1 DESIGN BASIS FOR STP
S.No Particulars Units Value Remarks
Page 12
1 DESIGN BASIS FOR STP
S.No Particulars Units Value Remarks
1 pH 6-8.5
2 mg/L 10
3 COD mg/L 50
4 TSS mg/L 10
5 NH3-N mg/L 2
6 TP mg/L 2
7 FC MPN/100 ml 100
Page 13
2.1 DESIGN FOR STILLING CHAMBER
S.No Particulars Value Units
Stilling chamber
Flow = 632.5 m3/hr
= 0.176 m3/sec
Detention time in stilling chamber DT = 30 Sec
Page 14
2.2 DESIGN FOR MECHANICAL FINE SCREEN
S.No Particulars Value Units
Mechanical Fine Screen Chamber
Flow = 632.5 m3/hr
= 0.176 m3/sec
Velocity of flow through screen v1 = 0.9 m/sec
(Assume between 0.6-1.2 m/s)
Area of flow through screen As=Flow/v1 = 0.2 m2
Side water depth SWD = 0.7 m
Free board FB = 0.5 m
Total width of clear opening
Wo=As/SWD = 0.29 m
Cleas space between bars Cs = 6 mm
Number of clear spaces Nc=Wo/Cs = 49 Nos
Number of Bars Nb=Nc-1 = 48 Nos
Width of each bars Wb = 2 mm
Width of screen Ws=(Nc*Cs)+(Nb*Wb)
= 0.39
Say = 0.4
Additional width Wa = 0.3
Width of screen chamber W = 0.7
Page 15
2.2 DESIGN FOR MECHANICAL FINE SCREEN
S.No Particulars Value Units
Depth of screen chamber D = 1.2 m
Page 16
2.3 DESIGN FOR MANUAL FINE SCREEN
S.No Particulars Value Units
1.2.1 Manual Fine Screen Chamber
Flow = 632.5 m3/hr
= 0.176 m3/sec
Velocity of flow through screen v1 = 0.9 m/sec
(Assume between 0.6-1.2 m/s)
Area of flow through screen As=Flow/v1 = 0.2 m2
Side water depth SWD = 0.7 m
Free board FB = 0.5 m
Total width of clear opening
Wo=As/SWD = 0.29 m
Cleas space between bars Cs = 10 mm
Number of clear spaces Nc=Wo/Cs = 29 Nos
Number of Bars Nb=Nc-1 = 28 Nos
Width of each bars Wb = 9 mm
Width of screen Ws=(Nc*Cs)+(Nb*Wb)
= 0.542
Say = 0.7
Additional width Wa = 0
Width of screen chamber W = 0.7
Page 17
2.3 DESIGN FOR MANUAL FINE SCREEN
S.No Particulars Value Units
Depth of screen chamber D = 1.2 m
Page 18
2.4 DESIGN FOR GRIT CHAMBER
S.No Particulars Value Units
1.2.1 Grit Chamber
Total flow = 632.5m3/hr
= 0.176m3/sec
Number of Working units = 1Nos
Number of Standby units = 0Nos
Flow = 632.5m3/hr
Q = 0.176m3/sec
Kinematic viscocity of sewage at 15C v = 0.00000114 m2/sec
Diameter of settling particle d = 0.15 mm
Specific gravity of particle S = 2.65
Page 19
2.4 DESIGN FOR GRIT CHAMBER
S.No Particulars Value Units
Surface area of grit chamber A=Q/(Q/A) = 15.82 m2
Assume Detention time in grit chamber
DT = 60 sec
Volume of grit chamber V=DT*Q = 10.56 m3
Active water depth required SWD = 0.67 m
Say 1 m
Free board FB = 0.5 m
Square grit chamber
Length of grit chamber L = 4 m
Width of grit chamber W = 4 m
Tota depth D = 1.5 m
Page 20
2.5 DESIGNFOR PARSHALL FLUME
S.No Particulars Value Units
1.2.1 Parshall Flume
Flow = 632.5 m3/hr
Q = 0.176 m3/sec
Peak flow (Q max) Q = 15.2 MLD
Source: CPHEEO Manual Parshall Flume
For 5-30 MLD Peak flow
CPHEEO W = 150 mm
CPHEEO A = 610 mm
B=1.5*Qmax^(1/3) = 841 mm
Value of B from CPHEEO = 600 mm
Considered B to be not less than CPHEEO value
Therefore B = 841 mm
C = 315 mm
Value of D from CPHEEO = 391 mm
