149 RFI-5858-QCN-2-0149 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 8-Jul-12 7:30 AM 8-Jul-12
Sleeper Pedestal PS-13-F1 = 25 nos Prior shuttering. Raslaffan
2486 Pre - pouring Check Formworks, Reinforcement Embeded items, cleaning and QG Gate # 5 TSF 4.1
RFI-5858-QCN-2-0151 RFI-5858-QCN-2-0151 CONCRETE APPROVED B-V-3100-004-2-201-02_4 W W H 9-Jul-12 7:00 AM 9-Jul-12
construction joint of Precast Pipe Sleeper PS-31-F1 = 25 nos, Prior to concreting. Raslaffan a.b.c.d.e
5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-31-F1 = 25 nos. QG Gate # 5 TSF
2487 RFI-5858-QCN-2-0152 RFI-5858-QCN-2-0152 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 9-Jul-12 7:30 AM 9-Jul-12
and concrete spacer Raslaffan
Pre - pouring Check Reinforcement and cleaning of Precast Pipe Track Foundation PR- QG Gate # 5 TSF
2488 RFI-5858-QCN-2-0153 RFI-5858-QCN-2-0153 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 4.1 b.d W W H 9-Jul-12 8:00 AM 9-Jul-12 Not ready for inspection
09 = 4 nos, PR-10 4 nos and PR-46 = 4 nos prior to shuttering. Raslaffan
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) For Precast Ready Mix Qatar
2489 RFI-5858-QCN-2-0154 RFI-5858-QCN-2-0154 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 9-Jul-12 2:30 PM 9-Jul-12
Pipe Sleeper Footing PS-09-F1 = 50 nos. Raslaffan Area
QG Gate # 5 TSF
2490 RFI-5858-QCN-2-0155 RFI-5858-QCN-2-0155 CONCRETE 6.4 Complication of 14 days curing Precast Pipe Sleeper Pedestal PS-009-F1 = 50 nos. APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Jul-12 7:30 AM 9-Jul-12
Raslaffan
Check Lean Concrete Pouring PS-08-F1 SLD014 To SLD01 = 13 nos, PS-09-F1 SLD071 BET.MASHRAB TO
2491 RFI-5858-QCN-2-0156 RFI-5858-QCN-2-0156 CONCRETE To SLD058 = 14 nos, SLD092,091,090, 088 = 4 nos,B70 PR 09 (Loop 500)- (4 nos) B70 APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_2 3.b S W H 9-Jul-12 9.00 AM 9-Jul-12
PR 46(LOOP 033)-)(4 nos) PS-07-F2 SLD069, PS-08-F2 SLD061 Area
2492 7.2 Check Compressive Strenght @ 28 days (Cube testing as per BS 1881) for Precast Ready Mix Qatar
RFI-5858-QCN-2-0157 RFI-5858-QCN-2-0157 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 10-Jul-12 2:30 PM 10-Jul-12
Pipe Sleeper Pedestal PS-22-F1 = 40 nos. Raslaffan Area
2493 Pre - Pouring Check Formworks, Reinforcement and cleaning for precast Culvert Cover QG Gate # 5 TSF
RFI-5858-QCN-2-0158 RFI-5858-QCN-2-0158 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 10-Jul-12 7:00 AM 10-Jul-12
Type A of BZRC-009A = 7 nos.Prior concreting. Raslaffan
5.1 Concrete Placement Request for Precast Culvert Type A of BZRC-009A = 7 nos and QG Gate # 5 TSF
2494 RFI-5858-QCN-2-0159 RFI-5858-QCN-2-0159 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 10-Jul-12 7:30 AM 10-Jul-12
concrete spacer Raslaffan
Pre - Pouring Reinforcement, Cleaning and construction joint Preparation for Precast Pipe QG Gate # 5 TSF
2495 RFI-5858-QCN-2-0160 RFI-5858-QCN-2-0160 CONCRETE
Track Pedestal PR-09 = 4 nos, PR-10 = 10 nos send PR-46 = 4 nos prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 11-Jul-12 7:00 AM 11-Jul-12
9.2 Check surface below grade, Check Protective Coating (First Coat) Prior second coat QG Gate # 5 TSF
2496 RFI-5858-QCN-2-0161 RFI-5858-QCN-2-0161 CONCRETE
of pipe Sleeper PS-09-F1 = 50 nos and PS-02-F1 = 30 nos prior second coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 a S W H 11-Jul-12 7:00 AM 11-Jul-12
Pre - Pouring Check Formworks, Embedded items and cleaning Precast Pipe Track QG Gate # 5 TSF
2497 RFI-5858-QCN-2-0162 RFI-5858-QCN-2-0162 CONCRETE
Pedestal PR-09 = 4 nos, PR-10 = 4 nos and PR-46 = 4 nos prior to concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 a.c.d W W H 12-Jul-12 7:00 AM 12-Jul-12
5.1 Concrete Placement Request for Precast Pipe Track Pedestal for PR-09 = 4 nos, PR- QG Gate # 5 TSF
2498 RFI-5858-QCN-2-0163 RFI-5858-QCN-2-0163 CONCRETE
10 = 4 nos and PR-46 = 4 nos and concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 12-Jul-12 7:30 AM 12-Jul-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Per - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper
QG Gate # 5 TSF
2499 RFI-5858-QCN-2-0164 RFI-5858-QCN-2-0164 CONCRETE Footing PS-13-F1 = 42 nos, PS-14-F1 = 8 nos and Pipe Sleeper inside Clulvert APPROVED B-V-3100-004-2-201-02_4 4.1 a.b.d W W H 12-Jul-12 7:00 AM 12-Jul-12
Raslaffan
Foundation BZRC-009 = 3 nos.
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-13-F1 = 42 nos, QG Gate # 5 TSF
2500 RFI-5858-QCN-2-0165 RFI-5858-QCN-2-0165 CONCRETE
PS-14-F1 = 8 nos and Pipe Sleeper inside Culvert Foundation BZRC-009 = 3 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 12-Jul-12 7:30 AM 12-Jul-12
Check Setting Out, Line / Level , B70-PS-13 SLD035 TO SLD008 = 21 nos, Hamad to Ras Laffan
2501 RFI-5858-QCN-2-0166 RFI-5858-QCN-2-0166 CONCRETE
(SLD028,027,022,021,019,018 - not included)
APPROVED
Refinery
B-V-3100-004-2-201-02_4 3.b S W H 12-Jul-12 8:30 AM 12-Jul-12
BET.MASHRAB TO
Check Lean Concrete Pouring, B70-PS13 SLD035 TO SLD008 = 21 nos
2502 RFI-5858-QCN-2-0167 RFI-5858-QCN-2-0167 CONCRETE
(SLD028,027,022,021,019,018 - not included)
CANCELLED HAMLA Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 12-Jul-12 9:00 AM 11-Jul-12
Area
BET.MASHRAB TO
Check Polyethylene Installation, Check Hardboard Installation PS-07-F1 SLD0101 To
2503 RFI-5858-QCN-2-0168 RFI-5858-QCN-2-0168 CONCRETE APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_3 9.2 S W H 12-Jul-12 9:30 AM 12-Jul-12
SLD0 042 - 51 nos (SLD094, 93,85,84,83,82,44,43- not included)
Area
7.2 Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Precast Ready Mix Qatar
2504 RFI-5858-QCN-2-0169 RFI-5858-QCN-2-0169 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 14-Jul-12 2:30 PM 14-Jul-12
Pipe Sleeper Footing PS-09-F1 = 3 nos and PS-10-F1 27 nos. Raslaffan Area
9.2 Check surface below grade a) Check Protective Coating (Final Coat ) of Pipe Sleeper QG Gate # 5 TSF
2505 RFI-5858-QCN-2-0170 RFI-5858-QCN-2-0170 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 14-Jul-12 7:00 AM 14-Jul-12
PS-09-F1 50 nos and PS-02-F1 = 30 nos. Raslaffan
2506 9.1 Check surface preparation of Pipe Sleeper footing and pedestal PS-08-F1 = 20 nos, QG Gate # 5 TSF
RFI-5858-QCN-2-0171 RFI-5858-QCN-2-0171 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 14-Jul-12 7:30 AM 14-Jul-12
PS-09-F1= 3 nos and PS-10-F1 = 27 nos prior protective coating first coat. Raslaffan
2507 6.3 Check Form Removal of precast Culvert Base and Wall 10 nos, Culvert Cover Type A QG Gate # 5 TSF
RFI-5858-QCN-2-0172 RFI-5858-QCN-2-0172 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 14-Jul-12 8:00 AM 14-Jul-12
10 nos and Culvert Type B = 2 nos of BZRC-009. Raslaffan
2508 8.1 Check Marking and curing and confirm Readiness prior to shifting of Precast pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0173 RFI-5858-QCN-2-0173 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 14-Jul-12 8:30 AM 14-Jul-12
Sleeper PS-09-F1 = 50 nos and PS-02-F1 = 30 nos. Raslaffan
Pre - Pouring Reinforcement, Embedded items, cleaning and construction joint QG Gate # 5 TSF
2509 RFI-5858-QCN-2-0174 RFI-5858-QCN-2-0174 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1b.c.d.e W W H 14-Jul-12 7:30 AM 14-Jul-12
preparation for Precast Culvert Wall BZRC-006 = 1 nos Prior shuttering. Raslaffan
Check Compressive Strength @ 28 days (Cube testing as per BS 1881) for Pipe Sleeper BET.MASHRAB TO
2510 RFI-5858-QCN-2-0175 RFI-5858-QCN-2-0175 CONCRETE Blinding PS-07-F1 SLD0101 To SLD0 048 - 47 nos. (SLD094,93,85,84,83,82- Not APPROVED HAMLA Raslaffan B-V-3100-004-2-201-02_2 7.2 S W H 14-Jul-12 2:00 PM 14-Jul-12
included) Area
7.2 Check Compressive Strength @ 28 Days (Cube testing as per BS 1881) for Precast Ready Mix Qatar
2512 RFI-5858-QCN-2-0177 RFI-5858-QCN-2-0177 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 15-Jul-12 2:30 PM 14-Jul-12
Pipe Sleeper Pedestal PS-02-F1 = 30 nos. Raslaffan Area
2513 4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joint for Precast Pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0178 RFI-5858-QCN-2-0178 CONCRETE APPROVED B-V-3100-004-0-200-10_0 4.1 b.d.e W W H 15-Jul-12 7:30 AM 15-Jul-12
Sleeper Pedestal PS-10-F1 = 50 nos prior shuttering. Raslaffan
wesd side of
2514 Check Setting Out, Line/Level PS-02-F1 SLD0 To SLD014 (SLD002& 03 - Not included) -
RFI-5858-QCN-2-0179 RFI-5858-QCN-2-0179 CONCRETE APPROVED MASHRSAB ROAD B-V-3100-004-2-201-02_2 3.a S W H 15-Jul-12 9:00 AM 15-Jul-12
12 nos, PS-03-F1 SLD0100 To SLD079- 22 nos.
Raslafan Area
wesd side of
2515 Check Lean Concrete Pouring PS-02-F1 SLD01 To SLD014-12 nos (SLD002& 03- not
RFI-5858-QCN-2-0180 RFI-5858-QCN-2-0180 CONCRETE APPROVED MASHRSAB ROAD B-V-3100-004-2-201-02_2 3.b S W H 15-Jul-12 1:30 PM 15-Jul-12
included) PS-03-F1 SLD0100 TO SLD079-22 nos
Raslafan Area
4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joint for Precast Pipe QG Gate # 5 TSF
2516 RFI-5858-QCN-2-0181 RFI-5858-QCN-2-0181 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a.b.e.d W W H 15-Jul-12 7:00 AM 15-Jul-12
Sleeper Footing PS-02-F1 = 3 nos and PS-03-F1 = 27 nos prior concreting. Raslaffan
5.1 Concrete Placement Request for Precast Pipe Sleeper Footing PS-02-F1 = 3 nos QG Gate # 5 TSF
2517 RFI-5858-QCN-2-0182 RFI-5858-QCN-2-0182 CONCRETE
and PS-03-F1 = 27 nos and concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 15-Jul-12 7:30 AM 15-Jul-12
Pre - Pouring Reinforcement, Embedded items, cleaning and construction joint QG Gate # 5 TSF 4.1a.b.c.d.
2518 RFI-5858-QCN-2-0183 RFI-5858-QCN-2-0183 CONCRETE
preparation of Precast Pipe Sleeper Pedestal PS-10-F1 = 50 nos prior Concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4
e
W W H 15-Jul-12 7:00 AM 15-Jul-12
5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal PS-10-F1 = 50 nos QG Gate # 5 TSF
2519 RFI-5858-QCN-2-0184 RFI-5858-QCN-2-0184 CONCRETE
and concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 15-Jul-12 7:30 AM 15-Jul-12
Section 2 Bet.
2520 RFI-5858-QCN-2-0185 RFI-5858-QCN-2-0185 CONCRETE 6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal PS-33-F2 = 33 nos. APPROVED Mashrab Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 15-Jul-12 8:00 AM 15-Jul-12
Area
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Section 2 Bet.
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal PS-08-F1 = 20 nos.
2521 RFI-5858-QCN-2-0186 RFI-5858-QCN-2-0186 CONCRETE APPROVED Mashrab Raslaffan B-V-3100-004-2-201-02_2 6.4 S W H 15-Jul-12 8:00 AM 15-Jul-12
PS-09-F1 = 3 nos and PS-10-F1 = 30 nos.
Area
4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joint for Precast Pipe
QG Gate # 5 TSF
2522 RFI-5858-QCN-2-0187 RFI-5858-QCN-2-0187 CONCRETE Sleeper Pedestal B70-PS-10-F1 = 35 nos, B70-PS-11-F1 = 1 nos, B70-PS-12-F1 = 12 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 16-Jul-12 7:00 AM 16-Jul-12
nos and B70-PS-13-F1 = 2 nos.
6.3 Check Form Removal of Precast Pipe Track Pedestal of B70-PR-09 = 4 nos, B70-PR- QG Gate # 5 TSF
2523 RFI-5858-QCN-2-0188 RFI-5858-QCN-2-0188 CONCRETE
10 = 4 nos and D70-PR-46 = 4 no.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 W W H 16-Jul-12 7:30 AM 16-Jul-12
9.2 Check Protective coating (First Coat ) of Pipe Sleeper B70-PS-02-F1 = 30 nos, B70- QG Gate # 5 TSF
2524 RFI-5858-QCN-2-0189 RFI-5858-QCN-2-0189 CONCRETE
PS-F1 = 36 nos and B70-PS-09-F1 = 14 nos prior second coating.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 a S W H 16-Jul-12 8:00 AM 16-Jul-12
7.2 Check Compressive Strength @ 28 days for Precast Pipe Sleeper Pedestal B70-PS- Ready Mix Qatar
2525 RFI-5858-QCN-2-0190 RFI-5858-QCN-2-0190 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 16-Jul-12 2:30 PM 16-Jul-12
08-F1 = 36 nos and B70-PS-09-F1 = 14 nos. Raslaffan Area
2529 7.2 Check Compressive Strength @ 28 days Precast Culvert Base 5 nos, Culvert Cover Ready Mix Qatar
RFI-5858-QCN-2-0194 RFI-5858-QCN-2-0194 CONCRETE APPROVED B-V-3100-004-2-201-02_2 7.2 S W H 17-Jul-12 2:30 PM 17-Jul-12
Type A = 11 nos and Type B = 2 nos. of BZRC-009. Raslaffan Area
9.2 Check Surface Below Grade, Check Protective Coating first Coat of Precast Pipe
2530 QG Gate # 5 TSF
RFI-5858-QCN-2-0195 RFI-5858-QCN-2-0195 CONCRETE Sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 3 nos and B70-PS-10-F1 = 22 nos APPROVED B-V-3100-004-2-201-02_4 9.2 a S W H 17-Jul-12 7:30 AM 17-Jul-12
Raslaffan
(Total 45 nos) Prior second coating.
9.1 Check Surface preparation of pipe Sleeper footing and pedestal B70-PS-30-F2 = 33 QG Gate # 5 TSF
2531 RFI-5858-QCN-2-0196 RFI-5858-QCN-2-0196 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 9.1 S W H 17-Jul-12 7:30 AM 16-Jul-12 Cancelled Due to Hot weather (RED FLAG)
nos prior protective coating first coat. Raslaffan
BET.Mashrab to
2534 RFI-5858-QCN-2-0199 RFI-5858-QCN-2-0199 CONCRETE Check Pouring of stopper Footing PS-07-F2 SLD069 & PS-08-F2 SLD061 APPROVED Hamla Avenue B-V-3100-004-2-201-02_4 4.1 a, b&d W W H 18-Jul-12 8:00 PM 18-Jul-12
Raslaffan
Check Lean Concrete Pouring PS-09-F1 to SLD024 (SLD036&35-Not Included) -13 BET.Mashrab to
2535 RFI-5858-QCN-2-0200 RFI-5858-QCN-2-0200 CONCRETE no.S,SLD087 & SLD089- 2 No.s B70 PR-10 & 11 - (2Nos), PS-07 F2 SLD019 (1No), PS- APPROVED Hamla Avenue B-V-3100-004-2-201-02_4 3.0 b S W H 18-Jul-12 8:30 PM 18-Jul-12
08 F2 SLD008 (1No) Raslaffan
2536 6.4 Completion of 14 Days curing for Precast Culvert Wall 10 nos and Covert Type B = 2 QG Gate # 5 TSF
RFI-5858-QCN-2-0201 RFI-5858-QCN-2-0201 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 21-Jul-12 7:30 AM 21-Jul-12
nos of BZRC-009. Raslaffan
2537 6.4 Completion of 14 Days curing for Precast Pipe Track Foundation B70-PR-09, B70- QG Gate # 5 TSF
RFI-5858-QCN-2-0202 RFI-5858-QCN-2-0202 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 21-Jul-12 7:30 AM 21-Jul-12
PR-10 and B70-PR-46 = 12 nos. Raslaffan
6.4 Completion of 14 Days curing for Precast Pipe Sleeper Footing B70-PS-31-F1 = 25 QG Gate # 5 TSF
2538 RFI-5858-QCN-2-0203 RFI-5858-QCN-2-0203 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 21-Jul-12 7:30 AM 21-Jul-12
nos and Culvert Foundation BZRC-009 = 1 nos. Raslaffan
7.2 Check Compressive Strength @ 28 days Precast Pipe Sleeper Pedestal B70-PS-09- Ready Mix Qatar Area
2539 RFI-5858-QCN-2-0204 RFI-5858-QCN-2-0204 CONCRETE
F1 = 50 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 21-Jul-12 2:30 PM 21-Jul-12
QG Gate # 5 TSF
2540 RFI-5858-QCN-2-0205 RFI-5858-QCN-2-0205 CONCRETE 6.3 Check From Removal of Precast Pipe Sleeper Pedestal B70-PS-10-F1 = 50 nos. APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 21-Jul-12 8:00 AM 21-Jul-12
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast
QG Gate # 5 TSF
2541 RFI-5858-QCN-2-0206 RFI-5858-QCN-2-0206 CONCRETE Pipe Sleeper Pedestal B70-PS-10-F1 = 35 nos, B70-PS-11-F1 = 1 nos, B70-PS-12-F1 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1a.b.e.d W W H 22-Jul-12 7:30 AM 22-Jul-12
12 nos, B70-PS-13-F1 = 2 nos and B70-PS-30-F2 = 2 nos prior concreting.
5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-10-F1 =35
QG Gate # 5 TSF
2542 RFI-5858-QCN-2-0207 RFI-5858-QCN-2-0207 CONCRETE nos, B70-PS-11-F1 = 1 nos, B70-PS-12-F1 12 nos, B70-PS-13-F1 = 2 nos and B70-PS- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 22-Jul-12 7:30 AM 22-Jul-12
30-F2 = 2 nos concrete spacer.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QG Gate # 5 TSF
2543 RFI-5858-QCN-2-0208 RFI-5858-QCN-2-0208 CONCRETE 6.3 Check From Removal of Precast Culvert Type A = 7 nos of BZRC-009 A. APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 22-Jul-12 8:00 AM 22-Jul-12
Raslaffan
9.1 Check surface preparation of Pipe Sleeper Footing and pedestal B70-PS-30-F2 = 32 QG Gate # 5 TSF
2544 RFI-5858-QCN-2-0209 RFI-5858-QCN-2-0209 CONCRETE
nos. prior to first coat.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 23-Jul-12 7.30 AM 23-Jul-12
9.2 Check Surface Below Grade Check Protective Coating Second Coat (Final Coat) of
QG Gate # 5 TSF
2545 RFI-5858-QCN-2-0210 RFI-5858-QCN-2-0210 CONCRETE Precast Pipe Sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 3 nos and B70-PS-10-F1 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 23-Jul-12 7.30 AM 23-Jul-12
= 22 nos. (Total 45 nos)
Pre - Pouring Check Reinforcement, and cleaning of Precast Pipe Track Foundation B70-
QG Gate # 5 TSF
2546 RFI-5858-QCN-2-0211 RFI-5858-QCN-2-0211 CONCRETE PR-03 = 4 nos, B70-PR-05 = 4 nos, B70-PR-07 = 4 nos, B70-PR-11 = 4 nos and B70-PR- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 b.d W W H 23-Jul-12 7.00 AM 23-Jul-12
64 = 4 nos.(Total F1 10 nos and F2 = 10 nos)
5.1 Concrete Placement Request for Precast Pipe Track Pedestal for B70-PR-03 = 4 nos,
QG Gate # 5 TSF
2547 RFI-5858-QCN-2-0212 RFI-5858-QCN-2-0212 CONCRETE B70-PR-05 = 4 nos,B70-PR-07 = 4 nos, B70-PR-11 = 4 nos and B70-PR-64 = 4 nos. APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 23-Jul-12 7:30 AM 23-Jul-12
Raslaffan
(Total F1 = 10 nos and F2 = 10 nos)
4.1 Pre- Pouring Check Reinforcement, Cleaning and Construction joints for Precast pipe QG Gate # 5 TSF
2548 RFI-5858-QCN-2-0213 RFI-5858-QCN-2-0213 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 24-Jul-12 7:00 AM 24-Jul-12
Sleeper Pedestal B70-PS-13-F1 = 42 nos and B70-PS-14-F1 = 8 nos Prior shuttering. Raslaffan
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-10-F1 = 50 QG Gate # 5 TSF
2549 RFI-5858-QCN-2-0214 RFI-5858-QCN-2-0214 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 24-Jul-12 7.30 AM 24-Jul-12
nos. Raslaffan
2550 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-10-F1 = 35 QG Gate # 5 TSF
RFI-5858-QCN-2-0215 RFI-5858-QCN-2-0215 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 24-Jul-12 7.30 AM 24-Jul-12
nos, B70-PS-11-F1 = 1 nos, B70-PS-12-F1 = 12 nos and B70-PS-13-F1 = 2 nos. Raslaffan
2551 7.2 Check Compressive Strength @ 28 days for Precast Pipe Pedestal B70-PS-30-F2 33 Ready Mix Qatar
RFI-5858-QCN-2-0216 RFI-5858-QCN-2-0216 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 24-Jul-12 2:30 PM 24-Jul-12
nos. Raslaffan Area
8.1 Check Marking and curing and confirm readiness prior to shifting / lifting of Precast
2552 QG Gate # 5 TSF
RFI-5858-QCN-2-0217 RFI-5858-QCN-2-0217 CONCRETE Pipe Sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 3 nos and B70-PS-10-F1- = 22 APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 24-Jul-12 8:30 AM 24-Jul-12
Raslaffan
nos ( Total 45 nos)
Check Setting Out,Line/Level PS-02-F1 SLD015 TO SLD033-18No.S, PS-03-F1 West Side of Mashrab
2553 RFI-5858-QCN-2-0218 RFI-5858-QCN-2-0218 CONCRETE APPROVED B-V-3100-004-2-201-02_2 3.a S W H 25-Jul-12 8.00 AM 25-Jul-12
SLD055 TO SLD077- 23 Nos. Road Raslaffan Area
Check Lean Concrete Pouring PS-02-F1 SLD015 TO SLD033-18Nos. PS-03-F1 West Side of Mashrab
2554 RFI-5858-QCN-2-0219 RFI-5858-QCN-2-0219 CONCRETE APPROVED B-V-3100-004-2-201-02_2 3.b S W H 25-Jul-12 1.30 AM 25-Jul-12
SLD055 TO SLD077- 23 Nos. Road Raslaffan Area
Visual Inspection of Studs Welding Prior to Galvanizing Tags - Pipe Sleeper PS-90-F3 =
01 nos, Culvert - BZRC-004 = 4 nos, nos, BZRC-005 = 04 nos, BZRC-008 = 04 nos, QG Gate # 5 TSF 4.1
2555 RFI-5858-QCN-2-0220 RFI-5858-QCN-2-0220 CONCRETE CANCELLED B-V-3100-004-2-208-01_0 W H H 28-Jul-12 8:30 AM 28-Jul-12
BZRC-09 = 04 nos, BZRC-09A = 04 nos, BZEC-010 = 04 nos, BZRC011 = 04 nos & Raslaffan a.b.c.d.e
BZRC-012 = 4 nos.
7.2 Check Compressive Strength @ 28 days for Precast Pipe Sleeper Pedestal B70-PS- Ready Mis=x Qatar
2556 RFI-5858-QCN-2-0221 RFI-5858-QCN-2-0221 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 26-Jul-12 2:30 PM 26-Jul-12
08-F1 = 20 nos, B70- PS-09-F1 = 3 nos and B70-PS-10-F1 = 27 nos. Raslaffan Area
4.1 Pre - Pouring Check formworks, Reinforcement, Embeded items, cleaning and
2557 QG Gate # 5 TSF 4.1
RFI-5858-QCN-2-0222 RFI-5858-QCN-2-0222 CONCRETE Construction joints for Precast Pipe Sleeper Pedestal B70-PS-13-F1 = 42 nos and B70- APPROVED B-V-3100-004-2-201-02_4 W W H 26-Jul-12 7:00 AM 26-Jul-12
Raslaffan a.b.c.d.e
PS-14-F1 = 8 nos prior concreting.
2558 5.1 Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-13-F1 = 42 QG Gate # 5 TSF
RFI-5858-QCN-2-0223 RFI-5858-QCN-2-0223 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 26-Jul-12 7:30 AM 26-Jul-12
nos and B70-PS-F1 = 8 nos and concrete spacer. Raslaffan
QG Gate # 5 TSF
2560 RFI-5858-QCN-2-0225 RFI-5858-QCN-2-0225 CONCRETE Check Lean Concrete Pouring Culvert BZRC-009 ( 17 meter Length ) APPROVED B-V-3100-004-2-201-02_4 3.b S W H 28-Jul-12 9:00 AM 28-Jul-12
Raslaffan
BET.Mashrab to
2561 RFI-5858-QCN-2-0226 RFI-5858-QCN-2-0226 CONCRETE Check Form Removal of Stopper Foundation PS-07-F2 SLD069 &PS-08-F2 SLD061 APPROVED Hamla Avenue B-V-3100-004-2-201-02_2 6.3 S W H 28-Jul-12 9:00 AM 28-Jul-12
Raslaffan
BET.Mashrab to
Check Reinforcement,Cleaning&Construction joints Prior to shuttering of Stopper
2562 RFI-5858-QCN-2-0227 RFI-5858-QCN-2-0227 CONCRETE
Footing PS-07-F2 SLD069 &PS-08-F2 SLD061
APPROVED Hamla Avenue B-V-3100-004-2-201-02_2 4.1 b.d.&e W W H 28-Jul-12 8:45 AM 28-Jul-12
Raslaffan
QG Gate # 5 TSF
2563 RFI-5858-QCN-2-0228 RFI-5858-QCN-2-0228 CONCRETE 9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-31-F1, 25 nos CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 28-Jul-12 7:00 AM 28-Jul-12 Not Ready for inspection
9.1. Check surface preparation of Precast Culvert Base 5 nos and Wall 10 nos of BZRC- QG Gate # 5 TSF
2564 RFI-5858-QCN-2-0229 RFI-5858-QCN-2-0229 CONCRETE
009 prior first coating
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 28-Jul-12 7:00 AM 28-Jul-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joints for Precast Pipe QG Gate # 5 TSF
2565 RFI-5858-QCN-2-0230 RFI-5858-QCN-2-0230 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1b.d.e W W H 29-Jul-12 7:00 AM 29-Jul-12
Sleeper Pedestal B70-PS-02-F1 = 3 nos. and B70-PS-03-F1 = 27 nos prior shuttering. Raslaffan
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast
QG Gate # 5 TSF 4.1a.b.c.d
2566 RFI-5858-QCN-2-0231 RFI-5858-QCN-2-0231 CONCRETE Pipe Sleeper Pedestal B70-PS-02-F1 = 3 nos, and B70-PS-03-Fi = 27 nos prior APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 W W H 29-Jul-12 7:10 AM 29-Jul-12
concreting.
5.1 Concrete placement Request for Precast Sleeper Pipae Pedestal B70-PS-02-F1 = 3 QG Gate # 5 TSF
2567 RFI-5858-QCN-2-0232 RFI-5858-QCN-2-0232 CONCRETE
nos and B70-PS-03-F1 = 27 nos including concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1a.b.c W H H 29-Jul-12 7:30 AM 29-Jul-12
6.3 Check From Removal of Precast Pipe Slaeeper Footing and Pedestal B70-PS-10-F1
QG Gate # 5 TSF
2568 RFI-5858-QCN-2-0233 RFI-5858-QCN-2-0233 CONCRETE = 35 nos, B70-PS-11-F1 = 1 nos, B70-PS-12-F1 = 12 nos, B70-PS-13-F1 = 3 nos and APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 29-Jul-12 8:00 AM 29-Jul-12
B70-PS-30-F2 = 2 nos.
6.3 Check Form Removal of Precast Pipe Sleeper Footing and Pedestal B70-PS-13-F1 QG Gate # 5 TSF
2569 RFI-5858-QCN-2-0234 RFI-5858-QCN-2-0234 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 29-Jul-12 8:00 AM 29-Jul-12
= 42 nos. and B70-PS-14-F1 = 8 nos. Raslaffan
4.1 Pre - Pouring Check Reinforcement, Cleaning and Construction joints for Precast Pipe
QG Gate # 5 TSF
2570 RFI-5858-QCN-2-0235 RFI-5858-QCN-2-0235 CONCRETE Track Pedestal B70-PR-03 = 4 nos, B70-PR-05 = 4 nos, B70-PR-07 = 4 nos, B70-PR-11 APPROVED B-V-3100-004-2-201-02_4 4.1.b.d.e W W H 29-Jul-12 8:00 AM 29-Jul-12
Raslaffan
= 4 nos and B70-PR-64 = 4 nos ( Total FI = 10 nos & F2= 10 nos ) prior shuttering.
9.1. Check surface preparation of Pipe sleeper footing and pedestal B70-PS-08-F1 = 20 QG Gate # 5 TSF
2571 RFI-5858-QCN-2-0236 RFI-5858-QCN-2-0236 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 29-Jul-12 7:30 AM 29-Jul-12
nos, B70-PS-09-F1 = 8 nos, B70-PS-10-F1 = 27 nos ( Total 55 nos ) prior first coating. Raslaffan
9.1. Check surface preparation of Precast Pipe Track Footing and Pedestal B70-PR-09 =
2572 QG Gate # 5 TSF
RFI-5858-QCN-2-0237 RFI-5858-QCN-2-0237 CONCRETE 4 nos, B70-PR-10 = 4 nos, and B70-PR-46 = 4 nos. ( Total F1 = 6 nos and F2 = 6 nos ) APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 29-Jul-12 7:30 AM 29-Jul-12
Raslaffan
prior to first coating.
7.2. Check Compressive Strength @ 28 days for Precast Pipe Sleeper Footing B70-PS-
2573 Ready Mix Qatar
RFI-5858-QCN-2-0238 RFI-5858-QCN-2-0238 CONCRETE 31-F1 = 25 nos, Precast Pipe Track Footing B70-PR-09 = 4 nos, B70-PR-10= 4 nos, B70- APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 29-Jul-12 2:30 PM 29-Jul-12
Raslaffan Area
PR-46 = 4 nos and Culvert Base BZRC-009A = 1 no.
BET.Mashrab to
2574 Check Erection of Precast sleeper PS-07-F1 SLD001 TO SLD0 041 - 40 No.S PS-08-
RFI-5858-QCN-2-0239 RFI-5858-QCN-2-0239 CONCRETE APPROVED Hamla Avenue B-V-3100-004-2-201-02_2 8.2 S W H 29-Jul-12 8:30 AM 29-Jul-12
F1 SLD0 093 TO SLD058 - 33 No.S (SLD086&87 NOT INCLUDED)
Raslaffan
Visual Inspection of Studs Welding Prior to Galvanizing Tags - Pipe Sleeper PS-90-F3 =
01 nos, Culvert - BZRC-004 = 4 nos, nos, BZRC-005 = 04 nos, BZRC-008 = 04 nos, QG Gate # 5 TSF 4.1
2575 RFI-5858-QCN-2-0240 RFI-5858-QCN-2-0240 CONCRETE APPROVED B-V-3100-004-2-208-01_0 W H H 29-Jul-12 8:30 AM 29-Jul-12
BZRC-09 = 04 nos, BZRC-09A = 04 nos, BZEC-010 = 04 nos, BZRC011 = 04 nos & Raslaffan a.b.c.d.e
BZRC-012 = 4 nos.
Section 2 Bet.
6.4 Completion of 14 days curing for Precast Pipae Sleeper Pedestal B70-PS-31-F1 = 25
2576 RFI-5858-QCN-2-0241 RFI-5858-QCN-2-0241 CONCRETE APPROVED Mashrab Raslaffan B-V-3100-004-2-201-02_4 6.4 S H H 30-Jul-12 8:00 AM 30-Jul-12
nos.
Araea
Pre-pouring
QG Gate # 5 TSF
2577 RFI-5858-QCN-2-0242 RFI-5858-QCN-2-0242 CONCRETE Check formworks,reinforcement and cleaning of pedestal of pre-cast pipe sleeper footing APPROVED B-V-3100-004-2-201-02_4 9.2.a W W H 31-Jul-12 8:00 AM 31-Jul-12
Raslaffan
B70-PS-14-F1-46 nos and B70-PS-15-4 nos prior to concreting
5.1. Concrete Placement Request for Pipe Sleeper Footing B70-PS-14-F1 = 46 nos and QG Gate # 5 TSF
2578 RFI-5858-QCN-2-0243 RFI-5858-QCN-2-0243 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W H H 31-Jul-12 7:00 AM 31-Jul-12
B70-PS-15-F1 = 4 nos. including Concrete Spacer. Raslaffan
2579 9.2. Check Surface Below Grade Check Protective Coating ( First Coat ) of Precast QG Gate # 5 TSF
RFI-5858-QCN-2-0244 RFI-5858-QCN-2-0244 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 31-Jul-12 7:30 AM 31-Jul-12
Culvert Base = 5 nos and Culvert Wall = 10 nos of BZRC - 009 Prior to Final Coat. Raslaffan
2580 8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
RFI-5858-QCN-2-0245 RFI-5858-QCN-2-0245 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 31-Jul-12 8:00 AM 31-Jul-12
Culvert BZRC-009 Base = 5 nos including wall. Raslaffan
2581 9.2. Check Surface Below Grade Check Protective Coating ( First Coat ) of Precast Pipe QG Gate # 5 TSF
RFI-5858-QCN-2-0246 RFI-5858-QCN-2-0246 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 31-Jul-12 8:00 AM 31-Jul-12
Sleeper B70-PS-22-F1 = 39 nos. prior to final coat. Raslaffan
7.2. Check Compressive Strength @ 28 days for Precast Culvert Wall 10 nos and Cover Ready Mix Qatar
2582 RFI-5858-QCN-2-0247 RFI-5858-QCN-2-0247 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 1-Aug-12 2:30 PM 1-Aug-12
Type B = 2 nos of BZRC-009. Raslaffan Area
6.3 Check Form Removal of Precast Pipe Sleeper Footing and Pedestal B70-PS-02-F1 QG Gate # 5 TSF
2583 RFI-5858-QCN-2-0248 RFI-5858-QCN-2-0248 CONCRETE
= 3 nos., B70-PS-03-F1 = 27 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 1-Aug-12 8:00 AM 1-Aug-12
Pre - Pouring Check Formworks, Embedded iterms and cleaning of Precast Pipe Track
QG Gate # 5 TSF
2584 RFI-5858-QCN-2-0249 RFI-5858-QCN-2-0249 CONCRETE Pedestal B70-PR-03 = 4 nos, B70-PR-05 = 4 nos, B70-PR-07 = 4, B70-PR-11 = 4 nos APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 a.c.d W W H 1-Aug-12 7:00 AM 1-Aug-12
and B70-PR-63 = 4 nos ( Total F1 = 10 nos and F2 = 10 nos )prior to concreting.
5.1. Concrete Placement Request for Precast Pipe Track Pedestal for B70-PR-03 = 4
nos, B70-PR-05 = 4 nos, B70-PR-07 = 4 nos, B70-PR-11 = 4 nos and B70-PR-63 = 4 nos QG Gate # 5 TSF
2585 RFI-5858-QCN-2-0250 RFI-5858-QCN-2-0250 CONCRETE
( Total F1 = 10 nos and F2 = 10 nos ) including concrete spacer and spacer for PVC for
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 a.b.c W W/S H 1-Aug-12 7:30 AM 1-Aug-12
Duct Bank
9.2. Check Surface Below Grade Check Protective Coating Final coat of Precast Pipe QG Gate # 5 TSF
2586 RFI-5858-QCN-2-0251 RFI-5858-QCN-2-0251 CONCRETE
Sleeper B70-PS-22-F1 = 39 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 1-Aug-12 8:00 AM 1-Aug-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre - Pouring Check Formworks, Reinforcement and cleaning for Precast Culvert Base = QG Gate # 5 TSF
2587 RFI-5858-QCN-2-0252 RFI-5858-QCN-2-0252 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 2-Aug-12 7:00 AM 2-Aug-12
6 nos of BZRC-006 prior concreting. Raslaffan
5.1. Concrete Placement Request for Precast Culvert Base = 6 nos of BZRC-006 and QG Gate # 5 TSF
2588 RFI-5858-QCN-2-0253 RFI-5858-QCN-2-0253 CONCRETE
concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 2-Aug-12 7:30 AM 2-Aug-12
BET.MASHRAB TO
Check Polyetheylene Installation, Check Hardboard Installation PS-07-F1 SLD0 042 To
2589 RFI-5858-QCN-2-0254 RFI-5858-QCN-2-0254 CONCRETE
SLD0001- 40 nos.
APPROVED HAMALA AVENUE B-V-3100-004-2-201-02_3 9.2.b,c S W H 2-Aug-12 8:30 AM 2-Aug-12
Raslaffan Area
Surface below grade: 9.1. Check First coat of Precast Pipe Track B70-PR-09 = 4 nos,
QG Gate # 5 TSF
2590 RFI-5858-QCN-2-0255 RFI-5858-QCN-2-0255 CONCRETE B70-PR-10 = 4 nos, and B70-PR-46 = 4 nos. ( Total F1 = 6 nos and F2 = 6 nos ) prior to APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 2-Aug-12 7:30 AM 2-Aug-12
second coating.
Check Setting Out, Line / Level B70-PS-13 and B70-PS-14, SLD007 to SLD070 = 39 nos QG Gate # 5 TSF
2591 RFI-5858-QCN-2-0256 RFI-5858-QCN-2-0256 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 2-Aug-12 8:30 AM 2-Aug-12
( SLD102, SLD101,SLD081 not included ) (SLD 76 to SLD 70 not included) Raslaffan
Check Lean Concrete Pouring B70-PS-13 and B70-PS-14, SLD007 to SLD070 = 39 nos QG Gate # 5 TSF
2592 RFI-5858-QCN-2-0257 RFI-5858-QCN-2-0257 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 2-Aug-12 8:30 AM 2-Aug-12
( SLD102, SLD101,SLD081 not included )(PS-14-SLD-76 to SLD 70 not included) Raslaffan
BET.MASHRAB TO
Check Concrete Curing of Stopper Foundation(14days Curing completed) PS-07-F2
2593 RFI-5858-QCN-2-0258 RFI-5858-QCN-2-0258 CONCRETE APPROVED HAMALA AVENUE B-V-3100-004-2-201-02_4 6.4 S W H 2-Aug-12 9:00 AM 2-Aug-12
SLD069 &PS-08-F2 SLD061
Raslaffan Area
2594 9.1. Check First Coating of Pipe sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 8 nos QG Gate # 5 TSF
RFI-5858-QCN-2-0259 RFI-5858-QCN-2-0259 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 2-Aug-12 7:30 AM 2-Aug-12
and B70-PS-10-F1 = 27 nos, ( Total 55 nos ) prior second coating. Raslaffan
Check Lean Concrete Pouring PS-06-F1 SLD01 TO SLD026- 23 No.S (SLD02&SLD03- BET.MASHRAB TO
2596 RFI-5858-QCN-2-0261 RFI-5858-QCN-2-0261 CONCRETE Not included) PS-06-F1 SLD041 TO SLD046- 6 No.S PS-06-F2 SLD013 (PS-06 SLD- APPROVED HAMALA AVENUE B-V-3100-004-2-201-02_4 3.b S W H 2-Aug-12 1:30 AM 2-Aug-12
01,03,05,06 & 43,44,45,46 not included) Raslaffan Area
7.2 Check Compressive Strength @ 28 days for Precast Pipe Sleeper Footing PS-10-F1 Ready Mix Qatar
2597 RFI-5858-QCN-2-0262 RFI-5858-QCN-2-0262 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 4-Aug-12 2:30 PM 4-Aug-12
(50 nos) Raslaffan Area
7.2. Check Compressive Strength @ 28 days for Precast Pipe Sleeper Footing B70-PS-
Ready Mix Qatar
2598 RFI-5858-QCN-2-0263 RFI-5858-QCN-2-0263 CONCRETE 10-F1 = 35 nos, B70-PS-11-F1 = 1 nos. B70-PS-12-F1 = 12 nos and B70-PS-13-F1 = 2 APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 5-Aug-12 2:30 PM 5-Aug-12
Raslaffan Area
nos.
Pre - Pouring
2599 RFI-5858-QCN-2-0264 RFI-5858-QCN-2-0264 CONCRETE Check Formworks, Reinforcement, Embedded item and cleaning of Cast-in-situ Culvert APPROVED Qcon TSF Area B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 5-Aug-12 7:00 AM 5-Aug-12
Base = 2 nos of BZRC-009 Prior Concreting
QG Gate # 5 TSF
2600 RFI-5858-QCN-2-0265 RFI-5858-QCN-2-0265 CONCRETE 5.1. Concrete Placement Request for Cast-in-situ Culvert Base = 2 nos of BZRC-009 APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 5-Aug-12 7:30 AM 5-Aug-12
Raslaffan
6.3 Check Form Removal of Precast Pipe Track B70-PR-03 = 4 nos, B70-PR-05 = 4
2602 QG Gate # 5 TSF
RFI-5858-QCN-2-0267 RFI-5858-QCN-2-0267 CONCRETE nos, B70-PR-07 = 4 nos, B70-PR-11 = 4 nos. and B70-PR-64 = 4 nos ( Total F1 = 10 nos APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 5-Aug-12 7:30 AM 5-Aug-12
Raslaffan
and F2 = 10 nos ).
NEAR MASHRAB
2603 RFI-5858-QCN-2-0268 RFI-5858-QCN-2-0268 CONCRETE Check Setting Out,Line/Level DUCT BANK BZDP 005 APPROVED AVENUE SIGNAL B-V-3100-004-2-201-02_2 3.a S W H 5-Aug-12 9:00 AM 5-Aug-12
RASLAFFAN AREA
NEAR MASHRAB
2604 RFI-5858-QCN-2-0269 RFI-5858-QCN-2-0269 CONCRETE Check Lean Concrete Pouring DUCTBANK BZDP 005 APPROVED AVENUE SIGNAL B-V-3100-004-2-201-02_2 3.b S W H 5-Aug-12 1:15 PM 5-Aug-12
RASLAFFAN AREA
Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
2605 RFI-5858-QCN-2-0270 RFI-5858-QCN-2-0270 CONCRETE
Footing B70-PS-15-F1 =50 nos Prior Concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 6-Aug-12 7:00 AM 6-Aug-12
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-15-F1 = 50 QG Gate # 5 TSF
2606 RFI-5858-QCN-2-0271 RFI-5858-QCN-2-0271 CONCRETE
nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 6-Aug-12 7:30 AM 6-Aug-12
7.2. Check Compressive Strength @ 28 days for Precast Pipe Sleeper Footing B70-PS- Ready Mix Qatar
2607 RFI-5858-QCN-2-0272 RFI-5858-QCN-2-0272 CONCRETE
31-F1 = 25 nos.
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 7.2 S W H 6-Aug-12 2:30 PM 6-Aug-12
9.2. Check Surface Below Grade Check Protective Coating ( Final Coat ) of Precast Pipe QG Gate # 5 TSF
2608 RFI-5858-QCN-2-0273 RFI-5858-QCN-2-0273 CONCRETE
Track B70-PR-09 = 4 nos, B70-PR-10 = 4 nos and B70-PR-46 = 4 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 6-Aug-12 7:30 AM 6-Aug-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Pecast QG Gate # 5 TSF
2609 RFI-5858-QCN-2-0274 RFI-5858-QCN-2-0274 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 6-Aug-12 7:30 AM 6-Aug-12
Pipe Track B70-PR-09 = 4 nos B70-PR-10 = 4 nos and B70-PR-46 = 4 nos. Raslaffan
Pre - Pouring Reinforcement, Construction joint and cleaning of Precast pipe Sleeper QG Gate # 5 TSF
2610 RFI-5858-QCN-2-0275 RFI-5858-QCN-2-0275 CONCRETE
Pedestal B70-PS-14-F1 = 46 nos and B70-PS-15-F1 = 4 nos prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 6-Aug-12 7:30 AM 6-Aug-12
Pre - Pouring Reinforcement, Embedded items, cleaning and construction joint prparation QG Gate # 5 TSF
2611 RFI-5858-QCN-2-0276 RFI-5858-QCN-2-0276 CONCRETE
for Cast-in-situ Culvert Wall = 2 nos of BZRC-009 prior shuttering
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 7-Aug-12 9:00 AM 7-Aug-12
7.2. Check Compressive Strength @ 28 days for Precast Culvert Cover Type A = 7 nos Ready Mix Qatar
2612 RFI-5858-QCN-2-0277 RFI-5858-QCN-2-0277 CONCRETE
of BZRC-009
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 7.2 S W H 7-Aug-12 2:30 PM 7-Aug-12
9.1. Check Second Coating of Pipe sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 8 QG Gate # 5 TSF
2613 RFI-5858-QCN-2-0278 RFI-5858-QCN-2-0278 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 7-Aug-12 7:30 AM 7-Aug-12
nos and B70-PS-10-F1 = 27 nos ( Total 55 nos ) Raslaffan
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Pecast
QG Gate # 5 TSF
2614 RFI-5858-QCN-2-0279 RFI-5858-QCN-2-0279 CONCRETE Pipe Sleeper B70-PS-08-F1 = 20 nos, B70-PS-09-F1 = 20 nos and B70-PS-10-F1 = 27 APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 7-Aug-12 8:00 AM 7-Aug-12
Raslaffan
nos ( Total = 55 nos )
QG Gate # 5 TSF
2615 RFI-5858-QCN-2-0280 RFI-5858-QCN-2-0280 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Covert Type A = 7 nos of BZRC-009 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 7-Aug-12 8:00 AM 7-Aug-12
Raslaffan
2616 6.4 Completion of 14 days curing for Precast Pipe Track B70-PR-09 = 4 nos, B70-PR-10 QG Gate # 5 TSF
RFI-5858-QCN-2-0281 RFI-5858-QCN-2-0281 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 7-Aug-12 8:00 AM 7-Aug-12
= 4 nos and B70-PR-46 = 4 nos Raslaffan
2617 6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-13-F1 = 42 QG Gate # 5 TSF
RFI-5858-QCN-2-0282 RFI-5858-QCN-2-0282 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 7-Aug-12 8:00 AM 7-Aug-12
nos, B70-PS-14-F1 = 8 nos and 3 nos Pipe Sleeper Pedestal inside culvert. Raslaffan
2618 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing and Pedestal B70-PS- QG Gate # 5 TSF
RFI-5858-QCN-2-0283 RFI-5858-QCN-2-0283 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 7-Aug-12 8:00 AM 7-Aug-12
02-F1 = 3 nos, B70-PS-03-F1 = 27 nos and B70-PS-10-F1 = 50 nos ( Pedestal ) Raslaffan
5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-14-F1 = 46 QG Gate # 5 TSF
2620 RFI-5858-QCN-2-0285 RFI-5858-QCN-2-0285 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c. W W/S H 9-Aug-12 7:30 AM 9-Aug-12
nos and B70-PS-4 nos and concrete spacer. Raslaffan
Pre - Pouring Formworks, Reinforcement, Embedded items and cleaning of Precast QG Gate # 5 TSF
2621 RFI-5858-QCN-2-0286 RFI-5858-QCN-2-0286 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d. W W H 9-Aug-12 7:00 AM 9-Aug-12
Culvert Covert Type A = 11 nos of BZRC-006 prior concreting. Raslaffan
5.1. Concrete Placement Request for Precast Culvert Cover Type A = 11 nos of BZRC- QG Gate # 5 TSF
2622 RFI-5858-QCN-2-0287 RFI-5858-QCN-2-0287 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c. W W/S H 9-Aug-12 7:30 AM 9-Aug-12
006. Raslaffan
2623 Pre - Pouring Check Formworks, Reinforcement, Embedded item and cleaning of Cast- QG Gate # 5 TSF
RFI-5858-QCN-2-0288 RFI-5858-QCN-2-0288 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 9-Aug-12 10:00 AM 9-Aug-12
in-situ Culvert Wall = 4 nos of BZRC-009 Prior Concreting. Raslaffan
2625 Check Setting Out, Line / Level B70-PS-14, SLD079 to SLD057 = 21 nos ( Except Location: Section 4
RFI-5858-QCN-2-0290 RFI-5858-QCN-2-0290 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 9-Aug-12 9:00 AM 9-Aug-12
SLD064 and SLD063 ) near Area: Raslaffan
Check Lean Concrete Pouring B70-PS-14 ( SLD079 to SLD057 ) = 21 nos ( Except QG Gate # 5 TSF
2626 RFI-5858-QCN-2-0291 RFI-5858-QCN-2-0291 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 9-Aug-12 8:30 AM 9-Aug-12
SLD064 and SLD063 ) Raslaffan
7.2. Check Compressive Strength @ 28 days for Precast Pipe Track Pedestal B70-PR-
Ready Mix Qatar
2627 RFI-5858-QCN-2-0292 RFI-5858-QCN-2-0292 CONCRETE 09 = 4 nos, B70-PR-10 = 4 nos, B70-PR-46 = 4 nos and B70-PS-13-F1 = 42 nos and APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 7.2 S W H 9-Aug-12 2:30 PM 9-Aug-12
B70-PS-14-F1 = 8 nos including Pipe Sleeper inside Culvert BZRC-009 = 3 nos.
5.1 Concrete placement request for cast-in-situ stopper pedestal B70-PS-07-F1, SLD061 QG Gate # 5 TSF
2629 RFI-5858-QCN-2-0294 RFI-5858-QCN-2-0294 CONCRETE
and SLD069-2 nos including concrete spacer
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W H 12-Aug-12 10:30 AM 12-Aug-12
9.1. Check surface preparation of Pipe sleeper footing and pedestal B70-PS-10-F1 = 35
QG Gate # 5 TSF
2630 RFI-5858-QCN-2-0295 RFI-5858-QCN-2-0295 CONCRETE nos., B70-PS-11-F1 = 1 no B70-PS-012-F1 = 12 and B70-PS-13-F1=2 nos. prior first APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 13-Aug-12 7:30 AM 13-Aug-12
coating.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QG Gate # 5 TSF
2631 RFI-5858-QCN-2-0296 RFI-5858-QCN-2-0296 CONCRETE 9.1. Check Second Coating of Pipe sleeper B70-PS-31-F1 = 25 nos. APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 13-Aug-12 7:30 AM 13-Aug-12
Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
2632 RFI-5858-QCN-2-0297 RFI-5858-QCN-2-0297 CONCRETE
Footing B70-PS-03-F1 = 30 nos prior to concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 12-Aug-12 10:00 AM 12-Aug-12
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-03-F1 = 30 QG Gate # 5 TSF
2633 RFI-5858-QCN-2-0298 RFI-5858-QCN-2-0298 CONCRETE
nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W/S H 12-Aug-12 10:30 AM 12-Aug-12
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of QG Gate # 5 TSF
2634 RFI-5858-QCN-2-0299 RFI-5858-QCN-2-0299 CONCRETE
Precast Culvert Wall = 2 nos of BZRC-009A prior to concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 12-Aug-12 10:00 AM 12-Aug-12
5.1. Concrete Placement Request for Precast Culvert Wall = 2 nos of BZRC-009A and QG Gate # 5 TSF
2635 RFI-5858-QCN-2-0300 RFI-5858-QCN-2-0300 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c. W W/S H 12-Aug-12 10:30 AM 12-Aug-12
concrete spacer. Raslaffan
7.2. Check Compressive Strength @ 28 days for Pipe Sleeper Footing and Pedestal, Ready Mix Qatar
2636 RFI-5858-QCN-2-0301 RFI-5858-QCN-2-0301 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 12-Aug-12 2:30 PM 12-Aug-12
B70-PS-02-F1 = 3 nos, B70-PS-03-F1 = 27 nos and B70-PS-10-F1 = 50 nos. Raslaffan Area
Pre - Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast- QG Gate # 5 TSF
2637 RFI-5858-QCN-2-0302 RFI-5858-QCN-2-0302 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 13-Aug-12 9:30 AM 11-Sep-12
in-situ Culvert Footing = 1 no of BZRC-009 prior concreting. Raslaffan
2638 5.1. Concrete Placement Request for Cast-in-situ Culvert Foundation = 1 nos of BZRC- QG Gate # 5 TSF
RFI-5858-QCN-2-0303 RFI-5858-QCN-2-0303 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c. W W/S H 13-Aug-12 1:00 PM 13-Aug-12
009 Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning of Pipe Track Footing of
2639 QG Gate # 5 TSF
RFI-5858-QCN-2-0304 RFI-5858-QCN-2-0304 CONCRETE D110 ( B70-PR-04, B70-PR-13, B70-PR-14 B70-PR-15, B70-PR-19 and B70-PR-20 ) APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 13-Aug-12 9:30 AM 13-Aug-12
Raslaffan
Total F1 = 12 nos and F2 = 12 nos.
5.1. Concrete Placement Request for Precast Pipe Track Footing D110 ( B70-PR-04,
2640 B70-PR-13, B70-PR-14, B70-PR-15 B70-PR-19 and B70-PR-20 ) Total F1 = 12 nos and QG Gate # 5 TSF
RFI-5858-QCN-2-0305 RFI-5858-QCN-2-0305 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 13-Aug-12 7:30 AM 13-Aug-12
F2 = 12 nos. including concrete saddle for pvc = 24 nos and concrete saddle for concrete Raslaffan
pipe = 14 nos.
9.0 Protecrete Coating, Polyethylene and Hardboard installation B70-PS-08, SLD093 to Section 2 Area:
2641 RFI-5858-QCN-2-0306 RFI-5858-QCN-2-0306 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 13-Aug-12 7:30 AM 13-Aug-12
SLD093 to SLD070 = 22 nos prior backfilling Raslaffan
Check Setting Out, Line / Level B70-PS-03,D110-B70-PR-03, D110-B70-PR-05 = 2nos, Section 1 Area:
2642 RFI-5858-QCN-2-0307 RFI-5858-QCN-2-0307 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 14-Aug-12 9:00 AM 4-Aug-12
SLD018, SLD028, SLD078 = 3 nos., B70-PS-01, SLD002 to SLD005 = 4 nos. Raslaffan
Check Lean Concrete Pouring B70-PR-03 ,B70-PS-02 SLD018,B70-PS-02 SLD028 and Section 1 Area:
2643 RFI-5858-QCN-2-0308 RFI-5858-QCN-2-0308 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 14-Aug-12 10:00 AM 14-Aug-12
B70-PS-01, SLD002 to SLD005 = 4 nos Raslaffan
Check Setting Out, Line / Level D210-B70-PR-44, F7 = 1 no., F2 = 2 nos, F1 = 1 no. and Sulfur Line Area:
2644 RFI-5858-QCN-2-0309 RFI-5858-QCN-2-0309 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 14-Aug-12 9:30 AM 14-Aug-12
F4 = 1 no. Total 5 nos. Raslaffan
2645 Check Lean Concrete Pouring D210-B70-PR-44, F7 = 1 no., F2 = 2 nos, F1 = 1 no. and Sulfur Line Area:
RFI-5858-QCN-2-0310 RFI-5858-QCN-2-0310 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 14-Aug-12 1:00 PM 14-Aug-12
F4 = 1 no. Total 5 nos. Raslaffan
2646 Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
RFI-5858-QCN-2-0311 RFI-5858-QCN-2-0311 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 14-Aug-12 7:00 AM 14-Aug-12
Footing B70-PS-03-F1 = 30 nos. prior to concreting. Raslaffan
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-03-F1 = 30 QG Gate # 5 TSF
2647 RFI-5858-QCN-2-0312 RFI-5858-QCN-2-0312 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 14-Aug-12 7:30 AM 14-Aug-12
nos. Raslaffan
2649 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints for Precast QG Gate # 5 TSF
RFI-5858-QCN-2-0314 RFI-5858-QCN-2-0314 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 4.1.b.e W W H 14-Aug-12 8:30 AM 14-Aug-12 Work not Ready for inspection
Pipe Sleeper Pedestal B70-PS-15-F1 = 50 nos. prior shuttering. Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning of Cast-in-situ Pipe Stopper
2650 QG Gate # 5 TSF
RFI-5858-QCN-2-0315 RFI-5858-QCN-2-0315 CONCRETE Footing SLD019 = 1 nos, SLD013 = 1 nos and SLD008 = 1 nos prior shuttering.( B70-PS- APPROVED B-V-3100-004-2-201-02_4 4.1a.b.d W W H 15-Aug-12 7:00 AM 15-Aug-12
Raslaffan
06, B70-PS07 and B70-PS-08)
5.1 Concrete Placement Request for Cast-in-situ Pipe Sopper Footing SLD090 - 1 nos, QG Gate # 5 TSF
2651 RFI-5858-QCN-2-0316 RFI-5858-QCN-2-0316 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1a.b.c W W/S H 15-Aug-12 7:30 AM 15-Aug-12
SLD013 = 1 nos and SLD008 = 1 nos (B70-PS-07-F2 and B70-PS-08-F2, B70-PS-06-F2) Raslaffan
7.2 Check Compressive Strenght @ 28 days (Cube testing as per BSEN 12399-3) for QG Gate # 5 TSF
2652 RFI-5858-QCN-2-0317 RFI-5858-QCN-2-0317 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 15-Aug-12 3:30 PM 15-Aug-12
Pipe Sleeper Footing B70-PS-08-F2-(SLD69)& B70-PS-08-F2(SLD61) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check surface preparation of Precast Culvert cover Type A = 11 nos and Type B = 2 QG Gate # 5 TSF
2653 RFI-5858-QCN-2-0318 RFI-5858-QCN-2-0318 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 16-Aug-12 7.30 AM 16-Aug-12
nos of BZRC-009 prio first coating Raslaffan
QG Gate # 5 TSF
2656 RFI-5858-QCN-2-0321 RFI-5858-QCN-2-0321 CONCRETE 6.3 Check Form Removal Precast Culvert Cover = 11 nos of BZRC-006 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 W W H 16-Aug-12 8.00 AM 16-Aug-12
6.3 Check Form Removal Precast Pipe Sleeper Pedestal B70-PS-14-F1 = 46 nos and QG Gate # 5 TSF
2657 RFI-5858-QCN-2-0322 RFI-5858-QCN-2-0322 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 16-Aug-12 8.00 AM 16-Aug-12
B70-PS-15-F1 = 4 nos Raslaffan
6.3 Check Form Removal Precast Pipe Stopper Pedestal B70-PS-07, SLD069 and B70- Section-2 Area
2658 RFI-5858-QCN-2-0323 RFI-5858-QCN-2-0323 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 16-Aug-12 9.00 AM 16-Aug-12
PS-08, SLD061 Raslaffan
QG Gate # 5 TSF
2659 RFI-5858-QCN-2-0324 RFI-5858-QCN-2-0324 CONCRETE 6.3 Check Form Removal Cast-in-situ Culvert footing = 1 nos of BZRC-009 CANCELLED B-V-3100-004-2-201-02_4 6.3 W W H 16-Aug-12 9.00 AM 16-Aug-12 Not Ready for inspection
Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BSEN 12390-3) for
QG Gate # 5 TSF
2661 RFI-5858-QCN-2-0326 RFI-5858-QCN-2-0326 CONCRETE Pre-cast Pipe Sleeper pedastel B70-Ps-10-F1=35NOS,B70-PS-11-F1=1NO,B70-PS-12- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 19-Aug-12 9:30 AM 19-Aug-12
F1=12NOS,B70-PS-13-F1=12S&B70-PS-30-F2=2NOS AND CONCRETE .
7.2 Check Compressive Strength @28 Days (Cube Testing as per BSEN 12390-3) for
QG Gate # 5 TSF
2662 RFI-5858-QCN-2-0327 RFI-5858-QCN-2-0327 CONCRETE Pre-cast Pipe Track pedastel B70-PR-03=4NOS ,B70-PR-05=4NO ,B70-PR-07=4NOS APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 20-Aug-12 9:30 AM 20-Aug-12
,B70-PR-11=4NOS & B70-PR-64-=4NOS (Total F1-10 nos,F210 nos)
Item 4.1 Pre-pouring- Check Reinforcement and Construction joints for Pre-cast Culvert QG Gate # 5 TSF
2664 RFI-5858-QCN-2-0329 RFI-5858-QCN-2-0329 CONCRETE
Wall=8 Nos of BZRC-006 prior shuttering
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.b.e W W H 18-Aug-12 7:00 AM 18-Aug-12
9.1. Check surface preparation of Precast Pipe track footing and pedestal ( D110 ) B70-
QG Gate # 5 TSF
2665 RFI-5858-QCN-2-0330 RFI-5858-QCN-2-0330 CONCRETE PR-03 = 4 nos, B70-PR-05 = 4 nos, B70-PR-07 = 4 nos B70-PR-11 = 4 nos and B70-PR- APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.1 S W H 18-Aug-12 7:30 AM 18-Aug-12
64 = 4 nos, Total F1 = 10 nos and F2 = 10 nos prior first coat.
9.1. Check surface preparation of Precast Pipe sleeper Footing and Pedestal B70-PS-02- QG Gate # 5 TSF
2666 RFI-5858-QCN-2-0331 RFI-5858-QCN-2-0331 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 9.1 S W H 18-Aug-12 7:30 AM 18-Aug-12 Not Ready for inspection
F1 = 3 nos and B70-PS-03-F1 = 27 nos prior first coating. Raslaffan
9.2. Check Surface Below Grade Check Protective Coating ( Second coat ) of Precast QG Gate # 5 TSF
2667 RFI-5858-QCN-2-0332 RFI-5858-QCN-2-0332 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 18-Aug-12 8:00 AM 18-Aug-12
Pipe Sleeper B70-PS-31-F1 = 25 nos. Raslaffan
2668 9.1. Check protective coating first coat of B70-PS-10-F1 = 35 nos., B70-PS-11-F1 = 1 no QG Gate # 5 TSF
RFI-5858-QCN-2-0333 RFI-5858-QCN-2-0333 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 18-Aug-12 7:30 AM 18-Aug-12
B70-PS-12-F1 = 12 nos and B70-PS-13-F1=2 nos. prior final coating. Raslaffan
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation B70-
2670 Section 4 Raslaffan
RFI-5858-QCN-2-0335 RFI-5858-QCN-2-0335 CONCRETE PS-13, SLD035 to SLD023 = 11 nos except SLD028 and SLD027 SLD017 to SLD007 = APPROVED B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 22-Aug-12 7:30 AM 22-Aug-12
Area
11 nos. prior backfilling.
4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning for Pipe
2671 QG Gate # 5 TSF
RFI-5858-QCN-2-0336 RFI-5858-QCN-2-0336 CONCRETE Track Pedestal D110-B70-PR-04, B70-PR-13 B70-PR-14, B70-PR-15, B70-PR-19 and APPROVED B-V-3100-004-2-201-02_4 4.1.b.e W W H 21-Aug-12 7:00 AM 21-Aug-12
Raslaffan
B70-PR-20 Total F1 = 12 nos and F2=12 nos. prior shuttering.
2672 9.1. Check protective coating first coat of Culvert Cover = 6 nos of BZRC-009 prior final QG Gate # 5 TSF
RFI-5858-QCN-2-0337 RFI-5858-QCN-2-0337 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 22-Aug-12 7:30 AM 22-Aug-12
coat. Raslaffan
9.1. Check protective first coat of Pipe Track D110, B70-PR-03, B70-PR-05, B70-PR-07, QG Gate # 5 TSF
2673 RFI-5858-QCN-2-0338 RFI-5858-QCN-2-0338 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 22-Aug-12 7:30 AM 22-Aug-12
B70-PR-11 and B701-PR-64 Total, F1 = 10 nos and F2 = 10 nos prior second coat. Raslaffan
6.4 Completion of 14 days curing for Pipe Sleeper Pedestal B70-PS-14-F1 = 46 nos and QG Gate # 5 TSF
2674 RFI-5858-QCN-2-0339 RFI-5858-QCN-2-0339 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 20-Aug-12 8:30 AM 20-Aug-12
B70-PS-15-F1 = 4 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 14 days curing for Precast Pipe Track Pedestal B70-PR-03, B70-PR- QG Gate # 5 TSF
2675 RFI-5858-QCN-2-0340 RFI-5858-QCN-2-0340 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 20-Aug-12 8:30 AM 20-Aug-12
05, B70-PR-07, B70-PR-11 and B70-PR-64 Total F1 = 10 nos and F2 =10 nos. Raslaffan
QG Gate # 5 TSF
2676 RFI-5858-QCN-2-0341 RFI-5858-QCN-2-0341 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Base = 6 nos of BZRC-006 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 20-Aug-12 8:30 AM 20-Aug-12
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation B70- Section 2 Raslaffan
2677 RFI-5858-QCN-2-0342 RFI-5858-QCN-2-0342 CONCRETE
PS-08, SLD043 to SLD070 = 27 nos., except SLD061 prior first layer backfilling.
APPROVED
Area
B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 22-Aug-12 8:30 AM 22-Aug-12
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation B70- Section 1 Raslaffan
2678 RFI-5858-QCN-2-0343 RFI-5858-QCN-2-0343 CONCRETE
PS-03, SLD079 to SLD098 = 20 nos prior backfilling first coat.
APPROVED
Area
B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 22-Aug-12 9:00 AM 22-Aug-12
9.1. Check protective coating final coat of B70-PS-10-F1 = 35 nos., B70-PS-11-F1 = 1 no QG Gate # 5 TSF
2679 RFI-5858-QCN-2-0344 RFI-5858-QCN-2-0344 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 22-Aug-12 7:30 AM 22-Aug-12
B70-PS-12-F1 = 12 nos and B70-PS-13-F1=2 nos. Raslaffan
9.1. Check surface preparation of Precast Pipe sleeper Footing and Pedestal B70-PS-02- QG Gate # 5 TSF
2680 RFI-5858-QCN-2-0345 RFI-5858-QCN-2-0345 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 22-Aug-12 7:30 AM 22-Aug-12
F1 = 3 nos, B70-PS-03-F1 = 25nos and surface preparation more than 10mm. Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5 TSF
2681 RFI-5858-QCN-2-0346 RFI-5858-QCN-2-0346 CONCRETE Pre-cast Pipe Sleeper pedastal B70-PS-13-F1 = 42 nos and B70-PS-14-F1 = 8 nos & APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 23-Aug-12 9:30 AM 23-Aug-12
Raslaffan
Concrete spacer.
2682 9.1. Check protective second coat of Precast Pipe Track D110, B70-PR-03, B70-PR-05, QG Gate # 5 TSF
RFI-5858-QCN-2-0347 RFI-5858-QCN-2-0347 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 23-Aug-12 7:30 AM 23-Aug-12
B70-PR-07, B70-PR-11 and B701-PR-64 Total, F1 = 10 nos and F2 = 10 nos. Raslaffan
2683 9.1. Check first coat of Precast Pipe sleeper B70-PS-02-F1 = 3 nos, B70-PS-03-F1 = 25 QG Gate # 5 TSF
RFI-5858-QCN-2-0348 RFI-5858-QCN-2-0348 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 23-Aug-12 7:30 AM 23-Aug-12
nos prior secoand coat Raslaffan
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of precast
2684 QG Gate # 5 TSF
RFI-5858-QCN-2-0349 RFI-5858-QCN-2-0349 CONCRETE pipe track D110,B70-PR-03,B70-PR-05,B70-PR-07,B70-PR-11 and B70-PR-64, Total APPROVED B-V-3100-004-2-201-02_3 8.1 R W H 23-Aug-12 8:00 AM 23-Aug-12
Raslaffan
F1=10 nos and F2=10 nos
9.1. Check Second coat of Precast Pipe sleeper B70-PS-02-F1 = 3 nos, B70-PS-03-F1 = QG Gate # 5 TSF
2685 RFI-5858-QCN-2-0350 RFI-5858-QCN-2-0350 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 23-Aug-12 2:00 PM 23-Aug-12
25 nos and first coat of B70-PS-03-F1 = 2 nos prior second coating. Raslaffan
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
2686 RFI-5858-QCN-2-0351 RFI-5858-QCN-2-0351 CONCRETE APPROVED B-V-3100-004-2-201-02_3 8.1 R W H 23-Aug-12 2:00 PM 23-Aug-12
Pipe sleeper B70-PS-02-F1 = 2 nos and B70-PS-03-F1 = 25 nos Raslaffan
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast
QG Gate # 5 TSF
2687 RFI-5858-QCN-2-0352 RFI-5858-QCN-2-0352 CONCRETE Pipe Track Pedestal D110 - B70-PR-04 B70-PR-13, B70-PR-14, B70-PR-15, B70-PR-19 APPROVED B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 25-Aug-12 7:00 AM 25-Aug-12
Raslaffan
and B70-PR-20 Total F1 = 12 nos and F2 = 12 nos prior concreting.
5.1. Concrete Placement Request for Prcast Pipe Track Pedestal D110 - B70-PR-04,
QG Gate # 5 TSF
2688 RFI-5858-QCN-2-0353 RFI-5858-QCN-2-0353 CONCRETE B70-PR-13, B70-PR-13, B70-PR-14 B70-PR-15, B70-PR-14, B70-PR-15 and B70-PR-20, APPROVED B-V-3100-004-2-201-02_3 5.1.a.b.c W W/S H 25-Aug-12 7:30 AM 25-Aug-12
Raslaffan
Total F1 = 12 nos and F2 = 12 nos
2689 Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Precast QG Gate # 5 TSF
RFI-5858-QCN-2-0354 RFI-5858-QCN-2-0354 CONCRETE APPROVED B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 25-Aug-12 7:00 AM 25-Aug-12
Culvert Wall = 8 nos of BZRC-006 prior concreting. Raslaffan
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation of Section 4 Raslaffan
2692 RFI-5858-QCN-2-0357 RFI-5858-QCN-2-0357 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.2.a.b.c S W H 25-Aug-12 9:30 AM 25-Aug-12
Pipe Sleeper B70-PS-14, SLD085 to SLD100 =16 nos Area
9.1. Check surface preparation of Precast Pipe sleeper B70-PS-03-F1 = 2 nos prior to QG Gate # 5 TSF
2693 RFI-5858-QCN-2-0358 RFI-5858-QCN-2-0358 CONCRETE
repair.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.1 S W H 25-Aug-12 7:30 AM 25-Aug-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5 TSF
2694 RFI-5858-QCN-2-0359 RFI-5858-QCN-2-0359 CONCRETE Pre-cast Pipe Sleeper pedastel B70-PS-02-F1=3NOS AND B70-PS-03-F1=27 NOS & APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 7.2 S W H 26-Aug-12 9:30 AM 26-Aug-12
concrete spacer.
QG Gate # 5 TSF
2695 RFI-5858-QCN-2-0360 RFI-5858-QCN-2-0360 CONCRETE Final Inspection of galvanized Round bar. APPROVED
Raslaffan
B-V-3100-004-2-201-02_0 5.0 W W H 26-Aug-12 8:00 AM 26-Aug-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded QG Gate # 5 TSF
2696 RFI-5858-QCN-2-0361 RFI-5858-QCN-2-0361 CONCRETE
items and cleaning of Cast-in-situ culvert Wall of BZRC-009 prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 26-Aug-12 7:30 AM 3-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.1 Pre - Pouring Check Reinforcment and Construction joint for Cast-in-situ Pipe Stoper
Section 2 Raslaffan
2697 RFI-5858-QCN-2-0362 RFI-5858-QCN-2-0362 CONCRETE Pedestal B70-PS-06, SLD013, B70-PS-07, SLD019 and B70-PS-08, SLD008, Total = 3 APPROVED B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 26-Aug-12 8:00 AM 26-Aug-12
Area
nos prior shuttering.
9.1. Check surface and repair of Cast-in-situ Culvert wall = 4 nos of BZRC-009 prior first QG Gate # 5 TSF
2698 RFI-5858-QCN-2-0363 RFI-5858-QCN-2-0363 CONCRETE
coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.1 S W H 26-Aug-12 7:30 AM 26-Aug-12
Check Setting Out, Line / Level B70-PS-10, SLD073 to SLD052 = 20 nos ( Except Section 3 Raslaffan
2699 RFI-5858-QCN-2-0364 RFI-5858-QCN-2-0364 CONCRETE
SLD060 and SLD061
APPROVED
Area
B-V-3100-004-2-201-02_3 9.1 S W H 26-Aug-12 8:00 AM 26-Aug-12
Check Lean Concrete Pouring B70-PS-10, SLD073 to SLD052 = 20 nos ( Except SLD060 Section 3 Raslaffan
2700 RFI-5858-QCN-2-0365 RFI-5858-QCN-2-0365 CONCRETE
and SLD061 )
APPROVED
Area
B-V-3100-004-2-201-02_3 3.b S W H 26-Aug-12 9:00 AM 26-Aug-12
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
2701 RFI-5858-QCN-2-0366 RFI-5858-QCN-2-0366 CONCRETE APPROVED B-V-3100-004-2-201-02_3 8.1 R W H 26-Aug-12 7:00 AM 26-Aug-12
Culvert Cover 5 nos of BZRC-009 Raslaffan
9.2. Check Surface Below Grade Check Protective Coating ( First coat ) of Precast Pipe QG Gate # 5 TSF
2702 RFI-5858-QCN-2-0367 RFI-5858-QCN-2-0367 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 26-Aug-12 8:00 AM 26-Aug-12
Sleeper B70-PS-14-F1 = 46 nos and B70-PS-15-F1 = 4 nos prior second coating. Raslaffan
2705 Check Setting Out, Line / Level D-D20-B70-PR-44, F1 = 1 no., F2= 2 nos., F4 = 1 no. = 4 Sulfur Line Raslaffan
RFI-5858-QCN-2-0370 RFI-5858-QCN-2-0370 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 27-Aug-12 7:00 AM 27-Aug-12
nos. Area
Pre - Pouring Check Formworks, Reinforcement, Embeded items and cleaning of Cast-
2706 Sulfur Line Raslaffan
RFI-5858-QCN-2-0371 RFI-5858-QCN-2-0371 CONCRETE in-situ Pipe Track D210-B70-PR-44, F1 = 1 no. F2 = 2 nos and F4 = 1 no prior APPROVED B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 27-Aug-12 7:00 AM 27-Aug-12
Area
concreting
5.1. Concrete Placement Request for Cast-in-situ Pipe Track D210-B70-PR-44, F1 = 1 Sulfur Line Raslaffan
2707 RFI-5858-QCN-2-0372 RFI-5858-QCN-2-0372 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 5.1.a.b.c W W/S H 27-Aug-12 7:30 AM 27-Aug-12 Cancelled due to ready mix plant shutdown
no., F2 = 2 nos and F4 = 1 no. Total = 4 nos. Area
Pre - Pouring Check Formworks, Embeded items and cleaning of Cast-in-situ Duct Bank Duct Bank BZDP 005
2709 RFI-5858-QCN-2-0374 RFI-5858-QCN-2-0374 CONCRETE APPROVED B-V-3100-004-2-201-02_3 4.1.a.c.d W W H 27-Aug-12 7:00 AM 27-Aug-12
BZDP-005 prior concreting. Section 2
2711 6.3 Check Form Removal of of Pipe Track Pedestal D110-B70-PR-04, B70-PR-13, B70- QG Gate # 5 TSF
RFI-5858-QCN-2-0376 RFI-5858-QCN-2-0376 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 6.3 W W H 27-Aug-12 9:30 AM 27-Aug-12
PR-14, B70-PR-15, B70-PR-19 and B70-PR-20, F1 = 12 nos and F2 = 12 nos. Raslaffan
2712 9.2. Check Surface Below Grade Check Protective Coating ( First coat ) of Precast QG Gate # 5 TSF
RFI-5858-QCN-2-0377 RFI-5858-QCN-2-0377 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a W W H 27-Aug-12 8:30 AM 27-Aug-12
Culvert Covert Type A = 3 nos and Type B = 2 nos of BZRC-009 prior second coat. Raslaffan
Check Setting Out, Line / Level B70-PS-07, B70-PR-09, B70-PR-10 and B70-PR-46 Total Duct Bank BZDP 005
2714 RFI-5858-QCN-2-0379 RFI-5858-QCN-2-0379 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 27-Aug-12 8:30 AM 27-Aug-12
F1 = 6 nos and F2 = 6 nos prior backfilling. Section 2
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation B70-
Section 4 Raslaffan
2715 RFI-5858-QCN-2-0380 RFI-5858-QCN-2-0380 CONCRETE PS-13, SLD006 to SLD001 = 6 nos and B70-PS-14 SLD072 to SLD104 = 30 nos except APPROVED
Area
B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 27-Aug-12 8:30 AM 27-Aug-12
SLD101, SLD102
QG Gate # 5 TSF
2716 RFI-5858-QCN-2-0381 RFI-5858-QCN-2-0381 CONCRETE 9.1. Check surface preparation of Pipe Sleeper B70-PS-15-F1 = 50 nos prior first coat. APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.1 S W H 27-Aug-12 9:00 AM 27-Aug-12
9.2 Check Protective Coating ( second coat ) of precast pipe sleeper B70-PS-14-F- = 46 QG Gate # 5 TSF
2718 RFI-5858-QCN-2-0383 RFI-5858-QCN-2-0383 CONCRETE
nos and B70-PS-15-F1 = 4 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 27-Aug-12 8:00 AM 27-Aug-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
2719 RFI-5858-QCN-2-0384 RFI-5858-QCN-2-0384 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 27-Aug-12 8:00 AM 27-Aug-12
Pipe Sleeper B70-PS-14-F1 = 46 nos B70-PS-15-F1 = 4 nos. Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5 TSF
2720 RFI-5858-QCN-2-0385 RFI-5858-QCN-2-0385 CONCRETE Pipe Sleeper footing B70-PS-14-F1=46NOS AND B70-PS-15-F1=4NOS & concrete APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 28-Aug-12 9:30 AM 28-Aug-12
spacer.
9.0 Concrete Protection Protective Coating, Polyethylene and Hardboard installation B70- Section 2 Area
2721 RFI-5858-QCN-2-0386 RFI-5858-QCN-2-0386 CONCRETE
PS-08, SLD001 to SLD029 = 29 nos. prior backfilling first layer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 28-Aug-12 7:30 AM 28-Aug-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning for QG Gate # 5 TSF
2722 RFI-5858-QCN-2-0387 RFI-5858-QCN-2-0387 CONCRETE
Precast Pipe Sleeper Pedestal B70-PS-03-F1 = 30 nos prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.b.e W W H 28-Aug-12 7:00 AM 28-Aug-12
QG Gate # 5 TSF
2723 RFI-5858-QCN-2-0388 RFI-5858-QCN-2-0388 CONCRETE 6.3 Check Form Removal of of Precast Culvert Wall 8 nos, 4 nos panel of BZRC-006 CANCELLED B-V-3100-004-2-201-02_3 6.3 W W H 28-Aug-12 8:30 AM 28-Aug-12 Cancelled due to not Ready for inspection
Raslaffan
QG Gate # 5 TSF
2724 RFI-5858-QCN-2-0389 RFI-5858-QCN-2-0389 CONCRETE 9.1. Check surface repair prior first coat of pipe sleeper B70-PS-03-F1 = 2 nos. APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 28-Aug-12 7:00 AM 28-Aug-12
Raslaffan
9.1. Check surface preparation of Precast Pipe sleeper B70-PS-15-F1 = 5 nos prior to QG Gate # 5 TSF
2725 RFI-5858-QCN-2-0390 RFI-5858-QCN-2-0390 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 28-Aug-12 7:30 AM 28-Aug-12
repair. Raslaffan
2726 6.4 Completion of 14 days curing for Precast Pipe Sleeper B70-PS-14-F1 = 46 nos and QG Gate # 5 TSF
RFI-5858-QCN-2-0391 RFI-5858-QCN-2-0391 CONCRETE APPROVED B-V-3100-004-2-201-02_3 6.4 S W H 28-Aug-12 8:30 AM 28-Aug-12
B70-PS-15-F1 = 4 nos. Raslaffan
9.2. Check Surface Below Grade Check Protective Coating ( second coat ) of Cast-in-situ QG Gate # 5 TSF
2729 RFI-5858-QCN-2-0394 RFI-5858-QCN-2-0394 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.2.a S W H 28-Aug-12 2:00 PM 28-Aug-12
Culvert wall = 4 nos Raslaffan
Check Setting Out, Line / Level B70-PS-06, SLD045 to SLD080 = 33 nos., ( Except Section 2 Area
2730 RFI-5858-QCN-2-0395 RFI-5858-QCN-2-0395 CONCRETE
SLD048, SLD063 and SLD064 )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 29-Aug-12 8:00 AM 29-Aug-12
Check Lean Concrete Pouring B70-PS-06, SLD045 to SLD080 = 33 nos, (Except Section 2 Area
2731 RFI-5858-QCN-2-0396 RFI-5858-QCN-2-0396 CONCRETE
SLD048, SLD063 and SLD064) (PS-06 SLD053 to SLD080-26 not included)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 29-Aug-12 8:30 AM 29-Aug-12
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Precast Pipe Sleeper
QG Gate # 5 TSF
2732 RFI-5858-QCN-2-0397 RFI-5858-QCN-2-0397 CONCRETE Footing B70-PS-23-F1 = 14 nos, B70-PS-24-F1 = 26 nos B70-PS-04-F1 = 9 nos and APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b W W H 29-Aug-12 7:00 AM 29-Aug-12
B70-PS-05-F1 = 8 nos and B70-PS-06-F1 = 13 nos prior concreting.
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-23-F1 = 14
QG Gate # 5 TSF
2733 RFI-5858-QCN-2-0398 RFI-5858-QCN-2-0398 CONCRETE nos, B70-PS-24-F1 = 26 nos B70-PS-04-F1 = 9 nos and B70-PS-05-F1 = 8 nos and B70- APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 5.1.a.b.c W W/S H 29-Aug-12 7:30 AM 29-Aug-12
PS-06-F1 = 13 nos.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Pre-cast Pipe Track pedastel B70-PR-03=4NOS , B70-PR-05=4NOS, B70-PR-07=4NOS, QG Gate # 5 TSF
2734 RFI-5858-QCN-2-0399 RFI-5858-QCN-2-0399 CONCRETE
B70-PR-11=4NOS,B70-PR-64=4NOS (TOTAL F1=10NOS,F2=10NOS) & concrete
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 29-Aug-12 9:30 AM 29-Aug-12
spacer.
Pre - Pouring Check Formworks, Reinforcement, embeded item and cleaning of Cast-in-
Section 2 Area
2735 RFI-5858-QCN-2-0400 RFI-5858-QCN-2-0400 CONCRETE situ Pipe Stopper Pedestal B70-PS-06, SLD013 = 1 no B70-PS-07, SLD019 = 1 no and APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 29-Aug-12 8:00 AM 29-Aug-12
B70-PS-08, SLD008 = 1 no. prior concreting
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper Pedestal B70-PS-06, QG Gate # 5 TSF
2736 RFI-5858-QCN-2-0401 RFI-5858-QCN-2-0401 CONCRETE
SLD013 = 1 no., B70-PS-07, SLD019 = 1 no and B70-PS-08, SLD008 = 1 no.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 29-Aug-12 8:30 AM 29-Aug-12 Cancelled due to non-availability of concrete
6.6 Contraction / Expansion Joints Check Surface Preparation and Sealant application QG Gate # 5 TSF
2737 RFI-5858-QCN-2-0402 RFI-5858-QCN-2-0402 CONCRETE APPROVED B-V-3100-004-2-201-02_3 6.6.a.b S W H 29-Aug-12 7:00 AM 29-Aug-12
of Culvert Wall = 4 nos of BZRC-009 Raslaffan
Section 1 Area
2738 RFI-5858-QCN-2-0403 RFI-5858-QCN-2-0403 CONCRETE Check Setting Out, Line / Level D110-B70-PR-02 and B70-PR-04 APPROVED B-V-3100-004-2-201-02_3 3.b S W H 29-Aug-12 10:00 AM 29-Aug-12
Raslaffan
Section 1 Area
2739 RFI-5858-QCN-2-0404 RFI-5858-QCN-2-0404 CONCRETE Check Lean concrete Puring D110-PR-02 and PR-04 = 2 nos. CANCELLED B-V-3100-004-2-201-02_3 3.b S W H 29-Aug-12 1:30 PM 29-Aug-12 Due to no-availability
Raslaffan
5.1. Concrete Placement Request for Cast-in-situ Pipe Track D210-B70-PR-44, F1 = 1 Sulfur Line Raslaffan
2741 RFI-5858-QCN-2-0406 RFI-5858-QCN-2-0406 CONCRETE
no., F2 = 2 nos and F4 = 1 no. Total = 4 nos.
APPROVED
Area
B-V-3100-004-2-201-02_3 5.1a.b.c W W/S H 29-Aug-12 7:30 AM 29-Aug-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Form Removal of of Pipe Track Pedestal D110-B70-PR-04, B70-PR-13, B70- QG Gate # 5 TSF
2742 RFI-5858-QCN-2-0407 RFI-5858-QCN-2-0407 CONCRETE
PR-14, B70-PR-15, B70-PR-19 and B70-PR-20, F1 = 12 nos and F2 = 12 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 6.3 W W H 29-Aug-12 9:30 AM 29-Aug-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for QG Gate # 5 TSF
2743 RFI-5858-QCN-2-0408 RFI-5858-QCN-2-0408 CONCRETE
Pre-cast culvert Base=6nos of BZRC-006 & concrete spacer.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 30-Aug-12 9:30 AM 30-Aug-12
Check Setting Out, Line / Level B70-PS-14, SLD055, SLD056 and SLD019 = 3 nos, Section 4 Area
2744 RFI-5858-QCN-2-0409 RFI-5858-QCN-2-0409 CONCRETE
SLD018 and SLD081 = 2 nos, PR-19 and PR-64 = 2 nos. & PR-65 = 3 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 8:00 AM 30-Aug-12
Check Lean Concrete Pouring B70-PS-14, SLD055, SLD056 and SLD019 = 3 nos, Section 4 Area
2745 RFI-5858-QCN-2-0410 RFI-5858-QCN-2-0410 CONCRETE
SLD018 and SLD081 = 2 nos, PR-19 and PR-64 = 2 nos. and PR-65 = 3 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 1:30 PM 30-Aug-12 Not Ready for inspection
Check Setting Out, Line / Level B70-PS-10, SLD053 to SLD027 = 27 nos ( Except Section 3 Area
2746 RFI-5858-QCN-2-0411 RFI-5858-QCN-2-0411 CONCRETE
SLD036 )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 8:30 AM 30-Aug-12
Check Lean Concrete Pouring B70-PS-10, SLD053 to SLD027 = 27 nos ( Except SLD036 Section 3 Area
2747 RFI-5858-QCN-2-0412 RFI-5858-QCN-2-0412 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 1:30 PM 30-Aug-12
) Raslaffan
Check Setting Out, Line / Level B70-PS-06, SLD01, SLD04, SLD05, SLD06 and SLD08 = Section 2 Area
2748 RFI-5858-QCN-2-0413 RFI-5858-QCN-2-0413 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 8:30 AM 30-Aug-12
5 nos. Raslaffan
Check Lean Concrete Pouring B70-PS-06, SLD01, SLD04, SLD05, SLD06 and SLD08 = Section 2 Area
2749 RFI-5858-QCN-2-0414 RFI-5858-QCN-2-0414 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 3.b S W H 30-Aug-12 9:00 AM 30-Aug-12 Not Ready for inspection
5 nos. Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded QG Gate # 5 TSF
2750 RFI-5858-QCN-2-0415 RFI-5858-QCN-2-0415 CONCRETE APPROVED B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 1-Sep-12 7:00 AM 1-Sep-12
items and cleaning of Precast Culvert Wall 4 nos, 2 panel of BZRC-006 prior shuttering. Raslaffan
2752 5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-03-F1 = 30 QG Gate # 5 TSF
RFI-5858-QCN-2-0417 RFI-5858-QCN-2-0417 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 1-Sep-12 7:30 AM 1-Sep-12 Due to no-availability of concrete
nos and B70-PS-15-F1 = 10 nos. Raslaffan
QG Gate # 5 (Culvert
Check Concrete and metal surface prepation of culvert cover joint of BZRC-009 prior to
2753 RFI-5858-QCN-2-0418 RFI-5858-QCN-2-0418 CONCRETE CANCELLED BZRC-009)Raslaffan B-V-3100-004-2-201-02_3 3.1 S W H 1-Sep-12 7:30 PM 1-Sep-12 Not Ready for inspection
grouting.
Area
9.0. Concrete Protection Protective coating, Polyethylene and hardboard installation of Section 1 Area
2754 RFI-5858-QCN-2-0419 RFI-5858-QCN-2-0419 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a.b.c S W H 1-Sep-12 8:00 AM 1-Sep-12
B70-PS-03, SLD055 to SLD078 prior backfilling first layer. Raslaffan
9.1. Check protective coating first coat of pipe sleeper B70-PS-15-F1 = 50 nos prior QG Gate # 5 TSF
2755 RFI-5858-QCN-2-0420 RFI-5858-QCN-2-0420 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 1-Sep-12 7:30 PM 1-Sep-12
second coat. Raslaffan
Check Setting Out, Line / Level D210-B70-PR-44, F3 = 1 no., F5 = 1 no, F9A and F9b = 2 Sulfur Line Raslaffan
2756 RFI-5858-QCN-2-0421 RFI-5858-QCN-2-0421 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 1-Sep-12 8:30 AM 1-Sep-12
nos. Area
2757 Check Lean Concrete Pouring D210-B70-PR-44, F3 = 1 no., F5 = 1 no, F9A and F9b = 2 Sulfur Line Raslaffan
RFI-5858-QCN-2-0422 RFI-5858-QCN-2-0422 CONCRETE APPROVED B-V-3100-004-2-201-02_3 3.b S W H 1-Sep-12 1:30 PM 1-Sep-12
nos. Area
2758 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for QG Gate # 5 TSF
RFI-5858-QCN-2-0423 RFI-5858-QCN-2-0423 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 2-Sep-12 9:30 AM 2-Aug-12
Pre-cast -in-situ culvert Base=2nos of BZRC-009 Raslaffan
2759 Pre - Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Culvet BZRC-009
RFI-5858-QCN-2-0424 RFI-5858-QCN-2-0424 CONCRETE APPROVED B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 2-Sep-12 7:00 AM 11-Sep-12
Cuvlvert End wall of BZRC-009 prior concreting. Raslaffan Area
Culvet BZRC-009
2760 RFI-5858-QCN-2-0425 RFI-5858-QCN-2-0425 CONCRETE 5.1. Concrete Placement Request for Cast-in-situ culvert end wall of BZRC-009. APPROVED B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 2-Sep-12 7:30 AM 11-Sep-12
Raslaffan Area
5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-03-F1 = 30 QG Gate # 5 TSF
2761 RFI-5858-QCN-2-0426 RFI-5858-QCN-2-0426 CONCRETE
nos and B70-PS-15-F1 = 10 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 2-Sep-12 7:30 AM 2-Sep-12
Pre - Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-
Section 1 Area
2762 RFI-5858-QCN-2-0427 RFI-5858-QCN-2-0427 CONCRETE in-situ Pipe Stopper Footing B70-PS-02, SLD018, B70-PS-03, SLD028 and SLD078 = 2 APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 2-Sep-12 8:00 AM 2-Sep-12
nos prior concreting.
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper footing B70-PS-02, Section 1 Area
2763 RFI-5858-QCN-2-0428 RFI-5858-QCN-2-0428 CONCRETE
SLD018 = 1 no., B70-PS-03, SLD028 and SLD078 = 2 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 2-Sep-12 9:30 AM 3-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper Pedestal B70-PS-06, Section 2 Area
2764 RFI-5858-QCN-2-0429 RFI-5858-QCN-2-0429 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 2-Sep-12 8:30 AM 2-Sep-12 Cancelled due to Batching Plant
SLD013 = 1 no., B70-PS-07, SLD019 = 1 no and B70-PS-08, SLD008 = 1 no. Raslaffan
Check Lean Concrete Pouring B70-PS-10, SLD053 to SLD027 = 27 nos ( Except SLD036 Section 3 Area
2765 RFI-5858-QCN-2-0430 RFI-5858-QCN-2-0430 CONCRETE
)
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 2-Sep-12 1:30 AM 2-Sep-12 Cancelled due to Batching Plant
Check Lean Concrete Pouring B70-PS-14, SLD055, SLD056 and SLD019 = 3 nos, Section 4 Area
2766 RFI-5858-QCN-2-0431 RFI-5858-QCN-2-0431 CONCRETE
SLD018 and SLD081 = 2 nos, PR-19 and PR-64 = 2 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 2-Sep-12 1:30 PM 2-Sep-12 Cancelled due to Batching Plant
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded items QG Gate # 5 TSF
2767 RFI-5858-QCN-2-0432 RFI-5858-QCN-2-0432 CONCRETE
and cleaning of Precast Pipe Slleper Pedestal B70-PS-03-F1 = 30nos prior shuttering
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 2-Sep-12 7:00 AM 2-Sep-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, and cleaning of Sulfur Line Raslaffan
2768 RFI-5858-QCN-2-0433 RFI-5858-QCN-2-0433 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 4.1.b.c.d.e W W H 2-Sep-12 9:30 AM 2-Sep-12
Pipe Track D210-B70-PR-44, F1 = 1 no., F2 = 2 nos and F4 = 1 no prior shuttering. Area
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for QG Gate # 5 TSF
2769 RFI-5858-QCN-2-0434 RFI-5858-QCN-2-0434 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 3-Sep-12 9:30 AM 3-Sep-12
Pre-cast pipe sleeper Footing B70-PS-15-F1=50 nos. Raslaffan
QG Gate # 5 TSF
2770 RFI-5858-QCN-2-0435 RFI-5858-QCN-2-0435 CONCRETE 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-03-F1 = 30 nos APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 3-Sep-12 8:30 AM 3-Sep-12
Raslaffan
2771 6.4 Completion of 14 days curing for Precast Pipe Track B70-PR-04,13,14,15,19 and 20 QG Gate # 5 TSF
RFI-5858-QCN-2-0436 RFI-5858-QCN-2-0436 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 3-Sep-12 8:30 AM 3-Sep-12
total F1=12 nos and F2 = 12 nos. Raslaffan
2773 9.1. Check protective, hardboard and polyethylene sheet of Pipe Sleeper B70-PS-09, Section 2 Area
RFI-5858-QCN-2-0438 RFI-5858-QCN-2-0438 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 3-Sep-12 8:00 AM 3-Sep-12
SLD092 to SLD086 = 7 nos and SLD076 to SLD065 = 12 nos. prior backfilling. Raslaffan
9.1. Check protective coating second coat of pipe sleeper B70-PS-15-F1 = 50 nos prior QG Gate # 5 TSF
2774 RFI-5858-QCN-2-0439 RFI-5858-QCN-2-0439 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 3-Sep-12 8:00 AM 3-Sep-12
shifting. Raslaffan
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
2775 RFI-5858-QCN-2-0440 RFI-5858-QCN-2-0440 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 3-Sep-12 8:30 AM 3-Sep-12
Pipe Sleeper B70-PS-15-F1 = 50 nos. Raslaffan
6.6 Contraction / Expansion Joints Check Surface Preparation of Pipe sleeper B70-PS- QG Gate # 5 TSF
2776 RFI-5858-QCN-2-0441 RFI-5858-QCN-2-0441 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 3-Sep-12 7:00 AM 3-Sep-12
13-F1 = 42 nos and B70-PS-14-F1 = 8 nos prior first coating. Raslaffan
Check Lean Concrete Pouring B70-PS-06, SLD045 to SLD080 = 33 nos., ( Except Section 2 Area
2777 RFI-5858-QCN-2-0442 RFI-5858-QCN-2-0442 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 3-Sep-12 1:30 PM 3-Sep-12 due to nonavailabitily of concrete from RMQ
SLD048, SLD063 and SLD064 ) Raslaffan
2779 9.1. Check protective, hardboard and polyethylene sheet of Pipe Track D10-PR-05 prior Section 1 Area
RFI-5858-QCN-2-0444 RFI-5858-QCN-2-0444 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 3-Sep-12 8:00 AM 3-Sep-12
backfilling. Raslaffan
2780 QG Gate # 5
RFI-5858-QCN-2-0445 RFI-5858-QCN-2-0445 CONCRETE 6.4 Check completion of 14 days curing Cast-in-situ culvert wall BZRC-009 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 3-Sep-12 8:30 AM 3-Sep-12
(Culvert BZRC-009)
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Pipe Track footing Sulfur Line Raslaffan
2781 RFI-5858-QCN-2-0446 RFI-5858-QCN-2-0446 CONCRETE APPROVED B-V-3100-004-2-201-02_3 4.1.a.b.d W W H 4-Sep-12 6:45 AM 4-Sep-12
D210-B70-PR-44, F1, F3,F7,F8 and F11 = 5 nos prior concreting. Area
5.1. Concrete Placement Request for Cast-in-situ of Pipe Track footing D210-PR-44, F1, Sulfur Line Raslaffan
2782 RFI-5858-QCN-2-0447 RFI-5858-QCN-2-0447 CONCRETE
F3, F7,F8 and F11 = 5 nos
APPROVED
Area
B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 4-Sep-12 7:15 AM 4-Sep-12
Pre - Pouring Check Formworks, Reinforcement, embedded items and cleaning of QG Gate # 5 TSF
2783 RFI-5858-QCN-2-0448 RFI-5858-QCN-2-0448 CONCRETE
precast pipe sleeper pedestal B70-PS-03-F1 = 30 nos prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.a.b.c.d W W H 4-Sep-12 1:30 PM 4-Sep-12
5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-03-F1 = 30 QG Gate # 5 TSF
2784 RFI-5858-QCN-2-0449 RFI-5858-QCN-2-0449 CONCRETE
nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 4-Sep-12 1:30 PM 4-Sep-12
Check Lean Concrete Pouring B70-PS-06, SLD001, SLD004, SLD005, SLD006 and Section 2 Area
2785 RFI-5858-QCN-2-0450 RFI-5858-QCN-2-0450 CONCRETE
SLD008 = 5 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 4-Sep-12 9:00 AM 4-Sep-12 due to nonavailabitily of concrete from RMQ
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
QG Gate # 5 TSF
Check Concrete and metal surface prepation of culvert cover joint of BZRC-009 prior to
2786 RFI-5858-QCN-2-0451 RFI-5858-QCN-2-0451 CONCRETE APPROVED (Culvert BZRC-009) B-V-3100-004-2-201-02_2 3.1 S W H 4-Sep-12 8:30 AM 4-Sep-12
grouting.
Raslaffan
Check Lean Concrete Pouring B70-PS-14, SLD055, SLD056 and SLD019 = 3 nos, Section 4 Area
2787 RFI-5858-QCN-2-0452 RFI-5858-QCN-2-0452 CONCRETE
SLD018 and SLD081 = 2 nos, PR-19 and PR-64 = 2 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 4-Sep-12 8:30 AM 4-Sep-12 due to nonavailabitily of concrete from RMQ
QG Gate # 5 TSF
2788 RFI-5858-QCN-2-0453 RFI-5858-QCN-2-0453 CONCRETE 6.3 Check Form Removal of of Cast-in-situ Culvert End wall of BZRC-009. APPROVED (Culvert BZRC-009) B-V-3100-004-2-201-02_3 6.3 W W H 5-Sep-12 7:30 AM 5-Sep-12
Raslaffan
Check Lean Concrete Pouring B70-PS-10, SLD053 to SLD027 = 27 nos Section 3 Area
2789 RFI-5858-QCN-2-0454 RFI-5858-QCN-2-0454 CONCRETE
( Except SLD036 )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 5-Sep-12 1:30 PM 5-Sep-12
Check Lean Concrete Pouring B70-PS-06, SLD045 to SLD080 = 33 nos., ( Except Section 2 Area
2790 RFI-5858-QCN-2-0455 RFI-5858-QCN-2-0455 CONCRETE CANCELLED B-V-3100-004-2-201-02_3 3.b S W H 5-Sep-12 1:30 PM 5-Sep-12 due to nonavailabitily of concrete from RMQ
SLD048, SLD063 and SLD064 ) Raslaffan
Section 1 Area
2791 RFI-5858-QCN-2-0456 RFI-5858-QCN-2-0456 CONCRETE Check Lean Concrete Pouring D110-B70-PR-02 and PR-04 = 2 nos. CANCELLED B-V-3100-004-2-201-02_3 3.b S W H 5-Sep-12 1:30 PM 5-Sep-12 due to nonavailabitily of concrete from RMQ
Raslaffan
9.1. Check protective, hardboard and polyethylene sheet of Precast Pipe Track B70-PS- Section 2 Area
2792 RFI-5858-QCN-2-0457 RFI-5858-QCN-2-0457 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 5-Sep-12 7:30 AM 5-Sep-12
08, PR-11 prior backfilling first layer. Raslaffan
2793 9.1. Check surface preparation of cast-in-situ pipe stopper B70-PS-07, SLD069 = 1 no. Section 2 Area
RFI-5858-QCN-2-0458 RFI-5858-QCN-2-0458 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 5-Sep-12 8:00 AM 5-Sep-12
and B70-PS-08, SLD061 = 1 no. prior first coating. Raslaffan
2794 9.2. Check Surface Below Grade Check Protective coating ( First coat ) of Pipe sleeper QG Gate # 5 TSF
RFI-5858-QCN-2-0459 RFI-5858-QCN-2-0459 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.2 S W H 5-Sep-12 7:30 AM 5-Sep-12
B70-PS-13-F1 = 42 nos and B70-PS-14-F1 = 8 nos prior second coating. Raslaffan
2795 Qatar Ready Mix Qcon grout cubes 1 day strength are came less than 30 mpa. As
RFI-5858-QCN-2-0460 RFI-5858-QCN-2-0460 CONCRETE 4.4.1 Check Compressive Strength @ 1 Days for grout (culvert BZRC-009 top cover joint) REJECTED B-V-3100-004-2-208-02_2 4.4.1 S W H 5-Sep-12 10:30 AM 5-Sep-12
Raslaffan Area per spec 1 day age strength 35mpa required
9.3 Check Surface above grade final coat of Pipe Sleeper B70-PS-07, SLD101 to
Section 2 Area
2796 RFI-5858-QCN-2-0461 RFI-5858-QCN-2-0461 CONCRETE SLD054 = 40 nos (except SLD094, SLD093, SLD085 to SLD082 and SLD069 ) prior to APPROVED B-V-3100-004-2-201-02_3 9.3 S W H 5-Sep-12 8:00 AM 5-Sep-12
Raslaffan
release to mechanical works.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for QG Gate # 5 TSF
2797 RFI-5858-QCN-2-0462 RFI-5858-QCN-2-0462 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 6-Sep-12 9:30 AM 6-Sep-12
pipe sleeper pedestal B70-PS-14-F1 =46nos and B70-PS-15-F1=4nos.oncrete spacer. Raslaffan
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper Pedestal B70-PS-06, Section 2 Area
2798 RFI-5858-QCN-2-0463 RFI-5858-QCN-2-0463 CONCRETE APPROVED B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 5-Sep-12 1:30 PM 5-Sep-12
SLD013 = 1 no., B70-PS-07, SLD019 = 1 no and B70-PS-08, SLD008 = 1 no. Raslaffan
Section 3 Area
2799 RFI-5858-QCN-2-0464 RFI-5858-QCN-2-0464 CONCRETE Check Setting Out, Line/Level. B70-PS-10-F1 : SLD012 To SLD026 ( 15 Foundations ) APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 6-Sep-12 8:30 AM 6-Sep-12
Raslaffan
2800 9.1. Check protective, hardboard and polyethylene sheet of Culvert Wall BZRC-009 1.0 Culvert BZRC-009
RFI-5858-QCN-2-0465 RFI-5858-QCN-2-0465 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 6-Sep-12 7:00 AM 6-Sep-12
meter height prior first layer backfilling. Raslaffan Area
2801 Pre - Pouring Check Formworks, Reinforcement, embedded items and cleaning of QG Gate # 5 TSF
RFI-5858-QCN-2-0466 RFI-5858-QCN-2-0466 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 6-Sep-12 7:00 AM 6-Sep-12
precast culvert wall 4 nos 2 panel of BZRC-006 prior concreting. Raslaffan
QG Gate # 5 TSF
2803 RFI-5858-QCN-2-0468 RFI-5858-QCN-2-0468 CONCRETE 5.1. Concrete Placement Request for Precast Culvert wall = 4 nos 2 panel of BZRC-006. CANCELLED B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W/S H 6-Sep-12 7:30 AM 6-Sep-12 due to nonavailabitily of concrete from RMQ
Raslaffan
9.2. Check Surface Below Grade Check Protective coating ( second coat ) of Pipe QG Gate # 5 TSF
2804 RFI-5858-QCN-2-0469 RFI-5858-QCN-2-0469 CONCRETE
sleeper B70-PS-13-F1 = 42 nos and B70-PS-14-F1 = 8 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 S W H 6-Sep-12 3:00 PM 6-Sep-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, and cleaning of QG Gate # 5 TSF
2805 RFI-5858-QCN-2-0470 RFI-5858-QCN-2-0470 CONCRETE
Precast Pipe Sleeper Pedestal of B70-PS-15-F1 = 40 nos prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 6-Sep-12 7:30 AM 6-Sep-12
Check Lean Concrete Pouring B70-PS-06, SLD001, SLD004,SLD005, SLD006 and Section 2 Area
2806 RFI-5858-QCN-2-0471 RFI-5858-QCN-2-0471 CONCRETE
SLD008 = 5 nos.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 6-Sep-12 9:00 AM 5-Sep-12 due to nonavailabitily of concrete from RMQ
6.3 Check Concrete Surface upon Form Removal of Stopper Pedestal B70-PS-07-F2, Section 2 Area
2807 RFI-5858-QCN-2-0472 RFI-5858-QCN-2-0472 CONCRETE
SLD019 and B70-PS-08-F2, SLD008
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 W W H 8-Sep-12 7:00 AM 8-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.6 Post Pour Check Concrete reparir 10mm of Cast-in-situ concrete Culvert wall BZRC- QG Gate # 5 (BZRC-
2808 RFI-5858-QCN-2-0473 RFI-5858-QCN-2-0473 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.5.a S W H 7-Sep-12 7:00 AM 7-Sep-12
009 prior repairing. 009)Raslaffan
.3 Check Concrete Surface upon Form Removal of Pre-cast Pipe Sleeper B70-PS-03-F1 QG Gate # 5 TSF
2809 RFI-5858-QCN-2-0474 RFI-5858-QCN-2-0474 CONCRETE
= 30 nos & B70-PS-15-F1 = 10 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 W W H 8-Sep-12 7:00 AM 8-Sep-12
Check Lean Concrete Pouring B70-PS-14, SLD055, SLD056 and SLD019 = 3 nos, Section 4 Area
2810 RFI-5858-QCN-2-0475 RFI-5858-QCN-2-0475 CONCRETE
SLD018 and SLD081 = 2 nos, PR-19 and PR-64 = 2 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 8-Sep-12 8:30 AM 8-Sep-12
QG Gate # 5 TSF
2811 RFI-5858-QCN-2-0476 RFI-5858-QCN-2-0476 CONCRETE 5.1. Concrete Placement Request for Precast Culvert wall = 4 nos 2 panel of BZRC-006. APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W/S H 8-Sep-12 7:30 AM 8-Sep-12
Check Lean Concrete Pouring B70-PS-06, SLD045 to SLD080 = 33 nos., ( Except Section 2 Area
2812 RFI-5858-QCN-2-0477 RFI-5858-QCN-2-0477 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 8-Sep-12 1:30 PM 8-Sep-12
SLD048, SLD063 and SLD064 ) Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, and cleaning of Sulfur Line Raslaffan
2813 RFI-5858-QCN-2-0478 RFI-5858-QCN-2-0478 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 8-Sep-12 7:30 AM 8-Sep-12
Pipe Track D210-B70-PR-44, F1 = 1 no., F2 = 2 nos and F4 = 1 no prior shuttering Area
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5 TSF
2814 RFI-5858-QCN-2-0479 RFI-5858-QCN-2-0479 CONCRETE APPROVED B-V-3100-004-2-201-02_3 8.1 R W H 8-Sep-12 7:30 AM 8-Sep-12
Pipe Sleeper B70-PS-13-F1 = 42 nos. and B70-PS-14-F1 = 8 nos. Raslaffan
2816 Check Lean Concrete Pouring B70-PS-06, SLD001, SLD004, SLD005, SLD006 and Section 2 Area
RFI-5858-QCN-2-0481 RFI-5858-QCN-2-0481 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 8-Sep-12 9:00 AM 8-Sep-12 Cancelled due to non-availability of concrete
SLD008 = 5 nos. Raslaffan
9.1. Check protective, hardboard and polyethylene sheet of Culvert Wall BZRC-009 1.0 Culvert BZRC-009
2818 RFI-5858-QCN-2-0483 RFI-5858-QCN-2-0483 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 7-Sep-12 7:00 AM 7-Sep-12
meter height prior first layer backfilling. Gate 5 Raslaffan Area
9.1 Check surface preparation of cast-in-situ culvert end wall of BZRC-009 prior cecond Section 2 Area
2819 RFI-5858-QCN-2-0484 RFI-5858-QCN-2-0484 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.1 S W H 8-Sep-12 8:00 AM 8-Sep-12
coat. Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
cast-in-situ stopper pipe pedastel B70-PS-07-F1,SLD061 and SLD069=2nos,including QG Gate # 5 TSF
2820 RFI-5858-QCN-2-0485 RFI-5858-QCN-2-0485 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 9-Sep-12 9:30 AM 3-Sep-12
concrete spacer. Precast pipe sleeper footing B70-PS-03-F1=30NOS. Precast culvert Raslaffan
wall=2nos of BZRC-009-A and concrete spacer.
9.2 a. Check Protective Coating first coat prior second coat of Culvert End wall of BZRC- Culvert BZRC-009
2821 RFI-5858-QCN-2-0486 RFI-5858-QCN-2-0486 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 9-Sep-12 7:00 AM 9-Sep-12
009. Raslaffan Area
2822 9.2 a. Check Protective Coating second coat of Culvert End wall of BZRC-009 prior Culvert BZRC-009
RFI-5858-QCN-2-0487 RFI-5858-QCN-2-0487 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 9-Sep-12 7:00 AM 9-Sep-12
hardboard installation. Raslaffan Area
2823 9.1.c. Check protective, hardboard and polyethylene sheet of Culvert Wall BZRC-009 1.0 Culvert BZRC-009
RFI-5858-QCN-2-0488 RFI-5858-QCN-2-0488 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1.c S W H 9-Sep-12 7:30 AM 9-Sep-12
meter height prior backfilling. Gate 5 Raslaffan Area
Section 1- PR-01
2824 Check Setting Out, Line / Level D110-B70-PR-01, F10=1 nos., F11=1 nos., F12=1 nos.,
RFI-5858-QCN-2-0489 RFI-5858-QCN-2-0489 CONCRETE APPROVED Area B-V-3100-004-2-201-02_3 3.b S W H 9-Sep-12 7:45 AM 9-Sep-12
F13=1 nos., F14=1 nos.
Raslaffan
Section 1- PR-01
Check Lean Concrete Pouring D110-B70-PR-01, F10=1 nos., F11=1 nos., F12=1 nos.,
2825 RFI-5858-QCN-2-0490 RFI-5858-QCN-2-0490 CONCRETE CANCELLED Area B-V-3100-004-2-201-02_3 3.b S W H 9-Sep-12 8:00 AM 9-Sep-12 Cancelled due to non-availability of concrete
F13=1 nos., F14=1 nos.
Raslaffan
9.2.a Check Protective Coating cast-in-situ pipe stopper B70-PS-07, SLD069 = 1 nos Section 2 Area
2827 RFI-5858-QCN-2-0492 RFI-5858-QCN-2-0492 CONCRETE
and B70-PS-08, SLD061 = 1 nos prior second coating
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 9-Sep-12 8:00 AM 9-Sep-12
9.2.a Check Protective Coating cast-in-situ pipe stopper B70-PS-07, SLD069 = 1 nos and Section 2 Area
2828 RFI-5858-QCN-2-0493 RFI-5858-QCN-2-0493 CONCRETE
B70-PS-08, SLD061 = 1 nos second (Final) coating
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 9-Sep-12 3:00 PM 9-Sep-12
Pre - Pouring Check Formworks, Reinforcement, embedded items and cleaning of QG Gate # 5 TSF
2829 RFI-5858-QCN-2-0494 RFI-5858-QCN-2-0494 CONCRETE
precast pipe sleeper pedestal B70-PS-15-F1 = 40 nos. prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 9-Sep-12 7:00 AM 9-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-15-F1 = 50 QG Gate # 5 TSF
2830 RFI-5858-QCN-2-0495 RFI-5858-QCN-2-0495 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W/S H 9-Sep-12 7:30 AM 9-Sep-12 Cancelled due to non-availability of concrete
nos Raslaffan
Pre - Pouring Check Formworks, Reinforcement, and cleaning of precast pipe sleeper QG Gate # 5 TSF
2831 RFI-5858-QCN-2-0496 RFI-5858-QCN-2-0496 CONCRETE
footing B70-PS-16-F1 = 50 nos. prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 9-Sep-12 7:00 AM 9-Sep-12
5.1 Concrete Placement Request for Precast Pipe Sleeper pedestal B70-PS-16-F1 = 40 QG Gate # 5 TSF
2832 RFI-5858-QCN-2-0497 RFI-5858-QCN-2-0497 CONCRETE
nos
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c.d W W/S H 9-Sep-12 7:30 AM 9-Sep-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded items
QG Gate # 5 TSF
2833 RFI-5858-QCN-2-0498 RFI-5858-QCN-2-0498 CONCRETE and cleaning of Precast Pipe Sleeper pedestal B70-PS-23-F1 = 4 nos and B70-PS-24-F1 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 9-Sep-12 8:00 AM 9-Sep-12
= 26 nos prior shuttering
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Pre-cast pipe rack footing D110( B70-PR-04,B70-PR-13,B70-PR-14,B70-PR-15,B70-PR- QG Gate # 5 TSF
2834 RFI-5858-QCN-2-0499 RFI-5858-QCN-2-0499 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 10-Sep-12 9:30 AM 10-Sep-12
19 and B70-PR-20) tOTAL F1=12nos and F2=12nos,including concrete Saddle for PVC Raslaffan
=24nos&concrete Saddle forconcrete pipp=14nos
6.3 Check concrete surface upon form removal of Cast-in-situ Pipe Stopper B70-PS-06, Section 2 Area
2835 RFI-5858-QCN-2-0500 RFI-5858-QCN-2-0500 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 10-Sep-12 8:30 AM 10-Sep-12
SLD013 Raslaffan
6.3 Check concrete surface upon Form Removal of of Precast Culvert Wall 8 nos, 4 nos QG Gate # 5 TSF
2836 RFI-5858-QCN-2-0501 RFI-5858-QCN-2-0501 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 W W H 10-Sep-12 8:30 AM 10-Sep-12
panel of BZRC-006 Raslaffan
2837 9.1.c Check protective, hardboard and polyethylene sheet of Culvert end Wall BZRC-009 Culvert BZRC-009
RFI-5858-QCN-2-0502 RFI-5858-QCN-2-0502 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1.c S W H 10-Sep-12 8:30 AM 10-Sep-12
1.0 meter height prior backfilling. Gate 5 Raslaffan Area
2838 Pre - Pouring Check Formworks, Reinforcement, and cleaning of Pipe Track footing Sulfur Line Raslaffan
RFI-5858-QCN-2-0503 RFI-5858-QCN-2-0503 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.d W W H 10-Sep-12 7:30 AM 10-Sep-12
D210-B70-PR-44, F3, F5, F9a, F9b and F10 prior concreting. Area
2839 5.1. Concrete Placement Request for Cast-in-situ of Pipe Track footing D210-PR-44, F9a Sulfur Line Raslaffan
RFI-5858-QCN-2-0504 RFI-5858-QCN-2-0504 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 10-Sep-12 8:00 AM 10-Sep-12
and F9b. Area
5.1. Check concrete pouring for Cast-in-situ of Pipe Track Pedestal D210-PR-44, F1 = 1 Sulfur Line Raslaffan 4.1.a.b.c.d.
2841 RFI-5858-QCN-2-0506 RFI-5858-QCN-2-0506 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 W W H 10-Sep-12 8:00 AM 10-Sep-12 Not Ready for inspection
no, F2 = 2 nos and F4 = 1 no. Area e
Check Setting Out, Line/Level B70-PS-10-F2 : SLD036 & SLD079 = 2 Stoppers and B70- Section 3 Area
2842 RFI-5858-QCN-2-0507 RFI-5858-QCN-2-0507 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 10-Sep-12 9:00 AM 10-Sep-12
PR-15-F1,F2 = 4 nos (1 loop) Raslaffan
Check Lean Concrete Pouring B70-PS-10-F2 : SLD036 & SLD079 = 2 Stoppers and B70- Section 3 Area
2843 RFI-5858-QCN-2-0508 RFI-5858-QCN-2-0508 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 10-Sep-12 9:30 AM 10-Sep-12 Not Ready for inspection
PR-15-F1,F2 = 4 nos (1 loop) Raslaffan
2845 5.1. Check concrete pouring for Precast Pipe Sleeper Footing B70-PS-04-F1 = 9 nos, QG Gate # 5 TSF
RFI-5858-QCN-2-0510 RFI-5858-QCN-2-0510 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 5.1 W H H 10-Sep-12 8:00 AM 10-Sep-12 Cancelled due to non-availability of concrete
B70-PS-05-F1 = 8 nos and B70-PS-06-F1 = 13 nos. Raslaffan
2846 Pre - Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Sleeper QG Gate # 5 TSF
RFI-5858-QCN-2-0511 RFI-5858-QCN-2-0511 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 10-Sep-12 7:00 AM 10-Sep-12
Footing B70-PS-06-F1 = 30 nos prior concreting. Raslaffan
QG Gate # 5 TSF
2847 RFI-5858-QCN-2-0512 RFI-5858-QCN-2-0512 CONCRETE 5.1. Check concrete pouring for Precast Pipe Sleeper Pedestal B70-PS-06-F1 = 30 nos. CANCELLED B-V-3100-004-2-201-02_4 5.1 W W H 10-Sep-12 8:00 AM 10-Sep-12
Raslaffan
9.2.b,c Check Polyethylene & Hardboard Installation cast-in-situ pipe stopper B70-PS-07, Section 2 Area
2848 RFI-5858-QCN-2-0513 RFI-5858-QCN-2-0513 CONCRETE
SLD069 = 1 nos and B70-PS-08, SLD061 = 1 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.b,c S W H 10-Sep-12 3:00 PM 10-Sep-12
Culvert BZRC-009
2849 RFI-5858-QCN-2-0514 RFI-5858-QCN-2-0514 CONCRETE 9.1.c Check protective, hardboard and polyethylene sheet of Culvert Cover of BZRC-009 APPROVED
Gate 5 Raslaffan Area
B-V-3100-004-2-201-02_4 9.1.c S W H 10-Sep-12 10:00 AM 10-Sep-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5 TSF
2850 RFI-5858-QCN-2-0515 RFI-5858-QCN-2-0515 CONCRETE cast-in-situ culvert foundation=1no of BZRC-009 AND Pre-cast pipe sleeper footing B70- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 11-Sep-12 9:30 AM 10-Sep-12
PS-03-F1=30nos
6.3 Check concrete surface upon Form Removal of of Precast Culvert Wall 4 nos, 2 nos QG Gate # 5 TSF
2851 RFI-5858-QCN-2-0516 RFI-5858-QCN-2-0516 CONCRETE
panel of BZRC-006
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 W W H 11-Sep-12 7:30 AM 11-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe sleepers - Prior
Section 3 Area
2852 RFI-5858-QCN-2-0517 RFI-5858-QCN-2-0517 CONCRETE Backfilling B70-PS-09-F1, SLD001 to SLD016 except SLD007 & SLD008 = 14 nos and APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 11-Sep-12 7:00 AM 11-Sep-12
Raslaffan
B70-PS-10-F1, SLD061 to SLD087 = 26 nos
9.1. Check surface preparation of Precast Pipe Track D110-PR-04, B70-PR-13, B70-PR-
QG Gate # 5 TSF
2853 RFI-5858-QCN-2-0518 RFI-5858-QCN-2-0518 CONCRETE 14, B70-PR-15, B70-PR-19 and B70-PR-20 Total F1 = 12 nos and F2 = 12 nos prior first APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 11-Sep-12 9:30 AM 11-Sep-12
coating.
9.2 a. Check Protective Coating first coat prior second coat of Precast Pipe Track D110-
Culvert BZRC-009
2854 RFI-5858-QCN-2-0519 RFI-5858-QCN-2-0519 CONCRETE PR-04, B70-PR-13, B70-PR-14, B70-PR-15, B70-PR-19 and B70-PR-20 Total F1 = 12 APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 9.2.a S W H 11-Sep-12 3:30 PM 11-Sep-12
nos and F2 = 12 nos
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
QG Gate # 5 TSF
2855 RFI-5858-QCN-2-0520 RFI-5858-QCN-2-0520 CONCRETE Cast-in-situ Pipe Stopper Pedestal B70-PS-02, SLD018 B70-PS-03, SLD028 and APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 4.1.a.b.d.e W W H 11-Sep-12 8:00 AM 11-Sep-12
SLD078 prior shuttering.
9.1.c. Check protective, hardboard and polyethylene sheet of Culvert end Wall BZRC-009 Culvert BZRC-009
2856 RFI-5858-QCN-2-0521 RFI-5858-QCN-2-0521 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1.c S W H 11-Sep-12 8:30 AM 11-Sep-12
1.0 meter height prior backfilling. Gate 5 Raslaffan Area
5.1. Concrete Placement Request for Cast-in-situ of Pipe Track footing D210-PR-44, F3, Sulfur Line Raslaffan
2857 RFI-5858-QCN-2-0522 RFI-5858-QCN-2-0522 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 12-Sep-12 7:30 AM 12-Sep-12
F5, F10 Area
2859 5.1. Check concrete pouring for Cast-in-situ of Pipe Track Pedestal D210-PR-44, F1 = 1 Sulfur Line Raslaffan
RFI-5858-QCN-2-0524 RFI-5858-QCN-2-0524 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 12-Sep-12 8:00 AM 12-Sep-12
no, F2 = 2 nos and F4 = 1 no. Area
2860 5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-16-F1 = 40 QG Gate # 5 TSF
RFI-5858-QCN-2-0525 RFI-5858-QCN-2-0525 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c.d. W W/S H 12-Sep-12 7:30 AM 12-Sep-12
nos Raslaffan
2861 5.1. Check concrete pouring for Precast Pipe Sleeper Footing B70-PS-04-F1 = 9 nos, QG Gate # 5 TSF
RFI-5858-QCN-2-0526 RFI-5858-QCN-2-0526 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 12-Sep-12 8:00 AM 12-Sep-12
B70-PS-05-F1 = 8 nos and B70-PS-06-F1 = 13 nos. Raslaffan
QG Gate # 5 TSF
2862 RFI-5858-QCN-2-0527 RFI-5858-QCN-2-0527 CONCRETE 5.1. Check concrete pouring for Precast Pipe Sleeper Pedestal B70-PS-06-F1 = 30 nos. APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 12-Sep-12 8:00 AM 12-Sep-12
Raslaffan
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-15-F1 = 50 QG Gate # 5 TSF
2864 RFI-5858-QCN-2-0529 RFI-5858-QCN-2-0529 CONCRETE APPROVED B-V-3100-004-2-201-02_3 5.1.a.b.c.d W W/S H 12-Sep-12 7:30 AM 12-Sep-12
nos Raslaffan
9.3 Check Surface Above Grade Pre-cast pipe sleepers - 1st Coat prior 2nd coat B70-
2866 Section 2 Area
RFI-5858-QCN-2-0531 RFI-5858-QCN-2-0531 CONCRETE PS-07: SLD001 to SLD053 except SLD0043 & SLD044 = 50 nos and B70-PS-08, APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 12-Sep-12 7:00 AM 12-Sep-12
Raslaffan
SLD062 to SLD093 except SLD086 & SLD087 = 30 nos
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper Pedestal B70-PS-02, Section 1 Area
2869 RFI-5858-QCN-2-0534 RFI-5858-QCN-2-0534 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 5.1 W W/S H 12-Sep-12 1:30 PM 12-Sep-12 Concrete not supplied by RMQ
SLD018, B70-PS-03, SLD028 and SLD078 Raslaffan
9.1 Check Protective, hardboard and polyethylene sheet of Culvert end Wall BZRC-009 Culvert BZRC-009
2870 RFI-5858-QCN-2-0535 RFI-5858-QCN-2-0535 CONCRETE
1.0 meter highe third lift prior backfilling.
APPROVED
Gate 5 Raslaffan Area
B-V-3100-004-2-201-02_4 9.1.c S W H 12-Sep-12 9:30 AM 12-Sep-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5 TSF
2871 RFI-5858-QCN-2-0536 RFI-5858-QCN-2-0536 CONCRETE cast-in-situ pipe stopper footing SLD019=1nos, SLD013=1 nos, SLD008=1 nos, B70-PS- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 12-Sep-12 9:30 AM 12-Sep-12
07=F2, B70-PS-08=F2, B70-PS-06=F2
9.2 a. Check Protective Coating second coat of Precast Pipe Track D110-PR-04, B70-
QG Gate # 5 TSF
2872 RFI-5858-QCN-2-0537 RFI-5858-QCN-2-0537 CONCRETE PR-13, B70-PR-14, B70-PR-15, B70-PR-19 and B70-PR-20 Total F1 = 12 nos and F2 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 13-Sep-12 7:30 AM 13-Sep-12
12 nos
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast
QG Gate # 5 TSF
2873 RFI-5858-QCN-2-0538 RFI-5858-QCN-2-0538 CONCRETE Pipe Track D110-PR-04, B70-PR-13 B70-PR-14, B70-PR-15, B70-PR-19 and B70-PR- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.1 R W H 13-Sep-12 8:30 AM 13-Sep-12
20, Total F = 12 nos and F2 = 12 nos.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check surface preparation of Precast Pipe Sleeper Footing and Pedestal B70-PS-03- Section 2 Area
2874 RFI-5858-QCN-2-0539 RFI-5858-QCN-2-0539 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 13-Sep-12 7:30 AM 13-Sep-12
F1 = 30 nos prior first coating. Raslaffan
Section 2 Area
2875 RFI-5858-QCN-2-0540 RFI-5858-QCN-2-0540 CONCRETE Check Erection of Pre-cast Loop Pipe Track Foundations B70-PR-11 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.2 S W H 13-Sep-12 7:00 AM 13-Sep-12
9.3 Check Surface Above Grade Pre-cast pipe sleepers - 2nd Coat B70-PS-07: SLD001
Section 2 Area
2876 RFI-5858-QCN-2-0541 RFI-5858-QCN-2-0541 CONCRETE to SLD053 except SLD0043 & SLD044 = 50 nos and B70-PS-08, SLD062 to SLD093 CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 9.3 S W H 13-Sep-12 7:00 AM 13-Sep-12 Not Ready for inspection
except SLD086 & SLD087 = 30 nos
10.0 Check Final Visual Inspection of Pipe Sleeper B70-PS-07, SLD101 to SLD054 = 40 Section 2 Area
2877 RFI-5858-QCN-2-0542 RFI-5858-QCN-2-0542 CONCRETE
nos (Except SLD094, SLD093,SLD085 to SLD082 AND SLD069.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 10.0 S W H 13-Sep-12 8:30 AM 13-Sep-12 Cancelled due to survey report not attached
Section 2 Area
2878 RFI-5858-QCN-2-0543 RFI-5858-QCN-2-0543 CONCRETE 6.4 Completion of 14 days curing for B70-PS-07, SLD069 and B70-PS-08, SLD061. APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 13-Sep-12 8:30 AM 13-Sep-12
Raslaffan
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe sleepers - Prior (Section 4) B70-PS-
2879 RFI-5858-QCN-2-0544 RFI-5858-QCN-2-0544 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 13-Sep-12 8:30 AM 15-Sep-12
Backfilling B70-PS-14-F1 : SLD057-SLD061 = 5 nos 14 Raslaffan Area
Check Lean Concrete Pouring B70-PS-06, SLD001, SLD004, SLD005, SLD006 and Section 2 Area
2880 RFI-5858-QCN-2-0545 RFI-5858-QCN-2-0545 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 13-Sep-12 9:00 AM 13-Sep-12 Concrete not supplied by RMQ
SLD008 = 5 nos. Raslaffan
2882 Check Final Visual Inspection For Pipe Track Foundations ( Loops) D110-B70-PR-09 & Section 2 Area
RFI-5858-QCN-2-0547 RFI-5858-QCN-2-0547 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.2 S W H 13-Sep-12 7:00 AM 13-Sep-12
D110-B70-PR-46 Raslaffan
2883 9.1.c. Check protective coating, hardboard and polyethylene sheet of B70-PR-05 prior Section 1 Area
RFI-5858-QCN-2-0548 RFI-5858-QCN-2-0548 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1.c S W H 15-Sep-12 7:30 AM 15-Sep-12
backfilling. Raslaffan
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe sleepers - Prior (Section 2) B70-PS-
2884 RFI-5858-QCN-2-0549 RFI-5858-QCN-2-0549 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 15-Sep-12 7:00 AM 15-Sep-12
Backfilling B70-PS-09-F1 : SLD024-SLD034 = 11 nos 09 Raslaffan Area
6.3 Check Concrete surface upon form removal of Cast-in-situ D110-B70-PR-44, F1 = 1 Sulfur Line Area
2885 RFI-5858-QCN-2-0550 RFI-5858-QCN-2-0550 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 15-Sep-12 8:30 AM 15-Sep-12
no, F2 = 2 nos and F4 = 1 nos Raslaffan
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-06-F1 Gate # 5 Area
2886 RFI-5858-QCN-2-0551 RFI-5858-QCN-2-0551 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 15-Sep-12 8:00 AM 15-Sep-12
= 30 nos and B70-PS-16-F1 = 40 nos. Raslaffan
5.1. Concrete Placement Request for Cast-in-situ Pipe Stopper Pedestal B70-PS-02, Section 1 Area
2887 RFI-5858-QCN-2-0552 RFI-5858-QCN-2-0552 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W W/S H 15-Sep-12 1:30 PM 15-Sep-12
SLD018, B70-PS-03, SLD028 and SLD078 Raslaffan
2888 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate # 5 Area
RFI-5858-QCN-2-0553 RFI-5858-QCN-2-0553 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.d.e W W H 15-Sep-12 7:00 AM 15-Sep-12
Precast Pipe Sleeper Pedestal B70-PS-23 = 14 nos and B70-PS-24 = 26 nos. Raslaffan
2889 Pre - Pouring Check Formworks, Reinforcement and cleaning of Pipe Sleeper Footing Gate # 5 Area
RFI-5858-QCN-2-0554 RFI-5858-QCN-2-0554 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 15-Sep-12 7:00 AM 15-Sep-12
B70-PS-06-F1 = 30 nos prior concreting. Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Track,
Gate # 5 Area
2891 RFI-5858-QCN-2-0556 RFI-5858-QCN-2-0556 CONCRETE D110-B70-PR-21, B70-PR-26, B70-PR-22 B70-PR-47, B70-PR-48 and B70-PR-65, Total APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 15-Sep-12 7:00 AM 15-Sep-12
Raslaffan
F1 = 12 nos and F2 = 12 nos prior concreting.
5.1. Check concrete pouring for Precast Pipe Track D110-B70-PR-21, B70-PR-26, B70- Gate # 5 Area
2892 RFI-5858-QCN-2-0557 RFI-5858-QCN-2-0557 CONCRETE
PR-32, B70-PR-47, B70-PR-48 and B70-PR-65 Total = F1 = 12 nos and F2 = 12 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 15-Sep-12 7:30 AM 15-Sep-12
9.3 Check Surface Above Grade Pre-cast pipe sleepers - 2nd Coat B70-PS-07: SLD001
Section 2 Area
2893 RFI-5858-QCN-2-0558 RFI-5858-QCN-2-0558 CONCRETE to SLD053 execept SLD0043 & SLD044 = 50 nos and B70-PS-08, SLD062 to SLD093 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.3 S W H 15-Sep-12 7:00 AM 15-Sep-12
except SLD086 & SLD087 = 30 nos.
Section 2 Area
2894 RFI-5858-QCN-2-0559 RFI-5858-QCN-2-0559 CONCRETE Check Lean Concrete Pouring B70-PS-06, SLD075 to SLD081 = 6 nos. APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 15-Sep-12 9:30 AM 15-Sep-12
Check Lean Concrete Pouring B70-PS-06, SLD001, SLD004, SLD005, SLD006 and Section 2 Area
2895 RFI-5858-QCN-2-0560 RFI-5858-QCN-2-0560 CONCRETE
SLD008 = 5 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 15-Sep-12 9:00 AM 15-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast Gate # 5 Area
2896 RFI-5858-QCN-2-0561 RFI-5858-QCN-2-0561 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 15-Sep-12 7:30 AM 15-Sep-12
Removable panel prior installation of BZRC-009 Raslaffan
(Section 2) B70-PS-
Check Setting Out, Line/Level. B70-PS-08-F1 : SLD036 To SLD045 = 10 nos. B70-PS-
2897 RFI-5858-QCN-2-0562 RFI-5858-QCN-2-0562 CONCRETE
06-F1: SLD002 & SLD003 = 2 nos. B70-PS-06-F1:SLD093 & SLD094 = 2 nos
APPROVED 06, 07 & 08 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 15-Sep-12 8:00 AM 16-Sep-12
Area
(Section 2) B70-PS-
Check Lean Concrete Pouring B70-PS-08-F1 : SLD036 To SLD045 = 10 nos. B70-PS-06-
2898 RFI-5858-QCN-2-0563 RFI-5858-QCN-2-0563 CONCRETE
F1: SLD002 & SLD003 = 2 nos B70-PS-06-F1:SLD093 & SLD094 = 2 nos
APPROVED 06, 07 & 08 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 15-Sep-12 9:00 AM 15-Sep-12
Area
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, and cleaning of
Sulfur Line,
2900 RFI-5858-QCN-2-0565 RFI-5858-QCN-2-0565 CONCRETE Pipe Track Pedestal D210-B70-PR-44, F1 = 2 nos, F3 = 4 nos F7 = 2 nos and F8 = 2 nos. APPROVED B-V-3100-004-2-201-02_4 4.1 b.c.d. e W W H 16-Sep-12 7:00 AM 16-Sep-12
Raslaffan
prior shuttering.
Check 2nd coat Above Grade for cast-in-situ Pipe Stoppers B70-PS-07, SLD069 = 1 nos Section 2 (B70-PS-07
2901 RFI-5858-QCN-2-0566 RFI-5858-QCN-2-0566 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 9.3 S W H 16-Sep-12 4:00 PM 16-Sep-12 Not Ready for inspection
and B70-PS-08, SLD061 = 1 nos & 08), Raslaffan
2902 RFI-5858-QCN-2-0567 RFI-5858-QCN-2-0567 CONCRETE Check Setting out Line/Level D110-B70-PR-01,F6+1 Nos,F7+1Nos APPROVED Section 1-PR-01 B-V-3100-004-2-201-02_3 3.b S W H 16-Sep-12 9.15 AM 16-Sep-12
2903 RFI-5858-QCN-2-0568 RFI-5858-QCN-2-0568 CONCRETE Check lean Concrete pouring D110-B70-PR-01,F6-1 nos,F7=1 Nos APPROVED Section 1-PR-01 B-V-3100-004-2-201-02_3 3.b S W H 16-Sep-12 9.30 AM 16-Sep-12
6.4 Completion of 14 days curing for Pipe Sleeper Footing B70-PS-04-F1 = 9 nos, B70-
2904 RFI-5858-QCN-2-0569 RFI-5858-QCN-2-0569 CONCRETE APPROVED Gate # 5, Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 16-Sep-12 8:30 16-Sep-12
PS-05-F1 = 8 nos, B70-PS-06-F1 = 13 nos
2905 6.4 Completion of 14 days curing for Pipe Sleeper Footing B70-PS-23-F1 = 14 nos and
RFI-5858-QCN-2-0570 RFI-5858-QCN-2-0570 CONCRETE APPROVED Section 2, Raslaffan B-V-3100-004-2-201-02_4 6.4 R W H 16-Sep-12 8:30 AM 16-Sep-12
B70-PS-24-F1 = 26 nos.
2906 9.3 Check Surface Above Grade Pre-cast pipe sleepers - 2nd Coat B70-PS-08-, SLD046 Section 2 ( B70-PS-
RFI-5858-QCN-2-0571 RFI-5858-QCN-2-0571 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 16-Sep-12 3:00 PM 16-Sep-12
to SLD060 = 15 nos 08), Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints, and cleaning of
2907 RFI-5858-QCN-2-0572 RFI-5858-QCN-2-0572 CONCRETE APPROVED Gate # 5, Raslaffan B-V-3100-004-2-201-02_4 4.1 b.c.d. W W H 16-Sep-12 7:00 AM 16-Sep-12
Pipe Sleeper B70-PS-04-F1 = 9 nos, B70-PS-05-F1 = 8 nos. B70-PS-06-F1 = 13 nos.
9.1 Check Surface Preparation Above Grade Pre-cast pipe sleepers - Prior 1st Coat B70- Section 2 ( B70-PS-08
2908 RFI-5858-QCN-2-0573 RFI-5858-QCN-2-0573 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 16-Sep-12 7:00 AM 16-Sep-12
PS-08: SLD001 to SLD029 = 28 nos and B70-PS-09: SLD087 to SLD092 = 6 nos & 09), Raslaffan
9.1 Check surface preparation of Precast culvert walll 2 nos 1 Panel BZRC-009A prior to
2909 RFI-5858-QCN-2-0574 RFI-5858-QCN-2-0574 CONCRETE APPROVED Gate # 5 B-V-3100-004-2-201-02_4 9.1 S W H 16-Sep-12 7:30 AM 16-Sep-12
first coatting
Section 2 ( D110-
2910 RFI-5858-QCN-2-0575 RFI-5858-QCN-2-0575 CONCRETE Check Final Visual Inspection For Pipe Track Foundations (Loop) D110-B70-PR-10 CANCELLED B70-PR-10), B-V-3100-004-2-201-02_4 10.0 S W H 16-Sep-12 7:00 AM 16-Sep-12 Due to survey report not available
Raslaffan
2911 9.3 Check Surface Above Grade Pre-cast pipe sleepers - 1st Coat prior 2nd Coat B70- Section 2 ( B70-PS-
RFI-5858-QCN-2-0576 RFI-5858-QCN-2-0576 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 16-Sep-12 7:00 AM 16-Sep-12
PS-08-, SLD046 to SLD060 = 15 nos 08), Raslaffan
2912 Check Surface Preparation Above Grade for cast-in-situ Pipe Stoppers B70-PS-07, Section 2 (B70-PS-07
RFI-5858-QCN-2-0577 RFI-5858-QCN-2-0577 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 16-Sep-12 7:00 AM 16-Sep-12
SLD069 = 1 nos and B70-PS-08, SLD061 = 1 nos & 08), Raslaffan
Check 1st coat Above Grade for cast-in-situ Pipe Stoppers - Prior 2nd coat B70-PS-07, Section 2 (B70-PS-07
2913 RFI-5858-QCN-2-0578 RFI-5858-QCN-2-0578 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 9.3 S W H 16-Sep-12 11:00 AM 16-Sep-12 Not Ready for inspection
SLD069 = 1 nos and B70-PS-08, SLD061 = 1 nos & 08), Raslaffan
Culvert BZRC-009
2914 RFI-5858-QCN-2-0589 RFI-5858-QCN-2-0589 CONCRETE Check Setting Out, Line / Level BZRC-009 West Side APPROVED B-V-3100-004-2-201-02_3 3.b S W H 17-Sep-12 2.00PM 17-Sep-12
Raslaffan
Culvert BZRC-009
2915 RFI-5858-QCN-2-0590 RFI-5858-QCN-2-0590 CONCRETE Check Lean Concrete Pouring BZRC-009 West Side APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 3.b S W H 17-Sep-12 2.20PM 17-Sep-12
(Section 3) B70-PS-
Check Lean Concrete Pouring for 2 stoppers and 1 pipe track foundationsB70-PS-10-F2 :
2916 RFI-5858-QCN-2-0591 RFI-5858-QCN-2-0591 CONCRETE
SLD0036 & SLD079 = 2 Stoppersand D110-B70-PR-15 = 1 loop
CANCELLED 10,B70-PR-15 B-V-3100-004-2-201-02_4 3.b S W H 17-Sep-12 9:00 AM 17-Sep-12 Non-Availiability of concrete by RMQ
Raslaffan
5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 14 Gate 5 TSF
2918 RFI-5858-QCN-2-0593 RFI-5858-QCN-2-0593 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 17-Sep-12 7:30 AM 17-Sep-12
nos and B70-PS-24-F1 = 26 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-06-F1 = 30 Gate 5 TSF
2920 RFI-5858-QCN-2-0595 RFI-5858-QCN-2-0595 CONCRETE
nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 17-Sep-12 7:30 AM 17-Sep-12
(Section 3) D110-
2921 RFI-5858-QCN-2-0596 RFI-5858-QCN-2-0596 CONCRETE Check Setting Out, Line/Level.D110-B70-PR-48 & D110-B70-PR-14 APPROVED B70-PR-48 & 14 B-V-3100-004-2-201-02_4 3.0.a S W H 17-Sep-12 9:00 AM 17-Sep-12
Raslaffan
(Section 3) D110-
2922 RFI-5858-QCN-2-0597 RFI-5858-QCN-2-0597 CONCRETE Check Lean Concrete Pouring D110-B70-PR-48 & D110-B70-PR-14 CANCELLED B70-PR-48 & 14 B-V-3100-004-2-201-02_4 3.b S W H 17-Sep-12 9:30 AM 17-Sep-12 Non-Availiability of concrete by RMQ
Raslaffan
Pre - Pouring Check Formworks, Reinforcement, and cleaning of Precast Pipe Sleeper 4.1
2923 RFI-5858-QCN-2-0598 RFI-5858-QCN-2-0598 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 W W H 17-Sep-12 6:45 AM 17-Sep-12
Footing B70-PS-15-F1 = 10 nos prior concreting. a.b.d.e
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-15-F1 = 10 Gate 5 TSF
2924 RFI-5858-QCN-2-0599 RFI-5858-QCN-2-0599 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1.a.b.c W W/S H 17-Sep-12 7:30 AM 17-Sep-12
nos Raslaffan
10.0 Check Final Visual Inspection of Pipe Sleeper B70-PS-07, SLD101 to SLD054 = 40
2925 RFI-5858-QCN-2-0600 RFI-5858-QCN-2-0600 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 10.0 S W H 17-Sep-12 8.30AM 17-Sep-12
nos (Except SLD094, SLD093,SLD085 to SLD082 AND SLD069.
2926 9.3 Check Surface Above Grade First Coat of Pre-cast pipe sleepers - Prior Second Coat Section 2 ( B70-
RFI-5858-QCN-2-0601 RFI-5858-QCN-2-0601 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 17-Sep-12 1:30 PM 17-Sep-12
of B70-PS-08: SLD001 to SLD029 = 28 nos and B70-PS-09: SLD087 to SLD092 = 6 nos PS-08 & 09) Raslaffan
2927 9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe track foundations -
RFI-5858-QCN-2-0602 RFI-5858-QCN-2-0602 CONCRETE CANCELLED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 17-Sep-12 4:00 PM 17-Sep-12 Not Ready for inspection
Prior Backfilling D110-B70-PR-64, D110-B70-PR-19 & D110-B70-PR-65 = 3 loops
(Section 2) B70-PS-
2928 Check Lean Concrete Pouring B70-PS-06-F1 : Sld002 and SLD003 = 2 nos B70-PS-07-
RFI-5858-QCN-2-0603 RFI-5858-QCN-2-0603 CONCRETE CANCELLED 06, 07 & 08 B-V-3100-004-2-201-02_4 3.b S W H 18-Sep-12 9:00 AM 18-Sep-12 Non-Availiability of concrete by RMQ
F1 : Sld093 and SLD094 = 2 nos.
Raslaffan Area
Section 1 Area
2929 RFI-5858-QCN-2-0604 RFI-5858-QCN-2-0604 CONCRETE Check Polyetheylene Installation Check Hardboard Installation B70-PR-03 APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 18-Sep-12 7:30 AM 18-Sep-12
Raslaffan
Check Setting Out, Line / Level B70-PS-06-F1: SLD031 to SLD027 = 5 nos and D110- Section 2 Area
2931 RFI-5858-QCN-2-0606 RFI-5858-QCN-2-0606 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 18-Sep-12 9:00 AM 18-Sep-12
B70-PR-47 = 1 no. Raslaffan
Check Lean Concrete Pouring B70-PS-06-F1: SLD031 to SLD027 = 5 nos and D110- Section 2 Area
2932 RFI-5858-QCN-2-0607 RFI-5858-QCN-2-0607 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 18-Sep-12 9:00 AM 18-Sep-12 Non-Availiability of concrete by RMQ
B70-PR-47 = 1 no. Raslaffan
Check Reinforced Concrete Pre-Pouring for 2 stopper footings B70-PS-13: SLD018 &
2934 Section 4 Area
RFI-5858-QCN-2-0609 RFI-5858-QCN-2-0609 CONCRETE B70-PS-14: SLD081 4.1.a Check Formworks. 4.1.b Check Reinforcment. 4.1.d Check APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 18-Sep-12 8:30 AM 18-Sep-12
Raslaffan
Cleaning.
2935 9.2 Check Surface Below Grade heck Protective coating first coat of Precast Pipe Gate # 5 Area
RFI-5858-QCN-2-0610 RFI-5858-QCN-2-0610 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 18-Sep-12 9:00 AM 18-Sep-12
Sleeper B70-PS-03-F1 = 30 nos prior second coating. Raslaffan
5.1 Check Reinforced Concrete Pouring for 2 stopper footings B70-PS-13: SLD018 & Section 4 Area
2936 RFI-5858-QCN-2-0611 RFI-5858-QCN-2-0611 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 18-Sep-12 9:00 AM 19-Sep-12
B70-PS-14: SLD081 Raslaffan
9.2 Check Surface Below Grade Check Protective coating second coat of Precast Pipe Gate # 5 Area
2937 RFI-5858-QCN-2-0612 RFI-5858-QCN-2-0612 CONCRETE
Sleeper B70-PS-03-F1 = 30 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 18-Sep-12 4:00 PM 18-Sep-12
Check Concrete surface upon form removal of Stopper pedestal B70-PS-03 SLD 028 & Section 1 Area
2938 RFI-5858-QCN-2-0613 RFI-5858-QCN-2-0613 CONCRETE
SLD078, B70-PS-02 SLD018
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 18-Sep-12 8:00 AM 18-Sep-12
Check Surface preparation D210-B70-PR-44 Pipe Rack Foundation No. 4(F2),5 (F1),8 Sulphur Line
2939 RFI-5858-QCN-2-0614 RFI-5858-QCN-2-0614 CONCRETE
(F2) & 9(F4)
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 9.1 S W H 18-Sep-12 9:30 AM 18-Sep-12
Check from works, Embedded items, Cleaning & Expansion joints D210-B70-PR-44 Pipe Sulphur Line
2940 RFI-5858-QCN-2-0615 RFI-5858-QCN-2-0615 CONCRETE
Rack Foundation Pedestal G.L2,6,7,10 & 11/D21A & D21B
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_2 4.1.a.c.d.e W W H 18-Sep-12 9:00 AM 18-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring D210-B70-PR-44 Pipe Rack Foundation Pedestal G.L2,6,7,10 & Sulphur Line
2941 RFI-5858-QCN-2-0616 RFI-5858-QCN-2-0616 CONCRETE APPROVED B-V-3100-004-2-201-02_2 5.1 W H H 18-Sep-12 1:30 PM 19-Sep-12
11/D21A & D21B-(5Nos) Raslaffan Area
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast Gate # 5 Area
2942 RFI-5858-QCN-2-0617 RFI-5858-QCN-2-0617 CONCRETE
Culvert Covert Type B = 2 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.1 R W H 19-Sep-12 7:30 AM 19-Sep-12
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-06-F1 Gate # 5 Area
2943 RFI-5858-QCN-2-0618 RFI-5858-QCN-2-0618 CONCRETE
= 30 nos, B70-PS-23-F1 = 14 nos and B70-PS-24-F1 = 26 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 19-Sep-12 8:00 AM 19-Sep-12
(Section 3) B70-PS-
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe sleepers - Prior
2944 RFI-5858-QCN-2-0619 RFI-5858-QCN-2-0619 CONCRETE
Backfilling B70-PS-10-F1 : SLD012-SLD058 = 46 nos.
APPROVED 10 B-V-3100-004-2-201-02_4 9.2.b,c S W H 19-Sep-12 7:00 AM 19-Sep-12
Raslaffan Area
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints, and cleaning of Gate # 5 Area
2945 RFI-5858-QCN-2-0620 RFI-5858-QCN-2-0620 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 19-Sep-12 7:30 AM 19-Sep-12
Pipe Track Pedestal D110-B70-PR-21, B70-PR-26, B70-PR-32 Raslaffan
(Section 3) B70-PS-
Check Lean Concrete Pouring for 2 stoppers and 1 pipe track foundations B70-PS-10-
2946 RFI-5858-QCN-2-0621 RFI-5858-QCN-2-0621 CONCRETE APPROVED 10,B70-PR-15 Area B-V-3100-004-2-201-02_4 3.b S W H 19-Sep-12 9:00 AM 19-Sep-12
F2 : SLD0036 & SLD079 = 2 Stoppers and D110-B70-PR-15 = 1 loop
Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints, and cleaning of Gate # 5 Area
2947 RFI-5858-QCN-2-0622 RFI-5858-QCN-2-0622 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 19-Sep-12 7:30 AM 19-Sep-12
Pipe Sleeper Pedestal B70-PS-15-F1 = 50 nos prior shuttering. Raslaffan
2948 9.1. Check surface preparation of Precast Pipe Sleeper Footing and Pedestal B70-PS-03- Section 2 Area
RFI-5858-QCN-2-0623 RFI-5858-QCN-2-0623 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 19-Sep-12 7:30 AM 19-Sep-12
F1 = 30 nos prior first coating. Raslaffan
Section 2 Area
2951 RFI-5858-QCN-2-0626 RFI-5858-QCN-2-0626 CONCRETE Check Setting Out, Line / Level B70-PS-06-F1: SLD041 to SLD036 = 6 nos APPROVED B-V-3100-004-2-201-02_4 3.b S W H 19-Sep-12 9:00 PM 19-Sep-12
Raslaffan
(Section 2) B70-PS-
Check Setting Out, Line/Level. B70-PS-08-F1 : SLD036 To SLD045 = 10 nos B70-PS-06-
2952 RFI-5858-QCN-2-0627 RFI-5858-QCN-2-0627 CONCRETE APPROVED 06, 07 & 08 Area B-V-3100-004-2-201-02_4 3.0.a S W H 19-Sep-12 8:00 AM 19-Sep-12
F1: SLD002 & SLD003 = 2 nos B70-PS-07-F1:SLD093 & SLD094 = 2 nos
Raslaffan
(Section 3) D110-B70-
2953 RFI-5858-QCN-2-0628 RFI-5858-QCN-2-0628 CONCRETE Check Lean Concrete Pouring D110-B70-PR-48 & D110-B70-PR-14 APPROVED PR-48 & 14Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 19-Sep-12 9:30 AM 19-Sep-12
Area
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast Gate # 5 Area
2954 RFI-5858-QCN-2-0629 RFI-5858-QCN-2-0629 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 19-Sep-12 7:30 AM 19-Sep-12
Pipe Sleeper B70-PS-03-F1 = 30 nos Raslaffan
2955 9.2 Check Surface Below Grade Check Protective coating first coat of Precast Pipe Section 2 Area
RFI-5858-QCN-2-0630 RFI-5858-QCN-2-0630 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 19-Sep-12 4:00 PM 19-Sep-12
Sleeper B70-PS-03-F1 = 30 nos prior second coating. Raslaffan
2957 Check Concrete curing D210 - B70 - PR - 44 Pipe Rack Foundation 4(F2),5 (F1),8(F2 & SULPHUR LINE
RFI-5858-QCN-2-0632 RFI-5858-QCN-2-0632 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 19-Sep-12 9.30 AM 19-Sep-12
9(F4) Raslaffan
Check Concrete curing D210 - B70 - PR - 44 Pipe Rack Pedestal 4(F2),5 (F1),8(F2 & BET.MASHRAB TO
2958 RFI-5858-QCN-2-0633 RFI-5858-QCN-2-0633 CONCRETE APPROVED B-V-3100-004-2-201-02_2 3.b S W H 19-Sep-12 8.30 AM 19-Sep-12
9(F4) HAMLA AVENUE
Section 2 Area
2959 RFI-5858-QCN-2-0634 RFI-5858-QCN-2-0634 CONCRETE Check Lean Conrete Pouring:SLD041 to SLD036=6 Nos APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 19-Sep-12 9:00 AM 19-Sep-12
9.2 Check Polyethylene sheet and hardboard of Duct Bank BZDP-005 prior first layer Section 2 Duct Bank
2960 RFI-5858-QCN-2-0635 RFI-5858-QCN-2-0635 CONCRETE
backfilling.
APPROVED
BZDP-005 Raslaffan
B-V-3100-004-2-201-02_4 9.2 b.c S W H 20-Sep-12 7.30 AM 20-Sep-12
9.2 Check Surface Below Grade Check Protective coating second coat of Precast Pipe
2961 RFI-5858-QCN-2-0636 RFI-5858-QCN-2-0636 CONCRETE
Sleeper B70-PS-03-F1 = 30 nos.
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 20-Sep-12 4.30 PM 20-Sep-12
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast
2962 RFI-5858-QCN-2-0637 RFI-5858-QCN-2-0637 CONCRETE
Pipe Sleeper B70-PS-03-F1 = 30 nos
APPROVED Gate 5 TSF Raslaffan B-V-3100-004-2-201-02_4 8.1 R W H 20-Sep-12 4.30 PM 20-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Surface upon Form Removal for 2 pipe stoppers B70-PS-13: SLD018 & Section 4(B70-PS-13
2963 RFI-5858-QCN-2-0638 RFI-5858-QCN-2-0638 CONCRETE APPROVED B-V-3100-004-1-201-01_4 6.3 S W H 20-Sep-12 4.00 PM 20-Sep-12
B70-PS-14: SLD081 & 14) Raslaffan
Check Surface Below ground Protective Coating - First coat D210 - B70 - PR - 44 Pipe SULPHUR LINE
2964 RFI-5858-QCN-2-0639 RFI-5858-QCN-2-0639 CONCRETE
Rack Foundation No. 4(F2),5 (F1),8(F2) & 9(F4)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.2 a S W H 20-Sep-12 7.30 AM 20-Sep-12
Check Surface Below ground Protective Coating - Second coat D210 - B70 - PR - 44 Pipe SULPHUR LINE
2965 RFI-5858-QCN-2-0640 RFI-5858-QCN-2-0640 CONCRETE
Rack Foundation No. 4(F2),5 (F1),8(F2 )& 9(F4)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.2 a S W H 20-Sep-12 3.30 PM 20-Sep-12
6.4 Completion of 14 days curing for Pipe Sleeper B-70-PS-03-F1 = 30 nos and B70-PS-
2966 RFI-5858-QCN-2-0641 RFI-5858-QCN-2-0641 CONCRETE
15-F1 = 10 Nos
APPROVED Gate #5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 20-Sep-12 8.30 AM 20-Sep-12
Culvert BZRC-009
2967 RFI-5858-QCN-2-0642 RFI-5858-QCN-2-0642 CONCRETE 6.4 Completion of 3 days curing for Culvert End Wall and use Curing compound APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 20-Sep-12 8.30 AM 20-Sep-12
Raslaffan
Check Concrete Surface upon Form Removal D210 - B70 - PR - 44 Pipe Rack SULPHUR LINE
2968 RFI-5858-QCN-2-0643 RFI-5858-QCN-2-0643 CONCRETE APPROVED B-V-3100-004-2-201-02_2 6.3 S W H 20-Sep-12 9.30 AM 20-Sep-12
Foundation Pedestal G.L 2,6,7,10&11/D21A & D21B (10 Nos) Raslaffan
9.3 Check Surface Above Grade Pre-cast pipe sleepers - 2nd Coat B70-PS-07: SLD001
2969 RFI-5858-QCN-2-0644 RFI-5858-QCN-2-0644 CONCRETE to SLD053 except SLD0043 & SLD044 = 50 nos and B70-PS-08, SLD062 to SLD093 APPROVED Section 2 Raslaffan B-V-3100-004-1-201-01_4 9.3 S W H 20-Sep-12 8.00 AM 20-Sep-12
except SLD086 & SLD087 = 30 nos
2970 Check Surface preparation of Stopper Foundation B70- PS-03 SLD O28 &SLD078 B70-
RFI-5858-QCN-2-0645 RFI-5858-QCN-2-0645 CONCRETE APPROVED SECTION 1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 20-Sep-12 3.30 PM 20-Sep-12
PS-02 SLD O18
2973 RFI-5858-QCN-2-0648 RFI-5858-QCN-2-0648 CONCRETE CHECK SETTING OUT, LINE / LEVELB70-PS-06: SLD081 AND SLD048 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 22-Sep-12 1.30 PM 22-Sep-12
9.2.B,C CHECK POLYETHYLENE & HARDBOARD INSTALLATION PRE-CAST PIPE (Section 4) D110-
2975 RFI-5858-QCN-2-0650 RFI-5858-QCN-2-0650 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 22-Sep-12 7.00 AM 22-Sep-12
TRACK FOUNDATIONS - PRIOR BACKFILLING D110-B70-PR-65 B70-PR-65 Raslaffan
2977 6.6 A. CHECK SURFACE PREPARATION PRIOR SEALANT APPLICATION OF Gate 5 TSF ( Culvert
RFI-5858-QCN-2-0652 RFI-5858-QCN-2-0652 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.6.a S W H 21-Sep-12 7.30 AM 21-Sep-12
CULVERT BZRC-009. BZRC-009 ) Raslaffan
2979 8.2. CHECK ERECTION OF PRE-CAST OF CULVERT WALL 4 NOS 2 PANEL OF Section 2 Duct Bank
RFI-5858-QCN-2-0654 RFI-5858-QCN-2-0654 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.2 S W H 22-Sep-12 7.30 AM 23-Sep-12
BZRC-009 BZDP-005 Raslaffan
Gate 5 Culvert,
PRE - POURING CHECK FORMWORKS, REINFORCEMENT,EMBEDDED ITEMS AND
2981 RFI-5858-QCN-2-0656 RFI-5858-QCN-2-0656 CONCRETE
CLEANING OF CAST IN SITU CULVERT FOOTING 2 NOS PRIOR CONCRETING.
APPROVED BZRC-009 B-V-3100-004-2-201-02_4 4.1 a.b.d.e W W H 22-Sep-12 6.45 AM 22-Sep-12
RASLAFFAN
(Section 5) B70-PS-
2982 RFI-5858-QCN-2-0657 RFI-5858-QCN-2-0657 CONCRETE CHECK SETTING OUT, LINE/LEVEL. B70-PS-16: SLD079 TO SLD093 = 15 NOS CANCELLED
16 Raslaffan
B-V-3100-004-2-201-02_4 3.0.a S W H 22-Sep-12 9.30 AM 22-Sep-12 Not Ready for inspection
(Section 5) B70-PS-
2983 RFI-5858-QCN-2-0658 RFI-5858-QCN-2-0658 CONCRETE CHECK LEAN CONCRETE POURING B70-PS-16: SLD079 TO SLD093 = 15 NOS CANCELLED
16 Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 22-Sep-12 9.30 AM 22-Sep-12 Non-Availiability of concrete by RMQ
Gate 5 Culvert,
CONCRETE PLACEMENT :5.1. CHECK CONCRETE POURING FOR CAST-IN-SITU
2984 RFI-5858-QCN-2-0659 RFI-5858-QCN-2-0659 CONCRETE
CULVERT FOOTING = 2 NOS OF BZRC-009
APPROVED BZRC-009 B-V-3100-004-2-201-02_4 5.1 W H H 22-Sep-12 7.30 AM 22-Sep-12
RASLAFFAN
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
CHECK CONCRETE POURING D110 - B70 - PR - 01 PIPE RACK FOUNDATION PIPE RACK PR-01
2986 RFI-5858-QCN-2-0661 RFI-5858-QCN-2-0661 CONCRETE
FOOTING 8(F8),9(F9),11(F11),12(F10),13(F12),14(F13)&15(F14)- 7NOS
APPROVED
Raslaffan
B-V-3100-004-2-201-02_2 5.1 W H H 22-Sep-12 9.30 AM 22-Sep-12
CHECK SETTING OUT, LINE/LEVEL. B70-PS-09: SLD006 & SLD009 = 2 NOS B70-PS- (Section 3) B70-PS-
2990 RFI-5858-QCN-2-0665 RFI-5858-QCN-2-0665 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 9/22/2012 9.00 AM 22-Sep-12
10: SLD087 = 1 NOS 09/10 Raslaffan
2992 CHECK LEAN CONCRETE POURING B70-PS-09: SLD006 & SLD009 = 2 NOS B70-PS- (Section 3) B70-PS-
RFI-5858-QCN-2-0667 RFI-5858-QCN-2-0667 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 22-Sep-12 9.30 AM 22-Sep-12 Non-Availiability of concrete by RMQ
10: SLD087 = 1 NOS 09/10 Raslaffan
2997 RFI-5858-QCN-2-0672 RFI-5858-QCN-2-0672 CONCRETE CHECK ERECTION OF PRECAST LOOP FOUNDATION APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_2 8.2 S W H 22-Sep-12 9.30 AM 22-Sep-12
2998 RFI-5858-QCN-2-0673 RFI-5858-QCN-2-0673 CONCRETE CHECK LEAN CONCRETE POURINGB70-PS-06-F1 : SLD081 AND SLD048 CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 22-Sep-12 1.30 PM 22-Sep-12 Non-Availiability of concrete by RMQ
2999 CHECK SURFACE PREPARATION D210 - B70 - PR - 44 PIPE RACK FOUNDATION SULPHUR LINE
RFI-5858-QCN-2-0674 RFI-5858-QCN-2-0674 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 22-Sep-12 4.00 PM 22-Sep-12
PEDESTAL G.L 2,6,7,10&11/D21A & D21B (10 NOS) Raslaffan
3001 ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded Items, Construction joints, Culvert BZRC-009
RFI-5858-QCN-2-0676 RFI-5858-QCN-2-0676 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 23-Sep-12 2:30 PM 23-Sep-12
and cleaning of Cast-in-situ culvert end wall = 1 no and 2 nos Raslaffan Area
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded Items, Construction joints,
Gate # 5 Area
3002 RFI-5858-QCN-2-0677 RFI-5858-QCN-2-0677 CONCRETE and cleaning of Precast Pipe Sleeper Pedest B70-PS-04-F1 = 9 nos B70-PS-05-F1 = 8 APPROVED B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 23-Sep-12 7:30 AM 23-Sep-12
Raslaffan
nos and B70-PS-06-F1 = 13 nos prior shuttering
Check Erection of Pre-cast for Pipe Track Foundations ( loop) D110-B70-PR-64 & D110- Section 4 Area
3003 RFI-5858-QCN-2-0678 RFI-5858-QCN-2-0678 CONCRETE
B70-PR-19
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.2 S W H 23-Sep-12 4:00 PM 23-Sep-12
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe track foundations - Section 4 Area
3004 RFI-5858-QCN-2-0679 RFI-5858-QCN-2-0679 CONCRETE
Prior Backfilling D110-B70-PR-64 & D110-B70-PR-19
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.b,c S W H 23-Sep-12 4:00 PM 23-Sep-12
9.1. Check surface preparation of Precast Culvert 8 nos wall 4 panel base including pipe Gate # 5 Area
3005 RFI-5858-QCN-2-0680 RFI-5858-QCN-2-0680 CONCRETE
sleeper prior first coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 23-Sep-12 7:30 AM 23-Sep-12
9.1. Check surface preparation of Cast-in-situ Pipe Stopper B70-PS-06: SLD013, B70- Section 2 Area
3006 RFI-5858-QCN-2-0681 RFI-5858-QCN-2-0681 CONCRETE
PS-07: SLD019 and B70-PS-08: SLD008 prior first coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 23-Sep-12 8:00 AM 23-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Reinforcement & Cleaning for 2 pipe stoppers - Pedestals prior closing B70-PS-13: Section 2 Area
3007 RFI-5858-QCN-2-0682 RFI-5858-QCN-2-0682 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a W W H 23-Sep-12 7:00 AM 23-Sep-12
SLD018 & B70-PS-14: SLD081 Raslaffan
9.2 Check Surface Below Grade Check Protective coating first coat of Precast Pipe
Section 2 Area
3008 RFI-5858-QCN-2-0683 RFI-5858-QCN-2-0683 CONCRETE Stopper B70-PS-06: SLD013, B70-PS-07: SLD019 and B70-PS-08: SLD008 prior second APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 23-Sep-12 2:00 PM 23-Sep-12
coating
9.2 Check Surface Below Grade Check Protective coating second coat of Precast Pipe
Section 2 Area
3009 RFI-5858-QCN-2-0684 RFI-5858-QCN-2-0684 CONCRETE Sleeper B70-PS-08: SLD001 to SLD029 = 28 nos and B70-PS-09: SLD087 to SLD092 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 23-Sep-12 7.30 AM 23-Sep-12
6 nos.
Check Surface Below ground Protective Coating - First coat B70- PS-03 SLD O28 Section 1 Area
3010 RFI-5858-QCN-2-0685 RFI-5858-QCN-2-0685 CONCRETE
&SLD078 B70- PS-02 SLD O18
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.2.a S W H 23-Sep-12 9.30 AM 23-Sep-12
Check Surface Below ground Protective Coating - Second coat B70- PS-03 SLD O28 Section 1 Area
3011 RFI-5858-QCN-2-0686 RFI-5858-QCN-2-0686 CONCRETE APPROVED B-V-3100-004-2-201-02_3 9.2 a S W H 23-Sep-12 4.10 PM 23-Sep-12
&SLD078 B70- PS-02 SLD O18 Raslaffan
Section 1 (PS-01)
3012 RFI-5858-QCN-2-0687 RFI-5858-QCN-2-0687 CONCRETE Check Lean concrete Setting Out,Line/Level D110 B70-PS-01 SLD024 TO SLD014 APPROVED Area B-V-3100-004-2-201-02_4 3.a S W H 23-Sep-12 9.00 AM 23-Sep-12
Raslaffan
Section 1 (PS-01)
3013 RFI-5858-QCN-2-0688 RFI-5858-QCN-2-0688 CONCRETE Check Lean Concrete Pouring D110 B70-PS-01 SLD024 TO SLD014 (11 nos) APPROVED Area B-V-3100-004-2-201-02_4 3.b S W H 23-Sep-12 1.30 PM 23-Sep-12
Raslaffan
3015 6.3 CHECK CONCRETE SURFACE UPON FORM REMOVAL OF PRECAST PIPE
RFI-5858-QCN-2-0690 RFI-5858-QCN-2-0690 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 24-Sep-12 8.00 AM 24-Sep-12
SLEEPER B70-PS-15-F1 = 60 NOS
3017 RFI-5858-QCN-2-0692 RFI-5858-QCN-2-0692 CONCRETE CHECK LEAN CONCRETE POURINGB70-PS-06-F1 : SLD081 AND SLD048 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 24-Sep-12 8.30 AM 24-Sep-12
CHECK LEAN CONCRETE POURING B70-PS-16: SLD076 TO SLD099 = 24 NOS B70- (Section 5) B70-PS-
3018 RFI-5858-QCN-2-0693 RFI-5858-QCN-2-0693 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 24-Sep-12 9.30 AM 24-Sep-12
PS-15: SLD003 = 1 NOS 15 & 16 Raslaffan
3019 RFI-5858-QCN-2-0694 RFI-5858-QCN-2-0694 CONCRETE CHECK SETTING OUT, LINE / LEVEL D110-B70-PR-07 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 24-Sep-12 8.30 AM 24-Sep-12
3020 RFI-5858-QCN-2-0695 RFI-5858-QCN-2-0695 CONCRETE CHECK LEAN CONCRETE POURINGD110-B70-PR-07 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 24-Sep-12 9.00 AM 24-Sep-12
3021 CHECK LEAN CONCRETE POURING B70-PS-09: SLD006 & SLD009 = 2 NOS B70-PS- (Section 3) B70-PS-
RFI-5858-QCN-2-0696 RFI-5858-QCN-2-0696 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 24-Sep-12 9.30 AM 24-Sep-12
10: SLD087 = 1 NOS 09/10 Raslaffan
3023 SECTION 2,
RFI-5858-QCN-2-0698 RFI-5858-QCN-2-0698 CONCRETE 8.2 CHECK ERECTION OF PRE CAST PIPE TRACK D110-B70-PR-10 APPROVED B-V-3100-004-2-201-02_4 8.2 S W H 24-Sep-12 9.30 AM 24-Sep-12
RASLAFFAN
6.4 COMPLETION OF 14 DAYS CURING FOR CULVERT WALL 4 NOS 2 NOS PANEL
3025 RFI-5858-QCN-2-0700 RFI-5858-QCN-2-0700 CONCRETE
OF BZRC-006
APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 24-Sep-12 8.30 AM 24-Sep-12
CHECK SURFACE BELOW GROUND PROTECTIVE COATING - SECOND COAT D210 SULPHUR LINE
3028 RFI-5858-QCN-2-0703 RFI-5858-QCN-2-0703 CONCRETE
- B70 - PR - 44 PIPE RACK FOUNDATION NO. 2(F7),6 (F3),7(F2 )10(F3)& 11(F8)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_3 9.2 a S W H 24-Sep-12 4.30 PM 24-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
CHECK CONCRETE CURING OF STOPPER PEDESTALS B70- PS-03 SLD O28 SECTION1 (PS-
3032 RFI-5858-QCN-2-0707 RFI-5858-QCN-2-0707 CONCRETE
&SLD078 B70- PS-02 SLD O18
APPROVED
03&PS-02) Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 24-Sep-12 8.30 AM 24-Sep-12
CONCRETE PLACEMENT :5.1. CHECK CONCRETE POURING FOR CAST-IN-SITU Gate 5 Culvert BZRC-
3033 RFI-5858-QCN-2-0708 RFI-5858-QCN-2-0708 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 24-Sep-12 2.00 PM 24-Sep-12
CULVERT WALL 4 NOS OF BZRC-009 009 Raslaffan
CHECK REINFORCEMENT PRIOR TO CLOSE SHUTTERING B70 - PR - 44 PIPE SULPHUR LINE (B70
3034 RFI-5858-QCN-2-0709 RFI-5858-QCN-2-0709 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.1 b W W H 24-Sep-12 9.00 AM 24-Sep-12
RACK FOUNDATION PEDESTAL G.L 3,12,13,14 /D21A & D21B - (8NO.S) - PR - 44 ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in-situ culvert wall 4 nos of Culvert BZRC-009
3035 RFI-5858-QCN-2-0710 RFI-5858-QCN-2-0710 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 22-Sep-12 7.30 AM 25-Sep-12
BZRC-009 Raslaffan
3036 Check Concrete Surface upon Form Removal for 2 pipe stoppers - Footings B70-PS-10: Section 3 (B70-PS-
RFI-5858-QCN-2-0711 RFI-5858-QCN-2-0711 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 25-Sep-12 4.00 PM 25-Sep-12
SLD036 & SLD079 10) Raslaffan
3037 6.4 Completion of 14 days curing for Cast-in-situ Pipe stopper B70-PS-07: SLD019 and
RFI-5858-QCN-2-0712 RFI-5858-QCN-2-0712 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 25-Sep-12 8.30 AM 25-Sep-12
B70-PS-08: SLD008
3038 RFI-5858-QCN-2-0713 RFI-5858-QCN-2-0713 CONCRETE 6.4 Completion of 14 days curing for Cast-in-situ Pipe stopper B70-PS-06: SLD013 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 25-Sep-12 8.30 AM 25-Sep-12
SULPHUR LINE
Check Polyetheylene Installation Check Hardboard Installation D210 - B70 - PR - 44 Pipe
3040 RFI-5858-QCN-2-0715 RFI-5858-QCN-2-0715 CONCRETE APPROVED ( B70 PR-44) B-V-3100-004-2-201-02_3 9 .2 b & c S W H 25-Sep-12 4.30 PM 25-Sep-12
Rack Foundation No. 2(F7),6 (F3),7(F2 )10(F3)& 11(F8)
Raslaffan
5.1 Check Reinforced Concrete Pouring for 2 stopper Pedestals B70-PS-13: SLD018,
3042 RFI-5858-QCN-2-0717 RFI-5858-QCN-2-0717 CONCRETE CANCELLED Section 4 Raslaffan B-V-3100-004-2-201-02_4 5.1 W W H 25-Sep-12 9.00 AM 25-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
B70-PS-14: SLD081
3043 Check concrete surface upon form removal B70 - PR - 01 Pipe Rack Foundation Footing Section 1 (B70 PR
RFI-5858-QCN-2-0718 RFI-5858-QCN-2-0718 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 25-Sep-12 10.00 AM 25-Sep-12
8(F8),9(F9),11(F11),12(F10),13(F12),14(F13)&15(F14)- 7Nos 01) Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)
3044 Gate # 5 Area
RFI-5858-QCN-2-0719 RFI-5858-QCN-2-0719 CONCRETE forcast-in-situ Pipe Track footing D210-B70-PR-44,F1-1NO,F2-2NOS,F4-1NO CCT - APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 26-Sep-12 9:30 AM 26-Sep-12
Raslaffan
QCN-2# 065
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
3045 Gate # 5 Area
RFI-5858-QCN-2-0720 RFI-5858-QCN-2-0720 CONCRETE precast Pipe Sleeper FootingB70-PS-23-F1-14 NOS,PS-24-F1-26NOS,PS-04-F1- APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 26-Sep-12 9:30 AM 26-Sep-12
Raslaffan
9NOS,PS-05-F1-8NS,PS-06-F1-13 NOS.
Pre - Pouring Check Formworks, Reinforcement, cleaning and expansion joints of Pipe Gate # 5 Area
3046 RFI-5858-QCN-2-0721 RFI-5858-QCN-2-0721 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 26-Sep-12 7:00 AM 26-Sep-12
Sleeper Pedestal B70-PS-06-F1 = 30 nos prior concreting. Raslaffan
Concrete Placement : 5.1. Check concrete pouring for Precast Pipe Sleeper Pedestal Gate # 5 Area
3047 RFI-5858-QCN-2-0722 RFI-5858-QCN-2-0722 CONCRETE
B70-PS-06-F1 = 30 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 26-Sep-12 7:30 AM 26-Sep-12
Pre - Pouring Check Formworks, Reinforcement and cleaning of Pipe Sleeper Footing Gate # 5 Area
3048 RFI-5858-QCN-2-0723 RFI-5858-QCN-2-0723 CONCRETE
B70-PS-01-F1 = 17 nos and B70-PS-06-F1 = 13 nos prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.a.b.c.d W W H 26-Sep-12 7:00 AM 26-Sep-12
3049 Concrete Placement : 5.1. Check concrete pouring for Precast Pipe Sleeper Footing B70- Gate # 5 Area
RFI-5858-QCN-2-0724 RFI-5858-QCN-2-0724 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 26-Sep-12 7:30 AM 26-Sep-12
PS-01= 17 nos and B70-PS-06-F1 = 13 nos. Raslaffan
Check Reinforcement & Cleaning for 2 pipe stoppers - Pedestals prior closing B70-PS- Section 3 Area
3050 RFI-5858-QCN-2-0725 RFI-5858-QCN-2-0725 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.d W W H 26-Sep-12 7:30 AM 26-Sep-12
10: SLD036 & SLD079 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Erection of Pre-cast for Pipe Track Foundations ( loop) D110-B70-PR-14 & D110- Section 3 Area
3051 RFI-5858-QCN-2-0726 RFI-5858-QCN-2-0726 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.2 S W H 26-Sep-12 4:00 PM 26-Sep-12
B70-PR-15 Raslaffan
9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe track foundations - Section 3 Area
3052 RFI-5858-QCN-2-0727 RFI-5858-QCN-2-0727 CONCRETE
Prior Backfilling D110-B70-PR-14 & D110-B70-PR-15
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.b,c S W H 26-Sep-12 4:00 PM 26-Sep-12
Culvert BZRC-009
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded Items, Construction joints,
3053 RFI-5858-QCN-2-0728 RFI-5858-QCN-2-0728 CONCRETE
and cleaning of Cast-in-situ culvert end wall prior shuttering.
APPROVED Area B-V-3100-004-2-201-02_4 4.1.b.c.d.e W W H 26-Sep-12 10:30 AM 26-Sep-12
Raslaffan
Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Culvert Gate # 5 Area
3054 RFI-5858-QCN-2-0729 RFI-5858-QCN-2-0729 CONCRETE
Removable panel west side of BZRC-009 prir concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.b.c.d W W H 26-Sep-12 7:00 AM 26-Sep-12
Concrete Placement : 5.1. Check concrete pouring for Precast Culvert Removable Panel Gate # 5 Area
3055 RFI-5858-QCN-2-0730 RFI-5858-QCN-2-0730 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 26-Sep-12 7:30 AM 26-Sep-12
west side of BZRC-009 Raslaffan
(Section 3) B70-PS-
3056 RFI-5858-QCN-2-0731 RFI-5858-QCN-2-0731 CONCRETE Check Lean Concrete Pouring B70-PS-09: SLD006 & SLD009 = 2 nos CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 26-Sep-12 9:00 AM 26-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
09 Raslaffan Area
Surface Below Grade 9.2 Check Polyethylene sheet and hardboard of B70-PS-06: Section 2 Area
3057 RFI-5858-QCN-2-0732 RFI-5858-QCN-2-0732 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 26-Sep-12 7:30 AM 26-Sep-12
SLD013, B70-PS-07: SLD019 and B70-PS-08: SLD008 prior backfilling Raslaffan
(Section 5) B70-PS-
3058 Check Setting Out, Line/Level. For pipe sleepers B70-PS-15: SLD003 to SLD015 = 12
RFI-5858-QCN-2-0733 RFI-5858-QCN-2-0733 CONCRETE CANCELLED 15 Area B-V-3100-004-2-201-02_4 3.0.a S W H 26-Sep-12 9:00 AM 26-Sep-12 Not Ready for inspection
nos For pipe stopper B70-PS-15: SLD004= 1 nos
Raslaffan
9.2 Check Surface Below Grade Check Protective coating first coat of Precast Pipe
3059 Section 2 Area
RFI-5858-QCN-2-0734 RFI-5858-QCN-2-0734 CONCRETE Sleeper B70-PS-09; SLD070 to SLD057 = 15 nos and SLD034 to SLD025 = 10 nos prior APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 26-Sep-12 7:30 AM 26-Sep-12
Raslaffan
second coating.
(Section 5) B70-PS-
3060 Check Lean Concrete Pouring For pipe sleepers B70-PS-15: SLD003 to SLD015 = 12
RFI-5858-QCN-2-0735 RFI-5858-QCN-2-0735 CONCRETE CANCELLED 15 Area B-V-3100-004-2-201-02_4 3.b S W H 26-Sep-12 9:30 AM 26-Sep-12 Not Ready for inspection
nos For pipe stopper B70-PS-15: SLD004= 1 nos
Raslaffan
Culvert BZRC-009
3061 RFI-5858-QCN-2-0736 RFI-5858-QCN-2-0736 CONCRETE 6.1 Check concrete finish prior application of curing compound of BZRC-009. APPROVED Area B-V-3100-004-2-201-02_4 6.1 S S H 26-Sep-12 8:00 AM 26-Sep-12
Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for Gate # 5 Area
3062 RFI-5858-QCN-2-0737 RFI-5858-QCN-2-0737 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S S H 27-Sep-12 9:30 AM 27-Sep-12
Cast-in-situ Duct Bank BZDP-005 CCT-QCN-2-# 69, CCT-QCN-2-# 70 Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, check cleaning and construction / Gate # 5 Area
3063 RFI-5858-QCN-2-0738 RFI-5858-QCN-2-0738 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b.d.e W W H 27-Sep-12 7:30 AM 27-Sep-12
expansion joints of Precast Pipe Sleeper B70-PS-90-F1 = 9 nos prior shuttering. Raslaffan
Check Surface Preparation Above Grade for Pre-cast pipe sleepers B70-PS-09:
Section 3 Area
3064 RFI-5858-QCN-2-0739 RFI-5858-QCN-2-0739 CONCRETE SLD001 to SLD005 & SLD010 to SLD016 = 12 nos and B70-PS-10: SLD062 to APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 27-Sep-12 7:00 AM 27-Sep-12
Raslaffan
SLD090 except SLD087= 27 nos
BZRC-009 Culvert
3065 6.6. a.Check Surface preparation prior application of sealant of culvert wall groove
RFI-5858-QCN-2-0740 RFI-5858-QCN-2-0740 CONCRETE APPROVED Area B-V-3100-004-2-201-02_4 6.6.a S W H 27-Sep-12 8:00 AM 27-Sep-12
( BZRC-009 )
Raslaffan
Check Surface Above Grade for Pre-cast pipe sleepers - 1st coat prior 2 coat B70-PS-09:
3066 Section 3 Area
RFI-5858-QCN-2-0741 RFI-5858-QCN-2-0741 CONCRETE SLD001 to SLD005 & SLD010 to SLD016 = 12 nos and B70-PS-10: SLD062 to APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 27-Sep-12 4:00 PM 27-Sep-12
Raslaffan
SLD090 except SLD087= 27 nos
BZRC-009 Culvert
3067 RFI-5858-QCN-2-0742 RFI-5858-QCN-2-0742 CONCRETE 6.6. b. Check sealant application of culvert wall groove ( BZRC-009 ) APPROVED Area B-V-3100-004-2-201-02_4 6.6.b S W H 27-Sep-12 8:00 AM 27-Sep-12
Raslaffan
Section 2 BZDW-005
3068 RFI-5858-QCN-2-0743 RFI-5858-QCN-2-0743 CONCRETE Check Setting Out, Line / Level Duct Bank BZDW-005 APPROVED Duct Bank Area B-V-3100-004-2-201-02_4 3.b S W H 27-Sep-12 1:10 PM 27-Sep-12
Raslaffan
Section 2 BZDW-005
3069 RFI-5858-QCN-2-0744 RFI-5858-QCN-2-0744 CONCRETE Check Lean Concrete Pouring Duct Bank DZDW-005 CANCELLED Duct Bank Area B-V-3100-004-2-201-02_4 3.b S W H 27-Sep-12 1:30 PM 27-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
Raslaffan
Check Surface Preparation Above Grade for Pre-cast pipe sleepers B70-PS-13: SLD001
Section 4 Area
3070 RFI-5858-QCN-2-0745 RFI-5858-QCN-2-0745 CONCRETE to SLD017, SLD023 to SLD026 & SLD029 to SLD035 = 28 nos and B70-PS-14: SLD082 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 27-Sep-12 7:00 AM 27-Sep-12
to SLD100, SLD103 & SLD0104= 21 nos
Check Surface Above Grade for Pre-cast pipe sleepers- 1st coat prior 2nd coat B70-PS-
Section 4 Area
3071 RFI-5858-QCN-2-0746 RFI-5858-QCN-2-0746 CONCRETE 13: SLD001 to SLD017, SLD023 to SLD026 & SLD029 to SLD035 = 28 nos and B70-PS- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.3 S W H 27-Sep-12 4:00 PM 27-Sep-12
14: SLD082 to SLD100, SLD103 & SLD0104= 21 nos
9.3 Check Surface Above Grade Check Protective coating second coat of Precast Pipe Section 2 Area
3072 RFI-5858-QCN-2-0747 RFI-5858-QCN-2-0747 CONCRETE
Sleeper B70-PS-09; SLD070 to SLD057 = 15 nos and SLD034 to SLD025 = 10 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.3 S W H 27-Sep-12 2:30 PM 27-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Section 1 (PS-02&PS-
Check Polyetheylene Installation Check Hardboard Installation Stopper Foundations
3073 RFI-5858-QCN-2-0748 RFI-5858-QCN-2-0748 CONCRETE APPROVED 03) Area B-V-3100-004-2-201-02_4 9.2.b,c S W H 27-Sep-12 9:30 AM 27-Sep-12
B70- PS-03 SLD O28 &SLD078 B70- PS-02 SLD O18
Raslaffan
Check Setting Out, Line/Level. For pipe sleepers B70-PS-15: SLD003 to SLD023 = 20 (Section 5) B70-PS-
3074 RFI-5858-QCN-2-0749 RFI-5858-QCN-2-0749 CONCRETE
nos For pipe stopper B70-PS-15: SLD004= 1 nos
CANCELLED
15 Raslaffan Area
B-V-3100-004-2-201-02_4 3.0.a S W H 27-Sep-12 9:00 AM 27-Sep-12 Not Ready for inspection
Check Lean Concrete Pouring For pipe sleepers B70-PS-15: SLD003 to SLD023 = 20 (Section 5) B70-PS-
3075 RFI-5858-QCN-2-0750 RFI-5858-QCN-2-0750 CONCRETE
nos For pipe stopper B70-PS-15: SLD004= 1 nos
CANCELLED
15 Raslaffan Area
B-V-3100-004-2-201-02_4 9.2.b,c S W H 27-Sep-12 9:30 AM 27-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
(Section 3) B70-PS-
3076 RFI-5858-QCN-2-0751 RFI-5858-QCN-2-0751 CONCRETE Check Lean Concrete Pouring B70-PS-09: SLD006 & SLD009 = 2 nos CANCELLED 09 Area B-V-3100-004-2-201-02_4 3.b S W H 27-Sep-12 9:00 AM 27-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
Raslaffan
5.1 Check Reinforced Concrete Pouring for 2 stopper Pedestals B70-PS-13: SLD018, Section 4 Area
3077 RFI-5858-QCN-2-0752 RFI-5858-QCN-2-0752 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 5.1 W H H 27-Sep-12 9:00 AM 27-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
B70-PS-14: SLD081 Raslaffan
Check Final Visual Inspection for 3 loops Pipe Track Foundations D110-B70-PR-64, Section 4 Area
3078 RFI-5858-QCN-2-0753 RFI-5858-QCN-2-0753 CONCRETE APPROVED B-V-3100-004-2-201-02_4 10.0 S W H 27-Sep-12 4:00 PM 28-Sep-12
D110-B70-PR-19 & D110-B70-PR-65 Raslaffan
Culvert BZRC-009
9.1. a.Check Surface preparation of Precast Pipe sleeper B70-PS-06-F1 = 30 nos prior
3079 RFI-5858-QCN-2-0754 RFI-5858-QCN-2-0754 CONCRETE APPROVED Area B-V-3100-004-2-201-02_4 9.1.a S W H 27-Sep-12 8:00 AM 27-Sep-12
first coating
Raslaffan
Check Surface Above Grade for Pre-cast pipe sleepers - 2nd coat B70-PS-09: SLD001
3080 Section 3 Area
RFI-5858-QCN-2-0755 RFI-5858-QCN-2-0755 CONCRETE to SLD005 & SLD010 to SLD016 = 12 nos and B70-PS-10: SLD062 to SLD090 except APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 29-Sep-12 4:00 PM 29-Sep-12
Raslaffan
SLD087= 27 nos
Check Surface Above Grade for Pre-cast pipe sleepers- 2nd coat B70-PS-13: SLD001 to
3081 Section 4 Area
RFI-5858-QCN-2-0756 RFI-5858-QCN-2-0756 CONCRETE SLD017, SLD023 to SLD026 & SLD029 to SLD035 = 28 nos nd B70-PS-14: SLD082 to APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 29-Sep-12 4:00 PM 29-Sep-12
Raslaffan
SLD100, SLD103 & SLD0104= 21 nos
BZRC-009 Culvert
3082 Surface About Grade 9.2 a. Check Protective Coating first coat prior second coat of
RFI-5858-QCN-2-0757 RFI-5858-QCN-2-0757 CONCRETE APPROVED Area B-V-3100-004-2-201-02_4 9.2.a S W H 29-Sep-12 8:00 AM 29-Sep-12
Culvert wall 4 nos of Culvert BZRC-009
Raslaffan
BZRC-009 Culvert
Surface About Grade 9.2 a. Check Protective Coating second coat of Culvert wall 4 nos
3083 RFI-5858-QCN-2-0758 RFI-5858-QCN-2-0758 CONCRETE APPROVED Area B-V-3100-004-2-201-02_4 9.2.a S W H 29-Sep-12 4:30 PM 29-Sep-12
of Culvert BZRC-009
Raslaffan
Section 3 Area
3084 RFI-5858-QCN-2-0759 RFI-5858-QCN-2-0759 CONCRETE Check Erection of Pre-cast for Pipe Track Foundations ( loop) D110-B70-PR-48 APPROVED B-V-3100-004-2-201-02_4 8.2 S W H 29-Sep-12 4:00 PM 29-Sep-12
Raslaffan
Section 2 Area
3085 RFI-5858-QCN-2-0760 RFI-5858-QCN-2-0760 CONCRETE Check Lean Concrete Pouring Duct Bank BZDW-005 APPROVED B-V-3100-004-2-201-02_4 3.b S W H 29-Sep-12 8:00 AM 29-Sep-12
Raslaffan
SULPHUR LINE(B70
Check form works,Embedded items,Cleaning& Construction joints B70 - PR - 44 Pipe
3086 RFI-5858-QCN-2-0761 RFI-5858-QCN-2-0761 CONCRETE APPROVED - PR - 44) Area B-V-3100-004-2-201-02_4 4.1.a.c.d.e W W H 29-Sep-12 6:45 AM 29-Sep-12
Rack Foundation Pedestal G.L 3,12,13&14/D21A & D21B (8Nos)
Raslaffan
3087 Check Concrete Pouring B70 - PR - 44 Pipe Rack Foundation Pedestal G.L SULPHUR LINE Area
RFI-5858-QCN-2-0762 RFI-5858-QCN-2-0762 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 29-Sep-12 7:30 AM 29-Sep-12
3,12,13&14/D21A & D21B (8Nos) Raslaffan
3088 9.2.b,c Check Polyethylene & Hardboard Installation Pre-cast pipe track foundations - Section 3 Area
RFI-5858-QCN-2-0763 RFI-5858-QCN-2-0763 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 29-Sep-12 4:00 PM 29-Sep-12
Prior Backfilling D110-B70-PR-48 Raslaffan
BZRC-009 Culvert
3089 Surface Below Grade 9.2. a.Check Protective Coating first coat of Precast Pipe sleeper
RFI-5858-QCN-2-0764 RFI-5858-QCN-2-0764 CONCRETE APPROVED Area B-V-3100-004-2-201-02_4 9.2.a S W H 29-Sep-12 8:00 AM 29-Sep-12
B70-PS-06-F1 = 30 nos prior second coat.
Raslaffan
Check Lean Concrete Pouring For pipe sleepers B70-PS-15: SLD003 to SLD032 except
Section 5 Area
3090 RFI-5858-QCN-2-0765 RFI-5858-QCN-2-0765 CONCRETE SLD028 & SLD029 = 27 nos and B70-PS-16: SLD061 to SLD063 = 3 nos For pipe CANCELLED B-V-3100-004-2-201-02_4 3.b S W H 29-Sep-12 9:30 AM 29-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
Raslaffan
stopper B70-PS-15: SLD004= 1 nos
Check Setting Out, Line/Level. or pipe sleepers B70-PS-15: SLD003 to SLD032 except
Section 5 Area
3091 RFI-5858-QCN-2-0766 RFI-5858-QCN-2-0766 CONCRETE SLD028 & SLD029 = 27 nos and B70-PS-16: SLD061 to SLD063 = 3 nos For pipe APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.0.a S W H 29-Sep-12 9:00 AM 29-Sep-12
stopper B70-PS-15: SLD004= 1 nos
Cheaack from works, Embedded items, Cleaning & Construction joints B70-PR-01 Pipe Pipe Rack PR-01
3092 RFI-5858-QCN-2-0767 RFI-5858-QCN-2-0767 CONCRETE
Rack Foundation Footing 10(F10), 7(F7), 6(F6), 5(F5), 4(F4), 3(F3), - 6 nos.
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 4.1.a.c.d.e W W H 29-Sep-12 7:00 AM 29-Sep-12
Check Concrete Pouring B70 - PR - 44 Pipe Rack Foundation Footing 10(F10), 7(F7), Pipe Rack PR-01
3093 RFI-5858-QCN-2-0768 RFI-5858-QCN-2-0768 CONCRETE
6(F6), 5(F5), 4(F4), 3(F3), - 6 nos.
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 5.1 W H H 29-Sep-12 7:30 AM 29-Sep-12
5.1 Check Reinforced Concrete Pouring for 2 stopper Pedestals B70-PS-13: SLD018, Section 4 Area
3094 RFI-5858-QCN-2-0769 RFI-5858-QCN-2-0769 CONCRETE
B70-PS-14: SLD081
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 29-Sep-12 9:00 AM 29-Sep-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1 Check Surface preparation of Precast Pipe Sleeper B70-PS-16-F1 = 40 nos prior first Section 2 Area
3095 RFI-5858-QCN-2-0770 RFI-5858-QCN-2-0770 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 29-Sep-12 7:30 AM 29-Sep-12
coating Raslaffan
(Section 3) B70-PS-
3096 RFI-5858-QCN-2-0771 RFI-5858-QCN-2-0771 CONCRETE Check Lean Concrete Pouring B70-PS-09: SLD006 & SLD009 = 2 nos CANCELLED 09 Area B-V-3100-004-2-201-02_4 3.b S W H 29-Sep-12 9:00 AM 29-Sep-12 Cancelled non-avaliability of concrete supply from RMQ
Raslaffan
SECTION(PR-02)
Check form works,Embedded items,Cleaning& Construction joints B70 - PR - 02 Pipe
3097 RFI-5858-QCN-2-0772 RFI-5858-QCN-2-0772 CONCRETE
Rack Foundation Footing F1 & F2- 2 (2 Nos)
APPROVED Area B-V-3100-004-2-201-02_4 4.1a.c.d.e W W H 29-Sep-12 7:00 AM 29-Sep-12
Raslaffan
SECTION(PR-02)
Check Concrete Pouring B70 - PR - 02 Pipe Rack Foundation Footing F1 & F2- 2 (2
3098 RFI-5858-QCN-2-0773 RFI-5858-QCN-2-0773 CONCRETE
Nos)
APPROVED Area B-V-3100-004-2-201-02_4 5.1 W H H 29-Sep-12 7:40 AM 29-Sep-12
Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
QG Gate # 5
3099 RFI-5858-QCN-2-0774 RFI-5858-QCN-2-0774 CONCRETE Cast-in-situ culvert end wall at BZRC-009,B70-PS-03-F1=30nos. B70-PS-15-F1=10nos APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 30-Sep-12 9:30 AM 29-Sep-12
Raslaffan Area
TEST RECORD =CCT-QCN-2#076
Check Concrete Surface upon Form Removal for 2 stopper Pedestals B70-PS-13:
3100 RFI-5858-QCN-2-0775 RFI-5858-QCN-2-0775 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 6.2 S W H 30-Sep-12 3:00 PM 29-Sep-12
SLD018, B70-PS-14: SLD081
8.1 Check Marking and curing and confirm readiness prior to shifting / lifting of Precast QG Gate # 5
3101 RFI-5858-QCN-2-0776 RFI-5858-QCN-2-0776 CONCRETE APPROVED B-V-3100-004-2-201-02_4 8.1 R W H 30-Sep-12 8:00 AM 30-Sep-12
Pipe Sleeper B70-PS-06-F1 = 30 nos. Raslaffan Area
3102 Check Surface Preparation Above Grade for Pre-cast pipe sleepers B70-PS-14:
RFI-5858-QCN-2-0777 RFI-5858-QCN-2-0777 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 30-Sep-12 4:00 PM 30-Sep-12
SLD057 to SLD062 & SLD065 to SLD080 = 22 nos
3103 9.2.b Check hardboard and plyethylene sheet of Pipe Sleeper B70-PS-06:SLD001 to
RFI-5858-QCN-2-0778 RFI-5858-QCN-2-0778 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 30-Sep-12 7:30 AM 30-Sep-12
SLD010 = 10 nos and B70-PS-08: SLD037 to SLD045 = 9 nos Prior backfilling.
3104 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
RFI-5858-QCN-2-0779 RFI-5858-QCN-2-0779 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 1-Oct-12 9:30 AM 30-Sep-12
Cast-in-situ pipe stopper Footing (B70-PS-02-SLD018,PS-03SLD
3105 RFI-5858-QCN-2-0780 RFI-5858-QCN-2-0780 CONCRETE Check Setting Out, Line / LevelD110-PR-12: F2, F3, F4 and F5 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 1-Oct-12 8.30 AM 1-Oct-12
3106 RFI-5858-QCN-2-0781 RFI-5858-QCN-2-0781 CONCRETE Check Lean Concrete PouringD110-B70-PR-12: F2, F3, F4 and F5 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 1-Oct-12 9.00 AM 1-Oct-12
Check Lean Concrete Pouring For pipe sleepers B70-PS-15: SLD003 to SLD032 except
3107 RFI-5858-QCN-2-0782 RFI-5858-QCN-2-0782 CONCRETE APPROVED (Section 5) Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 1-Oct-12 9.30 AM 1-Oct-12
SLD028 & SLD029 = 27 nos and B70-PS-16: SLD061 to SLD063 = 3 nos
(Section 3) B70-PS-
3108 RFI-5858-QCN-2-0783 RFI-5858-QCN-2-0783 CONCRETE Check Lean Concrete Pouring B70-PS-09: SLD006 & SLD009 = 2 nos APPROVED B-V-3100-004-2-201-02_4 3.b S W H 1-Oct-12 9.00 AM 1-Oct-12
09 Raslaffan
3109 Pre - Pouring Check Formworks and Cleaning of Cast-in- Situ End wall of BZRC-009 prior Culvert BZRC-009
RFI-5858-QCN-2-0784 RFI-5858-QCN-2-0784 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 a.d. W W H 1-Oct-12 7:00 AM 1-Oct-12
concreting. ( West Side) Raslaffan
3110 RFI-5858-QCN-2-0785 RFI-5858-QCN-2-0785 CONCRETE 5.1. Concrete concrete pouring of Cast-in- Situ Culvert end wall west side of BZRC-009 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W W/S H 1-Oct-12 7.30 AM 1-Oct-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded items
3111 4.1 b.c.d.
RFI-5858-QCN-2-0786 RFI-5858-QCN-2-0786 CONCRETE and cleaning of Precast Pipe Sleeper B70-PS-90-F2 = 5 nos B70-PS-F3 = 3 nos and APPROVED Gate 5 TSF Raslaffan B-V-3100-004-2-201-02_4 W W H 1-Oct-12 7.00 AM 1-Oct-12
e
B70-PS-90-F4 = 12 nos prior shuttering.
Pre - Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Sleeper
3112 RFI-5858-QCN-2-0787 RFI-5858-QCN-2-0787 CONCRETE Footing B70-PS-90-F1 = 9 nos B70-PS-90-F2 = 5 nos, B70-PS-90-F3 = 3 nos and B70- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 a.b.d. W W H 1-Oct-12 7:00 AM 1-Oct-12
PS-90-F4 = 12 nos prior concreting
Check Surface Above Grade for Pre-cast pipe sleepers- 1st coat prior 2nd coat B70-PS-
3113 RFI-5858-QCN-2-0788 RFI-5858-QCN-2-0788 CONCRETE
14: SLD057 to SLD062 & SLD065 to SLD080 = 22 nos
APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 1-Oct-12 10.00 AM 1-Oct-12
5.1. Concrete concrete pouring of Precast Pipe Sleeper pedestal B70-PS-90-F1 = 9 nos,
3114 RFI-5858-QCN-2-0789 RFI-5858-QCN-2-0789 CONCRETE
B70-PS-90-F2 = 5 nos B70-PS-90-F3 = 3 nos and B70-PS-90-F4 = 12 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W W/S H 1-Oct-12 7.30 AM 1-Oct-12
Pre - Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Sleeper
3115 RFI-5858-QCN-2-0790 RFI-5858-QCN-2-0790 CONCRETE Footing B70-PS-17-F1 = 49 nos, B70-PS-18-F1 = 1 no, B70-PS-23-F1 = 13 nos and B70- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 a.b.d. W W H 1-Oct-12 7.00 AM 1-Oct-12
PS-24-F1 = 27 nos prior concreting
5.1. Concrete concrete pouring of Precast Pipe Sleeper footing B70-PS-17-F1 = 49 nos,
3116 RFI-5858-QCN-2-0791 RFI-5858-QCN-2-0791 CONCRETE
B70-PS-18-F1 = 1 no B70-PS-23-F1 = 13 nos and B70-PS-24-F1 = 27 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W W/S H 1-Oct-12 7.30 AM 1-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 14 days curing for Precast Pipe Track Pedestal B70-PR-04, B70-PR-
3117 RFI-5858-QCN-2-0792 RFI-5858-QCN-2-0792 CONCRETE APPROVED Gate 5 TSF Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 1-Oct-12 8.30 AM 1-Oct-12
13, B70-PR-14, B70-PR-15 B70-PR-19 and B70-PR-20" F1 = 12 nos and F2 = 12 nos
3118 RFI-5858-QCN-2-0793 RFI-5858-QCN-2-0793 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Wall = 8 nos of BZRC-006 APPROVED Gate 5 TSF Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 1-Oct-12 8.30 AM 1-Oct-12
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of
3120 RFI-5858-QCN-2-0795 RFI-5858-QCN-2-0795 CONCRETE Precast Pipe Sleeper pedestal B70-PS-F1 = 17 nos and B70-PS-06-FI = 13 nos prior APPROVED Gate 5 TSF Raslaffan B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 2-Oct-12 7.30 AM 2-Oct-12
shuttering.
Check Concrete Surface upon Form Removal D210 B70 - PR - 44 Pipe Rack Foundation SULPHUR LINE
3121 RFI-5858-QCN-2-0796 RFI-5858-QCN-2-0796 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 2-Oct-12 7.30 AM 2-Oct-12
Pedestal G.L 3,12,13&14/D21A & D21B (8Nos) Raslaffan
Check Surface Above Grade for Pre-cast pipe sleepers- 2nd coat B70-PS-14: SLD057 to
3122 RFI-5858-QCN-2-0797 RFI-5858-QCN-2-0797 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 2-Oct-12 4.30 PM 2-Oct-12
SLD062 & SLD065 to SLD080 = 22 nos
Check concrete surface upon form removal D110 B70 - PR - 01 Pipe Rack Foundation Section 1 (B70 PR 01)
3123 RFI-5858-QCN-2-0798 RFI-5858-QCN-2-0798 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 2-Oct-12 9.00 AM 2-Oct-12
Footing 10(F10),7(F7),6(F6),5(F5),4(F4),3(F3)- 6Nos Raslaffan
3124 9.2. b.c. Check hardboard and polyethylene sheet of Pipe Sleeper B70-PS-06: SLD011 to
RFI-5858-QCN-2-0799 RFI-5858-QCN-2-0799 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 2-Oct-12 8.30 AM 2-Oct-12
SLD032 = 21 nos priorbackfilling.
SECTION1 (D110
3125 Check Reinforcement prior to close shuttering D110 B70 - PR -01 Pipe Rack Foundation
RFI-5858-QCN-2-0800 RFI-5858-QCN-2-0800 CONCRETE CANCELLED B70 - PR - 01 ) B-V-3100-004-2-201-02_4 4.1 b W W H 2-Oct-12 3.45 PM 2-Oct-12 Not Ready for inspection
Pedestal G.L 15 - 9 /A,B - (14No.s)
Raslaffan
3126 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
RFI-5858-QCN-2-0801 RFI-5858-QCN-2-0801 CONCRETE APPROVED Gate #5 Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 3-Oct-12 9.30 AM 3-Oct-12
pipe stopper pedastel PS-03-F1=30nos
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
3127 RFI-5858-QCN-2-0802 RFI-5858-QCN-2-0802 CONCRETE Pipe Track footing sulfar area D210-PR-44,F1,F3,F7,F8&F11=5nos,Cast-in-situ pipe APPROVED Gate #5 Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 3-Oct-12 9.30 AM 3-Oct-12
stopper Pedestal (B70-PS-02-SLD019,PS-08-SLD 008),(B70-PS-06-SLD013)
Pre - Pouring Check Formworks, Reinforcement and cleaning of Cast-in- Situ Pipe
3128 RFI-5858-QCN-2-0803 RFI-5858-QCN-2-0803 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 a.b..d W W H 3-Oct-12 7.00 AM 3-Oct-12
Sleeper Footing B70-PS-06: SLD048 & SLD081 prior concreting.
5.1. Concrete Placement Request for Cast-in- Situ Pipe Stopper Footing B70-PS-06:
3129 RFI-5858-QCN-2-0804 RFI-5858-QCN-2-0804 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 3-Oct-12 7.30 AM 3-Oct-12
DLD048 and SLD081
5.1 Check Reinforced Concrete Pouring for 2 stopper Pedestals B70-PS-10: SLD036 &
3130 RFI-5858-QCN-2-0805 RFI-5858-QCN-2-0805 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 3-Oct-12 9.00 AM 3-Oct-12
SLD079
Check Reinforced Concrete Pre-Pouring for 2 stopper Pedestals B70-PS-10: SLD036 &
3131 RFI-5858-QCN-2-0806 RFI-5858-QCN-2-0806 CONCRETE SLD079 4.1.a Check Formworks. 4.1.b Check Reinforcment. , 4.1.c Check Embedded APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 3-Oct-12 8.30 AM 3-Oct-12
Items., 4.1.d Check Cleaning.
3132 6.1 Check concrete finish prior curing compound application of Culvert End wall of BZRC- Culvert BZRC-009
RFI-5858-QCN-2-0807 RFI-5858-QCN-2-0807 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.1 S S H 3-Oct-12 7.30 AM 3-Oct-12
009 west side Raslaffan
3133 RFI-5858-QCN-2-0808 RFI-5858-QCN-2-0808 CONCRETE Check Setting Out, Line/Level For Duct Bank BZDW 006 APPROVED (Section 3) Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 3-Oct-12 9.00 AM 3-Oct-12
3134 RFI-5858-QCN-2-0809 RFI-5858-QCN-2-0809 CONCRETE Check Lean Concrete Pouring For Duct Bank BZDW 006 APPROVED (Section 3) Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 4-Oct-12 9.30 AM 4-Oct-12
6.3 Check Form Removal of Precast Pipe Sleeper B70-PS-90-F1 = 9 nos, B70-PS-90-F2 Gate 5 Culvert BZRC-
3135 RFI-5858-QCN-2-0810 RFI-5858-QCN-2-0810 CONCRETE
= 5 nos, B70-PS-90-F3 = 3 nos and B70-PS-90-F4 = 12 nos
APPROVED
009 Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 3-Oct-12 9.00 AM 3-Oct-12
Check Setting Out, Line/Level. For pipe sleepers B70-PS-15: SLD033 to SLD040 = 8 nos
3136 RFI-5858-QCN-2-0811 RFI-5858-QCN-2-0811 CONCRETE
For Pipe Track Foundation ( loop) B70-PR-20
APPROVED (Section 5) Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 3-Oct-12 9.00 AM 3-Oct-12
Check Lean Concrete Pouring For pipe sleepers B70-PS-15: SLD033 to SLD040 = 8 nos
3137 RFI-5858-QCN-2-0812 RFI-5858-QCN-2-0812 CONCRETE
For Pipe Track Foundation ( loop) B70-PR-20
APPROVED (Section 5) Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 3-Oct-12 9.30 AM 3-Oct-12
Check Lean concrete Setting Out,Line/Level DUCT BANK BZDP 002& DUCT BANK
3138 RFI-5858-QCN-2-0813 RFI-5858-QCN-2-0813 CONCRETE
BZDW 001
APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 3-Oct-12 7.00 AM 3-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
3139 RFI-5858-QCN-2-0814 RFI-5858-QCN-2-0814 CONCRETE Check Lean Concrete Pouring DUCT BANK BZDP 002& DUCT BANK BZDW 001 APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_4 3.0 b S W H 3-Oct-12 7.30 AM 3-Oct-12
9.2 a. Check Protective Coating first coat prior second coat of Culvert End wall of BZRC- BZRC-009 Culvert
3140 RFI-5858-QCN-2-0815 RFI-5858-QCN-2-0815 CONCRETE
009 west side
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 3-Oct-12 4.00 PM 3-Oct-12
9.2. b.c. Check hardboard and polyethylene sheet of Culvert Wall West side including Culvert BZRC-009
3141 RFI-5858-QCN-2-0816 RFI-5858-QCN-2-0816 CONCRETE
Culvert End Wall prior backfilling.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.b,c S W H 4-Oct-12 7.30 AM 4-Oct-12
BZRC-009 Culvert
3142 RFI-5858-QCN-2-0817 RFI-5858-QCN-2-0817 CONCRETE 9.2 a. Check Protective Coating second coat of Culvert End wall of BZRC-009 west side APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 4-Oct-12 7.00 AM 4-Oct-12
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-06-F1 = 30 nos and B70-
3143 RFI-5858-QCN-2-0818 RFI-5858-QCN-2-0818 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 4-Oct-12 8.00 AM 4-Oct-12
PS-15-F1 = 10 nos prior first coating
Check Surface Preparation Above Grade For Pipe Sleepers B70-PS-10: SLD027 to
3144 RFI-5858-QCN-2-0819 RFI-5858-QCN-2-0819 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 4-Oct-12 7.00 AM 4-Oct-12
SLD059 except SLD025 = 32 nos
9.2.b.c Check Surface Below Grade- Polyethylene & Hardboard Installation For Pipe
3145 RFI-5858-QCN-2-0820 RFI-5858-QCN-2-0820 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 4-Oct-12 6.30 AM 4-Oct-12
Sleepers B70-PS-16: SLD061, SLD062 & SLD063
3146 9.2. b.c. Check hardboard and polyethylene sheet of Pipe Sleeper B70-PS-06: SLD011 to
RFI-5858-QCN-2-0821 RFI-5858-QCN-2-0821 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 4-Oct-12 7.30 AM 4-Oct-12
SLD032 = 21 nos prior backfilling.
Pre - Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Sleeper
3147 RFI-5858-QCN-2-0822 RFI-5858-QCN-2-0822 CONCRETE Footing B701-PS-18-F1 = 31 nos and B70-PS-19-F1 = 17 nos and B70-PS-20-F1 = APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 a.b..d W W H 4-Oct-12 7.00 AM 4-Oct-12
2 nos. prior concreting.
3148 Check Surface preparation D210 B70 - PR - 44 Pipe Rack Foundation Pedestal G.L SULPHUR LINE
RFI-5858-QCN-2-0823 RFI-5858-QCN-2-0823 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 4-Oct-12 4.00 PM 4-Oct-12
3,12,13&14/D21A & D21B (8Nos) Raslaffan
5.1. Concrete Placement Request for Precast Pipe Sleeper Footing B70-PS-18-F1 = 31
3149 RFI-5858-QCN-2-0824 RFI-5858-QCN-2-0824 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 4-Oct-12 7.30 AM 4-Oct-12
nos, B70-PS-19-F1 = 17 nos and B70-PS-20-F1 = 2 nos
5.1. Concrete Placement Request for Precast Pipe Sleeper Perestals Footing B70-PS-01-
3151 RFI-5858-QCN-2-0826 RFI-5858-QCN-2-0826 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 4-Oct-12 7.30 AM 4-Oct-12
F1 = 17 nos and B70-PS-06-F1 = 13 nos
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-06-F1 = 30 nos and B70-
3152 RFI-5858-QCN-2-0827 RFI-5858-QCN-2-0827 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 4-Oct-12 7.30 AM 4-Oct-12
PS-15-F1 = 10 nos prior first coating
3153 Check Surface Above Grade For Pipe Sleepers B70-PS-10: SLD027 to SLD059 except
RFI-5858-QCN-2-0828 RFI-5858-QCN-2-0828 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 4-Oct-12 3.00 PM 4-Oct-12
SLD025 = 32 nos - 1st coat prior 2nd coat
3154 RFI-5858-QCN-2-0829 RFI-5858-QCN-2-0829 CONCRETE Check Concrete Curing for 2 stopper Footings B70-PS-13: SLD018, B70-PS-14: SLD081 APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 4-Oct-12 7.00 AM 4-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
3156 RFI-5858-QCN-2-0831 RFI-5858-QCN-2-0831 CONCRETE Pre-cast culvert wall-4nos,BZRC-006&B70-PS-06-SLD013 stopper pedestal TEST APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 6-Oct-12 9.30 AM 6-Oct-12
REPORT=CCT-QCN-2#078
Check Surface Above Grade For Pipe Sleepers B70-PS-10: SLD027 to SLD059 except
3157 RFI-5858-QCN-2-0832 RFI-5858-QCN-2-0832 CONCRETE
SLD025 = 32 nos - 1st coat prior 2nd coat
APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 5-Oct-12 11.00 AM 5-Oct-12
SECTION1 (D110
Check Reinforcement prior to close shuttering D110 B70 - PR -01 Pipe Rack
3158 RFI-5858-QCN-2-0833 RFI-5858-QCN-2-0833 CONCRETE
Foundation Pedestal G.L 15 - 9 /A,B - (14No.s)
APPROVED B70 - PR - 01 ) B-V-3100-004-2-201-02_4 4.1.b S W H 5-Oct-12 7.00 AM 5-Oct-12
Raslaffan
Check Sureface Above Grade For Pipe Sleeper B70-PS-10 SLD027 to SLD059 except
3159 RFI-5858-QCN-2-0834 RFI-5858-QCN-2-0834 CONCRETE
SLD025 = 32 nos - 2 ed coat
APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 6-Oct-12 11.00 AM 6-Oct-12
Check Concrete Surface upon Form Removal for Pipe Stoppers - Pedestals B70-PS-10:
3160 RFI-5858-QCN-2-0835 RFI-5858-QCN-2-0835 CONCRETE
SLD036 & SLD079 = 2 nos
APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 6-Oct-12 2.00 PM 6-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30 AM
Check Surface Above Grade For Pipe Sleepers - Surface Preparation, 1st coat & 2nd
3161 RFI-5858-QCN-2-0836 RFI-5858-QCN-2-0836 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 6-Oct-12 To 6-Oct-12
Coat B70-PS-16: SLD061, SLD062 & SLD063
4:30 PM
9.2. b.c. Check hardboard and polyethylene sheet of Culvert Wall West side including Culvert BZRC-009
3162 RFI-5858-QCN-2-0837 RFI-5858-QCN-2-0837 CONCRETE
Culvert End Wall 1.2 meter height.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.b,c S W H 5-Oct-12 8.00 AM 5-Oct-12
Check Pre-Pouring For Pipe Stopper Footing B70-PS-15: SLD004 a) Check Formwork. b)
3163 RFI-5858-QCN-2-0838 RFI-5858-QCN-2-0838 CONCRETE
Check Reinforcement., c) Check Cleaning.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 6-Oct-12 8.00 AM 6-Oct-12
3164 RFI-5858-QCN-2-0839 RFI-5858-QCN-2-0839 CONCRETE Check Concrete Pouring For Pipe Stopper Footing B70-PS-15: SLD004 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W W H 6-Oct-12 9.00 AM 6-Oct-12
9.2 a. Check Protective Coating first coat prior second coat of Pipe Stopper Pedestal
3165 RFI-5858-QCN-2-0840 RFI-5858-QCN-2-0840 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 6-Oct-12 10.00 AM 6-Oct-12
B70-PS-06: SLD013, B70-PS-07: SLD019 and B70-PS-08: SLD008.
3166 RFI-5858-QCN-2-0841 RFI-5858-QCN-2-0841 CONCRETE Check Setting Out, Line/Level For Pipe Sleeper B70-PS-15: SLD041 to SLD054 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 6-Oct-12 9.00 AM 6-Oct-12
3167 RFI-5858-QCN-2-0842 RFI-5858-QCN-2-0842 CONCRETE Check Lean Concrete Pouring For Pipe Sleeper B70-PS-15: SLD041 to SLD063 = 23 nos APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 6-Oct-12 9.30 AM 6-Oct-12
3168 9.2. Check hardboard and polyethylene sheet of Pipe Sleeper B70-PS-06: SLD035 to
RFI-5858-QCN-2-0843 RFI-5858-QCN-2-0843 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 6-Oct-12 9.30 AM 6-Oct-12
SLD050 = 15 nos prior backfilling
3170 9.2 a. Check Protective Coating first coat prior second coat of Pipe Sleeper B70-PS-06-
RFI-5858-QCN-2-0845 RFI-5858-QCN-2-0845 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 6-Oct-12 8.00 AM 6-Oct-12
F1 = 30 nos
Check Surface Preparation Above Grade For Pipe Sleepers B70-PS-10: SLD012 to
3171 RFI-5858-QCN-2-0846 RFI-5858-QCN-2-0846 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 7-Oct-12 4:00 PM 7-Oct-12
SLD025 = 14 nos
3172 RFI-5858-QCN-2-0847 RFI-5858-QCN-2-0847 CONCRETE Check Surface Preparation for Pipe Stoppers B70-PS-10: SLD036 & SLD079 = 2 nos APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 10.0 S W H 7-Oct-12 4:00 PM 7-Oct-12
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of
Gate 5 TSF
3173 RFI-5858-QCN-2-0848 RFI-5858-QCN-2-0848 CONCRETE Precast Pipe Sleeper pedestal B70-PS-23-F1 = 13 nos and B70-PS-24-FI = 27 nos prior APPROVED B-V-3100-004-2-201-02_4 4.1 b.d.e W W H 7-Oct-12 7:00 AM 7-Oct-12
Raslaffan
shuttering.
Pre - Pouring Check Formworks, Reinforcement, embedded items, construction joint and
4.1 a.b.c.d.
3174 RFI-5858-QCN-2-0849 RFI-5858-QCN-2-0849 CONCRETE cleaning of Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 13 nos and B70-PS-24-F1 = APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 W W H 7-Oct-12 1:00 PM 7-Oct-12
e
27 nos prior concreting.
3175 5.1. Concrete Placement Request for Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 13
RFI-5858-QCN-2-0850 RFI-5858-QCN-2-0850 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 8-Oct-12 1:30 PM 8-Oct-12
nos, B70-PS-24-F1 = 27 nos
3176 9.2 a. Check Protective Coating second coat of Pipe Stopper Pedestal B70-PS-06:
RFI-5858-QCN-2-0851 RFI-5858-QCN-2-0851 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 7-Oct-12 9:00 AM 7-Oct-12
SLD013, B70-PS-07: SLD019 and B70-PS-08: SLD008.
3177 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-01-F1 =
RFI-5858-QCN-2-0852 RFI-5858-QCN-2-0852 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 7-Oct-12 7:30 AM 7-Oct-12
13 nos and B70-PS-06-F1 = 17 nos
3178 RFI-5858-QCN-2-0853 RFI-5858-QCN-2-0853 CONCRETE 9.2 a. Check Protective coating second coat of Pipe Sleeper B70-PS-06-F1 = 30 nos APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 7-Oct-12 7:30 AM 7-Oct-12
8.1. Check Marking and curing and confirm readiness prior to shifting / lifting of Precast Gate 5 TSF
3179 RFI-5858-QCN-2-0854 RFI-5858-QCN-2-0854 CONCRETE
Pipe Sleeper B70-PS-06-F1 = 30 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 8.1 R W H 7-Oct-12 8:00 AM 7-Oct-12
6.6. a.Check Surface preparation prior application of sealant of culvert wall groove BZRC-009 Culvert
3180 RFI-5858-QCN-2-0855 RFI-5858-QCN-2-0855 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.6 a. S W H 7-Oct-12 7:30 AM 7-Oct-12
( BZRC-009 ) west side. Raslaffan
BZRC-009 Culvert
3181 RFI-5858-QCN-2-0856 RFI-5858-QCN-2-0856 CONCRETE 6.6. b. Check sealant application of culvert wall groove ( BZRC-009 ) west side. APPROVED B-V-3100-004-2-201-02_4 6.6 b. S W H 7-Oct-12 7:30 AM 7-Oct-12
Raslaffan
3182 Check Polyetheylene Installation Check Hardboard Installation B70-PS-02 SLD 001 TO SECTION1
RFI-5858-QCN-2-0857 RFI-5858-QCN-2-0857 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 7-Oct-12 7:00 AM 7-Oct-12
SLD 033 & B70-PS-01 SLD 002,SLD 003& SLD004 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface Below ground Protective Coating - First coat D210 B70 - PR - 44 Pipe
3185 RFI-5858-QCN-2-0860 RFI-5858-QCN-2-0860 CONCRETE Rack Foundation Pedestal G.L 3,12,13&14/D21A & D21B (8Nos) & Curing for G.L.3 APPROVED SULPHUR AREA B-V-3100-004-2-201-02_4 9.1 S S H 7-Oct-12 9:30 AM 7-Oct-12
(F5),12 (9A/9B),13 (F11), 14 (F10)
Check Surface Concrete Surface upon Form Removal for Pipe Stoppers - footing B70-
3186 RFI-5858-QCN-2-0861 RFI-5858-QCN-2-0861 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 7-Oct-12 4:00 PM 7-Oct-12
PS-15: SLD004
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
3187 Gate 5 TSF
RFI-5858-QCN-2-0862 RFI-5858-QCN-2-0862 CONCRETE Cast-in- Situ of Pipe Track footing D210-PR-44, F9a and F9b.TEST REPORT=CCT-QCN- APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 8-Oct-12 9:30AM 8-Oct-12
Raslaffan
2#081
3189 Check Concrete Curing for Pipe Stoppers - Using Curing Compound B70-PS-10: SLD036
RFI-5858-QCN-2-0864 RFI-5858-QCN-2-0864 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 8-Oct-12 4:00 PM 8-Oct-12
& SLD079 = 2 nos
3190 Check Surface Above Grade - 1st coat prior 2nd coat For Pipe Sleepers B70-PS-10:
RFI-5858-QCN-2-0865 RFI-5858-QCN-2-0865 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 8-Oct-12 7:00 AM 8-Oct-12
SLD012 to SLD025 = 14 nos
Check Surface Above Grade - 2nd coat For Pipe Sleepers B70-PS-10: SLD012 to
3191 RFI-5858-QCN-2-0866 RFI-5858-QCN-2-0866 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 8-Oct-12 4:00 PM 8-Oct-12
SLD025 = 14 nos
3192 Check Reinforcement prior closing formworks for Pipe Stoppers - Pedestal B70-PS-15:
RFI-5858-QCN-2-0867 RFI-5858-QCN-2-0867 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1.b W W H 8-Oct-12 7:00 AM 8-Oct-12
SLD004
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of
3193 Gate 5 TSF
RFI-5858-QCN-2-0868 RFI-5858-QCN-2-0868 CONCRETE Precast Pipe Sleeper pedestal B70-PS-17-F1 = 49 nos and B70-PS-18-FI = 1 nos prior APPROVED B-V-3100-004-2-201-02_4 4.1 b.d. e W W H 8-Oct-12 7:00 AM 8-Oct-12
Raslaffan
shuttering.
9.2. b.c. Check hardboard and polyethylene sheet of Culvert cover West side prior Culvert BZRC-009
3194 RFI-5858-QCN-2-0869 RFI-5858-QCN-2-0869 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.b,c S W H 8-Oct-12 8:00 AM 8-Oct-12
backfilling. Raslaffan
3195 Completion of 14 days Curing of Footing D110 - B70 - PR - 01 Pipe Rack Foundation PIPE RACK PR - 01
RFI-5858-QCN-2-0870 RFI-5858-QCN-2-0870 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 8-Oct-12 7:00 AM 8-Oct-12
8(F8),9(F9),11(F11),12(F10),13(F12),14(F13)&15(F14)- 7Nos
9.2. Check hardboard and polyethylene sheet of Pipe Sleeper B70-PS-06: SLD035 to
3196 RFI-5858-QCN-2-0871 RFI-5858-QCN-2-0871 CONCRETE
SLD050 = 15 nos prior backfilling
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 8-Oct-12 1:30 PM 8-Oct-12
Check Concrete Curing D210 B70 - PR - 44 Pipe Rack Foundation Pedestal G.L
3197 RFI-5858-QCN-2-0872 RFI-5858-QCN-2-0872 CONCRETE APPROVED SULPHUR AREA B-V-3100-004-2-201-02_4 6.4 S W H 8-Oct-12 7:20 AM 8-Oct-12
3,12,13&14/D21A & D21B (8Nos)
Check Setting Out, Line/Level For Pipe Sleeper B70-PS-15: SLD055 to SLD069 = 15 nos
Section 3 & 5
3198 RFI-5858-QCN-2-0873 RFI-5858-QCN-2-0873 CONCRETE B70-PS-09 : SLD007 & SLD008 = 2 nos, B70-PS-10: SLD010, SLD011, SLD060 & APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.0.a S W H 8-Oct-12 9:00 AM 8-Oct-12
SLD061 = 4 nos
Check Setting Out,Line/Level B70 - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD 027- SECTION1
3199 RFI-5858-QCN-2-0874 RFI-5858-QCN-2-0874 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.a S W H 8-Oct-12 7:10 AM 8-Oct-12
NOT INCLUDED) & PS- 04 SLD 027 TO SLD020 Raslaffan
Check Lean Concrete Pouring B70 - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD 027- SECTION1
3200 RFI-5858-QCN-2-0875 RFI-5858-QCN-2-0875 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 9-Oct-12 8:00 AM 9-Oct-12
NOT INCLUDED) & PS- 04 SLD 027 TO SLD020 Raslaffan
6.6. a.Check Surface preparation prior of Precast Pipe Sleeper B70-PS-23-F1 = 14 nos
3201 RFI-5858-QCN-2-0876 RFI-5858-QCN-2-0876 CONCRETE
and B70-PS-26-F1 = 26 nos prior first coating
APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_4 6.6.a S W H 8-Oct-12 1:30 PM 8-Oct-12
Check Lean Concrete Pouring For Pipe Sleeper B70-PS-15: SLD055 to SLD069 = 15 nos
Section 3 & 5
3202 RFI-5858-QCN-2-0877 RFI-5858-QCN-2-0877 CONCRETE B70-PS-09 : SLD007 & SLD008 = 2 nos, B70-PS-10: SLD010, SLD011, SLD060 & APPROVED B-V-3100-004-2-201-02_4 3.0.b S S H 8-Oct-12 9:30 AM 8-Oct-12
Raslaffan
SLD061 = 4 nos
9.2 a. Check Protective Coating first coat of Precast Pipe Track D110-B70-PR-21, B70-
3203 RFI-5858-QCN-2-0878 RFI-5858-QCN-2-0878 CONCRETE PR-26, B70-PR-32, B70-PR-47 B70-PR-48 and B70-PR-65, Total F1 = 12 nos and F2 = APPROVED SECTION1 2 B-V-3100-004-2-201-02_4 9.2.a S W H 8-Oct-12 7:00 AM 8-Oct-12
12 nos. prior second coat.
Check Surface Below ground Protective Coating - Second coat D210 B70 - PR - 44 Pipe
3204 RFI-5858-QCN-2-0879 RFI-5858-QCN-2-0879 CONCRETE
Rack Foundation Pedestal G.L 3,12,13&14/D21A & D21B (8Nos)
APPROVED SULPHUR AREA B-V-3100-004-2-201-02_4 9.2.a S W H 9-Oct-12 9:30 AM 9-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Curing for Pipe Stoppers - Footings B70-PS-10: SLD036 & SLD079 = 2
3205 RFI-5858-QCN-2-0880 RFI-5858-QCN-2-0880 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 7:00 AM 9-Oct-12
nos
7:00 AM
3206 Check Surface Below Grade for Pipe Stoppers (Footings) Protective Coating 1st & 2nd
RFI-5858-QCN-2-0881 RFI-5858-QCN-2-0881 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 9-Oct-12 To 9-Oct-12
layers B70-PS-10: SLD036 & SLD079 = 2 nos
4:00 PM
3207 Pre - Pouring Check Formworks, Reinforcement and cleaning of Pire Track D110-B70-
RFI-5858-QCN-2-0882 RFI-5858-QCN-2-0882 CONCRETE APPROVED Section Raslaffan B-V-3100-004-2-201-02_3 4.1 a.b..d W W H 9-Oct-12 1:00 PM 9-Oct-12
PR-12, F2, F3, F4 and F5 prior concreting.
5.1. Concrete Placement Request for Cast-in- Situ Pipe Track Footing D110-PR-12: F3,
3208 RFI-5858-QCN-2-0883 RFI-5858-QCN-2-0883 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_3 5.1 W H H 9-Oct-12 1:15 PM 9-Oct-12
F4 and F5
3209 Pre - Pouring Check Formworks, embedded item and cleaning of Duct Bank BZDW-005
RFI-5858-QCN-2-0884 RFI-5858-QCN-2-0884 CONCRETE APPROVED Section Raslaffan B-V-3100-004-2-201-02_3 4.1 a.b.c.d W W H 9-Oct-12 1:00 PM 9-Oct-12
prior concreting.
BZDW-005 Section 2
3210 RFI-5858-QCN-2-0885 RFI-5858-QCN-2-0885 CONCRETE 5.1. Concrete Placement Request for Cast-in- Situ Duct Bank BZDW-005 APPROVED B-V-3100-004-2-201-02_3 5.1 W H H 9-Oct-12 1:15 PM 9-Oct-12
Raslaffan
3211 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing and Pedestal B70-PS- Gate 5 TSF
RFI-5858-QCN-2-0886 RFI-5858-QCN-2-0886 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 8:30 AM 9-Oct-12
15-F1 = 50 nos and B70-PS-16-F1 = 40 nos Raslaffan
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing and Pedestal B70-PS-
3212 Gate 5 TSF
RFI-5858-QCN-2-0887 RFI-5858-QCN-2-0887 CONCRETE 06-F1 = 30 nos, B70-PS-05-F1 = 8 nos B70-PS-04-F1 = 9 nos and B70-PS-06-F1 = 13 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 8:30 AM 9-Oct-12
Raslaffan
nos
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 14 Gate 5 TSF
3213 RFI-5858-QCN-2-0888 RFI-5858-QCN-2-0888 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 8:30 AM 9-Oct-12
nos and B70-PS-24-F1 = 26 nos Raslaffan
3214 6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-15-F1 = 60 Gate 5 TSF
RFI-5858-QCN-2-0889 RFI-5858-QCN-2-0889 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 8:30 AM 9-Oct-12
nos and Pipe Track Pedestal D110-B70-PR-21, 26, 32, 47, 48 and 65 Raslaffan
3215 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-90-F1 = 9 Gate 5 TSF
RFI-5858-QCN-2-0890 RFI-5858-QCN-2-0890 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 9-Oct-12 8:30 AM 9-Oct-12
nos, B70-PS-90-F2 = 3 nos B70-PS-90-F3 = 3 nos, B70-PS-90-F4 = 12 nos Raslaffan
3216 RFI-5858-QCN-2-0891 RFI-5858-QCN-2-0891 CONCRETE Check Final Visual Inspection For Pipe Sleepers B70-PS-16: SLD061, SLD062 & SLD063 CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 10.0 S W H 9-Oct-12 9:00 AM 9-Oct-12 Not Ready for inspection
3217 Check Reinforcement prior to close shuttering D110 B70 - PR -01 Pipe Rack Foundation SECTION1 (D110
RFI-5858-QCN-2-0892 RFI-5858-QCN-2-0892 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 b W W H 9-Oct-12 7:30 AM 9-Oct-12
Pedestal G.L 8 - 3 /A,B - (12No.s) B70 - PR - 01 )
Check Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 15 -
3219 RFI-5858-QCN-2-0894 RFI-5858-QCN-2-0894 CONCRETE CANCELLED D110 B70 - PR - 01 B-V-3100-004-2-201-02_4 5.1 W H H 9-Oct-12 1:00 PM 9-Oct-12 Not Ready for inspection
9 /A,B - (14No.s)
Check Surface preparation of Pipe Sleeper Foundation -Above ground B70 - PS-03
3220 RFI-5858-QCN-2-0895 RFI-5858-QCN-2-0895 CONCRETE APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 9-Oct-12 7:30 AM 9-Oct-12
SLD001 TO SLD 055,PS-02 SLD 001 TO SLD033& PS-01SLD 002,SLD 003 &SLD04
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Gate 5 TSF
3221 RFI-5858-QCN-2-0896 RFI-5858-QCN-2-0896 CONCRETE Concrete Cast-in- Situ of Pipe Track footing D210-PR-44, F3, F5, F10,Cast-in- Situ of APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 10-Oct-12 9:30AM 10-Oct-12
Pipe Track Pedestal D210-PR-44, F1 = 1 no, F2 = 2 nos and F4 = 1 no.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Concrete Precast Pipe Sleeper Pedestal B70-PS-16-F1 = 40 nos,Precast Pipe Sleeper
Gate 5 TSF
3222 RFI-5858-QCN-2-0897 RFI-5858-QCN-2-0897 CONCRETE Footing B70-PS-04-F1 = 9 nos, B70-PS-05-F1 = 8 nos and B70-PS-06-F1 = 13 APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 10-Oct-12 9:30AM 10-Oct-12
Raslaffan
nos.Precast Pipe Sleeper Pedestal B70-PS-06-F1 = 30 nos.Precast Pipe Sleeper Footing
B70-PS-15-F1 = 50 nos
Check Polyethylene & Hardboard Installation for pipe stopper - prior backfilling B70-PS-
3223 RFI-5858-QCN-2-0898 RFI-5858-QCN-2-0898 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 10-Oct-12 7:00 AM 10-Oct-12
10: SLD036 & SLD079 = 2 nos
4.1.a.c Check Formwork, Embedded Items Pre- Pouring for Pipe Stopper - Pedestal B70-
3224 RFI-5858-QCN-2-0899 RFI-5858-QCN-2-0899 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 10-Oct-12 7:00 AM 10-Oct-12
PS-15: SLD004
3225 RFI-5858-QCN-2-0900 RFI-5858-QCN-2-0900 CONCRETE Check Concrete Pouring for Pipe Stopper - Pedestal B70-PS-15: SLD004 CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 10-Oct-12 7:30 AM 10-Oct-12
9.2 a. Check Protective Coating first coat of Precast Pipe Sleeper B70-PS-23-F1 = 14 nos
3226 RFI-5858-QCN-2-0901 RFI-5858-QCN-2-0901 CONCRETE
and B70-PS-24-F1 = 26 nos prior to second coat
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 10-Oct-12 7:00 AM 10-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
SECTION 1
3227 RFI-5858-QCN-2-0902 RFI-5858-QCN-2-0902 CONCRETE Check final visual inspection B70-PR-03,B70-PR-04 &B70-PR-05 CANCELLED B-V-3100-004-2-201-02_4 10.0 S W H 10-Oct-12 9:00 AM 10-Oct-12 Not Ready for inspection
Raslaffan
3228 Check Concrete Surface upon Form Removal for Precast Pipe Sleeper Pedestals B70- Gate 5 TSF
RFI-5858-QCN-2-0903 RFI-5858-QCN-2-0903 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 10-Oct-12 10:00 AM 10-Oct-12
PS-23-F1 = 13 nos, B70-PS-24-F1 = 27 nos Raslaffan
3229 Check Setting Out, Line/Level For Pipe Sleepers & Stopper B70-PS-15: SLD071,
RFI-5858-QCN-2-0904 RFI-5858-QCN-2-0904 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 10-Oct-12 9:00 AM 10-Oct-12
SLD072, SLD073 = 3 nos B70-PS-15: SLD070 = 1 nos
Check Polyetheylene Installation Check Hardboard Installation D210 B70 - PR - 44 Pipe SULPHUR
3230 RFI-5858-QCN-2-0905 RFI-5858-QCN-2-0905 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9 .2 b&c S W H 10-Oct-12 7:00 AM 10-Oct-12
Rack Foundations 3(F5),12(F9A&F9B),13(F11)&14(F10) Raslaffan AREA
3231 Check Lean Concrete Pouring For Pipe Sleepers & Stopper B70-PS-15: SLD069 SLD073
RFI-5858-QCN-2-0906 RFI-5858-QCN-2-0906 CONCRETE CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S W H 10-Oct-12 9:30 AM 10-Oct-12
= 4 nos B70-PS-15: SLD070 = 1 nos
Crossing # 40
3232 RFI-5858-QCN-2-0907 RFI-5858-QCN-2-0907 CONCRETE Check Surface Above Grade For Culvert BZRC-009 - 1st coat prior 2nd coat APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 11-Oct-12 7:00 AM 11-Oct-12
Raslaffan
3233 Check Polyethylene & Hardboard Installation for pipe sleepers - prior backfilling B70-PS-
RFI-5858-QCN-2-0908 RFI-5858-QCN-2-0908 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 11-Oct-12 7:00 AM 11-Oct-12
06: SLD074 to SLD088 except SLD083 = 13 nos
3234 Check Setting Out, Line/Level For Pipe Sleepers B70-PS-16: SLD070, SLD071, SLD072,
RFI-5858-QCN-2-0909 RFI-5858-QCN-2-0909 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 11-Oct-12 9:00 AM 11-Oct-12
SLD100 & SLD101 = 5 nos
Check Lean Concrete Pouring For Pipe Sleepers B70-PS-16: SLD070, SLD071, SLD072,
3235 RFI-5858-QCN-2-0910 RFI-5858-QCN-2-0910 CONCRETE CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b W S H 11-Oct-12 9:30 AM 11-Oct-12
SLD100 & SLD101 = 5 nos
4.1.a.c Check Formwork, Embedded Items Pre- Pouring for Pipe Sleeper - Pedestals
3236 B70-PS-17-F1 = 49 nos & B70-PS-18-F1= 1 nos 4.1.a.b.d Check Formwork, Gate 5 TSF
RFI-5858-QCN-2-0911 RFI-5858-QCN-2-0911 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 11-Oct-12 7:00 AM 11-Oct-12
Reinforcement & Cleaning for Pipe Sleeper - Footings, B70-PS-26-F3 = 31 nos & B70- Raslaffan
PS-24-F1 = 1 nos
3237 Check Concrete Pouring for Pre-cast Pipe Sleepers Pedestals: B70-PS-17-F1 = 49 nos & Gate 5 TSF
RFI-5858-QCN-2-0912 RFI-5858-QCN-2-0912 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W W H 11-Oct-12 7:30 AM 11-Oct-12
B70-PS-18-F1= 1 nos Footings: B70-PS-26-F3 = 31 nos & B70-PS-24-F1 = 1 nos Raslaffan
Check Reinforcement prior to close shuttering D110 B70 - PR -02 Pipe Rack Foundation SECTION 1
3238 RFI-5858-QCN-2-0913 RFI-5858-QCN-2-0913 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b W W H 11-Oct-12 9:30 AM 11-Oct-12
Pedestal 1-2 / A,B(F1&F2) Raslaffan
Check Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 15 - D110 B70 - PR - 01
3240 RFI-5858-QCN-2-0915 RFI-5858-QCN-2-0915 CONCRETE
9 /A,B - (14No.s)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 11-Oct-12 7:30 AM 11-Oct-12
3241 RFI-5858-QCN-2-0916 RFI-5858-QCN-2-0916 CONCRETE Check Concrete Pouring for cast-in- Situ Pipe Track Footing D110-B70-PR-12 ( F2) CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 11-Oct-12 7:30 AM 11-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Gate 5 TSF
3242 RFI-5858-QCN-2-0917 RFI-5858-QCN-2-0917 CONCRETE Cast-in- Situ Pipe Stopper Pedestal B70-PS-02, SLD018, B70-PS-03, SLD028 and APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 13-Oct-12 9:30AM 13-Oct-12
Raslaffan
SLD078
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for
Precast Pipe Sleeper Pedestal B70-PS-06-F1 = 30 nos. ,Precast Pipe Track D110-B70- Gate 5 TSF
3243 RFI-5858-QCN-2-0918 RFI-5858-QCN-2-0918 CONCRETE
PR-21, B70-PR-26, B70-PR-32, B70-PR-47, B70-PR-48 and B70-PR-65 Total = F1 = 12
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 13-Oct-12 9:30AM 13-Oct-12
nos and F2 = 12 nos.
Crossing # 40
3244 RFI-5858-QCN-2-0919 RFI-5858-QCN-2-0919 CONCRETE Check Surface Above Grade For Culvert BZRC-009 - 2nd coat APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 13-Oct-12 7:00 AM 13-Oct-12
Raslaffan
Check 14 Days Concrete Curing For Pipe Stopper- Pedestals B70-PS-13: SLD018 &
3245 RFI-5858-QCN-2-0920 RFI-5858-QCN-2-0920 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 13-Oct-12 7:00 AM 13-Oct-12
B70-PS-14: SLD081
Check Protective Coating 1st coat prior 2nd coat For Precast Culvert Wall = 8 nos of Gate 5 TSF
3246 RFI-5858-QCN-2-0921 RFI-5858-QCN-2-0921 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 13-Oct-12 10:00 AM 13-Oct-12
BZRC 006 Raslaffan
Gate 5 TSF
3247 RFI-5858-QCN-2-0922 RFI-5858-QCN-2-0922 CONCRETE Check Surface Preparation For Precast Culvert Cover Type-A = 11 nos of BZRC 006 APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 13-Oct-12 10:00 AM 13-Oct-12
Raslaffan
Check concrete surface upon form removal D110 B70 - PR -01 Pipe Rack Foundation D110 B70 - PR - 01
3248 RFI-5858-QCN-2-0923 RFI-5858-QCN-2-0923 CONCRETE
Pedestal G.L 15 - 9 /A,B - (14No.s)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.3 S W H 13-Oct-12 3:40 PM 13-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.1.b.d Check Reinforcement & Cleaning For Pre-Cast Pipe Sleeper - Pedestals ( Prior Gate 5 TSF
3249 RFI-5858-QCN-2-0924 RFI-5858-QCN-2-0924 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 13-Oct-12 8:00 AM 13-Oct-12
Closing) B70-PS-18-F1 = 31 nos B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 2 nos Raslaffan
7:00 AM
3250 9.1Check Surface Preparation 9.2 Check Protective Coating 1st layer For Pre-Cast Pipe Gate 5 TSF
RFI-5858-QCN-2-0925 RFI-5858-QCN-2-0925 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1.2 S W H 13-Oct-12 To 13-Oct-12
Sleepers B70-PS-06-F1 = 15 nos Raslaffan
4:00 PM
3251 Check Lean Concrete Pouring For Pipe Sleepers B70-PS-16: SLD070, SLD071, SLD072,
RFI-5858-QCN-2-0926 RFI-5858-QCN-2-0926 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 14-Oct-12 9:30 AM 14-Oct-12
SLD100 & SLD101 = 5 nos
Check Lean Concrete Pouring For Pipe Sleepers & Stopper B70-PS-15: SLD069 SLD073
3252 RFI-5858-QCN-2-0927 RFI-5858-QCN-2-0927 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 14-Oct-12 9:30 AM 14-Oct-12
= 4 nos B70-PS-15: SLD070 = 1 nos
3253 RFI-5858-QCN-2-0928 RFI-5858-QCN-2-0928 CONCRETE Check Concrete Pouring for Pipe Stopper - Pedestal B70-PS-15: SLD004 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 14-Oct-12 7:30 AM 14-Oct-12
3254 RFI-5858-QCN-2-0929 RFI-5858-QCN-2-0929 CONCRETE Check Concrete Pouring for cast-in- Situ Pipe Track Footing D110-B70-PR-12 ( F2) APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 14-Oct-12 7:30 AM 22-Oct-12
3255 Check Setting Out, Line/Level For Pipe Track Foundations D110-B70-PR-12 ( F1) &
RFI-5858-QCN-2-0930 RFI-5858-QCN-2-0930 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 14-Oct-12 9:00 AM 14-Oct-12
D110-B70-PR-13 ( loop)
3256 Check Lean Concrete Pouring For Pipe Track Foundations D110-B70-PR-12 ( F1) &
RFI-5858-QCN-2-0931 RFI-5858-QCN-2-0931 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 14-Oct-12 9:30 AM 14-Oct-12
D110-B70-PR-13 ( loop)
7:00 AM
Check Surface Above Above Grade( Surface Preparation, 1st Coat & 2nd Coat) For 2
3257 RFI-5858-QCN-2-0932 RFI-5858-QCN-2-0932 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 14-Oct-12 To 14-Oct-12
Pipe Stopper B70-PS-10: SLD036 & SLD079
5:00 PM
9.2.b,c Check Surface Below Grade ( Polyethylene Installation & Hardboard) For Pipe
3258 RFI-5858-QCN-2-0933 RFI-5858-QCN-2-0933 CONCRETE Sleepers B70-PS-16: SLD076 to SLD089 & SLD092 to SLD099 = 22 nos B70-PS-15: APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 14-Oct-12 5:00 PM 14-Oct-12
SLD003, SLD005 & SLD007 to SLD016 = 12 nos
7:00 AM
3259 9.1Check Surface Preparation 9.2 Check Protective Coating 1st layer For Pre-Cast Pipe Gate 5 TSF
RFI-5858-QCN-2-0934 RFI-5858-QCN-2-0934 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1,2 S W H 14-Oct-12 To 14-Oct-12
Sleepers B70-PS-06-F1 = 15 nos Raslaffan
4:00 PM
Check Surface preparation D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 15 - D110 B70 - PR - 01
3260 RFI-5858-QCN-2-0935 RFI-5858-QCN-2-0935 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 14-Oct-12 3:45 PM 14-Oct-12
12 /A,B - (8No.s) Raslaffan
Gate 5 TSF
3262 RFI-5858-QCN-2-0937 RFI-5858-QCN-2-0937 CONCRETE Check Protective Coating 2nd coat For Precast Culvert Wall = 8 nos of BZRC 006 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 14-Oct-12 10:00 AM 14-Oct-12
Check Above Ground Protective Coating of Sleeper foundations- First Coat B70 - PS-03 SECTION 1
3263 RFI-5858-QCN-2-0938 RFI-5858-QCN-2-0938 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.3 S W H 14-Oct-12 4:00 AM 14-Oct-12
SLD001 TO SLD 055,PS-02 SLD 001 TO SLD033& PS-01SLD 002,SLD 003 &SLD04 Raslaffan
Check Surface Below Grade 1st coat For Precast Culvert Cover Type-A = 11 nos of Gate 5 TSF
3264 RFI-5858-QCN-2-0939 RFI-5858-QCN-2-0939 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 14-Oct-12 10:00 AM 14-Oct-12
BZRC 006 Raslaffan
4.1.a.b.d Check Formwork, Reinforcement & Cleaning for Pre-cast Pipe Track Gate 5 TSF
3265 RFI-5858-QCN-2-0940 RFI-5858-QCN-2-0940 CONCRETE
Foundations - Footings D110-B70-PR-34, 35, 49, 63, 66, & 67 = 24 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 14-Oct-12 7:00 AM 14-Oct-12
Check Concrete Pouring for Pre-cast Pipe Track Foundations - Footing D110-B70-PR-34, Gate 5 TSF
3266 RFI-5858-QCN-2-0941 RFI-5858-QCN-2-0941 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 14-Oct-12 7:30 AM 14-Oct-12
35, 49, 63, 66, & 67 = 24 nos Raslaffan
Gate 5 TSF
3267 RFI-5858-QCN-2-0942 RFI-5858-QCN-2-0942 CONCRETE Check Surface Below Grade 1st coat For Precast Pipe Sleepers B70-PS-15-F1 = 50 nos APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 14-Oct-12 10:00 AM 14-Oct-12
Raslaffan
Check Surface Preparation Above Grade For Pipe Sleepers & Stopper B70-PS-06:
3268 RFI-5858-QCN-2-0943 RFI-5858-QCN-2-0943 CONCRETE SLD001 To SLD031, SLD035 To SLD061, SLD064 To SLD082 & SLD084 To SLD088 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 14-Oct-12 10:00 AM 14-Oct-12
Except SLD048 & SLD081 = 80 nos
Check Reinforcement & Cleaning for cast-in- Situ Pipe Track Pedestals - Prior Closing for
3269 RFI-5858-QCN-2-0944 RFI-5858-QCN-2-0944 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 14-Oct-12 7:30 AM 14-Oct-12 Not Ready for inspection
D110-B70-PR-12: F3,F4,F5
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3) for Gate 5 TSF
3270 RFI-5858-QCN-2-0945 RFI-5858-QCN-2-0945 CONCRETE
Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 14 nos and B70-PS-24-F1 = 26 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 15-Oct-12 9:30 AM 15-Oct-12
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7.2 Check Compressive Strength @7 Days (Cube Testing as per BS EN 12390-3) for
3271 RFI-5858-QCN-2-0946 RFI-5858-QCN-2-0946 CONCRETE APPROVED QIL LAB Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 15-Oct-12 9:30 AM 15-Oct-12
Mix-D (Galf Ready Mix) Trial mix 1,2,3
Check Surface Above Grade For Pipe Sleepers & Stopper - 1st coat prior 2nd coat B70-
3274 RFI-5858-QCN-2-0949 RFI-5858-QCN-2-0949 CONCRETE PS-06: SLD001 To SLD031, SLD035 To SLD061, SLD064 To SLD082 & SLD084 To APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 15-Oct-12 10:00 AM 15-Oct-12
SLD088 Except SLD048 & SLD081 = 80 nos
3275 SECTION 1
RFI-5858-QCN-2-0950 RFI-5858-QCN-2-0950 CONCRETE Check form works,Embedded items,Cleaning DUCT BANK BZDW 001 APPROVED B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 15-Oct-12 9:00 AM 15-Oct-12
Raslaffan
SECTION 1
3276 RFI-5858-QCN-2-0951 RFI-5858-QCN-2-0951 CONCRETE Check Concrete Pouring DUCT BANK BZDW 001 APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 16-Oct-12 1:30 PM 16-Oct-12
Raslaffan
3277 Check form works,Embedded items,Cleaning& Construction joints D110 B70 - PR -02 SECTION 1
RFI-5858-QCN-2-0952 RFI-5858-QCN-2-0952 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 15-Oct-12 9:30 AM 15-Oct-12
Pipe Rack Foundation Pedestal 1-2 / A,B(F1&F2) Raslaffan
3278 Check Concrete Pouring D110 B70 - PR -02 Pipe Rack Foundation Pedestal 1-2 / SECTION 1
RFI-5858-QCN-2-0953 RFI-5858-QCN-2-0953 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 15-Oct-12 2:30 PM 16-Oct-12
A,B(F1&F2) Raslaffan
3280 SECTION 1
RFI-5858-QCN-2-0955 RFI-5858-QCN-2-0955 CONCRETE Check Concrete Pouring B70 PS 01 F3 SLD005- PIPE SLEEPER FOOTING APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 16-Oct-12 2:30 PM 16-Oct-12
Raslaffan
Check Surface Above Grade For Pipe Sleepers & Stopper - 2nd coat B70-PS-06:
3281 RFI-5858-QCN-2-0956 RFI-5858-QCN-2-0956 CONCRETE SLD001 To SLD031, SLD035 To SLD061, SLD064 To SLD082 & SLD084 To SLD088 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 16-Oct-12 10:00 AM 16-Oct-12
Except SLD048 & SLD081 = 80 nos
3282 RFI-5858-QCN-2-0957 RFI-5858-QCN-2-0957 CONCRETE Check Erection of Pre-cast Foundations for Pipe Track ( loop) D110-B70-PR-07 CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 8.2 S W H 16-Oct-12 10:00 AM 16-Oct-12
3283 RFI-5858-QCN-2-0958 RFI-5858-QCN-2-0958 CONCRETE Check Polyethylene & Hardboard Installation for Pipe Track ( loop) D110-B70-PR-07 CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 16-Oct-12 10:00 AM 16-Oct-12
3284 RFI-5858-QCN-2-0959 RFI-5858-QCN-2-0959 CONCRETE Check Pre-Placement Concrete For Duct Bank BZDW 006 APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 16-Oct-12 10:00 AM 16-Oct-12
3285 RFI-5858-QCN-2-0960 RFI-5858-QCN-2-0960 CONCRETE Check Concrete Pouring For Duct Bank BZDW 006 APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 16-Oct-12 10:00 AM 16-Oct-12
4.1.a,c Check Pre-Pouring For Pre-Cast Pipe Sleeper - Pedestals ( Formwork &
Gate 5 TSF
3286 RFI-5858-QCN-2-0961 RFI-5858-QCN-2-0961 CONCRETE Embedded Items) B70-PS-18-F1 = 31 nos B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 2 APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 16-Oct-12 8:00 AM 16-Oct-12
Raslaffan
nos
Check Pouring For Pre-Cast Pipe Sleeper - Pedestals B70-PS-18-F1 = 31 nos B70-PS- Gate 5 TSF
3287 RFI-5858-QCN-2-0962 RFI-5858-QCN-2-0962 CONCRETE
19-F1 = 17 nos, B70-PS-20-F1 = 2 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 16-Oct-12 8:00 AM 16-Oct-12
9.1 Check Surface Preparation for Pre-Cast Pipe Sleepers B70-PS-90-F1= 9 nos, B70- Gate 5 TSF
3288 RFI-5858-QCN-2-0963 RFI-5858-QCN-2-0963 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 16-Oct-12 3:00 PM 16-Oct-12
PS-90-F2= 5 nos, B70-PS-90-F3= 3 nos, B70-PS-90-F4= 12 nos Raslaffan
Check Concrete Surface upon Form Removal for Pipe Stopper - Pedestal B70-PS-15:
3289 RFI-5858-QCN-2-0964 RFI-5858-QCN-2-0964 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 16-Oct-12 7:30 AM 16-Oct-12
SLD004
Check Surface Below ground Protective Coating - First coat D110 B70 - PR -01 Pipe D110 B70 - PR - 01
3290 RFI-5858-QCN-2-0965 RFI-5858-QCN-2-0965 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 16-Oct-12 9:30 AM 16-Oct-12
Rack Foundation Pedestal G.L 15(F14),14(F13),13(F12)&12(F10) Raslaffan
Check Setting Out, Line/Level For Pipe Track Foundations For Pipe Sleepers, Stopper &
3291 Section 2 & 5
RFI-5858-QCN-2-0966 RFI-5858-QCN-2-0966 CONCRETE Track ( loop ) B70-PS-09: SLD074 To SLD086= 13 nos, B70-PS-09: SLD054 B70-PS-09: APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 16-Oct-12 8:00 AM 16-Oct-12
Raslaffan
SLD051 to SLD056 = 5 nos. B70-PS-16: SLD075 = 1 nos, D110-B70-PR-67 = 1 loop
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Lean Concrete Pouring For Pipe Sleepers, Stopper & Track ( loop ) B70-PS-09:
Section 2 & 5
3292 RFI-5858-QCN-2-0967 RFI-5858-QCN-2-0967 CONCRETE SLD074 To SLD086= 13 nos, B70-PS-09: SLD054, B70-PS-09-SLD051 to SLD056. B70- APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.0.b S S H 16-Oct-12 9:30 AM 16-Oct-12
PS-16: SLD075 = 1 nos, D110-B70-PR-67 = 1 loop
4.1 Check Pre-Pouring For Pre-cast (Formwor, Reinforcement & Cleaning) For: - Pipe
Sleeper - Footings B70-PS-03-F1 = 35 nos - Culvert Cover Type-B For BZRC 006 = 2 Gate 5 TSF
3293 RFI-5858-QCN-2-0968 RFI-5858-QCN-2-0968 CONCRETE
nos, BZRC 009A = 2 nos, Removable Panels For BZRC 006 = 2 nos & BZRC 009A= 1
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 16-Oct-12 8:00 AM 16-Oct-12
nos
5.1 Check Concrete Pouring For Pre-cast For: - Pipe Sleeper - Footings B70-PS-03-F1 =
Gate 5 TSF
3294 RFI-5858-QCN-2-0969 RFI-5858-QCN-2-0969 CONCRETE 35 nos - Culvert Cover Type-B For BZRC 006 = 2 nos, BZRC 009A = 2 nos, Removable APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 16-Oct-12 8:30 AM 16-Oct-12
Raslaffan
Panels For BZRC 006 = 2 nos & BZRC 009A= 1 nos
Check Surface Below ground Protective Coating - Second coat D110 B70 - PR -01 Pipe D110 B70 - PR - 01
3295 RFI-5858-QCN-2-0970 RFI-5858-QCN-2-0970 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 16-Oct-12 4:00 PM 16-Oct-12
Rack Foundation Pedestal G.L 15(F14),14(F13),13(F12)&12(F10) Raslafan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for 2
Gate 5 TSF
3296 RFI-5858-QCN-2-0971 RFI-5858-QCN-2-0971 CONCRETE stopper footings B70-PS-13: SLD018 & B70-PS-14: SLD081 , D210-B70-PR-44 Pipe APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 17-Oct-12 9:30AM 17-Oct-12
Rack Foundation Pedestal G.L2,6,7,10 & 11/D21A & D21B-(5Nos).