From CPHEEO Data D/B = 0.65
For same D/B ratio D = 549 mm
F = 300 mm
G = 600 mm
K = 75 mm
Z = 113 mm
Page 21
2.5 DESIGNFOR PARSHALL FLUME
S.No Particulars Value Units
Say = 6.0 m
Width of Channel W = 0.6 m
Total depth of channel D = 1.10 m
Free Board 0.5m Say 1.1 m
Page 22
2.6 DESIGN FOR DIVISION BOX
S.No Particulars Value Units
1.2.1 Division Box
Flow = 632.5 m3/hr
= 0.176 m3/sec
Detention time DT = 10 Sec
Channel
Velocity in Channel v = 0.6 m/sec
Side Water depth SWD = 0.5 m
Cross section area A = 0.3 m2
Width of Channel W = 0.6 m
Free Board FB = 0.3 m
Page 23
2.7 DESIGN FOR SBR
S.No Particulars Value Units
1.2.1 SBR Basin
Total volume of sewage treated Vf = 6180 m3/day
Basin Sizing
Volume of sewage treated Vf = 6180 m3/day
BOD in influent BOD_i = 250 mg/l
MLSS MLSS = 3800 mg/l
MLVSS/MLSS MLVSS = 0.7
Page 24
2.7 DESIGN FOR SBR
S.No Particulars Value Units
Fill volume per basin = 1030 m3
Decant depth conssiderd = 2.2 m
Length of basin = 26 m
Width of basin = 18 m
Total Depth of basin SWD+FB = 6
Pre-React Zone
Recirulation ratio R = 25%
Feed flow to each basin Qf = 258 m3/hr
Recirculation flow required Qr = 64.5 m3/hr
provided = 65 m3/hr
Flow rate through each basin Q=Qf+Qr = 322.5 m3/hr
HRT provided = 60 min
Volume of selector basin Vs = 322.5 m3
Number of compartments provided Nc = 4 Nos
SWD = 5.5 m
Length provided = 18 m
Width of selector basin = 3.3 m
Page 25
2.7 DESIGN FOR SBR
S.No Particulars Value Units
Kg O2 reqd for BOD removal = 1779.84 Kg/day
Inlet TKN = 45 mg/l
Outlet ammonical nitrogen = 2 mg/l
Nitrogen assimilated during BOD removal = 12 mg/l
Ammonical nitrogen removed = 31 mg/l
Kg of ammonical nitrogen removed in a day = 191.58 Kg/day
Kg O2 required per kg of NH3N = 4.6 Kg/Kg
Kg O2 reqd for NH3N removal = 881.27 Kg/day
NO3-N generated assuming 75% nitrification of NH3-N
= 143.69 Kg/day
Outlet NO3-N = 5 mg/l
Outlet NO3-N per day = 30.90 Kg/day
NO3-N denitrified = 112.79 Kg/day
O2 credit during de-nitrification of NO3-N = 2.86 Kg/Kg
O2 credit available during de-nitrification = 90%
O2 relesed during denitrifcation = 290.31 Kg/day
Air requirement
Total actual oxygen requirement AOR = 2370.80 Kg/day
Oxygen required under standard conditions (SOR)
Page 26
2.7 DESIGN FOR SBR
S.No Particulars Value Units
Page 27
2.7 DESIGN FOR SBR
S.No Particulars Value Units
Say = 1400 Nm3/hr
Standby Blowers = 1 Nos
Sludge Generation
Biological sludge production
Kg/Kg
BOD
Specific sludge yield = 0.85 removal
Total BOD removed = 1483.2 Kg/day
Sludge generated = 1260.72 kg/day
No Chemical Sludge
Page 28
2.7 DESIGN FOR SBR
S.No Particulars Value Units
Say = 80 m3/hr
Total Sludge waste in day = 150.09 m3/day
SRT Calculation
Volume of SBR = 5148 m3
MLSS = 3800 mg/l
Sludge generated per day = 1260.72 Kg/day
SRT = 15.52 days
Decanter rate
Decant volume = 515 m3
Decant time = 1.5 Hrs
Decant rate = 343.33 m3/hr
= 5.7 m3/min
Page 29
2.8 DESIGN FOR DISINFECTION- CHLORINE CONTACT TANK
S.No Particulars Value Units
1.2.1 Chlorine Contact Tank
Decant Rate from SBR Basin = 343.33 m3/hr