Check Final Visual Inspection For Pipe Sleepers & Stoppers ( B70-PS-06: SLD001 To
3297 RFI-5858-QCN-2-0972 RFI-5858-QCN-2-0972 CONCRETE SLD031 = 31 nos), (B70-PS-07: SLD019 & SLD069= 2 nos), (B70-PS-08: SLD001 To APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 10.0 S W H 17-Oct-12 8:00 AM 17-Oct-12
SLD029, SLD037 To SLD057 & SLD061= 51 nos),
Check Final Visual Inspection For Pipe Sleepers & Stoppers ( B70-PS-09: SLD001 To
SLD005, SLD010 To SLD016, SLD025 To SLD034, SLD057 To SLD071, & SLD087 To Section 2 & 3
3298 RFI-5858-QCN-2-0973 RFI-5858-QCN-2-0973 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 10.0 S W H 17-Oct-12 8:00 AM 17-Oct-12
SLD092 = 43 nos) (B70-PS-10: SLD012 To SLD025, SLD027 To SLD059, SLD062 To Raslaffan
SLD086, & SLD088 To SLD090 = 75 nos)
Check Protective Coating for Pre-Cast Pipe Sleepers - 1st coat prior 2nd coat B70-PS-90- Gate 5 TSF
3299 RFI-5858-QCN-2-0974 RFI-5858-QCN-2-0974 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 17-Oct-12 9:00 AM 17-Oct-12
F1= 9 nos & B70-PS-90-F3= 3 nos Raslaffan
7:00 AM
9.1 & 9.2.a Check Surface Preparation & Protective Coating ( 1st & 2nd layer) for Pipe
3300 RFI-5858-QCN-2-0975 RFI-5858-QCN-2-0975 CONCRETE
Stoppers B70-PS-13: SLD018 & B70-PS-14:SLD081
APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.1,2 S W H 17-Oct-12 To 17-Oct-12
5:00 PM
Check Polyethene & Hardboard Installation For Pre-Cast Pipe Sleepers B70-PS-06:
3301 RFI-5858-QCN-2-0976 RFI-5858-QCN-2-0976 CONCRETE SLD064, B70-PS-07: SLD093, SLD094, SLD043, SLD044, B70-PS-08: SLD086 & APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 17-Oct-12 7:00 AM 17-Oct-12
SLD087
Check Above Ground Protective Coating of Sleeper foundations- Second Coat B70 - PS-
3302 RFI-5858-QCN-2-0977 RFI-5858-QCN-2-0977 CONCRETE APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 17-Oct-12 4:00 PM 17-Oct-12
03 SLD001 TO SLD 055,PS-02 SLD 001 TO SLD033& PS-01SLD 002,SLD 003 &SLD04
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -01 Pipe
3303 RFI-5858-QCN-2-0978 RFI-5858-QCN-2-0978 CONCRETE APPROVED D110 B70 - PR -01 B-V-3100-004-2-201-02_4 9 .2 b&c S W H 17-Oct-12 3:40 PM 17-Oct-12
Rack Foundation Pedestal G.L 15(F14),14(F13),13(F12)&12(F10)
3304 RFI-5858-QCN-2-0979 RFI-5858-QCN-2-0979 CONCRETE Check Concrete Surface upon Form Removal For Duct Bank BZDW 006 APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 17-Oct-12 3:00 PM 17-Oct-12
PIPE RACK PR - 01
3305 RFI-5858-QCN-2-0980 RFI-5858-QCN-2-0980 CONCRETE Check Concrete Curing D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 15-12/A,B APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 17-Oct-12 7:00 AM 17-Oct-12
Check Surface preparation D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 11 - 9
3306 RFI-5858-QCN-2-0981 RFI-5858-QCN-2-0981 CONCRETE APPROVED D110 B70 - PR - 01 B-V-3100-004-2-201-02_4 9.1 S W H 17-Oct-12 8:45 AM 17-Oct-12
/A,B - (6No.s)
Check Surface Above Grade (Surface Preparation, 1st coat & 2nd coat) For Pre-Cast 7:00 AM
3307 RFI-5858-QCN-2-0982 RFI-5858-QCN-2-0982 CONCRETE Pipe Sleepers B70-PS-06: SLD064, B70-PS-07: SLD093, SLD094, SLD043, SLD044, APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 18-Oct-12 To 18-Oct-12
B70-PS-08: SLD086 & SLD087 = 7 nos 5:00 PM
9.2.b,c Check Polyethylene & Hardboard Installation for Pipe Stoppers B70-PS-13:
3308 RFI-5858-QCN-2-0983 RFI-5858-QCN-2-0983 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 18-Oct-12 6:30 AM 18-Oct-12
SLD018 & B70-PS-14:SLD081
Check Setting Out,Line/Level B70 PS -90 F1&F2 Pipe Sleeper SLD01 TO SLD016
3309 (SLD005,SLD006,SLD013&SLD014) B70 PS -90 F3 SLD003,SLD009&SLD017 ,B70 PS SULPHUR AREA-
RFI-5858-QCN-2-0984 RFI-5858-QCN-2-0984 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.a S W H 18-Oct-12 9:30 AM 22-Oct-12
-90 F4 BLOCK-12NoS, D210 B70 PR- PR-45,D210 B70 PR- PR-71& D210 B70 PR- PR- B70 PS 90 Raslaffan
44 FOUNDATION 1(F6)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Lean Concrete Pouring B70 PS -90 F1&F2 Pipe Sleeper SLD01 TO SLD016
(SLD005,SLD006,SLD013&SLD014) B70 PS -90 F3 SLD003,SLD009&SLD017 ,B70 PS SULPHUR AREA-
3310 RFI-5858-QCN-2-0985 RFI-5858-QCN-2-0985 CONCRETE
-90 F4 BLOCK-12NoS, D210 B70 PR- PR-45,D210 B70 PR- PR-71& D210 B70 PR- PR-
APPROVED
B70 PS 90 Raslaffan
B-V-3100-004-2-201-02_4 3.b S W H 18-Oct-12 1:30 PM 22-Oct-12
44 FOUNDATION 1(F6)
Check Lean Concrete Pouring For Pipe Sleepers B70-PS-16: SLD045 To SLD060 = 16
3311 RFI-5858-QCN-2-0986 RFI-5858-QCN-2-0986 CONCRETE
nos
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 18-Oct-12 9:30 AM 18-Oct-12
Check Above Ground Protective Coating of Stopper foundation Pedestal - First Coat B70
3312 RFI-5858-QCN-2-0987 RFI-5858-QCN-2-0987 CONCRETE APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 18-Oct-12 8:00 AM 18-Oct-12
- PS-03 F2 SLD028
Check Pre-Pouring ( Check Reinforcement & Cleaning ) prior Closing Pedestals for Pre-
Gate 5 TSF
3313 RFI-5858-QCN-2-0988 RFI-5858-QCN-2-0988 CONCRETE Cast Items: Loop Foundations: D110-B70-PR-34, 35, 63, 66, 67 & 49 = 24 Nos Pipe APPROVED B-V-3100-004-2-201-02_4 4.1 S W H 18-Oct-12 9:30 AM 18-Oct-12
Raslaffan
Sleepers: B70-PS-26-F3 = 31 nos & B70-PS-24-F1 = 1 nos
Check concrete surface upon form removal D110 B70 - PR -02 Pipe Rack Foundation
3314 RFI-5858-QCN-2-0989 RFI-5858-QCN-2-0989 CONCRETE
Pedestal 1-2 / A,B(F1&F2) - (Footing & Pedestal)
APPROVED Section1 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 18-Oct-12 9:40 AM 18-Oct-12
Check concrete surface upon form removal B70 PS 01 F3 SLD005- PIPE SLEEPER
3315 RFI-5858-QCN-2-0990 RFI-5858-QCN-2-0990 CONCRETE
FOOTING
APPROVED Section1 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 18-Oct-12 9:30 AM 18-Oct-12
Check Concrete Surface upon Form Removal For Pre-Cast Pipe Sleeper - Pedestals
Gate 5 TSF
3317 RFI-5858-QCN-2-0992 RFI-5858-QCN-2-0992 CONCRETE B70-PS-18-F1 = 31 nos B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 2 nos, & Removable APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 18-Oct-12 8:00 AM 18-Oct-12
Raslaffan
Panels For BZRC 006 = 2 nos & BZRC 009A= 1 nos
Check Protective Coating for Pre-Cast Pipe Sleepers - 2nd coat B70-PS-90-F1= 9 nos & Gate 5 TSF
3318 RFI-5858-QCN-2-0993 RFI-5858-QCN-2-0993 CONCRETE
B70-PS-90-F3= 3 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 18-Oct-12 8:00 AM 18-Oct-12
Check Setting Out, Line/Level For Pipe Track Foundations For Pipe Sleepers B70-PS-16:
3319 RFI-5858-QCN-2-0994 RFI-5858-QCN-2-0994 CONCRETE
SLD045 To SLD060 = 16 nos
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 18-Oct-12 8:00 AM 18-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3320 RFI-5858-QCN-2-0995 RFI-5858-QCN-2-0995 CONCRETE CONCRETE D110 - B70 - PR - 01 PIPE RACK FOUNDATION FOOTING APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 20-Oct-12 9:30 AM 20-Oct-12
Raslaffan
8(F8),9(F9),11(F11),12(F10),13(F12),14(F13)&15(F14)- 7NOS
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3321 RFI-5858-QCN-2-0996 RFI-5858-QCN-2-0996 CONCRETE CONCRETE D110 - B70 - PR - 01 PIPE RACK FOUNDATION FOOTING APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 20-Oct-12 9:30 AM 20-Oct-12
Raslaffan
8(F8),9(F9),11(F11),12(F10),13(F12),14(F13)&15(F14)- 7NOS
7.2 Check Compressive Strenght @ 7 Days ( Cube Testing per BS EN 12390-3) for Mix-D
3322 RFI-5858-QCN-2-0997 RFI-5858-QCN-2-0997 CONCRETE
(Gulf Ready Mix) Trial mix 4,5,6
APPROVED QIL LAB Raslaffan B-V-3100-004-2-201-02_4 7.2 S W H 18-Oct-12 11:30 AM 18-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3323 RFI-5858-QCN-2-0998 RFI-5858-QCN-2-0998 CONCRETE
CAST-IN- SITU CULVERT FOOTING = 2 NOS OF BZRC-009
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 20-Oct-12 9:30 AM 20-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-
3)forCONCRETE POURING OF PRECAST PIPE TRACK D110-B70-PR-21, B70-PR-26, Gate 5 TSF
3324 RFI-5858-QCN-2-0999 RFI-5858-QCN-2-0999 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 20-Oct-12 9:30 AM 20-Oct-12
B70-PR-32, B70-PR-47,PRECAST PIPE SLEEPER PEDESTAL B70-PS-15-F1 = 60 Raslaffan
NOS.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-
3325 RFI-5858-QCN-2-1000 RFI-5858-QCN-2-1000 CONCRETE 3)forCONCRETE POURING OF PRECAST PIPE SLEEPER FOOTING B70-PS-90-F1 = APPROVED Gate #5 TSF B-V-3100-004-2-201-02_4 7.2 S W H 20-Oct-12 9.30 AM 20-Oct-12
9 NOS, B70-PS-90-F2 = 3 NOS, B70-PS-90-F3 = 3 NOS AND B70-PS-90-F4 = 12 NOS.
Check Polyethylene & Hardboard Installation for Pipe Sleepers B70-PS-09: SLD006 To
3326 RFI-5858-QCN-2-1001 RFI-5858-QCN-2-1001 CONCRETE SLD009 = 4 nos B70-PS-10: SLD010, SLD011, SLD026, SLD060, SLD061, SLD087 = 6 APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 19-Oct-12 6:00 AM 19-Oct-12
nos
4.1.a,b,c,d Check Pre-Pouring For Cast-in- Situ Items: Pipe Stopper Pedestals B70-PS-
3327 Section 2 & 5
RFI-5858-QCN-2-1002 RFI-5858-QCN-2-1002 CONCRETE 06: SLD081 & SLD048 = 2 nos, Pipe Track Footing D110-B70-PR-12: F1 = 1 nos, Pipe APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 20-Oct-12 7:00 AM 20-Oct-12
Raslaffan
Sleeper Footing B70-PS-06: SLD083 = 1 nos
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface Below ground Protective Coating - First coat D110-B70-PR -01 Pipe Rack D110 B70 - PR - 01
3329 RFI-5858-QCN-2-1004 RFI-5858-QCN-2-1004 CONCRETE
Foundation G.L 11(F11),10(F10),9(F9)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 a S W H 20-Oct-12 8:00 AM 20-Oct-12
Check Surface Below ground Protective Coating - Second coat D110 B70 - PR -01 Pipe D110 B70 - PR - 01
3330 RFI-5858-QCN-2-1005 RFI-5858-QCN-2-1005 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 a S W H 20-Oct-12 4:30 PM 22-Oct-12
Rack Foundation G.L 11(F11),10(F10),9(F9) Raslaffan
Check Above Ground Protective Coating of Stopper foundation Pedestal - Second Coat
3331 RFI-5858-QCN-2-1006 RFI-5858-QCN-2-1006 CONCRETE APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 20-Oct-12 10:00 AM 20-Oct-12
B70 - PS-03 F2 SLD028
Check form works,Embedded items,Cleaning& Construction joints D110 B70 - PR -01 D110 B70 - PR - 01
3333 RFI-5858-QCN-2-1008 RFI-5858-QCN-2-1008 CONCRETE
Pipe Rack Foundation Pedestal G.L 8 - 3 /A,B - (12No.s)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 20-Oct-12 9:30 AM 22-Oct-12
Check Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 8 - 3 D110 B70 - PR - 01
3334 RFI-5858-QCN-2-1009 RFI-5858-QCN-2-1009 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 20-Oct-12 1:30 PM 20-Oct-12
/A,B - (12No.s) Raslaffan
Check Reinforcement & Cleaning Prior Form Closing Pre-cast Pipe Sleepers - Pedestals Gate 5 TSF
3335 RFI-5858-QCN-2-1010 RFI-5858-QCN-2-1010 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b,d W W H 20-Oct-12 7:30 AM 20-Oct-12
B70-PS-26-F3 = 31 nos Raslaffan
Check Pre-Pouring For Pre-cast Pipe Sleepers - Footings B70-PS-03-F1 = 5 nos, B70-
Gate 5 TSF
3336 RFI-5858-QCN-2-1011 RFI-5858-QCN-2-1011 CONCRETE PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos, & B70-PS-18-F1 = 25 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.b,d W W H 20-Oct-12 7:30 AM 20-Oct-12
nos
Check Concrete Pouring For Pre-cast Pipe Sleepers - Footings B70-PS-03-F1 = 5 nos,
Gate 5 TSF
3337 RFI-5858-QCN-2-1012 RFI-5858-QCN-2-1012 CONCRETE B70-PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos, & B70-PS-18-F1 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 20-Oct-12 8:00 AM 20-Oct-12
25 nos
7:00 AM
Check Surface Above Grade For Pipe Stopper ( Surface Preparationg, 1st & 2nd Coat)
3338 RFI-5858-QCN-2-1013 RFI-5858-QCN-2-1013 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 20-Oct-12 To 20-Oct-12
B70-PS-13: SLD018 & B70-PS-14:SLD081
5:00 PM
Check Surface Above Grade For Pipe Sleepers ( Surface Preparation, 1st coat & 2nd 6:00 AM
3339 RFI-5858-QCN-2-1014 RFI-5858-QCN-2-1014 CONCRETE coat) B70-PS-09: SLD006 To SLD009 = 4 nos B70-PS-10: SLD010, SLD011, SLD026, APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 20-Oct-12 To 20-Oct-12
SLD060, SLD061, SLD087 = 6 nos 4:00 PM
Check Erection of Pre-cast Foundations for Pipe Track ( loop) D110-B70-PR-13 & D110-
3340 RFI-5858-QCN-2-1015 RFI-5858-QCN-2-1015 CONCRETE
B70-PR-47
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 8.2 S W H 20-Oct-12 7:00 AM 20-Oct-12
Check Polyethylene & Hardboard Installation for Pipe Track ( loop) D110-B70-PR-13 &
3341 RFI-5858-QCN-2-1016 RFI-5858-QCN-2-1016 CONCRETE
D110-B70-PR-47
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 20-Oct-12 7:00 AM 20-Oct-12
3342 RFI-5858-QCN-2-1017 RFI-5858-QCN-2-1017 CONCRETE Check Polyethylene & Hardboard Installation for Pipe Track ( loop) D110-B70-PR-07 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b,c S W H 19-Oct-12 6:00 AM 19-Oct-12
3343 RFI-5858-QCN-2-1018 RFI-5858-QCN-2-1018 CONCRETE Check Erection of Pre-cast Foundations for Pipe Track ( loop) D110-B70-PR-07 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 8.2 S W H 19-Oct-12 6:00 AM 19-Oct-12
Check Concrete Curing D110 B70 - PR -01 Pipe Rack Foundation G.L
3344 RFI-5858-QCN-2-1019 RFI-5858-QCN-2-1019 CONCRETE APPROVED PIPE RACK PR - 01 B-V-3100-004-2-201-02_4 6.4 S W H 20-Oct-12 7:00 AM 20-Oct-12
11(F11),10(F10),9(F9)
3345 Check Concrete Surface upon Form Removal Pipe Stopper Pedestals B70-PS-06:
RFI-5858-QCN-2-1020 RFI-5858-QCN-2-1020 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 21-Oct-12 4:00 PM 21-Oct-12 Not Ready for inspection
SLD081 & SLD048 = 2 nos
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Curing B70 - PR - 01 Pipe Rack Foundation Footing PIPE RACK PR - 01
3346 RFI-5858-QCN-2-1021 RFI-5858-QCN-2-1021 CONCRETE
7(F7),6(F6),5(F5),4(F4),3(F3)- 5Nos
APPROVED
Raslaffan Area
B-V-3100-004-2-201-02_4 6.4 S W H 21-Oct-12 8:30 AM 21-Oct-12
Check Setting Out, Line/Level For Pipe Track Foundations For Pipe Sleepers & 1 Stopper
3347 RFI-5858-QCN-2-1022 RFI-5858-QCN-2-1022 CONCRETE
B70-PS-16: SLD035 To SLD044 = 10 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 21-Oct-12 8:00 AM 30-Oct-12
Check Lean Concrete Pouring For Pipe Sleepers B70-PS-16: SLD035 To SLD044 = 10
3348 RFI-5858-QCN-2-1023 RFI-5858-QCN-2-1023 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S W H 21-Oct-12 9:30 AM 22-Oct-12
nos
8:00 AM
Check Surface Preparation & 1st Coat for Pre-Cast Pipe Sleepers : B70-PS-03-F1 = 30
3349 RFI-5858-QCN-2-1024 RFI-5858-QCN-2-1024 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 9.1,2.a S W H 21-Oct-12 To 21-Oct-12
nos
5:00 PM
Check Protective Coating -1st Coat for Pre-Cast Pipe Sleepers : B70-PS-90-F2 = 5 nos &
3350 RFI-5858-QCN-2-1025 RFI-5858-QCN-2-1025 CONCRETE
B70-PS-90-F4 = 12 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 21-Oct-12 8:00 AM 21-Oct-12
Check Concrete Pre-Puring For Pre-cast Pipe Sleepers B70-PS-26-F3 = 21 nos - Gate 5 TSF
3351 RFI-5858-QCN-2-1026 RFI-5858-QCN-2-1026 CONCRETE
Pedestals.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 21-Oct-12 8:00 AM 21-Oct-12
Check Reinforcement & Cleaning Prior Closing For Pre-cast Culvert Cover Wall Type - B Gate 5 TSF
3352 RFI-5858-QCN-2-1027 RFI-5858-QCN-2-1027 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 21-Oct-12 8:00 AM 21-Oct-12
For BZRC 006 = 2 nos & BZRC 009A = 2 nos Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-
Gate 5 TSF
3354 RFI-5858-QCN-2-1029 RFI-5858-QCN-2-1029 CONCRETE 3)forCONCRETE POURING FOR 2 STOPPER FOOTINGS B70-PS-10: SLD036 & APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 22-Oct-12 9:30AM 22-Oct-12
SLD079, CAST-IN- SITU CULVERT WALL 4 NOS OF BZRC-009.
Gate 5 TSF
3355 RFI-5858-QCN-2-1030 RFI-5858-QCN-2-1030 CONCRETE 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 24-Oct-12 9:30AM 24-Oct-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3356 RFI-5858-QCN-2-1031 RFI-5858-QCN-2-1031 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 27-Oct-12 9:30AM 28-Oct-12
Concrete Pouring for 2 stopper Pedestals B70-PS-13: SLD018, B70-PS-14: SLD081 Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3357 RFI-5858-QCN-2-1032 RFI-5858-QCN-2-1032 CONCRETE Concrete Pouring B70 - PR - 44 Pipe Rack Foundation Footing 10(F10), 7(F7), 6(F6), APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 27-Oct-12 9:30AM 28-Oct-12
Raslaffan
5(F5), 4(F4), 3(F3), - 6 nos.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3358 RFI-5858-QCN-2-1033 RFI-5858-QCN-2-1033 CONCRETE Concrete Pouring B70 - PR - 02 Pipe Rack Foundation Footing F1 & F2- 2 (2 Nos),B70 - APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 27-Oct-12 9:30AM 28-Oct-12
PR - 44 Pipe Rack Foundation Pedestal G.L 3,12,13&14/D21A & D21B (8Nos)
Check Concrete Pouring for Pre-cast Pipe Track Foundations - Pedestals D110-B70-PR- Gate 5 TSF
3359 RFI-5858-QCN-2-1034 RFI-5858-QCN-2-1034 CONCRETE
34, 35, 49, 63, 66, & 67 = 24 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 22-Oct-12 7:30 AM 22-Oct-12
4.1 Check Pre-Pouring for Pre-cast Pipe Track Foundations - Pedestals D110-B70-PR- Gate 5 TSF
3360 RFI-5858-QCN-2-1035 RFI-5858-QCN-2-1035 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 22-Oct-12 7:00 AM 22-Oct-12
34, 35, 49, 63, 66, & 67 = 24 nos Raslaffan
Check Protective Coating - 2nd Coat for Pre-Cast Pipe Sleepers : B70-PS-90-F2 = 5 nos Gate 5 TSF
3361 RFI-5858-QCN-2-1036 RFI-5858-QCN-2-1036 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 22-Oct-12 2:00 PM 23-Oct-12
& B70-PS-90-F4 = 12 nos B70-PS-03-F1 = 30 nos Raslaffan
Check Concrete Surface upon Form Removal For Pre-Cast Pipe Sleepers - Pedestals Gate 5 TSF
3362 RFI-5858-QCN-2-1037 RFI-5858-QCN-2-1037 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 22-Oct-12 3:00 PM 22-Oct-12
B70-PS-26-F3 = 21 nos Raslaffan
3363 4.1.b & 4.1.d Check Reinforcement & Cleaning for cast-in- Situ Pipe Track Foundations -
RFI-5858-QCN-2-1038 RFI-5858-QCN-2-1038 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 22-Oct-12 7:00 AM 23-Oct-12
Pedestals D110-B70-PR-12: F1, F2,F4 & F5
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -01 Pipe D110 B70 - PR -01
3364 RFI-5858-QCN-2-1039 RFI-5858-QCN-2-1039 CONCRETE
Rack Foundation Pedestal G.L 9(F9),10(F10) & 11(F11)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9 .2 b&c S W H 22-Oct-12 3:40 PM 23-Oct-12
Check Surface Above Grade ( Surface Preparation & 1st Coat ) B70-PS-16: SLD076 to 6:30 AM
3365 RFI-5858-QCN-2-1040 RFI-5858-QCN-2-1040 CONCRETE SLD089 & SLD092 to SLD099 = 22 nos B70-PS-15: SLD003, SLD005 & SLD007 to APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 22-Oct-12 To 23-Oct-12
SLD016 = 12 nos 4:00 PM
Check Concrete Curing For cast-in- Situ Pipe Stoppers - Footing B70-PS-06: SLD048 &
3366 RFI-5858-QCN-2-1041 RFI-5858-QCN-2-1041 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 22-Oct-12 7:00 AM 23-Oct-12
SLD081 = 2 nos
Check concrete surface upon form removal D110 B70 - PR -01 Pipe Rack Foundation D110 B70 - PR - 01
3367 RFI-5858-QCN-2-1042 RFI-5858-QCN-2-1042 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 22-Oct-12 4:10 PM 22-Oct-12
Pedestal G.L 8 - 3 /A,B - (12No.s) Raslaffan
Check Final Visual Inspection For Pipe Sleepers B70-PS-06: SLD035 To SLD061 &
SLD064 To SLD088 except SLD083 = 49 nos B70-PS-07: SLD093,SLD094, SLD043 & Section 2 & 3
3368 RFI-5858-QCN-2-1043 RFI-5858-QCN-2-1043 CONCRETE
SLD044 = 4 nos, B70-PS-08: SLD086 & SLD087 = 2 nos, B70-PS-09: SLD006 TO
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 10.0 S W H 22-Oct-12 8:00 AM 22-Oct-12
SLD009 / B70-PS-10: SLD010, SLD011, SLD026, SLD060, SLD061 & SLD087 = 10 nos
Check Concrete Surface upon Form Removal Pipe Stopper Pedestals B70-PS-06:
3369 RFI-5858-QCN-2-1044 RFI-5858-QCN-2-1044 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 22-Oct-12 4:00 PM 22-Oct-12
SLD081 & SLD048 = 2 nos
Check Reinforcement prior to close shuttering B70 PS 01 F3 SLD005- Pipe Sleeper SECTION1
3370 RFI-5858-QCN-2-1045 RFI-5858-QCN-2-1045 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1b W W H 23-Oct-12 8:30 AM 23-Oct-12
Pedestal Raslaffan
Check Surface Preparation For Pipe Stopper B70-PS-06: SLD081 & SLD048 = 2 nos -
3371 RFI-5858-QCN-2-1046 RFI-5858-QCN-2-1046 CONCRETE
Footings & Pedestals
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 23-Oct-12 3:00 PM 23-Oct-12
4.1.b & 4.1.d Check Reinforcement & Cleaning for cast-in- Situ Pipe Sleeper & Stopper - Section 2 & 5
3372 RFI-5858-QCN-2-1047 RFI-5858-QCN-2-1047 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 23-Oct-12 6:30 AM 23-Oct-12
Pedestals ( Prior Closure) B70-PS-06: SLD083/ B70-PS-15: SLD070 Raslaffan
Check Surface preparation D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 3 - D110 B70 - PR - 01
3373 RFI-5858-QCN-2-1048 RFI-5858-QCN-2-1048 CONCRETE
4 /A,B - (4No.s)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 23-Oct-12 8:30 AM 23-Oct-12
9.2.b & c. Check Polyethylene & Hardboard Installation For Pre-Cast Pipe Sleepers B70-
3374 RFI-5858-QCN-2-1049 RFI-5858-QCN-2-1049 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 23-Oct-12 6:30 AM 23-Oct-12
PS-09: SLD076 To SLD078, SLD082 To SLD086 = 8 nos
3375 Check Concrete Surface upon Form Removal for Pre-cast Pipe Track Foundations - Gate 5 TSF
RFI-5858-QCN-2-1050 RFI-5858-QCN-2-1050 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 6.3 S W H 23-Oct-12 1:00 PM 23-Oct-12 Not Ready for inspection
Pedestals D110-B70-PR-34, 35, 49, 63, 66, & 67 = 24 nos Raslaffan
10:00 AM
Check Surface Below ground Protective Coating - First coat D110 B70 - PR -01 Pipe D110 B70 - PR - 01
3376 RFI-5858-QCN-2-1051 RFI-5858-QCN-2-1051 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 23-Oct-12 to 23-Oct-12
Rack Foundation Pedestal G.L 3 - 4 /A,B - (4No.s) Raslaffan
4:30 PM
3377 4.1.b & 4.1.d Check Reinforcement & Cleaning for Pre-cast Pipe Sleepers - Pedestals Gate 5 TSF
RFI-5858-QCN-2-1052 RFI-5858-QCN-2-1052 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 23-Oct-12 7:00 AM 23-Oct-12
( Prior Closure) B70-PS-26-F3 = 21 nos Raslaffan
4.1 Check Pre-Pouring for Pre-cast Items: Culvert Cover Type - B ( wall) for BZRC 006 =
3378 2 nos & BZRC 009A = 2 nos Pipe Sleepers ( Footing ) For B70-PS-18-F1 = 7 nos, B70- Gate 5 TSF
RFI-5858-QCN-2-1053 RFI-5858-QCN-2-1053 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 24-Oct-12 7:00 AM 24-Oct-12
PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos, Pipe Stopper ( Pedestals ) For B70-PS-26- Raslaffan
F3 = 10 nos & B70-PS-29-F2 = 1 nos
3379 4.1 Check Pre-Pouring for Pre-cast Items: Culvert Cover Type - B ( wall) for BZRC 006 = Gate 5 TSF
RFI-5858-QCN-2-1054 RFI-5858-QCN-2-1054 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 24-Oct-12 7:00 AM 24-Oct-12
2 nos & BZRC 009A = 2 nos Raslaffan
5.1 Check Concrete Pouring for Pre-cast Items: Pipe Sleepers ( Footing ) For B70-PS-18-
3380 Gate 5 TSF
RFI-5858-QCN-2-1055 RFI-5858-QCN-2-1055 CONCRETE F1 = 7 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos Pipe Stopper ( Pedestals ) APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 24-Oct-12 7:00 AM 21-Oct-12
Raslaffan
For B70-PS-26-F3 = 10 nos & B70-PS-29-F2 = 1 nos
5.1 Check Concrete Pouring for Pre-cast Items: Culvert Cover Type - B ( wall) for BZRC Gate 5 TSF
3381 RFI-5858-QCN-2-1056 RFI-5858-QCN-2-1056 CONCRETE
006 = 2 nos & BZRC 009A = 2 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 24-Oct-12 7:00 AM 24-Oct-12
Check Setting Out, Line/Level For Pipe Track Foundations For Pipe Sleepers B70-PS-16:
3382 Section 5 & 2
RFI-5858-QCN-2-1057 RFI-5858-QCN-2-1057 CONCRETE SLD020 To SLD034 = 15 nosB70-PS-06: SLD062 & SLD063 = 2 nos, B70-PS-09: APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 24-Oct-12 7:00 AM 3-Nov-12
Raslaffan
SLD072,SLD073, SLD035 & SLD036 = 4 nos
Check Lean Concrete Pouring For Pipe Sleepers B70-PS-16: SLD020 To SLD036 = 17
Section 5 & 2
3383 RFI-5858-QCN-2-1058 RFI-5858-QCN-2-1058 CONCRETE nosB70-PS-06: SLD062 & SLD063 = 2 nos, B70-PS-09: SLD072,SLD073, SLD035 & APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 3.0.b S S H 24-Oct-12 9:00 AM 24-Oct-12
SLD036 = 4 nos
3384 RFI-5858-QCN-2-1059 RFI-5858-QCN-2-1059 CONCRETE Check Setting Out,Line/Level B70 - PS -04 Stopper foundation SLD015 APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 24-Oct-12 7:10 AM 30-Oct-12
3385 RFI-5858-QCN-2-1060 RFI-5858-QCN-2-1060 CONCRETE Check Lean Concrete Pouring B70 - PS -04 Stopper foundation SLD015 APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 3.0 b S W H 24-Oct-12 8:00 AM 24-Oct-12
3386 RFI-5858-QCN-2-1061 RFI-5858-QCN-2-1061 CONCRETE Check Setting Out,Line/Level D110 B70 - PR - 01 Pipe Rack Foundation No.1 (F1) APPROVED PR-01 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 24-Oct-12 7:30 AM 30-Oct-12
6:30 AM
3387 RFI-5858-QCN-2-1062 RFI-5858-QCN-2-1062 CONCRETE Check Lean Concrete Pouring D110 B70 - PR - 01 Pipe Rack Foundation No.1 (F1) APPROVED PR-01 Raslaffan B-V-3100-004-2-201-02_4 3.0 b S W H 24-Oct-12 to 24-Oct-12
4:50 PM
3388 Check Applying of Curing Compound For Pipe Stopper B70-PS-06: SLD081 & SLD048 =
RFI-5858-QCN-2-1063 RFI-5858-QCN-2-1063 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 24-Oct-12 3:00 PM 24-Oct-12
2 nos - Footings & Pedestals
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.1 Check Pre-Pouring for cast-in- Situ Pipe Stopper - Footing B70-PS-09: SLD054 = 1
3389 RFI-5858-QCN-2-1064 RFI-5858-QCN-2-1064 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 24-Oct-12 7:00 AM 3-Nov-12
nos
3390 Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -01 Pipe D110 B70 - PR -01
RFI-5858-QCN-2-1065 RFI-5858-QCN-2-1065 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9 .2 b&c S W H 24-Oct-12 10:30 AM 25-Oct-12
Rack Foundation G.L 3(F3), 4 (F4) Raslaffan
5.1 Check Concrete Pouring for cast-in- Situ Pipe Stopper - Footing B70-PS-09: SLD054
3391 RFI-5858-QCN-2-1066 RFI-5858-QCN-2-1066 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 24-Oct-12 7:00 AM 24-Oct-12
= 1 nos
3392 9.2.b / 9.2.c Check Polyethylene & Hardboard Installation For Pipe Stopper B70-PS-06:
RFI-5858-QCN-2-1067 RFI-5858-QCN-2-1067 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 25-Oct-12 7:00 AM 25-Oct-12
SLD081 & SLD048 = 2 nos - Footings & Pedestals
3393 9.2.b / 9.2.c Check Polyethylene & Hardboard Installation For Pipe Sleepers B70-PS-09:
RFI-5858-QCN-2-1068 RFI-5858-QCN-2-1068 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 25-Oct-12 7:00 AM 25-Oct-12
SLD055, SLD056, SLD074, SLD075, SLD079, SLD080 & SLD081 = 7 nos
3394 RFI-5858-QCN-2-1069 RFI-5858-QCN-2-1069 CONCRETE Check Concrete Curing For Duct Bank BZDW 005 - 14 Days APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
3395 Check Concrete Curing For Pipe Track Foundations - 14 Days D110-B70-PR-12: F3, F4,
RFI-5858-QCN-2-1070 RFI-5858-QCN-2-1070 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
F5
3396 RFI-5858-QCN-2-1071 RFI-5858-QCN-2-1071 CONCRETE Check Concrete Curing For Pipe Stopper - 14 Days ( Footing) B70-PS-15: SLD004 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
3398 RFI-5858-QCN-2-1073 RFI-5858-QCN-2-1073 CONCRETE Check Concrete Pouring D210 B70 - PR - 44 Pipe Rack Foundation Footing G.L 1 (F6) APPROVED SULPHUR AREA B-V-3100-004-2-201-02_4 5.1 W H H 25-Oct-12 8:00 AM 25-Oct-12
SECTION 1
3399 RFI-5858-QCN-2-1074 RFI-5858-QCN-2-1074 CONCRETE Check form works,Embedded items,Cleaning DUCT BANK BZDP 002 APPROVED B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 25-Oct-12 10:00 AM 30-Oct-12
Raslaffan
SECTION 1
3400 RFI-5858-QCN-2-1075 RFI-5858-QCN-2-1075 CONCRETE Check Concrete Pouring DUCT BANK BZDP 002 CANCELLED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 25-Oct-12 1:00 PM 25-Oct-12 Not Ready for inspection
Check Lean Concrete Pouring B70 PS -90 F2 Pipe Sleeper SULPHUR AREA-
3402 RFI-5858-QCN-2-1077 RFI-5858-QCN-2-1077 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.b S W H 25-Oct-12 8:00 AM 25-Oct-12
SLD001,SLD005,SLD006,SLD013,SLD014 B70 PS 90
Check Concrete Curing For Pre-cast Pipe Sleepers - 14 Days B70-PS-17-F1 = 49 nos, Gate 5 TSF
3403 RFI-5858-QCN-2-1078 RFI-5858-QCN-2-1078 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
B70-PS-18 = 1 nos, B70-PS-23-F1=13 nos, B70-PS-24-F1 = 27 nos Raslaffan
Check Concrete Curing For Pre-cast Pipe Sleepers - 14 Days B70-PS-18-F1 = 34 nos,
Gate 5 TSF
3404 RFI-5858-QCN-2-1079 RFI-5858-QCN-2-1079 CONCRETE B70-PS-19 = 17 nos, B70-PS-19-F1=17 nos, B70-PS-01-F1 = 17 nos, B70-PS-06-F1=13 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
Raslaffan
nos, B70-PS-20-F1= 2 nos (Footing & Pedestal)
3405 RFI-5858-QCN-2-1080 RFI-5858-QCN-2-1080 CONCRETE Check Surface preparation of DUCT BANK BZDW 001 APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 25-Oct-12 7:30 AM 25-Oct-12
Check Polyetheylene Installation Check Hardboard Installation B70 - PS -03 Pipe Sleeper
3406 RFI-5858-QCN-2-1081 RFI-5858-QCN-2-1081 CONCRETE SLD01 TO SLD043(SLD 027&SLD 029- NOT INCLUDED) & PS- 04 SLD 027 TO APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 25-Oct-12 9:00 AM 25-Oct-12
SLD020
Check Concrete Curing for Pre-cast Pipe Sleepers - 14 Days. B70-PS-90-F1 = 9 nos, QG Gate#5 TSF
3407 RFI-5858-QCN-2-1082 RFI-5858-QCN-2-1082 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 25-Oct-12 7:00 AM 25-Oct-12
B70-PS-90-F2 = 5 nos, B70-PS-90-F3 = 3 nos, B70-PS-90-F4 = 14 nos. Raslaffan
3408 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
RFI-5858-QCN-2-1083 RFI-5858-QCN-2-1083 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 29-Oct-12 9:30AM 29-Oct-12
concrete pouring of Cast-in- Situ Culvert end wall west side of BZRC-009 Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Precast Pipe Sleeper pedestal B70-PS-90-F1 = 9 nos, B70-PS-90-F2 = 5 nos B70-PS-90- Gate 5 TSF
3409 RFI-5858-QCN-2-1084 RFI-5858-QCN-2-1084 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 29-Oct-12 9:30AM 29-Oct-12
F3 = 3 nos and B70-PS-90-F4 = 12 nos.B70-PS-17-F1 = 49 nos, B70-PS-18-F1 = 1 no Raslaffan
B70-PS-23-F1 = 13 nos and B70-PS-24-F1 = 27 nos
3410 RFI-5858-QCN-2-1085 RFI-5858-QCN-2-1085 CONCRETE Check Surface Preparation For Duct Bank BZDW 005 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 29-Oct-12 7:00 AM 30-Oct-12
7:00 AM
3411 RFI-5858-QCN-2-1086 RFI-5858-QCN-2-1086 CONCRETE 9.2.a Check Protective Coating For Duct Bank BZDW 005 - 1st & 2nd coat APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.a S W H 29-Oct-12 To 29-Oct-12
5:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
3412 RFI-5858-QCN-2-1087 RFI-5858-QCN-2-1087 CONCRETE 9.2.b Check Polyethylene Installation For Duct Bank BZDW 005 - Prior Backfilling CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b S W H 30-Oct-12 7:00 AM 30-Oct-12 Not Ready for inspection
7:00 AM
3413 Check Surface Above Grade For Pipe Stoppers ( Surface Preparation, 1st coat & 2nd
RFI-5858-QCN-2-1088 RFI-5858-QCN-2-1088 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 30-Oct-12 To 30-Oct-12 Not Ready for inspection
coat) B70-PS-06: SLD081 & SLD048 = 2 nos
5:00 PM
4.1.b/ 4.1.d Check Reinforcement & Cleaning for Pipe Stopper Pedestal - Prior Closing
3414 RFI-5858-QCN-2-1089 RFI-5858-QCN-2-1089 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 29-Oct-12 7:00 AM 29-Oct-12 Not Ready for inspection
B70-PS-09: SLD054 = 1 nos
3415 Check Concrete Curing For Pipe Track Foundation ( footing) - 14 Days D110-B70-PR-12:
RFI-5858-QCN-2-1090 RFI-5858-QCN-2-1090 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 27-Oct-12 7:00 AM 30-Oct-12
F2
3416 RFI-5858-QCN-2-1091 RFI-5858-QCN-2-1091 CONCRETE Check Concrete Curing For Duct Bank - 14 Days BZDW 006 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 29-Oct-12 2:00 PM 30-Oct-12
Check Setting Out, Line/Level For Pipe Sleepers, Stopper, & loopB70-PS-16: SLD001 To
3417 RFI-5858-QCN-2-1092 RFI-5858-QCN-2-1092 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 30-Oct-12 7:00 AM 5-Nov-12
SLD017 = 17 nos/D110-B70-PR-21 = 1 loop
3418 Check Lean Concrete Pouring For Pipe Sleepers, Stopper & loopB70-PS-16: SLD001 To
RFI-5858-QCN-2-1093 RFI-5858-QCN-2-1093 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 30-Oct-12 9:00 AM 3-Nov-12
SLD017 = 17 nos/D110-B70-PR-21 = 1 loop
Check Surface preparation D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 5 - D110 B70 - PR - 01
3419 RFI-5858-QCN-2-1094 RFI-5858-QCN-2-1094 CONCRETE
8 /A,B - (8No.s)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 29-Oct-12 8:30 AM 30-Oct-12
3420 4.1 Check Pre-Pouring for cast-in- Situ Pipe StoppersPedestal : B70-PS-15: SLD070 = 1
RFI-5858-QCN-2-1095 RFI-5858-QCN-2-1095 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 30-Oct-12 7:00 AM 5-Nov-12
nosFooting: B70-PS-16: SLD042 = 1 nos
5.1 Check Concrete Pouring for cast-in- Situ Pipe Stoppers: Pedestal : B70-PS-15:
3421 RFI-5858-QCN-2-1096 RFI-5858-QCN-2-1096 CONCRETE
SLD070 = 1 nosFooting: B70-PS-16: SLD042 = 1 nos
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 30-Oct-12 7:00 AM 3-Nov-12
Check Surface Below ground Protective Coating - First coat D110 B70 - PR -01 Pipe D110 B70 - PR - 01
3422 RFI-5858-QCN-2-1097 RFI-5858-QCN-2-1097 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 9.2.a S W H 29-Oct-12 10:30 AM 29-Oct-12 Not Ready for inspection
Rack Foundation G.L 5 (F5), 6 (F6),7 (F7)& 8 (F8) Raslaffan
3423 RFI-5858-QCN-2-1098 RFI-5858-QCN-2-1098 CONCRETE Check form works,Embedded items,Cleaning DUCT BANK BZDP 002 CANCELLED SECTION 1 Raslaffan B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 30-Oct-12 9:00 AM 30-Oct-12 Not Ready for inspection
SECTION 1
3424 RFI-5858-QCN-2-1099 RFI-5858-QCN-2-1099 CONCRETE Check Concrete Pouring DUCT BANK BZDP 002 APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 29-Oct-12 9:30 AM 30-Oct-12
Raslaffan
Check Reinforcement prior to close shuttering D210-B70 - PR - 44 Pipe Rack Foundation Sulphur Area
3425 RFI-5858-QCN-2-1100 RFI-5858-QCN-2-1100 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1b W W H 30-Oct-12 9:30 AM 30-Oct-12
Pedsatal G.L 1 (F6) - nos. Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3426 RFI-5858-QCN-2-1101 RFI-5858-QCN-2-1101 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 31-Oct-12 9:30 AM 31-Oct-12
Cast-in- Situ Pipe Stopper Footing B70-PS-06: DLD048 and SLD081 Raslaffan
3427 RFI-5858-QCN-2-1102 RFI-5858-QCN-2-1102 CONCRETE 9.2.b Check Polyethylene Installation For Duct Bank BZDW 005 - Prior Backfilling APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b S W H 31-Oct-12 6:30 AM 3-Nov-12
7:00 AM
Check Surface Above Grade For Pipe Stoppers ( Surface Preparation, 1st coat & 2nd
3428 RFI-5858-QCN-2-1103 RFI-5858-QCN-2-1103 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 31-Oct-12 To 3-Nov-12
coat) B70-PS-06: SLD081 & SLD048 = 2 nos
5:00 PM
3429 4.1.b/ 4.1.d Check Reinforcement & Cleaning for Pipe Stopper Pedestal - Prior Closing
RFI-5858-QCN-2-1104 RFI-5858-QCN-2-1104 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 31-Oct-12 7:00 AM 3-Nov-12
B70-PS-09: SLD054 = 1 nos & D110-B70-PR-12: F3 = 2 nos
7:00 AM
Check Surface Preparation & Protective Coating - 1st & 2nd coat For Duct Bank BZDW
3430 RFI-5858-QCN-2-1105 RFI-5858-QCN-2-1105 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.1/9.2.a S W H 31-Oct-12 To 3-Nov-12
006
5:00 PM
7:00 AM
3431 Check Surface Above Grade For Pipe Sleepers ( Surface Preparation, 1st coat & 2nd
RFI-5858-QCN-2-1106 RFI-5858-QCN-2-1106 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 31-Oct-12 To 3-Nov-12
coat) B70-PS-09: SLD074 To SLD086, SLD055 & SLD056 = 15 nos
5:00 PM
Check Concrete Curing For Pipe Sleeper - Pedestal - 14 Days B70-PS-15: SLD004 = 1
3432 RFI-5858-QCN-2-1107 RFI-5858-QCN-2-1107 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 31-Oct-12 7:00 AM 3-Nov-12
nos
7:00 AM
3433 Check Surface Preparation & Protective Coating - 1st & 2nd layer for Pipe Stopper B70-
RFI-5858-QCN-2-1108 RFI-5858-QCN-2-1108 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.1/9.2.a S W H 31-Oct-12 To 3-Nov-12
PS-15: SLD004 = 1 nos
5:00 PM
8:30 AM
3434 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 - D110 B70 - PR - 01
RFI-5858-QCN-2-1109 RFI-5858-QCN-2-1109 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 a S W H 31-Oct-12 to 3-Nov-12
PR -01 Pipe Rack Foundation G.L 5 (F5), 6 (F6),7 (F7)& 8 (F8) Raslaffan
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.2.b/9.2.c Check Polyethylene & Hardboard Installation for Pipe Stopper B70-PS-15:
3435 RFI-5858-QCN-2-1110 RFI-5858-QCN-2-1110 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 9.2 S W H 31-Oct-12 5:00 PM 3-Nov-12
SLD004 = 1 nos
3436 4.1 Check Reinforcement & Cleaning for Pre-cast Pipe Sleepers - Pedestal - Prior Closing Gate 5 TSF
RFI-5858-QCN-2-1111 RFI-5858-QCN-2-1111 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 31-Oct-12 6:30 AM 3-Nov-12
B70-PS-26-F3 = 21 nos Raslaffan
Gate 5 TSF
3437 RFI-5858-QCN-2-1112 RFI-5858-QCN-2-1112 CONCRETE 4.1 Check Pre-Pouring for Pre-cast Pipe Sleepers - Pedestal B70-PS-26-F3 = 21 nos APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 31-Oct-12 8:00 AM 3-Nov-12
Raslaffan
3439 Check Erection of Precast sleeper B70 - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD SECTION-1
RFI-5858-QCN-2-1114 RFI-5858-QCN-2-1114 CONCRETE APPROVED B-V-3100-004-2-201-02_2 8.2 S W H 31-Oct-12 9:30 AM 5-Nov-12
027&SLD 028- NOT INCLUDED) & PS- 04 SLD 027 TO SLD020 Raslaffan
4.1 Check Pre-Pouring for Pre-cast Removable Panel for Culvert BZRC-004 = 2 nos, Gate 5 TSF
3440 RFI-5858-QCN-2-1115 RFI-5858-QCN-2-1115 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 31-Oct-12 8:00 AM 3-Nov-12
BZRC-008 = 2 nos Raslaffan
3441 5.1 Check Concrete Pouring for Pre-cast Removable Panel for Culvert BZRC-004 = 2 Gate 5 TSF
RFI-5858-QCN-2-1116 RFI-5858-QCN-2-1116 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 31-Oct-12 8:00 AM 3-Nov-12
nos, BZRC-008 = 2 nos Raslaffan
Check Protective Coating for Pre-cast Pipe Sleepers - 1st coat B70-PS-23-F1 = 13 nos & Gate 5 TSF
3442 RFI-5858-QCN-2-1117 RFI-5858-QCN-2-1117 CONCRETE
B70-PS-24-F1 = 27 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 31-Oct-12 10:00 AM 3-Nov-12
3443 SECTION 1
RFI-5858-QCN-2-1118 RFI-5858-QCN-2-1118 CONCRETE Check Concrete curing DUCT BANK BZDW 001 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 31-Oct-12 9:00 AM 3-Nov-12
Raslaffan
Check Concrete curing D110 B70 - PR -02 Pipe Rack Foundation Pedestal 1-2 / SECTION 1
3444 RFI-5858-QCN-2-1119 RFI-5858-QCN-2-1119 CONCRETE
A,B(F1&F2)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 31-Oct-12 9:00 AM 3-Nov-12
D110 B70 - PR - 01
3445 RFI-5858-QCN-2-1120 RFI-5858-QCN-2-1120 CONCRETE Check Surface preparation D110 B70 - PR -02 Pipe Rack Foundation 1-2 / A,B(F1&F2) APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 31-Oct-12 3:30 PM 3-Nov-12
Raslaffan
Check Surface Below ground Protective Coating - First coat & Second coat DUCT BANK 7:30 AM
SECTION 1
3446 RFI-5858-QCN-2-1121 RFI-5858-QCN-2-1121 CONCRETE BZDW 001 APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2 a S W H 1-Nov-12 To 3-Nov-12
4:30 PM
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for 2
Gate 5 TSF
3447 RFI-5858-QCN-2-1122 RFI-5858-QCN-2-1122 CONCRETE stopper Pedestals B70-PS-10: SLD036 & SLD079, Precast Pipe Sleeper Perestals APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 1-Nov-12 9:30AM 1-Nov-12
Raslaffan
Footing B70-PS-01-F1 = 17 nos and B70-PS-06-F1 = 13 nos.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3448 RFI-5858-QCN-2-1123 RFI-5858-QCN-2-1123 CONCRETE Precast Pipe Sleeper Footing B70-PS-18-F1 = 31 nos, B70-PS-19-F1 = 17 nos and B70- APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 1-Nov-12 9:30AM 1-Nov-12
Raslaffan
PS-20-F1 = 2 nos
3449 RFI-5858-QCN-2-1124 RFI-5858-QCN-2-1124 CONCRETE 9.2.b Check Polyethylene Installation For Duct Bank BZDW 006 - Prior Backfilling APPROVED Section 3 Raslaffan B-V-3100-004-2-201-02_4 9.2.b S W H 1-Nov-12 6:30 AM 3-Nov-12
Check Protective Coating for Pre-cast Pipe Sleepers - 2nd coat B70-PS-23-F1 = 13 nos & Gate 5 TSF
3450 RFI-5858-QCN-2-1125 RFI-5858-QCN-2-1125 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 1-Nov-12 9:00 AM 3-Nov-12
B70-PS-24-F1 = 27 nos Raslaffan
Check form works,Reinforcement &Cleaning Stopper Foundation Footing B70 - PS -04 SECTION 1 4.1a,b,c,d,
3451 RFI-5858-QCN-2-1126 RFI-5858-QCN-2-1126 CONCRETE APPROVED B-V-3100-004-2-201-02_4 W W H 1-Nov-12 8:30 AM 3-Nov-12
SLD015 Raslaffan e
3452 SECTION 1
RFI-5858-QCN-2-1127 RFI-5858-QCN-2-1127 CONCRETE Check Concrete Pouring Stopper Foundation Footing B70 - PS -04 SLD015 APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 1-Nov-12 9:00 AM 3-Nov-12
Raslaffan
Check form works,Embedded items,Cleaning& Construction joints D210 B70 - PR - 44 SULPHUR AREA
3453 RFI-5858-QCN-2-1128 RFI-5858-QCN-2-1128 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a,c,d,e W W H 1-Nov-12 7:30 AM 3-Nov-12
Pipe Rack Foundation Pedestal G.L 1 / D21A&B (2Nos) Raslaffan
3454 Check Concrete Pouring D210 B70 - PR - 44 Pipe Rack Foundation Pedestal G.L 1 / SULPHUR AREA
RFI-5858-QCN-2-1129 RFI-5858-QCN-2-1129 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 1-Nov-12 8:00 AM 3-Nov-12
D21A&B (2Nos) Raslaffan
4.1 Check Pre-Pouring for cast-in- Situ Pedestals items: D110-B70-PR-12: F1,F2,F3,F4 &
3455 RFI-5858-QCN-2-1130 RFI-5858-QCN-2-1130 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 1-Nov-12 7:00 AM 4-Nov-12
F5 = 10 Pedestals B70-PS-06: SLD083 = 1 Pedestal
3456 5.1 Check Concrete Pouring for cast-in- Situ Pedestals items: D110-B70-PR-12:
RFI-5858-QCN-2-1131 RFI-5858-QCN-2-1131 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 1-Nov-12 8:00 AM 3-Nov-12
F1,F2,F3,F4 & F5 = 10 Pedestals B70-PS-06: SLD083 = 1 Pedestal
3457 Check Concrete Surface upon Form Removal For cast-in- Situ Pipe Sleeper - Pedestal
RFI-5858-QCN-2-1132 RFI-5858-QCN-2-1132 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 1-Nov-12 4:00 PM 3-Nov-12
B70-PS-15: SLD070 = 1 nos
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -01 Pipe D110 B70 - PR -01
3458 RFI-5858-QCN-2-1133 RFI-5858-QCN-2-1133 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9 .2 b&c S W H 1-Nov-12 8:00 AM 3-Nov-12
Rack Foundation G.L 5 (F5), 6 (F6),7 (F7)& 8 (F8) Raslaffan
3459 SECTION 1
RFI-5858-QCN-2-1134 RFI-5858-QCN-2-1134 CONCRETE Check Concrete curing B70 PS 01 F3 SLD005- PIPE SLEEPER FOOTING APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 1-Nov-12 7:00 AM 3-Nov-12
Raslaffan
Check Reinforcement & Cleaning Prior Closing for Pre-cast Pipe Sleepers - Pedestals
Gate 5 TSF
3460 RFI-5858-QCN-2-1135 RFI-5858-QCN-2-1135 CONCRETE B70-PS-03-F1 = 5 nos, B70-PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 APPROVED B-V-3100-004-2-201-02_4 4.1.b/4.1.d W W H 1-Nov-12 7:00 AM 3-Nov-12
Raslaffan
nos, & B70-PS-18-F1 = 25 nos
3461 RFI-5858-QCN-2-1136 RFI-5858-QCN-2-1136 CONCRETE Check Concrete Curing For cast-in- Situ Culvert end wall west side BZRC - 009 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 1-Nov-12 7:00 AM 3-Nov-12
3462 Check Concrete Curing For Pre-cast Pipe Track Foundaions - Footing D110-B70-PS-34, Gate 5 TSF
RFI-5858-QCN-2-1137 RFI-5858-QCN-2-1137 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 1-Nov-12 7:00 AM 3-Nov-12
35, 49, 63, 66 & 67 = 24 nos Raslaffan
Check Concrete Curing For Pre-cast Pipe Sleepers - Pedestals B70-PS-23-F1 = 13 nos & Gate 5 TSF
3463 RFI-5858-QCN-2-1138 RFI-5858-QCN-2-1138 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 1-Nov-12 7:00 AM 3-Nov-12
B70-PS-24-F1 = 27 nos Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3465 RFI-5858-QCN-2-1140 RFI-5858-QCN-2-1140 CONCRETE
Pipe Stopper Footing B70-PS-15: SLD004
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 7.2 S W H 3-Nov-12 9:30AM 3-Nov-12
7:30 Am
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 - SECTION 1
3467 RFI-5858-QCN-2-1142 RFI-5858-QCN-2-1142 CONCRETE
PR -02 Pipe Rack Foundation No 1 (F2) & 2 (F1)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 3-Nov-12 to 4-Nov-12
3:30 PM
Check Concrete Surface upon Form Removal for Pre-cast Pipe Sleepers - Pedestal B70- Gate 5 TSF
3468 RFI-5858-QCN-2-1143 RFI-5858-QCN-2-1143 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 3-Nov-12 8:00 AM 4-Nov-12
PS-26-F3 = 21 nos Raslaffan
Check Protective Coating for Pre-cast Pipe Sleeper - 1st coat B70-PS-17-F1 = 49 nos Gate 5 TSF
3470 RFI-5858-QCN-2-1145 RFI-5858-QCN-2-1145 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 3-Nov-12 07.00 AM 4-Nov-12
& B70-PS-18-F1= 1 nos Raslaffan
CONCRETE AND RAW MATERIAL TEST REPORT FOR READY MIX CONCRTE FROM -RMQ PLANT
3471 RFI-5858-QCN-2-1146 RFI-5858-QCN-2-1146 CONCRETE CANCELLED BF- S - B00- 320-002 NA NA NA NA 4-Nov-12 9:30AM 4-Nov-12
SEPTEMBER 01-09-2012 TO 30-09-2012. (DAILY,WEEKLY,MONTHLY). Raslaffan
5.1 Check Concrete Pouring for cast-in- Situ Pedestals items: D110-B70-PR-12:
3472 RFI-5858-QCN-2-1147 RFI-5858-QCN-2-1147 CONCRETE CANCELLED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 4-Nov-12 8:00 AM 5-Nov-12
F1,F2,F3,F4 & F5 = 10 PedestalsB70-PS-09: SLD054 = 1 Pedestal
4.1 Check Pre-Pouring for cast-in- Situ Pipe Stopper PedestalB70-PS-09: SLD054 = 1
3473 RFI-5858-QCN-2-1148 RFI-5858-QCN-2-1148 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 4-Nov-12 7:30 AM 4-Nov-12
Pedestal
6.3 Check Concrete Surface upon Form Removal for cast-in- Situ Pipe Sleeper -
3474 RFI-5858-QCN-2-1149 RFI-5858-QCN-2-1149 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 4-Nov-12 7:30 AM 5-Nov-12
PedestalB70-PS-06: SLD083 = 1 Pedestal
3475 Check Surface Preparation for cast-in- Situ Pipe Sleeper B70-PS-06: SLD083 = 1
RFI-5858-QCN-2-1150 RFI-5858-QCN-2-1150 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 4-Nov-12 7:30 AM 5-Nov-12
Pedestal
Check Concrete Curing for cast-in- Situ Pipe Sleeper - Applying Curing Compound B70-
3476 RFI-5858-QCN-2-1151 RFI-5858-QCN-2-1151 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 4-Nov-12 10:30 AM 5-Nov-12
PS-06: SLD083 = 1 Pedestal
3477 Check Setting Out, Line/Level For Pipe Sleepers, StopperB70-PS-16: SLD001 To
RFI-5858-QCN-2-1152 RFI-5858-QCN-2-1152 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 4-Nov-12 7:00 AM 6-Nov-12
SLD002 = 2 nosB70-PS-17: SLD071 To SLD083 = 13 nos
Check Lean Concrete Pouring For Pipe Sleepers, Stopper B70-PS-16: SLD001 To
3478 RFI-5858-QCN-2-1153 RFI-5858-QCN-2-1153 CONCRETE CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b S S H 4-Nov-12 9:00 AM Not Ready for inspection
SLD002 = 2 nosB70-PS-17: SLD071 To SLD083 = 13 nos
3.1.1 Check Grout Pre-Pouring For loop Foundations D110-B70-PR-46 & D110-B70-PR-
3479 RFI-5858-QCN-2-1154 RFI-5858-QCN-2-1154 CONCRETE 093.1.1.a Verify erection/alignment of structure released for grouting.3.1.1.b Check APPROVED Section 2 Raslaffan B-V-3100-004-2-208-02_2 3.1.1 S W H 4-Nov-12 7:00 AM 4-Nov-12
concrete and metal surface preparation., 3.1.1.c Check Formworks
4.1 Check Grout Pouring & Finishing For loop Foundations D110-B70-PR-46 & D110-
3480 RFI-5858-QCN-2-1155 RFI-5858-QCN-2-1155 CONCRETE B70-PR-094.1.a Check Depth of Pour4.1.b Check Mixing/ Pouring/ Sampling, 4.1.c Check APPROVED Section 2 Raslaffan B-V-3100-004-2-208-02_2 4.1 S W H 4-Nov-12 8:00 AM 4-Nov-12
Finishing
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -02 Pipe SECTION1
3481 RFI-5858-QCN-2-1156 RFI-5858-QCN-2-1156 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 4-Nov-12 7:00 AM 5-Nov-12
Rack Foundation No 1 (F2) & 2 (F1) Raslaffan
Check Concrete Surface upon form removal D210 B70-PR-44 Pipe rack Foundation
3483 RFI-5858-QCN-2-1158 RFI-5858-QCN-2-1158 CONCRETE APPROVED Sulfur Area B-V-3100-004-2-201-02_4 6.3 S W H 4-Nov-12 7:00 AM 5-Nov-12
Pedestal G.L 1/D21A&B (2Nos)
3484 4.1 Check Pre-Pouring for Pre-cast Type-B Culvert Cover & Type A 14 Nos, BZRC-006,
RFI-5858-QCN-2-1159 RFI-5858-QCN-2-1159 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 4-Nov-12 7:30 AM 5-Nov-12
BZRC-004 = 2 nos, BZRC-008 = 2 nos, & BZRC-008 = 14 nos
3485 5.1 Check Concrete Pouring for Pre-cast Type-B Culvert Cover BZRC-004 = 2 nos, Gate 5 TSF
RFI-5858-QCN-2-1160 RFI-5858-QCN-2-1160 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 4-Nov-12 7:30 AM 5-Nov-12
BZRC-006 = 2 nos, & BZRC-008 = 14 nos Raslaffan
SULPHUR LINE
3486 RFI-5858-QCN-2-1161 RFI-5858-QCN-2-1161 CONCRETE Check Surface preparation D210 B70 - PR - 44 Pipe Rack Foundation No 1 (F6) APPROVED B-V-3100-004-2-201-02_4 9.1 S W H 4-Nov-12 4:00 PM 5-Nov-12
Raslaffan
Check Pre-Pouring For Pre-cast Pipe Sleepers - Pedestals B70-PS-03-F1 = 5 nos, B70-
3487 Gate 5 TSF
RFI-5858-QCN-2-1162 RFI-5858-QCN-2-1162 CONCRETE PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos, & B70-PS-18-F1 = 25 APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 4-Nov-12 7:30 AM 5-Nov-12
Raslaffan
nos
Check Concrete Pouring For Pre-cast Pipe Sleepers - Pedestals B70-PS-03-F1 = 5 nos,
Gate 5 TSF
3488 RFI-5858-QCN-2-1163 RFI-5858-QCN-2-1163 CONCRETE B70-PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos, & B70-PS-18-F1 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 5.1 W H H 4-Nov-12 8:00 AM 5-Nov-12
25 nos
3489 Check concrete surface upon form removal Stopper Foundation Footing B70 - PS -04 Section1 (B70 PS-
RFI-5858-QCN-2-1164 RFI-5858-QCN-2-1164 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 4-Nov-12 10 00 AM 5-Nov-12
SLD015 04)
Check Protective Coating for Pre-cast Pipe Sleeper 2nd coat: B70-PS-17-F1 = 49 nos & Gate 5 TSF
3490 RFI-5858-QCN-2-1165 RFI-5858-QCN-2-1165 CONCRETE
B70-PS-18-PS-18-F1 = 1 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.2.a S W H 4-Nov-12 7:00 AM 5-Nov-12
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3491 RFI-5858-QCN-2-1166 RFI-5858-QCN-2-1166 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 5-Nov-12 9:30AM 5-Nov-12
Precast Pipe Sleeper Pedestal B70-PS-23-F1 = 13 nos, B70-PS-24-F1 = 27 nos Raslaffan
4.1 Check Grout Pouring & Finishing For loop Foundations D110-B70-PR-10 & D110-
3492 RFI-5858-QCN-2-1167 RFI-5858-QCN-2-1167 CONCRETE B70-PR-114.1.a Check Depth of Pour4.1.b Check Mixing/ Pouring/ Sampling, 4.1.c Check APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_2 4.1 S W H 5-Nov-12 8:00 AM 5-Nov-12
Finishing
3.1.1 Check Grout Pre-Pouring For loop Foundations D110-B70-PR-10 & D110-B70-PR-
3493 RFI-5858-QCN-2-1168 RFI-5858-QCN-2-1168 CONCRETE 113.1.1.a Verify erection/alignment of structure released for grouting.3.1.1.b Check APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_2 3.1.1 S W H 5-Nov-12 7:00 AM 5-Nov-12
concrete and metal surface preparation. 3.1.1.c Check Formworks
Check Reinforcement & Cleaning for Pedestals - Prior Closing Pre-cast Pipe Sleepers
Gate 5 TSF &
3495 RFI-5858-QCN-2-1170 RFI-5858-QCN-2-1170 CONCRETE ( Gate 5): B70-PS-03-F1 = 14 nos Cast-in- Situ Pipe Stopper ( Sec. 5): B70-PS-16: APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 5-Nov-12 8:00 AM 6-Nov-12
Section 5 Raslaffan
SLD042 = 1 nos
Check Polyethylene & Hardboard Installation for Pipe Sleepers B70-PS-15: SLD017 To 9.2.b/9.2.c
3496 RFI-5858-QCN-2-1171 RFI-5858-QCN-2-1171 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 S W H 5-Nov-12 8:00 AM 6-Nov-12
SLD063 except SLD028,SLD029 & SLD056 = 44 nos
3498 SECTION 1
RFI-5858-QCN-2-1173 RFI-5858-QCN-2-1173 CONCRETE Check Concrete Pouring B70 PS 01 F3 SLD005- PIPE SLEEPER PEDESTAL CANCELLED B-V-3100-004-2-201-02_4 5.1 W H H 5-Nov-12 2:30 PM 5-Nov-12 Not Redy for Inspection
Raslaffan
Check Surface Below ground Protective Coating - First & Second coat D210 B70 - PR -
3499 RFI-5858-QCN-2-1174 RFI-5858-QCN-2-1174 CONCRETE APPROVED SULPHUR AREA B-V-3100-004-2-201-02_4 9.2.a S W H 5-Nov-12 7:30 AM 6-Nov-12
44 Pipe Rack Foundation No 1 (F6) & Curing for G.L-1 (F6) Footing
3500 Check Polyetheylene Installation Check Hardboard Installation D210 B70 - PR - 44 Pipe SULPHUR AREA
RFI-5858-QCN-2-1175 RFI-5858-QCN-2-1175 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9 .2 b&c S W H 5-Nov-12 4:00 PM 6-Nov-12
Rack Foundation No 1 (F6) Raslaffan
4.4.1 Check Compressive Strength @1Days for grout (Loop foundationsD110-B70-PR- QATAR READY MIX
3501 RFI-5858-QCN-2-1176 RFI-5858-QCN-2-1176 CONCRETE REJECTED B-V-3100-004-2-201-02_4 4.4.1 S W H 5-Nov-12 08:30AM 5-Nov-12 FAILED TO ACHIEVE SPECIFIC STRENGTH
46&D110-B70-PR-09) Raslaffan
3502 Check Polyethylene & Hardboard Installation for Pipe Sleeper B70-PS-06: SLD083 = 1
RFI-5858-QCN-2-1177 RFI-5858-QCN-2-1177 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b/9.2.c S W H 5-Nov-12 8:00 AM 6-Nov-12
nos
3503 Check Reinforcement prior to close shuttering Stopper Foundation Pedestal B70 - PS -04
RFI-5858-QCN-2-1178 RFI-5858-QCN-2-1178 CONCRETE APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 4.1 b W W H 5-Nov-12 7:30 AM 6-Nov-12
SLD015
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
3504 RFI-5858-QCN-2-1179 RFI-5858-QCN-2-1179 CONCRETE APPROVED QIL SALWA B-V-3100-004-2-201-02_4 7.2 S W H 5-Nov-12 9:30 AM 5-Nov-12
gulf ready mix Trial mix-D
3505 7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
RFI-5858-QCN-2-1180 RFI-5858-QCN-2-1180 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 6-Nov-12 9:30AM 6-Nov-12
Cast-in- Situ Duct Bank BZDW-005 Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3506 RFI-5858-QCN-2-1181 RFI-5858-QCN-2-1181 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 6-Nov-12 9:30AM 6-Nov-12
Cast-in- Situ Pipe Track Footing D110-PR-12: F3, F4 and F5 Raslaffan
3507 Check Lean Concrete Pouring For Pipe Sleepers, Stopper B70-PS-16: SLD001 To Section 2, 3 & 5
RFI-5858-QCN-2-1182 RFI-5858-QCN-2-1182 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.0.b S W H 6-Nov-12 9:00 AM 7-Nov-12
SLD002 = 2 nosB70-PS-17: SLD071 To SLD083 = 13 nos, Raslaffan
3508 Crossing # 32
RFI-5858-QCN-2-1183 RFI-5858-QCN-2-1183 CONCRETE Check Setting Out, Line/Level For East Side of Culvert BZRC-006 APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 6-Nov-12 11:00 AM 7-Nov-12
Raslaffan
Crossing # 32
3509 RFI-5858-QCN-2-1184 RFI-5858-QCN-2-1184 CONCRETE Check Lean Concrete Pouring For East Side of Culvert BZRC-006 APPROVED B-V-3100-004-2-201-02_4 3.0.b S S H 6-Nov-12 2:00 PM 7-Nov-12
Raslaffan
Check Concrete Surface upon Form Removal for Pre-cast Pipe Sleepers - Pedestals
3510 Gate 5 TSF
RFI-5858-QCN-2-1185 RFI-5858-QCN-2-1185 CONCRETE B70-PS-03-F1 = 5 nos, B70-PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 6-Nov-12 9:00 AM 7-Nov-12
Raslaffan
nos, & B70-PS-18-F1 = 25 nos
Gate 5 TSF
3511 RFI-5858-QCN-2-1186 RFI-5858-QCN-2-1186 CONCRETE Check Pre-Pouring For Pre-cast Pipe Sleepers - Pedestals B70-PS-26-F3 = 14 nos APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1 W W H 6-Nov-12 7:30 AM 7-Nov-12
SULPHUR AREA
3513 RFI-5858-QCN-2-1188 RFI-5858-QCN-2-1188 CONCRETE Check Concrete Curing D210 B70 - PR - 44 Pipe Rack Foundation No 1 (F6) APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 6.4 S W H 6-Nov-12 7:00 AM 7-Nov-12
Check Polyetheylene Installation Check Hardboard Installation B70 PS -90 F2 Pipe SULPHUR AREA
3514 RFI-5858-QCN-2-1189 RFI-5858-QCN-2-1189 CONCRETE APPROVED B-V-3100-004-2-201-02_4 9 .2 b&c S W H 6-Nov-12 7:00 AM 7-Nov-12
Sleeper SLD001 Raslaffan
3515 RFI-5858-QCN-2-1190 RFI-5858-QCN-2-1190 CONCRETE Check Setting Out,Line/Level D110 B70 - PR - 01 Pipe Rack Foundation No.2 (F2) APPROVED PR-01 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 6-Nov-12 7:30 AM 7-Nov-12
3516 RFI-5858-QCN-2-1191 RFI-5858-QCN-2-1191 CONCRETE Check Lean Concrete Pouring D110 B70 - PR - 01 Pipe Rack Foundation No.2 (F2) APPROVED PR-01 Raslaffan B-V-3100-004-2-201-02_4 3.0 b S W H 6-Nov-12 8:30 AM 7-Nov-12
4.4.1 Check Compressive Strength @1Days for grout (Loop foundationsD110-B70-PR-10 QATAR READY MIX
3517 RFI-5858-QCN-2-1192 RFI-5858-QCN-2-1192 CONCRETE REJECTED B-V-3100-004-2-201-02_4 4.4.1 S W H 6-Nov-12 8:30AM 6-Nov-12 GROUT CUBES ARE NOT ACHIEVED THE SPEC STRENGTH
& D110-B70-PR-11) Raslaffan
B70 PS-01
3518 RFI-5858-QCN-2-1193 RFI-5858-QCN-2-1193 CONCRETE Check Setting Out,Line/Level B70 PS 01 F1 Sleeper foundation SLD 022& SLD023 APPROVED B-V-3100-004-2-201-02_4 3.a S W H 6-Nov-12 7:30 AM 7-Nov-12
Raslaffan
B70 PS-01
3519 RFI-5858-QCN-2-1194 RFI-5858-QCN-2-1194 CONCRETE Check Lean Concrete Pouring B70 PS 01 F1 Sleeper foundation SLD 022& SLD023 APPROVED B-V-3100-004-2-201-02_4 3.b S W H 6-Nov-12 8:30 AM 7-Nov-12
Raslaffan
Check Concrete Curing For Pre-cast Pipe Sleepers - Pedestals & Footings B70-PS-18-F1
Gate 5 TSF
3520 RFI-5858-QCN-2-1195 RFI-5858-QCN-2-1195 CONCRETE = 31 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 2 nos, B70-PS-26-F3 = 30 nos, B70- APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 6-Nov-12 7:00 AM 7-Nov-12
Raslaffan
PS-27-F3 = 5 nos
SECTION 1
3522 RFI-5858-QCN-2-1197 RFI-5858-QCN-2-1197 CONCRETE Check Concrete Pouring Stopper Foundation Pedestal B70 - PS -04 SLD015 APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 6-Nov-12 8:00 AM 7-Nov-12
Raslaffan
Check Concrete Curing For Pre-cast Culvert Cover Type - B & Removable PanelType-B
3523 Gate 5 TSF
RFI-5858-QCN-2-1198 RFI-5858-QCN-2-1198 CONCRETE Culvert Cover :BZRC-006 = 2 nos, BZRC-009A = 2 nos, Removable Panel: BZRC-006 = APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 6-Nov-12 7:00 AM 7-Nov-12
Raslaffan
2 nos, BZRC-009A = 1nos
3524 RFI-5858-QCN-2-1199 RFI-5858-QCN-2-1199 CONCRETE Check Concrete Curing For Cast-in- Situ Pipe Stopper - Footing B70-PS-15: SLD070 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 6-Nov-12 7:00 AM 7-Nov-12
3525 Check Final Visual Inspection For Duct Banks & Culvert BZDP 005, BZDW 005, BZDW Crossing # 11,18, 20
RFI-5858-QCN-2-1200 RFI-5858-QCN-2-1200 CONCRETE APPROVED B-V-3100-004-2-201-02_4 10.0 S W H 6-Nov-12 8:00 AM 7-Nov-12
006 & BZRC 009 & 40 Raslaffan
9:00 AM
3526 Check Surface Above Grade For Cast-in- Situ Pipe Sleeper ( Surface Preparation, 1st
RFI-5858-QCN-2-1201 RFI-5858-QCN-2-1201 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.3 S W H 7-Nov-12 To 7-Nov-12
coat & 2nd coat) B70-PS-06: SLD083 = 1 nos
4:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface Preparation For Pipe Track Foundations - Pedestals & Footings D110-
3527 RFI-5858-QCN-2-1202 RFI-5858-QCN-2-1202 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 7-Nov-12 6:30 AM 7-Nov-12
B70-PR-12: F1, F2, F3, F4, F3 (First & Seond Coat)
3528 Check Concrete Curing For Pipe Track Foundations (Using Curing Compound) -
RFI-5858-QCN-2-1203 RFI-5858-QCN-2-1203 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 7-Nov-12 2:00 PM 7-Nov-12
Pedestals & Footings D110-B70-PR-12: F1, F2, F3, F4, F5
Check Setting Out, Line/Level For Pipe Sleepers & Stopper B70-PS-17: SLD051 To Section 3 & 5
3529 RFI-5858-QCN-2-1204 RFI-5858-QCN-2-1204 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.0.a S W H 7-Nov-12 7:00 AM 8-Nov-12
SLD060 = 10 nos B70-PS-10: SLD001 To SLD006 = 6 nos Raslaffan
3530 Check Lean Concrete Pouring For Pipe Sleepers & StopperB70-PS-17: SLD051 To Section 3 & 5
RFI-5858-QCN-2-1205 RFI-5858-QCN-2-1205 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.0.b S W H 7-Nov-12 7:30 AM 8-Nov-12
SLD060 = 10 nosB70-PS-10: SLD001 To SLD006 = 6 nos Raslaffan
3531 Check Concrete Surface upon Form Removal For Culvert Cover Type-A BZRC-006 = 14 Gate 5 TSF
RFI-5858-QCN-2-1206 RFI-5858-QCN-2-1206 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 7-Nov-12 8:00 AM 7-Nov-12
nos Raslaffan
Check Reinforcement & Cleaning Prior Closing For Pre-cast Pipe Sleeper Pedestals B70- Gate 5 TSF
3532 RFI-5858-QCN-2-1207 RFI-5858-QCN-2-1207 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b/4.1.d W W H 7-Nov-12 8:00 AM 7-Nov-12
PS-18-F1 = 7 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos Raslaffan
Check Pre-Pouring For Pre-cast Pipe Track Foundations (Loop) - Footing D110-B70-PR-
3533 Gate 5 TSF
RFI-5858-QCN-2-1208 RFI-5858-QCN-2-1208 CONCRETE 50, 51, 52, 53, 68, 69 and Cost- in site Pipe stopper - Pedestal B70 PS-16 - SLD042 = 1 APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 7-Nov-12 7:00 AM 8-Nov-12
Raslaffan
nos.
Check concrete surface upon form removal B70 PS 01 F3 SLD005- Sleeper Foundation
3534 RFI-5858-QCN-2-1209 RFI-5858-QCN-2-1209 CONCRETE
Pedestal B70 - PS -04 F2 SLD015 - Stopper Foundation Pedestal
APPROVED Section1 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 7-Nov-12 2:30 PM 6-Nov-12
Check Concrete Pouring For Pre-cast Pipe Track Foundations (Loop) - Footing D110-
3535 Gate 5 TSF
RFI-5858-QCN-2-1210 RFI-5858-QCN-2-1210 CONCRETE B70-PR-50, 51, 52, 53, 68, 69 = 24 nos, and B70-PS-26 F3=14 Nos Cast- in site Pipe APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 7-Nov-12 7:30 AM 8-Nov-12
Raslaffan
stopper - Pedestal B70 PS-16 - SLD042 = 1 nos.
3536 RFI-5858-QCN-2-1211 RFI-5858-QCN-2-1211 CONCRETE Check Surface preparation of DUCT BANK BZDP 002 APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 7-Nov-12 7:10 AM 7-Nov-12
Check Setting Out,Line/Level Sleeper foundation B70 PS- 01 -F1 SLD 001,PS- 02- F1
3537 RFI-5858-QCN-2-1212 RFI-5858-QCN-2-1212 CONCRETE APPROVED B70 PS-01 Raslaffan B-V-3100-004-2-201-02_4 3.a S W H 7-Nov-12 7:30 AM 8-Nov-12
SLD 034,PS- 03- F1 SLD 027,SLD 054,PS- 03- F4 SLD051,SLD 052
Check Lean Concrete Pouring Sleeper foundation B70 PS- 01 -F1 SLD 001,PS- 02- F1
3538 RFI-5858-QCN-2-1213 RFI-5858-QCN-2-1213 CONCRETE
SLD 034,PS- 03- F1 SLD 027,SLD 054,PS- 03- F4 SLD051,SLD 052
APPROVED B70 PS-01 Raslaffan B-V-3100-004-2-201-02_4 3.b S W H 7-Nov-12 8:30 AM 7-Nov-12
Prepouring-Check form works,Reinforcement,Cleaning Pipe Rack Foundation D210 B70 - SULPHUR AREA
3539 RFI-5858-QCN-2-1214 RFI-5858-QCN-2-1214 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a,b,d W W H 7-Nov-12 8:30 AM 8-Nov-12
PR - 45 & D210 B70 - PR - 71 Raslaffan
SULPHUR AREA
3540 RFI-5858-QCN-2-1215 RFI-5858-QCN-2-1215 CONCRETE Check Concrete Pouring Pipe Rack Foundation D210 B70 - PR - 45 & D210 B70 - PR - 71 APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 7-Nov-12 1:00 PM 8-Nov-12
Raslaffan
Check Surface Below ground Protective Coating - First coat & Second coat DUCT BANK 9:30 AM
SECTION 1
3541 RFI-5858-QCN-2-1216 RFI-5858-QCN-2-1216 CONCRETE BZDP002 APPROVED B-V-3100-004-2-201-02_4 9.2.a S W H 7-Nov-12 to 7-Nov-12
Raslaffan
4:30 PM
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3542 RFI-5858-QCN-2-1217 RFI-5858-QCN-2-1217 CONCRETE Pre-cast Pipe Sleepers Pedestals: B70-PS-17-F1 = 49 nos & B70-PS-18-F1= 1 nos APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 8-Nov-12 9:30AM 8-Nov-12
Raslaffan
Footings: B70-PS-26-F3 = 31 nos & B70-PS-24-F1 = 1 nos.
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
3543 RFI-5858-QCN-2-1218 RFI-5858-QCN-2-1218 CONCRETE APPROVED QIL SALWA B-V-3100-004-2-201-02_4 7.2 S W H 8-Nov-12 9:30AM 9-Nov-12
Gulf Ready Mix Trial 4,5,6 Mix-D
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
3544 Gate 5 TSF
RFI-5858-QCN-2-1219 RFI-5858-QCN-2-1219 CONCRETE Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation Pedestal G.L 15 - 9 /A,B - APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 8-Nov-12 9:30AM 8-Nov-12
Raslaffan
(14No.s)
Check Polyethylene & Hardboard Installation For Pipe Track Foundations D110-B70-PR-
3545 RFI-5858-QCN-2-1220 RFI-5858-QCN-2-1220 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b/9.2.c S W H 8-Nov-12 6:30 PM 8-Nov-12
12: F1, F2, F3, F4, F5 = 5 nos
Check concrete surface upon form removal B70 PS 01 F3 SLD005- Sleeper Foundation
3547 RFI-5858-QCN-2-1222 RFI-5858-QCN-2-1222 CONCRETE APPROVED Section1 Raslaffan B-V-3100-004-2-201-02_4 6.3 S W H 8-Nov-12 3:30 PM 8-Nov-12
Pedestal B70 - PS -04 F2 SLD015 - Stopper Foundation Pedestal
Check Final Visual Inspection Sleeper foundations B70 - PS -03 Pipe Sleeper SLD055
3548 SECTION1
RFI-5858-QCN-2-1223 RFI-5858-QCN-2-1223 CONCRETE TO SLD100 B70 - PS -02 Pipe Sleeper SLD01 TO SLD033, B70 - PS -01 Pipe Sleeper APPROVED B-V-3100-004-2-201-02_4 9.2 S W H 8-Nov-12 7:30 AM 8-Nov-12
Raslaffan
SLD002 TO SLD004
3549 4.2 Check Grout Post Pour Inspection For loop Foundations - Removal of Forms, curing &
RFI-5858-QCN-2-1224 RFI-5858-QCN-2-1224 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-208-02_2 4.2 S W H 8-Nov-12 8:00 AM 8-Nov-12
voids check. D110-B70-PR-46, 09, 10 & 11 = 4 loops
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Reinforcement Prior to close shuttering Pipe Rack Foundation Pedestal D210-B70- Sulphur Area
3550 RFI-5858-QCN-2-1225 RFI-5858-QCN-2-1225 CONCRETE CANCELLED B-V-3100-004-2-202-02_4 4.1.b W W H 8-Nov-12 4:30 PM 8-Nov-12 Not Ready for Inspection
PR = 45 & D210-B70-PR = 71 Raslaffan
Check Polyethylene & Hardboard Installation For Pipe Sleepers B70-PS-06: SLD062 &
3551 RFI-5858-QCN-2-1226 RFI-5858-QCN-2-1226 CONCRETE SLD063 = 2 nos/ B70-PS-09: SLD051 To SLD053, SLD035 To SLD038, SLD072, APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 9.2.b/9.2.c S W H 10-Nov-12 6:30 PM 12-Nov-12
SLD073 = 9 nos
4.1 Check Grout Pouring & Finishing For loop Foundations D110-B70-PR-48, D110-B70-
3553 RFI-5858-QCN-2-1228 RFI-5858-QCN-2-1228 CONCRETE PR-14, & D110-B70-PR-154.1.a Check Depth of Pour4.1.b Check Mixing/ Pouring/ APPROVED Section 3 Raslaffan B-V-3100-004-2-208-02_2 4.1 S W H 10-Nov-12 7:30 AM 10-Nov-12
Sampling, 4.1.c Check Finishing
Check Concrete Surface upon Form Removal For Pre-cast Pipe Sleepers - Pedestals
3554 Gate 5 TSF
RFI-5858-QCN-2-1229 RFI-5858-QCN-2-1229 CONCRETE B70-PS-26-F3 = 14 nos and Cast-In-Situ pipe stopper (pedestal) B70-PS-16 SLD042= 1 APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 10-Nov-12 7:30 AM 12-Nov-12
Raslaffan
Nos
Check Surface preparation of Pipe Sleeper Foundation -Above ground B70 - PS -03 Pipe
3555 RFI-5858-QCN-2-1230 RFI-5858-QCN-2-1230 CONCRETE Sleeper SLD01 TO SLD043(SLD 027&SLD 028- NOT INCLUDED) & PS- 04 SLD 027 TO APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 10-Nov-12 7:30 AM 12-Nov-12
SLD020
3556 Check Setting Out, Line/Level For Pipe Sleepers & Stopper B70-PS-17: SLD021 To
RFI-5858-QCN-2-1231 RFI-5858-QCN-2-1231 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.a S W H 10-Nov-12 7:00 AM 12-Nov-12
SLD034 = 15 nos
Check Lean Concrete Pouring For Pipe Sleepers & Stopper B70-PS-17: SLD021 To
3557 RFI-5858-QCN-2-1232 RFI-5858-QCN-2-1232 CONCRETE
SLD035 = 15 nos
CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_4 3.0.b W W H 10-Nov-12 7:30 AM 10-Nov-12 Cancelled due to supply of concrete from RMQ
3558 SECTION 1
RFI-5858-QCN-2-1233 RFI-5858-QCN-2-1233 CONCRETE Check Concrete curing DUCT BANK BZDP 002 APPROVED B-V-3100-004-2-201-02_4 6.4 S W H 10-Nov-12 7:00 AM 12-Nov-12
Raslaffan
Check Sufface Preparation For Pre-cast Pipe Track Foundations D110-B70-PR-34, 35, Gate 5 TSF
3559 RFI-5858-QCN-2-1234 RFI-5858-QCN-2-1234 CONCRETE
49, 63, 66, 67 = 24 nos.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 9.1 S W H 10-Nov-12 7:30 AM 12-Nov-12
Check Reinforcement prior to close shuttering Pipe Rack Foundation Pedestal D210 B70 Sulphur Area
3560 RFI-5858-QCN-2-1235 RFI-5858-QCN-2-1235 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b W W H 10-Nov-12 4:30 PM 12-Nov-12
- PR - 45 & D210 B70 - PR - 71 Raslaffan
Check Reinforcement & Cleaning prior closing For Pre-cast Culvert Cover Wall Type-B
3561 RFI-5858-QCN-2-1236 RFI-5858-QCN-2-1236 CONCRETE
BZRC-004 = 2 nos & BZRC-008 = 2 nos
APPROVED Gate 5 TSF B-V-3100-004-2-201-02_4 4.1.b/4.1.c W W H 10-Nov-12 7:30 AM 12-Nov-12
Check Pre-Pouring For Cast-in- Situ Culvert East Side Cover- Base BZRC-006 = 1 Crossing # 32
3562 RFI-5858-QCN-2-1237 RFI-5858-QCN-2-1237 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 10-Nov-12 10:30 AM 12-Nov-12
Base Intermediate 3 Nos & End = nos Raslaffan
Check Concrete Pouring For Cast-in- Situ Culvert East Side Cover- Base BZRC-006 = Crossing # 32
3563 RFI-5858-QCN-2-1238 RFI-5858-QCN-2-1238 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 10-Nov-12 10:00 AM 12-Nov-12
1 Base Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for Gate 5 TSF
3564 RFI-5858-QCN-2-1239 RFI-5858-QCN-2-1239 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 11-Nov-12 9:30AM 11-Nov-12
cast-in- Situ Pipe Track Footing D110-B70-PR-12 ( F2) Raslaffan
7.2 Check Compressive Strength @28 Days (Cube Testing as per BS EN 12390-3)for
Gate 5 TSF
3565 RFI-5858-QCN-2-1240 RFI-5858-QCN-2-1240 CONCRETE Pipe Stopper - Pedestal B70-PS-15: SLD004,Pre-cast Pipe Track Foundations - Footing APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 11-Nov-12 9:30AM 11-Nov-12
Raslaffan
D110-B70-PR-34, 35, 49, 63, 66, & 67 = 24 nos.
3566 RFI-5858-QCN-2-1241 RFI-5858-QCN-2-1241 CONCRETE Check Surface preparation Stopper Foundation B70 - PS -04 SLD015 APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 11-Nov-12 7:00 AM 12-Nov-12
3567 Check Protective Coating For Pre-Cast Pipe Track Foundations - 1st coat D110-B70-PR- Gate 5 TSF
RFI-5858-QCN-2-1242 RFI-5858-QCN-2-1242 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 11-Nov-12 8:00 AM 12-Nov-12
34, 35, 49, 63, 66 & 67 = 24 nos Raslaffan
Check Protective Coating For Pre-Cast Type-B Cover wall - 1st coat BZRC 006 = 1 nos & Gate 5 TSF
3568 RFI-5858-QCN-2-1243 RFI-5858-QCN-2-1243 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 11-Nov-12 8:00 AM 12-Nov-12
BZRC 009A = 2 nos Raslaffan
3569 Check Pre-Pouring For Pre-cast Pipe Sleeper Pedestals B70-PS-18-F1 = 7 nos, B70-PS- Gate 5 TSF
RFI-5858-QCN-2-1244 RFI-5858-QCN-2-1244 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 11-Nov-12 8:00 AM 12-Nov-12
19-F1 = 17 nos, B70-PS-20-F1 = 26 nos Raslaffan
Check Concrete Pouring For Pre-cast Pipe Sleeper Pedestals B70-PS-18-F1 = 7 nos, Gate 5 TSF
3570 RFI-5858-QCN-2-1245 RFI-5858-QCN-2-1245 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Nov-12 8:00 AM 12-Nov-12
B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos Raslaffan
3571 Witness laboratory test for Grout cube sample one day, QCON-G003 (D110-B70-PR-48,
RFI-5858-QCN-2-1246 RFI-5858-QCN-2-1246 CONCRETE APPROVED RMQ Raslaffan Area B-V-3100-004-2-201-02_2 4.4.1 S W H 11-Nov-12 9:30 AM 11-Nov-12
D110-B70-PR-14, & D110-B70-PR-15)
Check Above Ground Protective Coating of Stopper foundation Pedestal - First Coat B70
3572 SECTION1
RFI-5858-QCN-2-1247 RFI-5858-QCN-2-1247 CONCRETE - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD 027&SLD 028- NOT INCLUDED) & PS- APPROVED B-V-3100-004-2-201-02_4 9 .3 S W H 11-Nov-12 3:00 PM 12-Nov-12
Raslaffan
04 SLD 027 TO SLD020
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
3574 Visual Inspection of completed welds of Embedded plate for TAGS- Culverts BZRC-006 Gate # 5 TSF
RFI-5858-QCN-2-1249 RFI-5858-QCN-2-1249 CONCRETE APPROVED B-V-3100-004-2-208-01_2 2.3.8 W W H 11-Nov-12 7.00 AM 11-Nov-12
(4nos), BZRC-003 (4nos) Prior to Galvanizing. Raslaffan
Check Reinforcement & Cleaning Prior Closing For Cast-in-situ Culvert BZRC-006 East Crossing # 32
3575 RFI-5858-QCN-2-1250 RFI-5858-QCN-2-1250 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 12-Nov-12 7:00 AM 12-Nov-12
Side Intermediate Walls = 6 nos & Sleeper = 1 nos Raslaffan
3576 Check Protective Coating For Pre-Cast Type-B Cover wall - 2nd coat BZRC 006 = 1 nos Gate 5 TSF
RFI-5858-QCN-2-1251 RFI-5858-QCN-2-1251 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 12-Nov-12 8:00 AM 12-Nov-12
& BZRC 009A = 2 nos Raslaffan
3577 Check Protective Coating For Pre-Cast Pipe Track Foundations - 2nd coat D110-B70-PR- Gate 5 TSF
RFI-5858-QCN-2-1252 RFI-5858-QCN-2-1252 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 12-Nov-12 8:00 AM 12-Nov-12
34, 35, 49, 63, 66 & 67 = 24 nos Raslaffan
Check Reinforcement & Cleaning prior closing For Pre-cast Pipe Track Foundations Gate 5 TSF
3578 RFI-5858-QCN-2-1253 RFI-5858-QCN-2-1253 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 12-Nov-12 7:00 AM 12-Nov-12
(Loop) - Pedestals D110-B70-PR-50, 51, 52, 53, 68, 69 = 24 nos Raslaffan
3579 Check Pre-Pouring For Pre-Cast Culver Cover Type-B BZRC-004 = 2 nos & BZRC-008 = Gate 5 TSF
RFI-5858-QCN-2-1254 RFI-5858-QCN-2-1254 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 12-Nov-12 11:00 AM 12-Nov-12
2 nos Raslaffan
Check Concrete Pouring For Pre-Cast Culver Cover Type-B BZRC-004 = 2 nos & BZRC- Gate 5 TSF
3580 RFI-5858-QCN-2-1255 RFI-5858-QCN-2-1255 CONCRETE
008 = 2 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 12-Nov-12 01:00 PM 12-Nov-12
Check Concrete Pouring Pipe Rack Foundation Pedestals D210 B70 PR 45 SL/D05A- SULPHUR AREA
3582 RFI-5858-QCN-2-1257 RFI-5858-QCN-2-1257 CONCRETE
O5B / 1A -1B D210 B70 PR 71 SL/D013A-013B / 1A -1B (8Nos)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 12-Nov-12 1:00 PM 12-Nov-12
Check Setting Out, Line/Level For Pipe Sleepers B70-PS-13: SLD020,SLD022, SLD027,
3583 RFI-5858-QCN-2-1258 RFI-5858-QCN-2-1258 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 3.0.a S W H 12-Nov-12 7:00 AM 12-Nov-12
SLD028 = 4 nos/B70-PS-14: SLD063, SLD064, SLD101, SLD102 = 4 nos
Check Lean Concrete Pouring For Pipe Sleepers & Stopper B70-PS-17: SLD021 To
Section 5 & 4
3584 RFI-5858-QCN-2-1259 RFI-5858-QCN-2-1259 CONCRETE SLD035 = 15 nos B70-PS-13: SLD020,SLD022, SLD027, SLD028 = 4 nos/B70-PS-14: APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 3.0.b S S H 12-Nov-12 7:30 AM 12-Nov-12
SLD063, SLD064, SLD101, SLD102 = 4 nos
7:30 AM
Check Surface Below ground Protective Coating - First coat & Second coat Stopper SECTION 1
3585 RFI-5858-QCN-2-1260 RFI-5858-QCN-2-1260 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 12-Nov-12 to 12-Nov-12
Foundation and hardboard & Polyethylene sheet B70 - PS -04 F2 SLD015 Raslaffan
2:30 PM
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Gate 5 TSF
3587 RFI-5858-QCN-2-1262 RFI-5858-QCN-2-1262 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 13-Nov-12 9:30 AM 13-Nov-12
Concrete Pouring For Duct Bank BZDW 006. Raslaffan
3590 Check Polyethylene & Hardboard Installation For Pipe Sleepers B70-PS-09: SLD0022, Section 2 & 3
RFI-5858-QCN-2-1265 RFI-5858-QCN-2-1265 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 13-Nov-12 6:30 PM 13-Nov-12
SLD023 = 2 nos, B70-PS-10: SLD001 To SLD009 = 9 nos Raslaffan
Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
3591 RFI-5858-QCN-2-1266 RFI-5858-QCN-2-1266 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1 W W H 13-Nov-12 7:00 AM 12-Nov-12
End Wall = 1 nos Raslaffan
3592 RFI-5858-QCN-2-1267 RFI-5858-QCN-2-1267 CONCRETE Check Surface Preparation For Cast-in- Situ Pipe Stopper B70-PS-09: SLD054 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Nov-12 6:30 PM 13-Nov-12
Check Curing For Cast-in- Situ Pipe Stopper - Using Curing Compound B70-PS-09:
3593 RFI-5858-QCN-2-1268 RFI-5858-QCN-2-1268 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Nov-12 7:30 AM 13-Nov-12
SLD054
3594 Check Setting Out, Line/Level For Pipe Sleepers & LoopB70-PS-17: SLD020 To SLD003
RFI-5858-QCN-2-1269 RFI-5858-QCN-2-1269 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 3.0.a S S H 13-Nov-12 7:00 AM 13-Nov-12
= 18 nos/D110-B70-PR-68
3595 Check Lean Concrete Pouring For Pipe Sleepers & LoopB70-PS-17: SLD020 To SLD003
RFI-5858-QCN-2-1270 RFI-5858-QCN-2-1270 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 3.0.b S S H 13-Nov-12 7:30 AM 14-Nov-12
= 18 nos/D110-B70-PR-68
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Pre-Pouring For Cast-in- Situ Culvert BZRC-006 East End Sleeper = 1 nos & Crossing # 32
3596 RFI-5858-QCN-2-1271 RFI-5858-QCN-2-1271 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 13-Nov-12 9:00 AM 13-Nov-12
Intermediate Wall = 6 nos Raslaffan
3597 Check concrete surface upon form removal Pipe Rack Foundation Pedestals D210 B70
RFI-5858-QCN-2-1272 RFI-5858-QCN-2-1272 CONCRETE APPROVED SULPHUR AREA B-V-3100-004-2-201-02_5 6.3 S W H 13-Nov-12 3:30 PM 13-Nov-12
PR 45 SL/D05A-O5B / 1A -1B & D210 B70 PR 71 SL/D013A-013B / 1A -1B (8Nos)
Check Concrete Pouring For Cast-in- Situ Culvert BZRC-006 East End Sleeper = 1 nos & Crossing # 32
3598 RFI-5858-QCN-2-1273 RFI-5858-QCN-2-1273 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-Nov-12 10:00 AM 13-Nov-12
Intermediate Wall = 6 nos Raslaffan
3599 RFI-5858-QCN-2-1274 RFI-5858-QCN-2-1274 CONCRETE Check Surface preparation Sleeper Foundation B70 - PS -01 SLD005 APPROVED Section 1 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Nov-12 4:00 PM 13-Nov-12
3600 Check Concrete Curing For Cast-in- Situ Culvert BZRC-006 East End Slab & Intermediate Crossing # 32
RFI-5858-QCN-2-1275 RFI-5858-QCN-2-1275 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 13-Nov-12 7:00 AM 13-Nov-12
Slab = 3 nos - Base ( Using Curing Compound) Raslaffan
Check Pre-Pouring For Pre-Cast Pipe Sleepers - Footing B70-PS-09-F1 = 21 nos/ B70- Gate 5 TSF
3601 RFI-5858-QCN-2-1276 RFI-5858-QCN-2-1276 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 13-Nov-12 7:00 AM 14-Nov-12
PS-10-F1 = 3 nos/ B70-PS-14-F1 = 19 nos/ B70-PS-15-F1 = 5 nos Raslaffan
Check Concrete Pouring For Pre-Cast Pipe Sleepers - Footing B70-PS-09-F1 = 21 nos/
3602 Gate 5 TSF
RFI-5858-QCN-2-1277 RFI-5858-QCN-2-1277 CONCRETE B70-PS-10-F1 = 3 nos/ B70-PS-14-F1 = 19 nos/ B70-PS-15-F1 = 7 nos Cast-in-situ B70- APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-Nov-12 8:00 AM 13-Nov-12
Raslaffan
PS-16 SLD002=1 nos Footing
Check Polyetheylene Installation Check Hardboard Installation Stopper Foundation B70 - SECTION1
3603 RFI-5858-QCN-2-1278 RFI-5858-QCN-2-1278 CONCRETE
PS -04 F2 SLD015
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2 S W H 13-Nov-12 3:00 PM 13-Nov-12
Check Above Ground Protective Coating of Sleeper & block foundation - First Coat & 10:00 AM
3604 RFI-5858-QCN-2-1279 RFI-5858-QCN-2-1279 CONCRETE Second coat B70 PS -90 F1 Pipe Sleeper SLD002,004,007,008,010,011,012,015,&016 APPROVED SULPHUR AREA B-V-3100-004-2-201-02_5 9.3 S W H 13-Nov-12 to 13-Nov-12
-9Nos F3 - SLD003,SLD009&SLD017 -5Nos , F4- BLOCK-12NoS 4:00 PM
Gate 5 TSF
3605 RFI-5858-QCN-2-1280 RFI-5858-QCN-2-1280 CONCRETE Check Surface Preparation For Pre-Cast Pipe Sleepers B70-PS-26-F1 = 50 nos APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 13-Nov-12 8:00 AM 13-Nov-12
Check Concrete curing Stopper Foundation Pedestal B70 - PS -04 F2 SLD015(Footing & SECTION 1
3606 RFI-5858-QCN-2-1281 RFI-5858-QCN-2-1281 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 13-Nov-12 7:00 AM 13-Nov-12
Pedestal) Raslaffan
Check Concrete Surface upon Form Removal For Pre-cast Pipe Sleeper Pedestals B70- Gate 5 TSF
3607 RFI-5858-QCN-2-1282 RFI-5858-QCN-2-1282 CONCRETE
PS-18-F1 = 7 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 14-Nov-12 8:00 AM 14-Nov-12
Check Concrete Surface upon Form Removal For Pre-Cast Culver Cover Type-B BZRC- Gate 5 TSF
3608 RFI-5858-QCN-2-1283 RFI-5858-QCN-2-1283 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 14-Nov-12 8:00 AM 14-Nov-12
004 = 2 nos & BZRC-008 = 2 nos Raslaffan
Gate 5 TSF
3609 RFI-5858-QCN-2-1284 RFI-5858-QCN-2-1284 CONCRETE Check Pre-Pouring For Pre-Cast Culvert Cover Type-A For BZRC-008 = 20 nos APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 14-Nov-12 7:00 AM 14-Nov-12
Raslaffan
Check Concrete Pouring For Pre-Cast Culvert Cover Type-A For BZRC-008 = 19 nos, & Gate 5 TSF
3610 RFI-5858-QCN-2-1285 RFI-5858-QCN-2-1285 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Nov-12 8:00 AM 14-Nov-12
BZRC 006 1 NOS Raslaffan
Check Polyethylene & Hardboard Installation For Cast-in- Situ Pipe Stopper B70-PS-09:
3611 RFI-5858-QCN-2-1286 RFI-5858-QCN-2-1286 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 14-Nov-12 6:30 PM 14-Nov-12
SLD054
7:30 AM
Check Surface Below ground Protective Coating - First coat & Second coat Sleeper SECTION 1
3612 RFI-5858-QCN-2-1287 RFI-5858-QCN-2-1287 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 14-Nov-12 to 14-Nov-12
Foundation B70 - PS -01 F3 SLD005 Raslaffan
9:30 AM
3613 Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
RFI-5858-QCN-2-1288 RFI-5858-QCN-2-1288 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 14-Nov-12 2:00 PM 14-Nov-12
End Sleeper = 1 nos & Intermediate Wall = 6 nos Raslaffan
SECTION 1
3614 RFI-5858-QCN-2-1289 RFI-5858-QCN-2-1289 CONCRETE Check Concrete curing B70 PS 01 F3 SLD005- PIPE SLEEPER PEDESTAL APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 14-Nov-12 7:25 AM 14-Nov-12
Raslaffan
3615 Check Concrete Curing For Cast-in- Situ Culvert BZRC-006 East End Sleeper = 1 nos & Crossing # 32
RFI-5858-QCN-2-1290 RFI-5858-QCN-2-1290 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 6.3 S W H 14-Nov-12 4:00 PM 13-Nov-12
Intermediate Wall = 6 nos - - Applying Curing Compound Raslaffan
Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
3616 RFI-5858-QCN-2-1291 RFI-5858-QCN-2-1291 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 14-Nov-12 8:00 AM 15-Nov-12
End Wall = 1 nos Raslaffan
3617 Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundations B70
RFI-5858-QCN-2-1292 RFI-5858-QCN-2-1292 CONCRETE APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 14-Nov-12 4:30 PM 14-Nov-12
- PS -01 SLD001,SLD005,SLD014 TO SLD023 & B70 - PS -02 SLD034
3618 4.2 Check Grout Post Pour For loop Foundations D110-B70-PR-48, D110-B70-PR-14, &
RFI-5858-QCN-2-1293 RFI-5858-QCN-2-1293 CONCRETE APPROVED Section 3 Raslaffan B-V-3100-004-2-208-02_2 4.2 S W H 14-Nov-12 7:00 AM 14-Nov-12
D110-B70-PR-15 - Check Forms Removal, Curing, & Voide Check.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Above Ground Protective Coating of Stopper foundation Pedestal - Second Coat
3619 RFI-5858-QCN-2-1294 RFI-5858-QCN-2-1294 CONCRETE B70 - PS -03 Pipe Sleeper SLD01 TO SLD043(SLD 027&SLD 028- NOT INCLUDED) & APPROVED SECTION1 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 14-Nov-12 3:00 PM 14-Nov-12
PS- 04 SLD 027 TO SLD020
3620 Check Surface preparation Pipe Rack Foundation D210 B70 - PR - 45 & D210 B70 - PR - SULPHUR LINE
RFI-5858-QCN-2-1295 RFI-5858-QCN-2-1295 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 14-Nov-12 4:00 PM 14-Nov-12
71 Raslaffan
Check Final Visual Inspection Sleeper& Block foundations B70 PS -90 F1 Pipe Sleeper
SECTION1
3621 RFI-5858-QCN-2-1296 RFI-5858-QCN-2-1296 CONCRETE SLD002,004,007,008,010,011,012,015,&016 -9Nos F3 - SLD003,SLD009&SLD017 APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 14-Nov-12 7:30 AM 14-Nov-12
Raslaffan
-5Nos , F4- BLOCK-12NoS F2-SLD001
3622 Check Pre-Pouring For Pre-cast Pipe Track Foundations (Loop) - Pedestals D110-B70- Gate 5 TSF
RFI-5858-QCN-2-1297 RFI-5858-QCN-2-1297 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 15-Nov-12 7:00 AM 15-Nov-12
PR-50, 51, 52, 53, 68, 69 Raslaffan
3623 Check Concrete Pouring For Pre-cast Pipe Track Foundations (Loop) - Pedestals D110- Gate 5 TSF
RFI-5858-QCN-2-1298 RFI-5858-QCN-2-1298 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 15-Nov-12 7:30 AM 15-Nov-12
B70-PR-50, 51, 52, 53, 68, 69 = 24 nos Raslaffan
Gate 5 TSF
3624 RFI-5858-QCN-2-1299 RFI-5858-QCN-2-1299 CONCRETE Check Protective Goating For Pre-Cast Pipe Sleepers - 1st coat B70-PS-26-F1 = 50 nos APPROVED B-V-3100-004-2-201-02_5 9.2.c S W H 15-Nov-12 10:00 AM 15-Nov-12
Raslaffan
3625 Prepouring - Check form works,Reinforcement& Cleaning, D110 B70 - PR -01 Pipe D110 B70 - PR - 01
RFI-5858-QCN-2-1300 RFI-5858-QCN-2-1300 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 15-Nov-12 8:30 AM 15-Nov-12
Rack Foundation 1(F1) & 2(F2) Raslaffan
D110 B70 - PR - 01
3626 RFI-5858-QCN-2-1301 RFI-5858-QCN-2-1301 CONCRETE Check Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation 1(F1) & 2(F2) APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 15-Nov-12 1:30 PM 15-Nov-12
3627 RFI-5858-QCN-2-1302 RFI-5858-QCN-2-1302 CONCRETE Check Pre-Pouring For Cast-in- Situ Pipe Stopper - Footing B70-PS-09: SLD021 = 1 nos APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 4.1 W W H 15-Nov-12 7:00 AM 15-Nov-12
Check Concrete Pouring For Cast-in- Situ Pipe Stopper - Footing B70-PS-09: SLD021 = 1
3628 RFI-5858-QCN-2-1303 RFI-5858-QCN-2-1303 CONCRETE
nos
APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_4 5.1 W H H 15-Nov-12 7:00 AM 15-Nov-12
Check Surface Preparation For Cast-in- Situ Culvert BZRC-006 East End Sleeper = 1 nos Crossing # 32
3629 RFI-5858-QCN-2-1304 RFI-5858-QCN-2-1304 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 15-Nov-12 7:00 AM 15-Nov-12
& Intermediate Wall = 6 nos Raslaffan
Check Surface above grade for cast-in- Situ Pipe Sleepers & Stopper ( Surface
Preparation, 1st coat & 2nd coat) B70-PS-06: SLD083, SLD062, SLD063/ B70-PS-09: Section 2 & 3
3630 RFI-5858-QCN-2-1305 RFI-5858-QCN-2-1305 CONCRETE
SLD023, SLD024, SLD035 To SLD038, SLD051 To SLD056, SLD072 & SLD073 = 17
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.3 S W H 15-Nov-12 3:00 PM 15-Nov-12
nos B70-PS-10: SLD001 To SLD009 = 9 nos
7:00 AM
Check Surface Below ground Protective Coating - First & Second coat Pipe Rack SULPHUR AREA
3631 RFI-5858-QCN-2-1306 RFI-5858-QCN-2-1306 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 15-Nov-12 to 15-Nov-12
Foundation D210 B70 - PR - 45 & D210 B70 - PR - 71 Raslaffan
1:30 PM
Check Polyetheylene Installation Check Hardboard Installation Pipe Rack Foundation SULPHUR AREA
3632 RFI-5858-QCN-2-1307 RFI-5858-QCN-2-1307 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 15-Nov-12 4:00 PM 15-Nov-12
D210 B70 - PR - 45 & D210 B70 - PR - 71 Raslaffan
Check Concrete Curing Pipe Rack Foundation D210 B70 - PR - 45 & D210 B70 - PR - 71 SULPHUR AREA
3633 RFI-5858-QCN-2-1308 RFI-5858-QCN-2-1308 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 15-Nov-12 7:00 AM 15-Nov-12
(Footing & Pedestal) Raslaffan
3636 Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Pipe Stopper - Section 2 & 5
RFI-5858-QCN-2-1311 RFI-5858-QCN-2-1311 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 17-Nov-12 7:00 AM 17-Nov-12
Pedestals B70-PS-09: SLD021 = 1 nos & B70-PS-16: SLD002 = 1 nos Raslaffan
Check Sealant Application For Expansion Joints For Cast-in- Situ Culvert BZRC-006 Crossing # 32
3637 RFI-5858-QCN-2-1312 RFI-5858-QCN-2-1312 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 17-Nov-12 7:00 AM 17-Nov-12
East Intermediate Wall = 6 nos Raslaffan
3638 Check Reinforcement & Cleaning prior closing For Pre-cast pipe Sleepers - Pedestals Gate 5 TSF
RFI-5858-QCN-2-1313 RFI-5858-QCN-2-1313 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 17-Nov-12 7:00 AM 17-Nov-12
B70-PS-18-F1 = 7 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos Raslaffan
Check Form Removal For Pre-cast Pipe Track Foundations (Loop) - Pedestals D110- Gate 5 TSF
3639 RFI-5858-QCN-2-1314 RFI-5858-QCN-2-1314 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 6.3 S W H 17-Nov-12 7:00 AM 15-Nov-12
B70-PR-50, 51, 52, 53, 68, 69 Raslaffan
3640 Check Form Removal For Pre-cast Culvert Cover Type-A For BZRC 008 = 19 nos & Gate 5 TSF
RFI-5858-QCN-2-1315 RFI-5858-QCN-2-1315 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.3 S W H 17-Nov-12 7:00 AM 17-Nov-12
BZRC 006 = 1 nos Raslaffan
3641 Final Inspection of galvanized Items Embedded Plate for Culverts, BZRC-003 (4 nos) & Qcon TSF Laydown
RFI-5858-QCN-2-1316 RFI-5858-QCN-2-1316 CONCRETE APPROVED B-V-3100-004-2-201-02_4 6.0 S/R H H 17-Nov-12 9:30 AM 19-Nov-12
BZRC-006 (4 nos) Yard QG Gate # 5
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Pre-Pouring For Pre-cast Pipe Sleepers - Footing B70-PS-28-F1 = 2 nos & B70- Gate 5 TSF
3642 RFI-5858-QCN-2-1317 RFI-5858-QCN-2-1317 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1 W W H 17-Nov-12 7:00 AM 17-Nov-12
29-F2 = 38 nos Raslaffan
3643 Check Concrete Pouring For Pre-cast Pipe Sleepers - Footing B70-PS-28-F1 = 2 nos & Gate 5 TSF
RFI-5858-QCN-2-1318 RFI-5858-QCN-2-1318 CONCRETE APPROVED B-V-3100-004-2-201-02_4 5.1 W H H 17-Nov-12 7:30 AM 17-Nov-12
B70-29-F2 = 38 nos Raslaffan
Check Protective Goating For Pre-Cast Pipe Sleepers - 2nd coat B70-PS-26-F1 = 50 Gate 5 TSF
3644 RFI-5858-QCN-2-1319 RFI-5858-QCN-2-1319 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.c S W H 17-Nov-12 08:00 AM 17-Nov-12
nos Raslaffan
6:30 AM
3645 Check Protective Coating For Cast-in- Situ Culvert BZRC-006 East Intermediate Wall = Crossing # 32
RFI-5858-QCN-2-1320 RFI-5858-QCN-2-1320 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 17-Nov-12 To 17-Nov-12
6 nos - 1st & 2nd layer Raslaffan
1:00 PM
3646 Section 4 Cr # 25
RFI-5858-QCN-2-1321 RFI-5858-QCN-2-1321 CONCRETE Check Setting Out, Line/Level For Duct Bank BZDP 007 CANCELLED B-V-3100-004-2-201-02_5 3.0.a S S H 17-Nov-12 8:00 AM 15-Nov-12
Raslaffan
Section 4 Cr # 25
3647 RFI-5858-QCN-2-1322 RFI-5858-QCN-2-1322 CONCRETE Check Lean Concrete Pouring For Duct Bank BZDP 007 CANCELLED B-V-3100-004-2-201-02_5 3.0.b S S H 17-Nov-12 9:00 AM 15-Nov-12
Raslaffan
3648 Check Concrete Curing For Cast-in- Situ Pipe Stopper - Pedestal B70-PS-15: SLD070
RFI-5858-QCN-2-1323 RFI-5858-QCN-2-1323 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 17-Nov-12 7:30 AM 17-Nov-12
= 1 nos
Check Concrete Curing For Cast-in- Situ Pipe Stopper - Footing B70-PS-15: SLD070 =
3649 RFI-5858-QCN-2-1324 RFI-5858-QCN-2-1324 CONCRETE
1 nos
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 6.4 S W H 17-Nov-12 7:30 AM 17-Nov-12
3650 Check Reinforcement prior to close shuttering Pipe Rack Foundation Pedestal
RFI-5858-QCN-2-1325 RFI-5858-QCN-2-1325 CONCRETE APPROVED Sulphur Area B-V-3100-004-2-201-02_4 4.1b W W H 17-Nov-12 9:40 AM 17-Nov-12
D210 B70 - PR - 45 & D210 B70 - PR - 71
Check Pre-Pouring For Cast-in- Situ Culvert BZRC-006 East End Wall = 1 nos, & PRE- Crossing # 32
3652 RFI-5858-QCN-2-1327 RFI-5858-QCN-2-1327 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 18-Nov-12 7:00 AM 18-Nov-12
CAST REMOVAL PANEL - 1NOS Raslaffan
Check Concrete Pouring For Cast-in- Situ Culvert BZRC-006 East End Wall = 1 nos & Crossing # 32
3653 RFI-5858-QCN-2-1328 RFI-5858-QCN-2-1328 CONCRETE
PRE-CAST REMOVAL PANEL - 1NOS
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 18-Nov-12 7:30 AM 18-Nov-12
Check Polyethylene & HardBoard Installation For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
3654 RFI-5858-QCN-2-1329 RFI-5858-QCN-2-1329 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 18-Nov-12 7:00 AM 18-Nov-12
Intermediate Walls = 6 nos Raslaffan
Check Form Removal For Pre-cast Pipe Track Foundations (Loop) - Pedestals D110- Gate 5 TSF
3655 RFI-5858-QCN-2-1330 RFI-5858-QCN-2-1330 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 6.3 S W H 18-Nov-12 7:00 AM 17-Nov-12
B70-PR-50, 51, 52, 53, 68, 69 Raslaffan
Check Pre-Pouring For Pre-cast Pipe Sleepers - Footing B70-PS-04-F3 = 10 nos+ B70- Gate 5 TSF
3656 RFI-5858-QCN-2-1331 RFI-5858-QCN-2-1331 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 18-Nov-12 7:00 AM 18-Nov-12
PS-03-(F4) 2 NOS Raslaffan
Check Concrete Pouring For Pre-cast Pipe Sleepers - Footing B70-PS-04-F3 = 10 nos & Gate 5 TSF
3657 RFI-5858-QCN-2-1332 RFI-5858-QCN-2-1332 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 18-Nov-12 7:30 AM 18-Nov-12
B70-PS-03 (F4) - 2 NOS Raslaffan
Gate 5 TSF
3658 RFI-5858-QCN-2-1333 RFI-5858-QCN-2-1333 CONCRETE Check Pre-Pouring For Pre-cast culvert cover Type - A BZRC 008 = 10 nos APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 19-Nov-12 7:00 AM 19-Nov-12
Raslaffan
3659 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Pre- Gate 5 TSF
RFI-5858-QCN-2-1334 RFI-5858-QCN-2-1334 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 19-Nov-12 9.30AM 19-Nov-12
cast Pipe Track Foundations - Pedestals D110-B70-PR-34, 35, 49, 63, 66, & 67 = 24 nos. Raslaffan
Gate 5 TSF
3660 RFI-5858-QCN-2-1335 RFI-5858-QCN-2-1335 CONCRETE Check Concrete Pouring For Pre-cast culvert cover Type - A BZRC 008 = 10 nos APPROVED B-V-3100-004-2-201-02_5 5.1 w H H 19-Nov-12 7:30 AM 19-Nov-12
Raslaffan
3661 Check Surface Preparation For Pre-cast Pipe Sleepers B70-PS-17-F1 = 5 nos & B70-PS- Gate 5 TSF
RFI-5858-QCN-2-1336 RFI-5858-QCN-2-1336 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-Nov-12 7:30 AM 19-Nov-12
18-F1 = 25 nos Raslaffan
Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
3662 RFI-5858-QCN-2-1337 RFI-5858-QCN-2-1337 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 19-Nov-12 1:00 PM 19-Nov-12
End Wall = 1 nos Raslaffan
3663 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 D110 B70 - PR -
RFI-5858-QCN-2-1338 RFI-5858-QCN-2-1338 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 19-Nov-12 7:00 AM 19-Nov-12
- PR -01 Pipe Rack Foundation Pedestal 1-2 / A- B (4no.s) 01Raslaffan
3664 Check Concrete Pouring D110 B70 - PR -01 Pipe Rack Foundation Pedestal 1-2 / A- B D110 B70 - PR - 01
RFI-5858-QCN-2-1339 RFI-5858-QCN-2-1339 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Nov-12 8:30 AM 19-Nov-12
(4no.s) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Crossing # 32
3665 RFI-5858-QCN-2-1340 RFI-5858-QCN-2-1340 CONCRETE Check Surface Preparation For Cast-in- Situ Culvert BZRC-006 East End Wall = 1 nos APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-Nov-12 3:00 PM 19-Jan-12
Raslaffan
3666 Check Pre-Pouring For cast-in- Situ Pipe Stopper B70-PS-09: SLD021 & B70-PS-16: Section 2 & 5
RFI-5858-QCN-2-1341 RFI-5858-QCN-2-1341 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 19-Nov-12 7:00 AM 19-Nov-12
SLD002 = 2 Pedestals B70-PS-17: SLD057 = 1 Footing Raslaffan
Check Concrete Pouring For cast-in- Situ Pipe Stopper B70-PS-09: SLD021 & B70-PS- Section 2 & 5
3667 RFI-5858-QCN-2-1342 RFI-5858-QCN-2-1342 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Nov-12 7:30 AM 19-Nov-12
16: SLD002 = 2 Pedestals B70-PS-17: SLD057 = 1 Footing Raslaffan
3668 Check Surface preparation of Pipe Sleeper Foundation Pedestal - Above ground B70 -
RFI-5858-QCN-2-1343 RFI-5858-QCN-2-1343 CONCRETE APPROVED PR-01 Raslaffan B-V-3100-004-2-201-02_4 9.1 S W H 19-Nov-12 7:30 AM 19-Nov-12
PS -01 SLD014 TO SLD023
3669 Check Erection of Pre-cast Pipe Track Foundations ( Loops ) D110-B70-PR-20, PR-67,
RFI-5858-QCN-2-1344 RFI-5858-QCN-2-1344 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 19-Nov-12 7:00 AM 19-Nov-12
PR-21
6:00 AM
3671 Check Surface Preparation & Protective Coating ( 1st & 2nd layer) For Cast-in- Situ Pipe
RFI-5858-QCN-2-1346 RFI-5858-QCN-2-1346 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 20-Nov-12 To 20-Nov-12
Stopper B70-PS-15: SLD070 = 1 nos
11:00 AM
Check Sealent Application For Expansion Joints For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
3672 RFI-5858-QCN-2-1347 RFI-5858-QCN-2-1347 CONCRETE
End Wall
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.6.b S W H 20-Nov-12 6:30 AM 19-Nov-12
7:00 AM
3673 Check Concrete Curing For Cast-in- Situ Culvert BZRC-006 East End Wall - Using Curing Crossing # 32
RFI-5858-QCN-2-1348 RFI-5858-QCN-2-1348 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 20-Nov-12 To 20-Nov-12
Compound Raslaffan
9:00 AM
7:00 AM
Check Protective Coating For Cast-in- Situ Culvert BZRC-006 East End Wall - 1st & 2nd Crossing # 32
3674 RFI-5858-QCN-2-1349 RFI-5858-QCN-2-1349 CONCRETE
coat
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.a S W H 20-Nov-12 To 20-Nov-12
9:00 AM
Check Erection of Precast sleeper B70 PS 90 SLD 001,SLD 005,SLD 006,SLD 013,SLD SULPHUR LINE -B70
3675 RFI-5858-QCN-2-1350 RFI-5858-QCN-2-1350 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 20-Nov-12 7:30 AM 20-Nov-12
014 PS 90 Raslaffan
Check Final Visual Inspection For Pipe Sleepers & Stopper B70-PS-06: SLD083,
SLD062, SLD063, SLD048 & SLD081 = 4 nos B70-PS-09: SLD023, SLD024, SLD035 To Section 2 & 3
3676 RFI-5858-QCN-2-1351 RFI-5858-QCN-2-1351 CONCRETE
SLD038, SLD051 To SLD056, SLD072 & SLD086 = 27 nos, B70-PS-10: SLD001 To
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 10.0 S W H 20-Nov-12 7:00 AM 20-Nov-12
SLD009 = 9 nos
Check concrete surface upon form removal D110 B70 - PR -01 Pipe Rack Foundation D110 B70 - PR - 01
3678 RFI-5858-QCN-2-1353 RFI-5858-QCN-2-1353 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 20-Nov-12 4:10 PM 20-Nov-12
No1& 2 Raslaffan
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for cast- Gate 5 TSF
3680 RFI-5858-QCN-2-1355 RFI-5858-QCN-2-1355 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 21-Nov-12 9.30AM 22-Nov-12
in- Situ Pipe Stopper - Footing B70-PS-09: SLD054 = 1 nos. Raslaffan
3681 RFI-5858-QCN-2-1356 RFI-5858-QCN-2-1356 CONCRETE Check Surface preparation D110 B70 - PR -01 Pipe Rack Foundation No 1& 2 APPROVED D110 B70 - PR - 01 B-V-3100-004-2-201-02_5 9.1 S W H 21-Nov-12 8:30 AM 21-Nov-12
3682 Check Polyethylene & Hardboard Installation For Cast-in- Situ Culvert BZRC-006 East Crossing # 32
RFI-5858-QCN-2-1357 RFI-5858-QCN-2-1357 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 21-Nov-12 9:00 AM 21-Nov-12
End Wall Raslaffan
Check Concrete Surface upon Form Removal For Cast-in- Situ B70-PS-09: SLD021
3683 RFI-5858-QCN-2-1358 RFI-5858-QCN-2-1358 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 21-Nov-12 7:00 AM 21-Nov-12
Pedestal
3684 RFI-5858-QCN-2-1359 RFI-5858-QCN-2-1359 CONCRETE Check Surface Preparation For Cast-in- Situ B70-PS-09: SLD021 - Base & Pedestal APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 21-Nov-12 9:00 AM 21-Nov-12
Check Concrete Surface upon Form Removal For Cast-in- Situ B70-PS-16: SLD002 -
3685 RFI-5858-QCN-2-1360 RFI-5858-QCN-2-1360 CONCRETE CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 21-Nov-12 7:00 AM 20-Nov-12
Pedestal
10:30 AM
3687 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
RFI-5858-QCN-2-1362 RFI-5858-QCN-2-1362 CONCRETE APPROVED D110 B70 - PR - 01 B-V-3100-004-2-201-02_5 9.2 a S W H 21-Nov-12 to 21-Nov-12
PR -01 Pipe Rack Foundation No 1& 2
4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for D210 Gate 5 TSF
3688 RFI-5858-QCN-2-1363 RFI-5858-QCN-2-1363 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 22-Nov-12 9.30AM 22-Nov-12
B70 - PR - 44 Pipe Rack Foundation Footing G.L 1 (F6). Raslaffan
7:00 AM
3689 Check Protective Coating ( 1st & 2nd coat) For Cast-in- Situ B70-PS-09: SLD021 - Base
RFI-5858-QCN-2-1364 RFI-5858-QCN-2-1364 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 22-Nov-12 To 22-Nov-12
& Pedestal
10:00 AM
Check Polythylene & Hardboard Installation For Cast-in- Situ B70-PS-09: SLD021 - Base
3690 RFI-5858-QCN-2-1365 RFI-5858-QCN-2-1365 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 22-Nov-12 1:00 PM 22-Nov-12
& Pedestal
3691 Check Concrete Curing ( Using Curing Compound) For Cast-in- Situ B70-PS-09: SLD021
RFI-5858-QCN-2-1366 RFI-5858-QCN-2-1366 CONCRETE APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 6.4 S H H 22-Nov-12 10:00 AM 22-Nov-12
- Base & Pedestal
3692 Check Polyethylene & Hardboard Installation For Cast-in-situ Pipe Stopper B70-PS-
RFI-5858-QCN-2-1367 RFI-5858-QCN-2-1367 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 22-Nov-12 6:30 AM 22-Nov-12
15: SLD070 = 1 nos
3694 Check Final Visual Inspection Sleeper foundations B70 - PS -03 Pipe Sleeper SLD01 TO SECTION1
RFI-5858-QCN-2-1369 RFI-5858-QCN-2-1369 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 22-Nov-12 7:30 AM 22-Nov-12
SLD043 & PS- 04 SLD 027 TO SLD020 Raslaffan
Check Protective Coating ( 1st & 2ndcoat) Pre-cast Pipe Sleepers B70-PS-03-F1 = 5 nos,
Gate 5 TSF
3695 RFI-5858-QCN-2-1370 RFI-5858-QCN-2-1370 CONCRETE B70-PS-04-F1 = 4 nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos, & B70-PS-18-F1 = APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.a S W H 22-Nov-12 7:30 AM 22-Nov-12
25 nosB70-PS-26-F3 = 21 nos
7.2 Check compressive strength as per BS EN-12390-3) Cast In Situ pipe track
3696 Gate 5 TSF
RFI-5858-QCN-2-1371 RFI-5858-QCN-2-1371 CONCRETE foundation footing D110-B70-PR-18(F16&F15) & North side culvert lean concrete BZRC- APPROVED B-V-3100-004-2-201-02_5 5.1 W W H 22-Nov-12 7:30 AM 22-Nov-12
Raslaffan
006, Pre-cast Culvert cover type A of BZRC-004=7 Nos and BZRC-005=4 nos
Check Reinforcment & Cleaning Prior Closing For Pre-cast Pipe Sleepers Pedestals B70- Gate 5 TSF
3697 RFI-5858-QCN-2-1372 RFI-5858-QCN-2-1372 CONCRETE
PS-04-F3 = 10 nos B70-PS-03-F4 = 2 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1 W W H 22-Nov-12 7:30 AM 22-Nov-12
Gate 5 TSF
3698 RFI-5858-QCN-2-1373 RFI-5858-QCN-2-1373 CONCRETE Check Pre-Pouring For Culvert Cover Type-A For BZRC008 = 2 nos & BZRC003 = 18 nos APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 22-Nov-12 7:30 AM 22-Nov-12
Raslaffan
Check Concrete Curing B70 - PR - 01 Pipe Rack Foundation 1(F1) & 2 (F2) Footing & PIPE RACK PR - 01
3699 RFI-5858-QCN-2-1374 RFI-5858-QCN-2-1374 CONCRETE
Pedestal , F3,F4,F5,F6,F7,F-Pedestal
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.4 S W H 22-Nov-12 7:30 AM 22-Nov-12
Check Polyethlene & Hardboard Installation for Pipe Sleepers B70-PS-14: SLD055,
3700 RFI-5858-QCN-2-1375 RFI-5858-QCN-2-1375 CONCRETE SLD056, SLD063, SLD064, SLD101, SLD102 = 6 nos B70-PS-13: SLD027, SLD028, APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 25-Nov-12 6:30 AM 25-Nov-12
SLD019, SLD020, SLD022 = 5 nos
Check Above Ground Protective Coating of Stopper foundation Pedestal - First &
3701 RFI-5858-QCN-2-1376 RFI-5858-QCN-2-1376 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.3 S W H 24-Nov-12 8.00 AM 24-Nov-12
Second Coat Stopper Foundation B70 - PS -04 SLD015
Check Polythylene & Hardboard Installation For Pre-cast Pipe Sleeper B17-PS-16,
3705 RFI-5858-QCN-2-1380 RFI-5858-QCN-2-1380 CONCRETE SLD001 to SLD038 = 37 nos.except SLD042, SLD019 and SLD018 Prior frist layer APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 25-Nov-12 7:00 AM 25-Nov-12
backfilling.
Pre-Puring for Pre-cast Pipe Sleepers (Footing), Check Formworks, Reinforcement and
Gate # 5 TSF
3706 RFI-5858-QCN-2-1381 RFI-5858-QCN-2-1381 CONCRETE Cleaning of Pre Pipe Sleeper B70-PS-15-F1 = 12 nos, B17-PS-20-F1 = 15 nos, B17-PS- APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 25-Nov-12 7:00 AM 25-Nov-12
Raslaffan Area
23-F3 = 10 nos and B70-PS-27-F1 = 25 nos, Prior concreting.
3707 Concrete Placement Check Concrete Pouring of Pre-cast Pipe Sleeper B70-PS-15-15-F1 Gate # 5 TSF
RFI-5858-QCN-2-1382 RFI-5858-QCN-2-1382 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Nov-12 7:30 AM 25-Nov-12
= 12 nos, B70-PS-20-F1 = 15 nos, B70-PS-23-F3 = 10 nos and B70-PS-27-F1 = 25 nos. Raslaffan Area
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Gate 5 TSF
3708 RFI-5858-QCN-2-1383 RFI-5858-QCN-2-1383 CONCRETE APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 26-Nov-12 9.30AM 26-Nov-12
DUCT BANK BZDP 002. Raslaffan
3709 Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and Gate 5 TSF
RFI-5858-QCN-2-1384 RFI-5858-QCN-2-1384 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 26-Nov-12 7:00 AM 26-Nov-12
Cleaning of Pre-cast Culvert Cover Type A of BZRC-003 = 14 nos. prior concreting. Raslaffan
3710 Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
RFI-5858-QCN-2-1385 RFI-5858-QCN-2-1385 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 26-Nov-12 7:20 AM 26-Nov-12
003 = 14 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Crossing # 32
3711 RFI-5858-QCN-2-1386 RFI-5858-QCN-2-1386 CONCRETE Check Polyethylene Installation For Top Cover of Culvert BZRC-006 APPROVED B-V-3100-004-2-201-02_5 9.2.b S W H 26-Nov-12 6:00 AM 26-Nov-12
Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embeded items
3712 Gate 5 TSF
RFI-5858-QCN-2-1387 RFI-5858-QCN-2-1387 CONCRETE and cleaning of Precast Pipe Sleeper pedestalB70-PS-28-F1 = 2 nos and B70-PS-29-F2 APPROVED B-V-3100-004-2-201-02_4 4.1b.c.d.e W W H 26-Nov-12 7:30 AM 26-Nov-12
Raslaffan
= 38 nos prior shuttering.
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-18-F1 =
3713 RFI-5858-QCN-2-1388 RFI-5858-QCN-2-1388 CONCRETE 7 nos, B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = 26 nos, B70-PS-04-F3 = 22 nos and APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-Nov-12 8:00 AM 26-Nov-12
B70-PS-03-F4 = 2 nos
3714 Check Polythylene & Hardboard Installation For Pre-cast Pipe Sleeper B70-PS-17;
RFI-5858-QCN-2-1389 RFI-5858-QCN-2-1389 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 26-Nov-12 8:30 AM 26-Nov-12
SLD070 to SLD083 = 14 nos prior first layer backfilling.
Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat
3715 SECTION1
RFI-5858-QCN-2-1390 RFI-5858-QCN-2-1390 CONCRETE Sleeper Foundations B70 - PS -01 SLD001,SLD005,SLD014 TO SLD023,B70 PS -02 APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 26-Nov-12 7:30 AM to 4:00 PM 26-Nov-12
Raslaffan
SLD034& B70 PS 03 SLD027,SLD029
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
3716 RFI-5858-QCN-2-1391 RFI-5858-QCN-2-1391 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 26-Nov-12 7:00 AM 19-Dec-12
- PR -06 Pipe Rack Foundation Footing 4 (F4) - 1 No
3717 RFI-5858-QCN-2-1392 RFI-5858-QCN-2-1392 CONCRETE Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Footing 4 (F4) - 1 No APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 5.1 W H H 26-Nov-12 8:30 AM 19-Dec-12
Pre-Pouring For Pre-cast Pipe Sleepers ( Footing ) Check Formworks, Reinforcement and
Gate 5 TSF
3718 RFI-5858-QCN-2-1394 RFI-5858-QCN-2-1394 CONCRETE Cleaning of Pre-cast Pipe Sleeper B70-PS-20-F1 = 4 nos, B70-PS-21-F1 = 4 nos B70- APPROVED
Raslaffan
B-V-3100-004-1-201-01_5 4.2.a W W H 27-Nov-12 7:00 AM 27-Nov-12
PS-27-F1 = 15 nos and B70-PS-30-F2 = 14 nos prior concreting.
3719 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper B70-PS-20-F1 = 4 Gate 5 TSF
RFI-5858-QCN-2-1395 RFI-5858-QCN-2-1395 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W H H 27-Nov-12 7:30 AM 27-Nov-12
nos, B70-PS-21-F1 = 4 nos, B70-PS-27-F1 = 15 nos and B70-PS-30-F2 = 14 nos Raslaffan
6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type A BZRC-
3720 RFI-5858-QCN-2-1396 RFI-5858-QCN-2-1396 CONCRETE
003 = 14 nos
APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 S W H 27-Nov-12 8:00 AM 27-Nov-12
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-26-F3 = 14 nos prior first Gate 5 TSF
3721 RFI-5858-QCN-2-1397 RFI-5858-QCN-2-1397 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Nov-12 8:00 AM 27-Nov-12
coating. Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
3722 RFI-5858-QCN-2-1398 RFI-5858-QCN-2-1398 CONCRETE
Cast-in- Situ Pipe Stopper Pedestal B70-PS-17: SLD057 prior shuttering.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 W W H 27-Nov-12 7:30 AM 27-Nov-12
3723 RFI-5858-QCN-2-1399 RFI-5858-QCN-2-1399 CONCRETE Check Pre-Pouring For Duct Bank For BZDP 007 APPROVED Cr # 25 Raslaffan B-V-3100-004-2-201-02_4 4.1b.c..e W W H 27-Nov-12 1:00 AM 27-Nov-12
3724 RFI-5858-QCN-2-1400 RFI-5858-QCN-2-1400 CONCRETE Check Concrete Pouring For Duct Bank For BZDP 007 APPROVED Cr # 25 Raslaffan B-V-3100-004-2-201-02_5 4.1 W H H 27-Nov-12 1:00 AM 28-Nov-12
6.3 Check Concrete surface upon form removal of Cast-in-situ Pipe Stopper Pedestal
3725 RFI-5858-QCN-2-1401 RFI-5858-QCN-2-1401 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 27-Nov-12 7:30 AM 27-Nov-12
B70-PS-16: SLD002
3728 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper B70-PS-28-F1 = 2 Gate 5 TSF
RFI-5858-QCN-2-1404 RFI-5858-QCN-2-1404 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 28-Nov-12 7:30 AM 28-Nov-12
nos and B70-PS-29-F2 = 38 nos, Pedestal. Raslaffan
Check Reinforcement prior to close shuttering D110 B70 - PR -06 Pipe Rack Foundation
3729 RFI-5858-QCN-2-1405 RFI-5858-QCN-2-1405 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1b W W H 28-Nov-12 8:00 AM 19-Dec-12
Pedestal G.L 4 /A,B - (2No.s)
3730 9.1. Check protective coating first coat of pipe sleeper B70-PS-26-F3 = 14 nos prior
RFI-5858-QCN-2-1406 RFI-5858-QCN-2-1406 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 28-Nov-12 7:30 AM 28-Nov-12
second coat.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints, embedded
Gate 5 TSF
3731 RFI-5858-QCN-2-1407 RFI-5858-QCN-2-1407 CONCRETE items and cleaning of Precast Pipe Sleeper pedestal B70-PS-26-F3 = 10 nos and B70- APPROVED B-V-3100-004-2-201-02_4 4.1b.c.d.e W W H 28-Nov-12 7:30 AM 28-Nov-12
Raslaffan
PS-27-F2 = 11 nos prior shuttering.
Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and
3733 Gate 5 TSF
RFI-5858-QCN-2-1409 RFI-5858-QCN-2-1409 CONCRETE Cleaning of Pre-cast Culvert Cover Type A of BZRC-003 = 5 nos, BZRC-004 = 7 nos APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 29-Nov-12 7:00 AM 29-Nov-12
Raslaffan
Culvert Cover Type B of BZRC-005 = 2 nos prior concreting.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
3734 RFI-5858-QCN-2-1410 RFI-5858-QCN-2-1410 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 29-Nov-12 7:20 AM 29-Nov-12
003 = 5 nos, BZRC-004 = 7 nos Culvert Cover Type B of BZRC-005 = 2 nos Raslaffan
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal of B70- Gate 5 TSF
3736 RFI-5858-QCN-2-1412 RFI-5858-QCN-2-1412 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 29-Nov-12 7:30 AM 29-Nov-12
PS-26-F3 = 10 nos and B70-PS-27-F1 = 11 nos Raslaffan
7:30 AM
3737 Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat B70- SECTION 2
RFI-5858-QCN-2-1413 RFI-5858-QCN-2-1413 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 29-Nov-12 to 29-Nov-12
PS-09 SLD021 & SLD022 Raslafan
4:00 PM
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
3738 RFI-5858-QCN-2-1414 RFI-5858-QCN-2-1414 CONCRETE - PR -06 Pipe Rack Foundation Footing 1(F1),2 (F2),3(F3),5 (F5),10(F9) - 5 NoS & APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 29-Nov-12 9:00 AM 19-Dec-12
Pedestal 4/A,B - 2 NoS
Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Footing 1(F1),2
3739 RFI-5858-QCN-2-1415 RFI-5858-QCN-2-1415 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 5.1 W H H 29-Nov-12 9:30 AM 19-Dec-12
(F2),3(F3),5 (F5),10(F9) - 5 NoS & Pedestal 4/A,B - 2 NoS
3740 9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-16: SLD042 prior
RFI-5858-QCN-2-1416 RFI-5858-QCN-2-1416 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 29-Nov-12 8:00 AM 29-Nov-12
first coating.
3741 RFI-5858-QCN-2-1417 RFI-5858-QCN-2-1417 CONCRETE 9.1. Check protective coating second coat of pipe sleeper B70-PS-26-F3 = 14 nos. APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 29-Nov-12 8:30 AM 29-Nov-12
3742 Check Polythylene & Hardboard Installation For Pre-cast Pipe Sleeper B70-PS-17;
RFI-5858-QCN-2-1418 RFI-5858-QCN-2-1418 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 29-Nov-12 1:00 PM 29-Nov-12
SLD051 to SLD060 = 9 nos except SLD057 prior for backfilling.
7:00 AM
Check Surface Above Grade For End wall Culvert BZRC-006 East Side ( Surface Crossing # 32
3743 RFI-5858-QCN-2-1419 RFI-5858-QCN-2-1419 CONCRETE
Preparation, 1st coat, & 2nd coat)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.3 S W H 1-Dec-12 To 1-Dec-12
5:00 PM
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-26-F3 =
3744 RFI-5858-QCN-2-1420 RFI-5858-QCN-2-1420 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-Dec-12 8:00 AM 1-Dec-12
10 nos, B70-PS-27-F1 = 11 nos B70-PS-28-F1 = 2 nos and B70-PS-29-F1 = 38 nos.
3745 RFI-5858-QCN-2-1421 RFI-5858-QCN-2-1421 CONCRETE Check Concrete Surface upon Form Removal For Duct Bank For BZDP 007 APPROVED Cr # 25 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-Dec-12 7:00 AM 1-Dec-12
9.1. Check protective coating First coat at 7:30 am and Second coat 10:00 am of Cast-in-
3746 RFI-5858-QCN-2-1422 RFI-5858-QCN-2-1422 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 1-Dec-12 7:30 AM 1-Dec-12
Situ Pipe stopper B70-PS-16: SLD042
Check Polythylene & Hardboard Installation For Cast-in- Situ Pipe Stopper B70-PS-17:
3747 RFI-5858-QCN-2-1423 RFI-5858-QCN-2-1423 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 1-Dec-12 1:30 PM 1-Dec-12
SLD042.
Check concrete surface upon form removal D110 B70 - PR -06 Pipe Rack Foundation No
3748 RFI-5858-QCN-2-1424 RFI-5858-QCN-2-1424 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 6.3 S W H 1-Dec-12 7:00 AM 1-Dec-12
4 (F4)
4.4.1 Check compressive Strength @ 28 days for grout (Loop foundations D110-B70-PR- Gate 5 TSF
3749 RFI-5858-QCN-2-1425 RFI-5858-QCN-2-1425 CONCRETE REJECTED B-V-3100-004-2-201-02_4 4.4.1 S W H 2-Dec-12 9.30AM 2-Dec-12 NCR-5858-QCN-007
46 &D110-B70-PR-09) Raslaffan
3751 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Gate 5 TSF
RFI-5858-QCN-2-1427 RFI-5858-QCN-2-1427 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 2-Dec-12 9.30AM 2-Dec-12
D110-B70-PR-12: F1,F2,F3,F4 & F5 = 10 PedestalsB70-PS-09: SLD054 = 1 Pedestal. Raslaffan
3752 RFI-5858-QCN-2-1428 RFI-5858-QCN-2-1428 CONCRETE Check Surface preparation D110 B70 - PR -06 Pipe Rack Foundation No 4(F4) APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 9.1 S W H 2-Dec-12 7:00 PM 4-Dec-12
Pre-Pouring For Pre-cast Culvert Covert Type A and Removable Panel Check
Gate 5 TSF
3753 RFI-5858-QCN-2-1429 RFI-5858-QCN-2-1429 CONCRETE Formworks, Reinforcement and Cleaning of Pre-cast Culvert Cover Type A of BZRC-004 APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 2-Dec-12 7:00 AM 4-Dec-12
Raslaffan
= 10 nos, and Removable Panel of BZRC-003 and 005 = 4 nos prior concreting.
3754 Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
RFI-5858-QCN-2-1430 RFI-5858-QCN-2-1430 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Dec-12 7:20 AM 4-Dec-12
004 = 10 nos and Removable Panel of BZRC-003 and BZRC-005 = 4 nos Raslaffan
3756 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal B70-PS- Gate 5 TSF
RFI-5858-QCN-2-1432 RFI-5858-QCN-2-1432 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Dec-12 10:00 AM 4-Dec-12
26-F3 = 10 nos and B70-PS-27-F2 = 11 nos, Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring For Pre-cast Cast-in- Situ ( Footing ) Check Formworks, Reinforcement and
3757 RFI-5858-QCN-2-1433 RFI-5858-QCN-2-1433 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 2-Dec-12 7:30 AM 4-Dec-12
Cleaning of Cast-in- Situ Pipe Track D110-B70-PR-22: F1 and F2 prior concreting.
3758 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-1434 RFI-5858-QCN-2-1434 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Dec-12 7:30 AM 4-Dec-12
22: F1 and F2.
3759 RFI-5858-QCN-2-1435 RFI-5858-QCN-2-1435 CONCRETE Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations D110-B70-PR-18: F16 & F15 CANCELLED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 2-Dec-12 6:30 AM 1-Dec-12 Not ready for inspection
3760 Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
RFI-5858-QCN-2-1436 RFI-5858-QCN-2-1436 CONCRETE CANCELLED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Dec-12 7:30 AM 1-Dec-12 Not ready for inspection
PR-18: F16 & F15
Pre-Pouring For Cast-in- Situ Pipe Stopper and Footing Check Formworks,
3761 4.1.a.b.c.d.
RFI-5858-QCN-2-1437 RFI-5858-QCN-2-1437 CONCRETE Reinforcement, Embedded items, Cleaning and expansion joints of Cast-in- Situ Pipe APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 W W H 2-Dec-12 10:00 AM 4-Dec-12
e
Stopper Pedestal B70-PS-17: SLD057 and Footing B70-PS-17: SLD021 prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Stopper Pedestal B70-PS- Gate 5 TSF
3762 RFI-5858-QCN-2-1438 RFI-5858-QCN-2-1438 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Dec-12 9:00 AM 4-Dec-12
17: SLD057 and Pipe Stopper Footing B70-PS-17: SLD21 Raslaffan
9:30 AM
3763 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
RFI-5858-QCN-2-1439 RFI-5858-QCN-2-1439 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 9.2 a S W H 2-Dec-12 to 4-Dec-12
PR -06 Pipe Rack Foundation No 4 (F4)
1:30 PM
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -06 Pipe
3764 RFI-5858-QCN-2-1440 RFI-5858-QCN-2-1440 CONCRETE
Rack Foundation 4 (F4)
APPROVED D110 B70 - PR -06 B-V-3100-004-2-201-02_5 9.2.b,c S W H 2-Dec-12 4:30 PM 4-Dec-12
3765 Check Polythylene & Hardboard Installation od Pipe Sleeper B70-PS-17: SLD017 to
RFI-5858-QCN-2-1441 RFI-5858-QCN-2-1441 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 2-Dec-12 7:30 AM 4-Dec-12
SLD035 = 18 nos except SLD021
9.1. Check protective coating first coat of pipe sleeper B70-PS-16: SLD063 to SLD032 =
3766 RFI-5858-QCN-2-1442 RFI-5858-QCN-2-1442 CONCRETE
31 nos except SLD 042 prior second coating.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 2-Dec-12 8:30 AM 4-Dec-12
Check Reinforcement prior to close shuttering D110 B70 - PR -06 Pipe Rack Foundation
3767 RFI-5858-QCN-2-1443 RFI-5858-QCN-2-1443 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1b W W H 2-Dec-12 4:00 PM 19-Dec-12
Pedestal 1-3,5,10/A,B - 10 NoS
4.4.1 Check compressive Strenght @ 28 days for grout (Lope foundations D110-B70-PR- Gate 5 TSF
3768 RFI-5858-QCN-2-1444 RFI-5858-QCN-2-1444 CONCRETE
10 & PR-11)
REJECTED
Raslaffan
B-V-3100-004-2-201-02_4 4.4.1 S W H 3-Dec-12 9:30 AM 3-Dec-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
Gate 5 TSF
3769 RFI-5858-QCN-2-1445 RFI-5858-QCN-2-1445 CONCRETE Precast Pipe Sleeper pedestal B70-PS-15-F1 = 17 nos, B70-PS-20-F1 = 8 nos, B70-PS- APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 3-Dec-12 7:30 AM 4-Dec-12
Raslaffan
21-F1 = 14nos and B70-PS-26-F1 = 8 nos prior shuttering.
PIPE RACK PR - 06
3770 RFI-5858-QCN-2-1446 RFI-5858-QCN-2-1446 CONCRETE Check Concrete Curing B70 - PR - 06 Pipe Rack Foundation 4 (F4)-Footing & Pedestal APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 3-Dec-12 7:30 AM 4-Dec-12
Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and
Gate 5 TSF
3771 RFI-5858-QCN-2-1447 RFI-5858-QCN-2-1447 CONCRETE Cleaning of Pre-cast Culvert Cover Type A of BZRC-004 = 7 nos, and BZRC-005 = 4 nos APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 3-Dec-12 7:00 AM 4-Dec-12
Raslaffan
prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
3772 RFI-5858-QCN-2-1448 RFI-5858-QCN-2-1448 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Dec-12 7:20 AM 6-Dec-12
004 = 7 nos and BZRC-005 = 4 nos Raslaffan
9.1. Check surface preparation of Precast Culvert Wall of BZRC-004 = 1 no. and BZRC- Gate 5 TSF
3773 RFI-5858-QCN-2-1449 RFI-5858-QCN-2-1449 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 3-Dec-12 8:00 AM 4-Dec-12
008 = 1 no. prior first coating. Raslaffan
3774 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-26-F3 =
RFI-5858-QCN-2-1450 RFI-5858-QCN-2-1450 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 3-Dec-12 8:00 AM 4-Dec-12
10 nos and B70-PS-27-F1 = 11 nos
3775 RFI-5858-QCN-2-1451 RFI-5858-QCN-2-1451 CONCRETE Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations D110-B70-PR-18: F16 & F15 APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 3-Dec-12 7:30 AM 8-Dec-12
3776 Check Concrete Pouring For Cast-in-situ Pipe Track Foundations - Footing
RFI-5858-QCN-2-1452 RFI-5858-QCN-2-1452 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 3-Dec-12 2:00 PM 6-Dec-12
D110-B70-PR-18: F16 & F15
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-
3777 RFI-5858-QCN-2-1453 RFI-5858-QCN-2-1453 CONCRETE APPROVED Section #5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 4-Dec-12 8:00 AM 6-Dec-12
17: SLD057
3778 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-26-F3 =
RFI-5858-QCN-2-1454 RFI-5858-QCN-2-1454 CONCRETE APPROVED Section #5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 4-Dec-12 8:00 AM 6-Dec-12
10 nos and B70-PS-27-F1 = 11 nos
3779 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Gate 5 TSF
RFI-5858-QCN-2-1455 RFI-5858-QCN-2-1455 CONCRETE APPROVED B-V-3100-004-2-201-02_4 7.2 S W H 5-Dec-12 10.30AM 5-Dec-12
D110-B70-PS-04- SLD015 &D110-B70-PS-01-F3- SLD015 (Stopper Pedestal) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Pipe Track Foundations -
3780 RFI-5858-QCN-2-1456 RFI-5858-QCN-2-1456 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 5-Dec-12 7:30 AM 7-Dec-12
Pedestals D110-B70-PR-18: F16 & F15
3781 RFI-5858-QCN-2-1457 RFI-5858-QCN-2-1457 CONCRETE Check Concrete Curing For Duct Bank BZDP-007 - 7 days wet curing APPROVED Cr # 25 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Dec-12 6:30 AM 7-Dec-12
3782 RFI-5858-QCN-2-1458 RFI-5858-QCN-2-1458 CONCRETE Check Surface Preparation For Duct Bank BZDP-007 APPROVED Cr # 25 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 1:00 PM 7-Dec-12
Pre-Pouring For Pre-cast Pipe Sleepers ( Pedestal and Footing ) Check Formworks,
3783 Reinforcement, Embedded items, Cleaning and expansion joints of Pre-cast Pipe Sleeper Gate 5 TSF 4.1.a.b.c.d.
RFI-5858-QCN-2-1459 RFI-5858-QCN-2-1459 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 5-Dec-12 6:50 AM 8-Dec-12
Pedestal of B70-PS-27-F1 = 8 nos, B70-PS-20 and 21-F1 = 25 nos and B70-PS-30-F2 Raslaffan e
= 14 nos and Precast Pipe Sleeper Footing. B70-PS-29-F2 = 40 nos prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal B70-
3784 Gate 5 TSF
RFI-5858-QCN-2-1460 RFI-5858-QCN-2-1460 CONCRETE PS-27-F1 = 8 nos and B70-PS-20=21 nos and 21-F1 = 4 nos B70-PS-30-F2 = 14 nos APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 5-Dec-12 7:00 AM 7-Dec-12
Raslaffan
and Precast Pipe Sleeper Footing B70-PS-29-F2 = 40 nos.
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-18-F1 = 7 nos, B70-PS- Gate 5 TSF
3785 RFI-5858-QCN-2-1461 RFI-5858-QCN-2-1461 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 8:00 AM 7-Dec-12
19-F1 = 17 nos and B70-PS-20-F1 = 26 nos prior first coating. Raslaffan
3786 9.1. Check protective coating first coat of pipe sleeper B70-PS-18-F1 = 7 nos, B70-PS-
RFI-5858-QCN-2-1462 RFI-5858-QCN-2-1462 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 2:00 PM 7-Dec-12
18-F1 = 17 nos and B70-PS-18-F1 = 26 nos prior second coating.
9.1. Check surface preparation of Precast Culvert BZRC-004 = 2 nos and BZRC-008 = 2 Gate 5 TSF
3787 RFI-5858-QCN-2-1463 RFI-5858-QCN-2-1463 CONCRETE
nos prior first coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 8:00 AM 7-Dec-12
3788 9.1. Check protective coating first coat of Precast Culvert Cover Type A of BZRC-008 =
RFI-5858-QCN-2-1464 RFI-5858-QCN-2-1464 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 7:00 AM 7-Dec-12
10 nos. prior second coating.
9.1. Check surface preparation of Precast Pipe Track D110-B70-PR-50, B70-PR-51, B70- Gate 5 TSF
3789 RFI-5858-QCN-2-1465 RFI-5858-QCN-2-1465 CONCRETE
PR-52, B70-PR-68 and B70-PR-69 = 24 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 8:00 AM 7-Dec-12
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of
3791 RFI-5858-QCN-2-1467 RFI-5858-QCN-2-1467 CONCRETE
Cast-in- Situ Pipe Track D110-B70-PR-22: F1 and F2 prior shuttering
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 5-Dec-12 7:30 AM 8-Dec-12
9.1. Check protective coating first coat of Precast Pipe Track D110-B70-PR-50, B70-PR-
3792 RFI-5858-QCN-2-1468 RFI-5858-QCN-2-1468 CONCRETE 51, B70-PR-52, B70-PR-53, B70-PR-68 and B70-PR-69 = 24 nos prior Second APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Dec-12 3:00 PM 7-Dec-12
Coating.
Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and Gate 5 TSF
3794 RFI-5858-QCN-2-1470 RFI-5858-QCN-2-1470 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 6-Dec-12 7:00 AM 6-Dec-12
Cleaning of Pre-cast Culvert Cover Type A of BZRC-005 = 10 nos prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
3795 RFI-5858-QCN-2-1471 RFI-5858-QCN-2-1471 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 6-Dec-12 7:20 AM 6-Dec-12
005 = 9 nos. Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
3796 RFI-5858-QCN-2-1472 RFI-5858-QCN-2-1472 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1b.c.d.e W W H 6-Dec-12 7:30 AM 6-Dec-12
Situ Pipe Stopper B70-PS-17: SLD057 prior shuttering.
3797 Check Polythylene & Hardboard Installation of Pipe Sleeper B70-PS-17 : SLD0016, TO
RFI-5858-QCN-2-1473 RFI-5858-QCN-2-1473 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 6-Dec-12 8:30 AM 6-Dec-12
SLD 003 = 14 NOS
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
3798 RFI-5858-QCN-2-1474 RFI-5858-QCN-2-1474 CONCRETE - PR -06 Pipe Rack Foundation Footing 6(F6), 9(F6) - 2 NoS & Pedestal 1,2,3,5,10 /A-B - APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 6-Dec-12 7:00 AM 6-Dec-12
10 No's
3799 Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Footing 6(F6),9(F6) -
RFI-5858-QCN-2-1475 RFI-5858-QCN-2-1475 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 5.1 W H H 6-Dec-12 8:30 AM 19-Dec-12
3 NoS & Pedestal 1,2,3,5,10 /A-B - 10 NoS
3802 9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-04-F3 = 26 nos prior first Gate 5 TSF
RFI-5858-QCN-2-1478 RFI-5858-QCN-2-1478 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 6-Dec-12 8:00 AM 6-Dec-12
coating. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check protective coating first coat of Precast Pipe Sleeper B70-PS-04-F3 = 15 nos
3803 RFI-5858-QCN-2-1479 RFI-5858-QCN-2-1479 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 6-Dec-12 2:30 PM 6-Dec-12
prior second coating.
3804 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Cast- Gate 5 TSF
RFI-5858-QCN-2-1480 RFI-5858-QCN-2-1480 CONCRETE APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 8-Dec-12 10:30 AM 8-Dec-12
in-situ Culvert East side cover Raslaffan
Pre-Pouring For Pre-cast Culvert Covert Type B Check Formworks, Reinforcement and
Gate 5 TSF
3805 RFI-5858-QCN-2-1481 RFI-5858-QCN-2-1481 CONCRETE Cleaning of Pre-cast Culvert Cover Type B of BZRC-005 = 2 nos and Curb Stone = 60 APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 8-Dec-12 7:00 AM 9-Dec-12
Raslaffan
nos.
3806 Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type B of BZRC- Gate 5 TSF
RFI-5858-QCN-2-1482 RFI-5858-QCN-2-1482 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 8-Dec-12 7:20 AM 9-Dec-12
005 = 2 nos and Curb Stone 60 nos. Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Stopper Pedestal and Footing Check Formworks,
3807 RFI-5858-QCN-2-1483 RFI-5858-QCN-2-1483 CONCRETE Embedded items and cleaning of Pipe Track Pedestal B70-PR-22: F1 = 2 nos and F2 = 2 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 8-Dec-12 1:15 PM 9-Dec-12
nos and Pipe Track Footing B70-PR-22: F3 = 1 no prior concreting.
Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal B70-PR-
3808 RFI-5858-QCN-2-1484 RFI-5858-QCN-2-1484 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 8-Dec-12 1:30 PM 9-Dec-12
22: F1 = 2 nos and F2 = 2 nos and Pipe Track Footing B70-PR-22: F3 = 1 no.
3809 Check Pre-Pouring For Cast-in- Situ Culvert Intermediate & End bases ( West Side)
RFI-5858-QCN-2-1485 RFI-5858-QCN-2-1485 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 8-Dec-12 11:00 AM 8-Dec-12
BZRC - 006
Check Concrete Pouring For Cast-in- Situ Culvert Intermediate & End bases ( West Side)
3810 RFI-5858-QCN-2-1486 RFI-5858-QCN-2-1486 CONCRETE
BZRC - 006
APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 8-Dec-12 1:00 PM 9-Dec-12
3811 9.1. Check protective coating second coat of Precast Pipe Sleeper B70-PS-03-F4 = 2 nos
RFI-5858-QCN-2-1487 RFI-5858-QCN-2-1487 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 8-Dec-12 9:30 AM 10-Dec-12
and B70-PS-04-F3 = 13 nos
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-27-F1 =
3812 RFI-5858-QCN-2-1488 RFI-5858-QCN-2-1488 CONCRETE
8 nos, B70-PS-20-F1 = 10 nos B70-PS-21-F1 = 15 nos and B70-PS-30-F1 = 14 nos.
APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 8-Dec-12 8:00 AM 10-Dec-12
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate 5 TSF
3813 RFI-5858-QCN-2-1489 RFI-5858-QCN-2-1489 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.b..d.e W W H 8-Dec-12 1:30 PM 12-Dec-12
Precast Pipe Sleeper pedestal B70-PS-29-F2 = 40 nos prior shuttering. Raslaffan
Check Final Visual Inspection For Pipe Sleepers & StoppersB70-PS-13: SLD001 To
3816 RFI-5858-QCN-2-1492 RFI-5858-QCN-2-1492 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 10.0 S W H 8-Dec-12 8:00 AM 10-Dec-12
SLD035 B70-PS-14: SLD055 To SLD104
Check concrete surface upon form removal D110 B70 - PR -06 Pipe Rack Foundation
3817 RFI-5858-QCN-2-1493 RFI-5858-QCN-2-1493 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 6.3 S W H 8-Dec-12 7:00 AM 10-Dec-12
Footing 6(F6),9(F6) - 2 NoS & Pedestal 1,2,3,5,10 /A-B - 10 NoS
11:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
3819 RFI-5858-QCN-2-1495 RFI-5858-QCN-2-1495 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 9.2 a S W H 9-Dec-12 to 10-Dec-12
PR -06 Pipe Rack Foundation No 1(F1),2(F2),3(F3),5(F5)&10(F9)
4:30 PM
3820 Check Reinforcement prior to close shuttering D110 B70 - PR -06 Pipe Rack Foundation
RFI-5858-QCN-2-1496 RFI-5858-QCN-2-1496 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1b W W H 9-Dec-12 3:00 PM 10-Dec-12
Pedestal 6,9/A,B - 4 NoS
Check Reinforcement & Cleaning prior closing For Cast-in- Situ Culvert Intermediate wall
3821 RFI-5858-QCN-2-1497 RFI-5858-QCN-2-1497 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 9-Dec-12 11:00 AM 10-Dec-12
& Sleeper ( West Side) BZRC - 006
Check Pre-Pouring For Pipe Track Foundations - Pedestals D110-B70-PR-18: F16 & F15
3823 RFI-5858-QCN-2-1499 RFI-5858-QCN-2-1499 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 9-Dec-12 9:00 AM 10-Dec-12
= 4 Pedestals
3824 4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR- Gate 5 TSF
RFI-5858-QCN-2-1500 RFI-5858-QCN-2-1500 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.4.1 S W H 9-Dec-12 2.30PM 9-Dec-12
03 & PR-04) Raslaffan
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -06 Pipe
3826 RFI-5858-QCN-2-1502 RFI-5858-QCN-2-1502 CONCRETE APPROVED D110 B70 - PR -06 B-V-3100-004-2-201-02_5 9.2.b,c S W H 10-Dec-12 2:30 PM 12-Dec-12
Rack Foundation 1(F1),2(F2),3(F3),5(F5)&10(F9)
Pre-Pouring For Pre-cast Pipe Sleeper Footing Check Formworks, Reinforcement and
3827 Gate 5 TSF
RFI-5858-QCN-2-1503 RFI-5858-QCN-2-1503 CONCRETE Cleaning of Pre-cast Pipe Sleeper Footing B70-PS-30-F1 = 1 no and B70-PS-32-F1 = 22 APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 10-Dec-12 7:00 AM 12-Dec-12
Raslaffan
nos prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Footing B70-PS- Gate 5 TSF
3828 RFI-5858-QCN-2-1504 RFI-5858-QCN-2-1504 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Dec-12 7:20 AM 12-Dec-12
30-F1 = 1 no and B70-PS-32-F1 = 22 nos. Raslaffan
3829 4.4.1 Check compressive Strength @ 28 days for grout (Loop foundation D110B70-PR-48 Gate 5 TSF
RFI-5858-QCN-2-1505 RFI-5858-QCN-2-1505 CONCRETE REJECTED B-V-3100-004-2-201-02_5 4.4.1 S W H 10-Dec-12 4:00 PM 9-Dec-12
& D110-B70-PR-14D110-B70-PR-15) Raslaffan
Pre-Pouring For Pre-cast Culvert Cover Type A Check Formworks, Reinforcement and
3830 Gate 5 TSF
RFI-5858-QCN-2-1506 RFI-5858-QCN-2-1506 CONCRETE Cleaning of Pre-cast Culvert Cover Type A, BZRC-005 = 7 nos, BZRC-010 = 3 nos and APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 10-Dec-12 7:00 AM 12-Dec-12
Raslaffan
BZRC-011 = 5 nos prior shuttering.
Concrete Placement Check Concrete pouring of Pre-cast Culvert Covert Type A, BZRC- Gate 5 TSF
3831 RFI-5858-QCN-2-1507 RFI-5858-QCN-2-1507 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Dec-12 7:20 AM 12-Dec-12
005 = 7 nos, BZRC-010 = 5 nos and BZRC-011 = 5 nos. Raslaffan
3832 6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type A BZRC-
RFI-5858-QCN-2-1508 RFI-5858-QCN-2-1508 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 10-Dec-12 8:00 AM 12-Dec-12
005 = 9 nos.
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track Pedestal
3833 RFI-5858-QCN-2-1509 RFI-5858-QCN-2-1509 CONCRETE
D110-B70-PR-22: F1 = 2 nos and F2 = 2 nos
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 10-Dec-12 8:00 AM 12-Dec-12
3834 Check Concrete Curing D110 B70 - PR -06 Pipe Rack Foundation PIPE RACK PR - 06
RFI-5858-QCN-2-1510 RFI-5858-QCN-2-1510 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 10-Dec-12 7:30 AM 12-Dec-12
1(F1),2(F2),3(F3),5(F5)&10(F9), footing & pedastal
Check Concrete Pouring For Pipe Track Foundations - Pedestals D110-B70-PR-18: F16
3835 RFI-5858-QCN-2-1511 RFI-5858-QCN-2-1511 CONCRETE
& F15 = 4 Pedestals
APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 10-Dec-12 1:00 PM 12-Dec-12
9.1. Check protective coating first coat of pipe sleeper B70-PS-16 and B70-PS-17:
3836 RFI-5858-QCN-2-1512 RFI-5858-QCN-2-1512 CONCRETE SLD031 to SLD072 = 41 nos except SLD 018, SLD019 SLD002 and B70-PR-21 prior APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Dec-12 8:30 AM 12-Dec-12
second coating.
9.1. Check protective coating second coat of pipe sleeper B70-PS-16: SLD032 to SLD063
3837 RFI-5858-QCN-2-1513 RFI-5858-QCN-2-1513 CONCRETE
= 31 nos.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Dec-12 8:30 AM 12-Dec-12
Check Pre-Pouring For Cast-in- Situ Culvert Intermediate wall & Sleeper ( West Side)
3838 RFI-5858-QCN-2-1514 RFI-5858-QCN-2-1514 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 10-Dec-12 11:00 AM 12-Dec-12
BZRC - 006
Check Concrete Pouring For Cast-in- Situ Culvert Intermediate wall & Sleeper ( West
3839 RFI-5858-QCN-2-1515 RFI-5858-QCN-2-1515 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 10-Dec-12 1:00 PM 12-Dec-12
Side) BZRC - 006
Check Concrete Curing For Cast-in- Situ Culvert Intermediate & End slabs ( West Side)
3840 RFI-5858-QCN-2-1516 RFI-5858-QCN-2-1516 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 10-Dec-12 6:30 AM 12-Dec-12
BZRC - 006 ( Applying curing compound)
3843 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal B70-PS- Gate 5 TSF
RFI-5858-QCN-2-1519 RFI-5858-QCN-2-1519 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Dec-12 7:30 AM 14-Dec-12
29-F2 = 40 nos. Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
3844 RFI-5858-QCN-2-1520 RFI-5858-QCN-2-1520 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 11-Dec-12 7:30 AM 12-Dec-12
Situ Pipe Track Pedestal D110-B70-PR-22: F3
3845 9.1. Check protective coating second coating of pipe sleeper B70-PS-18-F1 = 7 nos, B70-
RFI-5858-QCN-2-1521 RFI-5858-QCN-2-1521 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 11-Dec-12 8:00 AM 12-Dec-12
PS-19-F1 = 17 nos and B70-PS-20-F1 = 26 nos
Check Concrete Surface upon Form Removal For Pipe Track Foundations - Pedestals
3846 RFI-5858-QCN-2-1522 RFI-5858-QCN-2-1522 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Dec-12 3:00 PM 12-Dec-12
D110-B70-PR-18: F16 & F15 = 4 Pedestals
3847 9.1. Check protective coating second coating of Precast Pipe Track D110-B70-PR-50,
RFI-5858-QCN-2-1523 RFI-5858-QCN-2-1523 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 11-Dec-12 3:00 PM 12-Dec-12
B70-PR-51, B70-PR-52, B70-PR-53, B70-PR-68 and B70-PR-69, Total = 24 nos
3848 Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert Intermediate wall
RFI-5858-QCN-2-1524 RFI-5858-QCN-2-1524 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Dec-12 3:00 PM 12-Dec-12
& Sleeper ( West Side) BZRC - 006
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
3849 RFI-5858-QCN-2-1525 RFI-5858-QCN-2-1525 CONCRETE Check Pre-Pouring For Pipe Track Foundation - Footing D110-B70-PR-18: F13 APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 11-Dec-12 10:00 AM 12-Dec-12
3850 RFI-5858-QCN-2-1526 RFI-5858-QCN-2-1526 CONCRETE Check Concrete Pouring For Pipe Track Foundation - Footing D110-B70-PR-18: F13 APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 11-Dec-12 11:00 AM 12-Dec-12
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 SECTION 2 PR -
3851 RFI-5858-QCN-2-1527 RFI-5858-QCN-2-1527 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 12-Dec-12 10:00 AM 15-Dec-12
- PR -08 Pipe Rack Foundation Footing 1(F2) & 2(F1) - 2 NoS 08
3852 Check Concrete Pouring D110 B70 - PR -08 Pipe Rack Foundation Footing 1(F2) & 2(F1)
RFI-5858-QCN-2-1528 RFI-5858-QCN-2-1528 CONCRETE APPROVED D110 B70 - PR - 08 B-V-3100-004-2-201-02_5 5.1 W H H 12-Dec-12 1:30 PM 15-Dec-12
- 2 NoS
6:00 AM
3853 Check Surface Preparation & Protective Coating 1st & 2nd For Pipe Track Foundations
RFI-5858-QCN-2-1529 RFI-5858-QCN-2-1529 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 12-Dec-12 To 14-Dec-12
D110-B70-PR-18: F16 & F15
5:00 PM
Check Concrete Curing For Pipe Track Foundations - Applying Curing Compound D110-
3854 RFI-5858-QCN-2-1530 RFI-5858-QCN-2-1530 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 12-Dec-12 3:00 PM 14-Dec-12
B70-PR-18: F16 & F15
3855 Pre-Pouring For Pre-cast Culvert Cover Type A Check Formworks, Reinforcement and Gate 5 TSF
RFI-5858-QCN-2-1531 RFI-5858-QCN-2-1531 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 12-Dec-12 7:00 AM 15-Dec-12
Cleaning of Pre-cast Culvert Cover Type A, BZRC-010 = 13 nos Raslaffan
Concrete Placement Check Concrete pouring of Precast Culvert Cover Type A of BZRC-
3856 RFI-5858-QCN-2-1532 RFI-5858-QCN-2-1532 CONCRETE
010 = 13 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 12-Dec-12 8:30 AM 15-Dec-12
3857 Pre-Pouring For Pre-cast Culvert Cover Type A Check Formworks, Reinforcement and
RFI-5858-QCN-2-1533 RFI-5858-QCN-2-1533 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 12-Dec-12 8:00 AM 15-Dec-12
Cleaning of Cast-in- Situ Pipe Track Footing D110-B70-PR-22: F4
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110-
3858 RFI-5858-QCN-2-1534 RFI-5858-QCN-2-1534 CONCRETE
B70-PR-22: F4
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 12-Dec-12 8:30 AM 14-Dec-12
Check Concrete Curing For Cast-in- Situ Culvert Intermediate wall & Sleeper ( West Side)
3859 RFI-5858-QCN-2-1535 RFI-5858-QCN-2-1535 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 12-Dec-12 3:00 PM 14-Dec-12
BZRC - 006 - Applying Curing Compound
Check Surface Preparation & Sealant Application in Contraction Joints For Cast-in- Situ
3860 RFI-5858-QCN-2-1536 RFI-5858-QCN-2-1536 CONCRETE
Culvert Intermediate wall & Sleeper ( West Side) BZRC - 006
APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.6 S W H 12-Dec-12 3:00 PM 14-Dec-12
9.1. Check surface preparation of Precast Culvert Cover Type A BZRC-003 = 18 nos and Gate 5 TSF
3861 RFI-5858-QCN-2-1537 RFI-5858-QCN-2-1537 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 12-Dec-12 7:00 AM 14-Dec-12
BZRC-008 = 2 nos prior first coating. Raslaffan
6:00 AM
Check Surface Preparation & Protective Coating 1st & 2nd For Cast-in- Situ Culvert
3862 RFI-5858-QCN-2-1538 RFI-5858-QCN-2-1538 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 12-Dec-12 TO 14-Dec-12
Intermediate wall & Sleeper ( West Side) BZRC - 006
3:00 PM
Pre-Pouring For Cast-in- Situ Pipe Stopper Pedestal Check Formworks, Reinforcement,
4.1.a.b.c.d.
3863 RFI-5858-QCN-2-1539 RFI-5858-QCN-2-1539 CONCRETE embedded items and Cleaning of Pipe Stopper Pedestal B70-PS-17: SLD021 prior APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 W W H 12-Dec-12 9:00 AM 14-Dec-12
e
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Pedestal B70-
3864 RFI-5858-QCN-2-1540 RFI-5858-QCN-2-1540 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 12-Dec-12 8:30 AM 14-Dec-12
PS-17: SLD021
3868 ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
RFI-5858-QCN-2-1544 RFI-5858-QCN-2-1544 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 13-Dec-12 7:30 AM 16-Dec-12
Pipe Sleeper B70-PS-31-F1 = 1 no. B70-PS-32-F1 = 22 nos prior shuttering.
9.1. Check protective coating first coat of Precast Culvert Cover Type A BZRC-003 = 18
3869 RFI-5858-QCN-2-1545 RFI-5858-QCN-2-1545 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Dec-12 8:30 AM 16-Dec-12
nos and BZRC-008 = 2 nos prior second coating.
3870 6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type A BZRC-
RFI-5858-QCN-2-1546 RFI-5858-QCN-2-1546 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-Dec-12 8:00 AM 16-Dec-12
005 = 7 nos, BZRC-010 = 5 nos and BZRC-011 = 5 nos.
3871 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-29-F2 =
RFI-5858-QCN-2-1547 RFI-5858-QCN-2-1547 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-Dec-12 3:00 PM 16-Dec-12
40 nos
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polyethylene & Hardboard Installation For Pipe Track Foundations D110-B70-PR-
3872 RFI-5858-QCN-2-1548 RFI-5858-QCN-2-1548 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 13-Dec-12 10:00 AM 16-Dec-12
18: F16 & F15
3873 9.1. Check surface preparation of Precast Pipe Stopper B70-PS-16; SLD002 prior First
RFI-5858-QCN-2-1549 RFI-5858-QCN-2-1549 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Dec-12 7:00 AM 16-Dec-12
Coating.
9.1. Check protective coating first coat of Cast-in- Situ Pipe Stopper B70-PS-16; SLD002
3874 RFI-5858-QCN-2-1550 RFI-5858-QCN-2-1550 CONCRETE APPROVED Secton 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Dec-12 1:30 PM 16-Dec-12
prior second coating.
3875 Check Reinforcement & Cleaning Prior Closing For Pipe Track Foundations - Pedestals
RFI-5858-QCN-2-1551 RFI-5858-QCN-2-1551 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 13-Dec-12 10:00 AM 16-Dec-12
D110-B70-PR-18: F13 = 4 Pedestals
3876 Check Polythylene & Hardboard Installation od Pipe Stopper B70-PS-16: SLD002 prior
RFI-5858-QCN-2-1552 RFI-5858-QCN-2-1552 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Dec-12 3:30 PM 16-Dec-12
Backfilling.
Check Reinforcement & Cleaning Prior Cleaning For Cast-in- Situ Culvert End Wall ( West
3877 RFI-5858-QCN-2-1553 RFI-5858-QCN-2-1553 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 13-Dec-12 7:00 AM 16-Dec-12
Side) BZRC - 006
3878 Check Polyethylene & Hardboard Installation For Culvert E-W ( Middle) walls - Except
RFI-5858-QCN-2-1554 RFI-5858-QCN-2-1554 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 13-Dec-12 2:00 PM 16-Dec-12
End Wall ( West Side) BZRC - 006
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
3879 RFI-5858-QCN-2-1555 RFI-5858-QCN-2-1555 CONCRETE
- PR -06 Pipe Rack Foundation Pedestal 6,9 /A-B - 4 NoS
APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 13-Dec-12 10:30 AM 19-Dec-12
3880 Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Pedestal 6,9 /A-B - 4
RFI-5858-QCN-2-1556 RFI-5858-QCN-2-1556 CONCRETE CANCELLED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 5.1 W H H 13-Dec-12 1:30 PM 12-Dec-12
NoS
Check Reinforcement prior to close shuttering D110 B70 - PR -08 Pipe Rack Foundation D110 B70 - PR - 06
3881 RFI-5858-QCN-2-1557 RFI-5858-QCN-2-1557 CONCRETE
Pedestal 1-2/A-B - 4 NoS
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1b W W H 15-Dec-12 1:30 PM 16-Dec-12
Pre-Pouring For Pre-cast Culvert Cover Type A and Removable Panel Check Formworks,
Gate 5 TSF
3882 RFI-5858-QCN-2-1558 RFI-5858-QCN-2-1558 CONCRETE Reinforcement and Cleaning of Pre-cast Culvert Cover Type A, BZRC-010 = 4 nos and APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 15-Dec-12 7:00 AM 16-Dec-12
Raslaffan
Rmovable Panel BZRC-010 = 2 nos and BZRC-011 = 2 nos prior concreting.
Concrete Placement Check Concrete pouring of Precast Culvert Cover Type A of BZRC-
3883 RFI-5858-QCN-2-1559 RFI-5858-QCN-2-1559 CONCRETE
010 = 4 nos and Removable BZRC-010 = 2 nos and BZRC-011 = 2 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 15-Dec-12 7:30 AM 16-Dec-12
9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-22 : F1 and F2
3884 RFI-5858-QCN-2-1560 RFI-5858-QCN-2-1560 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 15-Dec-12 9:00 AM 16-Dec-12
prior application of curing compound nito proof 10.
9.1. Check surface preparation of Precast Culvert Cover Type A BZRC-003 = 10 nos prior
3885 RFI-5858-QCN-2-1561 RFI-5858-QCN-2-1561 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 15-Dec-12 8:00 AM 16-Dec-12
first coating.
Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 03 & D110 B70 SECTION 1
3886 RFI-5858-QCN-2-1562 RFI-5858-QCN-2-1562 CONCRETE APPROVED B-V-3100-004-2-201-02_2 4.2 S W H 15-Dec-12 7:00 AM 15-Dec-12
PR 04 Raslaffan
3889 9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-15 -F1 = 12 nos and
RFI-5858-QCN-2-1565 RFI-5858-QCN-2-1565 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 15-Dec-12 8:00 AM 16-Dec-12
B70-PS-20-F1 = 15 nos prior first coating.
9.1. Check protective coating second coat of Cast-in- Situ Pipe Stopper B70-PS-16;
3890 RFI-5858-QCN-2-1566 RFI-5858-QCN-2-1566 CONCRETE APPROVED Secton 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 15-Dec-12 8:30 AM 16-Dec-12
SLD002 prior backfilling.
3891 Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Pedestal 6,9 /A-B - 4 D110 B70 - PR - 06
RFI-5858-QCN-2-1567 RFI-5858-QCN-2-1567 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 15-Dec-12 7:30 AM 13-Dec-12
NoS Raslaffan
7.2 check compressive strength @28days Pre-cast Pipe Sleepers - Footing B70-PS-28- QG Gate 5 TSF
3892 RFI-5858-QCN-2-1568 RFI-5858-QCN-2-1568 CONCRETE APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 15-Dec-12 9:30 AM 15-Dec-12
F1 = 2 nos & B70-29-F2 = 38 nos TEST REPORT NO =CCT-QCN-2#167 Raslaffan
3894 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal B70-PS- Gate 5 TSF
RFI-5858-QCN-2-1570 RFI-5858-QCN-2-1570 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Dec-12 7:30 AM 9-Dec-12
31-F1 = 1 no. and B70-PS-32-F1 = 22 nos. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring For Pre-cast Pipe Sleepers Footing Check Formworks, Reinforcement and
Gate 5 TSF
3895 RFI-5858-QCN-2-1571 RFI-5858-QCN-2-1571 CONCRETE Cleaning of Pre-cast Pipe Sleeper Footing B70-PS-15-F4 = 2 nos, B70-PS-15-F3 = 3 nos APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d. W W H 16-Dec-12 7:00 AM 19-Dec-12
Raslaffan
B70-PS-22-F1 = 8 nos and B70-PS-30-F2 = 10 nos prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Footing of B70-
3896 Gate 5 TSF
RFI-5858-QCN-2-1572 RFI-5858-QCN-2-1572 CONCRETE PS-15-F4 = 2 nos, B70-PS-15-F3 = 3 nos B70-PS-22-F1 = 8 nos and B70-PS-30-F2 = 10 APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Dec-12 7:30 AM 19-Dec-12
Raslaffan
nos.
3897 RFI-5858-QCN-2-1573 RFI-5858-QCN-2-1573 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert End Wall ( West Side) BZRC - 006 APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 16-Dec-12 6:00 AM 19-Dec-12
3898 RFI-5858-QCN-2-1574 RFI-5858-QCN-2-1574 CONCRETE Check Concrete Pouring For Cast-in- Situ Culvert End Wall ( West Side) BZRC - 006 APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Dec-12 7:00 AM 19-Dec-12
3899 Check Pre-Pouring For Pipe Track Foundations - Pedestals D110-B70-PR-18: F13 = 4
RFI-5858-QCN-2-1575 RFI-5858-QCN-2-1575 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 16-Dec-12 7:00 AM 19-Dec-12
Pedestals
Check Concrete Pouring For Pipe Track Foundations - Pedestals D110-B70-PR-18: F13
3900 RFI-5858-QCN-2-1576 RFI-5858-QCN-2-1576 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Dec-12 7:30 AM 19-Dec-12
= 4 Pedestals
3901 RFI-5858-QCN-2-1577 RFI-5858-QCN-2-1577 CONCRETE 8.2. Check Erection of Pre-cast of Pipe Track D110-B70-PR-68 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 16-Dec-12 10:00 AM 28-Dec-12
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-17:
3902 RFI-5858-QCN-2-1578 RFI-5858-QCN-2-1578 CONCRETE
SLD021.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 16-Dec-12 8:00 AM 18-Dec-12
3903 ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
RFI-5858-QCN-2-1579 RFI-5858-QCN-2-1579 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 16-Dec-12 8:30 AM 19-Dec-12
Situ Pipe Track D110-B70-PR-22: F4 prior shuttering
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR- Gcc QIL LAB
3905 RFI-5858-QCN-2-1581 RFI-5858-QCN-2-1581 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.4.1 S W H 16-Dec-12 9.30 AM 16-Dec-12
07 & PR-13,PR-47) Raslaffan
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for Gcc QIL Lab
3906 RFI-5858-QCN-2-1582 RFI-5858-QCN-2-1582 CONCRETE
Check Concrete Pouring For Pre-cast culvert cover Type - A BZRC 008 = 10 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 7.2 S W H 17-Dec-12 10.30AM 17-Dec-12
9.1. Check protective coating first coat of Pipe Track D110-B70-PR-22: F1 and F2 prior
3907 RFI-5858-QCN-2-1583 RFI-5858-QCN-2-1583 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Dec-12 7:00 AM 18-Dec-12
second coating.
9.1. Check protective coating second coat of Pipe Track D110-B70-PR-22: F1 and F2
3908 RFI-5858-QCN-2-1584 RFI-5858-QCN-2-1584 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Dec-12 9:00 AM 18-Dec-12
prior hardboard proctection.
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 D110 B70 - PR - 06
3910 RF-5858-QCN-2-1586 RF-5858-QCN-2-1586 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 17-Dec-12 7:30 AM 18-Dec-12
- PR -06 Pipe Rack Foundation 7(F7),8(F8) Raslaffan
Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation 7(F7),8(F8) & D110 B70 - PR - 06
3911 RF-5858-QCN-2-1587 RF-5858-QCN-2-1587 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 17-Dec-12 8.30 AM 19-Dec-12
Pedestal 6,9 /A-B - 4 NoS Raslaffan
Pre-Pouring For Pre-cast Culvert Cover Type B and Type C Check Formworks,
Gate 5 TSF
3913 RFI-5858-QCN-2-1589 RFI-5858-QCN-2-1589 CONCRETE Reinforcement and Cleaning of Pre-cast Culvert Cover Type C, BZRC-004 = 1 no. and APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 19-Dec-12 7:00 AM 22-Dec-12
Raslaffan
Precast Culvert Cover Type B, BZRC-011 = 2 nos. prior concreting.
3914 Concrete Placement Check Concrete pouring of Precast Culvert Cover Type C, BZRC-
RFI-5858-QCN-2-1590 RFI-5858-QCN-2-1590 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Dec-12 7:30 AM 22-Dec-12
004 = 1 no. and Culvert Cover Type B, BZRC-011 = 2 nos.
Pre-Pouring For Cast-in- Situ Pipe Track Footing and Pedestal Check Formworks,
3915 RFI-5858-QCN-2-1591 RFI-5858-QCN-2-1591 CONCRETE Embedded items and cleaning of Cat-in- Situ Pipe Track Pedestal D11-B70-PR-22: F3 = APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 19-Dec-12 1:15 PM 22-Dec-12
2 nos and Pipe Track Footing D110-B70-PR-22: F5 = 1 no prior concreting.
3916 Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal B70-PR-
RFI-5858-QCN-2-1592 RFI-5858-QCN-2-1592 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Dec-12 1:30 PM 22-Dec-12
22: F3 = 2 nos and Pipe Track Footing D110-B70-PR-22: F5 = 1 no.
3917 Check Concrete Surface upon Form Removal For Pipe Track Foundations - Pedestals
RFI-5858-QCN-2-1593 RFI-5858-QCN-2-1593 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-Dec-12 6:30 AM 21-Dec-12
D110-B70-PR-18: F13 = 4 Pedestals
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30 AM
Check Surface Preparation & Protective Coating 1st & 2nd For Pipe Track Foundations
3918 RFI-5858-QCN-2-1594 RFI-5858-QCN-2-1594 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 19-Dec-12 To 21-Dec-12
D110-B70-PR-18: F13 = 4 Pedestals
4:30 PM
3919 Check Surface Above Grade ( Footing TOP) For Pipe Track Foundations D110-B70-PR-
RFI-5858-QCN-2-1595 RFI-5858-QCN-2-1595 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 19-Dec-12 4:00 PM 21-Dec-12
18: F13 = 4 Pedestals
Check concrete surface upon form removal D110 B70 - PR -06 Pipe Rack Foundation D110 B70 - PR - 06
3920 RFI5858-QCN-2-1596 RFI5858-QCN-2-1596 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 19-Dec-12 2:00 PM 21-Dec-12
Pedestal 6(F6),9(F6) - 4 Nos. Raslaffan
3921 Check Concrete Curing For Pipe Track Foundations - Applying Curing Compound D110-
RFI-5858-QCN-2-1597 RFI-5858-QCN-2-1597 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 19-Dec-12 9:00 AM 21-Dec-12
B70-PR-18: F13 = 4 Pedestals
3922 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-31-F1 =
RFI-5858-QCN-2-1598 RFI-5858-QCN-2-1598 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-Dec-12 9:00 AM 21-Dec-12
1 no. and B70-PS-32-F1 = 22 nos.
3923 RFI-5858-QCN-2-1599 RFI-5858-QCN-2-1599 CONCRETE Check Concrete Surface upon Form Removal Culvert End Wall ( West Side) BZRC - 006 APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-Dec-12 6:30 AM 21-Dec-12
3924 Check Concrete Curing for Culvert End Wall ( West Side) BZRC - 006 - Applying Curing
RFI-5858-QCN-2-1600 RFI-5858-QCN-2-1600 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 19-Dec-12 6:30 AM 21-Dec-12
Compound
Check Surface Preparation & Sealant Application for Culvert End Wall ( West Side) BZRC
3925 RFI-5858-QCN-2-1601 RFI-5858-QCN-2-1601 CONCRETE
- 006
APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 6.6 S W H 19-Dec-12 9:30 AM 21-Dec-12
3926 Check Surface Preparation & Protective coating 1st & 2nd for Culvert End Wall ( West
RFI-5858-QCN-2-1602 RFI-5858-QCN-2-1602 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 19-Dec-12 3:00 PM 21-Dec-12
Side) BZRC - 006
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
3927 RFI-5858-QCN-2-1603 RFI-5858-QCN-2-1603 CONCRETE
Situ Pipe Track D110-B70-PR-22: F4 = 2 nos prior shuttering.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 19-Dec-12 7:30 AM 22-Dec-12
7.2 Check Compressive strength @28 Days (Cube testing as per BS EN 12390-3) for
GCC QIL Lab
3928 RFI-5858-QCN-2-1604 RFI-5858-QCN-2-1604 CONCRETE Culvert Cover Type-A for BZRC008 = 2 nos & BZRC003 = 18 nos. & Culvert Cover Type- APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 20-Dec-12 2:30 PM 20-Dec-12
Raslaffan
A for BZRC008 = 2 nos & BZRC003 = 18 nos.
Check Polyethylene & Hardboard Installation For Pipe Track Foundations D110-B70-PR-
3929 RFI-5858-QCN-2-1605 RFI-5858-QCN-2-1605 CONCRETE
18: F13
APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 20-Dec-12 6:30 AM 22-Dec-12
Check Polyethylene & Hardboard Installation for Culvert End Wall ( West Side) BZRC -
3930 RFI-5858-QCN-2-1606 RFI-5858-QCN-2-1606 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 20-Dec-12 6:30 AM 22-Dec-12
006
Section 3 Hamla
3932 RFI-5858-QCN-2-1608 RFI-5858-QCN-2-1608 CONCRETE Check Concrete Pouring HAMLA CULVERT BZRC 004 EAST SIDE 2nd BASE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-Dec-12 3:00 PM 22-Dec-12
Culvert
3933 RFI-5858-QCN-2-1609 RFI-5858-QCN-2-1609 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert End & 3rd bases ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 20-Dec-12 1:00 PM 22-Dec-12
Check Concrete Pouring For Cast-in- Situ Culvert End & 3rd bases ( East Side) BZRC -
3934 RFI-5858-QCN-2-1610 RFI-5858-QCN-2-1610 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Dec-12 2:00 PM 22-Dec-12
008
3935 Check Reinforcement prior to close shuttering D110 B70 - PR -06 Pipe Rack Foundation
RFI-5858-QCN-2-1611 RFI-5858-QCN-2-1611 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1b W W H 20-Dec-12 3:00 PM 22-Dec-12
Pedestal 7,8/A,B - 4 NoS
D110 B70-PR-06
3936 RFI-5858-QCN-2-1612 RFI-5858-QCN-2-1612 CONCRETE Check Surface Preparation D110 B70-PR-06 Pipe Rack Foundation No 6(F6) & 9(F6) APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 20-Dec-12 8:00 AM 22-Dec-12
Raslaffan
11:00 AM
3937 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
RFI-5858-QCN-2-1613 RFI-5858-QCN-2-1613 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 9.2 a S W H 20-Dec-12 TO 22-Dec-12
PR -06 Pipe Rack Foundation No 6(F6) &9 (F6)
4:30 PM
7.2 Check compressive strength @28 Days (cube testeing as per BS EN -12390-3) for
3938 RFI-5858-QCN-2-1614 RFI-5858-QCN-2-1614 CONCRETE Concrete Pouring Pre-Cast Pipe Sleepers Pedestal B70-PS-18-F = 7 nos, B70-PS-19-F1 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 22-Dec-12 9:30 AM 22-Dec-12
= 17 nos, B70-PS-20-F1 = 26 nos, B70-PS-04-F3 = 10 nos, B70-PS-03-F4 = 2 nos.
3939 ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
RFI-5858-QCN-2-1615 RFI-5858-QCN-2-1615 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 22-Dec-12 7:30 AM 24-Dec-12
Pipe Sleeper Pedestal B70-PS-22-F1 = 8 nos and B70-30-F2 = 10 nos prior shuttering.
3940 Check Polythylene & Hardboard Installation od Pipe Track D110-B70-PR-22: F1 and F2
RFI-5858-QCN-2-1616 RFI-5858-QCN-2-1616 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 22-Dec-12 7:00 PM 23-Dec-12
prior backfilling.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert End & 3rd bases
3941 RFI-5858-QCN-2-1617 RFI-5858-QCN-2-1617 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 22-Dec-12 7:00 AM 23-Dec-12
( East Side) BZRC - 008
3942 Check Concrete Curing For Cast-in- Situ Culvert End & 3rd bases ( East Side) BZRC -
RFI-5858-QCN-2-1618 RFI-5858-QCN-2-1618 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 22-Dec-12 7:00 AM 23-Dec-12
008- curing compound
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-F1 = 2 nos and B70-PS-
3943 RFI-5858-QCN-2-1619 RFI-5858-QCN-2-1619 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 22-Dec-12 7:30 AM 23-Dec-12
29-F2 = 38 nos prior first coating.
3944 Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -06 Pipe
RFI-5858-QCN-2-1620 RFI-5858-QCN-2-1620 CONCRETE APPROVED D110 B70 - PR -06 B-V-3100-004-2-201-02_5 9.2.b,c S W H 22-Dec-12 7:30 AM 23-Dec-12
Rack Foundation 6(F6) & 9(F6)
3945 Check Surface Preparation for Cast-in- Situ Culvert End & 3rd bases ( East Side) BZRC -
RFI-5858-QCN-2-1621 RFI-5858-QCN-2-1621 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 22-Dec-12 7:00 AM 23-Dec-12
008
9.1. Check surface preparation of Precast Culvert Covert Type A BZRC-004 = 7 nos and
3946 RFI-5858-QCN-2-1622 RFI-5858-QCN-2-1622 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 22-Dec-12 8:00 AM 23-Dec-12
BZRC-005 = 13 nos prior first coating.
3947 Pre-Pouring For Pre-cast Pipe Sleeper Check Formworks, Reinforcement and Cleaning of Gate 5 TSF
RFI-5858-QCN-2-1623 RFI-5858-QCN-2-1623 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 22-Dec-12 7:00 AM 24-Dec-12
Pre-cast Pipe Sleeper B70-PS29-F2 = 12 nos prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Precast Pipe Sleeper Footing B70-PS-
3948 RFI-5858-QCN-2-1624 RFI-5858-QCN-2-1624 CONCRETE
29-F2 = 11 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 22-Dec-12 7:30 AM 24-Dec-12
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for Pre-
3949 Gate 5 TSF
RFI-5858-QCN-2-1625 RFI-5858-QCN-2-1625 CONCRETE cast Pipe Sleeper B70-PS-15-15-F1 = 12 nos, B70-PS-20-F1 = 15 nos, B70-PS-23-F3 = APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 23-Dec-12 9:30 AM 23-Dec-12
Raslaffan
10 nos and B70-PS-27-F1 = 25 nos.TEST REPORT NO =CCT-QCN-2#179
Pre-Pouring For Cast-in- Situ Pipe Track Footing and Pedestal Check Formworks,
Reinforcement, Embedded items, joints and cleaning of Pipe Track Pedestal D110-B70- Gate 5 TSF 4.1.a.b.c.d.
3950 RFI-5858-QCN-2-1626 RFI-5858-QCN-2-1626 CONCRETE
PR-22: F4 = 2 nos and F5 = 2 nos. and Pipe Track Footing D110-B70-PR-22: F6 = 1 no.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 23-Dec-12 1:15 PM 29-Dec-12
and D110-B70-PR-24: F1 = 1 no. prior concreting.
9.1. Check surface preparation of Pipe Stopper B70-PS-17: SLD057 and SLD0021 prior
3953 RFI-5858-QCN-2-1629 RFI-5858-QCN-2-1629 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 23-Dec-12 8:30 AM 23-Dec-12
protective coating
Prepouring - Check form works,Embeded items,Cleaning & Construction joints HAMLA Section 3 Hamla
3954 RFI-5858-QCN-2-1630 RFI-5858-QCN-2-1630 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 23-Dec-12 3:00 PM 26-Dec-12
CULVERT BZRC 004 3rd BASE FROM EAST SIDE (CONSTRUCTION JOINT -7.5m) Culvert
Check Concrete Pouring HAMLA CULVERT BZRC 004 3rd BASE FROM EAST SIDE Section 3 Hamla
3955 RFI-5858-QCN-2-1631 RFI-5858-QCN-2-1631 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Dec-12 3:30 PM 26-Dec-12
(CONSTRUCTION JOINT -7.5m) Culvert
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
3956 RFI-5858-QCN-2-1632 RFI-5858-QCN-2-1632 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 23-Dec-12 8:30 AM 24-Dec-12
Pipe Sleeper Pedestal B70-PS-15-F3 = 3 nos and B70-15-F4 = 3 nos prior shuttering.
PIPE RACK PR - 06
3957 RFI-5858-QCN-2-1633 RFI-5858-QCN-2-1633 CONCRETE Check Concrete Curing D110 B70 - PR -06 Pipe Rack Foundation 6(F6)& 9(F6) APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 23-Dec-12 7:30 AM 23-Dec-12
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for D110
3958 QG Gate 5 TSF
RFI-5858-QCN-2-1634 RFI-5858-QCN-2-1634 CONCRETE B70 - PR -06 Pipe Rack Foundation Footing 4 (F4) - 1 No&Pre-cast Culvert Cover Type A APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 24-Dec-12 9:30 AM 24-Dec-12
Raslaffan
of BZRC-003 = 14 nosTEST REPORT NO =CCT-QCN-2#180&181
Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundations B70 SECTION1
3959 RFI-5858-QCN-2-1635 RFI-5858-QCN-2-1635 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 24-Dec-12 7:30 AM 25-Dec-12
- PS -04 SLD002 TO SLD014 Raslaffan
3960 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 D110 B70 - PR - 06
RFI-5858-QCN-2-1636 RFI-5858-QCN-2-1636 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 24-Dec-12 8:30 AM 26-Dec-12
- PR -06 Pipe Rack Foundation Pedestal 7,8 /A-B - 4 NoS Raslaffan
Check Concrete Pouring D110 B70 - PR -06 Pipe Rack Foundation Pedestal 7,8 /A-B - 4 D110 B70 - PR - 06
3961 RFI-5858-QCN-2-1637 RFI-5858-QCN-2-1637 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 24-Dec-12 9:00 AM 26-Dec-12
NoS Raslaffan
3962 Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and Gate 5 TSF
RFI-5858-QCN-2-1638 RFI-5858-QCN-2-1638 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 24-Dec-12 1:15 PM 26-Dec-12
Cleaning of Pre-cast Culvert Cover Type A BZRC-012 = 5 nos prior concreting. Raslaffan
3963 Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
RFI-5858-QCN-2-1639 RFI-5858-QCN-2-1639 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 24-Dec-12 1:30 PM 26-Dec-12
012 = 5 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
3964 RFI-5858-QCN-2-1640 RFI-5858-QCN-2-1640 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert 2nd & 4th bases ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 24-Dec-12 10:30 AM 26-Dec-12
3965 Check Concrete Pouring For Cast-in- Situ Culvert 2nd & 4th bases ( East Side) BZRC -
RFI-5858-QCN-2-1641 RFI-5858-QCN-2-1641 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 24-Dec-12 1:30 PM 26-Dec-12
008
Pre-Pouring For Pre-cast Pipe Sleeper Footing and Pedestal Check Formworks,
Reinforcement, Imbedded Items, joints and Cleaning of Pre-cast Pipe Sleeper Pedestal Gate 5 TSF
3966 RFI-5858-QCN-2-1642 RFI-5858-QCN-2-1642 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 24-Dec-12 1:15 PM 26-Dec-12
B70-PS-22-F1 = 8 nos B70-PS-30-F2 = 10 nos and Precast Pipe Sleeper Footing B70- Raslaffan
PS-29-F2 = 1 no. and B70-PS-32-F1 = 9 nos prior concreting.
Concrete Placement Check Concrete pouring of Precast Pre-cast Pipe Sleeper Pedestal
3967 RFI-5858-QCN-2-1643 RFI-5858-QCN-2-1643 CONCRETE B70-PS-22-F1 = 8 nos, B70-PS-30-F2 = 10 nos and Precast Pipe Sleeper Footing B70- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 24-Dec-12 1:30 PM 26-Dec-12
PS-29-F2 = 1 no. and B70-PS-32-F1 = 9 nos prior concreting.
3968 Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
RFI-5858-QCN-2-1644 RFI-5858-QCN-2-1644 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 24-Dec-12 3:30 PM 26-Dec-12
EAST SIDE 2nd BASE WALL -- BOTH SIDE
9.1. Check protective coating first coat of Pipe Stopper B70-PS-17: SLD021 and SLD057
3969 RFI-5858-QCN-2-1645 RFI-5858-QCN-2-1645 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 24-Dec-12 9:00 AM 25-Dec-12
prior second coating.
3970 9.1. Check protective coating second coat of Pipe Stopper B70-PS-17: SLD021 and
RFI-5858-QCN-2-1646 RFI-5858-QCN-2-1646 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 24-Dec-12 3:30 PM 26-Dec-12
SLD057 prior hardboard installation.
9.1. Check protective coating first coat of Pipe Sleeper B70-PS-28-F2 = 2 nos and B70-
3971 RFI-5858-QCN-2-1647 RFI-5858-QCN-2-1647 CONCRETE
PS-29-F1 = 38 nos prior second coating.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 24-Dec-12 8:00 AM 26-Dec-12
3972 9.1. Check protective coating second coat of Pipe Sleeper B70-PS-28-F1 = 2 nos and
RFI-5858-QCN-2-1648 RFI-5858-QCN-2-1648 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 24-Dec-12 3:30 PM 26-Dec-12
B70-PS-29-F1 = 38 nos.
Check concrete surface upon form removal D110 B70 - PR -06 Pipe Rack Foundation 7
3973 RFI-5858-QCN-2-1649 RFI-5858-QCN-2-1649 CONCRETE
(F7)& 8 (F8)
APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 6.3 S W H 25-Dec-12 9:30 AM 25-Dec-12
Check Polythylene & Hardboard Installation od Pipe Stopper B70-PS-17: SLD057 prior
3974 RFI-5858-QCN-2-1650 RFI-5858-QCN-2-1650 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 25-Dec-12 9:30 AM 25-Dec-12
Backfilling.
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)for B70 - Gcc QIL Lab
3976 RFI-5858-QCN-2-1652 RFI-5858-QCN-2-1652 CONCRETE APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 25-Dec-12 2.30 PM 25-Dec-12
PS-20 -F1=4 nos;PS-27-F1=15 nos;PS-30-F2=15 nos. Raslaffan
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 SECTION 2 PR -
3977 RFI-5858-QCN-2-1653 RFI-5858-QCN-2-1653 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 26-Dec-12 7:00 AM 29-Dec-12
- PR -08 Pipe Rack Foundation Pedestal 1-2/A-B - 4 NoS 08 Raslaffan
Check Concrete Pouring D110 B70 - PR -08 Pipe Rack Foundation Pedestal 1-2/A-B - 4 D110 B70 - PR - 08
3978 RFI-5858-QCN-2-1654 RFI-5858-QCN-2-1654 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 26-Dec-12 9:00 AM 29-Dec-12
NoS Raslaffan
Prepouring - Check form works,Embeded items,Cleaning & Construction joints HAMLA Section 3 Hamla
3979 RFI-5858-QCN-2-1655 RFI-5858-QCN-2-1655 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 26-Dec-12 10:30 AM 29-Dec-12
CULVERT BZRC 004 1st BASE FROM EAST SIDE ( 5.05m) Culvert
7:30 AM
Check Concrete Pouring HAMLA CULVERT BZRC 004 1st BASE FROM EAST SIDE Section 3 Hamla
3980 RFI-5858-QCN-2-1656 RFI-5858-QCN-2-1656 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 26-Dec-12 to 29-Dec-12
( 5.05m) Culvert
4:00 PM
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for PRE-
3981 Gate 5 TSF
RFI-5858-QCN-2-1657 RFI-5858-QCN-2-1657 CONCRETE CAST PIPE SLEEPER B70-PS-28-F1=2NOS&B70-PS-29-F2=38 NOS&DUCT BANK APPROVED B-V-3100-004-2-201-02_5 7.2 S W H 26-Dec-12 9.30 AM 26-Dec-12
Raslaffan
BZOP-007TEST REPORT NO =CCT-QCN-2#184.185,186
11:00 AM
Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat SECTION 2
3982 RFI-5858-QCN-2-1658 RFI-5858-QCN-2-1658 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 26-Dec-12 to 28-Dec-12
Sleeper Foundations B70 - PS -09 SLD039 TO SLD050 & B70 - PS -08 SLD036 Raslaffan
4:00 PM
3983 Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert 2nd & 4th bases
RFI-5858-QCN-2-1659 RFI-5858-QCN-2-1659 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-Dec-12 7:30 AM 28-Dec-12
( East Side) BZRC - 008
Check Surface Preparation For Cast-in- Situ Culvert 2nd & 4th bases ( East Side) BZRC -
3984 RFI-5858-QCN-2-1660 RFI-5858-QCN-2-1660 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Dec-12 9:30 AM 28-Dec-12
008
3985 Check Concrete Curing For Cast-in- Situ Culvert 2nd & 4th bases ( East Side) BZRC -
RFI-5858-QCN-2-1661 RFI-5858-QCN-2-1661 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Dec-12 10:00 AM 28-Dec-12
008 - Applying Curing Compound
3986 Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Culvert 3rd North Wall +
RFI-5858-QCN-2-1662 RFI-5858-QCN-2-1662 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 26-Dec-12 8:00 AM 29-Dec-12
3 Sleepers ( East Side) BZRC - 008
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface preparation D110 B70 - PR -06 Pipe Rack Foundation No 7(F7)& 8(F8) & D110 B70 - PR - 06
3987 RFI-5858-QCN-2-1663 RFI-5858-QCN-2-1663 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 26-Dec-12 7:30 AM 28-Dec-12
Protective coating - First & Second coat (Curing compound applied) Raslaffan
3988 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 - D110 B70 - PR - 06
RFI-5858-QCN-2-1664 RFI-5858-QCN-2-1664 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 26-Dec-12 7:30 AM 28-Dec-12
PR -06 Pipe Rack Foundation No 7(F7) &8 (F8) Raslaffan
7.2 check compressive strength @ 28 Days (cube testing as per BS EN - 12390-3) for
3989 RFI-5858-QCN-2-1665 RFI-5858-QCN-2-1665 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 26-Dec-12 3:30 PM 26-Dec-12
PRE-CAST Pipe Sleeper B70-PS-28-F1 = 2 nos & B70-PS-29-F2 = 38 nos.
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for - (1)
D110 B70 - PR -06 Pipe Rack Foundation Footing 1(F1),2 (F2),3(F3),5 (F5),10(F9) - 5
NoS & Pedestal 4/A,B - 2 NoS, (2) D110 B70 - PR -06 Pipe Rack Foundation Footing
1(F1),2 (F2),3(F3),5 (F5),10(F9) - 5 NoS &Pedestal 4/A,B - 2 NoS (3) Pre-cast Culvert
Cover Type A of BZRC-003 = 5 nos, BZRC-004 = 7 nos Culvert Cover Type B of BZRC-
3990 RFI-5858-QCN-2-1666 RFI-5858-QCN-2-1666 CONCRETE
005 = 2 nos, Pre- cast Pipe Sleeper Pedestal of B70-PS-26-F3 = 10 nos and B70-PS-27-
APPROVED Gate 5 TSF B-V-3100-004-2-201-02_5 7.2 S W H 27-Dec-12 3.30 AM 27-Dec-12
F1 = 11 nos. (4) Pre-cast Culvert Cover Type A of BZRC-003 = 5 nos, BZRC-004 = 7 nos
Culvert Cover Type B of BZRC-005 = 2 nos,Pre-cast Pipe Sleeper Pedestal of B70-PS-
26-F3 = 10 nos and B70-PS-27-F1 = 11 nos. TEST REPORT NO =CCT-QCN-
2#,187,188, 189&190
3991 9.1. Check surface preparation of Culvert Covert Tpye A BZRC-004 = 7 nos, BZRC-005 =
RFI-5858-QCN-2-1667 RFI-5858-QCN-2-1667 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 27-Dec-12 7:30 AM 28-Dec-12
13 nos prior first coating.
Pre-Pouring For Pre-cast Pipe Sleepers Footing Check Formworks, Reinforcement and
Gate 5 TSF
3992 RFI-5858-QCN-2-1668 RFI-5858-QCN-2-1668 CONCRETE Cleaning of Pre-cast Pipe Sleeper Footing B70-PS-15-F4 = 2 nos, B70-PS-15-F3 = 3 nos APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d. W W H 27-Dec-12 7:00 AM 29-Dec-12
Raslaffan
prior concreting.
3993 Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Pedestal of B70- Gate 5 TSF
RFI-5858-QCN-2-1669 RFI-5858-QCN-2-1669 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Dec-12 7:30 AM 29-Dec-12
PS-15-F4 = 2 nos, B70-PS-15-F3 = 3 nos Raslaffan
6:30 AM
3994 Check Surface above grade ( Surface Preparation & Coating 1st & 2nd) For Culvert
RFI-5858-QCN-2-1670 RFI-5858-QCN-2-1670 CONCRETE APPROVED Cr # 32 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 27-Dec-12 TO 28-Dec-12
( West Side) BZRC - 006 4:30 PM
Pre-Pouring For Pre-cast Culvert Covert Type A Check Formworks, Reinforcement and Gate 5 TSF
3995 RFI-5858-QCN-2-1671 RFI-5858-QCN-2-1671 CONCRETE
Cleaning of Pre-cast Culvert Cover Type A BZRC-012 = 2 nos prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 27-Dec-12 7:00 AM 29-Dec-12
Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type A of BZRC- Gate 5 TSF
3996 RFI-5858-QCN-2-1672 RFI-5858-QCN-2-1672 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Dec-12 7:30 AM 29-Dec-12
012 = 2 nos Raslaffan
Pre-Pouring For Pre-cast Pipe Sleepers Footing Check Formworks, Reinforcement and Retaining wall
3997 RFI-5858-QCN-2-1673 RFI-5858-QCN-2-1673 CONCRETE
Cleaning of Cast-in- Situ Retaining wall footing 30 meters. prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d. W W H 27-Dec-12 1:15 PM 1-Jan-13
Retaining Wall
3998 RFI-5858-QCN-2-1674 RFI-5858-QCN-2-1674 CONCRETE Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining Footing 30 meters. CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 27-Dec-12 1:30 PM 27-Dec-12
Raslaffan
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -06 Pipe
3999 RFI-5858-QCN-2-1675 RFI-5858-QCN-2-1675 CONCRETE
Rack Foundation 7(F7) & 8(F8)
APPROVED D110 B70 - PR -06 B-V-3100-004-2-201-02_5 9.2.b,c S W H 27-Dec-12 7:00 AM 28-Dec-12
Prepouring - Check form works,Embeded items,Cleaning & Construction joints HAMLA Section 3 Hamla
4000 RFI-5858-QCN-2-1676 RFI-5858-QCN-2-1676 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 27-Dec-12 4:00PM 27-Dec-12
CULVERT BZRC 004 FROM EAST SIDE 2nd BASE WALL -- BOTH SIDE Culvert
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 2nd BASE Section 3 Hamla
4001 RFI-5858-QCN-2-1677 RFI-5858-QCN-2-1677 CONCRETE
WALL -- BOTH SIDE
CANCELLED
Culvert
B-V-3100-004-2-201-02_5 5.1 W H H 27-Dec-12 4:30 PM 27-Dec-12
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
4002 RFI-5858-QCN-2-1678 RFI-5858-QCN-2-1678 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 27-Dec-12 7:30 AM 28-Dec-12
Situ Pipe Track Pedestal D110-B70-PR-22: F6 and D110-B70-PR-22: F6 prior shuttering.
4003 ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
RFI-5858-QCN-2-1679 RFI-5858-QCN-2-1679 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 27-Dec-12 7:30 AM 28-Dec-12
Culvert Cover Type B: BZRC-011 = 2 nos prior shuttering.
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
4004 RFI-5858-QCN-2-1680 RFI-5858-QCN-2-1680 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 27-Dec-12 7:30 AM 28-Dec-12
Pipe Sleeper Pedestal B70-PS-29-F2 = 12 nos prior shuttering.
4005 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-1681 RFI-5858-QCN-2-1681 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 27-Dec-12 8:00 AM 28-Dec-12
22: F4 and F5
Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
4006 RFI-5858-QCN-2-1682 RFI-5858-QCN-2-1682 CONCRETE EAST SIDE 1ST BASE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION CANCELLED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 27-Dec 4:30 PM 27-Dec-12
ONLY)
Pre-Pouring For Cast-in- Situ Pipe Track Footing and Pedestal Check Formworks,
4007 Embedded items and cleaning of Cat-in- Situ Pipe Track Pedestal D110-B70-PR-24: F1 =
RFI-5858-QCN-2-1683 RFI-5858-QCN-2-1683 CONCRETE CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 29-Dec-12 1:15 PM 29-Dec-12
2 nos, B70-PR-22: F6 = 2 nos and Pipe Track Footing D110-B70-PR-23: F1 = 1 no. and
B70-PR-24: F2 = 1 no. prior concreting.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal D110-
4008 RFI-5858-QCN-2-1684 RFI-5858-QCN-2-1684 CONCRETE B70-PR-24: F1 = 2 nos, B70-PR-22: F6 = 2 nos and Pipe Track Footing D110-B70-PR-23 CANCELLED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Dec-12 1:30 PM 29-Dec-12
= 1 no. and B70-PR-24: 1 no.
4009 Check Pre-Pouring For Cast-in- Situ Culvert 2nd-N & S wall & 3 Sleepers ( East Side)
RFI-5858-QCN-2-1685 RFI-5858-QCN-2-1685 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 29-Dec-12 1:00 PM 1-Jan-13
BZRC - 008
Check Concrete Pouring For Cast-in- Situ Culvert 2nd-N & S wall & 3 Sleepers ( East
4010 RFI-5858-QCN-2-1686 RFI-5858-QCN-2-1686 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Dec-12 1:30 PM 1-Jan-13
Side) BZRC - 008
4011 6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-15-F3 =
RFI-5858-QCN-2-1687 RFI-5858-QCN-2-1687 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 29-Dec-12 8:00 AM 1-Jan-13
3 nos and B70-PS-15-F4 = 2 nos.
4012 Check Final Visual Inspection Sleeper foundations Sleeper Foundations B70 - PS -09
RFI-5858-QCN-2-1688 RFI-5858-QCN-2-1688 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_5 9.2 S W H 29-Dec-12 8:40 AM 1-Jan-13
SLD039 TO SLD050 & B70 PS -08 SLD036
Check Reinforcement & Cleaning prior closing For Cast-in- Situ Culvert 2nd- S wall ( East
4013 RFI-5858-QCN-2-1689 RFI-5858-QCN-2-1689 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 29-Dec-12 6:30 AM 1-Jan-13
Side) BZRC - 008
4014 9.1. Check protective coating first coat of Precast Culvert Cover Type A BZRC-004 = 7
RFI-5858-QCN-2-1690 RFI-5858-QCN-2-1690 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 29-Dec-12 7:30 AM 1-Jan-13
nos, BZRC-005 = 13 nos prior second coating
9.1. Check protective coating second coat of Precast Culvert Cover Type A BZRC-004 =
4015 RFI-5858-QCN-2-1691 RFI-5858-QCN-2-1691 CONCRETE
7 nos, BZRC-005 = 13 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 29-Dec-12 2:00 PM 1-Jan-13
4016 9.1. Check surface preparation of Precast Culvert Cover Type A BZRC-003 = 5 nos, Gate 5 TSF
RFI-5858-QCN-2-1692 RFI-5858-QCN-2-1692 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 29-Dec-12 7:00 AM 1-Jan-13
BZRC-004 = 7 nos and BZRC-005 = 2 nos prior first coating. Raslaffan
Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
4017 RFI-5858-QCN-2-1693 RFI-5858-QCN-2-1693 CONCRETE
F9
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 29-Dec-12 10:30 AM 1-Jan-13
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
4018 RFI-5858-QCN-2-1694 RFI-5858-QCN-2-1694 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Dec-12 1:00 PM 1-Jan-13
PR-18: F9
Check concrete surface upon form removal D110 B70 - PR -08 Pipe Rack Foundation 1
4020 RFI-5858-QCN-2-1696 RFI-5858-QCN-2-1696 CONCRETE APPROVED D110 B70 - PR - 08 B-V-3100-004-2-201-02_5 6.3 S W H 29-Dec-12 2:30 PM 1-Jan-13
(F2)& 2 (F1)
Concrete Placement Chack Concrete of cast-in-situ Retaining footing from N-S as per BF-S-B00-1320-002
4023 RFI-5858-QCN-2-1699 RFI-5858-QCN-2-1699 CONCRETE APPROVED B-V-3100-004-1-201-01_5 5.1 W H H 30-Dec-12 10:30 AM 1-Jan-13
attached highlight Drawings Section G and H. Raslaffan
4025 Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 2nd BASE Section 3 Hamla
RFI-5858-QCN-2-1701 RFI-5858-QCN-2-1701 CONCRETE APPROVED B-V-3100-004-1-201-01_5 5.1 W H H 30-Dec-12 11:10 AM 1-Jan-13
WALL -- BOTH SIDE AS PER ATTACHED HIGHLIGHT DRAWINGS Culvert
Pre-Pouring For Cast-in- Situ Pipe Track Footing and Pedestal Check Formworks,
Embedded items and cleaning of Cat-in- Situ Pipe Track Pedestal D110-B70-PR-24: F1 =
4026 RFI-5858-QCN-2-1702 RFI-5858-QCN-2-1702 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 30-Dec-12 1:15 PM 1-Jan-13
2 nos, B70-PR-22: F6 = 2 nos and Pipe Track Footing D110-B70-PR-23: F1 = 1 no. and
B70-PR-24: F2 = 1 no. prior concreting.
Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal D110-
4027 RFI-5858-QCN-2-1703 RFI-5858-QCN-2-1703 CONCRETE B70-PR-24: F1 = 2 nos, B70-PR-22: F6 = 2 nos and Pipe Track Footing D110-B70-PR-23 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 1:30 PM 1-Jan-13
= 1 no. and B70-PR-24: 1 no.
4028 RFI-5858-QCN-2-1704 RFI-5858-QCN-2-1704 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert 2nd- S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 30-Dec-12 1:30 PM 1-Jan-13
4029 RFI-5858-QCN-2-1705 RFI-5858-QCN-2-1705 CONCRETE Check Concrete Pouring For Cast-in- Situ Culvert 2nd- S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 2:30 PM 1-Jan-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining Footing from N- S Retaining Wall
4031 RFI-5858-QCN-2-1707 RFI-5858-QCN-2-1707 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 7:30 AM 1-Jan-13
as per attached highlighted drawings. Section G and H. Raslaffan
Pre-Pouring for Pipe Sleeper Pedestal and Culvert Cover Type B Check
4032 Gate 5 TSF
RFI-5858-QCN-2-1708 RFI-5858-QCN-2-1708 CONCRETE Formworks,Embedded items and Cleaning of Pre-cast Pipe Sleeper Pedestal B70-PS-22- APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 30-Dec-12 8:15 AM 1-Jan-13
Raslaffan
F3 = 1 no., B70-PS-29-F2 = 12 nos prior concreting
Concrete Placement Check Concrete pouring of Precast Pipe Sleeper Pedestal B70-PS-
4033 RFI-5858-QCN-2-1709 RFI-5858-QCN-2-1709 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 8:30 AM 1-Jan-13
22-F3 = 1 no., B70-PS-29-F2 = 12 nos
4034 Check Reinforcement & Cleaning prior closing For Cast-in- Situ Culvert 2nd- N & S wall +
RFI-5858-QCN-2-1710 RFI-5858-QCN-2-1710 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 30-Dec-12 10:00 AM 1-Jan-13
3 sleepers ( East Side) BZRC - 008
4035 Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
RFI-5858-QCN-2-1711 RFI-5858-QCN-2-1711 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 30-Dec-12 10:30 AM 1-Jan-13
F7 & F6
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
4036 RFI-5858-QCN-2-1712 RFI-5858-QCN-2-1712 CONCRETE CANCELLED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 1:30 PM 31-Dec-12
PR-18: F7 & F6
4037 Pre-Pouring for Culvert Cover Type B Check Formworks and Cleaning of Pre-cast Culvert Gate 5 TSF
RFI-5858-QCN-2-1713 RFI-5858-QCN-2-1713 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 30-Dec-12 8:15 AM 1-Jan-13
Wall Type B of BZRC-011 = 2 nos prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Precast Pipe Sleeper Pedestal B70-PS-
4038 RFI-5858-QCN-2-1714 RFI-5858-QCN-2-1714 CONCRETE
22-F3 = 1 no., B70-PS-29-F2 = 12 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Dec-12 8:30 AM 1-Jan-13
4039 9.1. Check surface preparation of Pipe Track D110-B70-PR-22: F4 prior application of
RFI-5858-QCN-2-1715 RFI-5858-QCN-2-1715 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Dec-12 7:00 AM 2-Jan-13
curing compound.
9.1. Check protective coating first coat of Cast-in- Situ Pie Track D110-B70-PR-22 : F4
4040 RFI-5858-QCN-2-1716 RFI-5858-QCN-2-1716 CONCRETE
prior second coating.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Dec-12 8:30 AM 1-Jan-13
9.1. Check protective coating second coat of Cast-in- Situ Pie Track D110-B70-PR-22 :
4041 RFI-5858-QCN-2-1717 RFI-5858-QCN-2-1717 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Dec-12 1:30 PM 1-Jan-13
F4 prior hardboard protection.
9.1. Check protective coating first coat of Precast Pipe Sleeper B70-PS-26-F3 = 10 nos
4043 RFI-5858-QCN-2-1719 RFI-5858-QCN-2-1719 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Dec-12 7:30 AM 2-Jan-13
and B70-PS-27-F1 = 11 nos prior second coat.
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-26-F3 = 10 nos and B70-
4044 RFI-5858-QCN-2-1720 RFI-5858-QCN-2-1720 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Dec-12 7:00 AM 2-Jan-13
PS-27-F1 = 11 nos prior first coating.
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Stopper B70-PS-17:
4045 RFI-5858-QCN-2-1721 RFI-5858-QCN-2-1721 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 30-Dec-12 8:30 AM 1-Jan-13
SLD021 prior backfilling.
Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
4046 RFI-5858-QCN-2-1722 RFI-5858-QCN-2-1722 CONCRETE EAST SIDE 1ST BASE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 30-Dec-12 4:30 PM 1-Jan-13
ONLY)
4048 Check Erection of Precast sleeper Sleeper Foundations B70 - PS -09 SLD039 TO
RFI-5858-QCN-2-1724 RFI-5858-QCN-2-1724 CONCRETE APPROVED Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 30-Dec-12 8:30 AM 1-Jan-13
SLD050 & B70 - PS -08 SLD036
Check Surface preparation of Pipe Rack Foundation D110 B70 - PR -08 Pipe Rack
4049 RFI-5858-QCN-2-1725 RFI-5858-QCN-2-1725 CONCRETE APPROVED SECTIOIN 2 PR 08 B-V-3100-004-2-201-02_4 9.1 S W H 31-Dec-12 7:00 AM 2-Jan-13
Foundation 1 (F2)& 2 (F1)
11:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
4050 RFI-5858-QCN-2-1726 RFI-5858-QCN-2-1726 CONCRETE APPROVED SECTION2 PR - 08 B-V-3100-004-2-201-02_5 9.2 a S W H 31-Dec-12 to 2-Jan-13
PR -08 Pipe Rack Foundation 1 (F2)& 2 (F1)
4:30 PM
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM EAST
4051 RFI-5858-QCN-2-1727 RFI-5858-QCN-2-1727 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 31-Dec-12 4:00 PM 2-Jan-13
SIDE 2nd BASE & WALLS (BOTH SIDE)-15M PORTION
4052 Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert 2nd-N wall & 3
RFI-5858-QCN-2-1728 RFI-5858-QCN-2-1728 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 31-Dec-12 8:30 AM 2-Jan-13
Pipe Sleepers ( East Side) BZRC - 008
Check Surface Preparation For Cast-in- Situ Culvert 3rd-N wall & 3 Pipe Sleepers ( East
4053 RFI-5858-QCN-2-1729 RFI-5858-QCN-2-1729 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 31-Dec-12 10:30 AM 2-Jan-13
Side) BZRC - 008
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Curing For Cast-in- Situ Culvert 3rd-N wall & 3 Pipe Sleepers ( East
4054 RFI-5858-QCN-2-1730 RFI-5858-QCN-2-1730 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 31-Dec-12 1:00 PM 2-Jan-13
Side) BZRC - 008 (Applying Curing Compound)
4056 RFI-5858-QCN-2-1732 RFI-5858-QCN-2-1732 CONCRETE Check Concrete Curing D110 B70 - PR -08 Pipe Rack Foundation 1(F2)& 2(F1) APPROVED PIPE RACK PR - 08 B-V-3100-004-2-201-02_5 6.4 S W H 1-Jan-13 7:30 AM 2-Jan-13
4057 Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -08 Pipe
RFI-5858-QCN-2-1733 RFI-5858-QCN-2-1733 CONCRETE APPROVED D110 B70 - PR -06 B-V-3100-004-2-201-02_5 9.2.b,c S W H 1-Jan-13 9:00 AM 2-Jan-13
Rack Foundation 1(F2) & 2(F1)
4058 Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
RFI-5858-QCN-2-1734 RFI-5858-QCN-2-1734 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 1-Jan-13 7:30 AM 2-Jan-13
EAST SIDE 3rd BASE WALL BOTH SIDES & SLEEPERS - 4 No
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 1ST BASE
4060 Section 3 Hamla
RFI-5858-QCN-2-1736 RFI-5858-QCN-2-1736 CONCRETE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION ONLY) & SLEEPERS-4 APPROVED B-V-3100-004-2-201-02_5 5.1 W W H 1-Jan-13 1:30 PM 2-Jan-13
Culvert
No
4062 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining Footing from N- S Retaining Wall
RFI-5858-QCN-2-1738 RFI-5858-QCN-2-1738 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W W H 1-Jan-13 1:20 PM 2-Jan-13
( 30 meters ) as per attached highlighted drawings. Section G and H. Raslaffan
Pre-Pouring For Pre-cast Culvert Cover Type B Check Formworks, Reinforcement and Gate 5 TSF
4063 RFI-5858-QCN-2-1739 RFI-5858-QCN-2-1739 CONCRETE
Cleaning of Pre-cast Culvert Cover Type B of BZRC-012 = 2 nos prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 1-Jan-13 7:00 AM 2-Jan-13
Concrete Placement Check Concrete pouring of Precast Culvert Cover Type B of BZRC-
4064 RFI-5858-QCN-2-1740 RFI-5858-QCN-2-1740 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W W H 1-Jan-13 7:30 AM 2-Jan-13
012 = 12 nos
Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
4065 RFI-5858-QCN-2-1741 RFI-5858-QCN-2-1741 CONCRETE
F5
APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 1-Jan-13 6:30 AM 2-Jan-13
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
4066 RFI-5858-QCN-2-1742 RFI-5858-QCN-2-1742 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W W H 1-Jan-13 6:30 AM 2-Jan-13
PR-18: F8
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Cast-in-
4067 RFI-5858-QCN-2-1743 RFI-5858-QCN-2-1743 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 1-Jan-13 9:30 AM 2-Jan-13
Situ Pipe Track Pedestal D110-B70-PR-23: F1 and D110-B70-PR-24: F2 prior shuttering.
9.1. Check protective coating first coat of Cast-in- Situ Pie Track D110-B70-PR-22 : F5
4069 RFI-5858-QCN-2-1745 RFI-5858-QCN-2-1745 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 1-Jan-13 8:30 AM 2-Jan-13
prior second coating.
9.1. Check protective coating second coat of Cast-in- Situ Pie Track D110-B70-PR-22 :
4070 RFI-5858-QCN-2-1746 RFI-5858-QCN-2-1746 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 1-Jan-13 1:30 PM 3-Jan-13
F5 prior hardboard protection.
4071 Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-22 : F5 prior
RFI-5858-QCN-2-1747 RFI-5858-QCN-2-1747 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 1-Jan-13 3:30 PM 3-Jan-13
backfilling.
Check Surface preparation HAMLA CULVERT BZRC 004 FROM EAST SIDE 2nd BASE
4072 RFI-5858-QCN-2-1748 RFI-5858-QCN-2-1748 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 1-Jan-13 7:30 AM 2-Jan-13
& WALLS (BOTH SIDE)-15M PORTION
Check Surface Below ground Protective Coating - First coat & Second coatHAMLA 11:00 AM
4073 RFI-5858-QCN-2-1749 RFI-5858-QCN-2-1749 CONCRETE CULVERT BZRC 004 FROM EAST SIDE 2nd BASE & WALLS (BOTH SIDE)-15M APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 1-Jan-13 TO 2-Jan-13
PORTION 4:30 PM
Check Concrete Curing HAMLA CULVERT BZRC 004 FROM EAST SIDE 2nd BASE &
4074 RFI-5858-QCN-2-1750 RFI-5858-QCN-2-1750 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 1-Jan-13 3:30 PM 3-Jan-13
WALLS (BOTH SIDE)-15M PORTION
4075 ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint cleaning of Precast
RFI-5858-QCN-2-1751 RFI-5858-QCN-2-1751 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1b.c.d.e W W H 1-Jan-13 7:30 AM 2-Jan-13
Pipe Sleeper Pedestal B70-PS-32-F1 = 9 nos B70-PS-30-F2 = 1 no. prior shuttering.
4076 Check Pre-Pouring For Cast-in- Situ Culvert 2nd-N wall & 3 pipe sleepers ( East Side)
RFI-5858-QCN-2-1752 RFI-5858-QCN-2-1752 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 1-Jan-13 1:30 PM 2-Jan-13
BZRC - 008
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring For Cast-in- Situ Culvert 2nd-N wall & 3 pipe sleepers ( East
4077 RFI-5858-QCN-2-1753 RFI-5858-QCN-2-1753 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W W H 1-Jan-13 2:00 PM 2-Jan-13
Side) BZRC - 008
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for - (1)
B70-PS-27-F1 = 8 nos and B70-PS-20 and 21-F1 = 25 nos B70-PS-30-F2 = 14 nos and
4078 RFI-5858-QCN-2-1754 RFI-5858-QCN-2-1754 CONCRETE Precast Pipe Sleeper Footing B70-PS-29-F2 = 40 nos. (2) B70-PS-27-F1 = 8 nos and APPROVED Gate 5 TSF B-V-3100-004-2-201-02_5 7.2 S W H 2-Jan-13 9:30 AM 2-Jan-13
B70-PS-20 and 21-F1 = 25 nos B70-PS-30-F2 = 14 nos and Precast Pipe Sleeper
Footing B70-PS-29-F2 = 40 nos. TEST REPORT NO =CCT-QCN-2#,197,198
Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
4079 RFI-5858-QCN-2-1755 RFI-5858-QCN-2-1755 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 2-Jan-13 10:30 AM 2-Jan-13
F4 G.L 16/A-B & F4 G.L 17/A-B
4080 Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
RFI-5858-QCN-2-1756 RFI-5858-QCN-2-1756 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Jan-13 1:30 PM 3-Jan-13
PR-18: F4 G.L 16/A-B & F4 G.L 17/A-B
Pre-Pouring For Cast-in- Situ Pipe Pedestal Check Formworks, Embedded items and
4081 RFI-5858-QCN-2-1757 RFI-5858-QCN-2-1757 CONCRETE cleaning of Cat-in- Situ Pipe Track Pedestal D110-B70-PR-23: F1 and D110-B70-PR-24- APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 2-Jan-13 1:15 PM 3-Jan-13
F2 prior concreting.
Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal D110-
4082 RFI-5858-QCN-2-1758 RFI-5858-QCN-2-1758 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Jan-13 1:30 PM 3-Jan-13
B70-PR-23: F2 and D110-B70-PR-24: F2
4083 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-1759 RFI-5858-QCN-2-1759 CONCRETE APPROVED Section #5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 2-Jan-13 8:00 AM 4-Jan-13
22 ; F6 and D110-B70-PR-24: F1.
Check Concrete Surface upon Form Removal For Cast-in- Situ Culvert 3rd- S wall ( East
4084 RFI-5858-QCN-2-1760 RFI-5858-QCN-2-1760 CONCRETE
Side) BZRC - 008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 2-Jan-13 8:30 AM 4-Jan-13
4085 6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type B of
RFI-5858-QCN-2-1761 RFI-5858-QCN-2-1761 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 2-Jan-13 8:00 AM 4-Jan-13
BZRC-012 = 2 nos
4086 RFI-5858-QCN-2-1762 RFI-5858-QCN-2-1762 CONCRETE Check Surface Preparation For Cast-in- Situ Culvert 3rd- S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 2-Jan-13 1:30 PM 4-Jan-13
Check Concrete Curing For Cast-in- Situ Culvert 3rd- S wall ( East Side) BZRC - 008
4087 RFI-5858-QCN-2-1763 RFI-5858-QCN-2-1763 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jan-13 4:00 PM 4-Jan-13
(Applying Curing Compound)
7.2 check compressive strength @28days (cube testing as per BS EN -12390-3) for - (1)
Cast-in- Situ Pipe Rack footing D110-B70-PR-06 (6 F6 & 9 F6 )& Pedestal 1,2,3,5,10-A-B
4088 RFI-5858-QCN-2-1764 RFI-5858-QCN-2-1764 CONCRETE
(10 nos) (2) Pre-cast Culvert cover Type -A BZRC-005 (9 nos)TEST REPORT NO =CCT-
APPROVED Gate 5 TSF B-V-3100-004-2-201-02_5 7.2 S W H 3-Jan-13 9.30 AM 3-Jan-13
QCN-2#,199,200,201
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 3rd BASE Section 3 Hamla
4090 RFI-5858-QCN-2-1766 RFI-5858-QCN-2-1766 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Jan-13 5:00 PM 3-Jan-13
WALL BOTH SIDE --7.5M PORTION & SLEEPERS- 2 No Culvert
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM EAST
4091 RFI-5858-QCN-2-1767 RFI-5858-QCN-2-1767 CONCRETE SIDE 1ST BASE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION ONLY) APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 3-Jan-13 8:00 AM 5-Jan-13
& SLEEPERS- 2 No
9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-22: F6 and Gate 5 TSF
4092 RFI-5858-QCN-2-1768 RFI-5858-QCN-2-1768 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 3-Jan-13 7:00 AM 5-Jan-13
D110-B70-PR-24 F1 prior application of curing compound. Raslaffan
9.1. Check protective coating first coating of Cast-in- Situ Pipe Track D110-B70-PR-22:
4093 RFI-5858-QCN-2-1769 RFI-5858-QCN-2-1769 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 3-Jan-13 8:30 AM 5-Jan-13
F6 and D110-B70-PR-24: F1 prior second coating.
4094 9.1. Check protective coating second coating of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-1770 RFI-5858-QCN-2-1770 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 3-Jan-13 1:30 PM 5-Jan-13
22: F6 and D110-B70-PR-24: F1 prior hardboard installation.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall
4095 RFI-5858-QCN-2-1771 RFI-5858-QCN-2-1771 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b.c..e W W H 3-Jan-13 7:30 AM 3-Jan-13
Cast-in- Situ Retaining wall N- S first panel prior shuttering. Raslaffan
4096 RFI-5858-QCN-2-1772 RFI-5858-QCN-2-1772 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert 2nd- S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 3-Jan-13 8:30 AM 3-Jan-13
4097 RFI-5858-QCN-2-1773 RFI-5858-QCN-2-1773 CONCRETE Check Concrete Pouring For Cast-in- Situ Culvert 2nd- S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 3-Jan-13 9:00 AM 3-Jan-13
4098 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall
RFI-5858-QCN-2-1774 RFI-5858-QCN-2-1774 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b.c..e W W H 3-Jan-13 2:00 PM 3-Jan-13
Cast-in- Situ Retaining wall N- S third panel prior shuttering. Raslaffan
4099 Check Reinforcement & Cleaning For Cast-in- Situ Pipe Track Foundations Pedestals -
RFI-5858-QCN-2-1775 RFI-5858-QCN-2-1775 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 3-Jan-13 10:30 AM 3-Jan-13
Prior closing D110-B70-PR-18: F9, F7, F6
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check surface preparation of Precast Culvert Cover Type C of BZRC-004 prior first Gate 5 TSF
4100 RFI-5858-QCN-2-1776 RFI-5858-QCN-2-1776 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 3-Jan-13 7:00 AM 5-Jan-13
coating. Raslaffan
Check Concrete CuringHAMLA CULVERT BZRC 004 FROM EAST SIDE 1ST BASE
4101 RFI-5858-QCN-2-1777 RFI-5858-QCN-2-1777 CONCRETE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION ONLY) & SLEEPERS- 2 APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 3-Jan-13 4:00 PM 5-Jan-13
No
Check Surface preparation HAMLA CULVERT BZRC 004 FROM EAST SIDE 1ST BASE
4102 RFI-5858-QCN-2-1778 RFI-5858-QCN-2-1778 CONCRETE WALL BOTH SIDE --(CONSTRUCTION JOINT 3.15M PORTION ONLY) & SLEEPERS- 2 APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 3-Jan-13 2:30 PM 5-Jan-13
No
Check Surface Below ground Protective Coating - First coat & Second coatHAMLA 3:00 PM
4103 RFI-5858-QCN-2-1779 RFI-5858-QCN-2-1779 CONCRETE CULVERT BZRC 004 FROM EAST SIDE 1ST BASE WALL BOTH SIDE -- APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 3-Jan-13 TO 5-Jan-13
(CONSTRUCTION JOINT 3.15M PORTION ONLY) & SLEEPERS- 2 No 4:30 PM
4104 RFI-5858-QCN-2-1780 RFI-5858-QCN-2-1780 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert 4th-N & S wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 5-Jan-13 7:00 AM 6-Jan-13
4105 RFI-5858-QCN-2-1781 RFI-5858-QCN-2-1781 CONCRETE Check Concrete Pouring For Cast-in- Situ Culvert 4th-N & S walls ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 5-Jan-13 7:00 AM 6-Jan-13
4106 Pre-Pouring For Pre-cast Pipe Sleeper Footing Check Formworks, Reinforcement and Gate 5 TSF
RFI-5858-QCN-2-1782 RFI-5858-QCN-2-1782 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 5-Jan-13 1:15 PM 5-Jan-13
Cleaning of Precast Pipe Footing B70-PS-09-F1 = 14 nos Raslaffan
Concrete Placement Check Concrete pouring of Pre-cast Precast Pipe Footing B70-PS- Gate 5 TSF
4107 RFI-5858-QCN-2-1783 RFI-5858-QCN-2-1783 CONCRETE
09-F1 = 14 nos, B70-PS-27-F1 = 1 no., B70-PS-03-F1 = 1 no and B70-PS-07-F1 = 1 no.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 5-Jan-13 1:20 PM 6-Jan-13
4108 Check Reinforcement & Cleaning Prior Closing For Cast-in- Situ Culvert 4th-N & S, & End
RFI-5858-QCN-2-1784 RFI-5858-QCN-2-1784 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 5-Jan-13 6:15 AM 5-Jan-13
Walls ( East Side) BZRC - 008
Check concrete surface upon form removal for cast-in- Situ culvert 2nd- N & S Walls
4109 RFI-5858-QCN-2-1785 RFI-5858-QCN-2-1785 CONCRETE
( East Side) BZRC - 008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 5-Jan-13 8:00 AM 5-Jan-13
Check Surface Preparation for cast-in- Situ culvert 2nd- N & S Walls ( East Side) BZRC -
4110 RFI-5858-QCN-2-1786 RFI-5858-QCN-2-1786 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Jan-13 11:00 AM 5-Jan-13
008
Pre-Pouring For Cast-in- Situ Retaining Wall . Check Formworks, Reinforcement and Retaining Wall
4111 RFI-5858-QCN-2-1787 RFI-5858-QCN-2-1787 CONCRETE
Cleaning of Cast-in- Situ Retaining wall N- S first panel prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 5-Jan-13 8:30 AM 6-Jan-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S first Retaining Wall
4112 RFI-5858-QCN-2-1788 RFI-5858-QCN-2-1788 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 5-Jan-13 9:00 AM 6-Jan-13
panel Raslaffan
Check concrete curing for cast-in- Situ culvert 2nd- N & S Walls & 3 pipe sleepers ( East
4113 RFI-5858-QCN-2-1789 RFI-5858-QCN-2-1789 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jan-13 3:00 PM 5-Jan-13
Side) BZRC - 008 -- Applying Curing Compound
Check Concrete CuringHAMLA CULVERT BZRC 004 FROM EAST SIDE 3rd BASE
4114 RFI-5858-QCN-2-1790 RFI-5858-QCN-2-1790 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 5-Jan-13 3:00 PM 5-Jan-13
WALL BOTH SIDE --7.5M PORTION & SLEEPERS- 2 No
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM EAST
4115 RFI-5858-QCN-2-1791 RFI-5858-QCN-2-1791 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 5-Jan-13 6:30 AM 5-Jan-13
SIDE 3rd BASE WALL BOTH SIDE --7.5M PORTION & SLEEPERS- 2 No
Check Surface Below ground Protective Coating - First coat & Second coatHAMLA 11:00 AM
4116 RFI-5858-QCN-2-1792 RFI-5858-QCN-2-1792 CONCRETE CULVERT BZRC 004 FROM EAST SIDE 3rd BASE WALL BOTH SIDE --7.5M PORTION APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 5-Jan-13 TO 5-Jan-13
& SLEEPERS- 2 No 4:30 PM
4117 Check Surface preparation HAMLA CULVERT BZRC 004 FROM EAST SIDE 3rd BASE
RFI-5858-QCN-2-1793 RFI-5858-QCN-2-1793 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 5-Jan-13 8:30 AM 5-Jan-13
WALL BOTH SIDE --7.5M PORTION & SLEEPERS- 2 No
9.1. Check surface preparation of precast culvert cover type A, BZRC-005 = 7 nos, Gate 5 TSF
4118 RFI-5858-QCN-2-1794 RFI-5858-QCN-2-1794 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 5-Jan-13 7:00 AM 5-Jan-13
BZRC-010 = 5 nos and BZRC-011 = 5 nos. prior first coating. Raslaffan
4119 4.4.1 Check compressive Strength @ 28 days for grout (Loop foundationsD110-B70-PR- GCC QIL Lab
RFI-5858-QCN-2-1795 RFI-5858-QCN-2-1795 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.4.1 S W H 5-Jan-13 4.00 PM 5-Jan-13
03,D110-B70-PR-04 ) Raslaffan
4121 Pre-Pouring For Cast-in- Situ Pipe Track Footing Check Formworks, Reinforcement and
RFI-5858-QCN-2-1797 RFI-5858-QCN-2-1797 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 5-Jan-13 1:30 PM 6-Jan-13
Cleaning of Cast-in- Situ Pipe Track Footing D110-B70-PR-23-F2 prior concreting.
4122 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110-
RFI-5858-QCN-2-1798 RFI-5858-QCN-2-1798 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 5-Jan-13 1:40 PM 6-Jan-13
B70-PR-23-F2.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4124 Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
RFI-5858-QCN-2-1800 RFI-5858-QCN-2-1800 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 6-Jan-13 10:30 AM 8-Jan-13
F1 G.L 18/A-B & 21/A-B, F2 G.L 20/A-B, F3 19/A-B
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-
4125 RFI-5858-QCN-2-1801 RFI-5858-QCN-2-1801 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 6-Jan-13 1:30 PM 7-Jan-13
PR-18: F1 G.L 18/A-B & 21/A-B, F2 G.L 20/A-B, F3 19/A-B
4126 Check Polythylene & Hardboard Installation od Pipe Stopper D10-B70-PR-22 : F6 prior
RFI-5858-QCN-2-1802 RFI-5858-QCN-2-1802 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 6-Jan-13 7:00 AM 6-Jan-13
backfilling.
4127 Check Surface Preparation & Sealent ApplicationHAMLA CULVERT BZRC 004 BASE &
RFI-5858-QCN-2-1803 RFI-5858-QCN-2-1803 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.6a,b S W H 6-Jan-13 8:00 AM 6-Jan-13
WALL - FROM EAST SIDE 3rd,2nd&1st (3.15M PORTION ONLY)
6.3 Check Concrete surface upon form removal of Cat-in- Situ Pipe Track D110-B70-PR-
4128 RFI-5858-QCN-2-1804 RFI-5858-QCN-2-1804 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 6-Jan-13 8:00 AM 6-Jan-13
23: F1 and D110-B70-PR-24: F1.
Pre-Pouring For Pre-cast Pipe Sleeper Footing Check Formworks, Reinforcement and
4129 Gate 5 TSF
RFI-5858-QCN-2-1805 RFI-5858-QCN-2-1805 CONCRETE Cleaning of Precast Pipe Footing B70-PS-27-F1 = 1 no., B70-PS-06-F3 = 1 no. B70-PS- APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 6-Jan-13 7:30 AM 6-Jan-13
Raslaffan
03-F1 = 1 no and B70-PS-07-F1 = 1 no. prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Precast Pipe Footing B70-PS- Gate 5 TSF
4130 RFI-5858-QCN-2-1806 RFI-5858-QCN-2-1806 CONCRETE
06-F3 = 1 no, B70-PS-27-F1 = 1 no., B70-PS-03-F1 = 1 no and B70-PS-07-F1 = 1 no.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 6-Jan-13 8:00 AM 6-Jan-13
4131 Pre-Pouring For Cast-in- Situ Retaining Wall ( Footing ) Check Formworks, Reinforcement Retaining Wall
RFI-5858-QCN-2-1807 RFI-5858-QCN-2-1807 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 6-Jan-13 1:15 PM 8-Jan-13
and Cleaning of Cast-in- Situ Retaining wall N- S Seventh panel prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S footing Retaining Wall
4132 RFI-5858-QCN-2-1808 RFI-5858-QCN-2-1808 CONCRETE
seventh panel.
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 6-Jan-13 1:30 PM 6-Jan-13
4133 RFI-5858-QCN-2-1809 RFI-5858-QCN-2-1809 CONCRETE Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 07,13 & 47 APPROVED SECTION 2 B-V-3100-004-2-201-02_2 4.1.1a,b&c S W H 6-Jan-13 8:10 AM 6-Jan-13
Review and approval of QIL test report for Reinforcement -Testing (sample location Gate Barzan Off-plot
4137 RFI-5858-QCN-2-1813 RFI-5858-QCN-2-1813 CONCRETE APPROVED B-V-3100-004-2-201-02_5 3.1.a R W H 6-Jan-13 8:30 AM 9-Jan-13
5 Precast Area) BARZAN
Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Pedestals D110-B70-PR-
4138 RFI-5858-QCN-2-1814 RFI-5858-QCN-2-1814 CONCRETE CANCELLED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 7-Jan-13 10:30 AM 7-Jan-13
18: F9 & F7 = 4 Pedestals
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Pedestals D110-B70-
4139 RFI-5858-QCN-2-1815 RFI-5858-QCN-2-1815 CONCRETE CANCELLED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 7-Jan-13 1:30 PM 7-Jan-13
PR-18: F9 & F7 = 4 Pedestals
4140 Pre-Pouring For Cast-in- Situ Retaining Wall ( Footing ) Check Formworks, Reinforcement Retaining Wall
RFI-5858-QCN-2-1816 RFI-5858-QCN-2-1816 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 7-Jan-13 1:25 PM 8-Jan-13
and Cleaning of Cast-in- Situ Retaining wall N- S Eight panel 15 meters prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S 15 Retaining Wall
4141 RFI-5858-QCN-2-1817 RFI-5858-QCN-2-1817 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 7-Jan-13 1:40 PM 7-Jan-13
meters. 6, 8 PANEL AND WALL PANEL Raslaffan
4142 9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-23-F1 and
RFI-5858-QCN-2-1818 RFI-5858-QCN-2-1818 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 7-Jan-13 7:00 AM 7-Jan-13
D110-B70-PR-24-F2 prior application of curing compound.
9.1. Check protective coating first coat of pipe track D110-B70-PR-23-F1 and D110-B70-
4143 RFI-5858-QCN-2-1819 RFI-5858-QCN-2-1819 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 7-Jan-13 9:00 AM 7-Jan-13
PR-24-F2 prior second coating.
4144 9.1. Check protective coating second coat of pipe track D110-B70-PR-23-F1 and D110-
RFI-5858-QCN-2-1820 RFI-5858-QCN-2-1820 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 7-Jan-13 2:30 PM 7-Jan-13
B70-PR-24-F2.
4145 6.3 Check Concrete surface upon form removal of Cat-in- Situ Retaining Wall N- S First Retaining Wall
RFI-5858-QCN-2-1821 RFI-5858-QCN-2-1821 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 7-Jan-13 8:30 AM 7-Jan-13
Panel Wall 15 meters. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4146 RFI-5858-QCN-2-1822 RFI-5858-QCN-2-1822 CONCRETE Check Pre-Pouring For Cast-in- Situ Culvert 1st (END) wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 7-Jan-13 7:00 AM 8-Jan-13
4147 RFI-5858-QCN-2-1823 RFI-5858-QCN-2-1823 CONCRETE Check Concrete Pouring For Cast-in- Situ Culvert 1st ( END) wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 7-Jan-13 8:00 AM 7-Jan-13
4149 4.4.1 Check compressive Strength @ 1 days for grout (Loop foundationsD110-B70-PR- GCC QIL Lab
RFI-5858-QCN-2-1825 RFI-5858-QCN-2-1825 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.4.1 S W H 7-Jan-13 9.30AM 7-Jan-13
02,D110-B70-PR-05 ) Raslaffan
4150 Check concrete surface upon form removal for cast-in- Situ culvert 4th- N & S walls ( East
RFI-5858-QCN-2-1826 RFI-5858-QCN-2-1826 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 7-Jan-13 9:00 AM 7-Jan-13
Side) BZRC - 008
Check Surface Preparation for cast-in- Situ culvert 4th-N & S walls ( East Side) BZRC -
4151 RFI-5858-QCN-2-1827 RFI-5858-QCN-2-1827 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 7-Jan-13 11:00 AM 7-Jan-13
008
4152 6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-011 = 4 nos
RFI-5858-QCN-2-1828 RFI-5858-QCN-2-1828 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
and Removable Panel = 2 nos.
4153 RFI-5858-QCN-2-1829 RFI-5858-QCN-2-1829 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-010 = 13 nos. APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
4154 Check concrete curing for cast-in- Situ culvert 4th- N & S walls ( East Side) BZRC - 008 --
RFI-5858-QCN-2-1830 RFI-5858-QCN-2-1830 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 3:00 PM 7-Jan-13
Applying Curing Compound
6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-005 = 7
4155 RFI-5858-QCN-2-1831 RFI-5858-QCN-2-1831 CONCRETE
nos , BZRC-010 = 5 nos, and BZRC-011 = 5 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
4156 RFI-5858-QCN-2-1832 RFI-5858-QCN-2-1832 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Cover Type B of BZRC-005 = 2 NOS APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
4157 RFI-5858-QCN-2-1833 RFI-5858-QCN-2-1833 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-005 = 9 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
7:00 AM
Check expansion joints surface preparation & sealant application for cast-in- Situ
4158 RFI-5858-QCN-2-1834 RFI-5858-QCN-2-1834 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.6 S W H 7-Jan-13 To 7-Jan-13
culvert( East Side) BZRC - 008 - 2 joints
4:00 PM
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-32-F1 = 1 no.
4159 RFI-5858-QCN-2-1835 RFI-5858-QCN-2-1835 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
and B70-PS-33-F1 = 22 nos
6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-004 = 7 nos
4160 RFI-5858-QCN-2-1836 RFI-5858-QCN-2-1836 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
and BZRC-005 = 4 nos
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-28-F1 = 2
4161 RFI-5858-QCN-2-1837 RFI-5858-QCN-2-1837 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
nos. and B70-PS-29-F2 = 38 nos
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-20-F1 = 4
4162 RFI-5858-QCN-2-1838 RFI-5858-QCN-2-1838 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
nos. B70-PS-21-F1 = 15 nos B70-PS-27-F1 = 15 nos and B70-PS-30-F1 = 14 nos
4163 RFI-5858-QCN-2-1839 RFI-5858-QCN-2-1839 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-003 = 14 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 7-Jan-13
Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
4164 RFI-5858-QCN-2-1840 RFI-5858-QCN-2-1840 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 7-Jan-13 4:00 PM 8-Jan-13
EAST SIDE 1st BASE WALL(BOTH SIDES& END WALL) 3 SIDES( 1.9 M PORTION)
4167 6.3 Check Concrete surface upon form removal of Cat-in- Situ Retaining Wall N- S third Retaining Wall
RFI-5858-QCN-2-1843 RFI-5858-QCN-2-1843 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 7-Jan-13 2:30 PM 8-Jan-13
Panel Wall 15 meters. Raslaffan
4168 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall
RFI-5858-QCN-2-1844 RFI-5858-QCN-2-1844 CONCRETE CANCELLED B-V-3100-004-2-201-02_4 4.1b.c.e W W H 7-Jan-13 10:00 AM 7-Jan-13
Cast-in- Situ Retaining wall N- S fifth panelprior shuttering. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
HAMLA CULVERT
4169 RFI-5858-QCN-2-1845 RFI-5858-QCN-2-1845 CONCRETE Check Erection of Culvert Precast Cover CULVERT BZRC 004 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 7-Jan-13 10:30 AM 9-Jan-13
Raslaffan
4170 Check Pre-Pouring For Cast-in- Situ Pipe Track Foundations - Footing D110-B70-PR-18:
RFI-5858-QCN-2-1846 RFI-5858-QCN-2-1846 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 7-Jan-13 11:00 AM 8-Jan-13
F10
Check Concrete Pouring For Cast-in- Situ Pipe Track Foundations - Pedestals D110-B70-
4171 RFI-5858-QCN-2-1847 RFI-5858-QCN-2-1847 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 7-Jan-13 1:30 PM 9-Jan-13
PR-18: F10
4172 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-1848 RFI-5858-QCN-2-1848 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_4 4.1b.c.e W W H 7-Jan-13 7:30 AM 8-Jan-13
Cast-in- Situ Pipe Track Pedestal D110-B70-PR-23-F2 prior shuttering.
4173 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-15-F1 = 2
RFI-5858-QCN-2-1849 RFI-5858-QCN-2-1849 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
nos, B70-PS-20-F1 = 15 nos B70-PS-26-F3 = 10 nos and B70-PS-27-F1 = 25 nos.
6.4 Completion of 14 days curing for Precast Culvert Cover Type A of BZRC-003 = 18
4174 RFI-5858-QCN-2-1850 RFI-5858-QCN-2-1850 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
nos and BZRC-008 = 2 nos
4175 RFI-5858-QCN-2-1851 RFI-5858-QCN-2-1851 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Cover Type A BZRC-008 = 10 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
Check protective coating 1st & 2nd for cast-in- Situ culvert 2nd, 3rd & 4th slabs & walls
4176 RFI-5858-QCN-2-1852 RFI-5858-QCN-2-1852 CONCRETE
( East Side) BZRC - 008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 7-Jan-13 6:15 AM 8-Jan-13
4177 6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-28-F1 = 2
RFI-5858-QCN-2-1853 RFI-5858-QCN-2-1853 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
nos, B70-PS-29-F1 = 38 nos
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-09-F1 = 21
4178 RFI-5858-QCN-2-1854 RFI-5858-QCN-2-1854 CONCRETE
nos, B70-PS-10-F1 = 3 nos B70-PS-14-F1 = 19 nos and B70-PS-15-F1 = 7 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
6.4 Completion of 14 days curing for Precast Culvert Wall Type B of BZRC-004 = 2 nos
4179 RFI-5858-QCN-2-1855 RFI-5858-QCN-2-1855 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 7-Jan-13 8:30 AM 8-Jan-13
and BZRC-008 = 2 nos
Check polyethylene & hardboard installation for cast-in- Situ culvert 2nd, 3rd & 4th slabs
4180 RFI-5858-QCN-2-1856 RFI-5858-QCN-2-1856 CONCRETE
& walls ( East Side) BZRC - 008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 7-Jan-13 7:00 AM 8-Jan-13
Check Reinforcement & Cleaning Prior to from work closure for the pedestals of F1 Grid
4181 RFI-5858-QCN-2-1857 RFI-5858-QCN-2-1857 CONCRETE 21, F2/ Grid 21, F2/Grid 20, F3/Grid 19, F1/Gred 18, F4/ Grid 17, F4/Grid 16, F5/Grid 15 APPROVED Crossing 29 Section 4 B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 9-Jan-13 9:00 AM 9-Jan-13
for B70-PR-18
Pre-Pouring For Pre-cast Culvert Covert Type B Check Formworks, Reinforcement and Gate 5 TSF
4182 RFI-5858-QCN-2-1858 RFI-5858-QCN-2-1858 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Jan-13 8:00 AM 9-Jan-13
Cleaning of Pre-cast Culvert Cover Type B Base of BZRC-003 = 2 nos Raslaffan
Concrete Placement Check Concrete pouring of Pre-cast Culvert Cover Type B base of Gate 5 TSF
4183 RFI-5858-QCN-2-1859 RFI-5858-QCN-2-1859 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Jan-13 8:30 AM 9-Jan-13
BZRC-003 = 2 nos Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Footing ) Check Formworks, Reinforcement
Retaining Wall
4184 RFI-5858-QCN-2-1860 RFI-5858-QCN-2-1860 CONCRETE and Cleaning of Cast-in- Situ Retaining wall ( Base ) N- S 10th Panel ( 15 meters ) prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Jan-13 1:25 PM 10-Jan-13
Raslaffan
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Base ) Retaining Wall
4185 RFI-5858-QCN-2-1861 RFI-5858-QCN-2-1861 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Jan-13 1:40 PM 9-Jan-13
7th and 9th panel 30 meters. Raslaffan
4186 Check Concerete Pouring for Cast-in- Situ Pedestals for F5 Gid 15, F6 Gid 14, F7 Gid 14,
RFI-5858-QCN-2-1862 RFI-5858-QCN-2-1862 CONCRETE APPROVED Crossing 29 Section 4 B-V-3100-004-2-201-02_5 5.1 W W H 9-Jan-13 9:00 AM 11-Jan-13
F7, Gid 13 and F9 Gid 11 for B70-PR - 18
Check Pre-Pouring for Cast-in- Situ Pedestals for F5 Gid 15, F6 Gid 14, F7 Gid 14, F7,
4187 RFI-5858-QCN-2-1863 RFI-5858-QCN-2-1863 CONCRETE APPROVED Crossing 29 Section 4 B-V-3100-004-2-201-02_5 5.1 W H H 9-Jan-13 10:00 AM 13-Jan-13
Gid 13 and F9 Gid 11 for B70-PR - 18
4188 Pre-Pouring For Cast-in- Situ Pipe Pedestal Check Formworks, Embedded items and
RFI-5858-QCN-2-1864 RFI-5858-QCN-2-1864 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Jan-13 1:40 PM 10-Jan-13
cleaning of Cat-in- Situ Pipe Track Pedestal D110-B70-PR-23: F2 prior concreting.
Concrete Placement Check Concrete pouring of Cast-i- Situ Pipe Track Pedestal D110-
4189 RFI-5858-QCN-2-1865 RFI-5858-QCN-2-1865 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 9-Jan-13 2:00 PM 9-Jan-13
B70-PR-23: F2
4190 Check concrete surface upon form removal for culvert 1st (END) wall ( East Side) BZRC -
RFI-5858-QCN-2-1866 RFI-5858-QCN-2-1866 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 9-Jan-13 9:00 AM 9-Jan-13
008
4191 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate 5 TSF
RFI-5858-QCN-2-1867 RFI-5858-QCN-2-1867 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 9-Jan-13 8:00 AM 9-Jan-13
Cast-in- Situ Retaining Wall 2nd Panel ( Wall ) 15 meters prior shuttering. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate 5 TSF
4192 RFI-5858-QCN-2-1868 RFI-5858-QCN-2-1868 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 9-Jan-13 8:00 AM 9-Jan-13
Precast Pipe Sleeper pedestal B70-PS-09-F1 = 14 nos prior shuttering. Raslaffan
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 3rd BASE Section 3 Hamla
4194 RFI-5858-QCN-2-1870 RFI-5858-QCN-2-1870 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 9-Jan-13 4:30 PM 8-Jan-13
WALL BOTH SIDE --7.5M PORTION & SLEEPERS- 2 No Culvert
4196 RFI-5858-QCN-2-1872 RFI-5858-QCN-2-1872 CONCRETE Check concrete surface preparation for culvert 1st (END) wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Jan-13 9:00 AM 11-Jan-13
4197 RFI-5858-QCN-2-1873 RFI-5858-QCN-2-1873 CONCRETE Check protective coating 1st & 2nd for culvert 1st (END) wall ( East Side) BZRC - 008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 10-Jan-13 9:00 AM 11-Jan-13
Pre-Pouring For Cast-in- Situ Retaining Wall ( Base and Wall ) Check Formworks,
4198 Retaining Wall
RFI-5858-QCN-2-1874 RFI-5858-QCN-2-1874 CONCRETE Reinforcement and Cleaning of Cast-in- Situ Retaining wall ( Base ) N- S 7th Panel ( 15 APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 10-Jan-13 1:25 PM 11-Jan-13
Raslaffan
meters ) and Wall 2nd panel ( 15 meters ) prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Base Retaining Wall
4199 RFI-5858-QCN-2-1875 RFI-5858-QCN-2-1875 CONCRETE
15 meters ) 7th panel and 2nd panel wall 15 meters.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 10-Jan-13 1:40 PM 13-Jan-13
4200 Check polyethylene & hardboard installation for culvert 1st (END) wall ( East Side) BZRC
RFI-5858-QCN-2-1876 RFI-5858-QCN-2-1876 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 10-Jan-13 3:00 PM 11-Jan-13
- 008
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
4201 RFI-5858-QCN-2-1877 RFI-5858-QCN-2-1877 CONCRETE
- PR -70 Pipe Rack Foundation Footing 1(F1),2 (F2) - 2no.s
APPROVED D110 B70 - PR - 01 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 10-Jan-13 9:30 AM 13-Jan-13
Check Concrete Pouring D110 B70 - PR -70 Pipe Rack Foundation Footing 1(F1),2 (F2) -
4202 RFI-5858-QCN-2-1878 RFI-5858-QCN-2-1878 CONCRETE APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 5.1 W H H 10-Jan-13 9:45 PM 13-Jan-13
2no.s
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM EAST SIDE 1ST BASE Section 3 Hamla
4204 RFI-5858-QCN-2-1880 RFI-5858-QCN-2-1880 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Jan-13 10:40 AM 13-Jan-13
WALL (END WALL & BOTH SIDE WALLS --1.9M PORTION) Culvert
Check concrete cuing for culvert 1st (END) wall ( East Side) BZRC - 008 - applying curing
4205 RFI-5858-QCN-2-1881 RFI-5858-QCN-2-1881 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 10-Jan-13 10:00 AM 11-Jan-13
compound
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate 5 TSF
4206 RFI-5858-QCN-2-1882 RFI-5858-QCN-2-1882 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 10-Jan-13 8:30 AM 11-Jan-13
Cast-in- Situ Retaining Wall 5th Panel ( Wall ) 15 meters prior shuttering. Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70=-
4207 RFI-5858-QCN-2-1883 RFI-5858-QCN-2-1883 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 10-Jan-13 3:30 PM 11-Jan-13
PR-23-F2.
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
4208 RFI-5858-QCN-2-1884 RFI-5858-QCN-2-1884 CONCRETE APPROVED SECTION 1 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 10-Jan-13 9:30 AM 13-Jan-13
- PS -01 Stopper Foundation Footing SLD 012
4209 RFI-5858-QCN-2-1885 RFI-5858-QCN-2-1885 CONCRETE Check Concrete Pouring D110 B70 - PS -01 Stopper Foundation Footing SLD 012 APPROVED SECTION 1 B-V-3100-004-2-201-02_5 5.1 W H H 10-Jan-13 9:45 AM 13-Jan-13
4210 RFI-5858-QCN-2-1886 RFI-5858-QCN-2-1886 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70 - PS -04 SLD002 TO SLD014 APPROVED SECTION 1 Raslaffan B-V-3100-004-2-201-02_2 8.2 S W H 10-Jan-13 7:30 AM 11-Jan-13
4.4.1 Check compressive Strength @ 28 days for grout (Loop foundationsD110-B70-PR- GCC QIL Lab
4212 RFI-5858-QCN-2-1888 RFI-5858-QCN-2-1888 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.4.1 S W H 12-Jan-13 3.00PM 12-Jan-13
07,D110-B70-PR-13,& D110-B70-PR-47) Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Base and Wall ) Check Formworks,
4213 Retaining Wall
RFI-5858-QCN-2-1889 RFI-5858-QCN-2-1889 CONCRETE Reinforcement and Cleaning of Cast-in- Situ Retaining wall ( Base ) N- S 8th and 11th APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 12-Jan-13 1:25 PM 13-Jan-13
Raslaffan
panel ( 30 meters ) and Wall 5th panel ( 15 meters ) prior concreting.