Chlorinator
Number of working units = 1 Nos
Number of Standby Units = 1 Nos
Flow = 343.33 m3/hr
Q = 0.1 m3/sec
Chlorine Dosage Cd = 5 mg/l
Chlorinator Requirement C=Q*Cd/1000 = 1.72 Kg/hr
Say 2 Kg/hr
Page 30
2.8 DESIGN FOR DISINFECTION- CHLORINE CONTACT TANK
S.No Particulars Value Units
Say 2 Nos
Page 31
2.9 DESIGN FOR SLUDGE DEWATERING
S.No Particulars Value Units
1.2.1 Sludge Generation
Total Sludge generated ws = 1260.72 Kg/day
Sludge consistency of Basins C% = 0.80%
Specific gravity of sludge S = 1.05
Sludge Sump
Detention time DT = 10 Hrs
Volume of Sump V = 70 m3
Active depth of sump AD = 3 m
Free board FB = 0.5 m
Area of sump A=V/AD = 23.33333 m3
L:B = 1
Length of sump L = 4.9 m
Width of sump W = 4.8 m
Total depth D = 3.5 m
Page 32
2.9 DESIGN FOR SLUDGE DEWATERING
S.No Particulars Value Units
Page 33
HYDRAULIC CALCULATIONS FOR 6 MLD
STP
Page 34
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
3.1 Site Levels
Final treated water disposal level = 0.5m above HFL
High Flood level (As per site conditions) 0.5 m
HFL = 876.00 m
Reference ground level
(As per site conditions) RGL = 875.80 m
Diameter of Pipe
Maximum flow through pipe Qd = 343.33 m3/hr
= 0.1 m3/sec
= 100 lps
Velocity of flow through pipe (Say) v = 0.8 m/sec
Cross sectional area of pipe Ac=(Q/v) = 0.13 m2
Diameter of pipe Dp=sqrt(Ac/( 407 mm
pi()/4)) =
Say = 450 mm
Top water level in pipe at exit TLpex = 876.95 m
Head loss calculations in RCC pipe
3.2.1 Exit loss through pipe
Hex = Kex v2/2g
Accelaration due to gravity g = 9.81 m/sec2
Kex = 1
Head loss due to exit Hex = 0.04 m
3.2.2 Head loss in pipe
Mannings Roughness factor for as per stds
RCC n = 0.013
Mannings formulae for gravity flow
Source: Cpheeo 3.15.4)
Q=(1/n)(3.118*10^-6)*D^2.67*S^0.5
Q is max. Flow in lps
D dia ofpipe in mm
Page 35
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Slope of Hydraulic Gradient S = 0.0012 m/m
Head loss in pipe H1=S*Ldp = 0.035 m
Say = 0.04 m
3.2.3 Entrance losses in pipe
Hen = Kex v2/2g
Accelaration due to gravity g = 9.81 m/sec2
Ken = 0.5
Head loss due to entrance Hen = 0.02 m
Page 36
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
= 100 lps
Velocity of flow through pipe (Say) v = 0.8 m/sec
Cross sectional area of pipe Ac=(Q/v) = 0.13 m2
Diameter of pipe Dp=sqrt(Ac/( 407 mm
pi()/4)) =
Say = 400 mm
Top water level in pipe at exit TLpex = 877.56 m
Head loss calculations in RCC pipe
Exit loss through pipe
Hex = Kex v2/2g
Accelaration due to gravity g = 9.81 m/sec2
Kex = 1
Head loss due to exit Hex = 0.04 m
Head loss in pipe
Mannings Roughness factor for as per stds
n = 0.013
Mannings formulae for gravity flow
Source: Cpheeo 3.15.4)
Q=(1/n)(3.118*10^-6)*D^2.67*S^0.5
Q is max. Flow in lps
D dia ofpipe in mm
Page 37
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Decanting depth Dd = 2.2 m
Decanter down comer drop Ddc = 0.9 m
Distance between centre of decanter shaft and bottom of pipe
Dcd = 0.3 m
Free fall from decanter outlet pipe Ff = 0.05 m
SBR Basin