4214 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Base ) Retaining Wall
RFI-5858-QCN-2-1890 RFI-5858-QCN-2-1890 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 12-Jan-13 1:30 PM 13-Jan-13
8th and 11th panel ( 30 meters ) and 5th panel wall ( 15 meters ). Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of
Gate 5 TSF
4215 RFI-5858-QCN-2-1891 RFI-5858-QCN-2-1891 CONCRETE Precast Pipe Sleeper Pedestal B70-PS-03-F3 = 1 no. B70-PS-06-F6 = 1 no., B70-PS-07- APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 12-Jan-13 7:30 AM 13-Jan-13
Raslaffan
F1 = 1 no. and B70-PS-27-F1 = 1 no. prior shuttering.
Check Pre-Pouring for cast-in-situ stopper foundation base concrete for SLD044 for B70-
4217 RFI-5858-QCN-2-1893 RFI-5858-QCN-2-1893 CONCRETE APPROVED Section 4, B70-PS-13 B-V-3100-004-2-201-02_5 4.1 W W H 12-Jan-13 4:00 PM 13-Jan-13 with bibin
PS-13
4219 ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of Gate 5 TSF
RFI-5858-QCN-2-1895 RFI-5858-QCN-2-1895 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 12-Jan-13 7:00 AM 13-Jan-13
Precast Culvert Cover Type B of BZRC-012 = 2 nos. prior shuttering. Raslaffan
9.1. Check surface preparation of Precast Culvert Cover Type A BZRC-010 = 13 nos prior Gate 5 TSF
4220 RFI-5858-QCN-2-1896 RFI-5858-QCN-2-1896 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 12-Jan-13 7:00 AM 13-Jan-13
first coating. Raslaffan
4221 9.1. Check protective coating first coat of Precast Culvert Cover Type A of BZRC-005 = 7
RFI-5858-QCN-2-1897 RFI-5858-QCN-2-1897 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Jan-13 7:00 AM 13-Jan-13
nos, BZRC-010 = 5 nos and BZRC-011 = 5 nos prior first coating.
Retaining Wal
4222 RFI-5858-QCN-2-1898 RFI-5858-QCN-2-1898 CONCRETE 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining Wall 2nd panel. APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 12-Jan-13 3:30 PM 13-Jan-13
4223 Check Reinforcement prior to close shuttering D110 B70 - PR -70 Pipe Rack Foundation
RFI-5858-QCN-2-1899 RFI-5858-QCN-2-1899 CONCRETE APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 4.1b W W H 12-Jan-13 4:10 PM 13-Jan-13
Pedestal 1-,2 /A-B - 4no.s
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM EAST
4226 RFI-5858-QCN-2-1902 RFI-5858-QCN-2-1902 CONCRETE
SIDE 1ST BASE & WALL (END WALL & BOTH SIDE WALLS --1.9M PORTION)
APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 13-Jan-13 1:30 PM 14-Jan-13
Check Surface preparation HAMLA CULVERT BZRC 004 FROM EAST SIDE 1ST BASE
4227 RFI-5858-QCN-2-1903 RFI-5858-QCN-2-1903 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 13-Jan-13 3:30 PM 14-Jan-13
& WALL (END WALL & BOTH SIDE WALLS --1.9M PORTION)
Check Surface Preparation & Sealent ApplicationHAMLA CULVERT BZRC 004 FROM
4228 RFI-5858-QCN-2-1904 RFI-5858-QCN-2-1904 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.6a,b S W H 13-Jan-13 4:35 PM 14-Jan-13
EAST SIDE 1ST BASE & WALL (END WALL & BOTH SIDE WALLS --1.9M PORTION)
9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-23 : F2 prior
4229 RFI-5858-QCN-2-1905 RFI-5858-QCN-2-1905 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Jan-13 7:00 AM 14-Jan-13
application of curing compound first coat.
9.1. Check protective coating first coat of Cast-in- Situ Pipe Track D110-B70-PR-23: F2
4230 RFI-5858-QCN-2-1906 RFI-5858-QCN-2-1906 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Jan-13 8:00 AM 14-Jan-13
prior second coating.
9.1. Check protective coating second coat of Cast-in- Situ Pipe Track D110-B70-PR-23:
4231 RFI-5858-QCN-2-1907 RFI-5858-QCN-2-1907 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Jan-13 9:30 AM 14-Jan-13
F2 prior hardboard installation.
4232 Check Polythylene & Hardboard Installation of cast-in- Situ Pipe Track D110-B70-PR-23:
RFI-5858-QCN-2-1908 RFI-5858-QCN-2-1908 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Jan-13 3:30 PM 14-Jan-13
F2 prior backfilling
Concrete Placement Check Concrete pouring of Pre-cast Precast Pipe Footing B70-PS-
4234 Gate 5 TSF
RFI-5858-QCN-2-1910 RFI-5858-QCN-2-1910 CONCRETE 03-F3 = 1 no, B70-PS-06-F3 = 1 no., B70-PS-07-F1 = 1 no., B70-PS-09-F1 = 14 nos and APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-Jan-13 7:30 AM 13-Jan-13
Raslaffan
B70-PS-27-F1 = 1 no.
Check Concrete Surface upon Form Removal For Cast-in- Situ foundation pedestals for Crossing #29,
4235 RFI-5858-QCN-2-1911 RFI-5858-QCN-2-1911 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 13-Jan-13 6:30 AM 14-Jan-13
F9/Grid11, F7/Grid 13, F6/Grid 14, F5/Grid 15 of B70-PR-18 Section 4 Raslaffan
4237 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall N- S 5th
RFI-5858-QCN-2-1913 RFI-5858-QCN-2-1913 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-Jan-13 3:30 PM 14-Jan-13
panel wall ( 15 meters )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring For Cast-in- Situ Foundation base for SLD044 Stopper of B70-
4238 RFI-5858-QCN-2-1914 RFI-5858-QCN-2-1914 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 13-Jan-13 6:30 AM 13-Jan-13
PS-13
4239 Check Pre-Pouring For Cast-in- Situ 50mm thick concrete on top of foundation for Crossing# 29,
RFI-5858-QCN-2-1915 RFI-5858-QCN-2-1915 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 13-Jan-13 6:30 AM 14-Jan-13
F13/Grid 4 & 5 of B70-PR-18 Section 4 Raslaffan
Check Concrete Pouring For 50mm thick concrete on top of foundation base at F13/Grid Crossing #29,
4240 RFI-5858-QCN-2-1916 RFI-5858-QCN-2-1916 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-Jan-13 6:30 AM 13-Jan-13
4 & 5 OF B70-PR-18 Section 4 Raslaffan
4241 Check Surface Preparation Prior to Coating For Cast-in- Situ foundation base and Crossing #29,
RFI-5858-QCN-2-1917 RFI-5858-QCN-2-1917 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 13-Jan-13 4:00 PM 14-Jan-13
pedestals for F9/Grid11, F7/Grid13, of B70-PR-18 Section 4 Raslaffan
4242 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Gate 5 TSF
RFI-5858-QCN-2-1918 RFI-5858-QCN-2-1918 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 13-Jan-13 9:30 AM 13-Jan-13
Cast-in- Situ Retaining Wall 4th panel and 6th panel ( Wall ) prior shuttering. Raslaffan
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-06-F1 = 11
4243 RFI-5858-QCN-2-1919 RFI-5858-QCN-2-1919 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Jan-13 8:30 AM 14-Jan-13
nos. and B70-PS-17-F1 = 30 nos,B70-PS-06-F1 30 No's Footing.
4244 6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-26-F3 = 21
RFI-5858-QCN-2-1920 RFI-5858-QCN-2-1920 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Jan-13 8:30 AM 14-Jan-13
nos.
6.4 Completion of 14 days curing for Precast Pipe Track D110-B70-PR-63, B70-PR-66,
4245 RFI-5858-QCN-2-1921 RFI-5858-QCN-2-1921 CONCRETE
B70-PR-67, B70-PR-34, B70-PR-35 B70-PR-40. Total nos = 24 nos.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Jan-13 8:30 AM 14-Jan-13
4246 6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-26-F3 = 10
RFI-5858-QCN-2-1922 RFI-5858-QCN-2-1922 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Jan-13 8:30 AM 14-Jan-13
nos and B70-PS-29-F2 = 1 no.
6.4 Completion of 14 days curing for Precast Culvert Cover Type B ( Wall ) of BZRC-004
4247 RFI-5858-QCN-2-1923 RFI-5858-QCN-2-1923 CONCRETE
= 2 nos and BZRC-09A = 2 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 13-Jan-13 8:30 AM 14-Jan-13
Check Concrete CuringHAMLA CULVERT BZRC 004 FROM EAST 1ST BASE & WALL -
4248 RFI-5858-QCN-2-1924 RFI-5858-QCN-2-1924 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 10:00 AM 14-Jan-13
1.9M PORTION
8:00 AM
Check Surface Below ground Protective Coating - First coat & Second coatHAMLA
4249 RFI-5858-QCN-2-1925 RFI-5858-QCN-2-1925 CONCRETE
CULVERT BZRC 004 FROM EAST SIDE 1ST BASE WALL -- 1.9M PORTION
APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 14-Jan-2013 to 14-Jan-13
1:30 PM
Pre-Pouring For Cast-in- Situ Retaining Wall ( Base ) Check Formworks, Reinforcement
Retaining Wall
4250 RFI-5858-QCN-2-1926 RFI-5858-QCN-2-1926 CONCRETE and Cleaning of Cast-in- Situ Retaining wall ( Base 15 meters ) N- S 12th panel prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 14-Jan-2013 1:25 PM 14-Jan-13
Raslaffan
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Base ) Retaining Wall
4251 RFI-5858-QCN-2-1927 RFI-5858-QCN-2-1927 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Jan-2013 1:30 PM 16-Jan-13
12th panel ( 15 meters ) Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4252 RFI-5858-QCN-2-1928 RFI-5858-QCN-2-1928 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 14-Jan-2013 1:00 PM 14-Jan-13
1st and second panel prior application of curing compound first coat. Raslaffan
Pre-Cast Items Check Marking and Curing and confirm readyness prior shifting / lifting of Crossing 38
4253 RFI-5858-QCN-2-1929 RFI-5858-QCN-2-1929 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Jan-2013 7:00 AM 14-Jan-13
Culvert Covert Type A = 20 nos and Tpye C 1 no. of BZRC-008. Raslaffan
Pre-Cast Items Check Erection of Precast of Culvert Covert Type A = 20 nos and Type C Crossing 38
4254 RFI-5858-QCN-2-1930 RFI-5858-QCN-2-1930 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Jan-2013 7:30 AM 16-Jan-13 with bibin
= 1 no., of BZRC-008 Raslaffan
4255 Check Polythylene & Hardboard Installation of Precast Culvert Cover of BZRC-008 = 21
RFI-5858-QCN-2-1931 RFI-5858-QCN-2-1931 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 14-Jan-2013 1:00 PM 14-Jan-13
nos prior backfilling.
9.1. Check surface preparation of Precast Pipe Sleeper B70-PS-28-F1 = 2 nos, B70-PS-
4256 RFI-5858-QCN-2-1932 RFI-5858-QCN-2-1932 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 14-Jan-2013 7:30 AM 14-Jan-13
29-F2 = 38 nos B70-PS-20-F1 = 8 nos and B70-PS-30-F2 = 14 nos prior first coating
4257 6.4 Completion of 14 days curing for Precast Removable Panel BZRC-004 and BZRC-
RFI-5858-QCN-2-1933 RFI-5858-QCN-2-1933 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
008 = 4 nos and Pipe Sleeper B70-PS-26-F3 = 21 nos.
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-03-F1 = 5
4258 RFI-5858-QCN-2-1934 RFI-5858-QCN-2-1934 CONCRETE nos, B70-PS-06-F1 = 2 nos, B70-PS-17-F1 = 5 nos and B70-PS-18-F1 = 25 nos,B70-PS- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
06-F1 33 No's Pedestal.
4259 6.4 Completion of 14 days curing for Precast Culvert Cover Type A BZRC-006 = 14 nos.
RFI-5858-QCN-2-1935 RFI-5858-QCN-2-1935 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
and Type B BZRC-008 and 004 = 4 nos
4260 6.4 Completion of 14 days curing for Precast Removable Panel BZRC-006 = 1 no and
RFI-5858-QCN-2-1936 RFI-5858-QCN-2-1936 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
B70-PS-03-F4 = 2 nos and B70-PS-04-F3 = 10 nos
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-18-F1 = 7
4261 RFI-5858-QCN-2-1937 RFI-5858-QCN-2-1937 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
nos, B70-PS-19-F1 = 17 nos and B70-PS-20-F1 = 26 nos
4262 6.4 Completion of 14 days curing for Precast Pipe Track D110-PR-50, 51, 52, 53, 68 and
RFI-5858-QCN-2-1938 RFI-5858-QCN-2-1938 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
69 = 24 nos
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-04-F3 = 10
4263 RFI-5858-QCN-2-1939 RFI-5858-QCN-2-1939 CONCRETE nos, B70-ps-03-f4 = 2 nos, PS-09-F1 = 21 nos B70-PS-10-F1 3 nos, PS-14-F1 = 8 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
and PS-15-F1 = 7 nos.
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-26-F3 = 10
4264 RFI-5858-QCN-2-1940 RFI-5858-QCN-2-1940 CONCRETE nos, B70-PS-27-F1 = 11 nos and Cuvert Cover Type A BZRC-003 = 5 nos, BZRC-004 = 7 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 8:30 AM 14-Jan-13
nos and Type B BZRC-005 = 2 nos
4265 Check Reinforcement & Cleaning Prior to form work closure for the pedestals of F14/Grid Crossing #29,
RFI-5858-QCN-2-1941 RFI-5858-QCN-2-1941 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 14-Jan-2013 4:00 PM 14-Jan-13
3 for B70-PR-18 Section 4 Raslaffan
Check Concrete Curing For Cast-in- Situ Foundation Base & Pedestal for F9/Grid11 & Crossing #29,
4266 RFI-5858-QCN-2-1942 RFI-5858-QCN-2-1942 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 14-Jan-2013 6:30 AM 14-Jan-13
F7/Grid 13of B70-PR-18 and applying curing compound. section 4 Raslaffan
4267 Check Surface Preparation Prior to Coating For Cast-in- Situ foundation base and Crossing #29,
RFI-5858-QCN-2-1943 RFI-5858-QCN-2-1943 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 14-Jan-2013 4:00 PM 14-Jan-13
pedestals for F6/Grid14, F5/Grid15, of B70-PR-18 Section 4 Raslaffan
Check Protective Coating 1st & 2nd coat For F9/Grid11, F7/Grid 13 foundation base and Crossing #29,
4268 RFI-5858-QCN-2-1944 RFI-5858-QCN-2-1944 CONCRETE
pedestals of B70-PR-18
APPROVED
Section 4 Raslaffan
B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 14-Jan-2013 4:00 PM 14-Jan-13
4269 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) D110
RFI-5858-QCN-2-1945 RFI-5858-QCN-2-1945 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 14-Jan-2013 2.30 PM 14-Jan-13
B70 - PR -06 Pipe Rack Foundation 7(F7),8(F8) & Pedestal 6,9 /A-B - 4 NoS
Check Protective Coating 1st & 2nd coat For F6/Grid14, F5/Grid 15 foundation base and Crossing #29,
4271 RFI-5858-QCN-2-1947 RFI-5858-QCN-2-1947 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 15-Jan-13 4:00 PM 15-Jan-13
pedestals of B70-PR-18 Section 4 Raslaffan
Check Concrete Curing For Cast-in- Situ Foundation Base & Pedestal for F6/Grid14 & Crossing #29,
4272 RFI-5858-QCN-2-1948 RFI-5858-QCN-2-1948 CONCRETE
F5/Grid 15of B70-PR-18 and applying curing compound.
APPROVED
section 4 Raslaffan
B-V-3100-004-2-201-02_5 6.4 S W H 15-Jan-13 6:30 AM 16-Jan-13
Crossing #29,
4273 RFI-5858-QCN-2-1949 RFI-5858-QCN-2-1949 CONCRETE Check Polyethylene & Hardboard Installation For F9/Grid 11, F7/Grid 13 of B70-PR-18 APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 15-Jan-13 8:00 AM 15-Jan-13
Section 4 Raslaffan
Check Reinforcement & Cleaning Prior to form work closure for the pedestal of stopper
4274 RFI-5858-QCN-2-1950 RFI-5858-QCN-2-1950 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 15-Jan-13 4:00 PM 15-Jan-13
SLD044 of B70-PS-13
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
4275 RFI-5858-QCN-2-1951 RFI-5858-QCN-2-1951 CONCRETE APPROVED SECTION 1 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 15-Jan-13 9:30 AM 18-Jan-13
- PS -01 Stopper Foundation Pedestal SLD 012
4276 RFI-5858-QCN-2-1952 RFI-5858-QCN-2-1952 CONCRETE Check Concrete Pouring D110 B70 - PS -01 Stopper Foundation Pedestal SLD 012 APPROVED SECTION 1 B-V-3100-004-2-201-02_5 5.1 W H H 15-Jan-13 9:50 AM 18-Jan-13
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
4277 RFI-5858-QCN-2-1953 RFI-5858-QCN-2-1953 CONCRETE APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 15-Jan-13 9:30 AM 16-Jan-13 with bibin
- PR -70 Pipe Rack Foundation Pedestal 1(F1),2 (F2) - 2no.s
4278 Check Concrete Pouring D110 B70 - PR -70 Pipe Rack Foundation Pedestal 1(F1),2 (F2)
RFI-5858-QCN-2-1954 RFI-5858-QCN-2-1954 CONCRETE APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 5.1 W H H 15-Jan-13 9:45 AM 18-Jan-13
- 2no.s
Pre-Pouring For Precast Culvert Cover Type B Check Formworks of Precast Culvert
4279 RFI-5858-QCN-2-1955 RFI-5858-QCN-2-1955 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a W W H 15-Jan-13 1:30 PM 15-Jan-13
Cover Type B wall of BZRC-012 = 2 nos. prior concreting
4280 Concrete Placement Check Concrete pouring of Precast Culvert Cover Type B 0f BZRC-
RFI-5858-QCN-2-1956 RFI-5858-QCN-2-1956 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 15-Jan-13 2:00 PM 18-Jan-13
012 = 2 nos.
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4281 RFI-5858-QCN-2-1957 RFI-5858-QCN-2-1957 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b W W H 15-Jan-13 1:25 PM 18-Jan-13
4th panel wall ( 15 meters ) prior concreting. Raslaffan
4282 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
RFI-5858-QCN-2-1958 RFI-5858-QCN-2-1958 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 15-Jan-13 1:30 PM 18-Jan-13
4th panel ( 15 meters ) Raslaffan
4285 Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
RFI-5858-QCN-2-1961 RFI-5858-QCN-2-1961 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 16-Jan-13 1:30 PM 19-Jan-13
6th panel wall ( 15 meters ) prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4286 RFI-5858-QCN-2-1962 RFI-5858-QCN-2-1962 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Jan-13 2:00 PM 17-Jan-13
6th panel ( 15 meters ) Raslaffan
4287 9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
RFI-5858-QCN-2-1963 RFI-5858-QCN-2-1963 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Jan-13 7:30 AM 17-Jan-13
3rd panel prior application of curing compound first coat. Raslaffan
4289 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S first and second Retaining Wall
RFI-5858-QCN-2-1965 RFI-5858-QCN-2-1965 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Jan-13 8:00 AM 17-Jan-13
panel prior second coating. Raslaffan
4290 9.1. Check protective coating second coat of Cast-in situ retaining wall N- S first and Retaining Wall
RFI-5858-QCN-2-1966 RFI-5858-QCN-2-1966 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Jan-13 3:30 PM 17-Jan-13
second panel. Raslaffan
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S third panel prior Retaining Wall
4291 RFI-5858-QCN-2-1967 RFI-5858-QCN-2-1967 CONCRETE
second coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 16-Jan-13 1:30 PM 17-Jan-13
4292 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
RFI-5858-QCN-2-1968 RFI-5858-QCN-2-1968 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 16-Jan-13 9:30 AM 18-Jan-13
Cast-in- Situ Retaining Wall 8th panel ( Wall ) prior shuttering. ) Raslaffan
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D210-B70-PR-
4295 RFI-5858-QCN-2-1971 RFI-5858-QCN-2-1971 CONCRETE
44 -6(F3),7(F1),9(F4),11(F8),12(F9A,F9B),13(F11), & 14(F10))
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 16-Jan-13 11.00 AM 16-Jan-13
ITP item 4.1 Pre - Pouring Check Reinforcement, Construction joints and cleaning of Gate 5 TSF
4297 RFI-5858-QCN-2-1973 RFI-5858-QCN-2-1973 CONCRETE
Precast Culvert Cover Type B of BZRC-003 = 2 nos. prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 16-Jan-13 8:00 AM 18-Jan-13
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-03-F1 =
4298 RFI-5858-QCN-2-1974 RFI-5858-QCN-2-1974 CONCRETE 19 nos, B70-PS-06-F3 = 1 no., B70-PS-07-F1 = 1 no., B70-PS-09-F1 = 14 no and B70- APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 16-Jan-13 7:30 AM 18-Jan-13
PS-27-F1 = 1 no.
9.1. Check protective coating first coat of Precast Pipe Sleeper B70-PS-28-F1 = 2 nos,
4299 RFI-5858-QCN-2-1975 RFI-5858-QCN-2-1975 CONCRETE B70-PS-29-F2 = 38 nos B70-PS-20-F1 = 8 nos and B70-PS-30-F2 = 14 nos prior second APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 16-Jan-13 8:00 AM 18-Jan-13
coating
Check concrete surface upon form removal D110 B70 - PR -70 Pipe Rack Foundation No D110 B70 - PR - 70
4300 RFI-5858-QCN-2-1976 RFI-5858-QCN-2-1976 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 16-Jan-13 4:10 PM 18-Jan-13 BIBIN
1(F1)& 2 (F2 )
4301 Check concrete surface upon form removal D110 B70 - PS -01 Stopper Foundation
RFI-5858-QCN-2-1977 RFI-5858-QCN-2-1977 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 6.3 S W H 16-Jan-13 4:10 PM 18-Jan-13 BIBIN
Pedestal SLD 012
Prepouring - Check form works,Embeded items,Cleaning & Expansion joints MASHRAB Section 1 MASHRAB
4302 RFI-5858-QCN-2-1978 RFI-5858-QCN-2-1978 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 a.c.d.e W W H 16-Jan-13 3:10 PM 19-Jan-13
CULVERT BZRC 003 FROM WEST SIDE 2nd BASE - 15M PORTION Culvert Raslaffan
4303 Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 2nd Section 1 MASHRAB
RFI-5858-QCN-2-1979 RFI-5858-QCN-2-1979 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Jan-13 3:30 PM 18-Jan-13
BASE -15M PORTION Culvert Raslaffan
6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type B ( wall )
4304 RFI-5858-QCN-2-1980 RFI-5858-QCN-2-1980 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Jan-13 8:30 AM 17-Jan-13
of BZRC-012 = 2 nos.
4305 9.1. Check protective coating second coat of Precast Pipe Sleeper B70-PS-28-F1 = 2
RFI-5858-QCN-2-1981 RFI-5858-QCN-2-1981 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Jan-13 2:30 PM 17-Jan-13
nos, B70-PS-29-F2 = 38 nos B70-PS-20-F1 = 8 nos and B70-PS-30-F2 = 14 nos.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
4306 RFI-5858-QCN-2-1982 RFI-5858-QCN-2-1982 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 17-Jan-13 2:30 PM 17-Jan-13
Cast-in- Situ Retaining Wall 7th panel ( Wall ) prior shuttering. ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4307 RFI-5858-QCN-2-1983 RFI-5858-QCN-2-1983 CONCRETE Check Surface preparation D110 B70 - PR -70 Pipe Rack Foundation No 1(F1)& 2 (F2 ) APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 9.1 S W H 17-Jan-13 10:30 AM 17-Jan-13 BIBIN
4308 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall N- S 4th
RFI-5858-QCN-2-1984 RFI-5858-QCN-2-1984 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Jan-13 1:30 PM 17-Jan-13
panel wall ( 15 meters )
Check Polythylene & Hardboard Installation of Retaining Wall N- S 1st and 2nd panel
4309 RFI-5858-QCN-2-1985 RFI-5858-QCN-2-1985 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Jan-13 1:30 PM 17-Jan-13
prior backfilling.
2:30 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
4312 RFI-5858-QCN-2-1988 RFI-5858-QCN-2-1988 CONCRETE APPROVED D110 B70 - PR - 70 B-V-3100-004-2-201-02_5 9.2 a S W H 17-Jan-13 TO 17-Jan-13 BIBIN
PR -70 Pipe Rack Foundation No 1(F1)& 2 (F2)
4:30 PM
2:30 AM
4313 Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
RFI-5858-QCN-2-1989 RFI-5858-QCN-2-1989 CONCRETE APPROVED Section 1 B-V-3100-004-2-201-02_5 9.2 a S W H 17-Jan-13 TO 17-Jan-13 BIBIN
PS -01 Stopper Foundation SLD 012
4:30 PM
4314 RFI-5858-QCN-2-1990 RFI-5858-QCN-2-1990 CONCRETE Check Surface preparation D110 B70 - PS -01 Stopper Foundation SLD 012 APPROVED Section 1 B-V-3100-004-2-201-02_5 9.1 S W H 17-Jan-13 10:30 AM 17-Jan-13 BIBIN
4315 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-1991 RFI-5858-QCN-2-1991 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 17-Jan-13 7:30 AM 17-Jan-13
reataining wall N- S 1st, 2nd and 3rd panel Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4316 RFI-5858-QCN-2-1992 RFI-5858-QCN-2-1992 CONCRETE
8th panel wall ( 15 meters ) prior concreting. And 13th panel footing (10.345 meters)
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b. W W H 19-Jan-13 1:15 PM 21-Jan-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S (footingl Retaining Wall
4317 RFI-5858-QCN-2-1993 RFI-5858-QCN-2-1993 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Jan-13 1:30 PM 19-Jan-13
) 13th panel ( 10.345 meters ) Raslaffan
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 3rd BASE Section 1
4319 RFI-5858-QCN-2-1995 RFI-5858-QCN-2-1995 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Jan-13 8:00AM 19-Jan-13
-7.5M PORTION MASHRAB Culvert
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
4320 RFI-5858-QCN-2-1996 RFI-5858-QCN-2-1996 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 19-Jan-13 9:30 AM 21-Jan-13
Cast-in- Situ Retaining Wall 10th panel ( Wall ) prior shuttering. ) Raslaffan
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -70 Pipe
4321 RFI-5858-QCN-2-1997 RFI-5858-QCN-2-1997 CONCRETE APPROVED D110 B70 - PR -70 B-V-3100-004-2-201-02_5 9.2.b,c S W H 19-Jan-13 9:00 AM 19-Jan-13
Rack Foundation 1 (F1) &2 (F2)
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4323 RFI-5858-QCN-2-1999 RFI-5858-QCN-2-1999 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-Jan-13 7:30 AM 19-Jan-13
4th panel prior application of curing compound first coat. Raslaffan
4324 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 4th panel prior Retaining Wall
RFI-5858-QCN-2-2000 RFI-5858-QCN-2-2000 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-Jan-13 1:00 PM 19-Jan-13
second coating. Raslaffan
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pre cast
4325 RFI-5858-QCN-2-2001 RFI-5858-QCN-2-2001 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 19-Jan-13 2.30 PM 19-Jan-13
pipe sleeper footing B70-PS-29-F2-11nos
4326 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall N- S 6th
RFI-5858-QCN-2-2002 RFI-5858-QCN-2-2002 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-Jan-13 9:30 PM 19-Jan-13
panel wall ( 15 meters )
Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
4327 RFI-5858-QCN-2-2003 RFI-5858-QCN-2-2003 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b W W H 19-Jan-13 4:00 PM 19-Jan-13
WEST SIDE 2rd BASE WALL BOTH SIDES - 15 M PORTION & 2 nos Sleeper CULVERT
4329 RFI-5858-QCN-2-2005 RFI-5858-QCN-2-2005 CONCRETE Check Concrete Curing D110 B70 - PS -01 Stopper Foundation SLD 012 APPROVED SECTION1 B-V-3100-004-2-201-02_5 6.4 S W H 19-Jan-13 7:10 AM 19-Jan-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D210-B70-PR-
4330 RFI-5858-QCN-2-2006 RFI-5858-QCN-2-2006 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 24-Jan-13 11:00 AM 24-Jan-13
44 -5(F1),4(F2),3(F5),2(F7),1(F6),
4332 RFI-5858-QCN-2-2008 RFI-5858-QCN-2-2008 CONCRETE Check Concrete Curing D110 B70 - PR -70 Pipe Rack Foundation No 1(F1)& 2 (F2) APPROVED PIPE RACK PR -70 B-V-3100-004-2-201-02_5 6.4 S W H 19-Jan-13 7:00 AM 19-Jan-13
4333 RFI-5858-QCN-2-2009 RFI-5858-QCN-2-2009 CONCRETE Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 02, & 05 APPROVED SECTION 1 B-V-3100-004-2-201-02_2 4.1.1a,b&c S W H 19-Jan-13 8:10 AM 19-Jan-13
4334 Check Laying of Asphalt Binder Course & Surface Course HAMLA CULVERT BZRC004
RFI-5858-QCN-2-2010 RFI-5858-QCN-2-2010 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 22-Jan-13 8:00 AM 22-Jan-13
EAST SIDE PORTION
4336 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
RFI-5858-QCN-2-2012 RFI-5858-QCN-2-2012 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 20-Jan-13 8:30 AM 20-Jan-13
Cast-in- Situ Retaining Wall 12th panel ( Wall ) prior shuttering. ) Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4337 RFI-5858-QCN-2-2013 RFI-5858-QCN-2-2013 CONCRETE
5th panel prior application of curing compound first coat.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 20-Jan-13 8:30 AM 21-Jan-13
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 5th panel prior Retaining Wall
4339 RFI-5858-QCN-2-2015 RFI-5858-QCN-2-2015 CONCRETE
second coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 20-Jan-13 1:00 PM 21-Jan-13
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
4340 RFI-5858-QCN-2-2016 RFI-5858-QCN-2-2016 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 20-Jan-13 9:30 AM 21-Jan-13
reataining wall N- S 4th panel Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S 3rd panel prior
4341 RFI-5858-QCN-2-2017 RFI-5858-QCN-2-2017 CONCRETE
backfilling.
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 20-Jan-13 8:00 AM 21-Jan-13
Pre-Pouring For Precast Culvert Cover Type B Check Formworks of Precast Culvert
4342 RFI-5858-QCN-2-2018 RFI-5858-QCN-2-2018 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a. W W H 20-Jan-13 7:30 AM 21-Jan-13
Cover Type B wall of BZRC-003 = 2 nos. prior concreting
Concrete Placement Check Concrete pouring of Precast Culvert Cover wall Type B 0f
4343 RFI-5858-QCN-2-2019 RFI-5858-QCN-2-2019 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Jan-13 8:00 AM 21-Jan-13
BZRC-003 = 2 nos.
Pre-Pouring For Cast-in-situ pipe track foundation Check Formworks, Reinforcement and
Crossing #29, Section
4344 RFI-5858-QCN-2-2020 RFI-5858-QCN-2-2020 CONCRETE Cleaning of Cast-in-situ pipe track foundation prior concreting.F1,F2,F3,F4,F10,F14 APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d W W H 20-Jan-13 1:00 PM 21-Jan-13
4
(pedestal) PR-18
Concrete Placement Check Concrete pouring of Cast-in-situ Retaining wall N-S ( Wall ) Retaining Wall
4346 RFI-5858-QCN-2-2022 RFI-5858-QCN-2-2022 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-Jan-13 7:30 AM 21-Jan-13
8th panel ( 15 meters ) Raslaffan
4347 Check Laying of Asphalt Base Course HAMLA CULVERT BZRC004 EAST SIDE
RFI-5858-QCN-2-2023 RFI-5858-QCN-2-2023 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.2.2 S W H 20-Jan-13 9:00 AM 21-Jan-13
PORTION
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
4350 RFI-5858-QCN-2-2026 RFI-5858-QCN-2-2026 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 21-Jan-13 9:30 AM 21-Jan-13
reataining wall N- S 5th panel Raslaffan
4351 Check Polythylene & Hardboard Installation of Retaining Wall N- S 4th and 5th panel prior Retaining Wall
RFI-5858-QCN-2-2027 RFI-5858-QCN-2-2027 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Jan-13 2:00 PM 22-Jan-13
backfilling. Raslaffan
4352 Check Laying of Asphalt Base Course - 2nd Layer HAMLA CULVERT BZRC004 EAST
RFI-5858-QCN-2-2028 RFI-5858-QCN-2-2028 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-03_5 4.22 S W H 21-Jan-13 8:00 AM 21-Jan-13
SIDE PORTION
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
4353 RFI-5858-QCN-2-2029 RFI-5858-QCN-2-2029 CONCRETE APPROVED B-V-3100-004-2-201-03_5 4.1a.b..d.e W W H 21-Jan-13 2:30 PM 21-Jan-13
Cast-in- Situ Retaining Wall 9th panel ( Wall ) prior shuttering. ) Raslaffan
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 1st BASE Section 1
4355 RFI-5858-QCN-2-2031 RFI-5858-QCN-2-2031 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 22-Jan-13 3:40 PM 24-Jan-13
- 14 M PORTION & 3 Nos Sleeper - 2nd & 3rd Base Portion MASHRAB Culvert
4356 Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
RFI-5858-QCN-2-2032 RFI-5858-QCN-2-2032 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 22-Jan-13 1:30 PM 24-Jan-13
10th panel wall ( 15 meters ) prior concreting. Raslaffan
4357 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
RFI-5858-QCN-2-2033 RFI-5858-QCN-2-2033 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 22-Jan-13 2:00 PM 24-Jan-13
10th panel ( 15 meters ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 8th Retaining Wall
4358 RFI-5858-QCN-2-2034 RFI-5858-QCN-2-2034 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 22-Jan-13 9:00 AM 22-Jan-13
panel wall. Raslaffan
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 2nd Section 1 MASHRAB
4362 RFI-5858-QCN-2-2038 RFI-5858-QCN-2-2038 CONCRETE
BASE NORTH SIDE WALL - 15 M PORTION
APPROVED
Culvert
B-V-3100-004-2-201-02_5 5.1 W H H 22-Jan-13 3:30 PM 24-Jan-13
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 2nd Section 1
4364 RFI-5858-QCN-2-2040 RFI-5858-QCN-2-2040 CONCRETE
BASE SOUTH SIDE WALL - 15 M PORTION
APPROVED
MASHRAB Culvert
B-V-3100-004-2-201-02_5 5.1 W H H 23-Jan-13 3:30PM 25-Jan-13
Check Polyethylene & Hardboard Installation For B70 - PS -13 SLD039 to SLD042, Crossing #29,
4365 RFI-5858-QCN-2-2041 RFI-5858-QCN-2-2041 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 23-Jan-13 9:00 AM 24-Jan-13
SLD045 to SLD053, Section 4 Raslaffan
Check Concrete Surface upon Form Removal For Cast-in- Situ foundation pedestals for Crossing #29,
4366 RFI-5858-QCN-2-2042 RFI-5858-QCN-2-2042 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 23-Jan-13 8:30 AM 24-Jan-13
F10/Grid10, F14/Grid 3, of B70-PR-18 Section 4 Raslaffan
, Section 4
4367 RFI-5858-QCN-2-2043 RFI-5858-QCN-2-2043 CONCRETE Check surface Preparation Below Grade Pipe Track foundation F10/grid-10, F14/grid-3 APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 23-Jan-13 3:00 PM 24-Jan-13
PR-18
4370 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
RFI-5858-QCN-2-2046 RFI-5858-QCN-2-2046 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 23-Jan-13 8:00 AM 24-Jan-13
Cast-in- Situ Retaining Wall 12th panel ( Wall ) prior shuttering. ) Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4371 RFI-5858-QCN-2-2047 RFI-5858-QCN-2-2047 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 23-Jan-13 8:00 AM 24-Jan-13
6th panel prior application of curing compound first coat. Raslaffan
4372 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 6th panel prior Retaining Wall
RFI-5858-QCN-2-2048 RFI-5858-QCN-2-2048 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 23-Jan-13 9:30 AM 24-Jan-13
second coating. Raslaffan
Retaining Wall
4373 RFI-5858-QCN-2-2049 RFI-5858-QCN-2-2049 CONCRETE 9.1. Check protective coating second coat of Cast-in situ retaining wall N- S 6th panel. APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 23-Jan-13 2:30 PM 24-Jan-13
Raslaffan
4374 6.3 Check Concrete surface upon form removal of Precast Culvert Cover Type B BZRC-
RFI-5858-QCN-2-2050 RFI-5858-QCN-2-2050 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_0 6.3 S W H 23-Jan-13 3:30 PM 24-Jan-13
003 = 2 nos.
4375 Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2051 RFI-5858-QCN-2-2051 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b W W H 23-Jan-13 10:30 AM 24-Jan-13
WEST SIDE 3rd BASE WALL BOTH SIDES - 7.5 M PORTION CULVERT
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4376 RFI-5858-QCN-2-2052 RFI-5858-QCN-2-2052 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 24-Jan-13 1:20 PM 24-Jan-13
7th panel wall ( 15 meters ) prior concreting. Raslaffan
4377 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
RFI-5858-QCN-2-2053 RFI-5858-QCN-2-2053 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 24-Jan-13 1:30 PM 24-Jan-13
7th panel ( 15 meters ) Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S 6th panel prior Retaining Wall
4378 RFI-5858-QCN-2-2054 RFI-5858-QCN-2-2054 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Jan-13 9:00 AM 25-Jan-13
backfilling. Raslaffan
4379 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2055 RFI-5858-QCN-2-2055 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 24-Jan-13 8:30 AM 25-Jan-13
reataining wall N- S 6th panel Raslaffan
4380 6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 10th Retaining Wall
RFI-5858-QCN-2-2056 RFI-5858-QCN-2-2056 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 24-Jan-13 3:30 PM 25-Jan-13
panel wall. Raslaffan
Check Concrete Surface upon Form Removal For Cast-in- Situ foundation pedestals for Crossing #29,
4381 RFI-5858-QCN-2-2057 RFI-5858-QCN-2-2057 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 24-Jan-13 8:30 AM 25-Jan-13
B70-PR-18 F1/Grid-21, F2/Grid-20, F3/Grid-19, F1/Grid-18, F4/Grid 17&16 Section 4 Raslaffan
4382 Check Protective Coating 1st & 2nd coat For F10/Grid10, F14/Grid 3 foundation base and Crossing #29,
RFI-5858-QCN-2-2058 RFI-5858-QCN-2-2058 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 24-Jan-13 1:30 PM 25-Jan-13
pedestals of B70-PR-18 Section 4 Raslaffan
Crossing #29,
4383 RFI-5858-QCN-2-2059 RFI-5858-QCN-2-2059 CONCRETE Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F4/Grid 16&17 APPROVED
section 4 Raslaffan
B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 6:30 AM 25-Jan-13
4384 Check Laying of Asphalt Base Course HALUL CULVERT BZRC008 EAST SIDE
RFI-5858-QCN-2-2060 RFI-5858-QCN-2-2060 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 24-Jan-13 9:00 AM 25-Jan-13
PORTION
Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F1/Grid-21&20 Crossing #29,
4387 RFI-5858-QCN-2-2063 RFI-5858-QCN-2-2063 CONCRETE
F2/Grid-19 F3/Grid-18
APPROVED
section 4 Raslaffan
B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 6:30 AM 25-Jan-13
Crossing #29,
4388 RFI-5858-QCN-2-2064 RFI-5858-QCN-2-2064 CONCRETE Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F10/Grid 10 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 6:30 AM 25-Jan-13
section 4 Raslaffan
Crossing #29,
4389 RFI-5858-QCN-2-2065 RFI-5858-QCN-2-2065 CONCRETE Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F14/Grid 3 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 6:30 AM 25-Jan-13
section 4 Raslaffan
Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F10/Grid 10 Crossing #29,
4390 RFI-5858-QCN-2-2066 RFI-5858-QCN-2-2066 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 9:30 AM 25-Jan-13
Pedestal. section 4 Raslaffan
Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F14/Grid 3 Crossing #29,
4391 RFI-5858-QCN-2-2067 RFI-5858-QCN-2-2067 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 24-Jan-13 6:30 AM 25-Jan-13
Pedestal. section 4 Raslaffan
9:00:00 PM
Check Laying of Asphalt Base Course - 2nd layer HALUL CULVERT BZRC008 EAST
4392 RFI-5858-QCN-2-2068 RFI-5858-QCN-2-2068 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 25-Jan-13 to 28-Jan-13
SIDE PORTION
4:00 PM
Pre-Cast Items Check Marking and Curing and confirm readyness prior shifting / lifting of
4393 Crossing 38
RFI-5858-QCN-2-2069 RFI-5858-QCN-2-2069 CONCRETE Precast Pipe Sleeper B70-PS-18-F1 = 32 nos B70-PS-19-F1 = 17 nos, B70-PS-20-F1 = APPROVED B-V-3100-004-2-201-02_5 8.1 R W H 26-Jan-13 7:30 AM 26-Jan-13
Raslaffan
50 nos and B70-PS-22-F1 = 61 nos
Check Laying of Asphalt Binder Course & Surface Course HALUL CULVERT BZRC008
4394 RFI-5858-QCN-2-2070 RFI-5858-QCN-2-2070 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 26-Jan-13 9:00 AM 28-Jan-13
EAST SIDE PORTION
4395 Check Concrete Curing For Cast-in- Situ Foundation Base B70-PR-18 F1/Grid-21&20 Crossing #29,
RFI-5858-QCN-2-2071 RFI-5858-QCN-2-2071 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Jan-13 7:30 AM 26-Jan-13
F2/Grid-19 F3/Grid-18 F4/Grid-16&17 Pedestal section 4 Raslaffan
Check Protective Coating 1st & 2nd coat For B70-PR-18 F4/Grid-16&17 foundation base Crossing #29,
4396 RFI-5858-QCN-2-2072 RFI-5858-QCN-2-2072 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 26-Jan-13 1:00 PM 26-Jan-13
and pedestals. Section 4 Raslaffan
4398 Check Surface Preparation Prior to Coating For Cast-in- Situ foundation base and Crossing #29,
RFI-5858-QCN-2-2074 RFI-5858-QCN-2-2074 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 26-Jan-13 7:00 AM 26-Jan-13
pedestals for B70-PR-18 F1/Grid-21&20 F2/Grid-19 F3/Grid-18 F4/Grid-16&17 Section 4 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4401 RFI-5858-QCN-2-2077 RFI-5858-QCN-2-2077 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 26-Jan-13 9:30 AM 27-Jan-13
7th panel ( 15 meters ) Raslaffan
6.4 Completion of 14 days curing for Precast Pipe Sleeper Footing B70-PS-29-F2 = 40
4403 RFI-5858-QCN-2-2079 RFI-5858-QCN-2-2079 CONCRETE nos and Pipe Sleeper Pedestal B70-PS-27-F1 = 8 nos, B70-PS-20-F1 = 20 nos, PS-21- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jan-13 8:30 AM 26-Jan-13
F1 = 4 nos and B70-PS-30-F2 = 14 nos
6.4 Completion of 14 days curing for Cast-in situ Pipe Track Pedestal D110-B70-PR- 22 ;
4404 RFI-5858-QCN-2-2080 RFI-5858-QCN-2-2080 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jan-13 8:30 AM 26-Jan-13
F1 = 2 nos, F2 = 2 nos and Pipe Track Footing D110-B70-PR-22; F3 = 1 no.
4405 6.4 Completion of 14 days curing for Cast-in situ Pipe Track Footing D110-B70-PR- 22 ;
RFI-5858-QCN-2-2081 RFI-5858-QCN-2-2081 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jan-13 8:30 AM 26-Jan-13
F1 and F2
6.4 Completion of 14 days curing for Cast-in situ Pipe Track Stopper footing B70-PS-17:
4406 RFI-5858-QCN-2-2082 RFI-5858-QCN-2-2082 CONCRETE
SLD057 and Pedestal SLD021
APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jan-13 8:30 AM 26-Jan-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
4408 RFI-5858-QCN-2-2084 RFI-5858-QCN-2-2084 CONCRETE
Cast-in- Situ Retaining Wall 9th panel ( Wall )prior shuttering.
APPROVED
) Raslaffan
B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 26-Jan-13 8:00 AM 26-Jan-13
7:30 AM
Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat
4409 RFI-5858-QCN-2-2085 RFI-5858-QCN-2-2085 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.3 S W H 26-Jan-13 TO 26-Jan-13
Sleeper Foundations B70 - PS -01 SLD011,SLD012,SLD013& SLD024
1:00 PM
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 3rd Section 1 MASHRAB
4411 RFI-5858-QCN-2-2087 RFI-5858-QCN-2-2087 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 26-Jan-13 10:30 AM 27-Jan-13
BASE WALL BOTH SIDES - 7.5 M PORTION& 2Nos SLEEPER- 14M PORTION Culvert
Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
4412 RFI-5858-QCN-2-2088 RFI-5858-QCN-2-2088 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Jan-13 7:00 AM 28-Jan-13
WEST SIDE 2nd BASE & WALL BOTH SIDE -- 15 M PORTION & SLEEPERS- 2 No CULVERT
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM WEST SIDE 2nd MASHRAB
4413 RFI-5858-QCN-2-2089 RFI-5858-QCN-2-2089 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 27-Jan-13 10:30 AM 28-Jan-13
BASE & WALL (BOTH SIDES) -- 15 M PORTION & SLEEPERS- 2 No CULVERT
Check Concrete CuringMASHRAB CULVERT BZRC 003 FROM WEST SIDE 2nd BASE MASHRAB
4414 RFI-5858-QCN-2-2090 RFI-5858-QCN-2-2090 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 27-Jan-13 4:30 PM 28-Jan-13
& WALL BOTH SIDE -- 15 M PORTION & SLEEPERS- 2 No CULVERT
Check Surface Below ground Protective Coating - First coat & Second coatMASHRAB 1:00 PM
MASHRAB
4415 RFI-5858-QCN-2-2091 RFI-5858-QCN-2-2091 CONCRETE CULVERT BZRC 003 FROM WEST SIDE 2nd BASE & WALL BOTH SIDE -- 15 M APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 27-Jan-13 TO 28-Jan-13
CULVERT
PORTION & SLEEPERS- 2 No 4:30 PM
Check Protective Coating 1st & 2nd coat For B70-PR-18 F1/Grid-21&18, F2/Grid-20, Crossing #29,
4417 RFI-5858-QCN-2-2093 RFI-5858-QCN-2-2093 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 27-Jan-13 3:30 PM 28-Jan-13
F3/Grid-19 foundation base and pedestals. Section 4 Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4419 RFI-5858-QCN-2-2095 RFI-5858-QCN-2-2095 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 27-Jan-13 2:00 PM 28-Jan-13
9th panel wall ( 15 meters ) prior concreting. Raslaffan
4420 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
RFI-5858-QCN-2-2096 RFI-5858-QCN-2-2096 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Jan-13 2:30 PM 28-Jan-13
9th panel ( 15 meters ) Raslaffan
4423 4.4.1 Check compressive Strength @ 1 days for grout (Pipe Rack foundations D110-B70-
RFI-5858-QCN-2-2099 RFI-5858-QCN-2-2099 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 27-Jan-13 11.00AM 28-Jan-13
PR-01 -15(F14),14(F13),13(F12),12(F10),11(F11),10(F10),9(F8),8(F8),7(F7),6(F6).
4425 Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2101 RFI-5858-QCN-2-2101 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b 0 W H 27-Jan-13 3:30 PM 27-Jan-13
WEST SIDE 1ST BASE WALL - 14 M END PORTION CULVERT
4426 Check Final Visual Inspection Sleeper foundations Sleeper Foundations B70 - PS -01
RFI-5858-QCN-2-2102 RFI-5858-QCN-2-2102 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 27-Jan-13 8:30 AM 28-Jan-13
SLD001,SLD005,SLD011 TO SLD024
Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
4427 RFI-5858-QCN-2-2103 RFI-5858-QCN-2-2103 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 28-Jan-13 7:00 AM 28-Jan-13
WEST SIDE 3rd BASE & WALL BOTH SIDE -- 7.5 M PORTION & SLEEPERS- 1 No CULVERT
4428 Check Polyethylene & Hardboard Installation For B70-PR-18 F1/Grid-21&18, F2/Grid-20, Crossing #29,
RFI-5858-QCN-2-2104 RFI-5858-QCN-2-2104 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 28-Jan-13 7:30 AM 28-Jan-13
F3/Grid-19 Section 4 Raslaffan
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM WEST SIDE 3rd MASHRAB
4429 RFI-5858-QCN-2-2105 RFI-5858-QCN-2-2105 CONCRETE
BASE & WALL BOTH SIDE -- 7.5 M PORTION & SLEEPERS- 1 No
APPROVED
CULVERT
B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 3:30 PM 28-Jan-13
Section 4, B70-PS-
4431 RFI-5858-QCN-2-2107 RFI-5858-QCN-2-2107 CONCRETE Check Concrete Pouring For Cast-in- Situ Stopper Pedestal for B70-PS-13 SLD044 APPROVED
13 SLD044 Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 28-Jan-13 9:30 AM 28-Jan-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
4432 RFI-5858-QCN-2-2108 RFI-5858-QCN-2-2108 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 28-Jan-13 8:30 AM 28-Jan-13
Cast-in- Situ Retaining Wall 11th panel ( Wall ) prior shuttering. ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 7th Retaining Wall
4433 RFI-5858-QCN-2-2109 RFI-5858-QCN-2-2109 CONCRETE
panel wall.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 28-Jan-13 9:30 AM 28-Jan-13
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4434 RFI-5858-QCN-2-2110 RFI-5858-QCN-2-2110 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 8:30 AM 28-Jan-13
7th panel prior application of curing compound first coat. Raslaffan
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 7th panel prior Retaining Wall
4435 RFI-5858-QCN-2-2111 RFI-5858-QCN-2-2111 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 2:00 PM 28-Jan-13
second coating. Raslaffan
Retaining Wall
4436 RFI-5858-QCN-2-2112 RFI-5858-QCN-2-2112 CONCRETE 9.1. Check protective coating second coat of Cast-in situ retaining wall N- S 7th panel. APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 4:00 PM 28-Jan-13
Raslaffan
4437 RFI-5858-QCN-2-2113 RFI-5858-QCN-2-2113 CONCRETE 9.1. Check surface preparation of Precast Culvert cover Type B BZRC-003 = 2 Nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 9:30 AM 28-Jan-13
9.1. Check protective coating 1st & 2nd coat of Precast Culvert Cover Type B BZRC-003 Retaining Wall
4438 RFI-5858-QCN-2-2114 RFI-5858-QCN-2-2114 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Jan-13 2:00 PM 28-Jan-13
= 2 Nos Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S 4th and 7th panel prior Retaining Wall
4440 RFI-5858-QCN-2-2116 RFI-5858-QCN-2-2116 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 29-Jan-13 9:00 AM 29-Jan-13
backfilling. Raslaffan
Check Surface Below ground Protective Coating - First coat & Second coatMASHRAB 7:00 AM
4441 MASHRAB
RFI-5858-QCN-2-2117 RFI-5858-QCN-2-2117 CONCRETE CULVERT BZRC 003 FROM WEST SIDE 3rd BASE & WALL BOTH SIDE -- 7.5 M APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 29-Jan-13 TO 29-Jan-13
CULVERT
PORTION 9:00 AM
4443 Check Surface Preparation & Sealent ApplicationMASHRAB CULVERT BZRC 003 MASHRAB
RFI-5858-QCN-2-2119 RFI-5858-QCN-2-2119 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6a,b S W H 29-Jan-13 7:00 AM 29-Jan-13
FROM WEST SIDE 3rd BASE & WALL BOTH SIDE - 7.5 M PORTION CULVERT
4446 Check Polyethylene & Hardboard Installation For B70 - PS -13 SLD051 to SLD052, PR-
RFI-5858-QCN-2-2122 RFI-5858-QCN-2-2122 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 29-Jan-13 9:00 AM 30-Jan-13
63 Loop foundation
Check Concrete CuringMASHRAB CULVERT BZRC 003 FROM WEST SIDE 3rd BASE & MASHRAB
4447 RFI-5858-QCN-2-2123 RFI-5858-QCN-2-2123 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 29-Jan-13 9:30 AM 29-Jan-13
WALL BOTH SIDE -- 7.5 M PORTION & SLEEPERS- 2 No CULVERT
4448 Check Core sampling of Asphalt HAMLA BZRC 004 EAST SIDE PORTION, HALUL
RFI-5858-QCN-2-2124 RFI-5858-QCN-2-2124 CONCRETE APPROVED SECTION3,4&5 B-V-3100-004-2-201-03_5 4.2.7 R W H 29-Jan-13 7:00 AM 29-Jan-13
CULVERT BZRC008 EAST SIDE PORTION& QG GATE No.5 BZRC 009
4449 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
RFI-5858-QCN-2-2125 RFI-5858-QCN-2-2125 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 30-Jan-13 2:30 PM 30-Jan-13
Situ Pipe Track Foundations - Footing D110-B70-PR-18: F4 G.L 16/A-B & F4 G.L 17/A-B
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 9th Retaining Wall
4450 RFI-5858-QCN-2-2126 RFI-5858-QCN-2-2126 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 30-Jan-13 1:30 pM 1-Feb-13
panel wall. Raslaffan
4451 9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
RFI-5858-QCN-2-2127 RFI-5858-QCN-2-2127 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 30-Jan-13 8:30 AM 1-Feb-13
8th panel prior application of curing compound first coat. Raslaffan
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 8th panel prior Retaining Wall
4452 RFI-5858-QCN-2-2128 RFI-5858-QCN-2-2128 CONCRETE
second coating.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 30-Jan-13 9:30 AM 1-Feb-13
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and Cleaning Crossing 44
4454 RFI-5858-QCN-2-2130 RFI-5858-QCN-2-2130 CONCRETE
of Cast-in- Situ Pipe Track D110-B70-PR-25; F1 prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 30-Jan-13 1:35 PM 30-Jan-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Crossing 44
4455 RFI-5858-QCN-2-2131 RFI-5858-QCN-2-2131 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Jan-13 2:00 PM 30-Jan-13
25: F1 Raslaffan
Check Laying of Asphalt Base Course LAFAN CULVERT BZRC006 WEST SIDE
4457 RFI-5858-QCN-2-2133 RFI-5858-QCN-2-2133 CONCRETE CANCELLED LAFAN CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 30-Jan-13 8:00 AM 30-Jan-13
PORTION
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
4459 RFI-5858-QCN-2-2135 RFI-5858-QCN-2-2135 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 30-Jan-13 11:00 AM 30-Jan-13
01 -9(F9),8(F8),7(F7),& 6(F6).
Check Reinforcement & Cleaning Prior to form work closure for the pedestal of B70-PR- Section 4 PR-18
4460 RFI-5858-QCN-2-2136 RFI-5858-QCN-2-2136 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 30-Jan-13 6:30 AM 30-Jan-13
18 F8/Grid-12 Raslaffan
4462 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2138 RFI-5858-QCN-2-2138 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 31-Jan-13 8:30 AM 31-Jan-13
reataining wall N- S 7th and 8th panel Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S 8th panel prior Retaining Wall
4463 RFI-5858-QCN-2-2139 RFI-5858-QCN-2-2139 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 31-Jan-13 3:30 PM 31-Jan-13
backfilling. Raslaffan
4464 Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
RFI-5858-QCN-2-2140 RFI-5858-QCN-2-2140 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 31-Jan-13 2:30 PM 2-Feb-13
12th panel wall ( 15 meters ) prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4465 RFI-5858-QCN-2-2141 RFI-5858-QCN-2-2141 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 31-Jan-13 3:00 PM 31-Jan-13
12th panel ( 15 meters ) Raslaffan
4466 Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items BZRC-09A ( Gate #
RFI-5858-QCN-2-2142 RFI-5858-QCN-2-2142 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 31-Jan-13 4:30 PM 2-Feb-13
and cleaning of Culvert Base of BZRC-09A ( 9 meters ) prior concreting 7 ) Raslaffan
4467 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A ( 9 BZRC-09A ( Gate #
RFI-5858-QCN-2-2143 RFI-5858-QCN-2-2143 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 31-Jan-13 5:00 PM 3-Feb-13
meters ) 7 ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring For Cast-in- Situ Culvert Check Formworks, imbedded items of Pipe Sleeper
4468 RFI-5858-QCN-2-2144 RFI-5858-QCN-2-2144 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 31-Jan-13 8:30 AM 2-Feb-13
Pedestal B70-PS-29-F2 = 1 no. and B70-PS-32-F1 = 9 nos\ prior concreting.
4469 Concrete Placement Check Concrete pouring of Precast Pipe Sleeper Pedestal B70-PS-
RFI-5858-QCN-2-2145 RFI-5858-QCN-2-2145 CONCRETE CANCELLED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 31-Jan-13 9:00 AM 31-Jan-13
29-F2 = 1 no. and B70-PS-32-F1 = 9 nos
Check Laying of Asphalt Base Course LAFAN CULVERT BZRC006 WEST SIDE
4470 RFI-5858-QCN-2-2146 RFI-5858-QCN-2-2146 CONCRETE APPROVED LAFAN CULVERT B-V-3100-004-2-201-03_5 4.22 S W H 31-Jan-13 8:00 AM 31-Jan-13
PORTION
4471 Check Concrete Surface upon Form Removal For Cast-in- Situ Stopper pedestals for PS-
RFI-5858-QCN-2-2147 RFI-5858-QCN-2-2147 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 31-Jan-13 6:30 AM 31-Jan-13
13 SLD-51&52
4472 Check Above Ground Surface Preparation Prior to Painting For Sleeper B70-PR-12
RFI-5858-QCN-2-2148 RFI-5858-QCN-2-2148 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 31-Jan-13 6:30 AM 31-Jan-13
SLD001 to SLD011 & PR-13 SLD039 to 042SLD045 to 052
4473 RFI-5858-QCN-2-2149 RFI-5858-QCN-2-2149 CONCRETE Check Surface Preparation Prior to Coating For Stopper B70-PR-13 SLD044 APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 31-Jan-13 9:30 AM 31-Jan-13
Check Laying of Asphalt Binder Course & Surface Course LAFAN CULVERT BZRC006
4475 RFI-5858-QCN-2-2151 RFI-5858-QCN-2-2151 CONCRETE
WEST SIDE PORTION
APPROVED LAFAN CULVERT B-V-3100-004-2-201-03_5 4.22 S W H 2-Feb-13 7:30 AM 2-Feb-13
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM WEST SIDE 1st BASE Section 1
4477 RFI-5858-QCN-2-2153 RFI-5858-QCN-2-2153 CONCRETE
WALL &END WALL - 14M PORTION
APPROVED
MASHRAB Culvert
B-V-3100-004-2-201-02_5 5.1 W H H 2-Feb-13 7:00AM 2-Feb-13
Check Pre-Pouring For Cast-in- Situ base concrete for B70-PR-18 F12/Grid-6&7
Crossing 29, Section
4478 RFI-5858-QCN-2-2154 RFI-5858-QCN-2-2154 CONCRETE foundation.Check Pre-Pouring For Cast-in- Situ Pedestal concrete for B70-PR-18 APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 2-Feb-13 1:00 PM 2-Feb-13
4 Raslaffan
F8/Grid-12 foundation.
Check Concrete Pouring For Cast-in- Situ base concrete for B70-PR-18 F12/Grid-6&7
Crossing #29,
4479 RFI-5858-QCN-2-2155 RFI-5858-QCN-2-2155 CONCRETE foundation.Check Concrete Pouring For Cast-in- Situ Pedestal concrete for B70-PR-18 APPROVED
Section 4 Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 2-Feb-13 1:00 PM 3-Feb-13
F8/Grid-12 foundation.
4480 RFI-5858-QCN-2-2156 RFI-5858-QCN-2-2156 CONCRETE Check Protective Coating 1st & 2nd coat For B70-PS-13- SLD044 base and pedestals. APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 2-Feb-13 6:30 AM 2-Feb-13
Pre-Pouring For Precast Removable Panel Check Formworks, imbedded items of Precast
4481 RFI-5858-QCN-2-2157 RFI-5858-QCN-2-2157 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 2-Feb-13 8:30 AM 2-Feb-13
Culvert BZRC-010 = 2 nos removable panel prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4483 RFI-5858-QCN-2-2159 RFI-5858-QCN-2-2159 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Feb-13 7:30 AM 2-Feb-13
12th panel ( 15 meters ) Raslaffan
4484 RFI-5858-QCN-2-2160 RFI-5858-QCN-2-2160 CONCRETE Check Polyethylene & Hardboard Installation For B70 - PS -13- SLD044 APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 2-Feb-13 1:30 AM 2-Feb-13
4485 Concrete Placement Check Concrete pouring of Precast Culvert BZRC-010 = 2 nos
RFI-5858-QCN-2-2161 RFI-5858-QCN-2-2161 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 R H H 2-Feb-13 9:00 AM 2-Feb-13
removable panel
Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items BZRC-09A ( Gate #
4486 RFI-5858-QCN-2-2162 RFI-5858-QCN-2-2162 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 2-Feb-13 1:20 PM 2-Feb-13
and cleaning of Culvert Base of BZRC-09A ( End Wall West Side ) prior concreting. 7 ) Raslaffan
4487 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A BZRC-09A ( Gate #
RFI-5858-QCN-2-2163 RFI-5858-QCN-2-2163 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Feb-13 1:30 PM 2-Feb-13
( End Wall West Side ) 7 ) Raslaffan
4489 4.4.1 Check compressive Strength @ 28 days for grout (Loop foundations D110-B70-PR-
RFI-5858-QCN-2-2165 RFI-5858-QCN-2-2165 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 3-Feb-13 11:00 AM 3-Feb-13
02,D110-B70-PR-05).
7:00 AM
4490 Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat
RFI-5858-QCN-2-2166 RFI-5858-QCN-2-2166 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.3 S W H 3-Feb-13 to 3-Feb-13
Sleeper Foundations B70 - PS -03 SLD051 & SLD052
7:30 AM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
Retaining Wall
4491 RFI-5858-QCN-2-2167 RFI-5858-QCN-2-2167 CONCRETE cleaning of cast-in- Situ Pipe Stopper Base B70-PS-22: SLD22, SLD043 and SLD058 = 3 CANCELLED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 3-Feb-13 2:00 PM 3-Feb-13
Raslaffan
nos prior concreting.
4492 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Base B70-PS-
RFI-5858-QCN-2-2168 RFI-5858-QCN-2-2168 CONCRETE CANCELLED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 3-Feb-13 2:10 PM 3-Feb-13
22: SLD022, SLD043 and SLD058 = 3 nos.
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, cleaning and BZRC-09A ( Gate 7 )
4493 RFI-5858-QCN-2-2169 RFI-5858-QCN-2-2169 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b..d.e W W H 3-Feb-13 7:30 AM 3-Feb-13
construction joints of Cast-in- Situ wall BZRC-09A ( 9 meters west side ) prior shuttering. Raslaffan
4494 Concrete Placement Check Concrete pouring of Precast Pipe Sleeper Pedestal B70-PS-
RFI-5858-QCN-2-2170 RFI-5858-QCN-2-2170 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Feb-13 5:00 PM 2-Feb-13
29-F2 = 1 no. and B70-PS-32-F1 = 9 nos
9.1. Check protective coating first coat of Precast Pipe Sleeper B70-PS-17: SLD003 to
4495 RFI-5858-QCN-2-2171 RFI-5858-QCN-2-2171 CONCRETE SLD061 = 40 nos except SLD021, SLD036 SLD045, SLD046, SLD047, SLD049 to APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 3-Feb-13 8:30 AM 3-Feb-13
SLD050b prior second coat
9.1. Check protective coating second coat of Precast Pipe Sleeper B70-PS-17: SLD003
4496 RFI-5858-QCN-2-2172 RFI-5858-QCN-2-2172 CONCRETE to SLD061 = 40 nos except SLD021, SLD036 SLD045, SLD046, SLD047, SLD049 to APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 3-Feb-13 3:30 PM 3-Feb-13
SLD050
4497 Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
RFI-5858-QCN-2-2173 RFI-5858-QCN-2-2173 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 4-Feb-13 8:30 AM 2-Feb-13
cleaning of cast-in- Situ Pipe Stopper Base B70-PS-22: SLD058 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Base B70-PS-
4498 RFI-5858-QCN-2-2174 RFI-5858-QCN-2-2174 CONCRETE
22: SLD058
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 4-Feb-13 9:00 Am 5-Feb-13
4499 Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2175 RFI-5858-QCN-2-2175 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 4-Feb-13 4:00 PM 4-Feb-13
WEST SIDE 1st BASE&WALL (BOTH SIDE&END WALL) -- 14 M PORTION CULVERT
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, cleaning and Crossing #44
4501 RFI-5858-QCN-2-2177 RFI-5858-QCN-2-2177 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b.d.e W W H 4-Feb-13 9:30 AM 4-Feb-13
construction joints of Cast-in- Situ Pipe Track Pedestal D110-B70-PR-25: F1 Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, Embedded Crossing # 44
4502 RFI-5858-QCN-2-2178 RFI-5858-QCN-2-2178 CONCRETE
Items and cleaning of Pipe Track Pedestal D110-B70-PR-25 : F1 prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 4-Feb-13 1:30 PM 4-Feb-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Crossing #44
4503 RFI-5858-QCN-2-2179 RFI-5858-QCN-2-2179 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 4-Feb-13 2:00 PM 4-Feb-13
B70-PR-25: F1 Raslaffan
Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items BZRC-09A ( Gate #
4504 RFI-5858-QCN-2-2180 RFI-5858-QCN-2-2180 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 4-Feb-13 3:00 PM 4-Feb-13
and cleaning of Culvert Base of BZRC-09A ( Third Portion 7.60 meters ) prior concreting. 7 ) Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A BZRC-09A ( Gate #
4505 RFI-5858-QCN-2-2181 RFI-5858-QCN-2-2181 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 4-Feb-13 3:30 PM 4-Feb-13
( Third Portion 7.60 meters ) 7 ) Raslaffan
4506 RFI-5858-QCN-2-2182 RFI-5858-QCN-2-2182 CONCRETE Check Surface preparation of Pipe Sleeper Foundation B70-PS--07 SLD083 APPROVED Section 2 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Feb-13 8:30 AM 4-Feb-13
10:30 AM
Check Surface Below ground Protective Coating - First coat & Second coat B70 - PS -07
4507 RFI-5858-QCN-2-2183 RFI-5858-QCN-2-2183 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_5 9.2 a S W H 4-Feb-13 to 4-Feb-13
SLD083
4:30 PM
4508 Check Concrete Surface upon Form Removal For Cast-in- Situ pedestals for B70-PR-18
RFI-5858-QCN-2-2184 RFI-5858-QCN-2-2184 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 5-Feb-13 6:30 AM 5-Feb-13
F8/Grid-12 Foundation
4509 RFI-5858-QCN-2-2185 RFI-5858-QCN-2-2185 CONCRETE Check Surface Preparation Prior to Coating For B70-PR-18 F8/Grid-12 APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Feb-13 9:30 AM 5-Feb-13
4510 RFI-5858-QCN-2-2186 RFI-5858-QCN-2-2186 CONCRETE Check Protective Coating 1st & 2nd coat For B70-PR-18 F8/Grid-12 base and pedestals. APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 5-Feb-13 14:30 PM 5-Feb-13
4513 Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 01 Pipe Rack
RFI-5858-QCN-2-2189 RFI-5858-QCN-2-2189 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-08_3 4.2 S W H 5-Feb-13 7:00 AM 5-Feb-13
Foundation 15(F14),14(F13),13(F12),12(F10),11(F11)10(F10),9(F9),8(F8),7(F7)&6(F6)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 01 Pipe Rack
4514 RFI-5858-QCN-2-2190 RFI-5858-QCN-2-2190 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-08_3 4.2 S W H 5-Feb-13 7:20 AM 5-Feb-13
Foundation 9(F9),8(F8),7(F7)&6(F6)
4515 Check Above Ground Protective Coating 1st coat For B70-PR-12 SLD001 to SLD011 &
RFI-5858-QCN-2-2191 RFI-5858-QCN-2-2191 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 5-Feb-13 6:30 AM 5-Feb-13
PR-13 SLD045 to 052
Check Above Ground Protective Coating 2nd coat For B70-PR-12 SLD001 to SLD011 &
4516 RFI-5858-QCN-2-2192 RFI-5858-QCN-2-2192 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 5-Feb-13 6:30 AM 5-Feb-13
PR-13 SLD045 to 052
4517 6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 12th Retaining Wall
RFI-5858-QCN-2-2193 RFI-5858-QCN-2-2193 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 6.3 S W H 5-Feb-13 1:30 PM 5-Feb-13
panel wall. Raslaffan
4518 Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundations B70
RFI-5858-QCN-2-2194 RFI-5858-QCN-2-2194 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_5 9.2 S W H 5-Feb-13 7:00 AM 5-Feb-13
- PS -07 SLD082,SLD083,SLD084,SLD085 & B70 - PS -06 SLD032,SLD033,SLD034
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 9th panel prior Retaining Wall
4519 RFI-5858-QCN-2-2195 RFI-5858-QCN-2-2195 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 5-Feb-13 9:30 AM 5-Feb-13
second coating. Raslaffan
Pre-Pouring For Precast Culvert Cover Type B Check Formworks, reinforcement and
4521 RFI-5858-QCN-2-2197 RFI-5858-QCN-2-2197 CONCRETE
cleaning of Precast Culvert Cover Type B base of BZRC-010 = 2 nos. prior cocreting.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 5-Feb-13 2:00 PM 5-Feb-13
4522 Concrete Placement Check Concrete pouring of Precast Culvert Cover Type B Base 0f
RFI-5858-QCN-2-2198 RFI-5858-QCN-2-2198 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 5-Feb-13 3:00 PM 5-Feb-13
BZRC-010 = 2 nos.
Concrete Placement Check Concrete pouring of Cast-in-situ Pipe Stopper Base B70-PS-
4526 RFI-5858-QCN-2-2202 RFI-5858-QCN-2-2202 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 5-Feb-13 1:30 PM 5-Feb-13
22: SLD022, SLD043 = 2 nos
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM WEST SIDE 1st MASHRAB
4527 RFI-5858-QCN-2-2203 RFI-5858-QCN-2-2203 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 6-Feb-13 7:00 AM 6-Feb-13
BASE & WALL -- 14 M END PORTION CULVERT
7:00 AM
Check Surface Below ground Protective Coating - First coat & Second coatMASHRAB MASHRAB
4528 RFI-5858-QCN-2-2204 RFI-5858-QCN-2-2204 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 6-Feb-13 TO 6-Feb-13
CULVERT BZRC 003 FROM WEST SIDE 1st BASE & WALL -- 14 M END PORTION CULVERT
10:00 AM
Check Concrete Curing MASHRAB CULVERT BZRC 003 FROM WEST SIDE 1st BASE MASHRAB
4530 RFI-5858-QCN-2-2206 RFI-5858-QCN-2-2206 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 6-Feb-13 10:30 AM 6-Feb-13
& WALL -- 14 M END PORTION & Type-B cover base & wall CULVERT
4531 Check Surface Preparation & Sealent Application MASHRAB CULVERT BZRC 003 MASHRAB
RFI-5858-QCN-2-2207 RFI-5858-QCN-2-2207 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a,b S W H 6-Feb-13 7:30 AM 6-Feb-13
FROM WEST SIDE 1st BASE & WALL -- 14 M END PORTION CULVERT
Check Polythylene & Hardboard Installation of Retaining Wall N- S 9th panel prior Retaining Wall
4532 RFI-5858-QCN-2-2208 RFI-5858-QCN-2-2208 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 6-Feb-13 1:30 PM 6-Feb-13
backfilling. Raslaffan
4533 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- Retaining Wall
RFI-5858-QCN-2-2209 RFI-5858-QCN-2-2209 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 6-Feb-13 8:30 AM 6-Feb-13
25; F1 Raslaffan
Section 4 PR-18
4534 RFI-5858-QCN-2-2210 RFI-5858-QCN-2-2210 CONCRETE Check Polyethylene & Hardboard Installation For B70-PR-18 F8/Grid-12 APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 6-Feb-13 9:00 AM 6-Feb-13
Raslaffan
4536 Check Reinforcement & Cleaning Prior to form work closure for the pedestal of B70-PR- Section 4 PR-18
RFI-5858-QCN-2-2212 RFI-5858-QCN-2-2212 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 6-Feb-13 6:30 AM 10-Feb-13
18 F12/Grid-6&7 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
4537 RFI-5858-QCN-2-2213 RFI-5858-QCN-2-2213 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 6-Feb-13 11:00 AM 6-Feb-13
01-5(F5),4(F4),3(F3),2(F2),1(F1).& D210-B70- PR- 44-8 (F2) & 10(F3).
4538 ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, cleaning and BZRC-09A ( Gate 7 )
RFI-5858-QCN-2-2214 RFI-5858-QCN-2-2214 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b.d.e W W H 6-Feb-13 7:00 AM 6-Feb-13
construction joints of Cast-in- Situ wall BZRC-09A ( 9 meters South side ) prior shuttering. Raslaffan
Crossing #29,
4539 RFI-5858-QCN-2-2215 RFI-5858-QCN-2-2215 CONCRETE Check Concrete Curing For Cast-in- Situ Foundation Pedestal B70-PR-18 F8/Grid-12 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 6-Feb-13 7:00 AM 6-Feb-13
section 4 Raslaffan
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)D110
B70 - PS -01 Stopper Foundation Footing SLD 012,g D110 B70 - PR -70 Pipe Rack
4540 Foundation Footing 1(F1),2 (F2) - 2no.s,Pedestals for F5 Gid 15, F6 Gid 14, F7 Gid 14,
RFI-5858-QCN-2-2216 RFI-5858-QCN-2-2216 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 W W H 7-Feb-13 2.30 PM 7-Feb-13
F7, Gid 13 and F9 Gid 11 for B70-PR - 18, & Cast-in- Situ Retaining wall N- S ( Base 15
meters ) 7th panel and 2nd panel wall 15 meters.HAMLA CULVERT BZRC 004 FROM
EAST SIDE 1ST BASE WALL (END WALL & BOTH SIDE WALLS --1.9M PORTION)
4541 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2217 RFI-5858-QCN-2-2217 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 7-Feb-13 8:30 AM 7-Feb-13
reataining wall N- S 9th panel Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4542 RFI-5858-QCN-2-2218 RFI-5858-QCN-2-2218 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 7-Feb-13 7:30 AM 7-Feb-13
10th panel prior application of curing compound first coat. Raslaffan
4543 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 10th panel prior Retaining Wall
RFI-5858-QCN-2-2219 RFI-5858-QCN-2-2219 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 7-Feb-13 9:30 AM 7-Feb-13
second coating. Raslaffan
Retaining Wall
4544 RFI-5858-QCN-2-2220 RFI-5858-QCN-2-2220 CONCRETE 9.1. Check protective coating second coat of Cast-in situ retaining wall N- S 10th panel. APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 7-Feb-13 2:30 PM 7-Feb-13
4545 Check Polythylene & Hardboard Installation of Retaining Wall N- S 10th panel prior Retaining Wall
RFI-5858-QCN-2-2221 RFI-5858-QCN-2-2221 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 7-Feb-13 3:30 PM 7-Feb-13
backfilling. Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4546 RFI-5858-QCN-2-2222 RFI-5858-QCN-2-2222 CONCRETE
11th panel wall ( 15 meters ) and 12th panel top portion prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b. W W H 7-Feb-13 1:20 PM 7-Feb-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4547 RFI-5858-QCN-2-2223 RFI-5858-QCN-2-2223 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 7-Feb-13 1:30 PM 11-Feb-13
11th panel ( 15 meters ) and 12th panel top portion. Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, cleaning and BZRC-09A ( Gate 7 )
4548 RFI-5858-QCN-2-2224 RFI-5858-QCN-2-2224 CONCRETE
construction joints of Cast-in- Situ wall BZRC-09A ( 7.60 meters ) prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.1.b.d.e W W H 7-Feb-13 1:30 PM 7-Feb-13
Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items
BZRC-09A ( Gate #
4549 RFI-5858-QCN-2-2225 RFI-5858-QCN-2-2225 CONCRETE and cleaning of Culvert wall of BZRC-09A ( 9 meters ) and Pipe Sleeper Pedestal = 2 nos APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 7-Feb-13 2:30 PM 7-Feb-13
7 ) Raslaffan
prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A BZRC-09A ( Gate #
4550 RFI-5858-QCN-2-2226 RFI-5858-QCN-2-2226 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 7-Feb-13 3:00 PM 11-Feb-13
( 9.0 meters ) and Pipe Sleeper Pedestal = 2 nos 7 ) Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement, construction/expansion joint and
BZRC-09A ( Gate 7 )
4551 RFI-5858-QCN-2-2227 RFI-5858-QCN-2-2227 CONCRETE cleaning of Cast-in- Situ Pipe Stopper B70-PS-22: SLD022, SLD043 and SLD058 = 3 nos APPROVED B-V-3100-004-2-201-02_5 4.1.b..d.e W W H 7-Feb-13 3:00 PM 7-Feb-13
Raslaffan
prior shuttering.
Check Laying of Asphalt Base Course LAFAN CULVERT BZRC006 EAST SIDE
4552 RFI-5858-QCN-2-2228 RFI-5858-QCN-2-2228 CONCRETE APPROVED LAFAN CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 7-Feb-13 7:30 AM 7-Feb-13
PORTION
Check Pre-Pouring For Cast-in- Situ Pedestal concrete for B70-PR-18 F12/Grid-6&7 Crossing 29, Section
4553 RFI-5858-QCN-2-2229 RFI-5858-QCN-2-2229 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 7-Feb-13 1:00 PM 7-Feb-13
foundation. 4 Raslaffan
4556 Check Laying of Asphalt Binder Course & Surface Course LAFAN CULVERT BZRC006
RFI-5858-QCN-2-2232 RFI-5858-QCN-2-2232 CONCRETE CANCELLED LAFAN CULVERT B-V-3100-004-2-201-02_5 4.2.2 S W H 9-Feb-13 7:30 AM 9-Feb-13
EAST SIDE PORTION
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
4557 RFI-5858-QCN-2-2233 RFI-5858-QCN-2-2233 CONCRETE cleaning of cast-in- Situ Pipe Stopper Pedestal B70-PS-22: SLD22, SLD043 and SLD058 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Feb-13 7:30 AM 9-Feb-13
= 3 nos prior concreting.
4558 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Pedestal B70-
RFI-5858-QCN-2-2234 RFI-5858-QCN-2-2234 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 9-Feb-13 8:00 AM 11-Feb-13
PS-22: SLD022, SLD043 and SLD058 = 3 nos.
Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat 7:30 AM
4559 RFI-5858-QCN-2-2235 RFI-5858-QCN-2-2235 CONCRETE Sleeper Foundations B70 - PS -07 SLD082,SLD084,SLD085 & B70 - PS -06 APPROVED SECTION 2 B-V-3100-004-2-201-02_5 9.3 S W H 9-Feb-13 TO 9-Feb-13
SLD032,SLD033,SLD034 2:00 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Crossing #29,
4560 RFI-5858-QCN-2-2236 RFI-5858-QCN-2-2236 CONCRETE Check Concrete Pouring For Cast-in- Situ Pedestal concrete for B70-PR-18 F12/Grid-6&7. APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Feb-13 7:30 AM 10-Feb-13
Section 4 Raslaffan
4561 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-22 : SLD034
RFI-5858-QCN-2-2237 RFI-5858-QCN-2-2237 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 9-Feb-13 9:00 AM 9-Feb-13
and SLD035, SLD037 to SLD042 and SLD051 to SLD053 = 11 nos prior backfilling.
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 12th Retaining Wall
4562 RFI-5858-QCN-2-2238 RFI-5858-QCN-2-2238 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 9-Feb-13 9:30 AM 9-Feb-13
panel wall. Raslaffan
4563 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
RFI-5858-QCN-2-2239 RFI-5858-QCN-2-2239 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 9-Feb-13 1:30 PM 11-Feb-13
Cast-in- Situ Retaining Wall 13th panel ( Wall ) prior shuttering. ) Raslaffan
4564 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert Wall BZRC-09A Retaining Wall
RFI-5858-QCN-2-2240 RFI-5858-QCN-2-2240 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 9-Feb-13 9:00 AM 9-Feb-13
( Second Portion ) Raslaffan
4565 RFI-5858-QCN-2-2241 RFI-5858-QCN-2-2241 CONCRETE Check Erection of Culvert Precast Cover Cluvert BZRC 003 APPROVED Mashrab Culvert B-V-3100-004-2-201-02_5 8.2 S W H 9-Feb-13 7:00 AM 9-Feb-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-22: Retaining Wall
4567 RFI-5858-QCN-2-2243 RFI-5858-QCN-2-2243 CONCRETE
SLD022, SLD053 and SLD058 = 3 nos
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 10-Feb-13 3:30 PM 10-Feb-13
4568 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2244 RFI-5858-QCN-2-2244 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 10-Feb-13 8:30 AM 10-Feb-13
reataining wall N- S 10th panel Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
4569 RFI-5858-QCN-2-2245 RFI-5858-QCN-2-2245 CONCRETE
13th panel wall ( 10.345 meters ) and 11th panel top portion prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b. W W H 10-Feb-13 2:30 PM 10-Feb-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4570 RFI-5858-QCN-2-2246 RFI-5858-QCN-2-2246 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Feb-13 3:00 PM 10-Feb-13
13th panel ( 10.345 meters ) and 11th panel top portion. Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and Cleaning Crossing 44
4571 RFI-5858-QCN-2-2247 RFI-5858-QCN-2-2247 CONCRETE
of Cast-in- Situ Pipe Track Base D110-B70-PR-25; F2 and F3 prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 10-Feb-13 8:30 AM 10-Feb-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Base D110-B70- Crossing 44
4572 RFI-5858-QCN-2-2248 RFI-5858-QCN-2-2248 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Feb-13 9:00 AM 10-Feb-13
PR-25: F2 and F3 Raslaffan
9.1. Check surface preparation of Cast-in- Situ Pipe Stopper D110-B70-PR-25: F1 PR-25, Crossing #
4573 RFI-5858-QCN-2-2249 RFI-5858-QCN-2-2249 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 10-Feb-13 7:30 AM 10-Feb-13
application of curing compound first coat. 44 Raslaffan
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-PR-25: F1 prior PR-25: Crossing #
4574 RFI-5858-QCN-2-2250 RFI-5858-QCN-2-2250 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 10-Feb-13 10:00 AM 10-Feb-13
second coating. 44 Raslaffan
Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items
BZRC-09A ( Gate #
4576 RFI-5858-QCN-2-2252 RFI-5858-QCN-2-2252 CONCRETE and cleaning of Culvert wall of BZRC-09A ( 7.60 meters ) third portion and Pipe Sleeper APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 10-Feb-13 3:30 PM 13-Feb-13
7 ) Raslaffan
Pedestal = 1 no prior concreting.
4577 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A BZRC-09A ( Gate #
RFI-5858-QCN-2-2253 RFI-5858-QCN-2-2253 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Feb-13 4:00 PM 10-Feb-13
( 7.60 meters ) third portion and Pipe Sleeper Pedestal = 1 no 7 ) Raslaffan
4579 Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM WEST SIDE 3rd BASE - Section 3 Hamla
RFI-5858-QCN-2-2255 RFI-5858-QCN-2-2255 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Feb-13 3:40 PM 10-Feb-13
(7.5 M PORTION) & 1nd BASE (2.8 M PORTION) Culvert
9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-09A North and South
4580 RFI-5858-QCN-2-2256 RFI-5858-QCN-2-2256 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Feb-13 10:30 AM 10-Feb-13
Outside application of curing compound first coat.
4581 9.1. Check protective coating first coat of Cast-in situ Culvert BZRC-09A ( N and S )
RFI-5858-QCN-2-2257 RFI-5858-QCN-2-2257 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Feb-13 1:30 PM 10-Feb-13
outside prior second coating.
4582 9.1. Check protective coating second coat of Cast-in site Culvert BZRC-09A ( N and S )
RFI-5858-QCN-2-2258 RFI-5858-QCN-2-2258 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 10-Feb-13 4:00 PM 10-Feb-13
outside
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, cleaning and BZRC-09A ( Gate 7 )
4583 RFI-5858-QCN-2-2259 RFI-5858-QCN-2-2259 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b.d.e W W H 10-Feb-13 1:30 PM 10-Feb-13
construction joints of Cast-in- Situ wall BZRC-09A End Wall west side prior shuttering. Raslaffan
4584 Check Laying of Asphalt Binder Course & Surface Course LAFAN CULVERT BZRC006
RFI-5858-QCN-2-2260 RFI-5858-QCN-2-2260 CONCRETE CANCELLED LAFAN CULVERT B-V-3100-004-2-201-03_5 4.22 S W H 10-Feb-13 7:30 AM 10-Feb-13
EAST SIDE PORTION
4586 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-22;
RFI-5858-QCN-2-2262 RFI-5858-QCN-2-2262 CONCRETE APPROVED Section # 6 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Feb-13 8:30 AM 11-Feb-13
SLD022, SLD043 and SLD058 = 3 nos
4587 6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 11th Retaining Wall
RFI-5858-QCN-2-2263 RFI-5858-QCN-2-2263 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 11-Feb-13 3:30 PM 11-Feb-13
panel wall. Raslaffan
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-25:
4588 RFI-5858-QCN-2-2264 RFI-5858-QCN-2-2264 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 11-Feb-13 10:00 AM 11-Feb-13
F1
4589 ITP item 4.1 Pre - Pouring Check Reinforcement, cleaning and construction joints of Cast- PR-25 ( Crossing
RFI-5858-QCN-2-2265 RFI-5858-QCN-2-2265 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b.d.e W W H 11-Feb-13 2:30 PM 11-Feb-13
in- Situ Pipe Track peofstal D110-B70-PR-25: F2 and F3 prior shuttering. 44 ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert Wall BZRC-09A Retaining Wall
4590 RFI-5858-QCN-2-2266 RFI-5858-QCN-2-2266 CONCRETE
( Third Portion )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 11-Feb-13 3:30 PM 11-Feb-13
4591 Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
RFI-5858-QCN-2-2267 RFI-5858-QCN-2-2267 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 12-Feb-13 9:00 AM 12-Feb-13
WEST SIDE 3rd BASE WALL(BOTH SIDES) 7.5 M PORTION & 2 SLEEPER
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM EAST
4592 RFI-5858-QCN-2-2268 RFI-5858-QCN-2-2268 CONCRETE
SIDE 1ST & 3rd BASE (7.5M & 2.8M PORTION)
APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 12-Feb-13 10:00 AM 12-Feb-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-22 : SLD054
4593 RFI-5858-QCN-2-2269 RFI-5858-QCN-2-2269 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Feb-13 9:00 AM 13-Feb-13
to SLD064 = 10 nos prior backfilling.
9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-22: SLD022,
4594 RFI-5858-QCN-2-2270 RFI-5858-QCN-2-2270 CONCRETE
SLD043 and SLD058 = 3 nos application of curing compound first coat.
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Feb-13 7:30 AM 13-Feb-13
Check Concrete Surface upon Form Removal For Cast-in- Situ pedestals for B70-PR-18-
4595 RFI-5858-QCN-2-2271 RFI-5858-QCN-2-2271 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-Feb-13 6:30 PM 13-Feb-13
F12/Grid-6&7
Check Surface Preparation Prior to Coating For Cast-in- Situ foundation base and Crossing #29,
4596 RFI-5858-QCN-2-2272 RFI-5858-QCN-2-2272 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 13-Feb-13 10:00 AM 13-Feb-13
pedestals for B70-PR-18-F12/Grid-6&7 Section 4 Raslaffan
Check Protective Coating 1st & 2nd coat For B70-PR-18-F12/Grid-6&7 base and
4597 RFI-5858-QCN-2-2273 RFI-5858-QCN-2-2273 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.1/9.2.a S W H 13-Feb-13 15:30 PM 13-Feb-13
pedestals.
9.1. Check protective coating first coat of Cast-in situ Pipe Stopper B70-PS-22: SLD022,
4598 RFI-5858-QCN-2-2274 RFI-5858-QCN-2-2274 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Feb-13 8:00 AM 13-Feb-13
SLD043 and SLD058 = 3 nos prior second coat.
9.1. Check protective coating second coat of Cast-in site Pipe Stopper B70-PS-22:
4599 RFI-5858-QCN-2-2275 RFI-5858-QCN-2-2275 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Feb-13 10:00 AM 13-Feb-13
SLD022, SLD043 and SLD058 = 3 nos
4600 Check Polythylene & Hardboard Installation of Precast Pipe Stopper B70-PS-22: SLD022,
RFI-5858-QCN-2-2276 RFI-5858-QCN-2-2276 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Feb-13 2:30 PM 13-Feb-13
SLD043 and SLD058 = 3 nos prior backfilling.
9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-09A North and South
4601 RFI-5858-QCN-2-2277 RFI-5858-QCN-2-2277 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Feb-13 7:30 AM 12-Feb-13
Outside ( Third Poertion ) application of curing compound first coat.
4602 9.1. Check protective coating first coat of Cast-in situ Culvert BZRC-09A ( N and S third
RFI-5858-QCN-2-2278 RFI-5858-QCN-2-2278 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Feb-13 9:30 AM 12-Feb-13
portion ) outside prior second coating.
9.1. Check protective coating second coat of Cast-in site Culvert BZRC-09A ( N and S
4603 RFI-5858-QCN-2-2279 RFI-5858-QCN-2-2279 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Feb-13 2:00 PM 12-Feb-13
third portion ) outside
4604 ITP item 4.1 Pre - Pouring Check Reinforcement, construction/expansion joint and
RFI-5858-QCN-2-2280 RFI-5858-QCN-2-2280 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.b..d.e W W H 13-Feb-13 8:00 AM 14-Feb-13
cleaning of Precast Culvert Cover Type B BZRC-010 = 2 nos prior shuttering.
4.4.1 Check compressive Strength @ 28 days for grout (Loop foundations D210-B70-PR-
4606 RFI-5858-QCN-2-2282 RFI-5858-QCN-2-2282 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 12-Feb-13 11:00 AM 12-Feb-13
44 -6(F3),7(F1),9(F4),11(F8),12(F9A,F9B),13(F11), & 14(F10)
4607 Check Surface preparation HAMLA CULVERT BZRC 004 FROM WEST SIDE 1st & 3rd
RFI-5858-QCN-2-2283 RFI-5858-QCN-2-2283 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 12-Feb-13 3:00 PM 12-Feb-13
BASE (7.5M&2.8M PORTION)
4609 Check Laying of Asphalt Binder Course & Surface Course LAFAN CULVERT BZRC006 LAFFAN CULVERT
RFI-5858-QCN-2-2285 RFI-5858-QCN-2-2285 CONCRETE APPROVED B-V-3100-004-2-201-01_2 5.1 S H H 13-Feb-13 10:00 AM 13-Feb-13
EAST SIDE PORTION AREA RASLAFFAN
4610 Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks of Retaining Wall Retaining Wall
RFI-5858-QCN-2-2286 RFI-5858-QCN-2-2286 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 14-Feb-13 2:30 PM 14-Feb-13
13th panel wall ( 10.345 meters ) top portion prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4611 RFI-5858-QCN-2-2287 RFI-5858-QCN-2-2287 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 14-Feb-13 3:00 PM 14-Feb-13
13th panel ( 10.345 meters ) top portion. Raslaffan
4612 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and Cleaning Crossing 44
RFI-5858-QCN-2-2288 RFI-5858-QCN-2-2288 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 14-Feb-13 2:30 PM 14-Feb-13
of Cast-in- Situ Pipe Track Pedestal D110-B70-PR-25; F2 and F3 prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Crossing 44
4613 RFI-5858-QCN-2-2289 RFI-5858-QCN-2-2289 CONCRETE
B70-PR-25: F2 and F3
CANCELLED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 14-Feb-13 3:00 PM 14-Feb-13
4614 Pre-Pouring For Cast-in- Situ Culvert Check Formworks, Reinforcement, Embedded items BZRC-09A ( Gate #
RFI-5858-QCN-2-2290 RFI-5858-QCN-2-2290 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 14-Feb-13 3:30 PM 14-Feb-13
and cleaning of Culvert wall of BZRC-09A end wall prior concreting. 7 ) Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert Base BZRC-09A BZRC-09A ( Gate #
4615 RFI-5858-QCN-2-2291 RFI-5858-QCN-2-2291 CONCRETE
end wall
APPROVED
7 ) Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 14-Feb-13 3:40 PM 14-Feb-13
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of BZRC-09A
4616 RFI-5858-QCN-2-2292 RFI-5858-QCN-2-2292 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 14-Feb-13 8:30 AM 14-Feb-13
Culvert BZRC-9A Raslaffan
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE -
Section 3 Hamla
4618 RFI-5858-QCN-2-2294 RFI-5858-QCN-2-2294 CONCRETE (15 M PORTION) , 3rd BASE WALL BOTH SIDES(7.5 M PORTION) & 2 Nos SLEEPER APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Feb-13 4:40 PM 14-Feb-13
Culvert
(7.5M & 2.8M PORTION)
Section 4 PR-18
4620 RFI-5858-QCN-2-2296 RFI-5858-QCN-2-2296 CONCRETE Check Polyethylene & Hardboard Installation For B70-PR-18 F12/Grid-6&7 APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 14-Feb-13 15:00 PM 14-Feb-13
Raslaffan
4623 Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM WEST
RFI-5858-QCN-2-2299 RFI-5858-QCN-2-2299 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 16-Feb-13 9:00 AM 16-Feb-13
SIDE 3rd BASE WALL ( BOTHSIDE) - 7.5M PORTION
Check Erection of Precast sleeper Foundations B70-PS-06 SLD032, SLD033 & SLD34,
4624 RFI-5858-QCN-2-2300 RFI-5858-QCN-2-2300 CONCRETE APPROVED Section 2 & 3 B-V-3100-004-2-201-02_5 8.2 S W H 16-Feb-13 8:30 AM 16-Feb-13
B70-PS-07 SLD082, SLD084 & SLD085, B70-PS-07- SLD017, SLD018, & SLD019
4625 Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-49 prior
RFI-5858-QCN-2-2301 RFI-5858-QCN-2-2301 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 16-Feb-13 8:30 AM 16-Feb-13
backfilling.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Wall ) Retaining Wall
4626 RFI-5858-QCN-2-2302 RFI-5858-QCN-2-2302 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Feb-13 1:20 PM 16-Feb-13
13th panel ( 10.345 meters ) top portion. Raslaffan
4627 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks of Retaining Wall ( Ditch ) Retaining Wall
RFI-5858-QCN-2-2303 RFI-5858-QCN-2-2303 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b. W W H 16-Feb-13 1:30 PM 16-Feb-13
2nd and 4th panel prior concreting. Raslaffan
4628 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
RFI-5858-QCN-2-2304 RFI-5858-QCN-2-2304 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Feb-13 2:00 PM 16-Feb-13
2nd and 4th panel. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface preparation HAMLA CULVERT BZRC 004 FROM WEST SIDE 3rd BASE
4629 RFI-5858-QCN-2-2305 RFI-5858-QCN-2-2305 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 16-Feb-13 4:30 PM 16-Feb-13
WALL (BOTH SIDE) - 7.5M PORTION
4630 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and Cleaning Crossing 44
RFI-5858-QCN-2-2306 RFI-5858-QCN-2-2306 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 16-Feb-13 1:30 PM 16-Feb-13
of Cast-in- Situ Pipe Track Pedestal D110-B70-PR-25; F2 and F3 prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Crossing 44
4631 RFI-5858-QCN-2-2307 RFI-5858-QCN-2-2307 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Feb-13 2:40 PM 16-Feb-13
B70-PR-25: F2 and F3 Raslaffan
4632 9.1 Check surface preparation of cast-in-situ retaining wall surface below grade N-S 11th Retaining Wall
RFI-5858-QCN-2-2308 RFI-5858-QCN-2-2308 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Feb-13 8:00 AM 16-Feb-13
panel prior application of curing compound first cost. Raslaffan
4633 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 11th panel prior Retaining Wall
RFI-5858-QCN-2-2309 RFI-5858-QCN-2-2309 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Feb-13 9:30 AM 16-Feb-13
second coating. Raslaffan
Retaining Wall
4634 RFI-5858-QCN-2-2310 RFI-5858-QCN-2-2310 CONCRETE 9.1 Check protective coating second coat of cast-in situ retaining wall N-S 11th Panel APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 16-Feb-13 2:30 PM 16-Feb-13
Raslaffan
4635 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Culvert Cover
RFI-5858-QCN-2-2311 RFI-5858-QCN-2-2311 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 16-Feb-13 7:00 AM 16-Feb-13
Type B Wall BZRC-010 = 2 nos and prior concreting.
Concrete Placement Check Concrete pouring of Precast Culvert Cover Type B Wall
4636 RFI-5858-QCN-2-2312 RFI-5858-QCN-2-2312 CONCRETE
BZRC-010 = 2 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Feb-13 7:30 AM 16-Feb-13
4637 RFI-5858-QCN-2-2313 RFI-5858-QCN-2-2313 CONCRETE Check Final Visual Inspection B70-PS-16: SLD001 to SLD0063 = 63 nos APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 10.0 S W H 16-Feb-13 1:30 PM 16-Feb-13
Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
4638 RFI-5858-QCN-2-2314 RFI-5858-QCN-2-2314 CONCRETE
WEST SIDE 2nd BASE WALL (BOTH SIDES) 15 M PORTION & 2 SLEEPER
APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 16-Feb-13 3:30 PM 16-Feb-13
4642 RFI-5858-QCN-2-2318 RFI-5858-QCN-2-2318 CONCRETE Check Erection of Precast Pipe Track D110-B70-PR-49 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Feb-13 8:00 AM 17-Feb-13
Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-49 prior
4643 RFI-5858-QCN-2-2319 RFI-5858-QCN-2-2319 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Feb-13 8:00 AM 17-Feb-13
backfilling.
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 13th Retaining Wall
4644 RFI-5858-QCN-2-2320 RFI-5858-QCN-2-2320 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 17-Feb-13 1:30 PM 17-Feb-13
panel wall and Concrete Ditch 2nd and 4th panel. Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
4645 RFI-5858-QCN-2-2321 RFI-5858-QCN-2-2321 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 8:00 AM 17-Feb-13
12th panel prior application of curing compound first coat. Raslaffan
4646 9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 12th panel prior Retaining Wall
RFI-5858-QCN-2-2322 RFI-5858-QCN-2-2322 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 9:30 AM 17-Feb-13
second coating. Raslaffan
Retaining Wall
4647 RFI-5858-QCN-2-2323 RFI-5858-QCN-2-2323 CONCRETE 9.1. Check protective coating second coat of Cast-in situ retaining wall N- S 12th panel. APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 2:30 PM 17-Feb-13
Raslaffan
4648 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2324 RFI-5858-QCN-2-2324 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 17-Feb-13 9:30 AM 17-Feb-13
reataining wall N- S 11th and 12th panel Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- Retaining Wall
4649 RFI-5858-QCN-2-2325 RFI-5858-QCN-2-2325 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 17-Feb-13 1:30 PM 17-Feb-13
25: F2 and F3 Raslaffan
4650 Check Concrete CuringHAMLA CULVERT BZRC 004 FROM WEST SIDE 3rd BASE
RFI-5858-QCN-2-2326 RFI-5858-QCN-2-2326 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 17-Feb-13 2:00 PM 17-Feb-13
WALL BOTH SIDE - 7.5M PORTION & SLEEPERS- 2 No
Check surface Below ground Protective Coating - First coat & seconed coat HAMLA 1:00 PM
4651 RFI-5858-QCN-2-2327 RFI-5858-QCN-2-2327 CONCRETE CLUVERT BZRC 004 FROM WEST SIDE 3rd BASE WALL 7.5M PORTION & 2 APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2.1 S W H 17-Feb-13 TO 17-Feb-13
SLEEPER 4:30 PM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-09A End
4652 RFI-5858-QCN-2-2328 RFI-5858-QCN-2-2328 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Feb-13 7:00 AM 17-Feb-13
Wall
4653 9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-09A ( End Wall ) application
RFI-5858-QCN-2-2329 RFI-5858-QCN-2-2329 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 8:30 AM 17-Feb-13
of curing compound first coat.
9.1. Check protective coating first coat of Cast-in situ Culvert BZRC-09A ( End Wall ) prior
4654 RFI-5858-QCN-2-2330 RFI-5858-QCN-2-2330 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 1:30 PM 17-Feb-13
second coating.
4655 RFI-5858-QCN-2-2331 RFI-5858-QCN-2-2331 CONCRETE 9.1. Check protective coating second coat of Cast-in site Culvert BZRC-09A ( End Wall ) APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 3:30 PM 17-Feb-13
4656 Check Surface preparation HAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE
RFI-5858-QCN-2-2332 RFI-5858-QCN-2-2332 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 17-Feb-13 4:30 PM 17-Feb-13
(BOTH SIDE) - 15M PORTION & 2 SLEEPER
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM WEST
4657 RFI-5858-QCN-2-2333 RFI-5858-QCN-2-2333 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 17-Feb-13 7:00 PM 17-Feb-13
SIDE 3rd BASE WALL ( BOTHSIDE) - 7.5M PORTION
4658 Check Polythylene & Hardboard Installation of BZRC-09A North and South portion BZRC-09A
RFI-5858-QCN-2-2334 RFI-5858-QCN-2-2334 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Feb-13 8:00 AM 17-Feb-13
outside prior backfilling. Raslaffan
4659 RFI-5858-QCN-2-2335 RFI-5858-QCN-2-2335 CONCRETE 6.3 Check Concrete surface upon form removal of Precast Culvert Wall BZRC-010 = 2 nos APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Feb-13 3:00 PM 17-Feb-13
4660 Check polyethylene & hardboard installation for pipe sleepers B70-PS-13: SLD38,
RFI-5858-QCN-2-2336 RFI-5858-QCN-2-2336 CONCRETE APPROVED Section 4 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 17-Feb-13 7:00 AM 11-Feb-13
SLD43, SLD53, SLD54
Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and Retaining Wall
4661 RFI-5858-QCN-2-2337 RFI-5858-QCN-2-2337 CONCRETE
Cleaning of Retaining Wall ( Ditch ) 3rd and 5th panel prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 18-Feb-13 1:20 PM 18-Feb-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
4662 RFI-5858-QCN-2-2338 RFI-5858-QCN-2-2338 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 18-Feb-13 1:30 PM 18-Feb-13
3rd and 5th panel. Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S 11th and 12th panel Retaining Wall
4663 RFI-5858-QCN-2-2339 RFI-5858-QCN-2-2339 CONCRETE
prior backfilling.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.b,c S W H 18-Feb-13 7:30 AM 18-Feb-13
9.1. Check surface preparation of Cast-in- Situ Pipe Stopper D110-B70-PR-25: F2 and F3 PR-25, Crossing #
4664 RFI-5858-QCN-2-2340 RFI-5858-QCN-2-2340 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 18-Feb-13 1:30 PM 18-Feb-13
application of curing compound first coat. 44 Raslaffan
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-25: F2 Retaining Wall
4665 RFI-5858-QCN-2-2341 RFI-5858-QCN-2-2341 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 18-Feb-13 3:30 PM 18-Feb-13
and F3 Raslaffan
1:00 PM
Check Surface Below ground Protective Coating - First coat & Second coat HAMLA
4666 RFI-5858-QCN-2-2342 RFI-5858-QCN-2-2342 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 18-Feb-13 TO 18-Feb-13
CULVERT BZRC 004 FROM WEST SIDE 2nd BASE -- 15M PORTION
4:30 PM
BZRC-09A
4667 RFI-5858-QCN-2-2343 RFI-5858-QCN-2-2343 CONCRETE Check Polythylene & Hardboard Installation of BZRC-09A End Wall prior backfilling. APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 18-Feb-13 1:30 PM 18-Feb-13
Raslaffan
BZRC-09A
4668 RFI-5858-QCN-2-2344 RFI-5858-QCN-2-2344 CONCRETE Check Erection of Precast Culvert Covert Type A of BZRC-09A West Side APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 18-Feb-13 8:00 AM 18-Feb-13
Raslaffan
4669 Check concrete curing for pipe track foundation D110-B70-PR-18: F12 (Footing &
RFI-5858-QCN-2-2345 RFI-5858-QCN-2-2345 CONCRETE APPROVED Cr # 29 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 18-Feb-13 7:00 AM 18-Feb-13
Pedestals)
6.3 Check Concrete surface upon form removal of Precast Culver Type B BZRC-010 = 2
4670 RFI-5858-QCN-2-2346 RFI-5858-QCN-2-2346 CONCRETE APPROVED BZRC-09A Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 18-Feb-13 9:00 AM 18-Feb-13
nos
4671 Check Concrete CuringHAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE -
RFI-5858-QCN-2-2347 RFI-5858-QCN-2-2347 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 18-Feb-13 2:00 PM 18-Feb-13
15M PORTION
4672 RFI-5858-QCN-2-2348 RFI-5858-QCN-2-2348 CONCRETE Check Final Visual Inspection B70-PS-17 SLD003 to SLD0035 = 33 nos. APPROVED SECTION 6 B-V-3100-004-2-201-02_5 10.0 S W H 18-Feb-13 1:30 PM 18-Feb-13
Check Final Visual Inspection Sleeper foundations Sleeper Foundations B70 - PS -07
4673 RFI-5858-QCN-2-2349 RFI-5858-QCN-2-2349 CONCRETE SLD082,SLD084,SLD085 & B70 - PS -06 SLD032,SLD033,SLD034 B70 - PS -09 APPROVED SECTION 2 B-V-3100-004-2-201-02_5 9.2 S W H 18-Feb-13 8:40 AM 18-Feb-13
SLD017,SLD018&SLD019
8-Aug-2012
4674 4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
RFI-5858-QCN-2-2350 RFI-5858-QCN-2-2350 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 18-Feb-13 11.00AM 17-Feb-13 To
06 - Grid 1 to 5 (A/B) 30-Aug-2012
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE Section 3 Hamla
4677 RFI-5858-QCN-2-2353 RFI-5858-QCN-2-2353 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Feb-13 8:30 AM 19-Feb-13
WALL - BOTHSIDES 15 M PORTION & 2 Nos SLEEPER Culvert
4678 9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-25: F2 PR-25: Crossing #44
RFI-5858-QCN-2-2354 RFI-5858-QCN-2-2354 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-Feb-13 7:30 AM 19-Feb-13
and F3 Raslaffan
4679 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-25:
RFI-5858-QCN-2-2355 RFI-5858-QCN-2-2355 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 19-Feb-13 9:30 AM 19-Feb-13
F2 and F3
4680 RFI-5858-QCN-2-2356 RFI-5858-QCN-2-2356 CONCRETE Check concrete pre-pouring for culvert 1st & 3rd bases BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 19-Feb-13 7:30 AM 19-Feb-13
4681 RFI-5858-QCN-2-2357 RFI-5858-QCN-2-2357 CONCRETE Check concrete pouring for culvert 1st & 3rd bases BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Feb-13 8:00 AM 19-Feb-13
Check Polythylene & Hardboard Installation of BZRC-09A North and South side and End BZRC-09A
4682 RFI-5858-QCN-2-2358 RFI-5858-QCN-2-2358 CONCRETE
Wall ( Additional Height )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.b,c S W H 19-Feb-13 8:30 AM 19-Feb-13
4683 9.1. Check surface preparation of Precast Culvert cover Type B BZRC-010 = 2 nos
RFI-5858-QCN-2-2359 RFI-5858-QCN-2-2359 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 19-Feb-13 8:00 AM 19-Feb-13
application of curing compound first coat.
9.1. Check protective coating first coat of Precast Culvert BZRC-010 = 2 nos prior second
4684 RFI-5858-QCN-2-2360 RFI-5858-QCN-2-2360 CONCRETE
coating.
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 19-Feb-13 9:30 AM 19-Feb-13
Check Laying of Asphalt Binder Course & Surface Course HAMLA CULVERT BZRC003 MASHRAB
4685 RFI-5858-QCN-2-2361 RFI-5858-QCN-2-2361 CONCRETE APPROVED B-V-3100-004-2-201-03_5 4.22 S W H 19-Feb-13 8:00 AM 20-Feb-13
WEST SIDE PORTION CULVERT
9.1. Check protective coating second coat of Precast Culvert Cover Type B BZRC-010 =
4686 RFI-5858-QCN-2-2362 RFI-5858-QCN-2-2362 CONCRETE
2 nos
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 19-Feb-13 1:30 PM 19-Feb-13
4.4.3 Check compressive Strength @ 28 days for grout (Loop foundations D210-B70-PR-
4688 RFI-5858-QCN-2-2364 RFI-5858-QCN-2-2364 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.3 S W H 20-Feb-13 11.00AM 20-Feb-13
44 -5(F1),4(F2),3(F5),2(F7),1(F6),)
Check Reinforcement prior to close shuttering HAMLA CULVERT BZRC 004 FROM
4689 RFI-5858-QCN-2-2365 RFI-5858-QCN-2-2365 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.1.b W W H 20-Feb-13 3:30 PM 20-Feb-13
WEST SIDE 1st BASE WALL (BOTH SIDE) & END WALL - 2.8 M PORTION
Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM WEST
4690 RFI-5858-QCN-2-2366 RFI-5858-QCN-2-2366 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 20-Feb-13 4:30 PM 20-Feb-13
SIDE 2nd BASE ( BOTHSIDE) - 15M PORTION & 2 SLEEPER
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 2nd. Retaining Wall
4693 RFI-5858-QCN-2-2369 RFI-5858-QCN-2-2369 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 20-Feb-13 8:30 AM 20-Feb-13
3rd, 4th and 5th panel wall. Raslaffan
4694 9.1. Check surface preparation of Cast-in- Situ retaining wall surface below grade N- S Retaining Wall
RFI-5858-QCN-2-2370 RFI-5858-QCN-2-2370 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 20-Feb-13 1:30 PM 20-Feb-13
13th panel prior application of curing compound first coat. Raslaffan
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S 13th panel prior Retaining Wall
4695 RFI-5858-QCN-2-2371 RFI-5858-QCN-2-2371 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 20-Feb-13 1:30 PM 20-Feb-13
second coating. Raslaffan
4696 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and Retaining Wall
RFI-5858-QCN-2-2372 RFI-5858-QCN-2-2372 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 20-Feb-13 1:20 PM 20-Feb-13
Cleaning of Retaining Wall ( Ditch ) 6th and 8th panel prior concreting. Raslaffan
4697 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
RFI-5858-QCN-2-2373 RFI-5858-QCN-2-2373 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 20-Feb-13 1:30 PM 20-Feb-13 cancelled pump not available
6th and 8th panel. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4700 RFI-5858-QCN-2-2376 RFI-5858-QCN-2-2376 CONCRETE Check concrete pre-pouring for culvert 1st base BZRC-005. 2 no sleepers APPROVED Cr # 23 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 20-Feb-13 3:30 PM 20-Feb-13
4701 RFI-5858-QCN-2-2377 RFI-5858-QCN-2-2377 CONCRETE Check concrete pouring for culvert 1st base BZRC-005 APPROVED Cr # 23 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Feb-13 4:00 PM 20-Feb-13
Check Surface preparation HAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE
4703 RFI-5858-QCN-2-2379 RFI-5858-QCN-2-2379 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 21-Feb-13 2:30 PM 21-Feb-13
( BOTHSIDE) - 15M PORTION & 2 SLEEPER
Check Polythylene & Hardboard Installation of Retaining Wall N- S 13th panel prior Retaining Wall
4705 RFI-5858-QCN-2-2381 RFI-5858-QCN-2-2381 CONCRETE
backfilling.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Feb-13 3:30 PM 21-Feb-13
4706 RFI-5858-QCN-2-2382 RFI-5858-QCN-2-2382 CONCRETE Check concrete pre-pouring for culvert 2nd base BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 21-Feb-13 4:30 PM 21-Feb-13
4707 RFI-5858-QCN-2-2383 RFI-5858-QCN-2-2383 CONCRETE Check concrete pouring for culvert 2nd base BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 21-Feb-13 5:00 PM 21-Feb-13
3:00 PM
Check Surface Below ground Protective Coating - First coat & Second coat HAMLA
4708 RFI-5858-QCN-2-2384 RFI-5858-QCN-2-2384 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 21-Feb-13 TO 21-Feb-13
CULVERT BZRC 004 FROM WEST SIDE 2nd BASE ( BOTHSIDE) - 15M PORTION
4:30 PM
Check Concrete CuringHAMLA CULVERT BZRC 004 FROM WEST SIDE 2nd BASE -
4709 RFI-5858-QCN-2-2385 RFI-5858-QCN-2-2385 CONCRETE
15M PORTION
APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 21-Feb-13 2:00 PM 21-Feb-13
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D210-B70-PR45
4711 RFI-5858-QCN-2-2387 RFI-5858-QCN-2-2387 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 21-Feb-13 11.00AM 21-Feb-13
F1& F2,D210-B70-PR 71 F1& F2,D110-B70-PR- 08 F1& F2,,)
4.4.3 Check compressive Strength @ 28 days for grout (Loop foundations D110-B70-PR-
4713 RFI-5858-QCN-2-2389 RFI-5858-QCN-2-2389 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.3 S W H 23-Feb-13 11:00 AM 23-Feb-13
01 -15(F14),14(F13),13(F12),12(F10),11(F11),10(F10),)
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
Retaining Wall E-W
4714 RFI-5858-QCN-2-2390 RFI-5858-QCN-2-2390 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 2nd Panel ( 15 meters ) and 5th APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 23-Feb-13 2:00 PM 23-Feb-13
Raslaffan
panel ( 15 meters ) prior concreting.
4715 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
RFI-5858-QCN-2-2391 RFI-5858-QCN-2-2391 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Feb-13 2:15 PM 27-Feb-13
2nd panel ( 15 meters ) and 5th panel ( 15 meters ) Raslaffan
Check reinforcement & cleaning for culvert 1st & 3rd intermediate walls ( N & S ) & 3 pipe
4716 RFI-5858-QCN-2-2392 RFI-5858-QCN-2-2392 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 23-Feb-13 6:30 AM 25-Feb-13
sleepers BZRC-008. prior to shutter closer
4718 RFI-5858-QCN-2-2394 RFI-5858-QCN-2-2394 CONCRETE Check concrete curing for culvert bases BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 23-Feb-13 7:30 AM 23-Feb-13
4719 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
RFI-5858-QCN-2-2395 RFI-5858-QCN-2-2395 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Feb-13 1:30 PM 27-Feb-13
6th and 8th panel. Raslaffan
4720 Check polyethelene & hardboard installation for pipe sleepers B70-PS-15: SLDSLD074,
RFI-5858-QCN-2-2396 RFI-5858-QCN-2-2396 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 23-Feb-13 7:00 AM 23-Feb-13
SLD075, SLD076
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Prepouring - Check form works,Embeded items,Cleaning & Construction joints HAMAD Section 3 Hamla
4721 RFI-5858-QCN-2-2397 RFI-5858-QCN-2-2397 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 23-Feb-13 4:00 PM 23-Feb-13
CULVERT BZRC 005 FROM SOUTH SIDE 2nd BASE - 9.5 M PORTION Culvert
4722 Check Concrete Pouring HAMAD CULVERT BZRC 005 FROM SOUTH SIDE 2nd BASE - Section 4 Hamad
RFI-5858-QCN-2-2398 RFI-5858-QCN-2-2398 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Feb-13 4:20 PM 27-Feb-13
9.5 M PORTION Culvert
Check Surface Preparation & Sealent ApplicationHAMLA CULVERT BZRC 004 FROM
4723 RFI-5858-QCN-2-2399 RFI-5858-QCN-2-2399 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.6a,b S W H 23-Feb-13 7:00 AM 23-Feb-13
WEST SIDE 2nd & 3rd BASE, WALL (7.5M&15M PORTIONS)
4724 RFI-5858-QCN-2-2400 RFI-5858-QCN-2-2400 CONCRETE Check Erection of pre-cast for pipe sleeper B70-PS-15 SLD074, SLD075, SLD076 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 23-Feb-13 6:00 AM 23-Feb-13
Check Concrete Pouring HAMLA CULVERT BZRC 004 FROM WEST SIDE 1st BASE Section 3 Hamla
4726 RFI-5858-QCN-2-2402 RFI-5858-QCN-2-2402 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Feb-13 10:00 AM 24-Feb-13
WALL (BOTHSIDE WALL& END WALL) 2.8 M PORTION Culvert Raslaffan
4727 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of Retaining Wall
RFI-5858-QCN-2-2403 RFI-5858-QCN-2-2403 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 24-Feb-13 8:30 AM 24-Feb-13
reataining wall N- S 13th panel. Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
Retaining Wall E-W
4728 RFI-5858-QCN-2-2404 RFI-5858-QCN-2-2404 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 7th panel ( 15 meters ) prior APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 24-Feb-13 8:00 AM 24-Feb-13
concreting.
4729 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
RFI-5858-QCN-2-2405 RFI-5858-QCN-2-2405 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 24-Feb-13 8:30 AM 27-Feb-13
7th panel ( 15 meters ) Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall ditch surface below grade N- Retaining Wall
4730 RFI-5858-QCN-2-2406 RFI-5858-QCN-2-2406 CONCRETE
S 2nd, 3rd, 4th and 5th panel prior application of curing compound first coat.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 24-Feb-13 7:30 AM 24-Feb-13
9.1. Check protective coating first coat of Cast-in situ retaining wall N- S Ditch 2nd, 3rd, Retaining Wall
4731 RFI-5858-QCN-2-2407 RFI-5858-QCN-2-2407 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 24-Feb-13 9:30 AM 24-Feb-13
4th and 5th panel prior second coating. Raslaffan
9.1. Check protective coating second coat of Cast-in situ retaining wall N- S ditch 2nd, Retaining Wall
4732 RFI-5858-QCN-2-2408 RFI-5858-QCN-2-2408 CONCRETE
3rd, 4th and 5th panel.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 24-Feb-13 1:30 PM 24-Feb-13
Check Polythylene & Hardboard Installation of Retaining Wall N- S ditch 2nd, 3rd, 4th and Retaining Wall
4733 RFI-5858-QCN-2-2409 RFI-5858-QCN-2-2409 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Feb-13 3:30 PM 24-Feb-13
5th panel Raslaffan
4734 RFI-5858-QCN-2-2410 RFI-5858-QCN-2-2410 CONCRETE Check concrete surface upon form removal for culvert bases BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 24-Feb-13 7:30 AM 24-Feb-13
4735 RFI-5858-QCN-2-2411 RFI-5858-QCN-2-2411 CONCRETE Check surface preparation for culvert bases BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 24-Feb-13 8:30 AM 24-Feb-13
4736 RFI-5858-QCN-2-2412 RFI-5858-QCN-2-2412 CONCRETE Check concrete pre-pouring for culvert 1st & 3rd intermediate walls ( N & S) BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 24-Feb-13 5:00 PM 24-Feb-13
4737 RFI-5858-QCN-2-2413 RFI-5858-QCN-2-2413 CONCRETE Check concrete pouring for culvert 1st & 3rd intermediate walls ( N & S) BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 24-Feb-13 6:00 PM 27-Feb-13
9.1. Check protective coating first coat of Precast Pipe Sleeper and Pipe StopperB70-PS-
4742 RFI-5858-QCN-2-2418 RFI-5858-QCN-2-2418 CONCRETE 22: SLD017 to SLD035 = 19 nos SLD038 to SLD043 = 6 nos and SLD 051 to SLD063 = APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 25-Feb-13 8:00 AM 25-Feb-13
13 nos
4743 Check surface above grade (surface preparation + coating 1st & 2nd) for pipe sleepers section 5 (east side
RFI-5858-QCN-2-2419 RFI-5858-QCN-2-2419 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 25-Feb-13 4:00 PM 25-Feb-13
B70-PS-15: SLDSLD074, SLD075, SLD076 of halul) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 6th Retaining Wall
4744 RFI-5858-QCN-2-2420 RFI-5858-QCN-2-2420 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 25-Feb-13 8:30 AM 25-Feb-13
and 8th panel Raslaffan
Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM MASHRAB
4746 RFI-5858-QCN-2-2422 RFI-5858-QCN-2-2422 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 25-Feb-13 9:30 AM 25-Feb-13
SOUTH SIDE 1st& 2nd BASE CULVERT
4747 4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
RFI-5858-QCN-2-2423 RFI-5858-QCN-2-2423 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 25-Feb-13 3:00 PM 25-Feb-13
12 -Grid 1 to 5/AB
4748 Check concrete surface upon form removal HAMLA CULVERT BZRC 004 FROM WEST
RFI-5858-QCN-2-2424 RFI-5858-QCN-2-2424 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 26-Feb-13 7:30 AM 26-Feb-13
SIDE 1st BASE WALL ( BOTHSIDE& END WALL) - 2.8 M PORTION
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall N- S 6th Retaining Wall
4749 RFI-5858-QCN-2-2425 RFI-5858-QCN-2-2425 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 26-Feb-13 8:00 AM 26-Feb-13
and 8th panel wall. Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
4750 Retaining Wall E-W
RFI-5858-QCN-2-2426 RFI-5858-QCN-2-2426 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 4th panel ( 13.45 meters ) prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 26-Feb-13 1:30 PM 26-Feb-13
Raslaffan
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
4751 RFI-5858-QCN-2-2427 RFI-5858-QCN-2-2427 CONCRETE
4th panel ( 13.48 meters )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 26-Feb-13 1:40 AM 26-Feb-13
4752 Check concrete pre-pouring for culvert 2nd walls 12.15 m length each side ( N & S)
RFI-5858-QCN-2-2428 RFI-5858-QCN-2-2428 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 26-Feb-13 5:30 PM 26-Feb-13
BZRC-008. 3 sleepers.
Check concrete pouring for culvert 2nd walls 12.15 m length each side ( N & S) + 3
4753 RFI-5858-QCN-2-2429 RFI-5858-QCN-2-2429 CONCRETE
sleepers BZRC-008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 26-Feb-13 6:00 PM 27-Feb-13
4.4.3 Check compressive Strength @ 28 days for grout (Pipe Track foundations D110-
4754 RFI-5858-QCN-2-2430 RFI-5858-QCN-2-2430 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.3 S W H 26-Feb-13 11:00 AM 26-Feb-13
B70-PR-01 -9(F9),8(F8),7(F7),& 6(F6).
Check reinforcement & cleaning prior closing for culvert 2nd walls 12.15 m length each
4755 RFI-5858-QCN-2-2431 RFI-5858-QCN-2-2431 CONCRETE
side ( N & S) + 3 sleepers BZRC-008
APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.c W W H 26-Feb-13 7:30 AM 26-Feb-13
7:00 AM
Check surface above grade (surface preparation, coating 1st & 2nd) for east wall culvert -
4756 RFI-5858-QCN-2-2432 RFI-5858-QCN-2-2432 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 26-Feb-13 To 26-Feb-13
BZRC-008
4:00 PM
Retaining Wall N- S
4757 RFI-5858-QCN-2-2433 RFI-5858-QCN-2-2433 CONCRETE 6.4 Completion of 14 days curing for Cast in situ retaining wall Base ( 30 meters ) N- S APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
Raslaffan
Retaining Wall N- S
4758 RFI-5858-QCN-2-2434 RFI-5858-QCN-2-2434 CONCRETE 6.4 Completion of 14 days curing for Cast in situ retaining wall Base ( 15 meters ) N- S APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
Raslaffan
6.4 Completion of 14 days curing for Cast in situ retaining wall ( Footing ) ( 30 meters ) N- Retaining Wall N- S
4759 RFI-5858-QCN-2-2435 RFI-5858-QCN-2-2435 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
S Raslaffan
6.4 Completion of 14 days curing for Cast in situ retaining wall ( Footing ) N- S 10th panel Retaining Wall N- S
4760 RFI-5858-QCN-2-2436 RFI-5858-QCN-2-2436 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
15 meters Raslaffan
4761 Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
RFI-5858-QCN-2-2437 RFI-5858-QCN-2-2437 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1.b W W H 26-Feb-13 3:30 PM 26-Feb-13
SOUTH SIDE 1st BASE WALL (BOTH SIDE) - 9 M PORTION & 3 SLEEPER
6.4 Completion of 14 days curing for Cast in situ retaining wall N- S 6th and 8th panel Retaining Wall N- S
4762 RFI-5858-QCN-2-2438 RFI-5858-QCN-2-2438 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
Footing and 3rd panel wall Raslaffan
Crossing 44
4764 RFI-5858-QCN-2-2440 RFI-5858-QCN-2-2440 CONCRETE 6.4 Completion of 14 days curing for Cast in situ Pipe Track Footing D110-B70-PR-25: F1 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 8:30 AM 26-Feb-13
Raslaffan
4765 Check concrete surface upon form removal for culvert 7.5m & 2.15m walls ( N & S) -
RFI-5858-QCN-2-2441 RFI-5858-QCN-2-2441 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-Feb-13 7:00 AM 26-Feb-13
BZRC-008
4766 RFI-5858-QCN-2-2442 RFI-5858-QCN-2-2442 CONCRETE Check surface preparation for culvert 7.5m & 2.15m walls ( N & S) - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Feb-13 9:00 AM 26-Feb-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check concrete curing for culvert 7.5m & 2.15m walls ( N & S) - BZRC-008 --- Applying
4767 RFI-5858-QCN-2-2443 RFI-5858-QCN-2-2443 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Feb-13 11:00 AM 26-Feb-13
curing compound
4768 Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
RFI-5858-QCN-2-2444 RFI-5858-QCN-2-2444 CONCRETE CANCELLED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 27-Feb-13 1:30 PM 27-Feb-13 CANCELLED WORK NOT READY
cleaning of cast-in- Situ Pipe Stopper Base B70-PS-20: SLD025 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Base B70-PS-
4769 RFI-5858-QCN-2-2445 RFI-5858-QCN-2-2445 CONCRETE CANCELLED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 27-Feb-13 1:40 PM 27-Feb-13 CANCELLED WORK NOT READY
20: SLD025
4770 Check Surface Preparation & Sealent ApplicationHAMLA CULVERT BZRC 004 FROM
RFI-5858-QCN-2-2446 RFI-5858-QCN-2-2446 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.6.a,b S W H 27-Feb-13 7:00 AM 27-Feb-13
WEST SIDE 1st& 2nd BASE WALL
4771 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Crossing 44
RFI-5858-QCN-2-2447 RFI-5858-QCN-2-2447 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 27-Feb-13 1:30 PM 27-Feb-13
of cast-in- Situ Pipe Track Footing D110-B70-PR-25: F4 prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
4772 RFI-5858-QCN-2-2448 RFI-5858-QCN-2-2448 CONCRETE APPROVED Crossing Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 27-Feb-13 1:40 PM 28-Feb-13
25: F4 ( Footing )
4773 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement, cleaning Retaining Wall E-W
RFI-5858-QCN-2-2449 RFI-5858-QCN-2-2449 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 27-Feb-13 1:30 PM 27-Feb-13
& expansion joints of Retaining Wall E-W Base 6th panel ( 15 meters ) prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
4774 RFI-5858-QCN-2-2450 RFI-5858-QCN-2-2450 CONCRETE
6th panel ( 15 meters )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 27-Feb-13 1:40 PM 27-Feb-13
4775 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining Wall E-W 2nd, Retaining Wall
RFI-5858-QCN-2-2451 RFI-5858-QCN-2-2451 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Feb-13 8:30 AM 27-Feb-13
5th and 7th panel ( Footing ) Raslaffan
Check concrete surface upon form removal for 2rd walls 12.15 m length each side ( N &
4777 RFI-5858-QCN-2-2453 RFI-5858-QCN-2-2453 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 28-Feb-13 7:30 AM 28-Feb-13
S) & 3 sleepers BZRC-008
Check surface preparation for 2rd walls 12.15 m length each side ( N & S) & 3 sleepers
4780 RFI-5858-QCN-2-2456 RFI-5858-QCN-2-2456 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 28-Feb-13 9:30 AM 28-Feb-13
BZRC-008
Check concrete curing for 2nd walls 12.15 m length each side ( N & S) & 3 sleepers
4781 RFI-5858-QCN-2-2457 RFI-5858-QCN-2-2457 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 28-Feb-13 1:30 PM 28-Feb-13
BZRC-008. using curing compound
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-23: SLD020
4782 RFI-5858-QCN-2-2458 RFI-5858-QCN-2-2458 CONCRETE to SLD022 = 3 nos and B70-PS-24: SLD001 to SLD16 = 14 nos Except SLD004 and APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 28-Feb-13 8:30 AM 28-Feb-13
SLD005
Check protective coating ( 1st & 2nd ) for 2nd walls 12.15 m length each side ( N & S) &
4783 RFI-5858-QCN-2-2459 RFI-5858-QCN-2-2459 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 28-Feb-13 1:30 PM 28-Feb-13
BZRC-008. 7.5 m wall, 2.15 m wall
4784 RFI-5858-QCN-2-2460 RFI-5858-QCN-2-2460 CONCRETE Check polyethylene installation & hardboard for culvert N & S walls BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 28-Feb-13 3:00 PM 28-Feb-13
ITP item 4.1 Pre - Pouring Check Reinforcement, construction joint and cleaning of Cast- Crossing 44
4785 RFI-5858-QCN-2-2461 RFI-5858-QCN-2-2461 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b..d.e W W H 28-Feb-13 1:30 PM 28-Feb-13
in- Situ Pipe Track Pedestal PR-25: F4prior shuttering. Raslaffan
4786 Check 2 expansion joints surface preparation & sealant application for culvert BZRC-008 -
RFI-5858-QCN-2-2462 RFI-5858-QCN-2-2462 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.6 S W H 28-Feb-13 2:00 PM 28-Feb-13
west side
4788 Check Concrete Pouring HAMAD CULVERT BZRC 005 FROM SOUTH SIDE 2nd wall - 9 Section 4 Hamad
RFI-5858-QCN-2-2464 RFI-5858-QCN-2-2464 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 28-Feb-13 2:50 PM 28-Feb-13
M PORTION & 3 SLEEPER Culvert
4789 Check final visual inspection for pipe sleepers B70-PS-12: SLD001 To SLD011, B70-PS- Setion 4 & 5
RFI-5858-QCN-2-2465 RFI-5858-QCN-2-2465 CONCRETE APPROVED B-V-3100-004-2-201-02_5 10.0 S W H 28-Feb-13 7:30 AM 28-Feb-13
13: SLD038 To SLD054, & B70-PS-15: SLD074 To SLD076 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4790 RFI-5858-QCN-2-2466 RFI-5858-QCN-2-2466 CONCRETE Check reinforcement & cleaning prior closing for end wall of culvert BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 28-Feb-13 4:00 PM 28-Feb-13
Check Surface preparation HAMLA CULVERT BZRC 004 FROM WEST SIDE 1st BASE&
4792 RFI-5858-QCN-2-2468 RFI-5858-QCN-2-2468 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 28-Feb-13 7:30 PM 28-Feb-13
WALL & Wall (2.8M PORTION)
4794 Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
RFI-5858-QCN-2-2470 RFI-5858-QCN-2-2470 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 2-Mar-13 1:30 PM 2-Mar-13
cleaning of cast-in- Situ Pipe Stopper Base B70-PS-20: SLD025 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ PipeTrack pedestal D110-
4795 RFI-5858-QCN-2-2471 RFI-5858-QCN-2-2471 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Mar-13 1:40 PM 2-Mar-13
B70-PR-25: F4
4796 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and Retaining Wall
RFI-5858-QCN-2-2472 RFI-5858-QCN-2-2472 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 2-Mar-13 1:30 PM 2-Mar-13
Cleaning of Retaining Wall ( Ditch ) 7th panel Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
4797 RFI-5858-QCN-2-2473 RFI-5858-QCN-2-2473 CONCRETE
7th panel.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 2-Mar-13 1:30 PM 2-Mar-13
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
Retaining Wall E-W
4800 RFI-5858-QCN-2-2476 RFI-5858-QCN-2-2476 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 13th, 9th and 11th panel prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 2-Mar-13 1:30 PM 2-Mar-13
Raslaffan
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
4801 RFI-5858-QCN-2-2477 RFI-5858-QCN-2-2477 CONCRETE
11th, 9th and 13th panel prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 2-Mar-13 1:30 PM 2-Mar-13
7:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat HAMLA
4805 RFI-5858-QCN-2-2481 RFI-5858-QCN-2-2481 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 2-Mar-13 TO 2-Mar-13
CULVERT BZRC 004 FROM WEST SIDE 1st BASE& WALL - 2.8M PORTION
11:00 AM
Check Concrete CuringHAMLA CULVERT BZRC 004 FROM WEST SIDE 1ST BASE &
4806 RFI-5858-QCN-2-2482 RFI-5858-QCN-2-2482 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 2-Mar-13 11:00 AM 2-Mar-13
WALL - 2.8M PORTION
4809 Check Erection of Precast sleeper Sleeper Foundations B70 - PS -05 SLD003,SLD004 &
RFI-5858-QCN-2-2485 RFI-5858-QCN-2-2485 CONCRETE APPROVED SECTION 1 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 2-Mar-13 7:30 AM 2-Mar-13
SLD005 B70 - PS -07 SLD083
4811 RFI-5858-QCN-2-2487 RFI-5858-QCN-2-2487 CONCRETE Check concrete pre-pouring for culvert end walls west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 3-Mar-13 1:30 PM 3-Mar-13
4812 RFI-5858-QCN-2-2488 RFI-5858-QCN-2-2488 CONCRETE Check concrete pouring for culvert end wall west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 3-Mar-13 2:00 PM 3-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- Retaining Wall
4813 RFI-5858-QCN-2-2489 RFI-5858-QCN-2-2489 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 3-Mar-13 3:30 PM 3-Mar-13
25: F4 Raslaffan
4814 Check Polythylene & Hardboard Installation of Retaining Wall N- S ditch 2nd, 3rd, 4th and Retaining Wall
RFI-5858-QCN-2-2490 RFI-5858-QCN-2-2490 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 3-Mar-13 7:00 AM 3-Mar-13
5th panel Raslaffan
Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
4815 RFI-5858-QCN-2-2491 RFI-5858-QCN-2-2491 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1.b W W H 3-Mar-13 2:30 PM 3-Mar-13
SOUTH SIDE 1st BASE WALL (BOTH SIDE & END WALL) - 12.891 M PORTION
4817 Concrete Placement Check Concrete pouring of Precast Pipe Track D110-B70-PR-37,
RFI-5858-QCN-2-2493 RFI-5858-QCN-2-2493 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 3-Mar-13 1:30 PM 5-Mar-13
38, 40, 41, 43, 54, 55, 56, 57, 58, 59, 60 and 62 = 26 nos ( Base )
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-6
4818 RFI-5858-QCN-2-2494 RFI-5858-QCN-2-2494 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_3 4.4.1 S W H 3-Mar-13 3:00 PM 3-Mar-13
-Grid 5 to 10/AB
4819 9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-25: F4
RFI-5858-QCN-2-2495 RFI-5858-QCN-2-2495 CONCRETE APPROVED PR-25 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Mar-13 4:00 PM 4-Mar-13
application of curing compound first coat.
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
Retaining Wall E-W
4820 RFI-5858-QCN-2-2496 RFI-5858-QCN-2-2496 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 3rd and 8th panel prior APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 4-Mar-13 1:30 PM 4-Mar-13
concreting.
4821 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
RFI-5858-QCN-2-2497 RFI-5858-QCN-2-2497 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 4-Mar-13 1:30 PM 6-Mar-13
3rd and 8th panel Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 9th, Retaining Wall E-W
4822 RFI-5858-QCN-2-2498 RFI-5858-QCN-2-2498 CONCRETE
11th and 13th panel ( Base )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 4-Mar-13 9:00 AM 4-Mar-13
Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
4824 RFI-5858-QCN-2-2500 RFI-5858-QCN-2-2500 CONCRETE
SOUTH SIDE 2nd BASE WALL
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 5-Mar-13 7:30 AM 5-Mar-13
4.4.3 Check compressive Strength @ 28 days for grout (Loop foundations D110-B70-PR-
4826 RFI-5858-QCN-2-2502 RFI-5858-QCN-2-2502 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.3 S W H 5-Mar-13 11:00 PM 5-Mar-13
01-5(F5),4(F4),3(F3),2(F2),1(F1).& D210-B70- PR- 44-8 (F2) & 10(F3).
Pre-Pouring For Cast-in- Situ Pipe stopper Check Formworks, Reinforcement and
4827 RFI-5858-QCN-2-2503 RFI-5858-QCN-2-2503 CONCRETE cleaning of cast-in- Situ Pipe Stopper B70-PS-23: SLD014 and B70-PS-24: SLD018 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 5-Mar-13 1:30 PM 5-Mar-13
( Footing ) prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-23:
4828 RFI-5858-QCN-2-2504 RFI-5858-QCN-2-2504 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 5-Mar-13 1:40 PM 6-Mar-13
SLD014 and B70-PS-24: SLD018 ( Footing )
Check Surface preparation HAMAD CULVERT BZRC 005 FROM SOUTH SIDE 2nd
4829 RFI-5858-QCN-2-2505 RFI-5858-QCN-2-2505 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 5-Mar-13 4:30 PM 5-Mar-13
BASE WALL
4830 9.1. Check surface preparation of Cast-in- Situ retaining wall ditch surface below grade N- Retaining Wall
RFI-5858-QCN-2-2506 RFI-5858-QCN-2-2506 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 5-Mar-13 7:00 AM 5-Mar-13
S, 6th, 7th and 8th panel prior application of curing compound first coat. Raslaffan
Check protective coating first coat of Cast-in situ retaining wall N- S Ditch 6th, 7th and 8th Retaining Wall
4831 RFI-5858-QCN-2-2507 RFI-5858-QCN-2-2507 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 5-Mar-13 8:00 AM 5-Mar-13
panel prior second coating. Raslaffan
4832 Check protective coating second coat of Cast-in situ retaining wall N- S ditch 6th, 7th and Retaining Wall
RFI-5858-QCN-2-2508 RFI-5858-QCN-2-2508 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 5-Mar-13 10:00 AM 5-Mar-13
8th panel. Raslaffan
Check Polythylene & Hardboard Installation of Retaining Wall N- S ditch 6th, 7th and 8th Retaining Wall
4833 RFI-5858-QCN-2-2509 RFI-5858-QCN-2-2509 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 5-Mar-13 1:00 PM 5-Mar-13
panel Raslaffan
4834 Check protective coating first coat of Cast-in- Situ Pipe Track D110-B70-PR-25: F4 prior
RFI-5858-QCN-2-2510 RFI-5858-QCN-2-2510 CONCRETE APPROVED PR-25 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 5-Mar-13 8:00 AM 5-Mar-13
second coating.
4835 RFI-5858-QCN-2-2511 RFI-5858-QCN-2-2511 CONCRETE Check protective coating second coat of Cast-in- Situ Pipe Track D110-B70-PS-25: F4 APPROVED PR-25 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 5-Mar-13 1:00 PM 5-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4836 RFI-5858-QCN-2-2512 RFI-5858-QCN-2-2512 CONCRETE Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-25: F4 APPROVED PR-25 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 5-Mar-13 4:30 PM 5-Mar-13
4837 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement, cleaning Retaining Wall E-W
RFI-5858-QCN-2-2513 RFI-5858-QCN-2-2513 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 5-Mar-13 1:30 PM 5-Mar-13
& expansion joints of Retaining Wall E-W Base 10th and 12th panel prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
4838 RFI-5858-QCN-2-2514 RFI-5858-QCN-2-2514 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 5-Mar-13 1:40 PM 6-Mar-13
10th and 12th panel Raslaffan
4839 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
RFI-5858-QCN-2-2515 RFI-5858-QCN-2-2515 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 5-Mar-13 9:30 AM 5-Mar-13
Cast-in- Situ Retaining Wall E-W 2nd panel Wall prior shuttering. ) Raslaffan
4840 RFI-5858-QCN-2-2516 RFI-5858-QCN-2-2516 CONCRETE Check concrete surface upon form removal for culvert end walls west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 5-Mar-13 9:30 AM 5-Mar-13
4841 RFI-5858-QCN-2-2517 RFI-5858-QCN-2-2517 CONCRETE Check surface preparation for culvert end walls west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 5-Mar-13 1:30 PM 5-Mar-13
4842 Check concrete curing for culvert end walls west side - BZRC-008 - using curing
RFI-5858-QCN-2-2518 RFI-5858-QCN-2-2518 CONCRETE APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Mar-13 3:30 PM 5-Mar-13
compound
4844 Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM EAST SIDE 1st & 3rd Section 1
RFI-5858-QCN-2-2520 RFI-5858-QCN-2-2520 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 6-Mar-13 7:30AM 6-Mar-13
BASE - 7.5M & 6M PORTION MASHRAB Culvert
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-23: SLD019
4845 RFI-5858-QCN-2-2521 RFI-5858-QCN-2-2521 CONCRETE
to SLD010 = 10 nos
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 6-Mar-13 1:30 PM 6-Mar-13
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
4846 RFI-5858-QCN-2-2522 RFI-5858-QCN-2-2522 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 6-Mar-13 1:30 PM 6-Mar-13
Cleaning of Pipe Stopper B70-PS-20: SLD025 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Sotpper B70-PS-20:
4847 RFI-5858-QCN-2-2523 RFI-5858-QCN-2-2523 CONCRETE
SLD025
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 6-Mar-13 1:40 PM 6-Mar-13
4848 RFI-5858-QCN-2-2524 RFI-5858-QCN-2-2524 CONCRETE Check protective coating (1st & 2nd) for culvert end walls west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 6-Mar-13 6:30 AM 6-Mar-13
Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and Retaining Wall
4849 RFI-5858-QCN-2-2525 RFI-5858-QCN-2-2525 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 6-Mar-13 1:30 PM 6-Mar-13
Cleaning of Retaining Wall ( ditch ) 9th and 11th panel prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S ( Ditch ) Retaining Wall
4850 RFI-5858-QCN-2-2526 RFI-5858-QCN-2-2526 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 6-Mar-13 1:30 PM 6-Mar-13
9tha and 11th panel. Raslaffan
4853 RFI-5858-QCN-2-2529 RFI-5858-QCN-2-2529 CONCRETE Check polyethylene & hardboard installation for culvert end walls west side - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 6-Mar-13 9:30 AM 6-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
4854 RFI-5858-QCN-2-2530 RFI-5858-QCN-2-2530 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 6-Mar-13 2:30 PM 6-Mar-13
Cast-in- Situ Retaining Wall E-W 6th panel Wall prior shuttering. ) Raslaffan
4855 RFI-5858-QCN-2-2531 RFI-5858-QCN-2-2531 CONCRETE Check polyethylene installation above top cover of culvert - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 9.2.b S W H 6-Mar-13 6:30 AM 6-Mar-13
4858 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
RFI-5858-QCN-2-2534 RFI-5858-QCN-2-2534 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 6-Mar-13 3:30 PM 6-Mar-13
Cast-in- Situ Pipe Stopper B70-PS-23: SLD014 and B70-PS-24: SLD018 prior shuttering ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4859 RFI-5858-QCN-2-2535 RFI-5858-QCN-2-2535 CONCRETE Check erection of pre-cast top cover of culvert ( type A 11 nos & type B 1 nos) - BZRC-008 APPROVED Cr # 38 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 6-Mar-13 6:30 AM 6-Mar-13
4860 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 PR - 18 SECTION
RFI-5858-QCN-2-2536 RFI-5858-QCN-2-2536 CONCRETE REJECTED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 6-Mar-13 1:10 PM 6-Mar-13 REJECTED
- PR -18 Pipe Rack Foundation Base Footing F11 4
4861 RFI-5858-QCN-2-2537 RFI-5858-QCN-2-2537 CONCRETE Check Concrete Pouring D110 B70 - PR -18 Pipe Rack Foundation Base Footing F11 CANCELLED PR - 18 SECTION 4 B-V-3100-004-2-201-02_5 5.1 W H H 6-Mar-13 1:30 PM 6-Mar-13 cancelled
Check Concrete Pouring HAMAD CULVERT BZRC 005 FROM SOUTH SIDE 1st BASE Section 4 Hamad
4864 RFI-5858-QCN-2-2540 RFI-5858-QCN-2-2540 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 7-Mar-13 7:20 AM 7-Mar-13
WALL(BOTH SIDE &END WALL - 12.891 M PORTION) Culvert
4865 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-23: SLD002
RFI-5858-QCN-2-2541 RFI-5858-QCN-2-2541 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 7-Mar-13 9:30 AM 7-Mar-13
to SLD009 = 8 nos
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
4866 RFI-5858-QCN-2-2542 RFI-5858-QCN-2-2542 CONCRETE
Precast Retaining wall West Side of BZRC-006 = 11 nos prior shuttering.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 7-Mar-13 7:00 AM 7-Mar-13
Pre-Pouring For Pre-cast Pipe Sleeper Footing Check Formworks, Reinforcement and
4867 Cleaning of Pre-cast Pipe Sleeper Footig B70-PS-29-F2 = 4 nos, B70-PS-32-F1 = 1 no. Gate 5 TSF
RFI-5858-QCN-2-2543 RFI-5858-QCN-2-2543 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 7-Mar-13 7:00 AM 7-Mar-13 cancelled
B70-PS-14-F3 = 12 nos, B70-PS-33 = 4 nos, B70-PS-14-F4 = 2 nos and B70-PS-14-F5 Raslaffan
-= 1 no. prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Footing B70-PS-
Gate 5 TSF
4868 RFI-5858-QCN-2-2544 RFI-5858-QCN-2-2544 CONCRETE 29-F2 = 4 nos, B70-PS-32-F1 = 1 no., B70-PS-14-F3 = 12 nos B70-PS-33-F1 = 4 nos, CANCELLED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 7-Mar-13 7:30 AM 7-Mar-13 cancelled
B70-PS-14-F4 = 2 nos and B70-PS-14-F5 = 1 no.
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
4870 RFI-5858-QCN-2-2546 RFI-5858-QCN-2-2546 CONCRETE
70 -G1F1 & 2F2
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 7-Mar-13 3:00 PM 7-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
4871 RFI-5858-QCN-2-2547 RFI-5858-QCN-2-2547 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-01_5 4.1a.b.d.e W W H 9-Mar-2013 7:30 AM 9-Mar-13
Cast-in- Situ Pipe Stopper B70-PS-20: SLD025, B70-PS-23: SLD014
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
4872 RFI-5858-QCN-2-2548 RFI-5858-QCN-2-2548 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Mar-2013 1:30 PM 9-Mar-13
Cleaning of Pipe Stopper B70-PS-23: SLD014 and B70-PS-24: SLD018 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Sotpper B70-PS-23:
4873 RFI-5858-QCN-2-2549 RFI-5858-QCN-2-2549 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 9-Mar-2013 1:40 PM 9-Mar-13
SLD014 and B70-PS-24: SLD018
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
Retaining Wall E-W
4874 RFI-5858-QCN-2-2550 RFI-5858-QCN-2-2550 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base 1st and last panel and 2nd panel APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 9-Mar-2013 1:30 PM 9-Mar-13
Raslaffan
Wall prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 1st and Retaining Wall E-W
4875 RFI-5858-QCN-2-2551 RFI-5858-QCN-2-2551 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Mar-2013 1:40 PM 9-Mar-13
last panel base and 2nd panel wall. Raslaffan
4876 Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
RFI-5858-QCN-2-2552 RFI-5858-QCN-2-2552 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 9-Mar-2013 4:30 PM 9-Mar-13
SOUTH SIDE 1st BASE WALL - END PORTION
Pre-Pouring For Pre-cast Pipe Sleeper Footing Check Formworks, Reinforcement and
Cleaning of Pre-cast Pipe Sleeper Footig B70-PS-29-F2 = 4 nos, B70-PS-32-F1 = 1 no. Gate 5 TSF
4877 RFI-5858-QCN-2-2553 RFI-5858-QCN-2-2553 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Mar-2013 7:00 AM 9-Mar-13
B70-PS-14-F3 = 12 nos, B70-PS-33 = 4 nos, B70-PS-14-F4 = 2 nos and B70-PS-14-F5 Raslaffan
-= 1 no. prior concreting.
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Footing B70-PS-
4878 Gate 5 TSF
RFI-5858-QCN-2-2554 RFI-5858-QCN-2-2554 CONCRETE 29-F2 = 4 nos, B70-PS-32-F1 = 1 no., B70-PS-14-F3 = 12 nos B70-PS-33-F1 = 4 nos, APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Mar-2013 7:30 AM 9-Mar-13
Raslaffan
B70-PS-14-F4 = 2 nos and B70-PS-14-F5 = 1 no.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
4879 RFI-5858-QCN-2-2555 RFI-5858-QCN-2-2555 CONCRETE Precast Pipe Track D110-B70-PR-37, 38, 40, 41, 43, 54, 55, 56, 57, 58, 59, 60 and 62 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 9-Mar-2013 8:00 AM 9-Mar-13
prior shuttering.
4883 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 PR - 18 SECTION
RFI-5858-QCN-2-2559 RFI-5858-QCN-2-2559 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 9-Mar-2013 1:10 PM 9-Mar-13
- PR -18 Pipe Rack Foundation Base Footing F11 4
4884 RFI-5858-QCN-2-2560 RFI-5858-QCN-2-2560 CONCRETE Check Concrete Pouring D110 B70 - PR -18 Pipe Rack Foundation Base Footing F11 APPROVED PR - 18 SECTION 4 B-V-3100-004-2-201-02_5 5.1 W H H 9-Mar-2013 1:30 PM 9-Mar-13
4885 Check Laying of Asphalt Base Course- 1st Layer HAMLA CULVERT BZRC004 WEST
RFI-5858-QCN-2-2561 RFI-5858-QCN-2-2561 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 4.2.2 S W H 9-Mar-2013 7:30 AM 9-Mar-13
SIDE PORTION
4886 Final inaspection of galvanised Embedded plate 2250 x 150 x 10mm - 12 nos; 2000 x 15x
RFI-5858-QCN-2-2562 RFI-5858-QCN-2-2562 CONCRETE APPROVED TSF Ladown Yard B-V-3100-004-2-201-02_5 3.2 S W H 9-Mar-2013 8:30 AM 11-Mar-13
10mm 27 nos; 1650 x 150 x 10 mm - 1 nos 20 mm round bar - 90 nos
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
Situ Pedestal concrete for B70-PR-18 F12/Grid-6&7.Pipe Track Base D110-B70-PR-25:
F2 and F3,Retaining wall N- S ( Wall ) 13th panel ( 10.345 meters ) and 11th panel top
4887 RFI-5858-QCN-2-2563 RFI-5858-QCN-2-2563 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 10-Mar-13 2:00 PM 10-Mar-13
portion. Culvert wall BZRC-09A ( 7.60 meters ) third portion and Pipe Sleeper Pedestal =
1 no,&HAMLA CULVERT BZRC 004 FROM WEST SIDE 3rd BASE - (7.5 M PORTION) &
1st BASE (2.8 M PORTION)
4888 RFI-5858-QCN-2-2564 RFI-5858-QCN-2-2564 CONCRETE Check concrete pre-pouring for duct bank BZDW 007 APPROVED Cr # 37 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 10-Mar-13 10:30 AM 10-Mar-13
4889 RFI-5858-QCN-2-2565 RFI-5858-QCN-2-2565 CONCRETE Check concrete pouring for duct bank BZDW 007 APPROVED Cr # 37 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 10-Mar-13 1:00 PM 15-Mar-13
4890 Check Laying of Asphalt Base Course- 2nd Layer HAMLA CULVERT BZRC004 WEST
RFI-5858-QCN-2-2566 RFI-5858-QCN-2-2566 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 10-Mar-13 7:30 AM 10-Mar-13
SIDE PORTION
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-24: SLD017
4891 RFI-5858-QCN-2-2567 RFI-5858-QCN-2-2567 CONCRETE
to SLD030 = 14 nos
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 10-Mar-13 9:30 AM 10-Mar-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-23: Retaining Wall
4892 RFI-5858-QCN-2-2568 RFI-5858-QCN-2-2568 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 11-Mar-13 7:30 AM 11-Mar-13
SLD014 and B70-PS-24: SLD018 Raslaffan
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM EAST SIDE 2nd BASE Section 1
4894 RFI-5858-QCN-2-2570 RFI-5858-QCN-2-2570 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Mar-13 7:00 AM 11-Mar-13
- 15M & 2 Sleeper MASHRAB Culvert
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
4895 RFI-5858-QCN-2-2571 RFI-5858-QCN-2-2571 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 11-Mar-13 7:30 AM 11-Mar-13
Cast-in- Situ Retaining Wall E-W 6th, 7th, 9th, 11th, 12th and 13th panel prior shuttering. ) Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
4896 RFI-5858-QCN-2-2572 RFI-5858-QCN-2-2572 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 11-Mar-13 1:30 PM 11-Mar-13
cleaning & expansion joints of Retaining Wall E-W 5th panel Wall prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 5th Retaining Wall E-W
4897 RFI-5858-QCN-2-2573 RFI-5858-QCN-2-2573 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Mar-13 1:40 PM 15-Mar-13
panel wall Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining Wall E-W 2th Retaining Wall E-W
4898 RFI-5858-QCN-2-2574 RFI-5858-QCN-2-2574 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 11-Mar-13 9:30 AM 11-Mar-13
panel. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-009A Middle BZRC-009A
4900 RFI-5858-QCN-2-2576 RFI-5858-QCN-2-2576 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Mar-13 3:20 PM 15-Mar-13
portion ( 6.4 meters ) and End Wall. Raslaffan
4901 6.3 Check Concrete surface upon form removal of Precast Retaining Wall of BZRC-006
RFI-5858-QCN-2-2577 RFI-5858-QCN-2-2577 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Mar-13 8:00 AM 11-Mar-13
West Side 1 nos ( Base and Wall )
4903 Check Laying of Asphalt Binder Course & Surface Course HAMLA CULVERT BZRC004
RFI-5858-QCN-2-2579 RFI-5858-QCN-2-2579 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-03_5 4.2.4 S W H 11-Mar-13 8:00 AM 11-Mar-13
WEST SIDE PORTION
4904 Check Reinforcement prior to close shuttering D110 B70 - PR - 18 Pipe Rack Foundation
RFI-5858-QCN-2-2580 RFI-5858-QCN-2-2580 CONCRETE APPROVED D110 B70 - PR - 06 B-V-3100-004-2-201-02_5 4.1.b W W H 11-Mar-13 3:00 PM 11-Mar-13
pedestal GL 8-9/A,B (F11)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface preparation HAMAD CULVERT BZRC 005 FROM SOUTH SIDE 1st BASE
4905 RFI-5858-QCN-2-2581 RFI-5858-QCN-2-2581 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 12-Mar-13 7:00 AM 12-Mar-13
WALL ( BOTH SIDE & END WALL)
4906 9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-24: SLD018 prior Retaining Wall
RFI-5858-QCN-2-2582 RFI-5858-QCN-2-2582 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 12-Mar-13 7:30 AM 12-Mar-13
application of curing compound first coating . Raslaffan
9.1. Check protective coating first coat of Cast-in situ Pipe Stopper B70-PS-24: SLD018
4907 RFI-5858-QCN-2-2583 RFI-5858-QCN-2-2583 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Mar-13 9:30 AM 12-Mar-13
prior second coat2
4908 9.1. Check protective coating second coat of Cast-in situ Pipe Stopper B70-PS-24:
RFI-5858-QCN-2-2584 RFI-5858-QCN-2-2584 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 12-Mar-13 1:00 PM 12-Mar-13
SLD018
4909 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-20: SLD009
RFI-5858-QCN-2-2585 RFI-5858-QCN-2-2585 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 12-Mar-13 8:00 AM 12-Mar-13
to SLD018 = 10 nos and SLD037 to SLD049 = 13 nos. prior backfilling.
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Embeded items and
4910 RFI-5858-QCN-2-2586 RFI-5858-QCN-2-2586 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.ac.d W W H 12-Mar-13 1:30 PM 13-Mar-13
Cleaning of Pipe Stopper B70-PS-20: SLD025 prior concreting.
4911 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Sotpper B70-PS-20:
RFI-5858-QCN-2-2587 RFI-5858-QCN-2-2587 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 12-Mar-13 1:40 PM 13-Mar-13
SLD025
Check Surface Preparation & Sealent ApplicationHAMAD CULVERT BZRC 005 FROM
4912 RFI-5858-QCN-2-2588 RFI-5858-QCN-2-2588 CONCRETE
SOUTH SIDE 1st& 2nd BASE & WALL
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.6a,b S W H 12-Mar-13 8:00 AM 12-Mar-13
Check Surface Below ground Protective Coating - First coat & Second coat HAMAD 9:00 AM
4913 RFI-5858-QCN-2-2589 RFI-5858-QCN-2-2589 CONCRETE CULVERT BZRC 005 FROM SOUTH SIDE 1st& 2nd BASE & WALL(OUTSIDE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.2 a S W H 12-Mar-13 TO 12-Mar-13
PORTION) 3:00 PM
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
4914 RFI-5858-QCN-2-2590 RFI-5858-QCN-2-2590 CONCRETE
cleaning & expansion joints of Retaining Wall E-W 7th panel Wall prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 12-Mar-13 1:40 PM 12-Mar-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 7th Retaining Wall E-W
4915 RFI-5858-QCN-2-2591 RFI-5858-QCN-2-2591 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 12-Mar-13 2:00 PM 15-Mar-13
panel wall Raslaffan
Check Concrete CuringHAMAD CULVERT BZRC 005 FROM SOUTH SIDE 1st& 2nd
4916 RFI-5858-QCN-2-2592 RFI-5858-QCN-2-2592 CONCRETE
BASE & WALL
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 12-Mar-13 9:00 AM 12-Mar-13
Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
4917 RFI-5858-QCN-2-2593 RFI-5858-QCN-2-2593 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b W W H 12-Mar-13 7:30 AM 12-Mar-13
EAST SIDE 3rd BASE WALL - 7.5 M PORTION CULVERT
7:30 AM
Check Above Ground Protective Coating of Sleeper foundation - First &Second Coat
4918 RFI-5858-QCN-2-2594 RFI-5858-QCN-2-2594 CONCRETE APPROVED SECTION 2 B-V-3100-004-2-201-02_5 9.3 S W H 12-Mar-13 TO 12-Mar-13
Sleeper Foundations B70 - PS -07 SLD083
11: AM
Check Laying of Asphalt Base Course - 1st layer HALUL CULVERT BZRC008 WEST
4919 RFI-5858-QCN-2-2595 RFI-5858-QCN-2-2595 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 12-Mar-13 7:30 AM 12-Mar-13
SIDE PORTION
4922 Check Laying of Asphalt Base Course - 2nd layer HALUL CULVERT BZRC008 WEST
RFI-5858-QCN-2-2598 RFI-5858-QCN-2-2598 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 13-Mar-13 7:30 AM 13-Mar-13
SIDE PORTION
Check concrete surface upon form removal DUCT BANKBZDW 007 (WEST SIDE OF CROSSING#37
4923 RFI-5858-QCN-2-2599 RFI-5858-QCN-2-2599 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 13-Mar-13 7:00 AM 13-Mar-13
HALUL CULVERT) SECTION4
4924 Check Polythylene & Hardboard Installation of Precast Pipe Stopper B70-PS-24: SLD018
RFI-5858-QCN-2-2600 RFI-5858-QCN-2-2600 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Mar-13 7:30 AM 13-Mar-13
prior backfilling
9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-23: SLD014 prior
4925 RFI-5858-QCN-2-2601 RFI-5858-QCN-2-2601 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Mar-13 7:30 AM 13-Mar-13
application of curing compound first coating .
4926 9.1. Check protective coating first coat of Cast-in situ Pipe Stopper B70-PS-23: SLD014
RFI-5858-QCN-2-2602 RFI-5858-QCN-2-2602 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Mar-13 9:00 AM 13-Mar-13
prior second coat
4927 9.1. Check protective coating second coat of Cast-in situ Pipe Stopper B70-PS-23:
RFI-5858-QCN-2-2603 RFI-5858-QCN-2-2603 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 13-Mar-13 1:00 PM 13-Mar-13
SLD014
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
4928 RFI-5858-QCN-2-2604 RFI-5858-QCN-2-2604 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 13-Mar-13 11.00AM 13-Mar-13
18 -grid 17 to 21/A-B)
4929 Check Polythylene & Hardboard Installation of Precast Pipe Stopper B70-PS-23: SLD014
RFI-5858-QCN-2-2605 RFI-5858-QCN-2-2605 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Mar-13 4:00 PM 13-Mar-13
prior backfilling
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-20:
4930 RFI-5858-QCN-2-2606 RFI-5858-QCN-2-2606 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-Mar-13 3:30 PM 13-Mar-13
SLD025
4931 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall E-W
RFI-5858-QCN-2-2607 RFI-5858-QCN-2-2607 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 13-Mar-13 8:00 AM 13-Mar-13
Cast-in- Situ Retaining Wall E-W 3rd panel wall prior shuttering. Raslaffan
4932 CROSSING#37
RFI-5858-QCN-2-2608 RFI-5858-QCN-2-2608 CONCRETE Check Surface preparation DUCT BANKBZDW 007 (WEST SIDE OF HALUL CULVERT) APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 13-Mar-13 2:00 PM 13-Mar-13
SECTION4
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 5th Retaining Wall E-W
4933 RFI-5858-QCN-2-2609 RFI-5858-QCN-2-2609 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 13-Mar-13 9:00 AM 13-Mar-13
panel wall Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-009A ( 9.0 BZRC-009A
4935 RFI-5858-QCN-2-2611 RFI-5858-QCN-2-2611 CONCRETE
meters length ) east side.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 13-Mar-13 3:50 PM 15-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
4936 RFI-5858-QCN-2-2612 RFI-5858-QCN-2-2612 CONCRETE Precast Pipe Sleeper B70-PS-F3 = 12 nos, B70-PS-F4 = 2 nos B70-PS-F5 = 1 no., B70- APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 13-Mar-13 7:30 AM 13-Mar-13
PS-32-F1 = 1 no., B70-PS-33-F1 = 4 nos and B70-PS-29-F2 = 4 nos prior shuttering.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
4937 RFI-5858-QCN-2-2613 RFI-5858-QCN-2-2613 CONCRETE
Precast Retaining wall of BZRC-006 East Side = 6 nos ( Wall ) prior shuttering.
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 13-Mar-13 7:30 AM 13-Mar-13
4939 RFI-5858-QCN-2-2615 RFI-5858-QCN-2-2615 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-32 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 14-Mar-13 7:00 AM 14-Mar-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-20: SLD019
4940 RFI-5858-QCN-2-2616 RFI-5858-QCN-2-2616 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 14-Mar-13 7:00 AM 14-Mar-13
to SLD024 = 6 nos
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
4941 RFI-5858-QCN-2-2617 RFI-5858-QCN-2-2617 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 14-Mar-13 1:40 PM 14-Mar-13
cleaning & expansion joints of Retaining Wall E-W 3rd panel Wall prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 3rd Retaining Wall E-W
4942 RFI-5858-QCN-2-2618 RFI-5858-QCN-2-2618 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Mar-13 2:00 PM 14-Mar-13
panel wall Raslaffan
Check Laying of Asphalt Binder Course & Surface Course HALUL CULVERT BZRC008
4943 RFI-5858-QCN-2-2619 RFI-5858-QCN-2-2619 CONCRETE APPROVED HALUL CULVERT B-V-3100-004-2-201-03_5 4.2.2 S W H 14-Mar-13 9:00 AM 14-Mar-13
EAST SIDE PORTION
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of BZRC-009A
4944 RFI-5858-QCN-2-2620 RFI-5858-QCN-2-2620 CONCRETE APPROVED B-V-3100-004-2-201-03_5 4.1a.b..d.e W W H 14-Mar-13 9:00 AM 14-Mar-13
BZRC-009A Culvert Middle Portion 6.40 meters ) prior shuttering. Raslaffan
Pre-Pouring For Precast Pipe Track Check Formworks, Reinforcement, cleaning and
4945 RFI-5858-QCN-2-2621 RFI-5858-QCN-2-2621 CONCRETE construction joints of Precast Pipe Track D110-B70-PR-37, 40, 41, 43, 54, 55,59 = 26 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 14-Mar-13 1:30 PM 14-Mar-13
( Pedestal ) prior concreting.
4947 Prepouring - Check form works,Embeded items,Cleaning & Construction joints Section 1
RFI-5858-QCN-2-2623 RFI-5858-QCN-2-2623 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 14-Mar-13 7:30 AM 14-Mar-13
MASHRAB CULVERT BZRC 003 FROM EAST SIDE 3rd BASE -7.5M PORTION (wall) MASHRAB Culvert
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM EAST SIDE 3rd BASE Section 1
4948 RFI-5858-QCN-2-2624 RFI-5858-QCN-2-2624 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 14-Mar-13 8:00AM 14-Mar-13
-7.5M PORTION. (wall) MASHRAB Culvert
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70
4950 PR - 18 SECTION
RFI-5858-QCN-2-2626 RFI-5858-QCN-2-2626 CONCRETE - PR -18 Pipe Rack Foundation Pedestal F11 & Plain concrete Above F13 Foundation APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 14-Mar-13 1:10 PM 14-Mar-13
4
Base
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring D110 B70 - PR -18 Pipe Rack Foundation Pedestal F11 & Plain
4951 RFI-5858-QCN-2-2627 RFI-5858-QCN-2-2627 CONCRETE APPROVED PR - 18 SECTION 4 B-V-3100-004-2-201-02_5 5.1 W H H 14-Mar-13 1:30 PM 14-Mar-13
concrete Above F13 Foundation Base
4952 Check Repair of Core Holes HAMLA BZRC 004 EAST SIDE PORTION, HALUL
RFI-5858-QCN-2-2628 RFI-5858-QCN-2-2628 CONCRETE APPROVED SECTION3,4&5 B-V-3100-004-2-201-03_5 4.2.7 S W H 14-Mar-13 9:00 AM 19-Mar-13
CULVERT BZRC008 EAST SIDE PORTION,QG GATE No.5 BZRC 009
7:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat DUCT CROSSING#37
4953 RFI-5858-QCN-2-2629 RFI-5858-QCN-2-2629 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 14-Mar-13 TO 14-Mar-13
BANKBZDW 007 (WEST SIDE OF HALUL CULVERT) SECTION4
11:00 AM
4954 CROSSING#37
RFI-5858-QCN-2-2630 RFI-5858-QCN-2-2630 CONCRETE Check Concrete Curing DUCT BANKBZDW 007 (WEST SIDE OF HALUL CULVERT) APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 16-Mar-13 7:00 AM 16-Mar-13
SECTION 4
4956 RFI-5858-QCN-2-2632 RFI-5858-QCN-2-2632 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-32 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Mar-13 7:30 AM 18-Mar-13
4957 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and Retaining Wall
RFI-5858-QCN-2-2633 RFI-5858-QCN-2-2633 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 16-Mar-13 8:00 AM 16-Mar-13
Cleaning of Retaining Wall End Portion ( 7.0 meters ) base prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S End Retaining Wall
4958 RFI-5858-QCN-2-2634 RFI-5858-QCN-2-2634 CONCRETE
Portion ( 7.0 meters ) Base.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 16-Mar-13 8:10 AM 16-Mar-13
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
4961 RFI-5858-QCN-2-2637 RFI-5858-QCN-2-2637 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 16-Mar-13 7:30 AM 16-Mar-13
cleaning & expansion joints of Retaining Wall E-W 6th panel Wall prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 6th Retaining Wall E-W
4962 RFI-5858-QCN-2-2638 RFI-5858-QCN-2-2638 CONCRETE
panel wall
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 16-Mar-13 8:00 AM 16-Mar-13
Pre-Pouring For Cast-in- Situ Culvert Check Formworks and embedded items of BZRC- BZRC-009A
4963 RFI-5858-QCN-2-2639 RFI-5858-QCN-2-2639 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.e W W H 16-Mar-13 3:00 PM 16-Mar-13
009A ( 6.4 meters length ) wall prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-009A ( 6.4 BZRC-009A
4964 RFI-5858-QCN-2-2640 RFI-5858-QCN-2-2640 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-Mar-13 3:50 PM 21-Mar-13
meters length ) Wall Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of BZRC-009A
4965 RFI-5858-QCN-2-2641 RFI-5858-QCN-2-2641 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a.b..d.e W W H 16-Mar-13 8:00 AM 16-Mar-13
BZRC-009A Culvert ( 9.0 meters length ) prior shuttering. (wall) Raslaffan
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-PR-37 = 4
4968 RFI-5858-QCN-2-2644 RFI-5858-QCN-2-2644 CONCRETE nos, PR-40 = 4 nos, PR-41 = 2 nos PR-43 = 4 nos, PR-54 = 4 nos, PR-55 = 4 nos and APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 16-Mar-13 3:30 AM 16-Mar-13
PR-59 = 4 nos
4.4.1 Check compressive Strength @ 28 days for grout (Loop foundations D110-B70-PR-
4969 RFI-5858-QCN-2-2645 RFI-5858-QCN-2-2645 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 17-Mar-13 3:00PM 17-Mar-13
06 -grid 1 to 5 (A/B)
4970 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-19: SLD001
RFI-5858-QCN-2-2646 RFI-5858-QCN-2-2646 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Mar-13 7:00 AM 17-Mar-13
to SLD006 = 6 nos
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
4971 RFI-5858-QCN-2-2647 RFI-5858-QCN-2-2647 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 17-Mar-13 1:30 PM 17-Mar-13
cleaning & expansion joints of Retaining Wall E-W 9th panel Wall prior concreting. Raslaffan
4972 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 9th Retaining Wall E-W
RFI-5858-QCN-2-2648 RFI-5858-QCN-2-2648 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 17-Mar-13 1:40 PM 17-Mar-13
panel wall Raslaffan
4973 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall E-W
RFI-5858-QCN-2-2649 RFI-5858-QCN-2-2649 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 17-Mar-13 10:00 AM 17-Mar-13
Cast-in- Situ Retaining Wall E-W 1st panel wall prior shuttering. Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Pre-cast Pipe Sleeper Footing B70-PS-
4975 Gate 5 TSF
RFI-5858-QCN-2-2651 RFI-5858-QCN-2-2651 CONCRETE 29-F2 = 4 nos, B70-PS-32-F1 = 1 no., B70-PS-14-F3 = 12 nos B70-PS-33-F1 = 4 nos, APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 17-Mar-13 7:30 AM 17-Mar-13
Raslaffan
B70-PS-14-F4 = 2 nos and B70-PS-14-F5 = 1 no.
9.1. Check surface preparation of Precast Retaining Wall West side of BZRC-006 = 11
4976 RFI-5858-QCN-2-2652 RFI-5858-QCN-2-2652 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Mar-13 7:30 AM 17-Mar-13
nos panel prior first coating.
4977 Check protective coating first coat of Precast Retaining wall of BZRC-006 West side = 11
RFI-5858-QCN-2-2653 RFI-5858-QCN-2-2653 CONCRETE CANCELLED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 17-Mar-13 1:00 PM 17-Mar-13 cancelled
nos prior second coating.
4978 Check protective coating second coat of Precast Retaining wall of BZRC-006 West side =
RFI-5858-QCN-2-2654 RFI-5858-QCN-2-2654 CONCRETE CANCELLED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 17-Mar-13 4:00 PM 17-Mar-13 cancelled
11 nos
6.3 Check Concrete surface upon form removal of Precast Retaining Wall of BZRC-006
4979 RFI-5858-QCN-2-2655 RFI-5858-QCN-2-2655 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Mar-13 3:00 PM 17-Mar-13
East Side 6 nos panel ( Base and Wall )
4980 6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 3rd Retaining Wall E-W
RFI-5858-QCN-2-2656 RFI-5858-QCN-2-2656 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 17-Mar-13 10:00 AM 17-Mar-13
panel wall Raslaffan
4981 RFI-5858-QCN-2-2657 RFI-5858-QCN-2-2657 CONCRETE Check concrete surface upon form removal D110 B70 - PR -18 Pipe Rack Foundation F11 APPROVED D110 B70 - PR - 18 B-V-3100-004-2-201-02_5 6.3 S W H 17-Mar-13 6:30 AM 17-Mar-13
4982 RFI-5858-QCN-2-2658 RFI-5858-QCN-2-2658 CONCRETE Check Surface preparation D110 B70 - PR -18 Pipe Rack Foundation F11 APPROVED D110 B70 - PR - 18 B-V-3100-004-2-201-02_5 9.1 S W H 17-Mar-13 7:30 AM 17-Mar-13
11:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
4983 RFI-5858-QCN-2-2659 RFI-5858-QCN-2-2659 CONCRETE
PR -18 Pipe Rack Foundation F11
APPROVED D110 B70 - PR - 18 B-V-3100-004-2-201-02_5 9.2.a S W H 17-Mar-13 TO 17-Mar-13
2:30 PM
4.4.1 Check compressive Strength @ 1 days for grout (Loop foundations D110-B70-PR-
4984 RFI-5858-QCN-2-2660 RFI-5858-QCN-2-2660 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_3 4.4.1 S W H 17-Mar-13 3:00 PM 17-Mar-13
64,65&19
Check Polyetheylene Installation Check Hardboard Installation D110 B70 - PR -18 Pipe
4985 RFI-5858-QCN-2-2661 RFI-5858-QCN-2-2661 CONCRETE
Rack Foundation F11
APPROVED D110 B70 - PR -18 B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Mar-13 4:30 PM 17-Mar-13
Check Concrete Curing D110 B70 - PR -18 Pipe Rack Foundation F11 (Footing &
4986 RFI-5858-QCN-2-2662 RFI-5858-QCN-2-2662 CONCRETE APPROVED PIPE RACK PR - 18 B-V-3100-004-2-201-02_5 6.4 S W H 17-Mar-13 3:30 PM 17-Mar-13
Pedestal)
9.3. Check protective coating second coat of Precast Pipe Sleeper and Pipe Stopper B70-
4987 RFI-5858-QCN-2-2663 RFI-5858-QCN-2-2663 CONCRETE PS-22: SLD017 to SLD035 = 19 nos SLD038 to SLD043 = 6 nos and SLD 051 to SLD063 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 17-Mar-13 8:00 AM 17-Mar-13
= 13 nos
9.3. Check protective coating surface preparation first coat of Precast Pipe Sleeper and
4988 RFI-5858-QCN-2-2664 RFI-5858-QCN-2-2664 CONCRETE Pipe Stopper B70-PS-23: SLD002 to SLD022 = 20 nos except SLD014, and B70-PS-24: APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S H H 17-Mar-13 8:00 AM 17-Mar-13
SLD001 to SLD030 = 27 nos except SLD004, SLD005 and SLD018 prior second coating.
Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
4989 RFI-5858-QCN-2-2665 RFI-5858-QCN-2-2665 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b W W H 17-Mar-13 7:30 AM 17-Mar-13
EAST SIDE 2nd BASE WALL - 15 M PORTION CULVERT
Check Final Visual Inspection Sleeper foundations Sleeper Foundations B70 - PS -07
4990 RFI-5858-QCN-2-2666 RFI-5858-QCN-2-2666 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_5 9.2 S W H 17-Mar-13 8:00 AM 17-Mar-13
SLD083
7:30 AM
4991 Check Above Ground Protective Coating of Culvert END PORTION WEST SIDE - First
RFI-5858-QCN-2-2667 RFI-5858-QCN-2-2667 CONCRETE APPROVED Mashrab Culvert B-V-3100-004-2-201-02_5 9.3 S W H 17-Mar-13 TO 17-Mar-13
&Second Coat and surface preparation
2:00 PM
7:30 AM
Check Surface Preparation & Above Ground Protective Coating of BZRC 004Culvert END
4994 RFI-5858-QCN-2-2670 RFI-5858-QCN-2-2670 CONCRETE APPROVED HAMLA CULVERT B-V-3100-004-2-201-02_5 9.3 S W H 18-Mar-13 TO 18-Mar-13
PORTION BOTH SIDE - First &Second Coat
2:00 PM
4995 9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-20: SLD025 prior
RFI-5858-QCN-2-2671 RFI-5858-QCN-2-2671 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 7:00 AM 18-Mar-13
first coating of curring compound.
4996 9.1. Check protective coating first coat of Cast-in situ Pipe Stopper B70-PS-20: SLD025
RFI-5858-QCN-2-2672 RFI-5858-QCN-2-2672 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 9:30 AM 18-Mar-13
prior second coating.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check protective coating second coat of Cast-in situ Pipe Stopper B70-PS-20:
4997 RFI-5858-QCN-2-2673 RFI-5858-QCN-2-2673 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 1:30 PM 18-Mar-13
SLD025
4998 Check Polythylene & Hardboard Installation of Precast Pipe Stopper B70-PS-20: SLD025
RFI-5858-QCN-2-2674 RFI-5858-QCN-2-2674 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 18-Mar-13 4:00 PM 18-Mar-13
prior backfilling
6.3 Check Concrete surface upon form removal of Precast Retaining Wall N- S Footing
4999 RFI-5858-QCN-2-2675 RFI-5858-QCN-2-2675 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 18-Mar-13 7:00 AM 18-Mar-13
( 7.0 meters )
5000 9.1. Check surface preparation of Cast-in- Situ Retaining Wall N- S Footing ( 7.0 meters ) Retaining Wall N- S
RFI-5858-QCN-2-2676 RFI-5858-QCN-2-2676 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 9:00 AM 18-Mar-13
prior first coating of curring compound. Raslaffan
5001 9.1. Check protective coating first coat of Cast-in situ Retaining Wall N- S footing ( 7.0 Retaining Wall N- S
RFI-5858-QCN-2-2677 RFI-5858-QCN-2-2677 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 10:30 AM 18-Mar-13
meters ) prior second coating. Raslaffan
9.1. Check protective coating second coat of Cast-in situ Retaining Wall N- S footing ( 7.0 Retaining Wall N- S
5002 RFI-5858-QCN-2-2678 RFI-5858-QCN-2-2678 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 1:30 PM 18-Mar-13
meters ) Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks, Reinforcement and
5003 Retaining Wall N- S
RFI-5858-QCN-2-2679 RFI-5858-QCN-2-2679 CONCRETE Cleaning of Retaining Wall N- S corner portion ( Base ) and ditch 10th and 12th panel APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 18-Mar-13 2:00 PM 18-Mar-13
Raslaffan
prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S Corner Retaining Wall N- S
5004 RFI-5858-QCN-2-2680 RFI-5858-QCN-2-2680 CONCRETE
portion ( Base ) and Ditch 10th and 12th panel.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 18-Mar-13 2:30 PM 19-Mar-13
5005 Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2681 RFI-5858-QCN-2-2681 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 18-Mar-13 6:30 AM 18-Mar-13
EAST SIDE 3rd BASE&WALL BOTH SIDE -- 7.5 M PORTION CULVERT
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM EAST SIDE 3rd MASHRAB
5006 RFI-5858-QCN-2-2682 RFI-5858-QCN-2-2682 CONCRETE
BASE & WALL -- 7.5 M
APPROVED
CULVERT
B-V-3100-004-2-201-02_5 9.1 S W H 18-Mar-13 10:00 AM 18-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
5007 RFI-5858-QCN-2-2683 RFI-5858-QCN-2-2683 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1a.b..d.e W W H 18-Mar-13 7:30 AM 18-Mar-13
Cast-in- Situ Retaining Wall E-W 4th panel prior shuttering. ) Raslaffan
Check Polythylene & Hardboard Installation of Precast Pipe sleeper B70-PS-17: SLD045
5008 RFI-5858-QCN-2-2684 RFI-5858-QCN-2-2684 CONCRETE
to SLD047 = 3 nos, SLD49 to SLD060 = 2 nos and SLD061 to SLD063 = 3 nos.
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 18-Mar-13 7:00 AM 18-Mar-13
Check Surface Preparation & Sealent Application MASHRAB CULVERT BZRC 003 MASHRAB
5009 RFI-5858-QCN-2-2685 RFI-5858-QCN-2-2685 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6a,b S W H 18-Mar-13 8:30 AM 18-Mar-13
FROM EAST SIDE 3rd BASE & WALL -- 7.5M PORTION CULVERT
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM EAST SIDE 2nd BASE Section 1
5012 RFI-5858-QCN-2-2688 RFI-5858-QCN-2-2688 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Mar-13 8:00AM 19-Mar-13
WALL - 15M PORTION MASHRAB Culvert
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
Retaining Wall E-W
5013 RFI-5858-QCN-2-2689 RFI-5858-QCN-2-2689 CONCRETE cleaning & expansion joints of Retaining Wall E-W 1st panel and 4th panel Wall prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 19-Mar-13 1:30 PM 19-Mar-13
Raslaffan
concreting.
5014 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 1st and Retaining Wall E-W
RFI-5858-QCN-2-2690 RFI-5858-QCN-2-2690 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 19-Mar-13 1:40 PM 19-Mar-13
4th panel wall Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 6th Retaining Wall E-W
5015 RFI-5858-QCN-2-2691 RFI-5858-QCN-2-2691 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 19-Mar-13 2:00 PM 19-Mar-13
and 9th panel wall Raslaffan
6.3 Check Concrete surface upon form removal of Precast Pipe Sleeper B70-PS-29-F2 =
5016 RFI-5858-QCN-2-2692 RFI-5858-QCN-2-2692 CONCRETE 4 nos, PS-32-F1 = 1 no., PS-14-F3 = 12 nos PS-33-F1 = 4 nos., PS-14-F4 = 2 nos and APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-Mar-13 9:30 AM 19-Mar-13
PS-14-F5 = 1 no.
Pre-Pouring For Precast Pipe Track Check Formworks, Embedded items and cleaning of
5017 RFI-5858-QCN-2-2693 RFI-5858-QCN-2-2693 CONCRETE Precast Pipe Track Pedestal D110-B70-PR-38 = 4 nos, PR-41 = 2 nos, PR-56 = 4 nos, APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.d.e W W H 19-Mar-13 1:30 PM 19-Mar-13
PR-57 = 4 nos, PR-58 = 4 nos, PR-60 = 4 nos and PR-62 = 4 nos ( Total = 26 nos )
Concrete Placement Check Concrete pouring of Precast Pipe Track Pedestal D110-B70-
5018 RFI-5858-QCN-2-2694 RFI-5858-QCN-2-2694 CONCRETE PR-38 = 4 nos,PR-41 = 2 nos, PR-56 = 4 nos PR-57 = 4 nos, PR-58 = 4 nos, PR-60 = 4 APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Mar-13 1:30 PM 19-Mar-13
nos and PR-62 = 4 nos ( Total = 26 nos )
5021 Check Reinforcement prior to close shutteringMASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2697 RFI-5858-QCN-2-2697 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b W W H 19-Mar-13 7:30 AM 19-Mar-13
EAST SIDE 1st BASE WALL - 6 M PORTION & 2 SLEEPER CULVERT
5023 4.4.3 Check compressive strength@28 Days for grout cube (D210-B70-PR45 F1&
RFI-5858-QCN-2-2699 RFI-5858-QCN-2-2699 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.3 S W H 20-Mar-13 2:00 PM 20-Mar-13
F2,D210-B70-PR 71 F1& F2,D110-B70-PR- 08 F1& F2,)
5024 Prepouring - Check form works,Embeded items,Cleaning & Construction joints DUCT EAST SIDE OF
RFI-5858-QCN-2-2700 RFI-5858-QCN-2-2700 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 20-Mar-13 4:10 PM 20-Mar-13
BANK BZDW 004 MASHRAB CULVERT
EAST SIDE OF
5025 RFI-5858-QCN-2-2701 RFI-5858-QCN-2-2701 CONCRETE Check Concrete Pouring DUCT BANK BZDW 004 APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-Mar-13 4:30PM 21-Mar-13
MASHRAB CULVERT
5026 6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining walL N- S ditch Retaining Wall N- S
RFI-5858-QCN-2-2702 RFI-5858-QCN-2-2702 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 20-Mar-13 9:00 AM 20-Mar-13
10th and 12th panel. Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 1st and Retaining Wall E-W
5027 RFI-5858-QCN-2-2703 RFI-5858-QCN-2-2703 CONCRETE
4th panel.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 20-Mar-13 4:00 PM 20-Mar-13
5028 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-17: SLD045, SLD046,
RFI-5858-QCN-2-2704 RFI-5858-QCN-2-2704 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Mar-13 8:30 AM 24-Mar-13
SLD047, SLD49, SLD050, SLD061, SLD062 and SLD063
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
5029 RFI-5858-QCN-2-2705 RFI-5858-QCN-2-2705 CONCRETE
cleaning & expansion joints of Retaining Wall E-W 8th panel prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 20-Mar-13 1:30 PM 20-Mar-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 8th Retaining Wall E-W
5030 RFI-5858-QCN-2-2706 RFI-5858-QCN-2-2706 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-Mar-13 1:40 PM 20-Mar-13
panel wall Raslaffan
6:30 AM
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations -
5031 RFI-5858-QCN-2-2707 RFI-5858-QCN-2-2707 CONCRETE
First &Second Coat D110 B70 PS 05 SLD 003 TO SLD008
APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.3 S W H 20-Mar-13 TO 20-Mar-13
10:30 AM
6:30 AM
Check Suraface Preparation & Above Ground Protective Coating of Structure foundations
5032 RFI-5858-QCN-2-2708 RFI-5858-QCN-2-2708 CONCRETE APPROVED SECTION1 PR 01 B-V-3100-004-2-201-02_5 9.3 S W H 20-Mar-13 TO 20-Mar-13
- First & Second Coat D110 B70 PR 001 GL 1-15 / A-B
4:30 PM
4.4.3 Check compressive strength@1 Day for grout cube (D110-B70-PR23 F1& F2,D110-
5033 RFI-5858-QCN-2-2709 RFI-5858-QCN-2-2709 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.1 S W H 20-Mar-13 3:00 PM 20-Mar-13
B70-PR 24 F1& F2.
6.4 Completion of 14 days curing for Precast Pipe Sleeper Pedestal B70-PS-22-F3 = 1
5034 RFI-5858-QCN-2-2710 RFI-5858-QCN-2-2710 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 20-Mar-13 8:30 AM 20-Mar-13
no. B70-PS-29-F2 = 12 nos
5035 RFI-5858-QCN-2-2711 RFI-5858-QCN-2-2711 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Wall BZRC-011 Type B -= 2 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 20-Mar-13 8:30 AM 20-Mar-13
5036 RFI-5858-QCN-2-2712 RFI-5858-QCN-2-2712 CONCRETE 6.4 Completion of 14 days curing for Precast Culvert Wall BZRC-012 Type B -= 2 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 20-Mar-13 8:30 AM 20-Mar-13
5037 Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2713 RFI-5858-QCN-2-2713 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 20-Mar-13 4:30 PM 20-Mar-13
EAST SIDE 2nd BASE&WALL BOTH SIDE -- 15 M PORTION CULVERT
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-19: SLD007
5038 RFI-5858-QCN-2-2714 RFI-5858-QCN-2-2714 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Mar-13 7:00 AM 21-Mar-13
to SLD011 = 5 nos.
5039 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Crossing 44
RFI-5858-QCN-2-2715 RFI-5858-QCN-2-2715 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 21-Mar-13 1:30 PM 21-Mar-13
of Pipe Track Footing of D110-B70-PR-25: F5 prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Crossing 44
5040 RFI-5858-QCN-2-2716 RFI-5858-QCN-2-2716 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 21-Mar-13 1:40 PM 21-Mar-13
B70-PR-25: F5 Raslaffan
5041 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) cast -in-
RFI-5858-QCN-2-2717 RFI-5858-QCN-2-2717 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 21-Mar-13 2:00 PM 21-Mar-13
Situ culvert 2nd base of BZRC-005 west side
5042 RFI-5858-QCN-2-2718 RFI-5858-QCN-2-2718 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-69 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Mar-13 9:30 AM 21-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5044 RFI-5858-QCN-2-2720 RFI-5858-QCN-2-2720 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70 - PS -09 SLD020 APPROVED SECTION 2 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 21-Mar-13 7:00 AM 21-Mar-13
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Reinforcement and
5045 RFI-5858-QCN-2-2721 RFI-5858-QCN-2-2721 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d. W W H 21-Mar-13 1:30 PM 21-Mar-13
Cleaning of Pipe Stopper B70-PS-17: SLD066 prior concreting. Footing
5046 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe stopper B70-PS-17:
RFI-5858-QCN-2-2722 RFI-5858-QCN-2-2722 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 21-Mar-13 1:40 PM 25-Mar-13
SLD066
5047 Pre-Pouring For Cast-in- Situ Culvert Check Formworks and embedded items of BZRC- BZRC-009A
RFI-5858-QCN-2-2723 RFI-5858-QCN-2-2723 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.e W W H 21-Mar-13 2:00 PM 21-Mar-13
009A wall ( 9.0 meters length ) middle portion and 3 nos of sleeper prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-009A ( 9.0 BZRC-009A
5048 RFI-5858-QCN-2-2724 RFI-5858-QCN-2-2724 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 21-Mar-13 2:30 PM 25-Mar-13
meters length ) middle portion Wall and 3 nos of sleeper Raslaffan
5049 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- B70 SECTION 4 D110
RFI-5858-QCN-2-2725 RFI-5858-QCN-2-2725 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 21-Mar-13 8:00 AM 21-Mar-13
- PR -16 Pipe Rack Foundation Footing GL 2-4/A-B (F2,F3,F4&F5) -B70 - PR - 16
Check Concrete Pouring D110- B70 - PR -16 Pipe Rack Foundation Footing GL 2-4/A- SECTION 4 D110
5050 RFI-5858-QCN-2-2726 RFI-5858-QCN-2-2726 CONCRETE
B(F2,F3,F4&F5)
APPROVED
-B70 - PR - 16
B-V-3100-004-2-201-02_5 5.1 W H H 21-Mar-13 8:20 AM 25-Mar-13
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-38 =
5051 RFI-5858-QCN-2-2727 RFI-5858-QCN-2-2727 CONCRETE 4 nos, PR-41 = 2 nos, PR-56 = 4 nos PR-57 = 4 nos, PR-58 = 4 nos, PR-60 = 4 nos and APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 21-Mar-13 9:00 AM 21-Mar-13
PR-62 = 4 nos
6.3 Check Concrete surface upon form removal of Cast-in- Situ culvert BZRC-009A wall BZRC-009A
5052 RFI-5858-QCN-2-2728 RFI-5858-QCN-2-2728 CONCRETE
( 6.4 meters length )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 21-Mar-13 7:00 AM 21-Mar-13
2:30 PM
Check Surface preparation & Above Ground Protective Coating of Sleeper foundation -
5053 RFI-5858-QCN-2-2729 RFI-5858-QCN-2-2729 CONCRETE APPROVED SECTION 2 B-V-3100-004-2-201-02_5 9.3 S W H 21-Mar-13 TO 21-Mar-13
First &Second Coat Sleeper Foundations B70 - PS -09 SLD020
4:00 PM
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM EAST SIDE 2nd MASHRAB
5054 RFI-5858-QCN-2-2730 RFI-5858-QCN-2-2730 CONCRETE
BASE & WALL BOTH SIDE -- 15 M
APPROVED
CULVERT
B-V-3100-004-2-201-02_5 9.1 S W H 23-Mar-13 6:30 AM 23-Mar-13
Check Surface Below ground Protective Coating - First coat & Second coatMASHRAB 8:00 AM
MASHRAB
5055 RFI-5858-QCN-2-2731 RFI-5858-QCN-2-2731 CONCRETE CULVERT BZRC 003 FROM EAST SIDE 2nd BASE & WALL BOTH SIDE -- 15 M APPROVED B-V-3100-004-2-201-02_5 9.2 a S W H 23-Mar-13 TO 23-Mar-13
CULVERT
PORTION 9:30 AM
Check Concrete Curing MASHRAB CULVERT BZRC 003 FROM EAST SIDE 2nd BASE MASHRAB
5057 RFI-5858-QCN-2-2733 RFI-5858-QCN-2-2733 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 23-Mar-13 10:30 AM 23-Mar-13
& WALL BOTHSIDE -- 15 M PORTION CULVERT
Check Surface Preparation & Sealent Application MASHRAB CULVERT BZRC 003 MASHRAB
5058 RFI-5858-QCN-2-2734 RFI-5858-QCN-2-2734 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6a,b S W H 23-Mar-13 8:30 AM 23-Mar-13
FROM EAST SIDE 3rd BASE & WALL -- 15M PORTION CULVERT
EAST OF
5059 RFI-5858-QCN-2-2735 RFI-5858-QCN-2-2735 CONCRETE Check concrete surface upon form removal DUCTBANK BZDW004 APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 23-Mar-13 6:30 AM 23-Mar-13
MASHRAB CULVERT
5060 EAST OF
RFI-5858-QCN-2-2736 RFI-5858-QCN-2-2736 CONCRETE Check Surface preparation DUCTBANK BZDW004 APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 23-Mar-13 9:30 AM 23-Mar-13
MASHRAB CULVERT
EAST MASHRAB
5061 RFI-5858-QCN-2-2737 RFI-5858-QCN-2-2737 CONCRETE Check Polyetheylene Installation DUCTBANK BZDW004 APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 23-Mar-13 10:30 AM 23-Mar-13
CULVERT
5062 EAST OF
RFI-5858-QCN-2-2738 RFI-5858-QCN-2-2738 CONCRETE Check Concrete Curing DUCTBANK BZDW004 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 23-Mar-13 10:30 AM 23-Mar-13
MASHRAB CULVERT
5063 RFI-5858-QCN-2-2739 RFI-5858-QCN-2-2739 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-69 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 23-Mar-13 8:30 AM 25-Mar-13
5065 RFI-5858-QCN-2-2741 RFI-5858-QCN-2-2741 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-19: SLD008 to SLD011 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 23-Mar-13 9:30 AM 31-Mar-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Reinforcement prior to close shuttering D110- B70 - PR -16 Pipe Rack Foundation
5066 RFI-5858-QCN-2-2742 RFI-5858-QCN-2-2742 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 4.1b W W H 23-Mar-13 4:00 PM 23-Mar-13
Pedestal GL 2-4/A-B-- (F2,F3,F4&F5)
5067 RFI-5858-QCN-2-2743 RFI-5858-QCN-2-2743 CONCRETE Check Final Visual Inspection D110-B70-PR-001 Piperack Foundation GL 1-15/A-B APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 23-Mar-13 10:30 AM 23-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Crosssing 44
5068 RFI-5858-QCN-2-2744 RFI-5858-QCN-2-2744 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 23-Mar-13 9:00 AM 23-Mar-13
Cast-in- Situ Pipe Track D110-B70-PR-25: F5 prior shuttering. Raslaffan
5069 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-2745 RFI-5858-QCN-2-2745 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 23-Mar-13 1:00 PM 23-Mar-13
Cast-in- Situ Pipe Stopper B70-PS-17: SLD066 prior shuttering.
5070 6.3 Check Concrete surface upon form removal of Cast-in- Situ BZRC-009A ( 9.0 meters BZRC-009A
RFI-5858-QCN-2-2746 RFI-5858-QCN-2-2746 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 23-Mar-13 9:00 AM 23-Mar-13
legnht ) Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
Retaining Wall E-W
5071 RFI-5858-QCN-2-2747 RFI-5858-QCN-2-2747 CONCRETE cleaning & expansion joints of Retaining Wall E-W 10th panel and 12th panel Wall prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 23-Mar-13 1:30 PM 23-Mar-13
Raslaffan
concreting.
5072 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 10th Retaining Wall E-W
RFI-5858-QCN-2-2748 RFI-5858-QCN-2-2748 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Mar-13 1:40 PM 23-Mar-13
and 12th panel wall Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 8th Retaining Wall E-W
5073 RFI-5858-QCN-2-2749 RFI-5858-QCN-2-2749 CONCRETE
panel wall
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.3 S W H 23-Mar-13 9:00 AM 23-Mar-13
5074 Check Final Visual Inspection D110-B70-PS-05 Pipe Sleeper Foundation SLD003 TO
RFI-5858-QCN-2-2750 RFI-5858-QCN-2-2750 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 24-Mar-13 9:30 AM 24-Mar-13
SLD008
5075 RFI-5858-QCN-2-2751 RFI-5858-QCN-2-2751 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-26 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Mar-13 8:30 AM 24-Mar-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of BZRC-009A
5077 RFI-5858-QCN-2-2753 RFI-5858-QCN-2-2753 CONCRETE
BZRC-009A Culvert end wall east side prior shuttering.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 24-Mar-13 7:00 AM 24-Mar-13
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded
Crossing 44
5078 RFI-5858-QCN-2-2754 RFI-5858-QCN-2-2754 CONCRETE items and cleaning of Pipe Track and Pipe Track Footing D110-B70-PR-25: F6 prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 24-Mar-13 2:00 PM 24-Mar-13
Raslaffan
concreting
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Crossing 44
5079 RFI-5858-QCN-2-2755 RFI-5858-QCN-2-2755 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 24-Mar-13 2:20 PM 24-Mar-13
25: F6 ( Footing ) Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Stopper Check Formworks, Embedded items and
5080 RFI-5858-QCN-2-2756 RFI-5858-QCN-2-2756 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d. W W H 24-Mar-13 2:00 PM 24-Mar-13
Cleaning of Pipe Stopper Pedestal B70-PS-17: SLD066 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe stopper Pedestal B70-
5081 RFI-5858-QCN-2-2757 RFI-5858-QCN-2-2757 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 24-Mar-13 2:20 PM 24-Mar-13
PS-17: SLD066
Check concrete reapair works b. Check concrete reapair works of Retaining Wall N- S Retaining Wall N- S
5082 RFI-5858-QCN-2-2758 RFI-5858-QCN-2-2758 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.5.b W H H 24-Mar-13 8:00 AM 24-Mar-13
( 10th panel wall ) Raslaffan
5083 RFI-5858-QCN-2-2759 RFI-5858-QCN-2-2759 CONCRETE Check concrete pre-pouring for west base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 24-Mar-13 1:30 PM 24-Mar-13
5084 RFI-5858-QCN-2-2760 RFI-5858-QCN-2-2760 CONCRETE Check concrete pouring for west base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 24-Mar-13 2:00 PM 24-Mar-13
5085 Check Final Visual Inspection Sleeper foundations Sleeper Foundations D110- B70 - PS
RFI-5858-QCN-2-2761 RFI-5858-QCN-2-2761 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_6 9.2 S W H 24-Mar-13 8:00 AM 24-Mar-13
-09 SLD020
5087 4.4.3 Check compressive strength@28 Days for grout cube (D110-B70-PR-12 -Grid 1 to
RFI-5858-QCN-2-2763 RFI-5858-QCN-2-2763 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.3 S W H 24-Mar-13 2:00 PM 27-Mar-13
5/AB)
Check Concrete Pouring MASHRAB CULVERT BZRC 003 FROM EAST SIDE 1st BASE Section 1
5089 RFI-5858-QCN-2-2765 RFI-5858-QCN-2-2765 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Mar-13 1:30PM 28-Mar-13
WALL(BOTH SIDE&END WALL) - 6M PORTION & 2 SLEEPER MASHRAB Culvert
5090 Pre-Pouring For Cast-in- Situ Culvert Check Formworks and embedded items of BZRC- BZRC-009A
RFI-5858-QCN-2-2766 RFI-5858-QCN-2-2766 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.e W W H 25-Mar-13 3:00 PM 25-Mar-13
009A End wall prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-009A ( End BZRC-009A
5091 RFI-5858-QCN-2-2767 RFI-5858-QCN-2-2767 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Mar-13 3:30 PM 28-Mar-13
Wall ) Raslaffan
5092 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded Crossing 44
RFI-5858-QCN-2-2768 RFI-5858-QCN-2-2768 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 25-Mar-13 2:00 PM 25-Mar-13
items and cleaning of Pipe Track Pedestal D110-B70-PR-25: F5 Raslaffan
5093 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Crossing 44
RFI-5858-QCN-2-2769 RFI-5858-QCN-2-2769 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Mar-13 2:30 PM 25-Mar-13
B70-PR-25: F5 Raslaffan
9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-009A base and Wall prior BZRC-009A
5094 RFI-5858-QCN-2-2770 RFI-5858-QCN-2-2770 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 25-Mar-13 7:30 AM 25-Mar-13
first coating of curring compound. ( 6.4 and 9.0 meters length ) Raslaffan
5095 9.1. Check protective coating first coat of Cast-in situ Culvert Base and Wall of BZRC- BZRC-009A
RFI-5858-QCN-2-2771 RFI-5858-QCN-2-2771 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 25-Mar-13 9:30 AM 25-Mar-13
009A ( 6.4 and 9.0 meters length ) Raslaffan
9.1. Check protective coating second coat of Cast-in situ Culvert Base and Wall BZRC- BZRC-009A
5096 RFI-5858-QCN-2-2772 RFI-5858-QCN-2-2772 CONCRETE
009A ( 6.4 and 9.0 meters )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 25-Mar-13 2:30 PM 25-Mar-13
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
5097 Retaining Wall E-W
RFI-5858-QCN-2-2773 RFI-5858-QCN-2-2773 CONCRETE cleaning & expansion joints of Retaining Wall E-W 11th panel and 14th panel prior APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 25-Mar-13 1:30 PM 25-Mar-13
Raslaffan
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 11th Retaining Wall E-W
5098 RFI-5858-QCN-2-2774 RFI-5858-QCN-2-2774 CONCRETE
panel wall
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 25-Mar-13 1:40 PM 25-Mar-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 10th Retaining Wall E-W
5099 RFI-5858-QCN-2-2775 RFI-5858-QCN-2-2775 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 25-Mar-13 1:00 PM 25-Mar-13
and 12th panel wall Raslaffan
Check erection of pre-cast pipe sleepers B70-PS-26: SLD025 To SLD071 except Tank Farm (Area 1)
5100 RFI-5858-QCN-2-2776 RFI-5858-QCN-2-2776 CONCRETE
SLD048, SLD049, SLD064, SLD065 = 40 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 8.2 S W H 25-Mar-13 7:00 AM 28-Mar-13
Check polyethylene & hardboard installation of pre-cast pipe sleepers B70-PS-26: Tank Farm (Area 1)
5101 RFI-5858-QCN-2-2777 RFI-5858-QCN-2-2777 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3.b/9.3.c S W H 25-Mar-13 7:00 AM 28-Mar-13
SLD025 To SLD071 except SLD048, SLD049, SLD064, SLD065 = 40 nos Raslaffan
5102 RFI-5858-QCN-2-2778 RFI-5858-QCN-2-2778 CONCRETE Check Final Visual Inspection D110-B70-PR-70 Piperack Foundation GL 1-2/A-B APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 26-Mar-13 9:30 AM 26-Mar-13
5104 RFI-5858-QCN-2-2780 RFI-5858-QCN-2-2780 CONCRETE Check concrete surface upon form removal for west base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-Mar-13 6:30 AM 28-Mar-13
5105 RFI-5858-QCN-2-2781 RFI-5858-QCN-2-2781 CONCRETE Check concrete surface preparation for west base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Mar-13 8:30 AM 28-Mar-13
5106 9.1. Check surface preparation of Cast-in- Situ Pipe Stopper B70-PS-17: SLD066 ( Base
RFI-5858-QCN-2-2782 RFI-5858-QCN-2-2782 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Mar-13 8:30 AM 26-Mar-13
and Pedestal ) prior first coat of curring compound
5107 RFI-5858-QCN-2-2783 RFI-5858-QCN-2-2783 CONCRETE Check concrete curing for west base of culvert BZRC-012 - using curing compound APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Mar-13 10:30 AM 28-Mar-13
5108 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-17:
RFI-5858-QCN-2-2784 RFI-5858-QCN-2-2784 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-Mar-13 7:00 AM 26-Mar-13
SLD066 (base pedestal)
9.1. Check protective coating first coat of Cast-in situ Pipe Stopper B70-PS-17:L SLD066
5109 RFI-5858-QCN-2-2785 RFI-5858-QCN-2-2785 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Mar-13 10:30 AM 26-Mar-13
( Base and Pedestal prior )
5110 9.1. Check protective coating second coat of Cast-in situ Pipe Stopper B70-PS-17:
RFI-5858-QCN-2-2786 RFI-5858-QCN-2-2786 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 26-Mar-13 3:30 PM 26-Mar-13
SLD066 ( Base and Pedestal )
5111 6.3 Check Concrete surface upon form removal of Cast-in- Situ D110-B70-PR25: F5 Crossing 44
RFI-5858-QCN-2-2787 RFI-5858-QCN-2-2787 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 26-Mar-13 3:00 PM 26-Mar-13
(base pedestal) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Crosssing 44
5112 RFI-5858-QCN-2-2788 RFI-5858-QCN-2-2788 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 26-Mar-13 7:00 AM 26-Mar-13
Cast-in- Situ Pipe Track D110-B70-PR-25: F6 pedestal prior shuttering. Raslaffan
5113 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded Crossing 44
RFI-5858-QCN-2-2789 RFI-5858-QCN-2-2789 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 27-Mar-13 2:00 PM 27-Mar-13
items and cleaning of Pipe Track Pedestal D110-B70-PR-25: F6 Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Crossing 44
5114 RFI-5858-QCN-2-2790 RFI-5858-QCN-2-2790 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Mar-13 2:30 PM 27-Mar-13
B70-PR-25: F6 Raslaffan
5115 Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement, Retaining Wall E-W
RFI-5858-QCN-2-2791 RFI-5858-QCN-2-2791 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 27-Mar-13 1:30 PM 27-Mar-13
cleaning & expansion joints of Retaining Wall E-W 12th panel prior concreting. Raslaffan
5116 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W 12th Retaining Wall E-W
RFI-5858-QCN-2-2792 RFI-5858-QCN-2-2792 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Mar-13 1:40 PM 27-Mar-13
panel wall Raslaffan
5119 RFI-5858-QCN-2-2795 RFI-5858-QCN-2-2795 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-17: SLD066 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 27-Mar-13 9:00 AM 27-Mar-13
5120 9.1. Check surface preparation of Cast-in- Situ Culvert Pipe Track ( Base and Pedestal ) Crossing 44
RFI-5858-QCN-2-2796 RFI-5858-QCN-2-2796 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 27-Mar-13 1:00 PM 27-Mar-13
D110-B70-PR-25: F5 Raslaffan
5121 RFI-5858-QCN-2-2797 RFI-5858-QCN-2-2797 CONCRETE Check Final Visual Inspection D110-B70-PR-002 Piperack Foundation GL 1-2/A-B APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 27-Mar-13 9:30 AM 27-Mar-13
BZRC-009A
5122 RFI-5858-QCN-2-2798 RFI-5858-QCN-2-2798 CONCRETE 6.3 Check Concrete surface upon form removal of Cast-in- Situ BZRC-009A End Wall APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Mar-13 9:00 AM 27-Mar-13
Raslaffan
5124 RFI-5858-QCN-2-2800 RFI-5858-QCN-2-2800 CONCRETE Check concrete pre-pouring for east base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 27-Mar-13 2:00 PM 27-Mar-13
5125 RFI-5858-QCN-2-2801 RFI-5858-QCN-2-2801 CONCRETE Check concrete pouring for east 2nd base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 27-Mar-13 2:00 PM 4-Apr-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ retaining wall E-W 11th Retaining Wall E-W
5126 RFI-5858-QCN-2-2802 RFI-5858-QCN-2-2802 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Mar-13 9:00 AM 27-Mar-13
and 14th panel wall Raslaffan
4.4.1 Check compressive strength@1 Day for grout cube (D110-B70-PR-22 F1& F2,
5128 RFI-5858-QCN-2-2804 RFI-5858-QCN-2-2804 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 28-Mar-13 11:00 AM 28-Mar-13
F3,F4,F5,F6)
5129 Check concrete surface upon form removal MASHRAB CULVERT BZRC 003 FROM MASHRAB
RFI-5858-QCN-2-2805 RFI-5858-QCN-2-2805 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 28-Mar-13 4:00 PM 28-Mar-13
EAST SIDE 1st BASE&WALL (BOTH SIDE&END WALL) --6 M PORTION CULVERT
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- B70
5131 SECTION 4 D110
RFI-5858-QCN-2-2807 RFI-5858-QCN-2-2807 CONCRETE - PR -16 Pipe Rack Foundation Pedestal GL 2-4/A-B(F2,F3,F4&F5) & Footing GL 1/A-B APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 28-Mar-13 1:30 PM 28-Mar-13
-B70 - PR - 16
(F1)
Check Concrete Pouring D110- B70 - PR -16 Pipe Rack Foundation Pedestal GL 2-4/A- SECTION 4 D110
5132 RFI-5858-QCN-2-2808 RFI-5858-QCN-2-2808 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 28-Mar-13 2:00 PM 28-Mar-13 CANCELLED NON AVAILABILITY OF PUMP
B(F2,F3,F4&F5) & Footing GL 1/A-B (F1) -B70 - PR - 16
5133 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-30 )
RFI-5858-QCN-2-2809 RFI-5858-QCN-2-2809 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 28-Mar-13 1:40 PM 28-Mar-13
of Pipe Track Footing D110-B70-PR-30: F4 Raslaffan
5134 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-30 )
RFI-5858-QCN-2-2810 RFI-5858-QCN-2-2810 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 28-Mar-13 2:00 PM 28-Mar-13
B70-PR-30: F4 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-25: F5 Crossing # 44
5135 RFI-5858-QCN-2-2811 RFI-5858-QCN-2-2811 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Mar-13 9:00 AM 28-Mar-13
prior second coating of curring compound. Raslaffan
5136 Crossing # 44
RFI-5858-QCN-2-2812 RFI-5858-QCN-2-2812 CONCRETE 9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-25: F5 APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 28-Mar-13 2:30 PM 28-Mar-13
Raslaffan
Check Grout Post pour Inspection for Loop Foundations D110 B70 PR 01 Pipe Rack
5137 RFI-5858-QCN-2-2813 RFI-5858-QCN-2-2813 CONCRETE APPROVED SECTION1 B-V-3100-004-2-201-08_4 4.2 S W H 28-Mar-13 7:20 AM 28-Mar-13
Foundation 5(F5),4(F4),3(F3),2(F2)&1(F1)
Pre-Pouring For Cast-in- Situ Retaining Wall ( Wall ) Check Formworks, Reinforcement,
5138 Retaining Wall E-W
RFI-5858-QCN-2-2814 RFI-5858-QCN-2-2814 CONCRETE cleaning & expansion joints of Retaining Wall E-W Base ( Top of existing concrete pipe ) APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 28-Mar-13 1:30 PM 28-Mar-13
Raslaffan
prior concreting.
5139 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W base Retaining Wall E-W
RFI-5858-QCN-2-2815 RFI-5858-QCN-2-2815 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 28-Mar-13 1:30 PM 28-Mar-13 CANCELLED NON AVAILABILITY OF PUMP
( Top of existing concrete pipe ) Raslaffan
6.3. Check Concrete surface upon form removal of Cast-in- Situ D110-B70-PR25: F6 Crossing 44
5140 RFI-5858-QCN-2-2816 RFI-5858-QCN-2-2816 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 28-Mar-13 1:30 PM 28-Mar-13
( Base and Pedestal ) Raslaffan
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of BZRC-09A
5142 RFI-5858-QCN-2-2818 RFI-5858-QCN-2-2818 CONCRETE
Culvert BZRC-009A ( East Side )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 6.6.a.b S W H 28-Mar-13 7:30 AM 28-Mar-13
5143 Check reinforcement & cleaning prior closing for west portion N & S wall + 2 sleepers of
RFI-5858-QCN-2-2819 RFI-5858-QCN-2-2819 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 28-Mar-13 7:30 AM 28-Mar-13
culvert BZRC-012
Check Grout Post pour Inspection for Loop Foundations D110 - B70 -PR -70 1(F1) & 2
5144 RFI-5858-QCN-2-2820 RFI-5858-QCN-2-2820 CONCRETE
(F2)
APPROVED SECTION 1 B-V-3100-004-2-201-02_4 4.2 S W H 28-Mar-13 8:10 AM 28-Mar-13
Prepouring - Check form works,Embeded items,Cleaning DUCT BANK BZDP 009 (12M
5145 RFI-5858-QCN-2-2821 RFI-5858-QCN-2-2821 CONCRETE APPROVED SECTION 4 CR# 35 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 30-Mar-13 7:30 AM 30-Mar-13
PORTION)
SECTION 4
5146 RFI-5858-QCN-2-2822 RFI-5858-QCN-2-2822 CONCRETE Check Concrete Pouring DUCT BANK BZDP 009 (12M PORTION) APPROVED
CROSSIING #35
B-V-3100-004-2-201-02_5 5.1 W H H 30-Mar-13 8:30 AM 30-Mar-13
Check concrete surface upon form removal D110 B70 - PR -16 Pipe Rack Foundation 2
5147 RFI-5858-QCN-2-2823 RFI-5858-QCN-2-2823 CONCRETE CANCELLED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 6.3 S W H 30-Mar-13 2:30 PM 30-Mar-13 CANCELLED WORK NOT READY
(F2),3(F3),4(F4)&5(F5)
Check Reinforcement prior to close shuttering D110- B70 - PR -16 Pipe Rack Foundation
5148 RFI-5858-QCN-2-2824 RFI-5858-QCN-2-2824 CONCRETE CANCELLED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 4.1b W W H 30-Mar-13 3:30 PM 30-Mar-13 CANCELLED WORK NOT READY
Pedestal GL 1/A-B -- (F1)
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-30 )
5149 RFI-5858-QCN-2-2825 RFI-5858-QCN-2-2825 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 30-Mar-13 1:20 PM 30-Mar-13
of Pipe Track Footing D110-B70-PR-30: F1 and F2 prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-30 )
5150 RFI-5858-QCN-2-2826 RFI-5858-QCN-2-2826 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Mar-13 1:30 PM 4-Apr-13
B70-PR-30: F1 and F2 Raslaffan
5151 RFI-5858-QCN-2-2827 RFI-5858-QCN-2-2827 CONCRETE Check concrete surface upon form removal for east base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 30-Mar-13 6:30 AM 30-Mar-13
5152 RFI-5858-QCN-2-2828 RFI-5858-QCN-2-2828 CONCRETE Check concrete surface preparation for east base of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 30-Mar-13 7:30 AM 30-Mar-13
5153 RFI-5858-QCN-2-2829 RFI-5858-QCN-2-2829 CONCRETE Check concrete curing for east base of culvert BZRC-012 - using curing compound APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Mar-13 10:30 AM 30-Mar-13
5154 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( N- S
RFI-5858-QCN-2-2830 RFI-5858-QCN-2-2830 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.a.b.d.e W W H 30-Mar-13 9:30 PM 30-Mar-13
Cast-in- Situ Retaining Wall N- S last panel and corner portion prior shuttering. ) Raslaffan
Check Polythylene & Hardboard Installation of Cast-in- Situ BZRC-009A ( North and BZRC-009A
5155 RFI-5858-QCN-2-2831 RFI-5858-QCN-2-2831 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 30-Mar-13 7:00 AM 30-Mar-13
South side ) Raslaffan
5156 9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-009A ( End wall ) prior first BZRC-009A
RFI-5858-QCN-2-2832 RFI-5858-QCN-2-2832 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 30-Mar-13 9:30 AM 31-Mar-13
coating of curring compound and Pipe Sleeper inside culvert. Raslaffan
5157 9.1. Check surface preparation of Cast-in- Situ Culvert Pipe Track ( Base and Pedestal ) Crossing 44
RFI-5858-QCN-2-2833 RFI-5858-QCN-2-2833 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 30-Mar-13 3:00 PM 30-Mar-13
D110-B70-PR-25: F6 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5158 RFI-5858-QCN-2-2834 RFI-5858-QCN-2-2834 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 30-Mar-13 10:00 AM 30-Mar-13
Cast-in- Situ Pipe Track D110-B70-PR-30: F4 ( Pedestal ) prior shuttering
9.3. Check protective coating second coat of Precast Pipe Sleeper and Pipe Stopper B70-
5159 RFI-5858-QCN-2-2835 RFI-5858-QCN-2-2835 CONCRETE PS-23: SLD002 to SLD022 = 21 nos B70-PS-24: SLD001 to SLD030 = 28 nos except APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 30-Mar-13 8:00 AM 30-Mar-13
SLD004, SLD005.
5161 4.4.3 Check compressive strength@28 Day for grout cube (D110-B70-PR-06 -grid 6 to 10
RFI-5858-QCN-2-2837 RFI-5858-QCN-2-2837 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 30-Mar-13 3:00 PM 30-Mar-13
(A/B))
Check Concrete Pouring D110- B70 - PR -16 Pipe Rack Foundation Pedestal GL 2- SECTION 4 D110
5163 RFI-5858-QCN-2-2839 RFI-5858-QCN-2-2839 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Mar-13 10:30 AM 30-Mar-13
4/A-B(F2,F3,F4&F5) & Footing GL 1/A-B (F1) -B70 - PR - 16
5164 Concrete Placement Check Concrete Pouring of Cast-in-situ Retaining Wall E-W base Retaining Wall E-W
RFI-5858-QCN-2-2840 RFI-5858-QCN-2-2840 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Mar-13 2:00 PM 30-Mar-13
(Top of existing concrete pipe) Raslaffan
9.1. Check protective coating first coat of Cast-in situ Culvert Base and Wall of BZRC- BZRC-009A
5165 RFI-5858-QCN-2-2841 RFI-5858-QCN-2-2841 CONCRETE
009A ( End Wall )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 7:00 AM 31-Mar-13
5166 9.1. Check protective coating second coat of Cast-in situ Culvert Base and Wall BZRC- BZRC-009A
RFI-5858-QCN-2-2842 RFI-5858-QCN-2-2842 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 9:30 AM 31-Mar-13
009A ( End Wall ) Raslaffan
Check concrete surface upon form removal D110 B70 - PR -16 Pipe Rack Foundation 2
5168 RFI-5858-QCN-2-2844 RFI-5858-QCN-2-2844 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 6.3 S W H 31-Mar-13 3:30 PM 31-Mar-13
(F2),3(F3),4(F4)&5(F5)
Check Surface preparation MASHRAB CULVERT BZRC 003 FROM EAST SIDE 1st MASHRAB
5169 RFI-5858-QCN-2-2845 RFI-5858-QCN-2-2845 CONCRETE
BASE & WALL (BOTH SIDE&END SIDE ) -- 6 M
APPROVED
CULVERT
B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 6:30 AM 31-Mar-13
Check Surface Below ground Protective Coating - First coat & Second coatMASHRAB 7:00 AM
MASHRAB
5170 RFI-5858-QCN-2-2846 RFI-5858-QCN-2-2846 CONCRETE CULVERT BZRC 003 FROM EAST SIDE 1ST BASE & WALL (BOTH SIDE&END SIDE) APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 31-Mar-13 TO 31-Mar-13
CULVERT
-- 6 M PORTION 9:00 AM
Check Concrete Curing MASHRAB CULVERT BZRC 003 FROM EAST SIDE 1st & 3rd MASHRAB
5171 RFI-5858-QCN-2-2847 RFI-5858-QCN-2-2847 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 31-Mar-13 10:30 AM 2-Apr-13
BASE & WALL (BOTHSIDE&END SIDE) -- 6 M PORTION CULVERT
5173 RFI-5858-QCN-2-2849 RFI-5858-QCN-2-2849 CONCRETE Check reinforcement & cleaning prior closing for west portion end wall of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 31-Mar-13 7:00 AM 31-Mar-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-17: SLD064
5174 RFI-5858-QCN-2-2850 RFI-5858-QCN-2-2850 CONCRETE APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 31-Mar-13 7:00 AM 31-Mar-13
to SLD070 = 6 nos except SLD066
5175 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Retaining Wall ( E-W
RFI-5858-QCN-2-2851 RFI-5858-QCN-2-2851 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 31-Mar-13 1:00 PM 31-Mar-13
Cast-in- Situ Retaining Wall E-W ( Top of existing concrete pipe ) prior shuttering ) Raslaffan
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-25: F6 Crossing # 44
5176 RFI-5858-QCN-2-2852 RFI-5858-QCN-2-2852 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 8:00 AM 31-Mar-13
prior second coating of curring compound. Raslaffan
5177 Crossing # 44
RFI-5858-QCN-2-2853 RFI-5858-QCN-2-2853 CONCRETE 9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-25: F6 APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 1:30 PM 31-Mar-13
Raslaffan
Crossing 44
5178 RFI-5858-QCN-2-2854 RFI-5858-QCN-2-2854 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Stopper D110-B70-PR-25: F6 APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 31-Mar-13 8:30 AM 31-Mar-13
Raslaffan
5179 Check erection of pre-cast pipe sleepers B70-PS-25: SLD001 To SLD003/ B70-PS-26: Tank Farm (Area 1)
RFI-5858-QCN-2-2855 RFI-5858-QCN-2-2855 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 31-Mar-13 7:00 AM 3-Apr-13
SLD071 To SLD092 except SLD0075 & SLD088, SLD017 to SLD022 & SLD061 = 29 nos Raslaffan
5180 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-2856 RFI-5858-QCN-2-2856 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 31-Mar-13 3:00 PM 31-Mar-13
Cast-in- Situ Pipe Track D110-B70-PR-30: F1 and F2 ( Pedestal ) prior shuttering
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5182 9.1. Check surface preparation of Precast Pipe Track D110-B70-PR-37, 38, 40, 41, 43,
RFI-5858-QCN-2-2858 RFI-5858-QCN-2-2858 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 31-Mar-13 10:00 AM 31-Mar-13
54, 55, 56, 57, 58, 59, 60 and 62 = 26 nos of foundation prior first coating
Check Surface Preparation & Sealent Application MASHRAB CULVERT BZRC 003 MASHRAB
5183 RFI-5858-QCN-2-2859 RFI-5858-QCN-2-2859 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.6.a.b S W H 31-Mar-13 8:30 AM 31-Mar-13
FROM EAST SIDE 1ST BASE & WALL -- 6M PORTION CULVERT
5184 Check Reinforcement prior to close shuttering D110- B70 - PR -16 Pipe Rack Foundation
RFI-5858-QCN-2-2860 RFI-5858-QCN-2-2860 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 4.1.b W W H 31-Mar-13 3:30 AM 31-Mar-13
Pedestal GL 1/A-B -- (F1)
5185 RFI-5858-QCN-2-2861 RFI-5858-QCN-2-2861 CONCRETE Check concrete surface upon form removal DUCTBANK BZDP 009 APPROVED SECTION 4 CR# 35 B-V-3100-004-2-201-02_5 6.3 S W H 31-Mar-13 2:30 AM 31-Mar-13
5187 Check Polythylene & Hardboard Installation of Cast-in- Situ BZRC-009A ( End Wall ) BZRC-009A
RFI-5858-QCN-2-2863 RFI-5858-QCN-2-2863 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 31-Mar-13 10:30 AM 31-Mar-13
Base and Wall Raslaffan
Check Laying of Asphalt Base Course HAMAD CULVERT BZRC005 SOUTH SIDE
5188 RFI-5858-QCN-2-2864 RFI-5858-QCN-2-2864 CONCRETE
HAMAD ROAD PORTION
APPROVED HAMAD CULVERT B-V-3100-004-2-201-03_5 4.22 S W H 01-Apr-2013 7:30 AM 4-Apr-13
5189 Check Surface preparation D110 B70 - PR -16 Pipe Rack Foundation No 2(F2),3(F3) ,
RFI-5858-QCN-2-2865 RFI-5858-QCN-2-2865 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 9.1 S W H 01-Apr-2013 1:30 PM 3-Apr-13
4(F4)& 5(F5)
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded
Section 6 ( PR-30 ) 4.1.a.b.c.d.
5190 RFI-5858-QCN-2-2866 RFI-5858-QCN-2-2866 CONCRETE items, construction joint and cleaning of Pipe Track Footing D110-B70-PR-30: F3 and APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 01-Apr-2013 1:30 PM 1-Apr-13
Pipe Track Pedestal D110-B70-PR-30: F4 prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-30 )
5191 RFI-5858-QCN-2-2867 RFI-5858-QCN-2-2867 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 01-Apr-2013 1:40 PM 1-Apr-13
B70-PR-30: F3 and Pedestal F4 Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks and Cleaning of Retaining Retaining Wall N- S
5192 RFI-5858-QCN-2-2868 RFI-5858-QCN-2-2868 CONCRETE
Wall N- S corner portion ( Wall ) prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.d W W H 01-Apr-2013 4:00 PM 1-Apr-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S Corner Retaining Wall N- S
5193 RFI-5858-QCN-2-2869 RFI-5858-QCN-2-2869 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 01-Apr-2013 4:20 PM 1-Apr-13 cancelled due to non availability at concrete
portion ( Wall ) Raslaffan
9.3. Check Surface preparation and protective coating first and second coat of Pipe
5195 RFI-5858-QCN-2-2871 RFI-5858-QCN-2-2871 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 01-Apr-2013 1:30 PM 3-Apr-13
Sleeper B70-PS-20: SLD0025 to SLD009 = 17 nos
5196 RFI5858-QCN-2-2872 RFI5858-QCN-2-2872 CONCRETE Check Surface preparation DUCTBANK BZDP 009 APPROVED SECTION 4 CR# 35 B-V-3100-004-2-201-02_5 9.1 S W H 01-Apr-2013 4:00 PM 3-Apr-13
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 - 2:00 PM
5199 RFI-5858-QCN-2-2875 RFI-5858-QCN-2-2875 CONCRETE PR -16 Pipe Rack Foundation No 2(F2),3(F3), 4(F4), &5 (F5) Fotting & Pedestal footing & APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 9.2 a S W H 01-Apr-2013 TO 3-Apr-13
pedestal 4:30 PM
5200 Check Polyetheylene Installation Check Hardboard Installation D110-B70 - PR -16 Pipe
RFI-5858-QCN-2-2876 RFI-5858-QCN-2-2876 CONCRETE APPROVED D110- B70 - PR -16 B-V-3100-004-2-201-02_5 9.2.b,c S W H 2-Apr-13 7:00 AM 2-Apr-13
Rack Foundation 2 (F2),3(F3),4(F4)&5(F5)
5202 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- B70 D110 -B70 - PR - 16
RFI-5858-QCN-2-2878 RFI-5858-QCN-2-2878 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 2-Apr-13 7:00 AM 2-Apr-13
- PR -16 Pipe Rack Foundation Pedestal GL 1/A-B(F1)
5203 Check Concrete Pouring D110- B70 - PR -16 Pipe Rack Foundation Pedestal GL 1/A- D110 -B70 - PR - 16
RFI-5858-QCN-2-2879 RFI-5858-QCN-2-2879 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Apr-13 8:00 AM 6-Apr-13
B(F1)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5204 RFI-5858-QCN-2-2880 RFI-5858-QCN-2-2880 CONCRETE Check concrete pre-pouring for west wall + 3 pipe sleepers of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 2-Apr-13 10:30 AM 2-Apr-13
5205 RFI-5858-QCN-2-2881 RFI-5858-QCN-2-2881 CONCRETE Check concrete pouring for west wall + 3 pipe sleepers of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-Apr-13 1:30 PM 4-Apr-13
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded Section 6 ( PR-30 ) 4.1.a.b.c.d.
5206 RFI-5858-QCN-2-2882 RFI-5858-QCN-2-2882 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 2-Apr-13 1:30 PM 2-Apr-13
items, construction joint and cleaning of Pipe Track Pedestal D110-B70-PR-30: F1 and F2 Raslaffan e
5207 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Section 6 ( PR-30 )
RFI-5858-QCN-2-2883 RFI-5858-QCN-2-2883 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Apr-13 1:40 PM 3-Apr-13
B70-PR-30: F1 and F2 Raslaffan
5208 BZRC-009A
RFI-5858-QCN-2-2884 RFI-5858-QCN-2-2884 CONCRETE Check Polythylene & Installation of Cast-in- Situ BZRC-009A top portion of slab APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 2-Apr-13 7:30 AM 5-Apr-13
Raslaffan
MASHRAB
5209 RFI-5858-QCN-2-2885 RFI-5858-QCN-2-2885 CONCRETE Check Erection of Culvert Precast Cover CULVERT BZRC 003 - EAST SIDE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 2-Apr-13 7:00 AM 5-Apr-13
CULVERT Raslaffan
5212 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-2888 RFI-5858-QCN-2-2888 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 2-Apr-13 1:00 PM 2-Apr-13
Cast-in- Situ Pipe Track D110-B70-PR-30: F3 ( Pedestal ) prior shuttering
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
Retaining Wall E-W
5213 RFI-5858-QCN-2-2889 RFI-5858-QCN-2-2889 CONCRETE cleaning & expansion joints of Retaining Wall E-W Top of existing concrete pipe ( Wall ) APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 2-Apr-13 1:30 PM 2-Apr-13
prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W top of Retaining Wall E-W
5214 RFI-5858-QCN-2-2890 RFI-5858-QCN-2-2890 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-Apr-13 1:40 PM 4-Apr-13
existing concrete pipe ( Wall ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5215 RFI-5858-QCN-2-2891 RFI-5858-QCN-2-2891 CONCRETE
30: F4 ( Base and Pedestal )
APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 2-Apr-13 3:00 PM 4-Apr-13
9:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat DUCT CROSSING#35
5216 RFI-5858-QCN-2-2892 RFI-5858-QCN-2-2892 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 2-Apr-13 TO 2-Apr-13
BANKBZDP 009 SECTION4
3:00 PM
CROSSING#35
5217 RFI-5858-QCN-2-2893 RFI-5858-QCN-2-2893 CONCRETE Check Concrete Curing DUCT BANKBZDP 009 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 2-Apr-13 9:00 AM 4-Apr-13
SECTION 4
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
Situ Retaining wall E-W base 10th and 12th panel,MASHRAB CULVERT BZRC 003
FROM EAST SIDE 1st & 3rd BASE - 7.5M & 6M PORTION,Cast-in- Situ Pipe Stopper
5218 RFI-5858-QCN-2-2894 RFI-5858-QCN-2-2894 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 3-Apr-13 2:00 PM 3-Apr-13
B70-PS-23: SLD014 and B70-PS-24: SLD018 ( Footing ) & Pipe Sotpper B70-PS-20:
SLD025,Retaining wall N- S ( Ditch ) 9tha and 11th panel.,recast Retaining Wall East
Side BZRC-006 = 6 nos panel ( Base ).
4.4.3 Check compressive strength@28 Day for grout cube (D110-B70-PR-70 -grid 1(F1)
5219 RFI-5858-QCN-2-2895 RFI-5858-QCN-2-2895 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 3-Apr-13 3:00 PM 3-Apr-13
& 2 (F2) )
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded Section 6 ( PR-30 ) 4.1.a.b.c.d.
5220 RFI-5858-QCN-2-2896 RFI-5858-QCN-2-2896 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 3-Apr-13 1:30 PM 3-Apr-13
items, construction joint and cleaning of Pipe Track Pedestal D110-B70-PR-30: F3 Raslaffan e
5221 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Section 6 ( PR-30 )
RFI-5858-QCN-2-2897 RFI-5858-QCN-2-2897 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Apr-13 1:40 PM 3-Apr-13
B70-PR-30: F3 Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-27 )
5222 RFI-5858-QCN-2-2898 RFI-5858-QCN-2-2898 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c. W W H 3-Apr-13 1:30 PM 3-Apr-13
of Pipe Track D110-B70-PR-27: F1 and F2 ( Base ) prior concreting Raslaffan
5223 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Section 6 ( PR-27 )
RFI-5858-QCN-2-2899 RFI-5858-QCN-2-2899 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Apr-13 1:40 PM 3-Apr-13
27: F1 and F2 ( Base ) Raslaffan
Pre-Pouring For Cast-in- Situ Retaining Wall E-W Check Formworks, Reinforcement,
Retaining Wall E-W
5224 RFI-5858-QCN-2-2900 RFI-5858-QCN-2-2900 CONCRETE cleaning & expansion joints of Retaining Wall E-W Top of existing concrete pipe ( Wall ) APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 3-Apr-13 1:30 PM 3-Apr-13
Raslaffan
prior concreting.
5225 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall E-W top of Retaining Wall E-W
RFI-5858-QCN-2-2901 RFI-5858-QCN-2-2901 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Apr-13 1:40 PM 5-Apr-13
existing concrete pipe ( Wall ) Raslaffan
5226 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-2902 RFI-5858-QCN-2-2902 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 3-Apr-13 3:00 PM 4-Apr-13
30: F1 and F2 ( Base and Pedestal )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall Corner Retaining Wall N- S
5227 RFI-5858-QCN-2-2903 RFI-5858-QCN-2-2903 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 6.3 S W H 3-Apr-13 3:00 PM 3-Apr-13 CANCELLED WORK NOT READY
portion ( Wall ) Raslaffan
5228 Check Laying of Asphalt Binder Course & Surface Course HAMLA CULVERT BZRC005
RFI-5858-QCN-2-2904 RFI-5858-QCN-2-2904 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-03_7 5.2.4 S W H 3-Apr-13 8:00 PM 4-Apr-13
WEST SIDE PORTION
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5229 RFI-5858-QCN-2-2905 RFI-5858-QCN-2-2905 CONCRETE CANCELLED PR-27 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 3-Apr-13 1:00 PM 3-Apr-13 cancelled
Cast-in- Situ Pipe Track D110-B70-PR-27: F1 and F2 ( Pedestal ) prior shuttering
5230 Check reinforcement & cleaning prior closing for east portion wall + 1 sleepers of culvert
RFI-5858-QCN-2-2906 RFI-5858-QCN-2-2906 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 3-Apr-13 3:30 PM 3-Apr-13
BZRC-012
5231 Check concrete surface upon form removal D110 B70 - PR -16 Pipe Rack Foundation 1
RFI-5858-QCN-2-2907 RFI-5858-QCN-2-2907 CONCRETE CANCELLED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 6.3 S W H 3-Apr-13 3:30 PM 3-Apr-13 CANCELLED WORK NOT READY
(F1)
Check erection of pre-cast items ( pipe sleepers & loop except pipe stopper foundations) Tank Farm (Area 1)
5232 RFI-5858-QCN-2-2908 RFI-5858-QCN-2-2908 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 3-Apr-13 2:30 PM 5-Apr-13
B70-PR-34 Raslaffan
5233 CROSSING#35
RFI-5858-QCN-2-2909 RFI-5858-QCN-2-2909 CONCRETE Check Polyetheylene & Hard borad Installation DUCTBANK BZDP009 APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 3-Apr-13 3:30 PM 4-Apr-13
SECTION 4
5234 RFI-5858-QCN-2-2910 RFI-5858-QCN-2-2910 CONCRETE 4.4.1 Check compressive strength@1 Day for grout cube (D110-B70-PR-63) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_4 4.4.1 S W H 3-Apr-13 3:00 PM 3-Apr-13
5235 Concrete Placement Check Concrete pouring of Cast-in-situ Retaining wall N-S Corner Retaining Wall N-S
RFI-5858-QCN-2-2911 RFI-5858-QCN-2-2911 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Apr-13 10:30 AM 3-Apr-13
portion ( Wall ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall Corner Retaining Wall N- S
5237 RFI-5858-QCN-2-2913 RFI-5858-QCN-2-2913 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 4-Apr-13 4:00 PM 5-Apr-13
portion ( Wall ) Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5238 RFI-5858-QCN-2-2914 RFI-5858-QCN-2-2914 CONCRETE
Cast-in- Situ Pipe Track D110-B70-PR-27: F1 and F2 ( Pedestal ) prior shuttering
APPROVED PR-27 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 4-Apr-13 1:00 PM 4-Apr-13
9.1. Check surface preparation of Cast-in- Situ Culvert Pipe Track ( Base and Pedestal )
5239 RFI-5858-QCN-2-2915 RFI-5858-QCN-2-2915 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Apr-13 9:00 AM 5-Apr-13
D110-B70-PR-30: F4
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-30: F4
5240 RFI-5858-QCN-2-2916 RFI-5858-QCN-2-2916 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Apr-13 1:30 PM 5-Apr-13
prior second coating of curring compound.
Check concrete surface upon form removal for west wall + 3 pipe sleepers of culvert
5241 RFI-5858-QCN-2-2917 RFI-5858-QCN-2-2917 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 4-Apr-13 10:30 AM 5-Apr-13
BZRC-012
5242 RFI-5858-QCN-2-2918 RFI-5858-QCN-2-2918 CONCRETE Check concrete surface preparation for west wall + 3 pipe sleepers of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Apr-13 2:30 PM 5-Apr-13
5243 RFI-5858-QCN-2-2919 RFI-5858-QCN-2-2919 CONCRETE 9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-30: F4 APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 4-Apr-13 4:00 PM 5-Apr-13
5244 Check concrete curing for west wall + 3 pipe sleepers of culvert BZRC-012 - using curing
RFI-5858-QCN-2-2920 RFI-5858-QCN-2-2920 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Apr-13 4:30 PM 6-Apr-13
compound
Check concrete surface upon form removal D110 B70 - PR -16 Pipe Rack Foundation 1
5245 RFI-5858-QCN-2-2921 RFI-5858-QCN-2-2921 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 6.3 S W H 06-Apr-13 6:30 AM 6-Apr-13
(F1)
5246 RFI-5858-QCN-2-2922 RFI-5858-QCN-2-2922 CONCRETE Check reinforcement & cleaning prior closing for east end wall of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 06-Apr-13 7:00 AM 6-Apr-13
Check polyethylene & hardboard installation of pre-cast pipe sleepers B70-PS-25: Tank Farm (Area 1)
5249 RFI-5858-QCN-2-2925 RFI-5858-QCN-2-2925 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 06-Apr-13 7:30 AM 6-Apr-13
SLD001 To SLD003/B70-PS-26: SLD072 To SLD092, SLD061, SLD017 To SLD022 Raslaffan
5250 Check reinforcement & cleaning prior closing for pipe stopper pedestal B70-PS-26: Tank Farm Area 1
RFI-5858-QCN-2-2926 RFI-5858-QCN-2-2926 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 06-Apr-13 7:30 AM 6-Apr-13
SLD088 Raslaffan
5251 RFI-5858-QCN-2-2927 RFI-5858-QCN-2-2927 CONCRETE Check Surface preparation D110 B70 - PR -16 Pipe Rack Foundation No 1(F1) APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 9.1 S W H 06-Apr-13 8:30 AM 6-Apr-13
5252 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded Section 6 ( PR-27 ) 4.1.a.b.c.d.
RFI-5858-QCN-2-2928 RFI-5858-QCN-2-2928 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 06-Apr-13 1:30 PM 6-Apr-13
items, construction joint and cleaning of Pipe Track Pedestal D110-B70-PR-27: F1 and F2 Raslaffan e
5253 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Pedestal D110- Section 6 ( PR-27 )
RFI-5858-QCN-2-2929 RFI-5858-QCN-2-2929 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 06-Apr-13 1:40 PM 6-Apr-13
B70-PR-27: F1 and F2 Raslaffan
9.3. Check Surface preparation and protective coating first and second coat of Pipe
5256 RFI-5858-QCN-2-2932 RFI-5858-QCN-2-2932 CONCRETE
Sleeper B70-PS-20: SLD0037 to SLD049 = 13 nos prior second coating.
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 06-Apr-13 7:30 AM 6-Apr-13
5257 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-22: SLD014 to
RFI-5858-QCN-2-2933 RFI-5858-QCN-2-2933 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 06-Apr-13 9:30 AM 9-Apr-13
SLD016 = 3 nos and B70-PS-24: SLD004 and SLD005 = 2 nos
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-30: F1
5258 RFI-5858-QCN-2-2934 RFI-5858-QCN-2-2934 CONCRETE
and F2 prior second coating of curring compound.
APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 06-Apr-13 3:30 PM 6-Apr-13
SECTION 1
Check Grout Pouring,Finishing,Depth of pour,Sampling/mixing& Finishingent for Pipe
5259 RFI-5858-QCN-2-2935 RFI-5858-QCN-2-2935 CONCRETE CANCELLED DESALINATION LINE B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 06-Apr-13 2:30 PM 6-Apr-13 CANCELLED WORK NOT READY
Rack Foundations VALVE PIT TIE IN- NEAR Anchor block B70- BL-01
10:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110 B70 -
5261 RFI-5858-QCN-2-2937 RFI-5858-QCN-2-2937 CONCRETE APPROVED D110 B70 - PR - 16 B-V-3100-004-2-201-02_5 9.2 a S W H 06-Apr-13 TO 6-Apr-13
PR -16 Pipe Rack Foundation No 1(F1)
2:30 PM
5262 RFI-5858-QCN-2-2938 RFI-5858-QCN-2-2938 CONCRETE Check Concrete Curing D110-B70 - PR -16 Pipe Rack Foundation 1 (F1) APPROVED D110- B70 - PR -16 B-V-3100-004-2-201-02_5 6.4 S W H 06-Apr-13 7:30 AM 6-Apr-13
9.1. Check surface preparation of Cast-in- Situ Culvert Pipe Track ( Base and Pedestal )
5263 RFI-5858-QCN-2-2939 RFI-5858-QCN-2-2939 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 06-Apr-13 9:30 AM 6-Apr-13
D110-B70-PR-30: F1 and F2 prior first coating of curring compound.
SECTION 1
Check form works,Embedded items,Cleaning& Construction joints- B70- BL-01 Anchor
5264 RFI-5858-QCN-2-2940 RFI-5858-QCN-2-2940 CONCRETE APPROVED -DESALINATION B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 06-Apr-13 8:30 AM 6-Apr-13
block
LINE
SECTION 1-
5265 RFI-5858-QCN-2-2941 RFI-5858-QCN-2-2941 CONCRETE Check Concrete Pouring B70- BL-01 Anchor block APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 06-Apr-13 9:30 AM 6-Apr-13
DESALINATION LINE
5266 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-30:
RFI-5858-QCN-2-2942 RFI-5858-QCN-2-2942 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 07-Apr-2013 9:00 AM 8-Apr-13
F4 prior backfilling.
9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-30: F1
5267 RFI-5858-QCN-2-2943 RFI-5858-QCN-2-2943 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 07-Apr-2013 7:30 AM 8-Apr-13
and F2 prior hardboard installation.
5268 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-30:
RFI-5858-QCN-2-2944 RFI-5858-QCN-2-2944 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 07-Apr-2013 1:30 PM 8-Apr-13
F1 and F2 prior backfilling.
9.1. Check surface preparation of Cast-in- Situ Culvert Pipe Track ( Base and Pedestal )
5269 RFI-5858-QCN-2-2945 RFI-5858-QCN-2-2945 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 07-Apr-2013 9:00 AM 8-Apr-13
D110-B70-PR-30: F3 prior first coating of curing compound.
5270 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-27 )
RFI-5858-QCN-2-2946 RFI-5858-QCN-2-2946 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 07-Apr-2013 7:00 AM 7-Apr-13
of Pipe Track Footing D110-B70-PR-27: F3 and F4 prior concreting Raslaffan
5271 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-27 )
RFI-5858-QCN-2-2947 RFI-5858-QCN-2-2947 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 07-Apr-2013 7:10 AM 7-Apr-13
B70-PR-27: F3 and F4 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- PR-27 ( Section 6 )
5272 RFI-5858-QCN-2-2948 RFI-5858-QCN-2-2948 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 07-Apr-2013 3:00 PM 8-Apr-13
27: F1 and F2 ( Base and Pedestal ) Raslaffan
5273 Pre-Pouring For Cast-in- Situ Retaining Wall Check Formworks and Cleaning of Retaining Retaining Wall N- S
RFI-5858-QCN-2-2949 RFI-5858-QCN-2-2949 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.d W W H 07-Apr-2013 7:00 AM 7-Apr-13
Wall N- S last potion ( Wall ) prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall N- S last Retaining Wall N- S
5274 RFI-5858-QCN-2-2950 RFI-5858-QCN-2-2950 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 07-Apr-2013 7:20 AM 12-Apr-13
portion ( Wall ) Raslaffan
5275 Check pre-pouring for pipe stoppers Pedestal: B70-PS-26: SLD088 Footing: B70-PS-26: Tank Farm Area 1
RFI-5858-QCN-2-2951 RFI-5858-QCN-2-2951 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 07-Apr-2013 10:30 AM 7-Apr-13
SLD075 & SLD056 Raslaffan
5276 Check concrete pouring for pipe stoppers Pedestal: B70-PS-26: SLD088 Footing: B70- Tank Farm Area 1
RFI-5858-QCN-2-2952 RFI-5858-QCN-2-2952 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 07-Apr-2013 1:30 PM 8-Apr-13
PS-26: SLD075 & SLD056 Raslaffan
9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-009A ( End wall ) prior first BZRC-009A
5277 RFI-5858-QCN-2-2953 RFI-5858-QCN-2-2953 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 07-Apr-2013 7:00 AM 8-Apr-13
coating. Raslaffan
5278 Check Polyetheylene Installation Check Hardboard Installation D110-B70 - PR -16 Pipe
RFI-5858-QCN-2-2954 RFI-5858-QCN-2-2954 CONCRETE APPROVED D110- B70 - PR -16 B-V-3100-004-2-201-02_5 9.2.b,c S W H 07-Apr-2013 8:00 AM 8-Apr-13
Rack Foundation 1 (F1)
5279 RFI-5858-QCN-2-2955 RFI-5858-QCN-2-2955 CONCRETE 6.4 Completion of 14 days curing for Precast Retaining Wall East Side = 6 nos Base APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 07-Apr-2013 8:30 AM 8-Apr-13
5280 6.4 Completion of 14 days curing for Precast Pipe Track D110-B70-PR-
RFI-5858-QCN-2-2956 RFI-5858-QCN-2-2956 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 07-Apr-2013 8:30 AM 8-Apr-13
37,38,40,41,43,54,55,56,57,58,59,60,62 =26 nos ( 2 nos Each )
6.4 Completion of 14 days curing for Precast Retaining Wall West Side ( BZRC-006 ) 11
5281 RFI-5858-QCN-2-2957 RFI-5858-QCN-2-2957 CONCRETE
nos Base
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 07-Apr-2013 8:30 AM 8-Apr-13
6.4 Completion of 14 days curing for Precast Retaining Wall West Side ( BZRC-006 ) 11
5282 RFI-5858-QCN-2-2958 RFI-5858-QCN-2-2958 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 07-Apr-2013 8:30 AM 8-Apr-13
nos Wall
6.4 Completion of 14 days curing for Precast Retaining Wall East Side ( BZRC-006 ) 6
5283 RFI-5858-QCN-2-2959 RFI-5858-QCN-2-2959 CONCRETE
nos Wall
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 07-Apr-2013 8:30 AM 8-Apr-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5286 RFI-5858-QCN-2-2962 RFI-5858-QCN-2-2962 CONCRETE APPROVED PR-27 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 8-Apr-13 10:00 AM 8-Apr-13
Cast-in- Situ Pipe Track D110-B70-PR-27: F3 and F4 ( Pedestal ) prior shuttering
9.1. Check surface preparation of Cast-in- Situ Pipe Track ( Base and Pedestal ) D110- PR-27 ( Section 6 )
5287 RFI-5858-QCN-2-2963 RFI-5858-QCN-2-2963 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 8-Apr-13 1:00 PM 8-Apr-13
B70-PR-27: F1 and F2 Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining wall last portion Retaining Wall N- S
5288 RFI-5858-QCN-2-2964 RFI-5858-QCN-2-2964 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 8-Apr-13 4:00 PM 8-Apr-13
( Wall ) Raslaffan
5289 9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-30: F3 PR-30 ( Section 6 )
RFI-5858-QCN-2-2965 RFI-5858-QCN-2-2965 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 8-Apr-13 7:30 AM 8-Apr-13
prior second coating of curring compound. Raslaffan
9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-30: F3 PR-30 ( Section 6 )
5290 RFI-5858-QCN-2-2966 RFI-5858-QCN-2-2966 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 8-Apr-13 10:30 AM 8-Apr-13
prior hardboard installation. Raslaffan
5291 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-30: PR-30 ( Section 6 )
RFI-5858-QCN-2-2967 RFI-5858-QCN-2-2967 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 8-Apr-13 4:30 PM 8-Apr-13
F3 prior backfilling. Raslaffan
5294 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-24: SLD004 ( Section 6 )
RFI-5858-QCN-2-2970 RFI-5858-QCN-2-2970 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 8-Apr-13 7:30 AM 8-Apr-13
and SLD005 = 2 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 14 days curing for Precast Retaining Wall E-W 9th, 11th and 13th panel Retaining Wall E-W
5297 RFI-5858-QCN-2-2973 RFI-5858-QCN-2-2973 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 8-Apr-13 8:30 AM 8-Apr-13
( Base ) Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning
Section 6 ( PR-27 )
5304 RFI-5858-QCN-2-2980 RFI-5858-QCN-2-2980 CONCRETE of Pipe Track D110-B70-PR-27: F3 and F4 ( Pedestal ) and F5 ( Footing ) prior APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 9-Apr-13 1:30 PM 9-Apr-13
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Section 6 ( PR-27 )
5305 RFI-5858-QCN-2-2981 RFI-5858-QCN-2-2981 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Apr-13 1:40 PM 9-Apr-13
27: F3 and F4 ( Pedestal ) and F5 ( Footing ) Raslaffan
5306 RFI-5858-QCN-2-2982 RFI-5858-QCN-2-2982 CONCRETE Check concrete pre-pouring for east wall + 1 pipe sleepers of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 4.1 W W H 9-Apr-13 7:00 AM 9-Apr-13
5307 RFI-5858-QCN-2-2983 RFI-5858-QCN-2-2983 CONCRETE Check concrete pouring for east wall + 1 pipe sleepers of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 9-Apr-13 1:30 PM 9-Apr-13
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-27: F1 PR-27 ( Section 6 )
5308 RFI-5858-QCN-2-2984 RFI-5858-QCN-2-2984 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 9-Apr-13 7:00 AM 9-Apr-13
and F2 prior second coating of curring compound. Raslaffan
9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-27: F1 PR-27 ( Section 6 )
5309 RFI-5858-QCN-2-2985 RFI-5858-QCN-2-2985 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 9-Apr-13 9:00 AM 9-Apr-13
and F2 prior hardboard installation. Raslaffan
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-27: PR-27 ( Section 6 )
5310 RFI-5858-QCN-2-2986 RFI-5858-QCN-2-2986 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 9-Apr-13 1:00 PM 12-Apr-13
F1 and F2 prior backfilling. Raslaffan
9.3. Check Surface preparation and protective coating first and second coat of Pipe 7:30 AM
5311 RFI-5858-QCN-2-2987 RFI-5858-QCN-2-2987 CONCRETE Sleeper B70-PS-17: SLD045 to SLD50 = 5 nos SLD061 to SLD063 = 3 nos and SLD064 APPROVED Section 5 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 9-Apr-13 to 12-Apr-13
to SLD070 = 7 nos 4: 00 PM
Check reinforcement & cleaning prior closing for pipe stopper pedestal B70-PS-26: Tank Farm Area 1
5313 RFI-5858-QCN-2-2989 RFI-5858-QCN-2-2989 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 9-Apr-13 4:00 PM 9-Apr-13
SLD075 & SLD056 Raslaffan
5316 4.4.3 Check compressive strength@28 Day for grout cube (D110-B70-PR-18 -grid 17 to
RFI-5858-QCN-2-2992 RFI-5858-QCN-2-2992 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 9-Apr-13 3:00 PM 9-Apr-13
21/A-B )
5317 Check Laying of Asphalt Base Course MASHRAB CULVERT BZRC003 EAST SIDE MASHRAB
RFI-5858-QCN-2-2993 RFI-5858-QCN-2-2993 CONCRETE APPROVED B-V-3100-004-2-201-03_7 4.2.2 S W H 9-Apr-13 7:30 AM 12-Apr-13
PORTION CULVERT
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - 8:30 AM
5318 RFI-5858-QCN-2-2994 RFI-5858-QCN-2-2994 CONCRETE First &Second Coat Sleeper Foundations B70 - PS -16 SLD100,SLD101,SLD102 APPROVED SECTION5 CR#39 B-V-3100-004-2-201-02_5 9.3 S W H 9-Apr-13 TO 12-Apr-13
&SLD103 10:30 AM
Section1
5320 RFI-5858-QCN-2-2996 RFI-5858-QCN-2-2996 CONCRETE Check concrete surface upon form removal B70- BL-01 Anchor block APPROVED Desalination line TIE B-V-3100-004-2-201-02_5 6.3 S W H 10-Apr-13 6:30 AM 12-Apr-13
IN
Section1 7:00 AM
5322 Check Surface Below ground Protective Coating - First coat & Second coat B70- BL-01
RFI-5858-QCN-2-2998 RFI-5858-QCN-2-2998 CONCRETE APPROVED Desalination line TIE B-V-3100-004-2-201-02_5 9.2.a S W H 10-Apr-13 TO 12-Apr-13
Anchor block
IN 8:30 AM
Section1
5323 RFI-5858-QCN-2-2999 RFI-5858-QCN-2-2999 CONCRETE Check Concrete Curing B70- BL-01 Anchor block APPROVED Desalination line TIE B-V-3100-004-2-201-02_5 6.4 S W H 10-Apr-13 8:30 AM 12-Apr-13
IN
5324 Check Laying of Asphalt Binder Course & Surface Course MASHRAB CULVERT MASHRAB
RFI-5858-QCN-2-3000 RFI-5858-QCN-2-3000 CONCRETE APPROVED B-V-3100-004-2-201-03_7 4.2.2 S W H 10-Apr-13 8:00 AM 14-Apr-13
BZRC003 EAST SIDE ROAD PORTION CULVERT
SECTION 1
Check Grout Prepouring,Verify erection/ alignment,Concrete,Metal surface preparation &
5325 RFI-5858-QCN-2-3001 RFI-5858-QCN-2-3001 CONCRETE
Formworks VALVE PIT TIE IN- NEAR Anchor block B70- BL-01
APPROVED DESALINATION LINE B-V-3100-004-2-201-02_4 3.1.1a,b&c S W H 10-Apr-13 9:00 AM 12-Apr-13
SECTION 1
5326 Check Grout Pouring,Finishing,Depth of pour,Sampling/mixing& Finishing VALVE PIT TIE
RFI-5858-QCN-2-3002 RFI-5858-QCN-2-3002 CONCRETE APPROVED DESALINATION LINE B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 10-Apr-13 9:30 AM 10-Apr-13
IN- NEAR Anchor block B70- BL-01
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5327 RFI-5858-QCN-2-3003 RFI-5858-QCN-2-3003 CONCRETE
Cast-in- Situ Pipe Track D110-B70-PR-27:F5 ( Pedestal ) prior shuttering
APPROVED PR-27 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 10-Apr-13 10:00 AM 10-Apr-13
Pre-Pouring For Cast-in- Situ Culvert Check Formworks reinforcement, embedded items
5328 RFI-5858-QCN-2-3004 RFI-5858-QCN-2-3004 CONCRETE and construction/expansion joints of Culvert BZRC-010 ( End Wall and Third Portion ) APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.c.e W W H 10-Apr-13 1:20 PM 13-Apr-13
Base prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( End
5329 RFI-5858-QCN-2-3005 RFI-5858-QCN-2-3005 CONCRETE
Wall and Third Portion ) Base. East side
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 10-Apr-13 2:00 PM 12-Apr-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- PR-27 ( Section 6 )
5330 RFI-5858-QCN-2-3006 RFI-5858-QCN-2-3006 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 10-Apr-13 3:00 PM 12-Apr-13
27: F3 and F4 ( Base and Pedestal ) Raslaffan
9.3. Check Surface preparation and protective coating first of Pipe Sleeper B70-PS-19:
5331 RFI-5858-QCN-2-3007 RFI-5858-QCN-2-3007 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 10-Apr-13 10:30 AM 12-Apr-13
SLD001 to SLD0011 = 11 nos prior second coating.
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-20: SLD004
5334 RFI-5858-QCN-2-3010 RFI-5858-QCN-2-3010 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 10-Apr-13 9:00 AM 12-Apr-13
to SLD008 = 5 nos
Check concrete curing of pipe stopper pedestal & footing B70-PS-26: SLD088 - using Tank Farm Area 1
5336 RFI-5858-QCN-2-3012 RFI-5858-QCN-2-3012 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 10-Apr-13 3:30 PM 11-Apr-13
curing compound Raslaffan
Retaining Wall N- S
5338 RFI-5858-QCN-2-3014 RFI-5858-QCN-2-3014 CONCRETE 6.4 Completion of 1 day curing for Precast Retaining Wall N- S Corner Portion ( Wall ) APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 10-Apr-13 8:30 AM 12-Apr-13
Raslaffan
5339 9.1. Check surface preparation of Cast-in- Situ Retaining Wall N- S corner and Last Retaining Wall N- S
RFI-5858-QCN-2-3015 RFI-5858-QCN-2-3015 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 10-Apr-13 8:00 AM 12-Apr-13
portion prior first coating Raslaffan
Check surface above grade 1st coating of pipe sleepers B70-PS-25: SLD003 To
5342 Tank Farm Area 1
RFI-5858-QCN-2-3018 RFI-5858-QCN-2-3018 CONCRETE SLD001/PS-26: SLD014 To SLD092 except SLD023, SLD024, SLD036, SLD048, APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 12-Apr-13 10:30 AM 14-Apr-13
Raslaffan
SLD049, SLD056, SLD064, SLD065, SLD075 & SLD088
Check protective coating below grade for pipe stopper pedestal: B70-PS-26: SLD088. Tank Farm Area 1
5343 RFI-5858-QCN-2-3019 RFI-5858-QCN-2-3019 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 11-Apr-13 1:30 PM 13-Apr-13
footing Raslaffan
5345 Check polyethylene & hardboard installation for pipe track foundations (loop) D110-B70- Tank Farm Area 1
RFI-5858-QCN-2-3021 RFI-5858-QCN-2-3021 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 11-Apr-13 4:30 PM 13-Apr-13
PR-52 Raslaffan
Check concrete surface upon form removal for east wall + 1 pipe sleeper of culvert BZRC-
5346 RFI-5858-QCN-2-3022 RFI-5858-QCN-2-3022 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Apr-13 8:30 AM 14-Apr-13
012
5347 9.1. Check surface preparation of Cast-in- Situ Pipe Track ( Base and Pedestal ) D110- PR-27 ( Section 6 )
RFI-5858-QCN-2-3023 RFI-5858-QCN-2-3023 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 11-Apr-13 1:00 PM 13-Apr-13
B70-PR-27: F3 and F4 Raslaffan
9.1. Check protective coating first coat of Cast-in situ Pipe Track D110-B70-PR-27: F3 PR-27 ( Section 6 )
5348 RFI-5858-QCN-2-3024 RFI-5858-QCN-2-3024 CONCRETE
and F4 prior second coating of curring compound.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 11-Apr-13 4:00 PM 13-Apr-13
5349 9.3. Check Surface preparation and protective coating first and second of Retaining Wall Retaining Wall N- S
RFI-5858-QCN-2-3025 RFI-5858-QCN-2-3025 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 11-Apr-13 7:30 AM 13-Apr-13
N- S last and Corner portion prior second coating. Raslaffan
Check Polythylene & Hardboard Installation of Cast-in- Situ Retaining Wall N- S Last and Retaining Wall N- S
5350 RFI-5858-QCN-2-3026 RFI-5858-QCN-2-3026 CONCRETE
Corner Portion
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.b,c S W H 11-Apr-13 10:00 AM 13-Apr-13
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Embedded items, Section 6 ( PR-27 )
5351 RFI-5858-QCN-2-3027 RFI-5858-QCN-2-3027 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 11-Apr-13 1:30 PM 11-Apr-13
construction joints and cleaning of Pipe Track D110-B70-PR-27: F5 prior concreting.Q Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Section 6 ( PR-27 )
5352 RFI-5858-QCN-2-3028 RFI-5858-QCN-2-3028 CONCRETE
27: F5 ( Pedestal )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 11-Apr-13 1:40 PM 11-Apr-13
5353 RFI-5858-QCN-2-3029 RFI-5858-QCN-2-3029 CONCRETE Check concrete surface preparation for east wall + 1 pipe sleeper of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 11-Apr-13 4:30 AM 14-Apr-13
Check concrete curing for east wall + 1 pipe sleeper of culvert BZRC-012 - curing
5354 RFI-5858-QCN-2-3030 RFI-5858-QCN-2-3030 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 12-Apr-13 9:30 AM 14-Apr-13
compound
9.3. Check protective coating second coating of Pipe Sleeper B70-PS-19: SLD001 to
5355 RFI-5858-QCN-2-3031 RFI-5858-QCN-2-3031 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 11-Apr-13 10:30 AM 13-Apr-13
SLD0011 = 11 nos
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5356 RFI-5858-QCN-2-3032 RFI-5858-QCN-2-3032 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 11-Apr-13 2:00 PM 13-Apr-13
Cast-in- Situ Culvert BZRC-010 Third portion ( Wall ) prior shuttering
Check protective coating below grade of culvert BZRC-012 (1st & 2nd coat) pre-
5357 RFI-5858-QCN-2-3033 RFI-5858-QCN-2-3033 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.2.a S W H 12-Apr-13 2:30 PM 14-Apr-13
installation of polyethylene & hardboard
Check concrete pre-pouring for pipe stoppers Pedestal: B70-PS-26: SLD075 & SLD0056 Tank Farm Area 1
5359 RFI-5858-QCN-2-3035 RFI-5858-QCN-2-3035 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 11-Apr-13 10:30 AM 11-Apr-13
Footing: B70-PS-26: SLD036 B70-PS-27: SLD031 Raslaffan
5360 Check concrete pouring for pipe stoppers Pedestal: B70-PS-26: SLD075 & SLD0056 Tank Farm Area 1
RFI-5858-QCN-2-3036 RFI-5858-QCN-2-3036 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-Apr-13 1:30 PM 11-Apr-13
Footing: B70-PS-26: SLD036 & B70-PS-27: SLD031 Raslaffan
SECTION 1
5361 RFI-5858-QCN-2-3037 RFI-5858-QCN-2-3037 CONCRETE Check Grout Post pour Inspection for PIT VALVE TIE IN- NEAR Anchor block B70- BL-01 APPROVED DESALINATION LINE B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 11-Apr-13 3:30 PM 13-Apr-13
5362 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR- PR-27 ( Section 6 )
RFI-5858-QCN-2-3038 RFI-5858-QCN-2-3038 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 13-Apr-13 8:00 AM 14-Apr-13
27: F5 ( Base and Pedestal ) Raslaffan
5363 9.1. Check surface preparation of Cast-in- Situ Pipe Track ( Base and Pedestal ) D110- PR-27 ( Section 6 )
RFI-5858-QCN-2-3039 RFI-5858-QCN-2-3039 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 13-Apr-13 10:00 AM 14-Apr-13
B70-PR-27: F5 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.1. Check protective coating second coat of Cast-in situ Pipe Track D110-B70-PR-27: F3 PR-27 ( Section 6 )
5364 RFI-5858-QCN-2-3040 RFI-5858-QCN-2-3040 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 13-Apr-13 7:00 AM 14-Apr-13
and F4 prior hardboard installation. Raslaffan
7:30 AM
5365 9.3. Check Surface preparation and protective coating first and second of Pipe Sleeper
RFI-5858-QCN-2-3041 RFI-5858-QCN-2-3041 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 13-Apr-13 to 14-Apr-13
B70-PS-20: SLD008 to SLD004 = 5 nos
5:30 PM
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5366 RFI-5858-QCN-2-3042 RFI-5858-QCN-2-3042 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 13-Apr-13 7:00 AM 17-Apr-13
Cast-in- Situ Culvert BZRC-010 End Wall ( Wall ) prior shuttering
5367 RFI-5858-QCN-2-3043 RFI-5858-QCN-2-3043 CONCRETE Check Laying of Asphalt Base Course Culvert BZRC-009A ( East Side ) APPROVED BZRC-009A B-V-3100-004-2-201-03_7 5.2.2 S W H 13-Apr-13 7:30 AM 15-Apr-13
6:30 AM
5368 Check Surface Preparation & Above Ground Protective Coating of Culvert END
RFI-5858-QCN-2-3044 RFI-5858-QCN-2-3044 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.3 S W H 13-Apr-13 TO 14-Apr-13
PORTION SOUTH SIDE - First &Second Coat HAMAD CULVERT BZRC - 005
9:00 AM
Pre-Pouring For Cast-in- Situ Culvert Check Formworks reinforcement, embedded items
5369 RFI-5858-QCN-2-3045 RFI-5858-QCN-2-3045 CONCRETE and construction/expansion joints of Culvert BZRC-010 ( Middle Portion ) Base prior APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.c.e. W W H 13-Apr-13 8:00 AM 13-Apr-13
concreting.
5370 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( Middle
RFI-5858-QCN-2-3046 RFI-5858-QCN-2-3046 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 13-Apr-13 8:10 AM 13-Apr-13
Portion ) Base
5372 RFI-5858-QCN-2-3048 RFI-5858-QCN-2-3048 CONCRETE Check polyethylene & hardboard installation of culvert BZRC-012 APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 13-Apr-13 8:30 AM 14-Apr-13
Check surface above grade 2nd coating of pipe sleepers B70-PS-25: SLD003 To
Tank Farm Area 1
5373 RFI-5858-QCN-2-3049 RFI-5858-QCN-2-3049 CONCRETE SLD001/PS-26: SLD014 To SLD092 except SLD023, SLD024, SLD036, SLD048, APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.3 S W H 13-Apr-13 4:30 PM 14-Apr-13
SLD049, SLD056, SLD064, SLD065, SLD075 & SLD088
5374 RFI-5858-QCN-2-3050 RFI-5858-QCN-2-3050 CONCRETE Check expansion joint surface preparation & sealant application of culvert BZRC-012 CANCELLED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.6 S W H 13-Apr-13 7:30 AM 13-Apr-13 CANCELLED WORK NOT READY
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-27: PR-27 ( Section 6 )
5375 RFI-5858-QCN-2-3051 RFI-5858-QCN-2-3051 CONCRETE
F3 and F4 prior backfilling.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2.b,c S W H 13-Apr-13 8:30 AM 14-Apr-13
5377 RFI-5858-QCN-2-3053 RFI-5858-QCN-2-3053 CONCRETE 4.4.3 Check compressive strength@28 Day for grout cube (D110-B70-PR-64,65,19. ) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 13-Apr-13 3.00 PM 13-Apr-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-19: SLD013
( Section 6 )
5378 RFI-5858-QCN-2-3054 RFI-5858-QCN-2-3054 CONCRETE to SLD016 = 5 nos, and B70-PS-20: SLD050 and SLD051 = 2 nos, SLD026 to SLD031 = APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 14-Apr-13 7:30 AM 14-Apr-13
Raslaffan
6 nos
1:00 PM
9.1. Check surface preparation and protective coating first coat and second coat of Cast- PR-27 ( Section 6 )
5379 RFI-5858-QCN-2-3055 RFI-5858-QCN-2-3055 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 14-Apr-13 to 14-Apr-13
in situ Pipe Track D110-B70-PR-27: F5 Raslaffan
5:00 PM
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, embedded
4.1.a.b.c.d.
5380 RFI-5858-QCN-2-3056 RFI-5858-QCN-2-3056 CONCRETE items, construction joint and cleaning of Cast-in- Situ Culvert BZRC-010 ( Third Portion ) ( APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 14-Apr-13 8:00 AM 17-Apr-13
e
Wall ) prior concreting.
5381 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Culvert Wall BZRC-
RFI-5858-QCN-2-3057 RFI-5858-QCN-2-3057 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 14-Apr-13 8:30 AM 14-Apr-13
010 ( Third Portion )
Check reinforcement & cleaning prior closing for pipe stopper pedestals B70-PS-26: Tank Farm Area 1
5382 RFI-5858-QCN-2-3058 RFI-5858-QCN-2-3058 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b/4.1.d W W H 14-Apr-13 7:00 AM 14-Apr-13
SLD036 & B70-PS-27: SLD031 Raslaffan
5383 Check concrete repair (>10mm) of culvert BZRC-012 end east wall - using conrep 331 TX
RFI-5858-QCN-2-3059 RFI-5858-QCN-2-3059 CONCRETE APPROVED Cr # 60 Raslaffan B-V-3100-004-2-201-02_5 6.5.b W H H 14-Apr-13 8:30 AM 14-Apr-13
(approved materials)
5385 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-27: PR-27 ( Section 6 )
RFI-5858-QCN-2-3061 RFI-5858-QCN-2-3061 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 15-Apr-13 9:00 AM 15-Apr-13
F5 prior backfilling. Raslaffan
5386 RFI-5858-QCN-2-3062 RFI-5858-QCN-2-3062 CONCRETE Check Laying of Asphalt Binder Course & Surface Course BZRC-009A ( East Side ) APPROVED BZRC-009A B-V-3100-004-2-201-03_7 4.24 S W H 15-Apr-13 8:00 AM 17-Apr-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ culvert Wall and Base of
5387 RFI-5858-QCN-2-3063 RFI-5858-QCN-2-3063 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 15-Apr-13 8:30 AM 15-Apr-13
BZRC-010 ( Third Portion )
5388 Check concrete pre-pouring for pipe stoppers 2 Pedestals: B70-PS-26: SLD036 B70-PS- Tank Farm Area 1
RFI-5858-QCN-2-3064 RFI-5858-QCN-2-3064 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1 W W H 15-Apr-13 10:30 AM 18-Apr-13
27: SLD031 Footing: B70-PS-27: SLD011 Raslaffan
Check concrete pouring for pipe stoppers 2 Pedestals: B70-PS-26: SLD036 & B70-PS- Tank Farm Area 1
5389 RFI-5858-QCN-2-3065 RFI-5858-QCN-2-3065 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 15-Apr-13 1:30 PM 15-Apr-13 cancelled due to non availability at concrete
27: SLD031 Footing: B70-PS-27: SLD011 Raslaffan
5390 Check concrete surface upon form removal for pipe stoppers B70-PS-26: SLD075 & Tank Farm Area 1
RFI-5858-QCN-2-3066 RFI-5858-QCN-2-3066 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 15-Apr-13 6:30 AM 15-Apr-13
SLD0056 Raslaffan
5393 Check concrete curing for pipe stoppers - using curing compound B70-PS-26: SLD075 & Tank Farm Area 1
RFI-5858-QCN-2-3069 RFI-5858-QCN-2-3069 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 15-Apr-13 10:30 AM 17-Apr-13
SLD0056 Raslaffan
7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3)Cast-in-
Situ Retaining wall N- S Corner portion ( Base ) and Ditch 1th and 12th panel.MASHRAB
CULVERT BZRC 003 FROM EAST SIDE 2nd BASE WALL - 15M PORTION, Precast
5394 RFI-5858-QCN-2-3070 RFI-5858-QCN-2-3070 CONCRETE
Pipe Track Pedestal D110-B70-PR-38 = 4 nos,PR-41 = 2 nos, PR-56 = 4 nos PR-57 = 4
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 16-Apr-13 2:00 PM 16-Apr-13
nos, PR-58 = 4 nos, PR-60 = 4 nos and PR-62 = 4 nos ( Total = 26 nos ),Cast-in- Situ
Retaining wall E-W 1st and 4th panel wall.
5395 4.4.3 Check compressive strength@28 Day for grout cube (D110-B70-PR-23: F1 and F2,
RFI-5858-QCN-2-3071 RFI-5858-QCN-2-3071 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 16-Apr-13 3:00 PM 16-Apr-13
D110-B70-24: F1 and F2 )
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5398 RFI-5858-QCN-2-3074 RFI-5858-QCN-2-3074 CONCRETE
Cast-in- Situ Culvert BZRC-010 Midlle Portion ( Wall ) prior shuttering. (East Side)
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 16-Apr-13 9:00 AM 17-Apr-13
9.3. Check Surface preparation and protective coating first and second of Pipe Sleeper 7:30 AM
5399 RFI-5858-QCN-2-3075 RFI-5858-QCN-2-3075 CONCRETE B70-PS-19: SLD012 to SLD016 = 5 nos and B70-PS-20: SLD050 and SLD051 = 2 nos, APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 16-Apr-13 to 17-Apr-13
SLD026 to SLD031 = 6 nos 5:30 PM
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Culvert Wall BZRC-
5401 RFI-5858-QCN-2-3077 RFI-5858-QCN-2-3077 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Apr-13 3:30 PM 18-Apr-13
010 ( End Portion East Side ). Inculding 3 nos pedestal pipe sleeper
5404 Check polyethylene & hardboard installation for pipe stoppers B70-PS-26: SLD075 & Tank Farm Area 1
RFI-5858-QCN-2-3080 RFI-5858-QCN-2-3080 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 16-Apr-13 7:00 AM 17-Apr-13
SLD0056 Raslaffan
5405 RFI-5858-QCN-2-3081 RFI-5858-QCN-2-3081 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70 PS 11 SLD001 APPROVED SECTION 3 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 16-Apr-13 9:30 AM 18-Apr-13
5406 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70
RFI-5858-QCN-2-3082 RFI-5858-QCN-2-3082 CONCRETE APPROVED SECTION 3 B-V-3100-004-2-201-02_5 9.2 S W H 16-Apr-13 10:00 AM 17-Apr-13
PS- 11 SLD001
Review and approval of QIL test report for Reinforcement -Testing (sample location Gate Barzan Off-plot
5407 RFI-5858-QCN-2-3083 RFI-5858-QCN-2-3083 CONCRETE APPROVED B-V-3100-004-1-201-02_5 2.2 R R H 16-Apr-13 8:30 AM 17-Apr-13
5 Precast Area) BARZAN
5408 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
RFI-5858-QCN-2-3084 RFI-5858-QCN-2-3084 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 17-Apr-13 2:00 PM 17-Apr-13
Situ Retaining wall E-W 8th panel wall ,DUCT BANK BZDW 004
5409 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-18 GL 16-13/A-
RFI-5858-QCN-2-3085 RFI-5858-QCN-2-3085 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 17-Apr-13 11:00 AM 17-Apr-13
B)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6:30 AM
Check Surface preparation & Above Ground Protective Coating of Sleeper foundation -
5410 RFI-5858-QCN-2-3086 RFI-5858-QCN-2-3086 CONCRETE APPROVED SECTION 2 B-V-3100-004-2-201-02_5 9.3 S W H 17-Apr-13 TO 17-Apr-13
First &Second Coat Sleeper Foundations B70 - PS -08 SLD035
8:00 AM
5412 RFI-5858-QCN-2-3088 RFI-5858-QCN-2-3088 CONCRETE Check Final Visual Inspection D110-B70-PR-06 Piperack Foundation GL 1-10/A-B APPROVED SECTION1 PR-06 B-V-3100-004-2-201-02_5 9.2 S W H 17-Apr-13 9:00 AM 17-Apr-13
5413 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-20: SLD002, SLD003
RFI-5858-QCN-2-3089 RFI-5858-QCN-2-3089 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 17-Apr-13 8:30 PM 18-Apr-13
and SLD032 to SLD036 = 7 nos
5414 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-20: SLD002,
RFI-5858-QCN-2-3090 RFI-5858-QCN-2-3090 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 17-Apr-13 9:30 AM 17-Apr-13
SLD003 and SLD032 ro SLD036 = 7 nos
Check Final Visual Inspection Sleeper foundations Sleeper Foundations D110- B70 - PS
5415 RFI-5858-QCN-2-3091 RFI-5858-QCN-2-3091 CONCRETE APPROVED SECTION2 B-V-3100-004-2-201-02_6 9.2 S W H 17-Apr-13 8:20 AM 17-Apr-13
-08 SLD035
5416 9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-010 ( Third Portion ) North
RFI-5858-QCN-2-3092 RFI-5858-QCN-2-3092 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 17-Apr-13 7:30 AM 17-Apr-13
and South ( Base and Wall ) ( East Side ) prior first coating of curring compound.
10:30 AM
9.3. Check Surface preparation and protective coating first and second of Culvert BZRC-
5417 RFI-5858-QCN-2-3093 RFI-5858-QCN-2-3093 CONCRETE
010 ( North and South ) ( Wall and Base ) ( Third Portion East Side )
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 17-Apr-13 to 17-Apr-13
5:00 PM
6.3 Check Concrete surface upon form removal of Cast-in- Situ culvert Wall and Base of
5419 RFI-5858-QCN-2-3095 RFI-5858-QCN-2-3095 CONCRETE
BZRC-010 ( End Portion East Side )
CANCELLED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 17-Apr-13 4:00 PM 17-Mar-13 cancelled
Check polyethylene & hardboard installation for pre-cast pipe sleepers B70-PS-26:
Tank Farm Area 1
5420 RFI-5858-QCN-2-3096 RFI-5858-QCN-2-3096 CONCRETE SLD064, SLD065, SLD048, SLD049, SLD014 To SLD016, SLD001 To SLD003/B70-PS- APPROVED B-V-3100-004-2-201-02_5 9.2.b/9.2.c S W H 17-Apr-13 2:30 PM 17-Apr-13
Raslaffan
27: SLD007 To SLD042 except SLD011, SLD020, SLD021, SLD031, SLD040, SLD041
Check Grout Post pour Inspection for Pipe rack Foundations D210 - B70 -PR - 44 B70 PR
SULPHUR AREA PR
5421 RFI-5858-QCN-2-3097 RFI-5858-QCN-2-3097 CONCRETE 44 Pipe rack Foundation14(F10), 13(F11),12(F9A,F9B),11(F8),9(F4),7(F1),6(F3),5(F1) , APPROVED
44
B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 17-Apr-13 8:10 AM 19-Apr-13
4(F2),3(F5),2(F7),1(F6)
Check Grout Post pour Inspection for Pipe rack Foundations D110 B70 PR 64,B70 PR 65
5422 RFI-5858-QCN-2-3098 RFI-5858-QCN-2-3098 CONCRETE APPROVED SECTION 4 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 17-Apr-13 8:50 AM 19-Apr-13
& B70 PR 19
Check concrete pouring for pipe stoppers 2 Pedestals: B70-PS-26: SLD036 & B70-PS- Tank Farm Area 1
5424 RFI-5858-QCN-2-3100 RFI-5858-QCN-2-3100 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 17-Apr-13 1:30 PM 18-Apr-13
27: SLD031 Footing: B70-PS-27: SLD011 Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ culvert Wall and Base of
5425 RFI-5858-QCN-2-3101 RFI-5858-QCN-2-3101 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 18-Apr-13 4:00 PM 21-Apr-13
BZRC-010 ( End Portion East Side )
5427 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Culvert Wall BZRC-
RFI-5858-QCN-2-3103 RFI-5858-QCN-2-3103 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 18-Apr-13 1:40 PM 21-Apr-13
010 ( Middle Portion and Top of End Wall ) East side. Including one pipe sleeper
Prepouring - Check form works,Embeded items &Cleaning Protection slab (Above CSF-
5428 RFI-5858-QCN-2-3104 RFI-5858-QCN-2-3104 CONCRETE APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 18-Apr-13 10:30 AM 21-Apr-13
RLC 24" water line)
5429 RFI-5858-QCN-2-3105 RFI-5858-QCN-2-3105 CONCRETE Check Concrete Pouring Protection slab (Above CSF-RLC 24" water line) APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 5.1 W H H 18-Apr-13 1:00PM 21-Apr-13
Pre-Pouring For Cast-in- Situ Duct Bank Check Formworks, Reinforcement, Embedded Section 6 ( Crossing
5430 RFI-5858-QCN-2-3106 RFI-5858-QCN-2-3106 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.cd W W H 18-Apr-13 1:30 PM 21-Apr-13
items and cleaning of Duct Bank BZDP-010 prior concreting 53 ) Raslaffan
5432 Check Final Visual Inspection Sleeper foundations Sleeper Foundations D110- B70 - PS SECTION 2
RFI-5858-QCN-2-3108 RFI-5858-QCN-2-3108 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 18-Apr-13 3:20 PM 18-Apr-13
-05 SLD001& SLD002 Raslafan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
SULPHUR AREA
5433 RFI-5858-QCN-2-3109 RFI-5858-QCN-2-3109 CONCRETE Check Final Visual Inspection D210-B70-PR-44 Piperack Foundation GL 1-14/A-B APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 18-Apr-13 9:30 AM 18-Apr-13
PR-44
5434 Check Final Visual Inspection Sleeper foundations Sleeper Foundations D110- B70 - PS SECTION 3
RFI-5858-QCN-2-3110 RFI-5858-QCN-2-3110 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 18-Apr-13 7:00 AM 18-Apr-13
-11 SLD001 Raslaffan
6:30 AM
Check Surface preparation & Above Ground Protective Coating of Sleeper foundation - SECTION 2
5435 RFI-5858-QCN-2-3111 RFI-5858-QCN-2-3111 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 18-Apr-13 TO 18-Apr-13
First &Second Coat Sleeper foundation B70-PS- 05 SLD001,SLD002 Raslaffan
8:00 AM
5437 Check Concrete Pouring HAMAD CULVERT BZRC 005 FROM NORTH SIDE 1st BASE Section 4 Hamad
RFI-5858-QCN-2-3113 RFI-5858-QCN-2-3113 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-Apr-13 2:30 PM 22-Apr-13
(END PORTION)& 3rd BASE - (7.209 M & 6M PORTION) Culvert
5439 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-26:
RFI-5858-QCN-2-3115 RFI-5858-QCN-2-3115 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 20-Apr-13 8:00 AM 21-Apr-13
SLD036 and B70-PS-27: SLD031 ( Base and Pedestal )
SECTION1
5440 RFI-5858-QCN-2-3116 RFI-5858-QCN-2-3116 CONCRETE Check Polyetheylene Installation Check Hardboard Installation B70- BL-01 Anchor block APPROVED DESALINATION TIE B-V-3100-004-2-201-02_5 9.2 S W H 20-Apr-13 6:30 AM 21-Apr-13
IN
5441 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Tank Farm
RFI-5858-QCN-2-3117 RFI-5858-QCN-2-3117 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 20-Apr-13 9:00 AM 21-Apr-13
Cast-in- Situ Pipe Stopper Pedestal B70-PS-27 : SLD011 prior shuttering Raslaffan
9.1. Check surface preparation of Cast-in- Situ retaining wall E-W 1st to 4th panel prior to Retaining Wall ( E-W
5442 RFI-5858-QCN-2-3118 RFI-5858-QCN-2-3118 CONCRETE
first coating
APPROVED
) Raslaffan
B-V-3100-004-2-201-02_5 9.1 S W H 20-Apr-13 8:00 AM 21-Apr-13
9.3. Check Surface preparation and protective coating first coat of Retaining Wall E-W 1st Retaining wall E-W
5443 RFI-5858-QCN-2-3119 RFI-5858-QCN-2-3119 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 9.3 S W H 20-Apr-13 1:30 PM 20-Apr-13 CANCELLED WORK NOT READY
to 4th panel prior second coating. Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ culvert Wall and Base of
5444 RFI-5858-QCN-2-3120 RFI-5858-QCN-2-3120 CONCRETE
BZRC-010 ( Middle Portion and Top of End Wall ) ( East Side )
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 20-Apr-13 3:00 PM 21-Apr-13
Check concrete surface upon form removal Protection slab (Above CSF-RLC 24" water
5445 RFI-5858-QCN-2-3121 RFI-5858-QCN-2-3121 CONCRETE APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 6.3 S W H 20-Apr-13 7:00 AM 21-Apr-13
line)
5446 RFI-5858-QCN-2-3122 RFI-5858-QCN-2-3122 CONCRETE Check Surface preparation Protection slab (Above CSF-RLC 24" water line) APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 9.1 S W H 20-Apr-13 8:30 AM 21-Apr-13
5447 RFI-5858-QCN-2-3123 RFI-5858-QCN-2-3123 CONCRETE Check Concrete CuringProtection slab (Above CSF-RLC 24" water line) APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 6.4 S W H 20-Apr-13 10:30 AM 21-Apr-13
7:00 AM
Check Surface Below ground Protective Coating - First coat & Second coat Protection
5448 RFI-5858-QCN-2-3124 RFI-5858-QCN-2-3124 CONCRETE APPROVED Section 2 CR #10 A B-V-3100-004-2-201-02_5 9.2 a S W H 20-Apr-13 TO 21-Apr-13
slab (Above CSF-RLC 24" water line)
9:30 AM
5453 RFI-5858-QCN-2-3129 RFI-5858-QCN-2-3129 CONCRETE 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-49) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 21-Apr-13 11:00 AM 21-Apr-13
5454 9.1. Check surface preparation of Cast-in- Situ Culvert BZRC-010 ( Middle Portion and
RFI-5858-QCN-2-3130 RFI-5858-QCN-2-3130 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 21-Apr-13 9:30 AM 22-Apr-13
End Portion ) ( East Side ) prior first coating of curring compound.
5455 9.1. Check protective coating first coat of Cast-in situ Culvert BZRC-010 ( Middle and End
RFI-5858-QCN-2-3131 RFI-5858-QCN-2-3131 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 21-Apr-13 3:30 PM 22-Apr-13
Wall ) ( East Side ) prior second coating.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Crossing # 53
5456 RFI-5858-QCN-2-3132 RFI-5858-QCN-2-3132 CONCRETE 6.3 Check Concrete surface upon form removal of Cast-in- Situ Ductbank BZDP-010 APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 21-Apr-13 7:30 AM 22-Apr-13
Raslaffan
5457 9.3. Check Surface preparation and protective coating second coat of Retaining Wall E-W Retaining wall E-W
RFI-5858-QCN-2-3133 RFI-5858-QCN-2-3133 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 9.3 S W H 21-Apr-13 1:30 PM 21-Apr-13 CANCELLED WORK NOT READY
1st to 4th panel prior hardboard installation. Raslaffan
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-26: SLD001
Tank Farm
5458 RFI-5858-QCN-2-3134 RFI-5858-QCN-2-3134 CONCRETE and SLD002 = 2 nos B70-PS-27: SLD022 to SLD042 = 25 nos and SLD007 to SLD019 = APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Apr-13 7:30 AM 22-Apr-13
Raslaffan
12 nos prior backfilling.
5459 Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-53 prior Tank Farm
RFI-5858-QCN-2-3135 RFI-5858-QCN-2-3135 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Apr-13 7:30 AM 22-Apr-13
backfilling Raslaffan
5460 Check Polythylene sheet & Hardboard Installation of Cast-in- Situ retaining Wall E-W ( 1st Retaining Wall E-W
RFI-5858-QCN-2-3136 RFI-5858-QCN-2-3136 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 9.2.b,c S W H 21-Apr-13 9:00 AM 21-Apr-13 CANCELLED WORK NOT READY
to 4th panel ) prior backfilling. Raslaffan
6:30 AM
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations -
5461 RFI-5858-QCN-2-3137 RFI-5858-QCN-2-3137 CONCRETE APPROVED SECTION 4 Ralaffan B-V-3100-004-2-201-02_5 9.3 S W H 22-Apr-13 TO 22-Apr-13
First & Second Coat Sleeper foundation B70-PS -15 SLD088,SLD089,SLD090
8:30 AM
9.1. Check protective coating second coat of Cast-in situ Culvert BZRC-010 ( Middle and
5463 RFI-5858-QCN-2-3139 RFI-5858-QCN-2-3139 CONCRETE
End Wall ) ( East Side )
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 22-Apr-13 8:30 AM 22-Apr-13
5464 Check Polythylene & Hardboard Installation of Cast-in- Situ culvert BZRC-010 ( Middle
RFI-5858-QCN-2-3140 RFI-5858-QCN-2-3140 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 22-Apr-13 2:00 PM 22-Apr-13
and End Wall Portion ) prior backfilling ( East Side )
SECTION2 PR-12
5465 RFI-5858-QCN-2-3141 RFI-5858-QCN-2-3141 CONCRETE Check Final Visual Inspection D110-B70-PR-12 Piperack Foundation GL 1-5/A-B APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2 S W H 22-Apr-13 9:30 AM 22-Apr-13
Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
5466 RFI-5858-QCN-2-3142 RFI-5858-QCN-2-3142 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 22-Apr-13 1:30 PM 24-Apr-13
cleaning of Cast-in- Situ Pipe Stopper pedestal B70-PS-27: SLD011 prior concreting. Raslaffan e
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Pedestal B70-
5467 RFI-5858-QCN-2-3143 RFI-5858-QCN-2-3143 CONCRETE
PS-27: SLD011
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 22-Apr-13 1:30 PM 23-Apr-13
Check Grout Post pour Inspection for Pipe rack Foundations Pipe Rack Foundation D110 SECTION1 PR 06
5469 RFI-5858-QCN-2-3145 RFI-5858-QCN-2-3145 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 22-Apr-13 8:10 AM 22-Apr-13
B70 PR 06 5-10/A-B Raslaffan
Check Grout Post pour Inspection for Pipe rack Foundations Pipe Rack Foundation SECTION1 PR 18
5470 RFI-5858-QCN-2-3146 RFI-5858-QCN-2-3146 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 22-Apr-13 9:10 AM 22-Apr-13
D110- B70-PR-18 17-21/A-B Raslaffan
Check Grout Post pour Inspection for Pipe rack Foundations VALVE PIT TIE IN- NEAR Desalination TIE IN
5471 RFI-5858-QCN-2-3147 RFI-5858-QCN-2-3147 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 22-Apr-13 8:10 AM 22-Apr-13
Anchor block B70-BL-01 Anchor block
BZRC-009A
5472 RFI-5858-QCN-2-3148 RFI-5858-QCN-2-3148 CONCRETE Check Laying of Asphalt Base Course BZRC-009A ( West Side ) APPROVED B-V-3100-004-2-201-03_7 4.2.4 S W H 22-Apr-13 8:00 AM 22-Apr-13
Raslaffan
5473 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-17: SLD001, SLD002,
RFI-5858-QCN-2-3149 RFI-5858-QCN-2-3149 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 23-Apr-13 7:30 AM 24-Apr-13
SLD035, SLD036 and B70-PS-18: SLD032 and SLD033 Total = 6 nos
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-17: SLD001,
5474 RFI-5858-QCN-2-3150 RFI-5858-QCN-2-3150 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 23-Apr-13 8:30 AM 23-Apr-13
SLD002, SLD035, SLD036 and B70-PS-18: SLD032 and SLD033 Total 6 nos.
5475 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-31 )
RFI-5858-QCN-2-3151 RFI-5858-QCN-2-3151 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c. W W H 23-Apr-13 1:30 PM 24-Apr-13
of Pipe Track Footing D110-B70-PR-31: F1 Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-31 )
5476 RFI-5858-QCN-2-3152 RFI-5858-QCN-2-3152 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Apr-13 1:40 PM 25-Apr-13
B70-PR-31: F1 Raslaffan
5477 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper and Stopper B70- Tank Farm
RFI-5858-QCN-2-3153 RFI-5858-QCN-2-3153 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 23-Apr-13 7:30 AM 23-Apr-13
PS-26: SLD023, SLD024 and SLD036 = 3 nos prior backfilling Raslaffan
5478 Check Laying of Asphalt Binder Course & Surface Course Culvert BZRC-009A ( West
RFI-5858-QCN-2-3154 RFI-5858-QCN-2-3154 CONCRETE APPROVED BZRC-009A B-V-3100-004-2-201-03_5 4.24 S W H 23-Apr-13 8:00 AM 23-Apr-13
Side )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5480 Check Concrete PouringHAMAD CULVERT BZRC 005 FROM NORTH SIDE 2nd BASE - Section 4 Hamad
RFI-5858-QCN-2-3156 RFI-5858-QCN-2-3156 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Apr-13 7:30 AM 23-Apr-13
(8.5M PORTION) & 3 SLEEPERS Culvert
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- Section 4 B70- STN-
5481 RFI-5858-QCN-2-3157 RFI-5858-QCN-2-3157 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 23-Apr-13 7:20 AM 27-Apr-13
B70- STN-74 Pipe Rack Foundation Base 1/A-B (F1) - 2 Nos 74
5482 Check Concrete Pouring D110- B70- STN-74 Pipe Rack Foundation Base 1/A-B (F1) - 2 Section 4 B70-
RFI-5858-QCN-2-3158 RFI-5858-QCN-2-3158 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Apr-13 7:50 AM 23-Apr-13
Nos STN- 74
5483 SECTION 4
RFI-5858-QCN-2-3159 RFI-5858-QCN-2-3159 CONCRETE Check Final Visual Inspection Sleeper foundation B70-PS-15 SLD088,SLD089,SLD090 APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 23-Apr-13 9:30 AM 23-Apr-13
Raslaffan
5485 4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-22:
RFI-5858-QCN-2-3161 RFI-5858-QCN-2-3161 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 24-Apr-13 11:00 AM 24-Apr-13
F1,F2,F3,F4,F5&F6)
5487 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-18: SLD016
RFI-5858-QCN-2-3163 RFI-5858-QCN-2-3163 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Apr-13 9:00 AM 24-Apr-13
to SLD031 = 15 nos except SLD017 prior backfilling.
Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
5488 RFI-5858-QCN-2-3164 RFI-5858-QCN-2-3164 CONCRETE
NORTH SIDE 3rd BASE WALL - 6 M PORTION
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 24-Apr-13 6:30 AM 24-Apr-13
9.3. Check Surface preparation and protective coating first coat and second coat of Duct Duct Bank BZDP-
5489 RFI-5858-QCN-2-3165 RFI-5858-QCN-2-3165 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 24-Apr-13 8:00 AM 24-Apr-13
Bank BZDP-010 prior protection. 010 Raslaffan
Check Reinforcement prior to close shuttering D110- B70- STN-74 Pipe Rack Foundation Section 4 B70-
5491 RFI-5858-QCN-2-3167 RFI-5858-QCN-2-3167 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b W W H 24-Apr-13 3:00 PM 24-Apr-13
Pedestal 1/A-B (F1) STN- 74
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Section 6 ( PR-31 )
5492 RFI-5858-QCN-2-3168 RFI-5858-QCN-2-3168 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 24-Apr-13 9:00 AM 24-Apr-13
Cast-in- Situ Pipe Track D110-B70-PR-31: F1 ( Pedestal ) prior shuttering Raslaffan
Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-35 prior Tank Farm
5493 RFI-5858-QCN-2-3169 RFI-5858-QCN-2-3169 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Apr-13 8:00 AM 24-Apr-13
backfilling Raslaffan
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper and Stopper B70-
Tank Farm
5494 RFI-5858-QCN-2-3170 RFI-5858-QCN-2-3170 CONCRETE PS-26: SLD023, SLD024 = 2 nos B70-PS-27: SLD031 and B70-PS-29: SLD070 to APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 24-Apr-13 9:00 AM 24-Apr-13
Raslaffan
SLD079 = 9 nos prior backfilling.
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-27:
5495 RFI-5858-QCN-2-3171 RFI-5858-QCN-2-3171 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 24-Apr-13 7:30 AM 24-Apr-13
SLD031 prior coating of curing compound
8:00 AM
5496 9.3. Check Surface preparation and protective coating first coat and second coat of Pipe
RFI-5858-QCN-2-3172 RFI-5858-QCN-2-3172 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 24-Apr-13 to 24-Apr-13
Stopper B70-PS-27: SLD031 prior hardboard protection.
10:30AM
5498 Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining wall Concrete Retaining Wall N- S
RFI-5858-QCN-2-3174 RFI-5858-QCN-2-3174 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 24-Apr-13 1:40 PM 25-Apr-13
Ditch ( Corner and Last Portion ) Raslaffan
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-29: SLD070 to Tank Farm
5499 RFI-5858-QCN-2-3175 RFI-5858-QCN-2-3175 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 24-Apr-13 7:30 AM 28-Apr-13
SLD079 = 9 nos Raslaffan
5500 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
RFI-5858-QCN-2-3176 RFI-5858-QCN-2-3176 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 25-Apr-13 2:00 PM 25-Apr-13
Situ Pipe Track Footing D110-B70-PR-30: F4
Section 6
5501 Pre-Pouring For Cast-in- Situ Retaining Wall N- S Check Formworks, Reinforcement and
RFI-5858-QCN-2-3177 RFI-5858-QCN-2-3177 CONCRETE APPROVED ( Retaining Wall E-W ) B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 25-Apr-13 1:30 PM 29-Apr-13
Cleaning of Pipe Stopper Base B70-PS-18: SLD017 prior concreting.
Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Base B70-PS- Section 6 Retaining
5502 RFI-5858-QCN-2-3178 RFI-5858-QCN-2-3178 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Apr-13 1:40 PM 27-Apr-13
18: SLD017 Wall ( E-W ) Raslaffan
Check Concrete PouringHAMAD CULVERT BZRC 005 FROM NORTH SIDE 3rd WALL - Section 4 Hamad
5504 RFI-5858-QCN-2-3180 RFI-5858-QCN-2-3180 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-Apr-13 4:30 PM 27-Apr-13
(6M PORTION) & 1 SLEEPER Culvert
5505 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-18: SLD011 to
RFI-5858-QCN-2-3181 RFI-5858-QCN-2-3181 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 25-Apr-13 7:30 AM 29-Apr-13
SLD015 = 5 nos except SLD017
5506 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-18: SLD015
RFI-5858-QCN-2-3182 RFI-5858-QCN-2-3182 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b,c S W H 25-Apr-13 9:00 AM 25-Apr-13
to SLD011 = 5 nos except SLD017 prior backfilling.
5508 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-3184 RFI-5858-QCN-2-3184 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 25-Apr-13 1:40 PM 27-Apr-13
31: F1 ( Pedestal )
Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
5509 RFI-5858-QCN-2-3185 RFI-5858-QCN-2-3185 CONCRETE
NORTH SIDE 1st,2nd&3rd BASE
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 25-Apr-13 6:30 AM 25-Apr-13
5510 Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
RFI-5858-QCN-2-3186 RFI-5858-QCN-2-3186 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 25-Apr-13 4:00 PM 25-Apr-13
NORTH SIDE 2nd BASE WALL BOTH SIDE - (8.5M PORTION)
9.1. Check surface preparation of Cast-in- Situ Pipe Stopper Base and Pedestal B70-PS-
5511 RFI-5858-QCN-2-3187 RFI-5858-QCN-2-3187 CONCRETE
27: SLD011 prior first coating of curring compound.
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 25-Apr-13 7:30 AM 25-Apr-13
10:30 AM
9.3. Check protective coating first and second of Pipe Stopper B70-PS-27: SLD011 prior
5512 RFI-5858-QCN-2-3188 RFI-5858-QCN-2-3188 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 25-Apr-13 to 25-Apr-13
hardboard. ( Base and Pedestal )
5:00 PM
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-29: SLD064 to Tank Farm
5513 RFI-5858-QCN-2-3189 RFI-5858-QCN-2-3189 CONCRETE
SLD069 = 6 nos and SLD080 to SLD084 = 5 nos
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 8.2 S W H 25-Apr-13 7:30 AM 28-Apr-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper and Stopper B70- Tank Farm
5514 RFI-5858-QCN-2-3190 RFI-5858-QCN-2-3190 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 25-Apr-13 8:00 AM 25-Apr-13
PS-29: SLD064 to SLD069 = 6 nos and SLD080 to SLD084 = 5 nos Raslaffan
10:30 AM
9.3. Check protective coating first and second of Pipe Stopper B70-PS-27: SLD011 prior
5515 RFI-5858-QCN-2-3191 RFI-5858-QCN-2-3191 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 25-Apr-13 to 25-Apr-13
hardboard.
5:00 PM
7.2 Check compressive stength@28 Days (cube testing as per BS EN - 12390-3) DUCT
5516 RFI-5858-QCN-2-3192 RFI-5858-QCN-2-3192 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 27-Apr-13 2:00 PM 27-Apr-13
BANK BZDP 009 (MIX:B)
7.2 Check compressive stength@28 Days (cube testing as per BS EN - 12390-3) DUCT
5517 RFI-5858-QCN-2-3193 RFI-5858-QCN-2-3193 CONCRETE BANK BZDP 009 (MIX:B) D110-B70-PR-16 Pipe Rack Foundaton Pedestal GL 2-4 / A- APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 27-Apr-13 2:00 PM 27-Apr-13
B(F2,F3,F4 & F5) Foting gl 1/A-B (F1)
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5518 RFI-5858-QCN-2-3194 RFI-5858-QCN-2-3194 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 27-Apr-13 9:00 AM 27-Apr-13
Cast-in- Situ Pipe Stopper B70-PS-18: SLD017 prior shuttering. Pedestal
5519 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-3195 RFI-5858-QCN-2-3195 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 27-Apr-13 7:30 AM 27-Apr-13
31: F1 ( Base and Pedestal )
9.1. Check surface preparation of Cast-in- Situ Pipe Track D110-B70-PR-31: F1 ( Base
5520 RFI-5858-QCN-2-3196 RFI-5858-QCN-2-3196 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 27-Apr-13 3:00 PM 27-Apr-13
and Pedestal )
5521 Pre-Pouring Check Formworks, Reinforcement and Cleaning of Pipe Track D100-B70-
RFI-5858-QCN-2-3197 RFI-5858-QCN-2-3197 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 27-Apr-13 2:00 PM 29-Apr-13
PR-31: F2 ( Footing ) prior concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
5522 RFI-5858-QCN-2-3198 RFI-5858-QCN-2-3198 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 27-Apr-13 2:30 PM 29-Apr-13
31: F2 ( Footing )
5523 6.3 Check Concrete surface upon form removal of Cast-in- Situ Retaining Wall N- S Ditch Retaining Wall ( N- S
RFI-5858-QCN-2-3199 RFI-5858-QCN-2-3199 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 27-Apr-13 7:00 AM 27-Apr-13
( Last and Corner Portion ) ) Raslaffan
5524 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-28: SLD001 to Tank Farm
RFI-5858-QCN-2-3200 RFI-5858-QCN-2-3200 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 27-Apr-13 8:30 AM 29-Apr-13
SLD014 = 14 nos and B70-PS-29: SLD085 to SLD087 = 3 nos Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper and Stopper B70- Tank Farm
5525 RFI-5858-QCN-2-3201 RFI-5858-QCN-2-3201 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b,c S W H 27-Apr-13 8:00 AM 27-Apr-13
PS-28: SLD001 to SLD014 = 14 nos and B70-PS-29: SLD085 to SLD087 = 3 nos Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Pipe 6:00 AM
5526 RFI-5858-QCN-2-3202 RFI-5858-QCN-2-3202 CONCRETE Sleeper B70-PS-26: SLD001 to SLD002 = 2 nos and B70-PS-27: SLD007 to SLD042 = APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 27-Apr-13 to 27-Apr-13
25 nos. 5:00 PM
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- Section 4 B70- STN-
5527 RFI-5858-QCN-2-3203 RFI-5858-QCN-2-3203 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 28-Apr-13 7:30 AM 1-May-13
B70- STN-74 Pipe Rack Foundation Pedestal 1/A-B (F1) - 2 Nos 74
5528 Check Concrete Pouring D110- B70- STN-74 Pipe Rack Foundation Pedestal 1/A-B (F1) - Section 4 B70-
RFI-5858-QCN-2-3204 RFI-5858-QCN-2-3204 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 28-Apr-13 7:50 AM 28-Apr-13 cancelled due to non availability at concrete
2 Nos STN- 74
9.3. Check Surface preparation and protective coating first of Precast Pipe Sleeper B70-
5529 RFI-5858-QCN-2-3205 RFI-5858-QCN-2-3205 CONCRETE PS-17: SLD001, SLD002, SLD035, SLD036 = 4 nos and B70-PS-18: SLD011 to SLD033 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.3. S W H 28-Apr-13 2:30 PM 28-Apr-13
= 22 nos except SLD017 prior second coating.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Section 6 ( PR-31 )
5530 RFI-5858-QCN-2-3206 RFI-5858-QCN-2-3206 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,b,d,e W W H 28-Apr-13 8:30 AM 28-Apr-13
Cast-in- Situ Pipe Track D110-B70-PR-31: F2 ( Pedestal ) prior shuttering Raslaffan
8:00 AM
5531 9.3. Check protective coating first and second of Cast-in- Situ Pipe Track Pedestal and
RFI-5858-QCN-2-3207 RFI-5858-QCN-2-3207 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 28-Apr-13 to 28-Apr-13
Footing D110-B70-PR-31: F1 prior hardboard.
1:30 PM
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-31:
5532 RFI-5858-QCN-2-3208 RFI-5858-QCN-2-3208 CONCRETE
F1 ( Base and Pedestal )
APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 28-Apr-13 4:00 PM 28-Apr-13
Prepouring - Check form works,Embeded items,Cleaning & Expansion joints HAMAD Section 4 Hamad
5535 RFI-5858-QCN-2-3211 RFI-5858-QCN-2-3211 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 29-Apr-13 7:00 AM 4-May-13
CULVERT BZRC 005 FROM NORTH SIDE 2nd BASE WALL - (8.5M PORTION) Culvert
Check Concrete PouringHAMAD CULVERT BZRC 005 FROM NORTH SIDE 2nd BASE Section 4 Hamad
5536 RFI-5858-QCN-2-3212 RFI-5858-QCN-2-3212 CONCRETE
WALL - (8.5M PORTION)
APPROVED
Culvert
B-V-3100-004-2-201-02_5 5.1 W H H 29-Apr-13 7:30 AM 1-May-13
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, Rmbedded
5537 RFI-5858-QCN-2-3213 RFI-5858-QCN-2-3213 CONCRETE items, cleaning & expansion joints of Pipe Track D110-B70-PR-31: F2 ( Pedestal ) prior APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 29-Apr-13 1:30 PM 1-May-13
concreting.
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
5538 RFI-5858-QCN-2-3214 RFI-5858-QCN-2-3214 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Apr-13 1:40 PM 1-May-13
31: F2 ( Pedestal )
Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
5539 RFI-5858-QCN-2-3215 RFI-5858-QCN-2-3215 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 29-Apr-13 6:30 AM 29-Apr-13
NORTH SIDE 3rd BASE WALL
Pre-Pouring Check Formworks, Reinforcement, embedded items and cleaning of Cast-in- BZDW-008 4.1.a.b.c.d.
5540 RFI-5858-QCN-2-3216 RFI-5858-QCN-2-3216 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 29-Apr-13 2:00 PM 4-May-13
Situ Duct Bank BZDW-008 prior concreting Raslaffan e
5541 RFI-5858-QCN-2-3217 RFI-5858-QCN-2-3217 CONCRETE Concrete Placement Check Concrete pouring of Cast-in- Situ Duct Bank BZDW-008 APPROVED BZDW-008 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Apr-13 2:20 PM 1-May-13
5542 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-3218 RFI-5858-QCN-2-3218 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 29-Apr-13 2:00 PM 29-Apr-13
Track Footing D110-B70-PR-30: F3 and Pedestal F4
Above Ground Protective Coating of Sleeper foundations - Second Coat Sleeper 6:30 AM
5543 RFI-5858-QCN-2-3219 RFI-5858-QCN-2-3219 CONCRETE foundations B70 PS 17 SLD001,SLD002,SLD035 & SLD035 B70 PS 18 SLD011 TO APPROVED SECTION 6 B-V-3100-004-2-201-02_5 9.3 S W H 29-Apr-13 TO 29-Apr-13
SLD033 (22 NoS) (Except SLD017) 8:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
1:30 PM
5544 Sleeper B70-PS-29: SLD055 to SLD062 = 8 nos SLD064 to SLD079 = 16 nos, SLD081 to
RFI-5858-QCN-2-3220 RFI-5858-QCN-2-3220 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 29-Apr-13 to 2-May-13
SLD087 = 7 nos and B70-PS-27: SLD003 to SLD006 = 4 nos., SLD020, SLD021
5:30PM
SLD040, SLD041 = 4 nos
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of
5545 RFI-5858-QCN-2-3221 RFI-5858-QCN-2-3221 CONCRETE CANCELLED BZRC-012 Raslaffan B-V-3100-004-2-201-02_5 6.6.a.b S W H 29-Apr-13 9:30 AM 29-Apr-13 CANCELLED WORK NOT READY
Culvert BZRC-012
5546 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of
RFI-5858-QCN-2-3222 RFI-5858-QCN-2-3222 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.6.a.b S W H 29-Apr-13 9:30 AM 29-Apr-13
Culvert BZRC-010
5548 RFI-5858-QCN-2-3224 RFI-5858-QCN-2-3224 CONCRETE 4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-63) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 4.4.3 S W H 30-Apr-13 11:00 AM 30-Apr-13
5549 Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement and cleaning Section 6 ( PR-29 )
RFI-5858-QCN-2-3225 RFI-5858-QCN-2-3225 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c. W W H 30-Apr-13 1:30 PM 2-May-13
of Pipe Track Footing D110-B70-PR-29: F1 Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track Footing D110- Section 6 ( PR-29 )
5550 RFI-5858-QCN-2-3226 RFI-5858-QCN-2-3226 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-Apr-13 1:40 PM 1-May-13
B70-PR-29: F1 Raslaffan
Pre-Cast Items Check Erection of Precast of Culvert BZRC-010 Type A cover 12 nos and
5553 RFI-5858-QCN-2-3229 RFI-5858-QCN-2-3229 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 30-Apr-13 3:30 PM 6-May-13
Type B = 1 no.
5554 Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
RFI-5858-QCN-2-3230 RFI-5858-QCN-2-3230 CONCRETE CANCELLED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1b W W H 30-Apr-13 4:00 PM 30-Apr-13 CANCELLED WORK NOT READY
NORTH SIDE 1ST BASE WAL L (BOTH SIDE&END WALL) - (7.209M PORTION)
Check Concrete Pouring D110- B70- STN-74 Pipe Rack Foundation Pedestal 1/A-B (F1) - Section 4 B70-
5555 RFI-5858-QCN-2-3231 RFI-5858-QCN-2-3231 CONCRETE
2 Nos
APPROVED
STN- 74
B-V-3100-004-2-201-02_5 5.1 W H H 30-Apr-13 7:50 AM 1-May-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5557 RFI-5858-QCN-2-3233 RFI-5858-QCN-2-3233 CONCRETE
31: F2 ( Base and Pedestal )
APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-May-13 2:00 PM 1-May-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Section 6 ( PR-29 )
5558 RFI-5858-QCN-2-3234 RFI-5858-QCN-2-3234 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 1-May-13 9:00 AM 1-May-13
Cast-in- Situ Pipe Track D110-B70-PR-29: F1 ( Pedestal ) prior shuttering Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5559 RFI-5858-QCN-2-3235 RFI-5858-QCN-2-3235 CONCRETE
Stopper B70-PS-27: SLD011 and SLD031
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 1-May-13 1:30 PM 1-May-13
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of
5560 RFI-5858-QCN-2-3236 RFI-5858-QCN-2-3236 CONCRETE APPROVED BZRC-012 Raslaffan B-V-3100-004-2-201-02_5 6.6.a.b S W H 1-May-13 8:30 AM 8-May-13
Culvert BZRC-012. upto bottom of cover SLAB
Pre-Cast Items Check Erection of Precast of Culvert BZRC-012 Type A cover 7 nos and
5561 RFI-5858-QCN-2-3237 RFI-5858-QCN-2-3237 CONCRETE APPROVED BZRC-012 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 1-May-13 9:30 AM 6-May-13
Type B = 2 nos.
6.4 Completion of 3 days water curing and 1 day curing compound of Pipe Track D110-
5562 RFI-5858-QCN-2-3238 RFI-5858-QCN-2-3238 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
B70-PR-30: F1 and F2 ( Pedestal )
6.4 Completion of 3 days water curing and 1 day curing compound of Pipe Track D110-
5563 RFI-5858-QCN-2-3239 RFI-5858-QCN-2-3239 CONCRETE APPROVED PR-30 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
B70-PR-30: F3 ( Pedestal )
6.4 Completion of 4 days water curing and 1 day curing compound of Pipe Track D110-
5564 RFI-5858-QCN-2-3240 RFI-5858-QCN-2-3240 CONCRETE APPROVED PR-27 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
B70-PR-27: F1 and F2 ( Base )
5565 6.4 Completion of 3 days water curing and 2 days curing compound of Pipe Track D110-
RFI-5858-QCN-2-3241 RFI-5858-QCN-2-3241 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
B70-PR-31: F1 ( Base )
6.4 Completion of 1 day water curing and 2 days curing compound of Pipe Track D110-
5566 RFI-5858-QCN-2-3242 RFI-5858-QCN-2-3242 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
B70-PR-31: F1 ( Pedestal )
5567 6.4 Completion of 14 days water curing of retaining wall E-W ( Top of existing concretye Retaining Wall ( E-W
RFI-5858-QCN-2-3243 RFI-5858-QCN-2-3243 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 1-May-13 8:30 AM 1-May-13
pipe ) ) Raslaffan
7:00 AM
5569 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-3245 RFI-5858-QCN-2-3245 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 9.3. S W H 2-May-13 to 2-May-13
D110-B70-PR-31: F2 ( Base and Pedestal )
10:30AM
5570 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-31:
RFI-5858-QCN-2-3246 RFI-5858-QCN-2-3246 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-May-13 1:00 PM 2-May-13
F2 ( Base and Pedestal )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Prepouring - Check form works,Cleaning & Expansion joints D110-DIKE-003(W-BZRC) SECTION4 DIKE
5571 RFI-5858-QCN-2-3247 RFI-5858-QCN-2-3247 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a,c,d,e W W H 2-May-13 1:30 AM 9-May-13
WEST RETAINING WALL-- From East Side 1st, 3rd,5th&7th panel BASE (South Side ) 003(W-BZRC)
5572 Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
RFI-5858-QCN-2-3248 RFI-5858-QCN-2-3248 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 2-May-13 2:00 PM 4-May-13
East Side 1st, 3rd,5th&7th panel BASE (South Side) 003(W-BZRC)
5573 RFI-5858-QCN-2-3249 RFI-5858-QCN-2-3249 CONCRETE 6.3 Check Concrete surface upon form removal of Cast-in- Situ Duct Bank BZDW-008 APPROVED BZDW-008 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 2-May-13 7:00 AM 2-May-13
8:00 AM
5574 9.3. Check Surface preparation and protective coating first and Second coat of Duct Bank
RFI-5858-QCN-2-3250 RFI-5858-QCN-2-3250 CONCRETE APPROVED BZDW-008 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 2-May-13 to 2-May-13
BZDW-008
11:00AM
5575 Check Polythylene & Hardboard Installation of Cast-in- Situ Duct Bank BZDW-008 prior BZDW-008
RFI-5858-QCN-2-3251 RFI-5858-QCN-2-3251 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-May-13 1:00 PM 2-May-13
backfilling Raslaffan
Pre-Pouring For Cast-in- Situ Pipe Track Check Formworks, Reinforcement, Rmbedded
5576 RFI-5858-QCN-2-3252 RFI-5858-QCN-2-3252 CONCRETE items, cleaning & expansion joints of Pipe Track D110-B70-PR-29: F1 ( Pedestal ) prior APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 2-May-13 1:30 PM 7-May-13
concreting.
5577 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-3253 RFI-5858-QCN-2-3253 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-May-13 1:40 PM 4-May-13
29: F1 ( Pedestal )
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-22: SLD012, SLD013,
5578 RFI-5858-QCN-2-3254 RFI-5858-QCN-2-3254 CONCRETE
SLD036, SLD037, SLD044, SLD045, SLD046 and SLD051 = 8 nos
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 2-May-13 7:30 AM 4-May-13
5579 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-22: SLD012,
RFI-5858-QCN-2-3255 RFI-5858-QCN-2-3255 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-May-13 8:30 AM 2-May-13
SLD013, SLD036, SLD037 SLD044, SLD045, SLD046 and SLD051 = 8 nos
Check concrete surface upon form removal D110- B70- STN-74 Pipe Rack Foundation Section 4 B70-
5580 RFI-5858-QCN-2-3256 RFI-5858-QCN-2-3256 CONCRETE
1/A-B (F1) - 2 Nos
APPROVED
STN- 74
B-V-3100-004-2-201-02_5 6.3 S W H 2-May-13 6:30 AM 2-May-13
Section 4 B70-
5581 RFI-5858-QCN-2-3257 RFI-5858-QCN-2-3257 CONCRETE Check Surface preparation D110- B70- STN-74 Pipe Rack Foundation 1/A-B (F1) - 2 Nos APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 2-May-13 1:30 PM 2-May-13
STN- 74
6:30 AM
Check Surface Below ground Protective Coating - First coat & Second coat D110- B70- Section 4 B70-
5583 RFI-5858-QCN-2-3259 RFI-5858-QCN-2-3259 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2a S W H 4-May-13 TO 4-May-13
STN-74 Pipe Rack Foundation 1/A-B (F1) - 2 Nos STN- 74
8:00 AM
Section 4 B70-
5584 RFI-5858-QCN-2-3260 RFI-5858-QCN-2-3260 CONCRETE Check Concrete Curing D110- B70- STN-74 Pipe Rack Foundation 1/A-B (F1) - 2 Nos APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 4-May-13 8:00 AM 4-May-13
STN- 74
Check Polyetheylene Installation Check Hardboard Installation D110- B70- STN-74 Pipe Section 4 B70-
5585 RFI-5858-QCN-2-3261 RFI-5858-QCN-2-3261 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2b&c S W H 4-May-13 10:00 AM 4-May-13
Rack Foundation 1/A-B (F1) - 2 Nos STN- 74
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5586 RFI-5858-QCN-2-3262 RFI-5858-QCN-2-3262 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 4-May-13 7:00 AM 4-May-13
29: F1 ( Base and Pedestal )
1:00 PM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5587 RFI-5858-QCN-2-3263 RFI-5858-QCN-2-3263 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 4-May-13 to 7-May-13
D110-B70-PR-29: F1 ( Base and Pedestal )
4:30 PM
5588 Pre-Pouring For Cast-in- Situ Check Formworks, Reinforcement and Cleaning of Pipe Tank Farm
RFI-5858-QCN-2-3264 RFI-5858-QCN-2-3264 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 4-May-13 7:00 AM 9-May-13
Stopper Base B70-PS-28: SLD022 prior concreting. Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper Base B70-PS- Tank Farm
5589 RFI-5858-QCN-2-3265 RFI-5858-QCN-2-3265 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 4-May-13 7:30 AM 9-May-13
28: SLD022 Raslaffan
Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
5591 RFI-5858-QCN-2-3267 RFI-5858-QCN-2-3267 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 4-May-13 2:00 PM 5-May-13
East Side 1st, 3rd,5th&7th panel BASE (South Side) 003(W-BZRC)
5592 6.4 Completion of 3 days water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-3268 RFI-5858-QCN-2-3268 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-May-13 8:30 AM 4-May-13
B70-PR-31: F2 ( Base )
5593 6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-3269 RFI-5858-QCN-2-3269 CONCRETE APPROVED PR-31 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-May-13 8:30 AM 4-May-13
B70-PR-31: F2 ( Pedestal )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 2 days water curing and 1 day curing compound of Duct Bank BZDW-
5594 RFI-5858-QCN-2-3270 RFI-5858-QCN-2-3270 CONCRETE APPROVED BZDW-008 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-May-13 8:30 AM 4-May-13
008
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-29: SLD001
Tank Farm
5596 RFI-5858-QCN-2-3272 RFI-5858-QCN-2-3272 CONCRETE to SLD047 = 41 nos except Pipe Stopper B70-PS-30: SLD063 to SLD065 = 3 nos and CANCELLED B-V-3100-004-2-201-02_5 9.2.b.c S W H 4-May-13 10:30 AM 4-May-13 CANCELLED WORK NOT READY
Raslaffan
SLD069 tp SLD072 = 4 nos prior backfilling
Check Final Visual Inspection of Precast Pipe Sleeper B70-PS-26: SLD001 and SLD002
5597 = 2 nos, B70-PS-27: SLD003 to SLD042 = 38 nos, Except Pipe Stopper SLD011 and Tank Farm
RFI-5858-QCN-2-3273 RFI-5858-QCN-2-3273 CONCRETE APPROVED B-V-3100-004-2-201-02_5 10 S W H 4-May-13 8:30 AM 4-May-13
SLD031 B70-PS-28: SLD001 to SLD026 = 24 nos except SLD008 and SLD022 and B70- Raslaffan
PS-29: SLD055 to SLD087 = 31 nos except SLD063 and SLD080
Prepouring - Check form works,Embeded items,Cleaning & Construction jointsD110- B70 D110 -B70 - PR - 17
5599 RFI-5858-QCN-2-3275 RFI-5858-QCN-2-3275 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 5-May-13 1:00 PM 5-May-13
- PR- 17 Pipe Rack Foundation Base1(F1,F2),2(F3,F4)
5600 Check Concrete Pouring D110- B70- PR- 17 Pipe Rack Foundation
RFI-5858-QCN-2-3276 RFI-5858-QCN-2-3276 CONCRETE APPROVED D110 -B70 - PR - 17 B-V-3100-004-2-201-02_5 5.1 W H H 5-May-13 2:00 PM 5-May-13
Base1(F1,F2),2(F3,F4)
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-29: SLD001
Tank Farm
5607 RFI-5858-QCN-2-3283 RFI-5858-QCN-2-3283 CONCRETE to SLD047 = 41 nos except Pipe Stopper B70-PS-30: SLD063 to SLD065 = 3 nos and APPROVED B-V-3100-004-2-201-02_5 9.2.b.c S W H 5-May-13 3:30 PM 6-May-13
Raslaffan
SLD069 tp SLD072 = 4 nos prior backfilling
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5608 RFI-5858-QCN-2-3284 RFI-5858-QCN-2-3284 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 5-May-13 9:00 AM 7-May-13
Cast-in- Situ Pipe Stopper B70-PS-28: SLD022 prior shuttering
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110- SECTION #1 CR #
5609 RFI-5858-QCN-2-03285 RFI-5858-QCN-2-03285 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a,c,d,e W W H 6-May-13 1:00 PM 6-May-13
B70- PR-75 Pipe Rack Foundation 1(F1)&2(F1) 5
SECTION #1 CR #
5610 RFI-5858-QCN-2-03286 RFI-5858-QCN-2-03286 CONCRETE Check Concrete Pouring D110- B70- PR-75 Pipe Rack Foundation 1(F1)&2(F1), footing APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 6-May-13 2:00 PM 6-May-13
5
Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
5612 RFI-5858-QCN-2-03288 RFI-5858-QCN-2-03288 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 6-May-13 2:00 PM 6-May-13 CANCELLED WORK NOT READY
East Side 8th & 10th panel BASE (South Side ) 003(W-BZRC)
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-29:
5614 RFI-5858-QCN-2-03290 RFI-5858-QCN-2-03290 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 6-May-13 8:30 AM 6-May-13
F1 prior backfilling.
5615 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-69 GL 1-2/A-B
RFI-5858-QCN-2-03291 RFI-5858-QCN-2-03291 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 6-May-13 10:30 AM 6-May-13
& D110-B70-PR-26 GL 1-2/A-B)
5616 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) pipe
RFI-5858-QCN-2-03292 RFI-5858-QCN-2-03292 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 6-May-13 2:00 PM 6-May-13
stoppers Pedestal: B70-PS-26: SLD088 Footing: B70-PS-26: SLD075 & SLD056
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5618 Check Reinforcement prior to close shuttering D110- B70- PR-17 Pipe Rack Foundation
RFI-5858-QCN-2-03294 RFI-5858-QCN-2-03294 CONCRETE APPROVED D110 B70 - PR - 17 B-V-3100-004-2-201-02_5 4.1.b W W H 6-May-13 3:30 PM 6-May-13
Pedestal 1(F1,F2),3(F3,F4)
5621 Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03297 RFI-5858-QCN-2-03297 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 7-May-13 8:30 AM 7-May-13
cleaning of Cast-in- Situ Pipe Stopper Pedestal B70-PS-28: SLD022 prior concreting Raslaffan e
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-28: Tank Farm
5622 RFI-5858-QCN-2-03298 RFI-5858-QCN-2-03298 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 7-May-13 8:30 AM 7-May-13
SLD022. (Pedestal) Raslaffan
5623 Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-38:
RFI-5858-QCN-2-03299 RFI-5858-QCN-2-03299 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 7-May-13 1:30 PM 9-May-13
prior backfilling.
Check Reinforcement prior to close shuttering D110 -B70- PR-75 Pipe Rack Foundation
5624 RFI-5858-QCN-2-03300 RFI-5858-QCN-2-03300 CONCRETE
Pedestal 1(F1)&2(F1)
APPROVED D110 B70 - PR -05 B-V-3100-004-2-201-02_5 4.1.b W W H 7-May-13 3:30 PM 7-May-13
7.2 Check compressive strenth@28 Days (Cube testing as per BS-EN -12390-3) East
5625 RFI-5858-QCN-2-03301 RFI-5858-QCN-2-03301 CONCRETE wall + 1 pipe sleepers of culvert BZRC-012 & Cast-in-situ Pipe Track D110-B70-PR-27: APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 7-May-13 2:00 PM 7-May-13
F3 and F4 (Pedestal) and F5 Footing
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 SECTION 1 CR # 5
5629 RFI-5858-QCN-2-03305 RFI-5858-QCN-2-03305 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 8-May-13 1:00 PM 8-May-13
PR 75 Pipe Rack Foundation Pedestal 1-2/A-B
5630 RFI-5858-QCN-2-03306 RFI-5858-QCN-2-03306 CONCRETE Check Concrete Pouring D110 B70 PR 75 Pipe Rack Foundation Pedestal 1-2/A-B APPROVED SECTION 1 CR # 5 B-V-3100-004-2-201-02_5 5.1 W H H 8-May-13 2:00 PM 12-May-13
5633 RFI-5858-QCN-2-03309 RFI-5858-QCN-2-03309 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70-PS-14 SLD050 TO SLD054 APPROVED SECTION 4 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 8-May-13 6:40 AM 14-May-13
5634 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70-
RFI-5858-QCN-2-03310 RFI-5858-QCN-2-03310 CONCRETE APPROVED SECTION 4 B-V-3100-004-2-201-02_5 9.2 S W H 8-May-13 7:00 AM 8-May-13
PS-14 SLD050 TO SLD054
5636 RFI-5858-QCN-2-03312 RFI-5858-QCN-2-03312 CONCRETE 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-34,50,51 & 52.) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 8-May-13 10:30 AM 8-May-13
Pre-Pouring Check Formworks, Reinforcement and cleaning of Cast-in- Situ Culvert Pipe Tank Farm 4.1.a.b.c.d.
5637 RFI-5858-QCN-2-03313 RFI-5858-QCN-2-03313 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 8-May-13 7:30 AM 8-May-13
Track Base D110-B70-PR-36: F2 prior concreting Raslaffan e
5638 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Tank Farm
RFI-5858-QCN-2-03314 RFI-5858-QCN-2-03314 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 8-May-13 7:40 AM 8-May-13
36: F2 ( Base ) Raslaffan
5639 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-28:
RFI-5858-QCN-2-03315 RFI-5858-QCN-2-03315 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 8-May-13 7:30 AM 9-May-13
SLD022 ( Base and Pedestal )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD029 to Tank Farm
5640 RFI-5858-QCN-2-03316 RFI-5858-QCN-2-03316 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 8.2 S W H 8-May-13 10:30 AM 8-May-13 CANCELLED WORK NOT READY
SLD051 = 20 nos except SLD034 Raslaffan
5641 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD029
RFI-5858-QCN-2-03317 RFI-5858-QCN-2-03317 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-May-13 3:30 PM 8-May-13 CANCELLED WORK NOT READY
to SLD051 = 20 nos except SLD034 prior backfilling.
Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
5642 RFI-5858-QCN-2-03318 RFI-5858-QCN-2-03318 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 8-May-13 2:00 PM 13-May-13
East Side 8th & 10th panel BASE (South Side ) 003(W-BZRC)
5644 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 B70 D110 -B70 - PR - 17
RFI-5858-QCN-2-03320 RFI-5858-QCN-2-03320 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 9-May-13 1:00 PM 9-May-13
PR 17 Pipe Rack Foundation Pedestal 1(F1,F2),2(F3,F4)
5646 Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
RFI-5858-QCN-2-03322 RFI-5858-QCN-2-03322 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 9-May-13 6:30 AM 11-May-13
NORTH SIDE 2nd BASE & WALL
Check concrete surface upon form removal D110 -B70- PR-75 Pipe Rack Foundation
5647 RFI-5858-QCN-2-03323 RFI-5858-QCN-2-03323 CONCRETE
1(F1)&2(F1)
APPROVED Section1 PR - 75 B-V-3100-004-2-201-02_5 6.3 S W H 9-May-13 1:00 PM 11-May-13
5648 RFI-5858-QCN-2-03324 RFI-5858-QCN-2-03324 CONCRETE Check Surface preparation D110 -B70- PR-75 Pipe Rack Foundation 1(F1)&2(F1) APPROVED D110 B70 - PR - 75 B-V-3100-004-2-201-02_5 9.1 S W H 9-May-13 4:00 PM 11-May-13
Pre-Pouring Check Formworks, Reinforcement and cleaning of Cast-in- Situ Pipe Track Tank Farm 4.1.a.b.c.d.
5649 RFI-5858-QCN-2-03325 RFI-5858-QCN-2-03325 CONCRETE
Base D110-B70-PR-36: F3 prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 9-May-13 1:30 PM 9-May-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Tank Farm
5650 RFI-5858-QCN-2-03326 RFI-5858-QCN-2-03326 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-May-13 1:40 PM 13-May-13
36: F3 ( Base ) Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5651 RFI-5858-QCN-2-03327 RFI-5858-QCN-2-03327 CONCRETE
Cast-in- Situ Pipe Track D110-B70-PR-36: F2 ( Pedestal ) prior shuttering
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 9-May-13 9:00 AM 9-May-13
9.2. Check Surface preparation and protective coating first and Second coat of Pipe Track
5652 RFI-5858-QCN-2-03328 RFI-5858-QCN-2-03328 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 9-May-13 8:00 AM to 1:30 PM 11-May-13
B70-PS-28- SLD022 ( Base and Pedestal )
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Stopper B70-PS-28:
5653 RFI-5858-QCN-2-03329 RFI-5858-QCN-2-03329 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 9-May-13 3:30 PM 11-May-13
SLD022 prior backfilling.
Check Surface preparation HAMAD CULVERT BZRC 005 FROM NORTH SIDE 2nd
5654 RFI-5858-QCN-2-03330 RFI-5858-QCN-2-03330 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 9-May-13 3:00 PM 11-May-13
BASE & WALL
4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-16-1 (F1,F2) 3
5655 RFI-5858-QCN-2-03331 RFI-5858-QCN-2-03331 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 9-May-13 10:30 AM 9-May-13
(F3,F4))
Check Reinforcement prior to close shuttering HAMAD CULVERT BZRC 005 FROM
5656 RFI-5858-QCN-2-03332 RFI-5858-QCN-2-03332 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 4.1.b W W H 9-May-13 4:00 PM 9-May-13
NORTH SIDE 1ST BASE WAL L (BOTH SIDE&END WALL) - (7.209M PORTION)
5657 Check Surface Below ground Protective Coating - First coat & Second coat D110 -B70- Section 1 PR -75
RFI-5858-QCN-2-03333 RFI-5858-QCN-2-03333 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 10-May-13 6:30 AM TO 7:30 AM 11-May-13
PR-75 Pipe Rack Foundation 1(F1)&2(F1) Raslaffan
Check Polyetheylene Installation Check Hardboard Installation D110 -B70- PR-75 Pipe Section 1 PR -75
5658 RFI-5858-QCN-2-03334 RFI-5858-QCN-2-03334 CONCRETE APPROVED B-V-3100-004-2-201-02_5 2.9.b&c S W H 10-May-13 8:30 AM 11-May-13
Rack Foundation 1(F1)&2(F1) Raslaffan
Check Surface Preparation & Sealent ApplicationHAMAD CULVERT BZRC - 005 FROM
5660 RFI-5858-QCN-2-03336 RFI-5858-QCN-2-03336 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.6.a,b S W H 11-May-13 8:00 AM 11-May-13
NORTH SIDE 2nd&3rd BASE & WALL
5661 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03337 RFI-5858-QCN-2-03337 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 11-May-13 7:00 AM 11-May-13
Cast-in- Situ Pipe Track D110-B70-PR-36: F3 ( Pedestal ) prior shuttering
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Tank Farm
5663 RFI-5858-QCN-2-03339 RFI-5858-QCN-2-03339 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-May-13 1:40 PM 14-May-13
36: F2 and F3 ( Pedestal ) and F1 ( Base ) Raslaffan
5664 Pre-Pouring Check Formworks, Reinforcement and cleaning of Cast-in- Situ Pipe Stopper Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03340 RFI-5858-QCN-2-03340 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 11-May-13 1:30 PM 11-May-13
B70-PS-29: SLD063 ( Base ) prior concreting Raslaffan e
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-29: Tank Farm
5665 RFI-5858-QCN-2-03341 RFI-5858-QCN-2-03341 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 11-May-13 1:40 PM 15-May-13
SLD063 ( Base ) Raslaffan
5666 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
RFI-5858-QCN-2-03342 RFI-5858-QCN-2-03342 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 11-May-13 2:00 PM 11-May-13
Situ Culvert East side of BZRC-010 ( Middle Portion ) Base
5667 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD029 to Tank Farm
RFI-5858-QCN-2-03343 RFI-5858-QCN-2-03343 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 11-May-13 9:30 AM 15-May-13
SLD051 = 20 nos except SLD034 Raslaffan
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD029
5668 RFI-5858-QCN-2-03344 RFI-5858-QCN-2-03344 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 11-May-13 10:30 AM 11-May-13
to SLD051 = 20 nos except SLD034 prior backfilling.
5669 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03345 RFI-5858-QCN-2-03345 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 12-May-13 7:00 AM 12-May-13
Cast-in- Situ Pipe Track D110-B70-PR-36: F1 ( Pedestal ) prior shuttering
5671 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR- Tank Farm
RFI-5858-QCN-2-03347 RFI-5858-QCN-2-03347 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 12-May-13 1:40 PM 12-May-13
36: F1 Pedestal and Precast D110-B70-PR-36: F4 ( Base ) Raslaffan
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5672 RFI-5858-QCN-2-03348 RFI-5858-QCN-2-03348 CONCRETE
Cast-in- Situ Pipe Stopper B70-PS-29: SLD063 ( Pedestal ) prior shuttering
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 12-May-13 8:30 AM 12-May-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-29: Tank Farm
5674 RFI-5858-QCN-2-03350 RFI-5858-QCN-2-03350 CONCRETE
SLD063 ( Pedestal ) and Precast Pipe Stopper B70-PS-26: SLD011 ( Base )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 12-May-13 1:40 PM 15-May-13
Check concrete surface upon form removal D110-B70-PR-17 Pipe Rack Foundation
5675 RFI-5858-QCN-2-03351 RFI-5858-QCN-2-03351 CONCRETE APPROVED Section4 PR - 17 B-V-3100-004-2-201-02_5 6.3 S W H 12-May-13 7:00 AM 14-May-13
1(F1,F2),2(F3,F4)
5676 RFI-5858-QCN-2-03352 RFI-5858-QCN-2-03352 CONCRETE Check Surface preparation D110-B70-PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4) APPROVED Section4 PR - 17 B-V-3100-004-2-201-02_5 9.1 S W H 12-May-13 11:00 AM 14-May-13
Check Surface Below ground Protective Coating - First coat & Second coat D110-B70-
5677 RFI-5858-QCN-2-03353 RFI-5858-QCN-2-03353 CONCRETE APPROVED Section4 PR - 17 B-V-3100-004-2-201-02_5 9.2.a S W H 12-May-13 2:30 PM to 4:00 PM 14-May-13
PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4)
5678 RFI-5858-QCN-2-03354 RFI-5858-QCN-2-03354 CONCRETE Check Concrete Curing D110-B70-PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4) APPROVED D110- B70 - PR -17 B-V-3100-004-2-201-02_5 6.4 S W H 12-May-13 2:30 PM 14-May-13
5680 Review and approval for QIL test report for Reinforcement 16mm testing (sample location Barzan Off-plot
RFI-5858-QCN-2-03356 RFI-5858-QCN-2-03356 CONCRETE APPROVED B-V-3100-004-2-201-02_5 2.2 R R H 12-May-13 8:30 AM 15-May-13
Gate 5 Precast Area) Raslaffan Area
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5681 RFI-5858-QCN-2-03357 RFI-5858-QCN-2-03357 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3. S W H 12-May-13 9:30 AM 14-May-13
36: F2 and F3 ( Base and Pedestal )
5682 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110-B70-
RFI-5858-QCN-2-03358 RFI-5858-QCN-2-03358 CONCRETE APPROVED SECTION 6 B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 13-May-13 1:00 PM 17-May-13
PS-18 Pipe Stopper Foundation Pedestal SLD017
5683 RFI-5858-QCN-2-03359 RFI-5858-QCN-2-03359 CONCRETE Check Concrete Pouring D110-B70-PS-18 Pipe Stopper Foundation Pedestal SLD017 APPROVED SECTION 6 B-V-3100-004-2-201-02_5 5.1 W H H 13-May-13 2:00 PM 15-May-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5684 RFI-5858-QCN-2-03360 RFI-5858-QCN-2-03360 CONCRETE 36: F1 ( Base and Pedestal ) and Pipe Stopper B70-PS-29: SLD063 ( Base and APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 13-May-13 10:30 AM 14-May-13
Pedestal )
5685 Prepouring - Check form works,Embeded items,Cleaning & Expansion joints HAMAD Section 4 Hamad
RFI-5858-QCN-2-03361 RFI-5858-QCN-2-03361 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a,c,d,e W W H 13-May-13 7:00 AM 13-May-13
CULVERT BZRC 005 FROM NORTH SIDE END WALL - (7.209M PORTION) Culvert
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Concrete Pouring HAMAD CULVERT BZRC 005 FROM NORTH SIDE END WALL Section 4 Hamad
5686 RFI-5858-QCN-2-03362 RFI-5858-QCN-2-03362 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-May-13 7:30 AM 13-May-13
- (7.209M PORTION) Culvert
5687 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Track D110- Tank Farm
RFI-5858-QCN-2-03363 RFI-5858-QCN-2-03363 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 13-May-13 1:30 PM 13-May-13
B70-PR-39 prior concreting. (Base) (One number) Raslaffan
Concrete Placement Check Concrete pouring of Precast Pipe Track D110-B70-PR-39. Tank Farm
5688 RFI-5858-QCN-2-03364 RFI-5858-QCN-2-03364 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-May-13 1:40 PM 14-May-13
(footing) (one number) Raslaffan
5689 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Stopper Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03365 RFI-5858-QCN-2-03365 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 13-May-13 1:30 PM 13-May-13
B70-PS-29: SLD080 prior concreting. Raslaffan e
5690 Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-29: Tank Farm
RFI-5858-QCN-2-03366 RFI-5858-QCN-2-03366 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-May-13 1:40 PM 16-May-13
SLD080 Raslaffan
5692 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03368 RFI-5858-QCN-2-03368 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 13-May-13 9:00 AM 13-May-13
Precast Pipe Track D110-B70-PR-36: F4 ( Pedestal ) prior shuttering
Check Surface Below ground Protective Coating - First coat & Second coat DIKE 001 Section6 N- S Dike
5693 RFI-5858-QCN-2-03369 RFI-5858-QCN-2-03369 CONCRETE
North South Retaining wall 13th panel ditch
APPROVED
001
B-V-3100-004-2-201-02_5 9.2.a S W H 13-May-13 8:30 AM to 2:00 PM 14-May-13
4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-18 GL 16-
5695 RFI-5858-QCN-2-03371 RFI-5858-QCN-2-03371 CONCRETE
13/A-B))
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 14-May-13 10:30 AM 14-May-13
5696 RFI-5858-QCN-2-03372 RFI-5858-QCN-2-03372 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70 PS 13 SLD036 TO SLD037 APPROVED SECTION 4 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 14-May-13 6:40 AM 17-May-13
Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70- SECTION 4
5697 RFI-5858-QCN-2-03373 RFI-5858-QCN-2-03373 CONCRETE
PS-13 SLD036 TO SLD037
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 9.2 S W H 14-May-13 7:00 AM 15-May-13
Check Surface Below ground Protective Coating - First coat & Second coat DIKE 002 Section6 N- S Dike
5698 RFI-5858-QCN-2-03374 RFI-5858-QCN-2-03374 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 14-May-13 7:30 AM to 2:00 PM 15-May-13
East West Retaining wall 1st,2nd& 3rd panel (South Side Portion) 002
Pre-Pouring Check Formworks, Reinforcement and cleaning of Pipe Track D110-B70-PR- 4.1.a.b.c.d.
5699 RFI-5858-QCN-2-03375 RFI-5858-QCN-2-03375 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 14-May-13 1:30 PM 14-May-13
33: F4 ( Base ) prior concreting. e
5700 RFI-5858-QCN-2-03376 RFI-5858-QCN-2-03376 CONCRETE Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-33: F4 ( Base ) APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 14-May-13 1:40 PM 14-May-13
9.3. Check Surface preparation and protective coating first and Second coat of Pip
5701 RFI-5858-QCN-2-03377 RFI-5858-QCN-2-03377 CONCRETE Sleeper B70-PS-29: SLD001, SLD006 to SLD012 SLD014 to SLD022, SLD025 to APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 14-May-13 8:00 AM to 5:30 PM 16-May-13
SLD035, SLD038 to SLD040, SLD043, SLD044 and SLD046 to SLD047 = 35 nos
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipr Track D110-B70-PR-36:
5702 RFI-5858-QCN-2-03378 RFI-5858-QCN-2-03378 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 14-May-13 1:30 PM 16-May-13
F2 and F3
5703 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-29: SLD049 to Tank Farm
RFI-5858-QCN-2-03379 RFI-5858-QCN-2-03379 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 14-May-13 9:00 AM 20-May-13
SLD054 = 11 nos Raslaffan
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-29: SLD049 Tank Farm
5704 RFI-5858-QCN-2-03380 RFI-5858-QCN-2-03380 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.b.c S W H 14-May-13 9:30 AM 15-May-13
to SLD054 = 6 nos prior backfilling. Raslaffan
5705 9.3. Check Surface preparation and protective coating first and Second coat of Pip Track
RFI-5858-QCN-2-03381 RFI-5858-QCN-2-03381 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 14-May-13 8:00 AM to 5:30 PM 16-May-13
D110-B70-PR-36: F1, F2 and F3
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5706 RFI-5858-QCN-2-03382 RFI-5858-QCN-2-03382 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 14-May-13 8:00 AM 14-May-13
Precast Pipe Stopper B70-PS-26: SLD011 prior shuttering
5707 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Track D110- Tank Farm
RFI-5858-QCN-2-03383 RFI-5858-QCN-2-03383 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 14-May-13 1:30 PM 14-May-13
B70-PR-36: F4 ( Pedestal ) and Pipe Stopper B70-PS-26: SLD011 prior concreting Raslaffan
5708 Concrete Placement Check Concrete pouring of Precast Pipe Track D110-B70-PR-36: F4 Tank Farm
RFI-5858-QCN-2-03384 RFI-5858-QCN-2-03384 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 14-May-13 1:40 PM 14-May-13 CANCELLED WORK NOT READY
( Pedestal ) and Pipe Stopper B70-PS-26: SLD011 ( Pedestal ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5710 Check concrete surface upon form removal D110-B70-PS-18 Pipe Stopper Foundation
RFI-5858-QCN-2-03386 RFI-5858-QCN-2-03386 CONCRETE APPROVED Section 6 Raaslaffan B-V-3100-004-2-201-02_5 6.3 S W H 15-May-13 7:00 AM 16-May-13
SLD017
5711 RFI-5858-QCN-2-03387 RFI-5858-QCN-2-03387 CONCRETE Check Surface preparation D110-B70-PS-18 Pipe Stopper Foundation SLD017 APPROVED SECTION 6 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 15-May-13 4:00 PM 16-May-13
5713 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70-
RFI-5858-QCN-2-03389 RFI-5858-QCN-2-03389 CONCRETE APPROVED SECTION 6 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 15-May-13 7:40 AM 16-May-13
PS-18 SLD001,SLD002,SLD003,,SLD004
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5714 RFI-5858-QCN-2-03390 RFI-5858-QCN-2-03390 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 15-May-13 9:00 AM 15-May-13
Precast Pipe Track D110-B70-PR-33: F4 ( Pedestal ) prior shuttering
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5715 RFI-5858-QCN-2-03391 RFI-5858-QCN-2-03391 CONCRETE Precast Pipe Track D110-B70-PR-39 ( Pedestal ) and Pipe Stopper B70-PS-29 : SLD080 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 15-May-13 9:30 AM 15-May-13
prior shuttering
Check Polyetheylene Installation Check Hardboard Installation DIKE 002 East West DIKE 002 EW
5716 RFI-5858-QCN-2-03392 RFI-5858-QCN-2-03392 CONCRETE
Retaining wall 1st,2nd& 3rd panel (South Side Portion)
APPROVED
Retaining wall
B-V-3100-004-2-201-02_5 9.2 S W H 15-May-13 3:40 PM 16-May-13
Check concrete surface upon form removal HAMAD CULVERT BZRC 005 FROM
5718 RFI-5858-QCN-2-03394 RFI-5858-QCN-2-03394 CONCRETE
NORTH SIDE END WALL (7.209M)
APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.3 S W H 15-May-13 3:30 AM 16-May-13
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-26: SLD004
5720 RFI-5858-QCN-2-03396 RFI-5858-QCN-2-03396 CONCRETE
to SLD013 = 9 nos except SLD011 prior backfilling.
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 15-May-13 3:30 PM 16-May-13
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-36:
5721 RFI-5858-QCN-2-03397 RFI-5858-QCN-2-03397 CONCRETE F4 ( Base and Pedestal ) and Precast Pipe Stopper B70-PS-26: SLD011 ( Base and CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02-R 6.3 S W H 15-May-13 10:30 AM 15-May-13 CANCELLED WORK NOT READY
Pedestal )
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110-B70- SECTION 4 Raslaffan
5724 RFI-5858-QCN-2-03400 RFI-5858-QCN-2-03400 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 15-May-13 1:00 PM 17-May-13
PS-14 Pipe Stopper Foundation Footing SLD016
SECTION 4 Raslaffan
5725 RFI-5858-QCN-2-03401 RFI-5858-QCN-2-03401 CONCRETE Check Concrete Pouring D110-B70-PS-14 Pipe Stopper Foundation Footing SLD016 APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 15-May-13 2:00 PM 16-May-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5726 RFI-5858-QCN-2-03402 RFI-5858-QCN-2-03402 CONCRETE Precast Pipe Stopper B70-PS-28: SLD008 B70-PS-29: SLD032 and SLD045 prior APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 16-May-13 9:00 AM 16-May-13
shuttering. (Pedestal)
5728 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Culvert
RFI-5858-QCN-2-03404 RFI-5858-QCN-2-03404 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 16-May-13 2:00 PM 16-May-13
Wall BZRC-010 ( Middle Portion and Top of End Wall ) East side
Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
5729 RFI-5858-QCN-2-03405 RFI-5858-QCN-2-03405 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 16-May-13 1:30 PM 16-May-13
cleaning of Cast-in- Situ Pipe Track B70-PS-29 SLD013 ( Base ) prior concreting. Raslaffan e
5730 Concrete Placement Check Concrete pouring of Precast Pipe Track B70-PS-29: SLD013 Tank Farm
RFI-5858-QCN-2-03406 RFI-5858-QCN-2-03406 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-May-13 1:350 PM 16-May-13
( Base ) Raslaffan
5731 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03407 RFI-5858-QCN-2-03407 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3. S W H 16-May-13 8:00 AM to 1:30 PM 17-May-13
Stopper B70-PS-29: SLD063 prior hardboard protection.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Surface Below ground Protective Coating - First coat & Second coat D110-B70-
5732 RFI-5858-QCN-2-03408 RFI-5858-QCN-2-03408 CONCRETE APPROVED Section6 B-V-3100-004-2-201-02_5 9.2.a S W H 16-May-13 7:30 AM to 10:00 AM 17-May-13
PS-18 Pipe Stopper Foundation SLD017
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD015, SLD017, Tank Farm
5734 RFI-5858-QCN-2-03410 RFI-5858-QCN-2-03410 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 16-May-13 8:00 AM 22-May-13
SLD018, SLD020 to SLD024, SLD027 to SLD031 = 14 nos Raslaffan
5735 Check Reinforcement prior to close shuttering D110-DIKE-003(W-BZRC) WEST SECTION4 DIKE
RFI-5858-QCN-2-03411 RFI-5858-QCN-2-03411 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1b W W H 16-May-13 6:30 AM 16-May-13
RETAINING WALL-- From East Side 8th panel (South Side ) 003 Raslaffan
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-36:
5736 RFI-5858-QCN-2-03412 RFI-5858-QCN-2-03412 CONCRETE F4 ( Base and Pedestal ) and Precast Pipe Stopper B70-PS-26: SLD011 ( Base and CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02-R 6.3 S W H 16-May-13 10:30 AM 16-May-13 CANCELLED WORK NOT READY
Pedestal )
Prepouring - Check form works,Embeded items,Cleaning & Expansion joints D110-DIKE- SECTION4 DIKE
5737 RFI-5858-QCN-2-03413 RFI-5858-QCN-2-03413 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a,c,d,e W W H 16-May-13 7:30 AM 16-May-13
003(W-BZRC) WEST RETAINING WALL-- From East Side10 th panel Wall (South Side ) 003(W-BZRC)
5738 Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
RFI-5858-QCN-2-03414 RFI-5858-QCN-2-03414 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 16-May-13 8:30 AM 16-May-13
East Side10 th panel Wall (South Side ) 003(W-BZRC)
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipr Track D110-B70-PR-36:
5739 RFI-5858-QCN-2-03415 RFI-5858-QCN-2-03415 CONCRETE
F1
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 16-May-13 9:30 AM 17-May-13
5741 RFI-5858-QCN-2-03417 RFI-5858-QCN-2-03417 CONCRETE 4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-49) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 18-May-13 10:30 AM 18-May-13
Prepouring - Check form works,Embeded items,Cleaning & Expansion joints D110-DIKE- SECTION4 DIKE
5742 RFI-5858-QCN-2-03418 RFI-5858-QCN-2-03418 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 18-May-13 7:30 AM 18-May-13
003(W-BZRC) WEST RETAINING WALL-- From East Side8 th panel Wall (South Side ) 003(W-BZRC)
Check Concrete Pouring D110-DIKE-003(W-BZRC) WEST RETAINING WALL-- From SECTION4 DIKE
5743 RFI-5858-QCN-2-03419 RFI-5858-QCN-2-03419 CONCRETE
East Side8 th panel Wall (South Side )
APPROVED
003(W-BZRC)
B-V-3100-004-2-201-02_5 5.1 W H H 18-May-13 8:30 AM 18-May-13
Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-30: Tank Farm
5746 RFI-5858-QCN-2-03422 RFI-5858-QCN-2-03422 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 18-May-13 1:40 PM 18-May-13
SLD068 ( Base ) and Pipe Stopper B70-PS-26: SLD011 ( Pedestal ) Raslaffan
Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
5747 RFI-5858-QCN-2-03423 RFI-5858-QCN-2-03423 CONCRETE CANCELLED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 18-May-13 1:30 PM 18-May-13
cleaning of Pipe Track D110-B70-PR-33: F4 ( Prdestal ) and F3 ( Base ) prior concreting e
5749 Check Surface preparation HAMAD CULVERT BZRC-005 NORTH SIDE END PORTION
RFI-5858-QCN-2-03425 RFI-5858-QCN-2-03425 CONCRETE CANCELLED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.1 S W H 18-May-13 7:00 AM 18-May-13 CANCELLED WORK NOT READY
(7.209M) BASE & WALL
Check Surface Below ground Protective Coating - First coat & Second coat HAMAD
5750 RFI-5858-QCN-2-03426 RFI-5858-QCN-2-03426 CONCRETE CULVERT BZRC -005 FROM NORTH SIDE 1st, 2nd & 3rd BASE & WALL(OUTSIDE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 9.2.a S W H 18-May-13 10:00 AM to 4:00 PM 19-May-13
PORTION)
5751 Check Concrete CuringHAMAD CULVERT BZRC 005 FROM NORTH SIDE 1st,2nd& 3rd
RFI-5858-QCN-2-03427 RFI-5858-QCN-2-03427 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.4 S W H 18-May-13 9:00 AM 19-May-13
BASE & WALL
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe stopper B70-PS-29:
5752 RFI-5858-QCN-2-03428 RFI-5858-QCN-2-03428 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 18-May-13 8:30 AM 19-May-13
SLD063
5753 Check Surface Preparation & Sealent ApplicationHAMAD CULVERT BZRC - 005 FROM
RFI-5858-QCN-2-03429 RFI-5858-QCN-2-03429 CONCRETE APPROVED HAMAD CULVERT B-V-3100-004-2-201-02_5 6.6.a.b S W H 18-May-13 8:00 AM 19-May-13
NORTH SIDE 1st BASE & WALL
5754 Check Reinforcement prior to close shuttering D110-B70-PS-14 Pipe Stopper Foundation
RFI-5858-QCN-2-03430 RFI-5858-QCN-2-03430 CONCRETE APPROVED SECTION4 B-V-3100-004-2-201-02_5 4.1.b W W H 18-May-13 2:30 PM 18-May-13
Pedestal SLD016
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Tank Farm
5755 RFI-5858-QCN-2-03431 RFI-5858-QCN-2-03431 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-55 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 18-May-13 8:00 AM 20-May-13
Raslaffan
5756 RFI-5858-QCN-2-03432 RFI-5858-QCN-2-03432 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-55 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 18-May-13 8:30 AM 19-May-13
Check Grout Prepouring,Concrete,Metal surface preparation & Formworks for Pipe Rack
5757 RFI-5858-QCN-2-03433 RFI-5858-QCN-2-03433 CONCRETE APPROVED SECTION 6 PR-27 B-V-3100-004-2-201-02_4 3.1.1a,b&c S W H 19-May-13 8:00 AM 21-May-13
Foundations D110-B70 - PR - 27 GL 1- 5 /A-B
5759 Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
RFI-5858-QCN-2-03435 RFI-5858-QCN-2-03435 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 19-May-13 1:30 PM 19-May-13
cleaning of Pipe Track D110-B70-PR-33: F4 ( Prdestal ) and F3 ( Base ) prior concreting e
5761 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-27: SLD001 and Tank Farm
RFI-5858-QCN-2-03437 RFI-5858-QCN-2-03437 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 19-May-13 8:00 AM 20-May-13
SLD002 Raslaffan
5763 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-27: SLD001
RFI-5858-QCN-2-03439 RFI-5858-QCN-2-03439 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 19-May-13 7:30 AM 19-May-13
and SLD002 prior backfilling.
6.3 Check Concrete surface upon form removal of Cast-insitu Pipe Stopper B70-PS-26:
5764 RFI-5858-QCN-2-03440 RFI-5858-QCN-2-03440 CONCRETE
SLD011 ( Base and Pedestal )
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 19-May-13 10:30 AM 19-May-13
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5765 RFI-5858-QCN-2-03441 RFI-5858-QCN-2-03441 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 19-May-13 1:30 PM to 5:30 PM 19-May-13
Stopper B70-PS-26: SLD011 prior hardboard protection.
Surface preparation & Above Ground Protective Coating of Sleeper foundations - First &
5766 RFI-5858-QCN-2-03442 RFI-5858-QCN-2-03442 CONCRETE
Second Coat Sleeper foundations B70 PS 18 SLD001,SLD002,SLD003 & SLD004
APPROVED SECTION 6 B-V-3100-004-2-201-02_5 9.3 S W H 19-May-13 6:30 AM to 8:30 AM 19-May-13
Check Surface preparation DIKE 002 East West Retaining wall 13th&14th panel (North Section6 N- S Dike
5767 RFI-5858-QCN-2-03443 RFI-5858-QCN-2-03443 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 19-May-13 10:00 AM 19-May-13
Side) 002
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5768 RFI-5858-QCN-2-03444 RFI-5858-QCN-2-03444 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 20-May-13 10:30 AM 20-May-13
33: F4 ( Base and Pedestal )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5769 RFI-5858-QCN-2-03445 RFI-5858-QCN-2-03445 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 20-May-13 2:30 PM to 5:30 PM 20-May-13
D110-B70-PR-33: F4 prior hardboard protection.
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5770 RFI-5858-QCN-2-03446 RFI-5858-QCN-2-03446 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 20-May-13 9:00 AM 20-May-13
Cast-in- Situ Pipe Track D110-B70-PR-33: F3 ( Pedestal )
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD003, SLD005 Tank Farm
5771 RFI-5858-QCN-2-03447 RFI-5858-QCN-2-03447 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 20-May-13 8:00 AM 22-May-13
to SLD010 = 7 nos Raslaffan
5772 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD003
RFI-5858-QCN-2-03448 RFI-5858-QCN-2-03448 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 20-May-13 9:30 AM 20-May-13
and SLD005 to SLD010 = 7 nos prior backfilling.
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110-B70- SECTION 4
5773 RFI-5858-QCN-2-03449 RFI-5858-QCN-2-03449 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 20-May-13 1:00 PM 20-May-13
PS-14 Pipe Stopper Foundation Pedestal SLD016 Raslaffan
5774 SECTION 4
RFI-5858-QCN-2-03450 RFI-5858-QCN-2-03450 CONCRETE Check Concrete Pouring D110-B70-PS-14 Pipe Stopper Foundation Pedestal SLD016 APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 20-May-13 1:30 PM 23-May-13
Raslaffan
5776 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-27- GL-1 to 5 /
RFI-5858-QCN-2-03452 RFI-5858-QCN-2-03452 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 20-May-13 2.30 PM 20-May-13
A-B)
5777 Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - SECTION 4
RFI-5858-QCN-2-03453 RFI-5858-QCN-2-03453 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 20-May-13 1:30 PM to 3:30 PM 20-May-13
First &Second Coat Sleeper foundation B70 -PS-13 SLD036 TO SLD037 Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5779 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Stopper Tank Farm
RFI-5858-QCN-2-03455 RFI-5858-QCN-2-03455 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 21-May-13 1:30 PM 21-May-13 CANCELLED WORK NOT READY
B70-PS-30: SLD054 ( Base ) Raslaffan
Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-30: Tank Farm
5780 RFI-5858-QCN-2-03456 RFI-5858-QCN-2-03456 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 21-May-13 1:40 PM 21-May-13 unavailanility of permit
SLD054 ( Base ) Raslaffan
5781 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03457 RFI-5858-QCN-2-03457 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 21-May-13 7:30 AM to 5:30 PM 21-May-13 CANCELLED WORK NOT READY
Sleeper B70-PS-30: SLD049 to SLD054 = 6 nos
5782 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD001
RFI-5858-QCN-2-03458 RFI-5858-QCN-2-03458 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 21-May-13 7:30 AM 21-May-13 CANCELLED WORK NOT READY
and SLD002 prior backfilling.
5784 Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
RFI-5858-QCN-2-03460 RFI-5858-QCN-2-03460 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 21-May-13 1:40 PM 21-May-13
cleaning of Pipe Track D110-B70-PR-33: F3 ( Prdestal ) and F2 ( Base ) prior concreting e
Check Concrete Pouring D110-RW-003 (W-BZRC) WEST RETAINING WALL-- From SECTION4 D110-
5787 RFI-5858-QCN-2-03463 RFI-5858-QCN-2-03463 CONCRETE
East Side1st,3rd,5th& 7th panel Wall (South Side )
APPROVED
RW-003(W-BZRC)
B-V-3100-004-2-201-02_5 5.1 W H H 21-May-13 1:30 PM 23-May-13
Check concrete surface upon form removal D110-RW-003 (W-BZRC) WEST RETAINING SECTION4 D110-
5788 RFI-5858-QCN-2-03464 RFI-5858-QCN-2-03464 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 21-May-13 3:00 PM 21-May-13
WALL-- From East Side8 th & 10th panel Wall (South Side ) RW-003 (W-BZRC)
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
5789 RFI-5858-QCN-2-03465 RFI-5858-QCN-2-03465 CONCRETE
33: F3 ( Base and Pedestal )
APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 22-May-13 10:30 AM 22-May-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5790 RFI-5858-QCN-2-03466 RFI-5858-QCN-2-03466 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 22-May-13 9:00 AM 22-May-13
Cast-in- Situ Pipe Track D110-B70-PR-33: F2 ( Pedestal )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5791 RFI-5858-QCN-2-03467 RFI-5858-QCN-2-03467 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 22-May-13 1:30 PM to 5:30 PM 22-May-13
D110-B70-PR-33: F3 prior hardboard protection.
Tank Farm
5792 RFI-5858-QCN-2-03468 RFI-5858-QCN-2-03468 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-54: APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 22-May-13 8:00 AM 23-May-13
Raslaffan
5793 RFI-5858-QCN-2-03469 RFI-5858-QCN-2-03469 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-54 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 22-May-13 9:30 AM 22-May-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5794 RFI-5858-QCN-2-03470 RFI-5858-QCN-2-03470 CONCRETE Cast-in- Situ Pipe Stopper B70-PS-29: SLD032, SLD045 and SLD080 ( Pedestal ) prior APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 22-May-13 7:30 AM 22-May-13
shuttering
Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-29: Tank Farm
5796 RFI-5858-QCN-2-03472 RFI-5858-QCN-2-03472 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 22-May-13 1:40 PM 26-May-13
SLD032, SLD045 and SLD080 Raslaffan
5797 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Cast-in-
RFI-5858-QCN-2-03473 RFI-5858-QCN-2-03473 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 22-May-13 2:00 PM 22-May-13
Situ Retaining wall Concrete Ditch N- S ( Corner and Last Portion )
Surface preparation & Above Ground Protective Coating of Sleeper foundations - First & SECTION 6
5798 RFI-5858-QCN-2-03474 RFI-5858-QCN-2-03474 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 22-May-13 1:30 PM to 3:30 PM 22-May-13
Second Coat D110-B70-PS-18 Pipe Sleeper Foundation SLD005 to SLD010 & SLD017 Raslaffan
5799 Pre-Cast Items Check Erection of Precast of Pipe Stopper B70-PS-29: SLD032, SLD045 Tank Farm
RFI-5858-QCN-2-03475 RFI-5858-QCN-2-03475 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 22-May-13 8:00 AM 22-May-13
and SLD080 Raslaffan
5800 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03476 RFI-5858-QCN-2-03476 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 22-May-13 7:30 AM to 5:30 PM 22-May-13
Stopper B70-PS-28: SLD008 B70-PS-29: SLD013, SLD032, SLD045
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polythylene & Hardboard Installation of Pipe Stopper Base B70-PS-28: SLD008,
5801 RFI-5858-QCN-2-03477 RFI-5858-QCN-2-03477 CONCRETE B70-PS-29: SLD013, SLD032 SLD045 and SLD080 and B70-PS-30: SLD068. base APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 22-May-13 8:30 AM 22-May-13
vertical side only
5802 Check Final Visual Inspection D110-B70-PS-18 Pipe Sleeper Foundation SLD001 TO
RFI-5858-QCN-2-03478 RFI-5858-QCN-2-03478 CONCRETE APPROVED SECTION6 B-V-3100-004-2-201-02_5 10 S W H 22-May-13 2:30 PM 22-May-13
SLD010 & SLD017
5804 Check Polythylene & Hardboard Installation of Cast-in- Situ D110-B70-PR-33: F3 prior
RFI-5858-QCN-2-03480 RFI-5858-QCN-2-03480 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 23-May-13 8:30 AM 23-May-13
backfilling
5805 RFI-5858-QCN-2-03481 RFI-5858-QCN-2-03481 CONCRETE Check Laying of Asphalt Base Course Culvert BZRC-010 ( East Side ) APPROVED BZRC-010 B-V-3100-004-2-201-03_7 5.2.2 S W H 23-May-13 7:30 AM 23-May-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-29:
5806 RFI-5858-QCN-2-03482 RFI-5858-QCN-2-03482 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 23-May-13 10:00 AM 23-May-13
SLD032, SLD045 and SLDS080 ( Base and Pedestal )
5807 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD058, SLD059, Tank Farm
RFI-5858-QCN-2-03483 RFI-5858-QCN-2-03483 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 23-May-13 7:30 AM 23-May-13
SLD060, SLD066 and SLD067 = 5 nos Raslaffan
5809 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03485 RFI-5858-QCN-2-03485 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 23-May-13 9:30 AM to 5:30 PM 23-May-13
Stopper B70-PS-29: SLD063
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Cast-in- Situ Pipe Sleeper Tank Farm 4.1.a.b.c.d.
5810 RFI-5858-QCN-2-03486 RFI-5858-QCN-2-03486 CONCRETE
B70-PS-29: SLD004 base prior concreting.
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 23-May-13 1:30 PM 23-May-13
Concrete Placement Check Concrete pouring of Precast Pipe Sleeper B70-PS-29: Tank Farm
5811 RFI-5858-QCN-2-03487 RFI-5858-QCN-2-03487 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 23-May-13 1:40 PM 23-May-13 CANCELLED DUE TO ON AVILABILITY AT CONCRETE
SLD004 Raslaffan
5814 RFI-5858-QCN-2-03490 RFI-5858-QCN-2-03490 CONCRETE Check Laying of Asphalt Binder Course & Surface Course BZRC-010 ( East Side ) APPROVED BZRC-010 Raslaffan B-V-3100-004-2-202-02_6 4.2.4 S W H 24-May-13 8:30 AM 24-May-13
5815 RFI-5858-QCN-2-03491 RFI-5858-QCN-2-03491 CONCRETE Check Laying of Asphalt Base Course Culvert BZRC-012 APPROVED BZRC-012 Raslaffan B-V-3100-004-2-201-03_7 5.2.2 S W H 25-May-13 1:30 PM 27-May-13
Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
5816 RFI-5858-QCN-2-03492 RFI-5858-QCN-2-03492 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 25-May-13 1:30 PM 25-May-13
cleaning of Pipe Track D110-B70-PR-33: F2 ( Pedestal ) e
5818 Pre-Pouring Check Formworks, Reinforcement and cleaning of cast-in- Situ Pipe Track
RFI-5858-QCN-2-03494 RFI-5858-QCN-2-03494 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 25-May-13 1:30 PM 25-May-13
D110-B70-PR-29: F2 ( Base ) prior concreting.
5819 RFI-5858-QCN-2-03495 RFI-5858-QCN-2-03495 CONCRETE Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-29: F2 ( Base ) APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 25-May-13 1:40 PM 25-May-13
5820 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-03496 RFI-5858-QCN-2-03496 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 25-May-13 2:00 PM 23-May-13
Track D110-B70-PR-31: F2( Footing )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5821 RFI-5858-QCN-2-03497 RFI-5858-QCN-2-03497 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 25-May-13 7:30 AM to 11:30 AM 25-May-13
Stopper B70-PS-29: SLD032, SLD045 and SLD080 prior painting of curing compound.
5822 Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-29: SLD032,
RFI-5858-QCN-2-03498 RFI-5858-QCN-2-03498 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 25-May-13 1:30 PM 25-May-13
SLD045 and SLD080 prior backfilling
5823 Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 - SECTION 4
RFI-5858-QCN-2-03499 RFI-5858-QCN-2-03499 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 25-May-13 1:00 PM 25-May-13
B70- PR-73 Pipe Rack Foundation Footing 1(F1) & 2(F2) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
SECTION 4
5824 RFI-5858-QCN-2-03500 RFI-5858-QCN-2-03500 CONCRETE Check Concrete Pouring D110 - B70- PR-73 Pipe Rack Foundation Footing 1(F1) & 2(F2) APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-May-13 2:00 PM 26-May-13
Raslaffan
5825 Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Stopper Tank Farm
RFI-5858-QCN-2-03501 RFI-5858-QCN-2-03501 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.e W W H 25-May-13 7:30 AM 25-May-13
B70-PS-30: SLD054 ( Base ) Raslaffan
Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-30: Tank Farm
5826 RFI-5858-QCN-2-03502 RFI-5858-QCN-2-03502 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 25-May-13 7:40 AM 25-May-13
SLD054 ( Base ) Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5827 RFI-5858-QCN-2-03503 RFI-5858-QCN-2-03503 CONCRETE Sleeper B70-PS-30: SLD033, SLD035 = 2 nos SLD036 to SLD041 = 6 nos, SLD046 to APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 25-May-13 7:30 AM to 5:30 PM 25-May-13
SLD049 = 4 nos
Check Concrete Pouring D110-RW-003(W-BZRC) WEST RETAINING WALL-- From East SECTION4 D110-
5831 RFI-5858-QCN-2-03507 RFI-5858-QCN-2-03507 CONCRETE
Side2nd,4th& 6th panel Wall (South Side )
APPROVED
RW-003(W-BZRC)
B-V-3100-004-2-201-02_5 5.1 W H H 26-May-13 7:00 AM 26-May-13
5832 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03508 RFI-5858-QCN-2-03508 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 26-May-13 10:00 AM 26-May-13
33: F2 ( Base and Pedestal )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5833 RFI-5858-QCN-2-03509 RFI-5858-QCN-2-03509 CONCRETE
D110-B70-PR-33: F2 prior hardboard protection.
APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 26-May-13 1:30 PM to 3:30 PM 26-May-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5835 RFI-5858-QCN-2-03511 RFI-5858-QCN-2-03511 CONCRETE
Cast-in- Situ Pipe Track D110-B70-PR-29: F2 ( Pedestal )
APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 26-May-13 9:00 AM 26-May-13
SECTION4 D110-
Check Erection of Culvert Precast Retaining Wall D110-RW-003(W-BZRC) WEST
5836 RFI-5858-QCN-2-03512 RFI-5858-QCN-2-03512 CONCRETE APPROVED RW-003(W-BZRC) B-V-3100-004-2-201-02_5 8.2 S W H 26-May-13 6:30 AM 26-May-13
RETAINING WALL-- From East Side1st to 11th panel Wall (North Side )
Raslaffan
5837 RFI-5858-QCN-2-03513 RFI-5858-QCN-2-03513 CONCRETE Check Laying of Asphalt Binder Course & Surface Course BZRC-012 APPROVED BZRC-012 Raslaffan B-V-3100-004-2-201-03_7 4.24 S W H 26-May-13 8:30 AM 26-May-13
Check Surface preparation D110-RW-002 East West Retaining wall 5th&6th panel (South Section6 E-W D110-
5838 RFI-5858-QCN-2-03514 RFI-5858-QCN-2-03514 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 26-May-13 10:00 AM 26-May-13
Side) RW002
5841 Check Erection of Precast sleeper Sleeper foundation D110-B70-PS-19 SLD017 & D110-
RFI-5858-QCN-2-03517 RFI-5858-QCN-2-03517 CONCRETE APPROVED SECTION 6 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 26-May-13 6:40 AM 26-May-13
B70-PS-20 SLD001
Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
5842 RFI-5858-QCN-2-03518 RFI-5858-QCN-2-03518 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 W W H 27-May-13 1:30 PM 27-May-13
cleaning of Pipe Track D110-B70-PR-29: F2 ( Pedestal ) e
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5844 RFI-5858-QCN-2-03520 RFI-5858-QCN-2-03520 CONCRETE Cast-in- Situ Pipe Stopper B70-PS-29: SLD013 B70-PS-30: SLD068 and Pipe Sleeper APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 27-May-13 8:30 AM 27-May-13
B70-PS-29: SLD004 ( All Pedestal ) Prior Shuttring
5846 Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-29: Tank Farm
RFI-5858-QCN-2-03522 RFI-5858-QCN-2-03522 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-May-13 1:40 PM 27-May-13
SLD013, B70-PS-30: SLD068 and Pipe Sleeper B70-PS-29: SLD004 ( All Pedestal ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5847 RFI-5858-QCN-2-03523 RFI-5858-QCN-2-03523 CONCRETE Check Final Visual Inspection Sleeper foundation D110-B70 -PS-13 SLD036 TO SLD037 APPROVED SECTION4 B-V-3100-004-2-201-02_5 9.2 S W H 27-May-13 9:30 AM 27-May-13
5848 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-29: SLD005, SLD036 Tank Farm
RFI-5858-QCN-2-03524 RFI-5858-QCN-2-03524 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 27-May-13 7:30 AM 27-May-13
and SLD037 = 3 nos Raslaffan
5850 Check Final Visual Inspection Piperack D110-B70-PR-07 ,D110-B70-PR-08 &D110-B70- SECTION - 2
RFI-5858-QCN-2-03526 RFI-5858-QCN-2-03526 CONCRETE APPROVED B-V-3100-004-2-201-02_5 10 S W H 27-May-13 1:30 PM 27-May-13
PR-46 Raslaffan
5851 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03527 RFI-5858-QCN-2-03527 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 28-May-13 10:00 AM 28-May-13
29: F2 ( Base and Pedestal )
Tank Farm
5852 RFI-5858-QCN-2-03528 RFI-5858-QCN-2-03528 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-37 and PR-40 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 28-May-13 7:30 AM 28-May-13
Raslaffan
5853 Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-37 and
RFI-5858-QCN-2-03529 RFI-5858-QCN-2-03529 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 28-May-13 8:30 AM 28-May-13
PR-40
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5856 RFI-5858-QCN-2-03532 RFI-5858-QCN-2-03532 CONCRETE
Cast-in- Situ Pipe Stopper B70-PS-28: SLD008 prior shuttering
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 28-May-13 8:30 AM 28-May-13
Concrete Placement Check Concrete pouring of cast in situ Pipe Stopper B70-PS-28: Tank Farm
5858 RFI-5858-QCN-2-03534 RFI-5858-QCN-2-03534 CONCRETE
SLD008 ( Pedestal ) and B70-PS-30: SLD034 ( Base )
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 5.1 W H H 28-May-13 1:40 PM 28-May-13
Surface preparation & Above Ground Protective Coating of Sleeper foundations - First & SECTION 6
5859 RFI-5858-QCN-2-03535 RFI-5858-QCN-2-03535 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 28-May-13 9:30 AM to 9:30 AM 28-May-13
Second Coat Sleeper foundation D110-B70-PS-19 SLD017 & D110-B70-PS-20 SLD001 Raslaffan
Check Final Visual Inspection Sleeper foundation D110-B70-PS-19 SLD017 & D110-B70- SECTION 6
5860 RFI-5858-QCN-2-03536 RFI-5858-QCN-2-03536 CONCRETE APPROVED B-V-3100-004-2-201-02_5 10 S W H 28-May-13 2:30 PM 28-May-13
PS-20 SLD001 Raslaffan
Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
5861 RFI-5858-QCN-2-03537 RFI-5858-QCN-2-03537 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 28-May-13 1:30 PM 28-May-13
cleaning of Precast Pipe Track D110-B70-PR-36: F4 prior concreting. Raslaffan e
Concrete Placement Check Concrete pouring of Precast Pipe Track D110-B70-PR-36: F4 Tank Farm
5862 RFI-5858-QCN-2-03538 RFI-5858-QCN-2-03538 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 28-May-13 1:40 PM 28-May-13
( Pedestal ) Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5863 RFI-5858-QCN-2-03539 RFI-5858-QCN-2-03539 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 28-May-13 1:30 PM to 3:30 AM 28-May-13
D110-B70-PR-29: F2 prior hardboard protection.
5864 Check Polythylene & Hardboard Installation of Cast-in- Situ D110-B70-PR-29: F2 prior
RFI-5858-QCN-2-03540 RFI-5858-QCN-2-03540 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 28-May-13 4:00 PM 28-May-13
backfilling
5868 Check Reinforcement prior to close shuttering D110 -B70- PR-73 Pipe Rack Foundation SECTION4 PR -73
RFI-5858-QCN-2-03544 RFI-5858-QCN-2-03544 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b W W H 29-May-13 1:30 PM 29-May-13
Pedestal 1(F1)&2(F2) Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5869 RFI-5858-QCN-2-03545 RFI-5858-QCN-2-03545 CONCRETE Stopper B70-PS-29: SLD013 and B70-PS-30: SLD068 and Pipe Sleeper B70-PS-29: APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 29-May-13 7:30 AM to 10:30 AM 29-May-13
SLD004 prior hardboard.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-29: SLD013, B70-
5870 RFI-5858-QCN-2-03546 RFI-5858-QCN-2-03546 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 29-May-13 2:00 PM 29-May-13
PS-30: SLD068 and Pipe Sleeper B70-PS-29: SLD004 prior backfilling.
5871 6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-36:
RFI-5858-QCN-2-03547 RFI-5858-QCN-2-03547 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 29-May-13 7:30 AM 29-May-13
F4 ( Base and Pedestal) and Pipe Stopper B70-PS-28: SLD008
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5873 RFI-5858-QCN-2-03549 RFI-5858-QCN-2-03549 CONCRETE Stopper B70-PS-29: SLD032, SLD045 SLD080 and Pipe Sleeper B70-PS-29: SLD036 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 29-May-13 8:30 AM to 5:30 PM 29-May-13
and SLD037
5874 Check concrete surface upon form removal D110-RW-003(W-BZRC) WEST RETAINING SECTION4 RW
RFI-5858-QCN-2-03550 RFI-5858-QCN-2-03550 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 30-May-13 6:30 AM 30-May-13
WALL-- From East Side1,2,3,4,5,6th &7th panel Wall (South Side ) 003(W-BZRC)
Pre-Pouring Check Formworks, Reinforcement and cleaning of Pipe Stopper B70-PS-30: Tank Farm 4.1.a.b.c.d.
5879 RFI-5858-QCN-2-03555 RFI-5858-QCN-2-03555 CONCRETE
SLD019 ( Base ) prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 30-May-13 1:30 PM 30-May-13
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS30: Tank Farm
5880 RFI-5858-QCN-2-03556 RFI-5858-QCN-2-03556 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 30-May-13 1:40 PM 30-May-13
SLD019 ( Base ) Raslaffan
5882 RFI-5858-QCN-2-03558 RFI-5858-QCN-2-03558 CONCRETE Concrete Placement Check Concrete pouring of Cast-in- Situ Duct Bank BZDP-011 APPROVED BZDP-011 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-May-13 1:30 PM 2-Jun-13
Prepouring - Check form works,Embeded items,Cleaning & Construction joints D110 - SECTION 4
5883 RFI-5858-QCN-2-03559 RFI-5858-QCN-2-03559 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 1-Jun-13 1:00 PM 1-Jun-13
B70- PR-73 Pipe Rack Foundation Pedestal 1(F1) & 2(F2) Raslaffan
SECTION 4
5884 RFI-5858-QCN-2-03560 RFI-5858-QCN-2-03560 CONCRETE Check Concrete Pouring D110 - B70- PR-73 Pipe Rack Foundation Pedestal 1(F1) & 2(F2) APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 1-Jun-13 2:00 PM 1-Jun-13
Raslaffan
5885 RFI-5858-QCN-2-03561 RFI-5858-QCN-2-03561 CONCRETE 6.3 Check Concrete surface upon form removal of Cast-in- Situ Duct Bank BZDP-011 APPROVED BZDP-011 Raslaffan B-V-3100-004-2-201-02_5 6.3. S W H 1-Jun-13 10:30 AM 1-Jun-13
5887 Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-36: F4, PR-56, Tank Farm
RFI-5858-QCN-2-03563 RFI-5858-QCN-2-03563 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 1-Jun-13 8:00 AM 1-Jun-13
PR-57 and PR-58 Raslaffan
5889 Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-36: F4,
RFI-5858-QCN-2-03565 RFI-5858-QCN-2-03565 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 1-Jun-13 8:30 AM to 10:30 AM 1-Jun-13
PR-56, PR-57 and PR-58 prior backfilling.
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5890 RFI-5858-QCN-2-03566 RFI-5858-QCN-2-03566 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 1-Jun-13 9:00 AM 1-Jun-13
D110-B70-PR-36: F4 and Pipe Stopper B70-PS-28: SLD008 prior hardboard protection.
5891 Check Polythylene & Hardboard Installation of Precast Pipe Stopper B70-PS-28: SLD008
RFI-5858-QCN-2-03567 RFI-5858-QCN-2-03567 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 1-Jun-13 8:30 AM to 10:30 AM 1-Jun-13
prior backfilling.
5892 Pre-Pouring Check Formworks, Reinforcement and cleaning of Pipe Stopper B70-PS-30: Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03568 RFI-5858-QCN-2-03568 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 1-Jun-13 7:30 AM 1-Jun-13
SLD004 ( Base ) prior concreting Raslaffan e
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS30: Tank Farm
5893 RFI-5858-QCN-2-03569 RFI-5858-QCN-2-03569 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 H H H 1-Jun-13 8:00 AM 1-Jun-13
SLD004 ( Base ) Raslaffan
5894 RFI-5858-QCN-2-03570 RFI-5858-QCN-2-03570 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70-PS - 03 SLD 044 & SLD 045 APPROVED SECTION 1 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 2-Jun-13 7:30 AM 2-Jun-13
Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundations B70- SECTION-1
5895 RFI-5858-QCN-2-03571 RFI-5858-QCN-2-03571 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 2-Jun-13 8:00 AM 2-Jun-13
PS - 03 SLD 044 & SLD 045 Raslaffan
5896 RFI-5858-QCN-2-03572 RFI-5858-QCN-2-03572 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70-PS - 12 SLD012 APPROVED SECTION 4 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 2-Jun-13 7:30 AM 2-Jun-13
5897 Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundation B70- SECTION 4
RFI-5858-QCN-2-03573 RFI-5858-QCN-2-03573 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 2-Jun-13 8:00 AM 2-Jun-13
PS - 12 SLD012 Raslaffan
9.3. Check Surface preparation and protective coating first and Second coat of Duct Bank
5898 RFI-5858-QCN-2-03574 RFI-5858-QCN-2-03574 CONCRETE APPROVED BZDP-011 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 2-Jun-13 8:00 AM to 10:30 AM 2-Jun-13
BZDP-011
5899 RFI-5858-QCN-2-03575 RFI-5858-QCN-2-03575 CONCRETE Check Polythylene & Hardboard Installation of Duct Bank BZDP-011 prior backfilling. APPROVED BZDP-011 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-Jun-13 4:00 PM 2-Jun-13
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
5900 RFI-5858-QCN-2-03576 RFI-5858-QCN-2-03576 CONCRETE
Sleeper B70-PS-27: SLD001 and SLD002 and B70-PS-29: SLD004
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 2-Jun-13 8:30 AM to 2:30 PM 2-Jun-13
5901 Check Surface preparation D110-RW-003(W-BZRC) WEST RETAINING WALL-- From Section4 D110-RW-
RFI-5858-QCN-2-03577 RFI-5858-QCN-2-03577 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 2-Jun-13 10:00 AM 2-Jun-13
East Side1,2,3,4,5,6th,7th,8th&10th South Side panel Wall Inside portion 003(W-BZRC)
Check Surface Below ground Protective Coating - First coat & Second coat D110-RW-
Section4 D110-RW-
5902 RFI-5858-QCN-2-03578 RFI-5858-QCN-2-03578 CONCRETE 003(W-BZRC) WEST RETAINING WALL-- From East Side1,2,3,4,5,6th,7th,8th&10th APPROVED
003(W-BZRC)
B-V-3100-004-2-201-02_5 9.2.a S W H 2-Jun-13 10:30 AM to 4:00 PM 2-Jun-13
North Side panel Wall Inside portion
4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-69 GL 1-2/A-B
5904 RFI-5858-QCN-2-03580 RFI-5858-QCN-2-03580 CONCRETE
& D110-B70-PR-26 GL 1-2/A-B)
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 2-Jun-13 2:30 PM 2-Jun-13
4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-30: F1, F2, F3
5905 RFI-5858-QCN-2-03581 RFI-5858-QCN-2-03581 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 2-Jun-13 3:30 PM 2-Jun-13
and F4)
6.4 Completion of 4 days water curing and 1 day curing compound of Pipe Track D110-
5906 RFI-5858-QCN-2-03582 RFI-5858-QCN-2-03582 CONCRETE APPROVED PR-36 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-36: F2 ( Base )
6.4 Completion of 3 days water curing and 1 day curing compound of Pipe Track D110-
5907 RFI-5858-QCN-2-03583 RFI-5858-QCN-2-03583 CONCRETE APPROVED PR-36 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-36: F3 ( Base )
6.4 Completion of 2 days water curing and 1 day curing compound of Pipe Track D110-
5908 RFI-5858-QCN-2-03584 RFI-5858-QCN-2-03584 CONCRETE APPROVED PR-36 Raslaffan B-V-3100-004-2-201-02_5 6.4. S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-36: F2, F3 & F1( Pedestal ) ( Base )
6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Track D110-
5909 RFI-5858-QCN-2-03585 RFI-5858-QCN-2-03585 CONCRETE APPROVED PR-36 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-36: F1 ( Base )
5910 6.4 Completion of 6 days water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-03586 RFI-5858-QCN-2-03586 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-33: F4 ( Base )
6.4 Completion of 4 days water curing and 1 day curing compound of Pipe Track D110-
5911 RFI-5858-QCN-2-03587 RFI-5858-QCN-2-03587 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-33: F4 ( Pedestal ) and F3 ( Base )
5912 6.4 Completion of 3 days water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-03588 RFI-5858-QCN-2-03588 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-33: F3 ( Pedestal ) and F2 ( Base )
6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Track D110-
5913 RFI-5858-QCN-2-03589 RFI-5858-QCN-2-03589 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 2-Jun-13 8:30 AM 2-Jun-13
B70-PR-33: F2 ( Pedestal )
5914 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation D110-
RFI-5858-QCN-2-03590 RFI-5858-QCN-2-03590 CONCRETE APPROVED Section - 4 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 3-Jun-13 6:30 AM 3-Jun-13
B70- PS-14 SLD011 TO SLD019
5915 RFI-5858-QCN-2-03591 RFI-5858-QCN-2-03591 CONCRETE Check concrete surface upon form removal Stopper foundation D110-B70- PS-14 SLD016 APPROVED Section - 4 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 3-Jun-13 6:00 AM 3-Jun-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5916 RFI-5858-QCN-2-03592 RFI-5858-QCN-2-03592 CONCRETE Check Surface preparation Stopper foundation D110-B70- PS-14 SLD016 APPROVED Section - 4 Raslaffan B-V-3100-004-2-201-02_5 9.1 S W H 3-Jun-13 7:30 AM 3-Jun-13
5917 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) D110-
RFI-5858-QCN-2-03593 RFI-5858-QCN-2-03593 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 3-Jun-13 2:00 PM 3-Jun-13
B70- PR-75 Pipe Rack Foundation 1(F1)&2(F1)
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD011, SLD016 Tank Farm
5918 RFI-5858-QCN-2-03594 RFI-5858-QCN-2-03594 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 3-Jun-13 7:30 AM 3-Jun-13
and SLD032 = 3 nos Raslaffan
5919 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD011,
RFI-5858-QCN-2-03595 RFI-5858-QCN-2-03595 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 3-Jun-13 9:30 AM 3-Jun-13
SLD016 and SLD032 = 3 nos prior backfilling.
5920 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03596 RFI-5858-QCN-2-03596 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 3-Jun-13 9:30 AM to 5:30 PM 3-Jun-13
Stopper B70-PS-28: SLD008
Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
5921 RFI-5858-QCN-2-03597 RFI-5858-QCN-2-03597 CONCRETE APPROVED PR - 28 Raslaffan B-V-3100-004-2-201-02_5 W W H 3-Jun-13 3:00 PM 3-Jun-13
cleaning of Pipe Track D110-B70-PR-28: F1 and F2 ( Base ) prior concreting & F2 (Base) e
5922 Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-28: F1 and
RFI-5858-QCN-2-03598 RFI-5858-QCN-2-03598 CONCRETE APPROVED PR - 28 Raslaffan B-V-3100-004-2-201-02_5 5.1 W W H 3-Jun-13 3:30 PM 3-Jun-13
F2 ( Base ) and F2 (Base)
Check Surface Below ground Protective Coating - First coat & Second coat Stopper
5923 RFI-5858-QCN-2-03599 RFI-5858-QCN-2-03599 CONCRETE
foundation D110-B70- PS-14 SLD016
APPROVED Section - 4 Raslaffan B-V-3100-004-2-201-02_5 9.2a S W H 3-Jun-13 9:30 AM to 11:00 AM 3-Jun-13
5924 Check Polyetheylene Installation Check Hardboard Installation Stopper foundation D110- SECTION 4
RFI-5858-QCN-2-03600 RFI-5858-QCN-2-03600 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 3-Jun-13 3:30 PM 3-Jun-13
B70- PS-14 SLD016 Raslaffan
Check Surface Below ground Protective Coating - First coat & Second coat D110-RW-
Section4 D110-RW-
5925 RFI-5858-QCN-2-03601 RFI-5858-QCN-2-03601 CONCRETE 003(W-BZRC) WEST RETAINING WALL-- From East Side1,2,3,4,5,6th,7th,8th&10th APPROVED
003(W-BZRC)
B-V-3100-004-2-201-02_5 9.2.a S W H 3-Jun-13 7:30 AM to 1:00 PM 3-Jun-13
South Side panel Wall Inside portion
Check concrete surface upon form removal D110- B70-PR-73 Pipe Rack Foundation F1 Section 4 B70-PR-
5926 RFI-5858-QCN-2-03602 RFI-5858-QCN-2-03602 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 3-Jun-13 6:30 AM 3-Jun-13
& F2 73
Section 4 B70-PR-
5927 RFI-5858-QCN-2-03603 RFI-5858-QCN-2-03603 CONCRETE Check Surface preparation D110- B70-PR-73 Pipe Rack Foundation F1& F2 APPROVED
73
B-V-3100-004-2-201-02_5 9.1 S W H 3-Jun-13 1:30 PM 3-Jun-13
Check Polyetheylene Installation Check Hardboard Installation D110-RW 003(W-BZRC) D110-RW 003(W-
5928 RFI-5858-QCN-2-03604 RFI-5858-QCN-2-03604 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 4-Jun-13 3:40 PM 4-Jun-13
NORTH & SOUTH Retaining Wall Inside Portion BZRC)
Check Surface Below ground Protective Coating - First coat & Second coat D110- B70-
5929 RFI-5858-QCN-2-03605 RFI-5858-QCN-2-03605 CONCRETE APPROVED Section 4 PR- 73 B-V-3100-004-2-201-02_5 9.2.a S W H 4-Jun-13 6:30 AM to 10:00 AM 4-Jun-13
PR-73 Pipe Rack Foundation 1 (F1) & 2(F2)
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
5931 RFI-5858-QCN-2-03607 RFI-5858-QCN-2-03607 CONCRETE APPROVED PR - 28 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 4-Jun-13 9:30 AM 4-Jun-13
Cast-in- Situ Pipe Track D110-B70-PR-28: F1 prior shuttering
SECTION4 PR -73
5932 RFI-5858-QCN-2-03608 RFI-5858-QCN-2-03608 CONCRETE Check Concrete Curing D110-B70-PR-73 Pipe Rack Foundation 1(F1)& 2(F2) APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 10:30 AM 4-Jun-13
Raslaffan
5933 SECTION - 4
RFI-5858-QCN-2-03609 RFI-5858-QCN-2-03609 CONCRETE Check Concrete Curing Stopper foundation D110-B70- PS-14 SLD016 APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 7:30 AM 4-Jun-13
Raslaffan
6.4 Completion of 2 days water curing and 1 day curing compound of Ducxt Bank BZDW-
5934 RFI-5858-QCN-2-03610 RFI-5858-QCN-2-03610 CONCRETE APPROVED BZDW-008 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
008
5935 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-03611 RFI-5858-QCN-2-03611 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 4-Jun-13 2:00 PM 4-Jun-13
Stopper pedestal B70-PS-28: SLD022
5936 RFI-5858-QCN-2-03612 RFI-5858-QCN-2-03612 CONCRETE 4.4.3 Check compressive strength@ 28 Day for grout cube (D110-B70-PR-34,50,51 & 52.) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 4-Jun-13 3.30 PM 4-Jun-13
5937 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03613 RFI-5858-QCN-2-03613 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 4-Jun-13 9:30 AM to 5:30 PM 4-Jun-13
Sleeper B70-PS-28: SLD016, SLD017 = 2 nos, B70-PS-30: SLD012, SLD016, SLD032
5938 Check Laying of Asphalt Base Course HAMAD CULVERT BZRC-005 NORTH SIDE HAMAD CULVERT
RFI-5858-QCN-2-03614 RFI-5858-QCN-2-03614 CONCRETE APPROVED B-V-3100-004-2-201-03_5 4.22 S W H 4-Jun-13 7:30 AM 4-Jun-13
HAMAD ROAD PORTION Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.4 Completion of 4 days water curing and 1 day curing compound of Pipe Track D110-
5939 RFI-5858-QCN-2-03615 RFI-5858-QCN-2-03615 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
B70-PR-29: F1 ( Base )
5940 6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-03616 RFI-5858-QCN-2-03616 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
B70-PR-29: F1 ( PEDESTAL )
6.4 Completion of 3 days water curing and 1 day curing compound of Duct Bank BZDP-
5941 RFI-5858-QCN-2-03617 RFI-5858-QCN-2-03617 CONCRETE APPROVED PR-29 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
011
5942 6.4 Completion of 4 days water curing and 1 day curing compound of Pipe Stopper B70-
RFI-5858-QCN-2-03618 RFI-5858-QCN-2-03618 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
PS-28: SLD022 ( Base )
5943 6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Stopper B70-
RFI-5858-QCN-2-03619 RFI-5858-QCN-2-03619 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 4-Jun-13 8:30 AM 4-Jun-13
PS-28: SLD022 ( Pedestal )
Check Grout Prepouring,Verify erection/ alignment,Concrete,Metal surface preparation & Tank Farm Raslaffan
5944 RFI-5858-QCN-2-03620 RFI-5858-QCN-2-03620 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.1.1a,b&c S W H 4-Jun-13 3:00 PM 4-Jun-13
Formworks for Pipe Rack Foundations D110-B70-PR-35 and PR-53
5948 RFI-5858-QCN-2-03624 RFI-5858-QCN-2-03624 CONCRETE 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-35 & 53) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 5-Jun-13 3.30 PM 5-Jun-13
Pre-Pouring Check Formworks, Reinforcement, Embedded items, Const. Joint and 4.1.a.b.c.d.
5949 RFI-5858-QCN-2-03625 RFI-5858-QCN-2-03625 CONCRETE APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 W W H 5-Jun-13 2:30 PM 5-Jun-13
cleaning of Pipe Track D110-B70-PR-28: F1 and F2 ( Pedestal ) e
Check Reinforcement prior to close shuttering D110 -B70- PR-28 Pipe Rack Foundation
5951 RFI-5858-QCN-2-03627 RFI-5858-QCN-2-03627 CONCRETE APPROVED D110 B70 - PR -28 B-V-3100-004-2-201-02_5 4.1.b W W H 5-Jun-13 6:00 AM 5-Jun-13
Pedestal 2(F2)
Prepouring - Check form works,Embeded items,Cleaning & Expansion joints D110-RW- SECTION6 D110-
5952 RFI-5858-QCN-2-03628 RFI-5858-QCN-2-03628 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 5-Jun-13 1:30 PM 5-Jun-13
001(N- S) RETAINING WALL DITCH -- 2nd panel Portion RW-001(N- S)
Check Concrete Pouring D110-RW-001(N- S) RETAINING WALL DITCH -- 2nd panel SECTION6 D110-
5953 RFI-5858-QCN-2-03629 RFI-5858-QCN-2-03629 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 5-Jun-13 2:00 PM 5-Jun-13
Portion RW-001(N- S)
Check Surface preparation D110-RW-002 East West Retaining wall 1st&2nd panel (North Section6 E-W D110-
5954 RFI-5858-QCN-2-03630 RFI-5858-QCN-2-03630 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 5-Jun-13 6:20 PM 5-Jun-13
Side) RW002
Check Surface Below ground Protective Coating - First coat & Second coat D110-RW- Section6 E-W D110-
5955 RFI-5858-QCN-2-03631 RFI-5858-QCN-2-03631 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2.a S W H 5-Jun-13 7:30 AM to 9:00 AM 5-Jun-13
002 East West Retaining wall 1st&2nd panel (North Side) RW002
5956 Check Polyetheylene Installation Check Hardboard Installation D110-RW-002 East West Section6 E-W D110-
RFI-5858-QCN-2-03632 RFI-5858-QCN-2-03632 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 5-Jun-13 1:20 PM 5-Jun-13
Retaining wall 1st&2nd panel (North Side) RW002
5957 RFI-5858-QCN-2-03633 RFI-5858-QCN-2-03633 CONCRETE 6.4 Completion of 14 days water curing of Pipe Track D110-B70-PR-36: F4 ( Base 0 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jun-13 8:30 AM 5-Jun-13
5958 6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Track D110-
RFI-5858-QCN-2-03634 RFI-5858-QCN-2-03634 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jun-13 8:30 AM 5-Jun-13
B70-PR-36: F4 ( Pedestal )
6.4 Completion of 7 days water curing and 1 day curing compound of Pipe Stopper B70-
5959 RFI-5858-QCN-2-03635 RFI-5858-QCN-2-03635 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jun-13 8:30 AM 5-Jun-13
PS-29: SLD013 ( Base )
5960 6.4 Completion of 9 days water curing and 1 day curing compound of Pipe Stopper B70-
RFI-5858-QCN-2-03636 RFI-5858-QCN-2-03636 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jun-13 8:30 AM 5-Jun-13
PS-30: SLD068 ( Base )
5961 6.4 Completion of 1 day water curing and 1 day curing compound of Pipe Stopper B70-
RFI-5858-QCN-2-03637 RFI-5858-QCN-2-03637 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 5-Jun-13 8:30 AM 5-Jun-13
PS-29: SLD013 / SLD004 and B70-PS-30: SLD068 ( Pedestal )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
5964 RFI-5858-QCN-2-03640 RFI-5858-QCN-2-03640 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70-PS - 03 SLD 049 & SLD 050 APPROVED SECTION 1 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 5-Jun-13 10:30 AM 5-Jun-13
5965 Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundations B70- SECTION - 1
RFI-5858-QCN-2-03641 RFI-5858-QCN-2-03641 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 5-Jun-13 8:00 AM 5-Jun-13
PS - 03 SLD 049 & SLD 050 Raslaffan
5966 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03642 RFI-5858-QCN-2-03642 CONCRETE APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 6-Jun-13 10:00 AM 6-Jun-13
28: F1 and F2 ( Base and Pedestal )
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations -
5967 RFI-5858-QCN-2-03643 RFI-5858-QCN-2-03643 CONCRETE First &Second Coat Sleeper Foundations B70-PS-03 SLD044,SLD045,SLD049,SLD 050 APPROVED SECTION1 & 4 B-V-3100-004-2-201-02_5 9.3 S W H 6-Jun-13 2:30 PM to 4:30 PM 6-Jun-13
& B70-PS-12 SLD012
5968 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-03644 RFI-5858-QCN-2-03644 CONCRETE APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 6-Jun-13 10:30 AM to 2:00 PM 6-Jun-13
D110-B70-PR-28: F1 and F2
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-22: SLD050
5969 RFI-5858-QCN-2-03645 RFI-5858-QCN-2-03645 CONCRETE
and B70-PS-23: SLD001 prior backfilling.
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 6-Jun-13 8:00 AM 6-Jun-13
5970 RFI-5858-QCN-2-03646 RFI-5858-QCN-2-03646 CONCRETE 4.4.1 Check compressive strength@ 1 Day for grout cube (D110-B70-PR-75 -1-2/AB) APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 6-Jun-13 11:00 AM 6-Jun-13
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-28:
5976 RFI-5858-QCN-2-03652 RFI-5858-QCN-2-03652 CONCRETE APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-Jun-13 7:00 AM 8-Jun-13
F1 and F2 prior backfilling.
5981 Check Polyetheylene Installation Check Hardboard Installation D110-RW-002 East West Section6 E-W D110-
RFI-5858-QCN-2-03657 RFI-5858-QCN-2-03657 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 8-Jun-13 9:20 AM 8-Jun-13
Retaining wall 5th&6th panel (South Side) RW002
Check Final Visual Inspection Sleeper foundation B70-PS - 03 SLD 044,SLD 045,SLD SECTION - 1
5982 RFI-5858-QCN-2-03658 RFI-5858-QCN-2-03658 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 9-Jun-13 1:30 PM 9-Jun-13
049 & SLD 050 Raslaffan
5983 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03659 RFI-5858-QCN-2-03659 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 9-Jun-13 9:30 AM 9-Jun-13
Sleeper B70-PS-30: SLD058 SLD059, SLD060, SLD066 and SLD067 = 5 nos
5984 Pre-Pouring Check Formworks, Reinforcement and Cleaning of Precast Lighting Pole
RFI-5858-QCN-2-03660 RFI-5858-QCN-2-03660 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 9-Jun-13 1:30 PM 10-Jun-13
Foundation = 7 nos ( Base ) prior concreting
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.4.1 Check compressive strength@ 1 Day for grout cube (D110- B70-PR-25 Pipe Rack
5987 RFI-5858-QCN-2-03663 RFI-5858-QCN-2-03663 CONCRETE Foundation 1- 5/A-B - 2 Nos &D110- B70- STN-74 Pipe Rack Foundation 1/A-B (F1) - 2 APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 9-Jun-13 2:45 PM 9-Jun-13
Nos &D110-B70-PR-31: F1 and F2 and D110-B70-PR-32: F1 and F2.)
5988 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Hamad
RFI-5858-QCN-2-03664 RFI-5858-QCN-2-03664 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 10-Jun-13 2:00 PM 10-Jun-13
Culvert BZRC-005 From North Side End Wall (7.209 m portion )
5989 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03665 RFI-5858-QCN-2-03665 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 10-Jun-13 9:00 AM 10-Jun-13
Cast-in- Situ Lighting Pole Foundation = 7 nos ( Pedestal ) prior shuttering.
5991 Check Concrete Curing D110-RW-003 WEST RETAINING WALL-- From East Side Section4 D110-RW-
RFI-5858-QCN-2-03667 RFI-5858-QCN-2-03667 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.4 S W H 11-Jun-13 9:00 AM 11-Jun-13
1st,2nd,3rd,4th,5th,6th,7th,8th&10th panel Base&Wall (South Side ) 003
Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-in- 4.1.a.b.c.d.
5992 RFI-5858-QCN-2-03668 RFI-5858-QCN-2-03668 CONCRETE
Situ Culvert BZRC-011 ( 10.70 meters ) ( Base ) prior concreting
APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5
e
W W H 11-Jun-13 1:30 PM 11-Jun-13
5993 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-011 ( 10.70
RFI-5858-QCN-2-03669 RFI-5858-QCN-2-03669 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 11-Jun-13 1:30 PM 13-Jun-13
meters ) ( Base )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
5995 RFI-5858-QCN-2-03671 RFI-5858-QCN-2-03671 CONCRETE D110-B70-PR-34, D110-B70-PR-35 D110-B70-PR-50, D110-B70-PR-51, D110-B70-PR- APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 12-Jun-13 9:30 AM 13-Jun-13
52 and D110-B70-PR-53
Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-in- 4.1.a.b.c.d.
5997 RFI-5858-QCN-2-03673 RFI-5858-QCN-2-03673 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 W W H 13-Jun-13 8:00 AM 13-Jun-13
Situ Culvert BZRC-011 ( 6.70 meters ) ( Base ) prior concreting e
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-011 ( 6.70
5998 RFI-5858-QCN-2-03674 RFI-5858-QCN-2-03674 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 13-Jun-13 8:30 AM 16-Jun-13
meters ) ( Base )
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
6001 RFI-5858-QCN-2-03677 RFI-5858-QCN-2-03677 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 15-Jun-13 10:00 AM 15-Jun-13
and cleaning of Cast-in- Situ Culvert BZRC-011 Wall ( 10.70 meters ) prior shuttering.
6002 Prepouring - Check form works,Embeded items&Cleaning D110-RW-004(E-BZRC) EAST SECTION4 D110-
RFI-5858-QCN-2-03678 RFI-5858-QCN-2-03678 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1a,c,d,e W W H 15-Jun-13 7:30 AM 17-Jun-13
RETAINING WALL PROTECTION SLAB. Cable protection slab RW-004(E-BZRC)
6004 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-03680 RFI-5858-QCN-2-03680 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 16-Jun-13 2:00 PM 13-Jun-13
Track D110-B70-PR-33: F4 ( Pedestal ) and F3 ( Base )
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
6005 RFI-5858-QCN-2-03681 RFI-5858-QCN-2-03681 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 16-Jun-13 2:45 PM 16-Jun-13
-12390-3) for D110-B70-PR-27- GL-1 to 5 / A-B
6006 Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-in- 4.1.a.b.c.d.
RFI-5858-QCN-2-03682 RFI-5858-QCN-2-03682 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 16-Jun-13 2:00 PM 16-Jun-13
Situ Culvert BZRC-010 ( 6.65 meters West Side ) ( Base ) prior concreting e
6007 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 6.65
RFI-5858-QCN-2-03683 RFI-5858-QCN-2-03683 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 16-Jun-13 2:30 PM 16-Jun-13
meters West Side ) ( Base )
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check concrete surface upon form removal D110-RW-004(E-BZRC) PROTECTION SLAB SECTION4 D110-
6008 RFI-5858-QCN-2-03684 RFI-5858-QCN-2-03684 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 17-Jun-13 6:30 AM 18-Jun-13
for kharama line RW-004(E-BZRC)
6009 Prepouring - Check form works,Embeded items,Cleaning DUCT BANK BZDW 009 (5.4 M SECTION - 4 CR#
RFI-5858-QCN-2-03685 RFI-5858-QCN-2-03685 CONCRETE APPROVED B-V-3100-004-2-201-02_6 4.1a,c,d,e W W H 18-Jun-13 7:30 AM 18-Jun-13
PORTION) 35 Raslaffan
SECTION 4
6010 RFI-5858-QCN-2-03686 RFI-5858-QCN-2-03686 CONCRETE Check Concrete Pouring DUCT BANK BZDP-009 (5.4 M PORTION) APPROVED B-V-3100-004-2-201-02_6 5.1 W H H 18-Jun-13 8:30 AM 18-Jun-13
CROSSIING #35
6011 Check Grout Prepouring,Verify Concrete, surface preparation & Formworks for Pipe Rack SECTION 4 PR-17
RFI-5858-QCN-2-03687 RFI-5858-QCN-2-03687 CONCRETE APPROVED B-V-3100-004-2-201-02_4 3.1.1a,b&c S W H 18-Jun-13 8:00 AM 18-Jun-13
Foundations D110-B70-PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4) Raslaffan
6012 Check Grout Pouring,Finishing,Depth of pour,Sampling/mixing& Finishingent for Pipe SECTION 4 PR-17
RFI-5858-QCN-2-03688 RFI-5858-QCN-2-03688 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 18-Jun-13 8:30 AM 18-Jun-13
Rack Foundations D110-B70-PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4) Raslaffan
Pre-Pouring Check Formworks, Reinforcement and cleaning of Pipe Stopper Base B70-
6013 RFI-5858-QCN-2-03689 RFI-5858-QCN-2-03689 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d W W H 18-Jun-13 1:30 PM 18-Jun-13
PS-22: SLD003 prior concreting
6014 RFI-5858-QCN-2-03690 RFI-5858-QCN-2-03690 CONCRETE Concrete Placement Check Concrete pouring of Pipe Stopper Base B70-PS-22: SLD003 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 18-Jun-13 1:30 PM 19-Jun-13
6016 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-22: SLD004, SLD005,
RFI-5858-QCN-2-03692 RFI-5858-QCN-2-03692 CONCRETE APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 18-Jun-13 9:30 AM 25-Jun-13
SLD006, SLD047, SLD048, SLD049 and SLD065 prior hardboard
Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-22: SLD004,
6017 RFI-5858-QCN-2-03693 RFI-5858-QCN-2-03693 CONCRETE
SLD005, SLD006 SLD047, SLD048, SLD049 and SLD065 prior backfilling.
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 18-Jun-13 3:30 PM 18-Jun-13
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Pipe Track D110-B70- 4.1.a.b.c.d.
6018 RFI-5858-QCN-2-03694 RFI-5858-QCN-2-03694 CONCRETE CANCELLED PR-42 Raslaffan B-V-3100-004-2-201-02_5 W W H 18-Jun-13 8:00 AM 18-Jun-13 CANCELLED WORK NOT READY
PR-42: F5 ( Base ) prior concreting prior concreting e
6019 RFI-5858-QCN-2-03695 RFI-5858-QCN-2-03695 CONCRETE Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F5 ( Base ) CANCELLED PR-42 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 18-Jun-13 8:30 AM 18-Jun-13 CANCELLED WORK NOT READY
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6020 RFI-5858-QCN-2-03696 RFI-5858-QCN-2-03696 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 18-Jun-13 7:30 AM 18-Jun-13
Cast-in- Situ Pipe Stopper B70-PS-30: SLD054 ( Pedestal ) prior shuttering
Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
6021 RFI-5858-QCN-2-03697 RFI-5858-QCN-2-03697 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 18-Jun-13 8:00 AM 18-Jun-13
cleaning of Precast Pipe Stopper B70-PS-30: SLD054 ( Pedestal ) prior concreting Raslaffan e
Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-30: Tank Farm
6022 RFI-5858-QCN-2-03698 RFI-5858-QCN-2-03698 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 18-Jun-13 8:30 AM 25-Jun-13
SLD054 ( Pedestal ) Raslaffan
SECTION -1
6023 RFI-5858-QCN-2-03699 RFI-5858-QCN-2-03699 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70-PS-03 SLD016 TO SLD019 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 18-Jun-13 6:00 AM 22-Jun-13
Raslaffan
Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70- SECTION - 1
6024 RFI-5858-QCN-2-03700 RFI-5858-QCN-2-03700 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 18-Jun-13 6:30 AM 18-Jun-13
PS-03 SLD016 TO SLD019 Raslaffan
6025 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70-
RFI-5858-QCN-2-03701 RFI-5858-QCN-2-03701 CONCRETE APPROVED Section - 6 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 19-Jun-13 7:30 AM 19-Jun-13
PS-21 SLD001 TO SLD004
6026 RFI-5858-QCN-2-03702 RFI-5858-QCN-2-03702 CONCRETE Check concrete surface upon form removal DUCTBANK BZDP 009 (5.4M PORTION) APPROVED SECTION 4 CR# 35 B-V-3100-004-2-201-02_6 6.3 S W H 19-Jun-13 2:30 AM 19-Jun-13
6027 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03703 RFI-5858-QCN-2-03703 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 19-Jun-13 1:30 PM 19-Jun-13
Cast-in- Situ Pipe Stopper B70-PS-22: SLD003 ( Pedestal ) prior shuttering
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Pipe Track D110-B70- 4.1.a.b.c.d.
6028 RFI-5858-QCN-2-03704 RFI-5858-QCN-2-03704 CONCRETE APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 W W H 19-Jun-13 1:30 PM 19-Jun-13
PR-42: F2 and F3 ( Base ) prior concreting prior concreting - pre cast e
6029 Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F2 and F3
RFI-5858-QCN-2-03705 RFI-5858-QCN-2-03705 CONCRETE APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Jun-13 1:30 PM 21-Jun-13
( Base ) and F3
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-011 ( 10.70
6031 RFI-5858-QCN-2-03707 RFI-5858-QCN-2-03707 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 19-Jun-13 2:00 PM 19-Jun-13
meters ) ( Wall )
6032 RFI-5858-QCN-2-03708 RFI-5858-QCN-2-03708 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70-PS-21 SLD001 TO SLD004 APPROVED SECTION 6 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 19-Jun-13 6:30 AM 22-Jun-13
6034 4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
RFI-5858-QCN-2-03710 RFI-5858-QCN-2-03710 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 19-Jun-13 11.00 AM 19-Jun-13
-12390-3) for D110-B70-PR-17 Pipe Rack Foundation 1(F1,F2),2(F3,F4)
6035 RFI-5858-QCN-2-03711 RFI-5858-QCN-2-03711 CONCRETE 6.4 Completion of 1 day curing compound of Culvert BZRC-010 ( Base 6.65 meters ) APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 19-Jun-13 8:30 AM 19-Jun-13
6037 Check Surface Preparation ,First coat & Second coat D110-RW-004(E-BZRC) EAST Section4 D110-RW-
RFI-5858-QCN-2-03713 RFI-5858-QCN-2-03713 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1&9.2a S W H 19-Jun-13 7:00 AM to 10:00 AM 19-Jun-13
RETAINING WALL PROTECTION SLAB ( EAST&SOUTH SIDE PORTION) 003(E-BZRC)
6039 Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - SECTION - 1
RFI-5858-QCN-2-03715 RFI-5858-QCN-2-03715 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 20-Jun-13 2:30 PM to 4:30 PM 21-Jun-13
First &Second Coat Sleeper foundation B70-PS-04 SLD016 TO SLD019 Raslaffan
Check Surface Preparation ,First coat & Second coat DUCTBANK BZDP 009 (5.4M
6040 RFI-5858-QCN-2-03716 RFI-5858-QCN-2-03716 CONCRETE
PORTION)
APPROVED SECTION 4 CR# 35 B-V-3100-004-2-201-02_5 9.1&9.2.a S W H 20-Jun-13 10:00 AM to 2:00 PM 21-Jun-13
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Pipe Track D110-B70- 4.1.a.b.c.d.
6041 RFI-5858-QCN-2-03717 RFI-5858-QCN-2-03717 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 20-Jun-13 2:30 PM 20-Jun-13
PR-33: F1 ( Base ) prior concreting e
6042 RFI-5858-QCN-2-03718 RFI-5858-QCN-2-03718 CONCRETE Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-33: F1 ( Base ) APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Jun-13 2:30 PM 25-Jun-13
CROSSING#35
6043 RFI-5858-QCN-2-03719 RFI-5858-QCN-2-03719 CONCRETE Check Polyetheylene & Hardboard Installation DUCTBANK BZDP009 (5.4M PORTION) APPROVED B-V-3100-004-2-201-02_5 9.2.b&c S W H 20-Jun-13 4:30 PM 21-Jun-13
SECTION - 4
Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-in- 4.1.a.b.c.d.
6044 RFI-5858-QCN-2-03720 RFI-5858-QCN-2-03720 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 20-Jun-13 1:30 PM 25-Jun-13
Situ Culvert BZRC-010 ( 8.850 meters West Side ) ( Base ) prior concreting e
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 8.850
6045 RFI-5858-QCN-2-03721 RFI-5858-QCN-2-03721 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Jun-13 1:30 PM 20-Jun-13
meters West Side ) ( Base )
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Track D110- 4.1.a.b.c.d.
6046 RFI-5858-QCN-2-03722 RFI-5858-QCN-2-03722 CONCRETE APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 W W H 20-Jun-13 1:30 PM 20-Jun-13
B70-PR-42: F3 and F5 ( Base ) prior concreting prior concreting e
6048 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-011 ( Base
RFI-5858-QCN-2-03724 RFI-5858-QCN-2-03724 CONCRETE CANCELLED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 20-Jun-13 3:30 PM 20-Jun-13 CANCELLED WORK NOT READY
and Pedestal ) West Side
Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Cast-in- 4.1.a.b.c.d.
6049 RFI-5858-QCN-2-03725 RFI-5858-QCN-2-03725 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 22-Jun-13 2:30 PM 22-Jun-13
Situ Culvert BZRC-010 ( 8.0 meters West Side ) ( Middle Base ) prior concreting e
6050 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 8.0
RFI-5858-QCN-2-03726 RFI-5858-QCN-2-03726 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 22-Jun-13 2:30 PM 25-Jun-13
meters West Side ) ( Middle Base )
Pre-Pouring Check Formworks, Reinforcement, embedded items, construction joint and 4.1.a.b.c.d.
6051 RFI-5858-QCN-2-03727 RFI-5858-QCN-2-03727 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 W W H 22-Jun-13 3:00 PM 22-Jun-13
cleaning of Cast -in- Situ Pipe Track D110-B70-PR-33; F1 ( Pedestal ) prior concreting e
6052 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03728 RFI-5858-QCN-2-03728 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 22-Jun-13 3:00 PM 25-Jun-13
33: F1 ( Pedestal )
6053 Check Polyetheylene Installation Check Hardboard Installation D110-RW-002 E-W Section6 E-W D110-
RFI-5858-QCN-2-03729 RFI-5858-QCN-2-03729 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 22-Jun-13 6:30 AM 24-Jun-13
Retaining wall10th &11 th panel RW002
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-011 ( Base
6054 RFI-5858-QCN-2-03730 RFI-5858-QCN-2-03730 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 22-Jun-13 1:30 PM 24-Jun-13
and Pedestal ) West Side
6056 RFI-5858-QCN-2-03732 RFI-5858-QCN-2-03732 CONCRETE Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-30: SLD054 APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 22-Jun-13 3:30 PM 24-Jun-13
9.3. Check Surface preparation and First Coating of Precast Pipe Sleeper B70-PS-30:
6057 RFI-5858-QCN-2-03733 RFI-5858-QCN-2-03733 CONCRETE SLD001 to SLD003 = 3 nos, SLD005 to SLD010 = 6 nos SLD012, SLD015 to SLD018 = 4 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 22-Jun-13 8:30 AM to 5:30 PM 24-Jun-13
nos and SLD020 to SLD022 = 3 nos prior second coat
6058 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03734 RFI-5858-QCN-2-03734 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02__ 4.1a.b.d.e W W H 22-Jun-13 9:30 AM 22-Jun-13
Cast-in- Situ Pipe Track D110-B70-PR-33 F1: prior shuttering
Tank Farm
6059 RFI-5858-QCN-2-03735 RFI-5858-QCN-2-03735 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-59 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 22-Jun-13 8:00 AM 25-Jun-13
Raslaffan
6060 RFI-5858-QCN-2-03736 RFI-5858-QCN-2-03736 CONCRETE Check Final Visual Inspection D110 -B70- PR-75 Pipe Rack Foundation 1 (F1) &2(F1) APPROVED SECTION1 PR-75 B-V-3100-004-2-201-02_5 9.2 S W H 22-Jun-13 2:30 PM 24-Jun-13
6061 RFI-5858-QCN-2-03737 RFI-5858-QCN-2-03737 CONCRETE Check Polythylene & Hardboard Installation of Precast Pipe Track D110-B70-PR-59 APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 22-Jun-13 9:30 AM 24-Jun-13
6062 6.3 Check Concrete surface upon form removal of Pipe stopper B70-PS-30: SLD054
RFI-5858-QCN-2-03738 RFI-5858-QCN-2-03738 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 22-Jun-13 8:30 AM 24-Jun-13
( Base and Pedestal )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
6063 RFI-5858-QCN-2-03739 RFI-5858-QCN-2-03739 CONCRETE
Stopper B70-PS-30: SLD054
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 22-Jun-13 9:30 AM to 5:30 PM 24-Jun-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6064 RFI-5858-QCN-2-03740 RFI-5858-QCN-2-03740 CONCRETE APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 23-Jun-13 7:30 AM 24-Jun-13
Cast-in- Situ Pipe Stopper B70-PS-30; SLD004 ( Pedestal ) prior shuttering
6.3 Check Concrete surface upon form removal of Pipe Track D110-B70-PR-33: F1
6065 RFI-5858-QCN-2-03741 RFI-5858-QCN-2-03741 CONCRETE
( Base and Pedestal )
APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 23-Jun-13 9:30 AM 24-Jun-13
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
6066 RFI-5858-QCN-2-03742 RFI-5858-QCN-2-03742 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 23-Jun-13 9:30 AM to 2:30 PM 24-Jun-13
D110-B70-PR-33: F1
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-22:
6067 RFI-5858-QCN-2-03743 RFI-5858-QCN-2-03743 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 23-Jun-13 7:00 AM 24-Jun-13
SLD003 ( Base )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
6068 RFI-5858-QCN-2-03744 RFI-5858-QCN-2-03744 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 23-Jun-13 8:30 AM 24-Jun-13
Stopper B70-PS-22: SLD003 ( Base )
6069 RFI-5858-QCN-2-03745 RFI-5858-QCN-2-03745 CONCRETE Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-22: SLD003 ( Base ) APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 23-Jun-13 9:30 AM 24-Jun-13
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
6070 RFI-5858-QCN-2-03746 RFI-5858-QCN-2-03746 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 23-Jun-13 3:30 PM 23-Jun-13
and cleaning of Cast-in- Situ Culvert BZRC-010 Wall ( 6.65 meters ) prior shuttering.
9.3. Check Surface preparation and First Coating of Precast Pipe Sleeper B70-PS-22:
6071 RFI-5858-QCN-2-03747 RFI-5858-QCN-2-03747 CONCRETE SLD036, SLD037, SLD044, SLD045, SLD046 SLD047, SLD048, SLD049, SLD050, APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 23-Jun-13 9:30 AM to 5:30 PM 24-Jun-13
SLD051 and SLD065 and B70-PS-21: SLD001 to SLD004 = 4 nos
6.4 Completion of 1 day water curing and 1 day curing compound of Culvert BZRC-010
6072 RFI-5858-QCN-2-03748 RFI-5858-QCN-2-03748 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 23-Jun-13 8:30 AM 24-Jun-13
( Base 8.85 meters )
6073 ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
RFI-5858-QCN-2-03749 RFI-5858-QCN-2-03749 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 23-Jun-13 10:00 AM 23-Jun-13
and cleaning of Cast-in- Situ Culvert BZRC-011 Wall ( 6.70 meters ) prior shuttering.
Pre-Pouring Check Formworks, Reinforcement and cleaning of Precast Pipe Stopper Tank Farm
6074 RFI-5858-QCN-2-03750 RFI-5858-QCN-2-03750 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 23-Jun-13 7:30 AM 25-Jun-13
B70-PS-30: SLD004 ( Pedestal ) prior concreting Raslaffan
6075 Concrete Placement Check Concrete pouring of Precast Pipe Stopper B70-PS-30: Tank Farm
RFI-5858-QCN-2-03751 RFI-5858-QCN-2-03751 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 23-Jun-13 7:30 AM 26-Jun-13
SLD004 (Pedestal ) Raslaffan
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-42:
6077 RFI-5858-QCN-2-03753 RFI-5858-QCN-2-03753 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 23-Jun-13 7:30 AM 24-Jun-13
F5 ( Base )
6078 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-03754 RFI-5858-QCN-2-03754 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 23-Jun-13 9:30 AM 24-Jun-13
D110-B70-PR-42: F5 ( Base )
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-33:
6079 RFI-5858-QCN-2-03755 RFI-5858-QCN-2-03755 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 23-Jun-13 2:30 PM to 5:30 PM 24-Jun-13
F1
6080 RFI-5858-QCN-2-03756 RFI-5858-QCN-2-03756 CONCRETE Check Final Visual Inspection Sleeper Foundations B70-PS - 04 SLD 019 to SLD 016 APPROVED SECTION1 B-V-3100-004-2-201-02_5 9.2 S W H 23-Jun-13 1:30 PM 28-Jun-13
6081 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 6.65
RFI-5858-QCN-2-03757 RFI-5858-QCN-2-03757 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 23-Jun-13 7:30 AM 24-Jun-13
and 8.85 meters ) ( Base
9.3. Check Surface preparation and protective coating first and Second coat of Cast-in-
6082 RFI-5858-QCN-2-03758 RFI-5858-QCN-2-03758 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 23-Jun-13 1:30 PM to 5:30 PM 24-Jun-13
Situ Culvert BZRC-010 Base ( 6.65 and 8.85 meters )
6083 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 8.0
RFI-5858-QCN-2-03759 RFI-5858-QCN-2-03759 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 24-Jun-13 8:00 AM 25-Jun-13
meters ) ( Base )
9.3. Check Surface preparation and protective coating first and Second coat of Cast-in-
6084 RFI-5858-QCN-2-03760 RFI-5858-QCN-2-03760 CONCRETE
Situ Culvert BZRC-010 Base
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 24-Jun-13 9:30 AM to 3:30 PM 25-Jun-13
6085 RFI-5858-QCN-2-03761 RFI-5858-QCN-2-03761 CONCRETE 6.4 Completion of 1 day curing compound of Culvert BZRC-010 ( Base 8.0 meters ) APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 24-Jun-13 8:30 AM 25-Jun-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-30:
6086 RFI-5858-QCN-2-03762 RFI-5858-QCN-2-03762 CONCRETE
SLD004 ( Pedestal )
APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 24-Jun-13 8:30 AM 25-Jun-13
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
6087 RFI-5858-QCN-2-03763 RFI-5858-QCN-2-03763 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 24-Jun-13 7:30 AM 24-Jun-13 CANCELLED WORK NOT READY
and cleaning of Cast-in- Situ Pipe Stopper B70-PS-30: SLD034 ( Pedestal )
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Track D110- 4.1.a.b.c.d.
6089 RFI-5858-QCN-2-03765 RFI-5858-QCN-2-03765 CONCRETE APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 W W H 24-Jun-13 1:30 PM 24-Jun-13
B70-PR-42: F1 = 1 nos and F2 = 2 nos ( Base ) prior concreting e
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-42:
6091 RFI-5858-QCN-2-03767 RFI-5858-QCN-2-03767 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 24-Jun-13 7:30 AM 25-Jun-13
F2 = 1 no and F3 = 2 nos ( Base )
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
6092 RFI-5858-QCN-2-03768 RFI-5858-QCN-2-03768 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 24-Jun-13 9:30 AM 25-Jun-13
D110-B70-PR-42: F2 = 1 nos and F3 = 2 nos ( Base )
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-42:
6093 RFI-5858-QCN-2-03769 RFI-5858-QCN-2-03769 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 24-Jun-13 2:30 PM to 5:30 PM 25-Jun-13
F2 = 1 no, F3 = 2 nos
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6094 RFI-5858-QCN-2-03770 RFI-5858-QCN-2-03770 CONCRETE Cast-in- Situ Pipe Track D110-B70-PR-42: F2 = 1 no and F3 = 2 nos Pedestal prior APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02__ 4.1a.b.d.e W W H 24-Jun-13 9:00 AM 26-Jun-13
shuttering
9.3. Check Surface preparation of Cast-in- Situ Culvert BZRC-011 Base and Wall ( 10.70
6095 RFI-5858-QCN-2-03771 RFI-5858-QCN-2-03771 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 24-Jun-13 9:30 AM to 5:30 PM 28-Jun-13
meters ) ( North and South )
6096 RFI-5858-QCN-2-03772 RFI-5858-QCN-2-03772 CONCRETE Check Erection of Precast sleeper Sleeper Foundation B70-PS - 12 SLD013 APPROVED SECTION 4 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 25-Jun-13 7:30 AM 29-Jun-13
Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundation B70- SECTION - 4
6097 RFI-5858-QCN-2-03773 RFI-5858-QCN-2-03773 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 25-Jun-13 8:30 AM 28-Jun-13
PS -012 SLD013 Raslaffan
6098 ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
RFI-5858-QCN-2-03774 RFI-5858-QCN-2-03774 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 25-Jun-13 3:30 PM 25-Jun-13
and cleaning of Cast-in- Situ Culvert BZRC-010 Wall ( 8.0 meters ) prior shuttering.
6099 Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and 4.1.a.b.c.d.
RFI-5858-QCN-2-03775 RFI-5858-QCN-2-03775 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 25-Jun-13 2:30 PM 25-Jun-13
cleaning of Cast-in- Situ Culvert BZRC-010 ( 6.65 meters ) ( Wall ) prior concreting e
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 6.65
6100 RFI-5858-QCN-2-03776 RFI-5858-QCN-2-03776 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 25-Jun-13 3:00 PM 28-Jun-13
meters ) ( Wall )
6101 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03777 RFI-5858-QCN-2-03777 CONCRETE APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 25-Jun-13 7:30 AM to 9:30 AM 26-Jun-13
Stopper B70-PS-30: SLD004
Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-30: SLD004 and
6102 RFI-5858-QCN-2-03778 RFI-5858-QCN-2-03778 CONCRETE SLD034 ( Base ) and Pipe Sleeper B70-PS-30: SLD042 and SLD045 And D110-B70-PR- APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 25-Jun-13 9:30 AM to 1:30 PM 28-Jun-13
45:F5
6103 6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-42:
RFI-5858-QCN-2-03779 RFI-5858-QCN-2-03779 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 25-Jun-13 9:30 AM 28-Jun-13
F1 = 1 no and F2 = 2 nos ( Base )
6104 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-03780 RFI-5858-QCN-2-03780 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 25-Jun-13 1:30 PM to 3:30 PM 28-Jun-13
D110-B70-PR-42: F = 1 nos and F2 = 2 nos ( Base )
6106 Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD042 and Tank Farm
RFI-5858-QCN-2-03782 RFI-5858-QCN-2-03782 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 25-Jun-13 8:30 AM 29-Jun-13
SLD045 Raslaffan
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Track D110- 4.1.a.b.c.d.
6107 RFI-5858-QCN-2-03783 RFI-5858-QCN-2-03783 CONCRETE
B70- STN-72 ( F1 and F2 Base ) prior concreting
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5
e
W W H 25-Jun-13 7:30 AM 26-Jun-13
6108 Concrete Placement Check Concrete pouring of Precast Pipe Track D110-B70- STN-72
RFI-5858-QCN-2-03784 RFI-5858-QCN-2-03784 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 25-Jun-13 7:40 AM 26-Jun-13
( F1 and F2 Base )
Check Concrete Pouring D110-RW-004(E-BZRC) EAST RETAINING WALL From East SECTION4 D110-
6111 RFI-5858-QCN-2-03787 RFI-5858-QCN-2-03787 CONCRETE
Side1st,3rd & 5th panel Base (South Side )
APPROVED
RW-004 (E-BZRC)
B-V-3100-004-2-201-02_5 5.1 W H H 26-Jun-13 4:30 PM 28-Jun-13
6.4 Completion of 14 days water curing of Precast Pipe Sleeper B70-PS-14-F3 = 12 nos,
6113 RFI-5858-QCN-2-03789 RFI-5858-QCN-2-03789 CONCRETE B70-PS-14-F4 = 2 nos, and F5 = 1 no B70-PS29-F2 = 4 nos B70-PS-32-F1 = 1 no and APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jun-13 8:30 AM 28-Jun-13
B70-PS-33-F1 = 4 nos Total = 24 nos ( Pedestal )
6.4 Completion of 14 days water curing of Precast Pipe Track D110-B70-PR-38, 41, 58,
6114 RFI-5858-QCN-2-03790 RFI-5858-QCN-2-03790 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 26-Jun-13 8:30 AM 28-Jun-13
59, 60, 62, 56 = 26 nos ( Pedestal )
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6115 RFI-5858-QCN-2-03791 RFI-5858-QCN-2-03791 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 26-Jun-13 8:30 AM 26-Jun-13
Cast-in- Situ Pipe Stopper B70-PS-30: SLD034 ( Pedestal ) prior shuttering
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Precast Pipe Track D110- Tank Farm 4.1.a.b.c.d.
6116 RFI-5858-QCN-2-03792 RFI-5858-QCN-2-03792 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 26-Jun-13 1:30 PM 26-Jun-13
B70-PR-61 ( Base ) prior concreting Raslaffan e
6117 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-03793 RFI-5858-QCN-2-03793 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 27-Jun-13 2:00 PM 27-Jun-13
Stopper B70-PS30: SLD019 ( Base ).
6119 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 6.65
RFI-5858-QCN-2-03795 RFI-5858-QCN-2-03795 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 27-Jun-13 10:00 AM 28-Jun-13
meters ) ( Wall )
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - SECTION - 4
6120 RFI-5858-QCN-2-03796 RFI-5858-QCN-2-03796 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.3 S W H 27-Jun-13 7:30 AM to 9:30 AM 28-Jun-13
First &Second Coat Sleeper Foundations B70-PS-12 SLD013 Raslaffan
6121 SECTION - 4
RFI-5858-QCN-2-03797 RFI-5858-QCN-2-03797 CONCRETE Check Final Visual Inspection Sleeper Foundations B70-PS-12 SLD013 APPROVED B-V-3100-004-2-201-02_5 9.2 S W H 27-Jun-13 10:30 AM 28-Jun-13
Raslaffan
6122 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03798 RFI-5858-QCN-2-03798 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 27-Jun-13 8:30 AM 27-Jun-13 CANCELLED WORK NOT READY
Cast-in- Situ Pipe Track D110-B70-PR-42: F5 ( Pedestal ) prior shuttering
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6124 Concrete Placement Check Concrete pouring of Pipe Track and Pipe Stopper B70-PS- Tank Farm
RFI-5858-QCN-2-03800 RFI-5858-QCN-2-03800 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Jun-13 2:30 PM 2-Jun-13
30; SLD034 ( Pedestal ) Raslaffan
6.4 Completion of 14 days water curing of Precast Pipe Sleeper Footing B70-PS-29-F2 =
6125 RFI-5858-QCN-2-03801 RFI-5858-QCN-2-03801 CONCRETE 4 nos, B70-PS-32-F1 = 1 no. B70-PS-33-F1 = 4 nos B70-PS-14-F3 = 12 nos B70-PS-14- APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 27-Jun-13 8:30 AM 28-Jun-13
F5 = 1 no. B70-PS-14-F4 = 2 nos
6.4 Completion of 14 days water curing of Precast Pipe Sleeper Pedestal B70-PS-27-F1
6126 RFI-5858-QCN-2-03802 RFI-5858-QCN-2-03802 CONCRETE = 21 nos, Culvert BZRC-003 and BZRC-005 Culvert Type A = 10 nos and Removable APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 27-Jun-13 8:30 AM 28-Jun-13
panel 4 nos
6.4 Completion of 14 days water curing of Precast Pipe Sleeper Footing B70-PS-23-F1 =
6127 RFI-5858-QCN-2-03803 RFI-5858-QCN-2-03803 CONCRETE 8 nos, B70-PS-PS-30-F2 = 10 nos B70-PS-32-F1 = 2 nos, and Pipe Sleeper Pedestal APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 27-Jun-13 8:30 AM 28-Jun-13
B70-PS-31-F1 = 17 nos and B70-PS-32-F1 = 6 nos
6.4 Completion of 14 days water curing of Precast Pipe Track Pedestal D110-B70-PR-37,
6128 RFI-5858-QCN-2-03804 RFI-5858-QCN-2-03804 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 27-Jun-13 8:30 AM 28-Jun-13
40, 41, 43, 54 and 59 = total 26 nos
6129 6.4 Completion of 14 days water curing of Precast Pipe Track Pedestal D110-B70-PR-50,
RFI-5858-QCN-2-03805 RFI-5858-QCN-2-03805 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 27-Jun-13 8:30 AM 28-Jun-13
51, 52, 53, 68, 69= 24 nos ( Base ) and Pipe Sleeper B70-PS-26-P3 = 14 nos ( Pedestal )
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and 4.1.a.b.c.d.
6130 RFI-5858-QCN-2-03806 RFI-5858-QCN-2-03806 CONCRETE
cleaning of Cast-in- Situ Culvert BZRC-010 ( 8.0 meters ) ( Wall ) prior concreting
APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5
e
W W H 29-Jun-13 3:00 PM 29-Jun-13
6131 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 8.0
RFI-5858-QCN-2-03807 RFI-5858-QCN-2-03807 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Jun-13 3:30 PM 30-Jun-13
meters ) ( Wall )
9.3. Check Surface preparation and protective coating first and Second coat of curing
6132 RFI-5858-QCN-2-03808 RFI-5858-QCN-2-03808 CONCRETE compound of Cast-in- Situ Culvert BZRC-010 Base ( 6.65 meters ) ( North and South ) APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 29-Jun-13 9:30 AM to 5:30 PM 29-Jun-13
outside
Pre-Pouring Check Formworks, Reinforcement, embdded items, construction joints and 4.1.a.b.c.d.
6133 RFI-5858-QCN-2-03809 RFI-5858-QCN-2-03809 CONCRETE APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 W W H 29-Jun-13 1:00 PM 30-Jun-13
Cleaning of Pipe Track D110-B70-PR-42: F4 ( Base ) pre cast e
6134 RFI-5858-QCN-2-03810 RFI-5858-QCN-2-03810 CONCRETE Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F4 ( Base ) APPROVED PR-42 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 29-Jun-13 1:30 PM 30-Jun-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6135 RFI-5858-QCN-2-03811 RFI-5858-QCN-2-03811 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 29-Jun-13 7:30 AM 29-Jun-13
Pipe Track D110-B70-PR-42: F2 and F3 ( Pedestal ) prior shuttering
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-42:
6136 RFI-5858-QCN-2-03812 RFI-5858-QCN-2-03812 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 29-Jun-13 7:00 AM 29-Jun-13
F2 = 2 nos (Base only)
9.3. Check Surface preparation and First Coating of Precast Pipe Stopper and Sleeper
6137 RFI-5858-QCN-2-03813 RFI-5858-QCN-2-03813 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 29-Jun-13 9:30 AM to 5:30 PM 29-Jun-13
B70-PS-30: SLD054, SLD053, SLD052, SLD045
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
6139 RFI-5858-QCN-2-03815 RFI-5858-QCN-2-03815 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 29-Jun-13 2:00 PM 29-Jun-13
-12390-3) for D110-B70-PR-30: F1, F2, F3 and F4
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Cast-in- Situ Retaining Section 4 D110-RW-
6140 4.1.a.b.c.d.
RFI-5858-QCN-2-03816 RFI-5858-QCN-2-03816 CONCRETE Wall D110-RW-004 (E-BZRC) from East side 2nd and 4th panel ( Base ) D110-RW-003 APPROVED 004( E-BZRC ) B-V-3100-004-2-201-02_5 W W H 29-Jun-13 2:00 PM 29-Jun-13
e
(E-BZRC) from West 8th panel ( Base ) Raslaffan
Concrete Placement Check Concrete pouring of Cast-in- Situ Retaining Wall D110-RW- Section 4 D110-RW-
6141 RFI-5858-QCN-2-03817 RFI-5858-QCN-2-03817 CONCRETE 004 (E-BZRC) from East side 2nd and 4th panel ( Base ) D110-RW-003 (E-BZRC) from APPROVED 004( E-BZRC ) B-V-3100-004-2-201-02_5 5.1 W H H 29-Jun-13 2:30 PM 2-Jul-13
West side 8th panel ( Base ) Raslaffan
6142 6.4 Completion of 4 days water curing and 1 day curing compound of Precast Pipe Track
RFI-5858-QCN-2-03818 RFI-5858-QCN-2-03818 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 29-Jun-13 8:30 AM 2-Jul-13
Base D110-B70-PR-42: F2 and F3
6.4 Completion of 3 days water curing and 1 day curing compound of Precast Pipe Track
6143 RFI-5858-QCN-2-03819 RFI-5858-QCN-2-03819 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 29-Jun-13 8:30 AM 1-Jul-13
Base D110-B70-PR-42: F3 and F5
6144 Check Reinforcement prior to close shuttering D110-RW-003(E-BZRC) EAST SECTION4 D110-
RFI-5858-QCN-2-03820 RFI-5858-QCN-2-03820 CONCRETE APPROVED B-V-3100-004-2-201-02_5 4.1.b W W H 30-Jun-13 1:00 APM 30-Jun-13
RETAINING WALL From East Side1st,3rd & 5th panel Wall (South Side ) RW-003 (E-BZRC)
ITP item 4.1 Pre - Pouring Check Reinforcement, Embedded items, Construction joints
6145 RFI-5858-QCN-2-03821 RFI-5858-QCN-2-03821 CONCRETE and cleaning of Cast-in- Situ Culvert BZRC-010 Wall ( 8.85 meters ) and 3 nos. of Pipe APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 4.1a.b.d.e W W H 30-Jun-13 8:00 AM 30-Jun-13
Sleeper Pedestal prior shuttering.
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 8.0
6146 RFI-5858-QCN-2-03822 RFI-5858-QCN-2-03822 CONCRETE CANCELLED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 30-Jun-13 10:00 AM 30-Jun-13 CANCELLED WORK NOT READY
meters ) ( Wall )
7:30 AM
6147 9.3. Check Protective coating first and Second coat of Cast-in- Situ Culvert BZRC-011
RFI-5858-QCN-2-03823 RFI-5858-QCN-2-03823 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 30-Jun-13 to 1-Jul-13
Base and Wall ( 10.70 meters )
2:30 PM
6149 Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-011 ( 6.70
RFI-5858-QCN-2-03825 RFI-5858-QCN-2-03825 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 30-Jun-13 7:40 AM 2-Jul-13
meters ) ( Wall ) and 1 no. Pipe Sleeper Pedestal
6150 6.4 Completion of 2 days water curing and 1 day curing compound of Cast-in- Situ Culvert
RFI-5858-QCN-2-03826 RFI-5858-QCN-2-03826 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
Wall of BZRC-010 ( 6.65 meters )
6.4 Completion of 8 days water curing and 1 day curing compound of Cast-in- Situ Culvert
6151 RFI-5858-QCN-2-03827 RFI-5858-QCN-2-03827 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
Wall of BZRC-011 ( 10.7 meters )
6152 6.3 Check Concrete surface upon form removal of Pipe Stopper B70-PS-30: SLD034
RFI-5858-QCN-2-03828 RFI-5858-QCN-2-03828 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 30-Jun-13 9:00 AM 1-Jul-13
( Pedestal )
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-42:
6153 RFI-5858-QCN-2-03829 RFI-5858-QCN-2-03829 CONCRETE
F2 and F3 ( Pedestal )
CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 30-Jun-13 7:30 AM 30-Jun-13 CANCELLED WORK NOT READY
6154 6.4 Completion of 2 days water curing and 1 day curing compound of Cast-in- Situ Pipe
RFI-5858-QCN-2-03830 RFI-5858-QCN-2-03830 CONCRETE APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
Track D110-B70-PR-33: F1 ( Base )
6.4 Completion of 1 day curing compound of Cast-in- Situ Pipe Track D110-B70-PR-33:
6155 RFI-5858-QCN-2-03831 RFI-5858-QCN-2-03831 CONCRETE
F1 ( Pedestal )
APPROVED PR-33 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
6.4 Completion of 2 days water curing and 1 day curing compound of Cast-in- Situ Pipe
6156 RFI-5858-QCN-2-03832 RFI-5858-QCN-2-03832 CONCRETE APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
Track D110-B70-PR-28: F1 and F2 ( Base )
6.4 Completion of 1 day curing compound of Cast-in- Situ Pipe Track D110-B70-PR-28:
6157 RFI-5858-QCN-2-03833 RFI-5858-QCN-2-03833 CONCRETE
F1 and F2 ( Pedestal )
APPROVED PR-28 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 30-Jun-13 8:30 AM 3-Jul-13
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 8.0
6158 RFI-5858-QCN-2-03834 RFI-5858-QCN-2-03834 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-Jul-13 9:30 AM 3-Jul-13
meters ) ( Wall )
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-011 ( 6.7
6159 RFI-5858-QCN-2-03835 RFI-5858-QCN-2-03835 CONCRETE CANCELLED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-Jul-13 9:30 AM 1-Jul-13 CANCELLED WORK NOT READY
meters ) ( Base and Wall )
6.3 Check Concrete surface upon form removal of Precast Pipe Track D110-B70-PR-42:
6160 RFI-5858-QCN-2-03836 RFI-5858-QCN-2-03836 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 1-Jul-13 8:30 AM 3-Jul-13
F4 ( Base )
Tank Farm
6161 RFI-5858-QCN-2-03837 RFI-5858-QCN-2-03837 CONCRETE Pre-Cast Items Check Erection of Precast of Pipe Track D110-B70-PR-41 APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 1-Jul-13 8:30 AM 5-Jul-13
Raslaffan
6162 RFI-5858-QCN-2-03838 RFI-5858-QCN-2-03838 CONCRETE Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-41 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 1-Jul-13 10:00 AM 1-Jul-13
6163 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Pipe
RFI-5858-QCN-2-03839 RFI-5858-QCN-2-03839 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 1-Jul-13 2:00 PM 1-Jul-13
Track Base D110-B70-PR-28-F1 &F2
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Pipe Track D110-B70- 4.1.a.b.c.d.
6164 RFI-5858-QCN-2-03840 RFI-5858-QCN-2-03840 CONCRETE APPROVED PR-61 Raslaffan B-V-3100-004-2-201-02_5 W W H 1-Jul-13 8:00 AM 1-Jul-13
PR-61: F1 = 1 no. ( Base ) e
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
6166 RFI-5858-QCN-2-03842 RFI-5858-QCN-2-03842 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 2-Jul-13 2.00 PM 2-Jul-13
-12390-3) for D110-B70-PR-35 & 53
6167 9.3. Check Surface preparation and protective coating first and Second coat of curing
RFI-5858-QCN-2-03843 RFI-5858-QCN-2-03843 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 2-Jul-13 9:30 AM to 5:30 PM 3-Jul-13
compound of Cast-in- Situ Culvert BZRC-010 Base and Wall ( 8.0 meters )
6168 Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-61: F1 ( Base )
RFI-5858-QCN-2-03844 RFI-5858-QCN-2-03844 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-Jul-13 8:00AM 3-Jul-13
and D110-B70-PR-41
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
6169 RFI-5858-QCN-2-03845 RFI-5858-QCN-2-03845 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 2-Jul-13 8:00 AM to 9:30 AM 3-Jul-13
Stopper B70-PS-30: SLD034
6170 RFI-5858-QCN-2-03846 RFI-5858-QCN-2-03846 CONCRETE Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-30: SLD034 APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 2-Jul-13 10:30 AM 3-Jul-13
6172 Check Grout Pouring,Finishing,Depth of pour,Sampling/mixing& Finishingent for Pipe Section 6 and
RFI-5858-QCN-2-03848 RFI-5858-QCN-2-03848 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 2-Jul-13 3:30 PM 3-Jul-13
Rack Foundations D110-B70-PR-29: F1 and F2 Section 7
6173 Check Final Visual Inspection B70-PS-22: SLD036, SLD037, SLD044 to SLD051 = 8 nos,
RFI-5858-QCN-2-03849 RFI-5858-QCN-2-03849 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 10 S W H 2-Jul-13 4:30 PM 3-Jul-13
SLD064 and SLD065
6177 4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
RFI-5858-QCN-2-03853 RFI-5858-QCN-2-03853 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 3-Jul-13 9:30 AM 5-Jul-13
Track D100-B70-PR-31: F1 and F2 D110-B70-PR-32: F1 and F2
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
6178 RFI-5858-QCN-2-03854 RFI-5858-QCN-2-03854 CONCRETE
Track D100-B70-PR-35 and D110-B70-PR-53
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 3-Jul-13 9:30 AM 5-Jul-13
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
6179 RFI-5858-QCN-2-03855 RFI-5858-QCN-2-03855 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 3-Jul-13 2:00 PM 3-Jul-13
-12390-3) for D110-B70-PR-75 -1-2/AB
4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
6181 RFI-5858-QCN-2-03857 RFI-5858-QCN-2-03857 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 3-Jul-13 3:00 PM 3-Jul-13
-12390-3) for D110-B70-PR-29 -F1,F2
6.4 Completion of 1 day water curing and 1 day curing compound of Cast-in- Situ Culvert
6182 RFI-5858-QCN-2-03858 RFI-5858-QCN-2-03858 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 3-Jul-13 8:30 AM 5-Jul-13
Wall of BZRC-010 ( 8.0 meters )
6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-011 ( 6.7
6183 RFI-5858-QCN-2-03859 RFI-5858-QCN-2-03859 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 3-Jul-13 3:30 PM 5-Jul-13
meters ) ( Base and Wall )
Check Concrete Pouring D110-RW-003(E-BZRC) EAST RETAINING WALL From East SECTION4 D110-
6185 RFI-5858-QCN-2-03861 RFI-5858-QCN-2-03861 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 3-Jul-13 1:30 PM 6-Jul-13
Side1st,3rd & 5th panel Wall (South Side ) RW-004 (E-BZRC)
6186 4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
RFI-5858-QCN-2-03862 RFI-5858-QCN-2-03862 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 3-Jul-13 9:30 AM 5-Jul-13
Track D110-B70-PR-34 D110-B70-PR-50, 51 and 52
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
6187 RFI-5858-QCN-2-03863 RFI-5858-QCN-2-03863 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 3-Jul-13 9:30 AM 5-Jul-13
Track D110-B70-PR-30: F1, F2, F3 and F4
6188 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03864 RFI-5858-QCN-2-03864 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 3-Jul-13 8:00 AM 3-Jul-13 cancelled non availability of documents
Cast-in- Situ Pipe Track D110-B70-PR-42: F5 ( Pedestal ) prior shuttering
9.3. Check Surface preparation and protective coating first and Second coat of Cast-in-
6189 RFI-5858-QCN-2-03865 RFI-5858-QCN-2-03865 CONCRETE CANCELLED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 4-Jul-13 9:30 AM to 5:30 PM 4-Jul-13 cancelled non availability of documents
Situ Culvert BZRC-011 Base and Wall ( 6.7 meters )
6190 4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
RFI-5858-QCN-2-03866 RFI-5858-QCN-2-03866 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 4-Jul-13 9:30 AM 9-Jul-13
Track D100-B70-PR-29: F1 and F2
6191 9.1. Check surface preparation of Retaining Wall E-W 5th, 6th, 7th, 8th and 9th panel Retaining Wall E-W
RFI-5858-QCN-2-03867 RFI-5858-QCN-2-03867 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1 S W H 4-Jul-13 8:00 AM to 3:00 PM 5-Jul-13
( Above Grade ) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Culvert BZRC-010 ( 8.85
6192 RFI-5858-QCN-2-03868 RFI-5858-QCN-2-03868 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 4-Jul-13 5:30 PM 7-Jul-13
meters ) ( Wall ) - end wall west side
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and 4.1.a.b.c.d.
6194 RFI-5858-QCN-2-03870 RFI-5858-QCN-2-03870 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 W W H 4-Jul-13 5:00 PM 4-Jul-13
cleaning of Cast-in- Situ Culvert BZRC-010 ( 8.85 meters ) ( Wall ) prior concreting e
6195 Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 - STN - 74 Pipe
RFI-5858-QCN-2-03871 RFI-5858-QCN-2-03871 CONCRETE APPROVED SECTION- 4 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 6-Jul-13 9:30 AM 7-Jul-13
rack Foundation1 /A-B(F1)- 2 Nos
6196 Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 75 Pipe
RFI-5858-QCN-2-03872 RFI-5858-QCN-2-03872 CONCRETE APPROVED SECTION-1 PR -75 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 6-Jul-13 9:00 AM 7-Jul-13
rack Foundation1-2/A-B
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 16 Pipe
6197 RFI-5858-QCN-2-03873 RFI-5858-QCN-2-03873 CONCRETE APPROVED SECTION- 3 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 6-Jul-13 9:30 AM 7-Jul-13
rack Foundation1(F1),2(F2),3(F3),4(F4&F5)
6198 6.3 Check Concrete surface upon form removal of Cast-in- Situ Culvert BZRC-010 ( 8.85
RFI-5858-QCN-2-03874 RFI-5858-QCN-2-03874 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 6-Jul-13 10:30 AM 6-Jul-13
meters ) ( Wall )
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe PR-23 and PR-24
6199 RFI-5858-QCN-2-03875 RFI-5858-QCN-2-03875 CONCRETE
Track D100-B70-PR-23: F1 and F2 and D110-B70-PR24: F1 and F2
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.2 S W H 6-Jul-13 9:30 AM 7-Jul-13
6200 4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
RFI-5858-QCN-2-03876 RFI-5858-QCN-2-03876 CONCRETE APPROVED PR-22 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 6-Jul-13 9:30 AM 10-Jul-13
Track D100-B70-PR-22: F1, F2, F3, F4, F5 and F6
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe PR-20, 21 and 68
6201 RFI-5858-QCN-2-03877 RFI-5858-QCN-2-03877 CONCRETE
Track D100-B70-PR-20, 21 and 68 & 67
APPROVED
Raslaffan
B-V-3100-004-2-201-02_4 4.2 S W H 6-Jul-13 9:30 AM 10-Jul-13
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
6202 RFI-5858-QCN-2-03878 RFI-5858-QCN-2-03878 CONCRETE APPROVED PR-49 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 6-Jul-13 9:30 AM 10-Jul-13
Track D100-B70-PR-49
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6205 RFI-5858-QCN-2-03881 RFI-5858-QCN-2-03881 CONCRETE CANCELLED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1a.b..d.e W W H 6-Jul-13 8:00 AM 6-Jul-13 CANCELLED WORK NOT READY
Cast-in- Situ Pipe Track D110-B70-PR-42: F5 ( Pedestal ) prior shuttering
Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F2 = 3 nos Tank Farm
6207 RFI-5858-QCN-2-03883 RFI-5858-QCN-2-03883 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 6-Jul-13 2:30 PM 10-Jul-13
and F3 = 2 nos. ( Pedestal ) Raslaffan
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
-12390-3) for D110- B70-PR-25 Pipe Rack Foundation 1- 5/A-B - 2 Nos &D110- B70-
6208 RFI-5858-QCN-2-03884 RFI-5858-QCN-2-03884 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 6-Jul-13 3:00 PM 6-Jul-13
STN-74 , 1/A-B (F1) - 2 Nos &D110-B70-PR-31: F1 and F2 and D110-B70-PR-32: F1 and
F2.
6209 Check Grout Prepouring,Concrete,Metal surface preparation & Formworks for Pipe Rack
RFI-5858-QCN-2-03885 RFI-5858-QCN-2-03885 CONCRETE APPROVED Tank Farm B-V-3100-004-2-201-02_4 3.1.1a,b&c S W H 6-Jul-13 3:30 PM 7-Jul-13
Foundations D110-B70-PR-37, 38, 54 and 55
9.3. Check Surface preparation and First Coating of Precast Pipe Sleeper B70-PS-30: 8:30 AM
6211 RFI-5858-QCN-2-03887 RFI-5858-QCN-2-03887 CONCRETE SLD042, SLD045, SLD051, SLD052, SLD053 SLD055 and Pipe Stopper B70-PS-30: APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 6-Jul-13 to 7-Jul-13
SLD054 5:30 PM
Check concrete surface upon form removal D110-RW-004(E-BZRC) EAST RETAINING SECTION4 RW-
6212 RFI-5858-QCN-2-03888 RFI-5858-QCN-2-03888 CONCRETE APPROVED B-V-3100-004-2-201-02_5 6.3 S W H 7-Jul-13 10:00 AM 7-Jul-13
WALL From East Side1st,3rd & 5th panel Base& Wall (South Side ) 004(E-BZRC)
6213 Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 18 Pipe SECTION - 4
RFI-5858-QCN-2-03889 RFI-5858-QCN-2-03889 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 7-Jul-13 9:30 AM 10-Jul-13
rack Foundation1-16/A-B Raslaffan
6214 Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 17 Pipe SECTION - 4
RFI-5858-QCN-2-03890 RFI-5858-QCN-2-03890 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 7-Jul-13 10:30 AM 7-Jul-13
rack Foundation1(F1,F2),2(F3,F4) Raslaffan
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 25 Pipe SECTION - 4
6215 RFI-5858-QCN-2-03891 RFI-5858-QCN-2-03891 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 7-Jul-13 1:30 PM 7-Jul-13
rack Foundation1-5/A-B Raslaffan
SECTION4 D110-
6216 Check Erection of Precast Retaining Wall D110-RW-004(W-BZRC) EAST RETAINING
RFI-5858-QCN-2-03892 RFI-5858-QCN-2-03892 CONCRETE APPROVED RW-004(E-BZRC) B-V-3100-004-2-201-02_5 8.2 S W H 7-Jul-13 2:30 PM 9-Jul-13
WALL-- From East Side1st to 6th panel (North Side )
Raslaffan
9:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of curing
6217 RFI-5858-QCN-2-03893 RFI-5858-QCN-2-03893 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 7-Jul-13 to 7-Jul-13
compound of Cast-in- Situ Culvert BZRC-010 Wall ( 8.85 meters )
5:30 PM
6218 4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
RFI-5858-QCN-2-03894 RFI-5858-QCN-2-03894 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 7-Jul-13 3:00 PM 7-Jul-13
-12390-3) for D110-B70-PR-37,38,54 & 55
Visual Inspectin of Embedded plate Stud Welding prior to Galavanizing for B70-PS-22-F1 QG Gate#5 Precast
6222 RFI-5858-QCN-2-03898 RFI-5858-QCN-2-03898 CONCRETE
(1no.) & B70-PS-22-F2 (1no.)
APPROVED
yard Raslaffan
B-V-3100-004-2-208-01_3 2.3.8 R W H 7-Jul-13 7:00 AM 7-Jul-13
9:30 AM
6223 9.3. Check Surface preparation and protective coating first and Second coat of curing
RFI-5858-QCN-2-03899 RFI-5858-QCN-2-03899 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 7-Jul-13 to 7-Jul-13
compound of Cast-in- Situ Culvert BZRC-011 Wall ( 6.70 meters )
5:30 PM
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
6224 RFI-5858-QCN-2-03900 RFI-5858-QCN-2-03900 CONCRETE
42: F2 = 3 nos and F3 = 2 nos Pedestal
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 7-Jul-13 10:30 AM 8-Jul-13
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 63 Pipe
6225 RFI-5858-QCN-2-03901 RFI-5858-QCN-2-03901 CONCRETE APPROVED SECTION- 4 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 8-Jul-13 10:30 AM 10-Jul-13
rack Foundation1,2 (F1&F2)
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 69 & D110
6226 RFI-5858-QCN-2-03902 RFI-5858-QCN-2-03902 CONCRETE
- B70 -PR - 26 Pipe rack Foundation1-2 /A-B
APPROVED SECTION- 6 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 8-Jul-13 8:30 AM 9-Jul-13
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70 -PR - 27 Pipe
6227 RFI-5858-QCN-2-03903 RFI-5858-QCN-2-03903 CONCRETE APPROVED SECTION- 6 B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 8-Jul-13 1:30 PM 9-Jul-13
rack Foundation1-5 /A-B
Check Polythylene & Hardboard Installation of Cast-in- Situ Culvert BZRC-010 ( 8.85
6229 RFI-5858-QCN-2-03905 RFI-5858-QCN-2-03905 CONCRETE APPROVED BZRC Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-Jul-13 9:30 AM 9-Jul-13
meters End Wall )
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
Tank Farm
6230 RFI-5858-QCN-2-03906 RFI-5858-QCN-2-03906 CONCRETE Pipe Track D110-B70-PR-61 and D110-B70-PR-39 ( East Side ) ( Pedestal ) and D110- APPROVED B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 8-Jul-13 7:30 AM 10-Jul-13
Raslaffan
B70-PR-42: F5prior shuttering
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
6231 RFI-5858-QCN-2-03907 RFI-5858-QCN-2-03907 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 8-Jul-13 1:30 PM 10-Jul-13
cleaning of Cast-in- Situ Pipe Track D110-B70-PR-61: ( Pedestal ) prior concreting Raslaffan e
6232 Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-61 and Tank Farm
RFI-5858-QCN-2-03908 RFI-5858-QCN-2-03908 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 8-Jul-13 2:00 PM 12-Jul-13
( Pedestal ) Raslaffan
7:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
6233 RFI-5858-QCN-2-03909 RFI-5858-QCN-2-03909 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 8-Jul-13 to 9-Jul-13
D110-B70-PR-42: F2 = 3 nos and F3 = 2 nos
9:30 AM
9:30 AM
6234 Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-42: F2 = 3 nos
RFI-5858-QCN-2-03910 RFI-5858-QCN-2-03910 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-Jul-13 to 9-Jul-13
and F3 = 2 nos and D110-B70-PR-39 ( Base )
2:30PM
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD025 and Tank Farm
6235 RFI-5858-QCN-2-03911 RFI-5858-QCN-2-03911 CONCRETE APPROVED B-V-3100-004-2-201-02_5 8.2 S W H 8-Jul-13 7:30 AM 10-Jul-13
SLD026 Raslaffan
6236 Check Polythylene & Hardboard Installation of Precast Pipe Sleeper B70-PS-30: SLD025
RFI-5858-QCN-2-03912 RFI-5858-QCN-2-03912 CONCRETE APPROVED Section 7 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-Jul-13 8:30 AM 9-Jul-13
and SLD026
6237 Pre-Cast Items Check Erection of Precast of Culvert Cover Type A and Type B of BZRC-
RFI-5858-QCN-2-03913 RFI-5858-QCN-2-03913 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 8-Jul-13 7:30 AM 10-Jul-13
011
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6238 RFI-5858-QCN-2-03914 RFI-5858-QCN-2-03914 CONCRETE Check Polythylene & Hardboard Installation of Culvert BZRC-011 ( 10.70 meters ) APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 8-Jul-13 9:30 AM 9-Jul-13
6239 Pre-Pouring Check Formworks, Reinforcement, Embedded items and cleaning of Precast 4.1.a.b.c.d.
RFI-5858-QCN-2-03915 RFI-5858-QCN-2-03915 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 W W H 8-Jul-13 1:30 PM 8-Jul-13
CCTV Foundation for Beach Valve area = 4 nos prior concreting e
Concrete Placement Check Concrete pouring of Precast CCTV Foundation 4 nos for
6240 RFI-5858-QCN-2-03916 RFI-5858-QCN-2-03916 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 8-Jul-13 2:00 PM 12-Jul-13
Beach Valve area
6241 Pre-Pouring Check Formworks, Reinforcement and Cleaning of Cast-in- Situ Pipe stopper 4.1.a.b.c.d.
RFI-5858-QCN-2-03917 RFI-5858-QCN-2-03917 CONCRETE CANCELLED Section 6 Raslaffan B-V-3100-004-2-201-02_5 W W H 8-Jul-13 1:30 PM 8-Jul-13 CANCELLED WORK NOT READY
B70-PS-30: SLD003 prior concreting e
6242 Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-22:
RFI-5858-QCN-2-03918 RFI-5858-QCN-2-03918 CONCRETE CANCELLED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 8-Jul-13 1:30 PM 8-Jul-13 CANCELLED WORK NOT READY
SLD003
7:00 AM
Check Surface Preparation ,First coat & Second coat D110-RW-004(E-BZRC) EAST Section4 D110-RW-
6243 RFI-5858-QCN-2-03919 RFI-5858-QCN-2-03919 CONCRETE APPROVED B-V-3100-004-2-201-02_5 9.1&9.2a S W H 9-Jul-13 to 9-Jul-13
RETAINING WALL 1,2,3,4&5th SOUTH SIDE PANEL ( SOUTH PORTION ) 003(E-BZRC)
10:00 AM
6244 Check Polyetheylene Installation Check Hardboard Installation D110-RW-004(E-BZRC) Section4 D110-RW-
RFI-5858-QCN-2-03920 RFI-5858-QCN-2-03920 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 9-Jul-13 3:30 AM 9-Jul-13
EAST RETAINING WALL 1,2,3,4&5th SOUTH SIDE PANEL ( SOUTH PORTION ) 004(E-BZRC)
Check Concrete Curing D110-RW-004(E-BZRC) EAST RETAINING WALL 1,2,3,4&5th Section4 D110-RW-
6245 RFI-5858-QCN-2-03921 RFI-5858-QCN-2-03921 CONCRETE
SOUTH SIDE PANEL ( SOUTH PORTION )
APPROVED
004(E-BZRC)
B-V-3100-004-2-201-02_5 6.4 S W H 9-Jul-13 10:00 AM 9-Jul-13
6246 Check Polythylene & Hardboard Installation of Cast-in- Situ Culvert BZRC-010 ( 6.65
RFI-5858-QCN-2-03922 RFI-5858-QCN-2-03922 CONCRETE APPROVED BZRC Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 9-Jul-13 9:30 AM 9-Jul-13
AND 8.0 meters )
6248 RFI-5858-QCN-2-03924 RFI-5858-QCN-2-03924 CONCRETE Check Polythylene & Hardboard Installation of Culvert BZRC-011 ( 6.7 meters ) APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 9-Jul-13 8:00 AM 9-Jul-13
Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-39 ( Base and Tank Farm
6250 RFI-5858-QCN-2-03926 RFI-5858-QCN-2-03926 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 9-Jul-13 8:00 AM 9-Jul-13
Pedestal ) (east side pedestal /w side base) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
6251 RFI-5858-QCN-2-03927 RFI-5858-QCN-2-03927 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 9-Jul-13 8:30 AM 9-Jul-13
42: F5 and D110-B70-PR-61 Pedestal
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6252 RFI-5858-QCN-2-03928 RFI-5858-QCN-2-03928 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 9-Jul-13 7:30 AM 11-Jul-13
Precast Pipe Track D110-B70-PR-42: F1 ( Pedestal ) Prior shuttering plat
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Cast-in- Situ Pipe stopper 4.1.a.b.c.d.
6253 RFI-5858-QCN-2-03929 RFI-5858-QCN-2-03929 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 W W H 9-Jul-13 8:30 AM 9-Jul-13
B70-PS-22: SLD003 prior concreting e
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-22:
6254 RFI-5858-QCN-2-03930 RFI-5858-QCN-2-03930 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 9-Jul-13 8:30 AM 11-Jul-13
SLD003
6255 RFI-5858-QCN-2-03931 RFI-5858-QCN-2-03931 CONCRETE Pre-Cast Items Check Erection of Precast of Culvert Covert of BZRC-010 APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_5 8.2 S W H 9-Jul-13 7:30 AM 9-Jul-13
6256 RFI-5858-QCN-2-03932 RFI-5858-QCN-2-03932 CONCRETE 6.4 Completion of 14 days water curing of Precast Lighting Ple Foundation = 7 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.4 S W H 9-Jul-13 8:30 AM 9-Jul-13
6257 Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03933 RFI-5858-QCN-2-03933 CONCRETE APPROVED B-V-3100-004-2-201-02_5 W W H 10-Jul-13 8:00 AM 10-Jul-13
cleaning of Cast-in- Situ Pipe Track D110-B70-PR-42: F5 ( Pedestal ) Raslaffan e
Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F5 Tank Farm
6258 RFI-5858-QCN-2-03934 RFI-5858-QCN-2-03934 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 10-Jul-13 8:00 AM 10-Jul-13
( Pedestal ) Raslaffan
6259 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03935 RFI-5858-QCN-2-03935 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 10-Jul-13 8:30 AM 10-Jul-13
39 ( Pedestal ) ( East Side )
7:30 AM
6260 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03936 RFI-5858-QCN-2-03936 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.3 S W H 10-Jul-13 to 10-Jul-13
Stopper B70-PS-30: SLD001, SLD025 and SLD026
11:30 AM
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
7:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
6261 RFI-5858-QCN-2-03937 RFI-5858-QCN-2-03937 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 10-Jul-13 to 10-Jul-13
D110-B70-PR-39: ( East Side )
11:30 AM
6262 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-03938 RFI-5858-QCN-2-03938 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.d.e W W H 10-Jul-13 9:30 AM 13-Jul-13
Precast Pipe Track D110-B70-PR-39:( West Side Pedestal ) (Prior to closer)
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Stopper B70-PS-22:
6263 RFI-5858-QCN-2-03939 RFI-5858-QCN-2-03939 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 10-Jul-13 8:30 AM 10-Jul-13
SLD003 ( Pedestal )
9:00 AM
6264 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-03940 RFI-5858-QCN-2-03940 CONCRETE APPROVED Section Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 10-Jul-13 to 10-Jul-13
Stopper B70-PS-22: SLD003 ( Pedestal )
11:30AM
6265 7.2 Check compressive strength@28 Days(Cube testing as per BS EN -12390-3) Culvert
RFI-5858-QCN-2-03941 RFI-5858-QCN-2-03941 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 11-Jul-13 2:00 PM 11-Jul-13
BZRC-011 ( 6.70 meters ) (2nd Base )
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
6266 RFI-5858-QCN-2-03942 RFI-5858-QCN-2-03942 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 W W H 11-Jul-13 8:00 AM 11-Jul-13 cancelled
cleaning of Precast Pipe Track D110-B70-PR-42: F1 ( Pedestal ) Raslaffan e
6267 Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F1 Tank Farm
RFI-5858-QCN-2-03943 RFI-5858-QCN-2-03943 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 5.1 W H H 11-Jul-13 8:00 AM 11-Jul-13 CANCELLED WORK NOT READY
( Pedestal ) Raslaffan
6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
6268 RFI-5858-QCN-2-03944 RFI-5858-QCN-2-03944 CONCRETE
42: F5 ( Pedestal ) and D110-B70-PR-39 ( Base West Side )
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Jul-13 8:30 AM 11-Jul-13
7:30 AM
6269 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-03945 RFI-5858-QCN-2-03945 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 11-Jul-13 to 11-Jul-13
D110-B70-PR-39: ( Base West Side )
11:30 AM
6.3 Check Concrete surface upon form removal of Precast of Miscellaneous Foundation
6270 RFI-5858-QCN-2-03946 RFI-5858-QCN-2-03946 CONCRETE
in Beach Valve Area D240-B10-XH-51: F1 = 2 nos and F2 = 2 nos
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 6.3 S W H 11-Jul-13 7:30 AM 11-Jul-13
7.2 Check compressive strength@28 Days for MIX:B (Cube testing as per BS EN -12390-
6271 RFI-5858-QCN-2-03947 RFI-5858-QCN-2-03947 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 13-Jul-13 2:00 PM 13-Jul-13
3) D110-RW-004(E-BZRC) EAST RETAINING WALL PROTECTION SLAB
Concrete Placement Check Concrete pouring of Pipe Track D110-B70-PR-42: F1 Tank Farm
6274 RFI-5858-QCN-2-03950 RFI-5858-QCN-2-03950 CONCRETE APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 13-Jul-13 8:00 AM 13-Jul-13
( Pedestal ) and D110-B70-PR-39: West Side ( Pedestal ) Raslaffan
7:30 AM
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-42:
6275 RFI-5858-QCN-2-03951 RFI-5858-QCN-2-03951 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 13-Jul-13 to 13-Jul-13
F5 and D110-B70-PR-39 ( Est Side )
10:30 AM
7:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
6276 RFI-5858-QCN-2-03952 RFI-5858-QCN-2-03952 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 13-Jul-13 to 13-Jul-13
D110-B70-PR-42: F5
9:30 AM
6277 RFI-5858-QCN-2-03953 RFI-5858-QCN-2-03953 CONCRETE Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-22: SLD003 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 13-Jul-13 8:30 AM 13-Jul-13
6278 Pre-Pouring Check Formworks, Reinforcement, Embedded items and Cleaning of Precast
RFI-5858-QCN-2-03954 RFI-5858-QCN-2-03954 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_5 4.1.a.b.c.d W W H 13-Jul-13 7:30 AM 13-Jul-13
Lighting Pole Foundation = 7 nos ( Pedestal ) prior concreting
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6279 RFI-5858-QCN-2-03955 RFI-5858-QCN-2-03955 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 14-Jul-13 11:00 AM 14-Jul-13
Culvert BZRC-010 ( 6.65 meters West Side ) (1 Base )
6280 RFI-5858-QCN-2-03956 RFI-5858-QCN-2-03956 CONCRETE Prepouring - Check form works,Embeded items,Cleaning DUCT BANK BZDP-006 APPROVED SECTION 2 CR# 15 B-V-3100-004-2-201-02_6 4.1a,c,d,e W W H 14-Jul-13 7:30 AM 14-Jul-13
SECTION 2
6281 RFI-5858-QCN-2-03957 RFI-5858-QCN-2-03957 CONCRETE Check Concrete Pouring DUCT BANK BZDP-006 APPROVED B-V-3100-004-2-201-02_6 5.1 W H H 14-Jul-13 8:00 AM 14-Jul-13
CROSSIING #15
6282 6.3 Check Concrete surface upon form removal of Cast-in- Situ Pipe Track D110-B70-PR-
RFI-5858-QCN-2-03958 RFI-5858-QCN-2-03958 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 6.3 S W H 14-Jul-13 8:30 AM 14-Jul-13
42: F1 ( Base and Pedestal ) and D110-B70-PR-39 ( Pedestal West Side )
6283 6.6 Contraction / Expansion Joints Check surface preparation and sealant application of
RFI-5858-QCN-2-03959 RFI-5858-QCN-2-03959 CONCRETE APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-02_6 6.6.a.b S W H 15--Jun-13 7:30 AM 15-Jul-13
Culvert BZRC-010
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
6.6 Contraction / Expansion Joints Check surface preparation and sealant application of
6284 RFI-5858-QCN-2-03960 RFI-5858-QCN-2-03960 CONCRETE APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-02_6 6.6.a.b S W H 15--Jun-13 7:30 AM 15-Jul-13
Culvert BZRC-011
7:30 AM
6285 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-03961 RFI-5858-QCN-2-03961 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 15--Jun-13 to 15-Jul-13
D110-B70-PR-39 ( West Side )
9:30 AM
7:30 AM
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-
6286 RFI-5858-QCN-2-03962 RFI-5858-QCN-2-03962 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 15--Jun-13 to 15-Jul-13
39( West Side )
10:30 AM
6287 RFI-5858-QCN-2-03963 RFI-5858-QCN-2-03963 CONCRETE Check concrete surface upon form removal DUCTBANK BZDP 006 APPROVED SECTION 2 CR# 15 B-V-3100-004-2-201-02_6 6.3 S W H 15--Jun-13 7:30 AM 15-Jul-13
6288 7.2 Check compressive strength@28 Days MIX B for (Cube testing as per BS EN
RFI-5858-QCN-2-03964 RFI-5858-QCN-2-03964 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 16-Jul-13 10:30 AM 16-Jul-13
-12390-3) DUCT BANK BZDP-009 (5.4 M PORTION)
7.2 Check compressive strength@28 Days MIX B for (Cube testing as per BS EN
6289 RFI-5858-QCN-2-03965 RFI-5858-QCN-2-03965 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 16-Jul-13 10:30 AM 16-Jul-13
-12390-3) Pipe Stopper Base B70-PS-22: SLD003
6290 4.4.3 Check compressive strength@28 Days for grout cube (Cube testing as per BS EN
RFI-5858-QCN-2-03966 RFI-5858-QCN-2-03966 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 4.4.3 S W H 16-Jul-13 10:30 AM 16-Jul-13
-12390-3) for D110-B70-PR-17 Pipe Rack Foundation 1(F1, F2, 2(F3,F4)
7:00 AM
6291 RFI-5858-QCN-2-03967 RFI-5858-QCN-2-03967 CONCRETE Check Surface Preparation ,First coat & Second coat DUCTBANK BZDP 006 APPROVED SECTION 2 CR# 15 B-V-3100-004-2-201-02_6 9.1&9.2a S W H 16-Jul-13 to 16-Jul-13
9:00 AM
6292 CROSSING#15
RFI-5858-QCN-2-03968 RFI-5858-QCN-2-03968 CONCRETE Check Polyetheylene & Hardboard Installation DUCTBANK BZDP 006 APPROVED B-V-3100-004-2-201-02_6 9.2.b&c S W H 16-Jul-13 11:30 AM 16-Jul-13
SECTION 2
CROSSING#15
6293 RFI-5858-QCN-2-03969 RFI-5858-QCN-2-03969 CONCRETE Check Concrete Curing DUCTBANK BZDP 006 APPROVED
SECTION 2
B-V-3100-004-2-201-02_6 6.4 S W H 16-Jul-13 9:00 AM 16-Jul-13
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and 4.1.a.b.c.d.
6295 RFI-5858-QCN-2-03971 RFI-5858-QCN-2-03971 CONCRETE
cleaning of Cast-in- Situ Box Foundation Type 105 = 23 nos prior concreting. (Pre cast)
APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_6
e
W W H 16-Jul-13 7:00 AM 16-Jul-13
Concrete Placement Check Concrete pouring of Precast Box Foundation Type 105 = 23
6296 RFI-5858-QCN-2-03972 RFI-5858-QCN-2-03972 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 16-Jul-13 7:30 AM 16-Jul-08
nos
Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- 4.1.a.b.c.d.
6297 RFI-5858-QCN-2-03973 RFI-5858-QCN-2-03973 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 W W H 16-Jul-13 8:00 AM 16-Jul-13
Situ retaining Wall E-W concrete ditch 5th panel prio concreting e
Concrete Placement Check Concrete pouring of cast-in- Situ Retaining Wall E-W
6298 RFI-5858-QCN-2-03974 RFI-5858-QCN-2-03974 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 16-Jul-13 8:00 AM 16-Jul-08
concrete Ditch 5th panel
6299 RFI-5858-QCN-2-03975 RFI-5858-QCN-2-03975 CONCRETE Check Polythylene & Hardboard Installation of Pipe Stopper Base B70-PS-30: SLD019 APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 16-Jul-13 8:30 AM 16-Jul-13
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6300 RFI-5858-QCN-2-03976 RFI-5858-QCN-2-03976 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 4.1a.b.d.e W W H 16-Jul-13 8:00 AM 16-Jul-13
Cast-in- Situ Pipe Stopper B70-PS-30: SLD019 prior shuttering. (Pedestal)
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6301 RFI-5858-QCN-2-03977 RFI-5858-QCN-2-03977 CONCRETE precast Pipe Track footing D110-B70-PR-42: F2= 1nos AND F3-1nos,Pipe Stopper APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 17-Jul-13 10:30 AM 17-Jul-13
Pedestal B70-PS-30- SLD054(Lean concrete for B70-PR-42-F3-1nos.
6303 Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and 4.1.a.b.c.d.
RFI-5858-QCN-2-03979 RFI-5858-QCN-2-03979 CONCRETE APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_6 W W H 17-Jul-13 7:30 AM 17-Jul-08
cleaning of Cast-in- Situ Box Foundation Type 107 = 4 nos prior concreting. e
6304 RFI-5858-QCN-2-03980 RFI-5858-QCN-2-03980 CONCRETE Concrete Placement Check Concrete pouring of Precast Box Foundation Type 107 = 4 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 17-Jul-13 8:00 AM 18-Jul-13
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6305 Culvert BZRC-011 ( 10.70 meters ) (End East side Wall ),Culvert BZRC-010 ( 8.850
RFI-5858-QCN-2-03981 RFI-5858-QCN-2-03981 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 18-Jul-13 10:30 AM 18-Jul-13
meters West Side ) ( Base ),Precast Pipe Track D110-B70-PR-42: F3 and F5 ( Base ),
cast-in- Situ Pipe Track D110-B70-PR-33: F1 ( Base ).
6306 RFI-5858-QCN-2-03982 RFI-5858-QCN-2-03982 CONCRETE Check Erection of Precast sleeper Sleeper foundation B70-PS-14 SLD009 & SLD010 APPROVED SECTION 4 Raslaffan B-V-3100-004-2-201-02_6 8.2 S W H 18-Jul-13 7:30 AM 18-Jul-13
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Pre-Pouring Check Formworks, Reinforcement and Cleaning of Cast -in situ Pipe Sleeper 4.1.a.b.c.d.
6307 RFI-5858-QCN-2-03983 RFI-5858-QCN-2-03983 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 W W H 18-Jul-13 7:30 AM 18-Jul-13
B70-PS-22: SLD001 ( Base ) e
6308 Concrete Placement Check Concrete pouring of Cast -in- Situ Pipe Sleeper B70-PS-22:
RFI-5858-QCN-2-03984 RFI-5858-QCN-2-03984 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 18-Jul-13 8:00 AM 18-Jul-13
SLD001 ( Base )
6311 Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-03987 RFI-5858-QCN-2-03987 CONCRETE CANCELLED B-V-3100-004-2-201-02_5 W W H 18-Jul-13 8:00 AM 18-Jul-08 CANCELLED WORK NOT READY
cleaning of Cast-in- Situ Pipe Stopper B710-PS-30: SLD019 Pedestal prior concreting Raslaffan e
Concrete Placement Check Concrete pouring of Pipe Stopper B70-PS-30: SLD019 Tank Farm
6312 RFI-5858-QCN-2-03988 RFI-5858-QCN-2-03988 CONCRETE CANCELLED B-V-3100-004-2-201-02_6 5.1 W H H 18-Jul-13 8:00 AM 18-Jul-08 CANCELLED WORK NOT READY
Pedestal Raslaffan
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6314 RFI-5858-QCN-2-03990 RFI-5858-QCN-2-03990 CONCRETE Cast-in- Situ Pipe Track D110-B70-PR-33: F1 ( Pedestal ). Culvert BZRC-010 ( 8.0 APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_5 7.2 S W H 20-Jul-13 10.30 AM 20-Jul-13
meters West Side ) ( Middle Base ).
6:30 AM
6315 Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - SECTION 4
RFI-5858-QCN-2-03991 RFI-5858-QCN-2-03991 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.3 S W H 20-Jul-13 to 20-Jul-13
First &Second Coat Sleeper foundation B70 PS 14 SLD050 TO SLD054 Raslaffan
9:30 AM
Pre-Pouring Check Formworks, Reinforcement, Embedded items, construction joint and Tank Farm 4.1.a.b.c.d.
6316 RFI-5858-QCN-2-03992 RFI-5858-QCN-2-03992 CONCRETE
cleaning of Cast-in- Situ Pipe Stopper B710-PS-30: SLD019 Pedestal prior concreting
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5
e
W W H 20-Jul-13 8:00 AM 20-Jul-13
Concrete Placement Check Concrete pouring of Pipe Stopper B70-PS-30: SLD019 Tank Farm
6317 RFI-5858-QCN-2-03993 RFI-5858-QCN-2-03993 CONCRETE APPROVED B-V-3100-004-2-201-02_6 5.1 W H H 20-Jul-13 8:00 AM 21-Jul-13
Pedestal Raslaffan
Concrete Placement Check Concrete pouring of Pipe Track D110-B70- STN-72 ( F1 and
6319 RFI-5858-QCN-2-03995 RFI-5858-QCN-2-03995 CONCRETE CANCELLED Gate 5 Raslaffan B-V-3100-004-2-201-02_5 5.1 W H H 20-Jul-13 8:00 AM 20-Jul-13 CANCELLED WORK NOT READY
F2 ) Pedestal
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6322 RFI-5858-QCN-2-03998 RFI-5858-QCN-2-03998 CONCRETE Precast Pipe Stopper B70-PS-30: SLD004 (Pedestal ) & (Lean concrete forPipe Stopper APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 21-Jul-13 10:30 AM 21-Jul-13
B70-PS-30: SLD034) .
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6323 RFI-5858-QCN-2-03999 RFI-5858-QCN-2-03999 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 4.1a.b.d.e W W H 21-Jul-13 8:30 AM 21-Jul-13
Cast-in- Situ Pipe Stopper B70-PS-22: SLD001 ( Pedestal ) prior shuttering
Concrete Placement Check Concrete pouring of Pipe Track D110-B70- STN-72 ( F1 and
6325 RFI-5858-QCN-2-04001 RFI-5858-QCN-2-04001 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 21-Jul-13 8:00 AM 21-Jul-13
F2 ) Pedestal
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-
6326 RFI-5858-QCN-2-04002 RFI-5858-QCN-2-04002 CONCRETE 3)Precast Pipe Track D110-B70-PR-42: F1 = 1 no and F2 = 2 nos ( Base ) &( Lean APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 22-Jul-13 10:30 AM 22-Jul-13
concrete forPipe B70-PS- SLD-016,B70-PS-30- Sld 42 &045)
4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
6327 RFI-5858-QCN-2-04003 RFI-5858-QCN-2-04003 CONCRETE CANCELLED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 22-Jul-13 10:30 AM 22-Jul-13 cancelled due to hot weather
-12390-3) for D110-B70-PR-36 Pipe Rack Foundation F1,F2,F3,F4
6328 6.3 Check Concrete surface upon form removal of Precast Lighting Pole Foundation = 7
RFI-5858-QCN-2-04004 RFI-5858-QCN-2-04004 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 6.3 S W H 22-Jul-13 8:30 AM 22-Jul-13
nos ( Base and Pedestal ) and CCTV Foundation = 4 nos
6329 6.3 Check Concrete surface upon form removal of Pipe Stopper Pedestal B710-PS-30:
RFI-5858-QCN-2-04005 RFI-5858-QCN-2-04005 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 6.3 S W H 22-Jul-13 8:30 AM 22-Jul-13
SLD019
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
6332 RFI-5858-QCN-2-04008 RFI-5858-QCN-2-04008 CONCRETE -12390-3) for D110-B70-PR-36 Pipe Rack Foundation F1,F2,F3,F4 & D110-B70-PR-28- APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 23-Jul-13 10:30 AM 23-Jul-13
F1 & F2.
6333 Check Polyetheylene Installation Check Hardboard Installation Sleeper Foundation B70- SECTION - 4
RFI-5858-QCN-2-04009 RFI-5858-QCN-2-04009 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 23-Jul-13 7:00 AM 23-Jul-13
PS -014 SLD003 TO SLD010 & B70-PS -015 SLD091 TO SLD095 Raslaffan
7:00 AM
6334 Check Surface Preparation ,First coat & Second coat D110-RW-003(W-BZRC) WEST Section4 D110-RW-
RFI-5858-QCN-2-04010 RFI-5858-QCN-2-04010 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.1&9.2a S W H 23-Jul-13 to 23-Jul-13
RETAINING WALL SOUTH SIDE 8th PANEL 003(W-BZRC)
10:00 AM
7:00 AM
6336 9.3. Check Surface preparation and protective coating first and Second coat of Pipe
RFI-5858-QCN-2-04012 RFI-5858-QCN-2-04012 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2 S W H 23-Jul-13 to 23-Jul-13
Stopper B70-PS-30: SLD019
9:00 AM
6338 Concrete Placement Check Concrete pouring of Precast Box Foundation Type 103 = 53
RFI-5858-QCN-2-04014 RFI-5858-QCN-2-04014 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 23-Jul-13 8:00 AM 23-Jul-13
nos and D240-XH-51 ( Misc ) = F5 = 2 nos
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD011 and Tank Farm
6339 RFI-5858-QCN-2-04015 RFI-5858-QCN-2-04015 CONCRETE
SLD048
APPROVED
Raslaffan
B-V-3100-004-2-201-02_5 8.2 S W H 23-Jul-13 8:00 AM 23-Jul-13
Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-30: SLD019 and
6340 RFI-5858-QCN-2-04016 RFI-5858-QCN-2-04016 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 23-Jul-13 8:30 AM 23-Jul-13
Sleeper B70-PS-30; SLD011 and SLD048
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
Precast Pipe Track D110-B70- STN-72 ( F1 and F2 Base ), Precast Pipe Track D110-
6341 RFI-5858-QCN-2-04017 RFI-5858-QCN-2-04017 CONCRETE
B70-PR-61 ( Base ),Culvert BZRC-010 ( 6.65 meters ) ( Wall ) & D110-RW-004(E-BZRC)
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 24-Jul-13 10:30 AM 24-Jul-13
EAST RETAINING WALL From East Side1st,3rd & 5th panel Base (South Side ).
Check Polyetheylene Installation Check Hardboard Installation D110-RW 003(W-BZRC) D110-RW 003(W-
6342 RFI-5858-QCN-2-04018 RFI-5858-QCN-2-04018 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 24-Jul-13 6:30 AM 24-Jul-13
West Retaining Wall South side 8th Panel BZRC)
7:00 AM
Check Surface Preparation ,First coat & Second coat D110-RW-004(E-BZRC) EAST Section4 D110-RW-
6345 RFI-5858-QCN-2-04021 RFI-5858-QCN-2-04021 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.1&9.2a S W H 24-Jul-13 To 24-Jul-13
RETAINING WALL 1,2,3,4&5th SOUTH SIDE PANEL ( NORTH PORTION ) 003(E-BZRC)
10:00 AM
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3) ipe
6346 RFI-5858-QCN-2-04022 RFI-5858-QCN-2-04022 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 25-Jul-13 10:30 AM 25-Jul-13
stopper pedestal B70-PS-30: SLD034
4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of Precast
6347 RFI-5858-QCN-2-04023 RFI-5858-QCN-2-04023 CONCRETE D240-B10-XH-51 = F1 = 2 nos and F2 = 2 nos D240-B10-STG-01 and D240-B10-STG-02 APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_6 a.b.d.e W W H 25-Jul-13 7:30 AM 28-Jul-13
= F1, F2, F3 and F4 ( Pedestal ) prior shuttering.
6351 SECTION - 4
RFI-5858-QCN-2-04027 RFI-5858-QCN-2-04027 CONCRETE Check Final Visual Inspection Sleeper foundation B70 PS 14 SLD050 TO SLD054 CANCELLED B-V-3100-004-2-201-02_6 9.2 S W H 25-Jul-13 10:30 AM 25-Jul-13 CANCELLED WORK NOT READY for final visuval inspection
Raslaffan
6352 Pre-Pouring Check Formworks, Reinforcement, Embedded items and Cleaning of Cast-
RFI-5858-QCN-2-04028 RFI-5858-QCN-2-04028 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 4.1.a.b.c.d W W H 25-Jul-13 7:30 AM 29-Jul-13
in- Situ Pipe Stopper B70-PS-22: SLD001 ( Pedestal ) prior concreting
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Concrete Placement Check Concrete pouring of Cast-in- Situ Pipe Stopper B70-PS-22:
6353 RFI-5858-QCN-2-04029 RFI-5858-QCN-2-04029 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 25-Jul-13 8:00 AM 29-Jul-13
SLD001 Pedestal
6354 SECTION - 2
RFI-5858-QCN-2-04030 RFI-5858-QCN-2-04030 CONCRETE Check Erection of Precast sleeper Sleeper Foundations B70-PS-08 SLD034 TO SLD030 APPROVED B-V-3100-004-2-201-02_6 8.2 S W H 25-Jul-13 11:00 AM 25-Jul-13
Raslaffan
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-30: SLD013 and Tank Farm
6355 RFI-5858-QCN-2-04031 RFI-5858-QCN-2-04031 CONCRETE APPROVED B-V-3100-004-2-201-02_6 8.2 S W H 25-Jul-13 8:00 AM 25-Jul-13
SLD014 Raslaffan
6356 Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-30: SLD019 and
RFI-5858-QCN-2-04032 RFI-5858-QCN-2-04032 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 25-Jul-13 8:30 AM 25-Jul-13
Sleeper B70-PS-30; SLD013 and SLD014
6357 Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- Section - 6 4.1.a.b.c.d.
RFI-5858-QCN-2-04033 RFI-5858-QCN-2-04033 CONCRETE APPROVED B-V-3100-004-2-201-02_6 W W H 25-Jul-13 7:00 AM 25-Jul-13
Situ retaining Wall E-W concrete ditch 4th and 6th panel prio concreting Raslaffan e
Concrete Placement Check Concrete pouring of cast-in- Situ Retaining Wall E-W Section - 6
6358 RFI-5858-QCN-2-04034 RFI-5858-QCN-2-04034 CONCRETE APPROVED B-V-3100-004-2-201-02_6 5.1 W H H 25-Jul-13 8:00 AM 25-Jul-13
concrete Ditch 4th and 6th panel Raslaffan
6359 Check Polyetheylene Installation Check Hardboard Installation D110-RW-004(E-BZRC) Section4 D110-RW-
RFI-5858-QCN-2-04035 RFI-5858-QCN-2-04035 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 25-Jul-13 8:30 AM 25-Jul-13
EAST RETAINING WALL NORTH & SOUTH SIDE PANEL 004(E-BZRC)
4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
6360 RFI-5858-QCN-2-04036 RFI-5858-QCN-2-04036 CONCRETE
-12390-3) for D110 - B70- PR-73 Pipe Rack Foundation 1(F1)& 2(F2).
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 25-Jul-13 3:30 PM 25-Jul-13
6361 Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70 SECTION - 2
RFI-5858-QCN-2-04037 RFI-5858-QCN-2-04037 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.2 S W H 27-Jul-13 6:30 AM 27-Jul-13
PS- 08 SLD0030 TO SLD0034 Raslaffan
6362 RFI-5858-QCN-2-04038 RFI-5858-QCN-2-04038 CONCRETE Check Laying of Asphalt Base Course Culvert BZRC-011 APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-03_7 5.2.2 S W H 27-Jul-13 7:30 AM 27-Jul-13
Check Grout Post pour Inspection for Pipe rack Foundations D110 - B70- PR-73 Pipe SECTION - 4
6363 RFI-5858-QCN-2-04039 RFI-5858-QCN-2-04039 CONCRETE APPROVED B-V-3100-004-2-201-02_4 4.1.1a,b&c S W H 27-Jul-13 7:30 PM 27-Jul-13
Rack Foundation 1(F1)& 2(F2) Raslaffan
6.3 Check Concrete surface upon form removal of Pipe Stopper Pedestal B710-PS-22:
6364 RFI-5858-QCN-2-04040 RFI-5858-QCN-2-04040 CONCRETE
SLD001 ( Base and Pedestal )
APPROVED Section - 6 Raslaffan B-V-3100-004-2-201-02_6 6.3 S W H 27-Jul-13 8:30 AM 27-Jul-13
8:30 AM
9.3. Check Surface preparation and protective coating first and Second coat of Pipe
6365 RFI-5858-QCN-2-04041 RFI-5858-QCN-2-04041 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 9.2 S W H 27-Jul-13 to 27-Jul-13
Sleeper B70-PS-22: SLD001
9:30 AM
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
Pipe Track D110-B70-PR-42: F4 ( Base ), Cast-in- Situ Culvert west side of BZRC-010
( 8.0 meters ) ( middle Wall ) &Cast-in- Situ Retaining Wall D110-RW-004 (E-BZRC) from
6366 RFI-5858-QCN-2-04042 RFI-5858-QCN-2-04042 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 28-Jul-13 10:30 AM 28-Jul-13
East side 2nd and 4th panel ( Base ) D110-RW-003 (E-BZRC) from West side 8th panel
( Base ) &Culvert BZRC-011 ( 6.70 meters ) ( End west side Wall ) and 1 no. Pipe Sleeper
Pedestal.
SECTION - 2
6367 RFI-5858-QCN-2-04043 RFI-5858-QCN-2-04043 CONCRETE Check Final Visual Inspection Sleeper foundation B70 PS- 08 SLD0030 TO SLD0034 APPROVED B-V-3100-004-2-201-02_6 10 S W H 28-Jul-13 10:30 AM 28-Jul-13
Raslaffan
6368 RFI-5858-QCN-2-04044 RFI-5858-QCN-2-04044 CONCRETE Check Laying of Asphalt Binder Course & Surface Course BZRC-011 APPROVED BZRC-011 Raslaffan B-V-3100-004-2-201-03_7 4.2.4 S W H 28-Jul-13 7:30 AM 28-Jul-13
6369 RFI-5858-QCN-2-04045 RFI-5858-QCN-2-04045 CONCRETE Check Polythylene & Hardboard Installation of Pipe Sleeper B70-PS-22: SLD001 APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 28-Jul-13 8:00 AM 28-Jul-13
6372 Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-61 ( Base ).
RFI-5858-QCN-2-04048 RFI-5858-QCN-2-04048 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 28-Jul-13 8:30 AM 28-Jul-13
North side
ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
6373 RFI-5858-QCN-2-04049 RFI-5858-QCN-2-04049 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 4.1a.b.d.e W W H 28-Jul-13 8:30 AM 28-Jul-13
Cast-in- Situ Pipe Track D110-B70-PR-61 prior shuttering north side
6:30 AM
Check Suraface Preparation & Above Ground Protective Coating of Sleeper foundations - SECTION - 2
6376 RFI-5858-QCN-2-04052 RFI-5858-QCN-2-04052 CONCRETE APPROVED B-V-3100-004-2-201-02_6 9.1 S W H 28-Jul-13 to 28-Jul-13
First &Second Coat Sleeper Foundations B70-PS-08 SLD034 TO SLD030 Raslaffan
9:30 AM
7:30 AM
6377 Check Polythylene & Hardboard Installation of Pipe Sleeper B70-PS-25: SLD004 and
RFI-5858-QCN-2-04053 RFI-5858-QCN-2-04053 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2.b.c S W H 29-Jul-13 to 29-Jul-13
SLD005
10:30AM
7:00 AM
9.3. Check Surface preparation and protective coating first and Second coat of Precast
6378 RFI-5858-QCN-2-04054 RFI-5858-QCN-2-04054 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_5 9.2. S W H 29-Jul-13 to 29-Jul-13
Lighting Pole Foundation = 7 nos
9:00 AM
6379 Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-04055 RFI-5858-QCN-2-04055 CONCRETE APPROVED B-V-3100-004-2-201-02_6 W W H 29-Jul-13 7:30 AM 29-Jul-13
Situ Pipe Trach D110-B70-PR-61 ( Pedestal ) prior concreting Raslaffan e
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-25: SLD004 and Tank Farm
6381 RFI-5858-QCN-2-04057 RFI-5858-QCN-2-04057 CONCRETE APPROVED B-V-3100-004-2-201-02_6 8.2 S W H 29-Jul-13 8:00 AM 29-Jul-13
SLD005 Raslaffan
6382 7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
RFI-5858-QCN-2-04058 RFI-5858-QCN-2-04058 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 30-Jul-13 10:30 AM 30-Jul-13
Pipe Track Base D110-B70-PR-61-F1 -1nos
4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
6383 RFI-5858-QCN-2-04059 RFI-5858-QCN-2-04059 CONCRETE
-12390-3) for D110-B70-PR-29 -F1,F2
APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 30-Jul-13 9:30 AM 30-Jul-13
6384 4.4.1 Check compressive strength@ 1 Day for grout cube (Cube testing as per BS EN
RFI-5858-QCN-2-04060 RFI-5858-QCN-2-04060 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.1 S W H 30-Jul-13 9:30 AM 30-Jul-13
-12390-3) for D110-B70-PR-40,56,57,58
Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- 4.1.a.b.c.d.
6385 RFI-5858-QCN-2-04061 RFI-5858-QCN-2-04061 CONCRETE
Situ retaining Wall E-W concrete ditch 7th and 9th panel prio concreting
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6
e
W W H 30-Jul-13 7:00 AM 5-Aug-13
Concrete Placement Check Concrete pouring of cast-in- Situ Retaining Wall E-W
6386 RFI-5858-QCN-2-04062 RFI-5858-QCN-2-04062 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 30-Jul-13 7:30 AM 30-Jul-13
concrete Ditch 7th and 9th panel
9.3. Check Surface preparation and First Coating of Pipe Sleeper and Pipe Stopper B70-
6387 RFI-5858-QCN-2-04063 RFI-5858-QCN-2-04063 CONCRETE
PS-22: SLD002 to SLD006 (PS-22 SLD033 stopper not inculded)
APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 9.3 S W H 30-Jul-13 7:30 AM 30-Jul-13
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6388 RFI-5858-QCN-2-04064 RFI-5858-QCN-2-04064 CONCRETE D110-RW-003(E-BZRC) EAST RETAINING WALL From East Side1st,3rd & 5th panel APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 31-Jul-13 10:30 AM 31-Jul-13
Wall (South Side ).
Check Polyetheylene Installation Check Hardboard Installation Sleeper foundation B70- SECTION - 4
6390 RFI-5858-QCN-2-04066 RFI-5858-QCN-2-04066 CONCRETE APPROVED B-V-3100-004-2-201-02_7 9.2 S W H 31-Jul-13 8:00 AM 31-Jul-13
PS-15 SLD096 SLD097 SLD099 & SLD0101 Raslaffan
6391 RFI-5858-QCN-2-04067 RFI-5858-QCN-2-04067 CONCRETE Check Laying of Asphalt Base Course Culvert BZRC-010 ( West Side ) APPROVED BZRC-011 Raslafan B-V-3100-004-2-201-03_8 5.2.2 S W H 31-Jul-13 7:30 AM 1-Aug-13
Pre-Cast Items Check Erection of Precast of Pipe Sleeper B70-PS-22: SLD010 and
6392 RFI-5858-QCN-2-04068 RFI-5858-QCN-2-04068 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 8.2 S W H 31-Jul-13 7:00 AM 31-Jul-13
SLD008
6393 Check Polythylene & Hardboard Installation of Pipe Stopper B70-PS-22: SLD008 and
RFI-5858-QCN-2-04069 RFI-5858-QCN-2-04069 CONCRETE APPROVED Section 6 Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 31-Jul-13 8:30 AM 31-Jul-13
SLD010
6394 RFI-5858-QCN-2-04070 RFI-5858-QCN-2-04070 CONCRETE Check Polythylene & Hardboard Installation of Pipe Track D110-B70-PR-42 : F4 ( Base ) APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 31-Jul-13 7:30 AM 31-Jul-13
6395 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-04071 RFI-5858-QCN-2-04071 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 4.1a.b..d.e W W H 31-Jul-13 9:30 AM 31-Jul-13
Cast-in- Situ Pipe Track D110-B70-PR-42 : F4 ( Pedestal ) prior shuttering
6397 RFI-5858-QCN-2-04073 RFI-5858-QCN-2-04073 CONCRETE Concrete Placement Check Concrete pouring of Precast B10-Y102 ; F2 = 3 nos ( Base ) APPROVED Gate # 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 31-Jul-13 7:30 AM 31-Jul-13
6398 7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
RFI-5858-QCN-2-04074 RFI-5858-QCN-2-04074 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 1-Aug-13 10:30 AM 1-Aug-13
Cast-in- Situ Culvert west side of BZRC-010 ( 8.85 meters ,Wall & End wall)
PROJECT TITLE.: BARZAN ONSHORE PROJECT
CONTRACT NO .: P3100-004
QCON JOBNO .: Q496/821
Check Erection of Precast Loop foundation D110 - B70- PR-66 Pipe Rack Foundation SECTION - 4
6399 RFI-5858-QCN-2-04075 RFI-5858-QCN-2-04075 CONCRETE APPROVED B-V-3100-004-2-201-02_6 8.2 S W H 1-Aug-13 7:30 AM 1-Aug-13
1(F1,F2) & 2(F1,F2) Raslaffan
6400 Check Polyetheylene Installation Check Hardboard Installation D110- B70-PR-73 Pipe
RFI-5858-QCN-2-04076 RFI-5858-QCN-2-04076 CONCRETE APPROVED Section - 4 PR - 66 B-V-3100-004-2-201-02_6 9.2.b&c S W H 1-Aug-13 9:00 AM 1-Aug-13
Rack Foundation 1 (F1) & 2(F2)
7:30 AM
9.3. Check Surface preparation and First Coating of Pipe Sleeper B70-PS-22: SLD0008,
6401 RFI-5858-QCN-2-04077 RFI-5858-QCN-2-04077 CONCRETE APPROVED Section - 6 Raslaffan B-V-3100-004-2-201-02_6 9.3 S W H 1-Aug-13 to 1-Aug-13
SLD010, SLD011, SLD012
11:30 AM
6402 Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- Tank Farm 4.1.a.b.c.d.
RFI-5858-QCN-2-04078 RFI-5858-QCN-2-04078 CONCRETE OPEN B-V-3100-004-2-201-02_6 W W H 1-Aug-13 7:30 AM
Situ Pipe Trach D110-B70-PR-61 and D110-B70-PR-42: F4 prior concreting Raslaffan e
6403 Concrete Placement Check Concrete pouring of cast-in- Situ Pipe Track D110-B70-PR-61 Tank Farm
RFI-5858-QCN-2-04079 RFI-5858-QCN-2-04079 CONCRETE APPROVED B-V-3100-004-2-201-02_6 5.1 W H H 1-Aug-13 8:00 AM 1-Aug-13
and D110-B70-PR-42: F4 ( Pedestal ) Raslaffan
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6404 RFI-5858-QCN-2-04080 RFI-5858-QCN-2-04080 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 3-Aug-13 10:30 AM 3-Aug-13
Pipe Track D110-B70-PR-42-F2-3nos, And F3-2nos Pedestal.
6405 4.4.3 Check compressive strength@ 28 Day for grout cube (Cube testing as per BS EN
RFI-5858-QCN-2-04081 RFI-5858-QCN-2-04081 CONCRETE APPROVED RMQ Lab Raslaffan B-V-3100-004-2-208-02_4 4.4.3 S W H 3-Aug-13 10:30 AM 3-Aug-13
-12390-3) for D110-B70-PR-37,38,54 & 55
Pre-Pouring Check Formworks, Embedded items and cleaning of Precast Fence Post = 4.1.a.b.c.d.
6406 RFI-5858-QCN-2-04082 RFI-5858-QCN-2-04082 CONCRETE
61 nos prior concreting
APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6
e
W W H 3-Aug-13 7:00 AM 3-Aug-13
6407 RFI-5858-QCN-2-04083 RFI-5858-QCN-2-04083 CONCRETE Concrete Placement Check Concrete pouring of Precast Fence Post = 61 nos APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 3-Aug-13 7:30 AM 5-Aug-13
6408 RFI-5858-QCN-2-04084 RFI-5858-QCN-2-04084 CONCRETE Check Laying of Asphalt Binder Course & Surface Course Culvert BZRC-010 APPROVED BZRC-010 Raslaffan B-V-3100-004-2-201-03_7 4.2.4 S W H 3-Aug-13 7:30 AM 3-Aug-13
7:30 AM
9.3. Check Surface preparation and First Coating of Pipe Sleeper and Pipe Stopper B70-
6409 RFI-5858-QCN-2-04085 RFI-5858-QCN-2-04085 CONCRETE APPROVED Section - 6 Raslaffan B-V-3100-004-2-201-02_6 9.3 S W H 3-Aug-13 to 3-Aug-13
PS-22: SLD003 SLD008, SLD010, SLD011, SLD012, SLD013, SLD014 and SLD015
11:30AM
6.3 Check Concrete surface upon form removal of Pipe Track D110-B70-PR-42: F4 and
6410 RFI-5858-QCN-2-04086 RFI-5858-QCN-2-04086 CONCRETE
D110-B70-PR-61 ( Pedestal )
APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 6.3. S W H 3-Aug-13 8:30 AM 3-Aug-13
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
D110-RW-003(E-BZRC) EAST RETAINING WALL From East Side2nd &4th panel Wall
6411 RFI-5858-QCN-2-04087 RFI-5858-QCN-2-04087 CONCRETE (South Side ).D110-RW-004(W-BZRC) EAST RETAINING WALL From East Side 8th APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 4-Aug-13 10:30 AM 4-Aug-13
Panel. & Precast of Miscellaneous Foundation in Beach Valve Area D240-B10-XH-51: F1
= 2 nos, F2 = 2 nos and D240-B10- STG-01 & D240-B10- STG-02: F1, F2, F3 and F4 .
Pre-Pouring Check Formworks, Reinforcement and cleaning of Cast-in-situ Pipe Stopper Tank Farm
6414 RFI-5858-QCN-2-04090 RFI-5858-QCN-2-04090 CONCRETE APPROVED B-V-3100-004-2-201-02_6 4.1.a.b..e W W H 4-Aug-13 7:00 AM 4-Aug-13
B70-PS-31: SLD012 and B70-PS-32: SLD015 ( Base ) prior concreting Raslaffan
Concrete Placement Check Concrete pouring of Cast-in-situ Pipe Stopper B70-PS-31: Tank Farm
6415 RFI-5858-QCN-2-04091 RFI-5858-QCN-2-04091 CONCRETE OPEN B-V-3100-004-2-201-02_5 5.1 W H H 4-Aug-13 7:30 AM
SLD012 ans B70-PS-32: SLD015 ( Base ) Raslaffan
6416 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-04092 RFI-5858-QCN-2-04092 CONCRETE APPROVED Gate 5 Raslaffan B-V-3100-004-2-201-02_6 4.1a.b.d.e W W H 4-Aug-13 7:00 AM 4-Aug-13
Precast B10-Y102: F2 = 3 nos ( Pedestal ) prior shuttering
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)
6417 RFI-5858-QCN-2-04093 RFI-5858-QCN-2-04093 CONCRETE Pipe Track D110-B70-PR-61 ( Pedestal ), &Precast CCTV Foundation 4 nos for Beach APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 5-Aug-13 10:30 AM 5-Aug-13
Valve area.
7:00 AM
6418 9.3. Check Surface preparation and protective coating first and Second coat of Pipe Track
RFI-5858-QCN-2-04094 RFI-5858-QCN-2-04094 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 9.2 S W H 5-Aug-13 to 5-Aug-13
D110-B70-PR-42: F4 and D110-B70-PR-61 ( North Side )
8:30 AM
7:30 AM
Check Polythylene & Hardboard Installation of Cast-in- Situ Pipe Track D110-B70-PR-42:
6419 RFI-5858-QCN-2-04095 RFI-5858-QCN-2-04095 CONCRETE APPROVED Tank Farm Raslaffan B-V-3100-004-2-201-02_6 9.2.b.c S W H 5-Aug-13 to 5-Aug-13
F4 and D110-B70-PR-61 ( North Side )
10:30AM
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)Pipe
6420 RFI-5858-QCN-2-04096 RFI-5858-QCN-2-04096 CONCRETE Track D110-B70-PR-39 ( Base and Pedestal ) (East side pedestal /w side base) &Pipe APPROVED RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 6-Aug-13 10:30 AM 6-Aug-13
Stopper pedestal B70-PS-22: SLD003.
6423 ITP item 4.1 Pre - Pouring Check Reinforcement and Construction joints and cleaning of
RFI-5858-QCN-2-04099 RFI-5858-QCN-2-04099 CONCRETE OPEN Tank farm Raslaffan B-V-3100-004-2-201-02_6 4.1.a.b..d.e W W H 6-Aug-13 7:00 AM
Pipe Stopper B70-PS-31: SLD012 and B70-PS-32: SLD015 ( Pedestal ) prior shuttering.
6425 RFI-5858-QCN-2-04101 RFI-5858-QCN-2-04101 CONCRETE 6.4 Completion of 14 days water curing of CCTV Foundation = 4 nos OPEN Gate 5 Raslaffan B-V-3100-004-2-201-02_6 6.4 S W H 6-Aug-13 8:30 AM
6426 RFI-5858-QCN-2-04102 RFI-5858-QCN-2-04102 CONCRETE 6.4 Completion of 14 days water curing of Pipe Stopper B70-PS-22: SLD003 ( Base ) OPEN Gate 5 Raslaffan B-V-3100-004-2-201-02_6 6.4 S W H 6-Aug-13 8:30 AM
6427 RFI-5858-QCN-2-04103 RFI-5858-QCN-2-04103 CONCRETE 6.4 Completion of 14 days water curing of Lighting Pole Foundation = 7 nos ( Pedestal ) OPEN Gate 5 Raslaffan B-V-3100-004-2-201-02_6 6.4 S W H 6-Aug-13 8:30 AM
6428 RFI-5858-QCN-2-04104 RFI-5858-QCN-2-04104 CONCRETE 6.4 Completion of 14 days water curing of Retaining Wall E-W Concrete Ditch 5th panel OPEN Section 5 Raslaffan B-V-3100-004-2-201-02_6 6.4 S W H 6-Aug-13 8:30 AM
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-3)Pipe
6429 RFI-5858-QCN-2-04105 RFI-5858-QCN-2-04105 CONCRETE
Track D110-B70-PR-42-F5-1nos Pedestal
OPEN RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 7-Aug-13 10:30 AM
6430 4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
RFI-5858-QCN-2-04106 RFI-5858-QCN-2-04106 CONCRETE OPEN Tank Farm Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 7-Aug-13 9:30 AM
Track D110-B70-PR-36: F1, F2, F3 and F4 and D110-B70-PR-40, 56, 57 and 58
Pre-Pouring Check Formworks, Reinforcement, construction joint and cleaning of Cast-in- 4.1.a.b.c.d.
6431 RFI-5858-QCN-2-04107 RFI-5858-QCN-2-04107 CONCRETE
Situ retaining Wall E-W concrete ditch 8th and 10th panel prio concreting
OPEN Section 6 Raslaffan B-V-3100-004-2-201-02_6
e
W W H 7-Aug-13 7:00 AM
Concrete Placement Check Concrete pouring of cast-in- Situ Retaining Wall E-W
6432 RFI-5858-QCN-2-04108 RFI-5858-QCN-2-04108 CONCRETE OPEN Section 6 Raslaffan B-V-3100-004-2-201-02_6 5.1 W H H 7-Aug-13 7:30 AM
concrete Ditch 8th and 10th panel
4.2 Check Post Pour Inspection- Removal of of forms, curing and voids check of Pipe
6433 RFI-5858-QCN-2-04109 RFI-5858-QCN-2-04109 CONCRETE
Track D110-B70-PR-28: F1 and F2
OPEN Section 6 Raslaffan B-V-3100-004-2-201-02_4 4.2 S W H 7-Aug-13 9:30 AM
7.2 Check compressive strength@28 Days for (Cube testing as per BS EN -12390-
6434 RFI-5858-QCN-2-04110 RFI-5858-QCN-2-04110 CONCRETE 3)Precast Lighting Pole Foundation = 7 nos ( Pedestal ),Pipe Track D110-B70-PR-42: F1 OPEN RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 10-Aug-13 10:30 AM
(Precast Pedestal ) and D110-B70-PR-39: West Side ( Pedestal cat-in- Situ ).
7.2 Check compressive strength@28 Days for MIX:B (Cube testing as per BS EN -12390-
6435 RFI-5858-QCN-2-04111 RFI-5858-QCN-2-04111 CONCRETE OPEN RMQ Lab Raslaffan B-V-3100-004-2-201-02_6 7.2 S W H 11-Aug-13 10:30 AM
3)DUCT BANK BZDP 006
QG Gate#5 TSF
6436 RFI-5858-QCN-3-0001 RFI-5858-QCN-3-0001 STRUCTURAL Welder qualification for the Stud welding WPS No. QCN-W-ST01/A APPROVED B-V-3100-004-3-202-01_2 NA W H H 19-Apr-12 8:00 AM 22-Apr-12
laydown Area
6:00 AM
QCN -BZ-TCF
6437 RFI-5858-QCN-3-0002 RFI-5858-QCN-3-0002 STRUCTURAL Cut and re-weld of dimensionally incorrect items. APPROVED B-V-3100-004-3-202-01_2 4.7 S W H 28-Aug-12 to 30-Aug-12
Raslaffan Area
5:00 PM
6:00 AM 01-Sep-12
QCON - BZ-TCF
6438 RFI-5858-QCN-3-0003 RFI-5858-QCN-3-0003 STRUCTURAL Cut and re-weld of dimensionally incorrect items. APPROVED B-S-B00-1520-552_2 4.7.a S W H 1-Sep-12 to 6-Sep-12 To
Raslaffan Area
5:00 AM 06-Set-12
6:00 AM 08-Sep-12
6439 Qcon-BZ-TCF Site
RFI-5858-QCN-3-0004 RFI-5858-QCN-3-0004 STRUCTURAL Cut and re-weld of dimensionally incorrect items. APPROVED B-S-B00-1520-552_2 4.7.a S W H 8-Sep-12 to 12-Sep-12 To
Raslaffan Area
5:00 AM 13-Sep-12
Check Release of foundation, Anchor BOLTS, Chipping and shim plates/ Pads prior to
D110-B70-PR-09 &
6440 RFI-5858-QCN-3-0005 RFI-5858-QCN-3-0005 STRUCTURAL the steel erection of D110-B70-PR-09 and D110-B70-PR-46 as per Attached Drawing and APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 15-Sep-12 8:00 AM 15-Sep-12
PR-46 Raslaffan Area
Document.
6441 Check BOLT Tightening (Prior to the Steel structure erection D110-B70-PR-09 and D110- D110-B70-PR-09 &
RFI-5858-QCN-3-0006 RFI-5858-QCN-3-0006 STRUCTURAL CANCELLED B-V-3100-004-3-202-01_2 6.1 W H H 15-Sep-12 8:00 AM 15-Sep-12 Cancelled (The same will be offered afer erection as per ITP)
B70-PR-46 as Attached Drawing. PR-46 Raslaffan Area
Check Final Orientation, Plumbness, Elevation, Leveling & Alignment Check D110-B70- D110-B70-PR-09
6447 RFI-5858-QCN-3-0012 RFI-5858-QCN-3-0012 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 5.1 S H H 26-Sep-12 7:00 AM 26-Sep-12
PR-09 Raslaffan Area
6448 Check Final Orientation, Plumbness, Elevation, Leveling & Alignment Check D110-B70- D110-B70-PR-46
RFI-5858-QCN-3-0013 RFI-5858-QCN-3-0013 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 5.1 S H H 26-Sep-12 7:00 AM 26-Sep-12
PR-46 Raslaffan Area
D110-B70-PR-09
6449 CHECK BOLT TIGHTNING OF D110-B70-PR-09 AS PER ATTACHED DOCUMENTS
RFI-5858-QCN-3-0014 RFI-5858-QCN-3-0014 STRUCTURAL APPROVED OFF-PLOT Raslaffan B-V-3100-004-3-202-01_2 6.1 W H H 27-Sep-12 9:00 AM 27-Sep-12
AND DRAWINGS.
Aarea
D110-B70-PR-46
CHECK BOLT TIGHTNING OF D110-B70-PR-46 AS PER ATTACHED DOCUMENTS
6450 RFI-5858-QCN-3-0015 RFI-5858-QCN-3-0015 STRUCTURAL APPROVED OFF-PLOT Raslaffan B-V-3100-004-3-202-01_2 6.1 W H H 27-Sep-12 9:00 AM 27-Sep-12
AND DRAWINGS.
Aarea
D110-B70-PR-03
6451 CHECK RELEASE OF FOUNDATION ,ANCHOR BOLTS,CHIPPING AND SHIM
RFI-5858-QCN-3-0016 RFI-5858-QCN-3-0016 STRUCTURAL CANCELLED OFF-PLOT Raslaffan B-V-3100-004-3-202-01_2 3.1 S/R W H 27-Sep-12 9:00 AM 27-Sep-12
PLATES/PADS PRIOR TO THE STEEL ERECTION OF D110-B70-PR-03.
Aarea
D110-B70-PR-05
CHECK RELEASE OF FOUNDATION ,ANCHOR BOLTS,CHIPPING AND SHIM
6452 RFI-5858-QCN-3-0017 RFI-5858-QCN-3-0017 STRUCTURAL
PLATES/PADS PRIOR TO THE STEEL ERECTION OF D110-B70-PR-05.
CANCELLED OFF-PLOT Raslaffan B-V-3100-004-3-202-01_2 3.1 S/R W H 27-Sep-12 9:00 AM 27-Sep-12
Aarea
6453 Check Final Orientation, Plumbness, Elevation, Leveling & Alignment Check D110-B70- D110-B70-PR-11 Off-
RFI-5858-QCN-3-0018 RFI-5858-QCN-3-0018 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 9.2.b,c S H H 30-Sep-12 7:00 AM 30-Sep-12
PR-11 Plot Raslaffan Area
Check Release of Foundation, anchor bolts, Chipping and shim Plates/pads Prior to the D110-B70-PR-10 Off-
6455 RFI-5858-QCN-3-0020 RFI-5858-QCN-3-0020 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 3-Oct-12 9.00 AM 3-Oct-12
steel Erection of D110-B70-PR-10 As per attached Drawings and Document. Plot Raslaffan Area
Check Release of Foundation , anchore Bolts, Chipping and Shim Plate/Pad Prior to the D110-B70-PR-03 Off-
6456 RFI-5858-QCN-3-0021 RFI-5858-QCN-3-0021 STRUCTURAL
steel Erection of D110-B70-PR-03
APPROVED
Plot Raslaffan
B-V-3100-004-3-202-01_2 3.1 S/R W H 6-Oct-12 10.00 AM 7-Oct-12
6464 Check Release of Foundation, anchor Bolts, Chipping and shim Plate/Pad Prior to the D110-B70-PR-44 Off-
RFI-5858-QCN-3-0029 RFI-5858-QCN-3-0029 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 14-Oct-12 10:00 AM 14-Oct-12
steel Erection of D110-B70-PR-44, Grid - 6 (F3), Grid - 7 (F1) Plot Raslaffan Area
D110 B70 - PR - 10
6465 RFI-5858-QCN-3-0030 RFI-5858-QCN-3-0030 STRUCTURAL Check Bolt Tightening (High Strength Bolts) of D110-B70-PR-10 APPROVED B-V-3100-004-3-202-01_2 6.1 W H H 17-Oct-12 9:00 AM 17-Oct-12
Raslaffan
6469 Check Release of Foundation, Anchor bolts, Chipping and shim Plate/Pad Prior to the D110+B70-PR-44
RFI-5858-QCN-3-0034 RFI-5858-QCN-3-0034 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 3-Nov-12 8:30 AM 3-Nov-12
Steel Erection of D110-B70-PR-44, GRID -2(F7), GRID - 3(F5) OFF-PLOT Area
D110-B70-PR-
CHECK FINAL OREINTATION,PLUMBNESS,ELAVATION,LEVELING & ALIGNMENT
6470 RFI-5858-QCN-3-0035 RFI-5858-QCN-3-0035 STRUCTURAL APPROVED 48,PR-14,PR-15. B-V-3100-004-3-202-01_2 5.1 S H H 4-Nov-12 9:00AM 4-Nov-12
CHECK. D110-B70-PR-48 D110-B70-PR-14, D110-B70-PR-15
OFF-PLOT
D110-B70-PR-
6471 CHECK BOLT TIGHTENING (HIGH STRENGTH BOLTS) OF D110-B70-PR-14.D110-
RFI-5858-QCN-3-0036 RFI-5858-QCN-3-0036 STRUCTURAL APPROVED 07,PR-13,PR-47 OFF- B-V-3100-004-3-202-01_2 6.1 W H H 5-Nov-12 9:00 AM 5-Nov-12
B70-PR-15D110-B70-PR-48
PLOT
D110-B70-PR -
6474 CHECK BOLT TIGHTENING OF ANCHOR BOLTS OF D110-B70-PR-46 D110-B-PR-
RFI-5858-QCN-3-0039 RFI-5858-QCN-3-0039 STRUCTURAL APPROVED 46,09,10,11. OFF- B-V-3100-004-3-202-01_2 6.2 W H H 13-Nov-12 9:00 AM 14-Nov-12
09.D110-B70-PR-10. D110-B70-PR-11.
PLOT
D110-B70-PR-
6478 RFI-5858-QCN-3-0043 RFI-5858-QCN-3-0043 STRUCTURAL CHECK BOLT TIGHTENING (HIGH STRENGTH BOLTS)..D110-B70-PR-04 APPROVED B-V-3100-004-2-201-02_5 5.1 W H H 27-Nov-12 9:00 AM 27-Nov-12
03,PR-04. OFF-PLOT
D110-B70-PR-46 ,
6481 RFI-5858-QCN-3-0046 RFI-5858-QCN-3-0046 STRUCTURAL FINAL VISUAL INSPECTION.D110-B70-PR-46D110-B70-PR-11 CANCELLED B-V-3100-004-3-202-02_2 10.0 W W H 1-Dec-12 9:00 AM 1-Dec-12
PR-11 OFF-PLOT
Check Release of Foundation, Anchor bolts, Chipping and shim Plate/pad Prior to the D110-B70-PR-44 Off-
6482 RFI-5858-QCN-3-0047 RFI-5858-QCN-3-0047 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 3-Dec-12 9:00 AM 3-Dec-12
steel Erection of D110-B70-PR-44, GRID - 1 (A & B) Plot Area
Check Release of Foundation, Anchor bolts, Chipping and shim Plate/pad Prior to the D110-B70-PR-45 Off-
6483 RFI-5858-QCN-3-0048 RFI-5858-QCN-3-0048 STRUCTURAL APPROVED B-V-3100-004-3-202-01_2 3.1 S/R W H 3-Dec-12 9:00 AM 3-Dec-12
steel Erection of D110-B70-PR-45 Plot Area
D110-B70-PR-
CHECK FINAL OREINTATION,PLUMBNESS,ELAVATION,LEVELING & ALIGNMENT
6484 RFI-5858-QCN-3-0049 RFI-5858-QCN-3-0049 STRUCTURAL APPROVED 47,PR-13,PR-07. B-V-3100-004-3-202_02_2 5.1 S H H 9-Dec-12 9:00AM 9-Dec-12
CHECK. D110-B70-PR-47 D110-B70-PR-13, D110-B70-PR-07
OFF-PLOT
D110-B70-PR-
CHECK BOLT TIGHTENING (HIGH STRENGTH BOLTS).D110-B70-PR-07D110-B70-
6486 RFI-5858-QCN-3-0051 RFI-5858-QCN-3-0051 STRUCTURAL APPROVED 47,PR-13,PR-07 OFF- B-V-3100-004-3-202-01_2 6.1 W H H 12-Dec-12 9:00AM 12-Dec