Top water level of SBR Basin TWLcb = 881.26 m
TWLcb=TLoc+Dd+Ddc+Dcd+Ff
Page 38
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Length of channel Lcs = 10 m
Width of channel Wcs = 0.6 m
Water Depth of channel SWDcs = 0.5 m
Hydraulic radius of channel
Wetted perimeter of channel P=Wcs+(2*SWDcs)
= 1.6 m
Hydarulic radius Rh=(Wcs*SWDcs)/P
Rh = 0.19
Mannings roughness n = 0.011
Head loss Hcs=((Q/Wcs*SWDcs)*n)/(Rh^(2/3)))^2 *Lcs
Hcs = 0.01
Page 39
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Hcs = 0.01
Head loss due to contraction in throat width
(From calcuations of Parshall flume Ha-Hb)
Hpfw = 0.18
Total head loss Hpf = 0.19
Margin Say = 0.027
= 0.217
Top water level in down stream of parshall flume
TWLpfds = 881.56 m
Topwater level in upstream of parshall flume
TWLpfus = 881.777 m
Grit Chamber
Head loss through exit gate
Width of the gate Wg = 0.5 m
Depth of the Gate Dg = 0.5 m
Maximum flow Q = 632.5 m3/hr
= 0.176 m3/sec
Velocity of flow through gate vg=Q/(Wg*Dg) = 0.704 m/sec
Page 40
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Page 41
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Maximum flow Q = 632.5 m3/hr
= 0.176 m3/sec
Velocity of flow through gate vg=Q/(Wg*Dg) = 0.704 m/sec
Page 42
3.0 HYDRAULIC CALCULATIONS
S.No Particulars Value Units
Say = 0.02 m
Head loss through entrance gate
Width of the gate Wg = 0.5 m
Depth of the Gate Dg = 0.5 m
Maximum flow Q = 632.5 m3/hr
= 0.176 m3/sec
Velocity of flow through gate vg=Q/(Wg*Dg) = 0.704 m/sec
Inlet Chamber
Nominal head loss Hic = 0.1 m
Top water level in inlet chamber TWLic = 882.53 m
Page 43
CIVIL UNIT LIST
Page 44
ELECTRICAL LOAD LIST
S.No Equipment Working Standby Total Voltage Phase Equp. Total Effici Eqp Load Selected Total Load Power Connected Consumed
BkW BkW ecny (kW) Model load (kW) factor factor Load (KVA) Load (Kw) Hrs of Consumed
(kW) operatio power
n (KWh/day)
1 Mechanical fine screen 1 0 1 415 3 0.80 0.80 0.80 1.00 1.00 1.00 0.90 0.80 1.25 1.13 8 9
2 Conveyor belt 1 0 1 415 3 0.40 0.40 0.80 0.50 0.50 0.50 0.90 0.80 0.63 0.56 4 2.25
3 Grit Seperator-Detrius 1 0 1 415 3 0.88 0.88 0.80 1.10 1.10 1.10 0.90 0.80 1.38 1.24 8 9.9
4 Grit classifier 1 0 1 415 3 1.20 1.20 0.80 1.50 1.50 1.50 0.90 0.80 1.88 1.69 4 6.75
5 Organic retrun pump 1 0 1 415 3 1.20 1.20 0.80 1.50 1.50 1.50 0.90 0.80 1.88 1.69 4 6.75
6 Air Blowers for aeration 2 1 3 415 3 45.50 91.00 0.85 53.60 55.00 110.00 0.90 0.80 137.50 123.75 12 1485
7 RAS Pumps 2 1 3 415 3 2.00 4.00 0.70 2.90 3.00 6.00 0.90 0.80 7.50 6.75 8 54
8 SAS Pumps 2 1 3 415 3 2.00 4.00 0.70 2.90 3.00 6.00 0.90 0.80 7.50 6.75 1.5 10.13
9 Decanters 2 0 2 415 3 0.35 0.70 0.90 0.40 0.50 1.00 0.90 0.80 1.25 1.13 8 9
10 Auto valves & gates 6 0 6 415 3 0.50 3.00 0.60 0.90 1.00 6.00 0.90 0.80 7.50 6.75 1 6.75
11 Air blower room hoist 1 0 1 415 3 2.40 2.40 0.80 3.00 3.00 3.00 0.90 0.80 3.75 3.38 0.5 1.69
12 Chlroine room hoist 1 0 1 415 3 1.00 1.00 0.90 1.10 1.10 1.10 0.90 0.80 1.38 1.24 0.5 0.62
13 Centrifuge feed pump 1 1 2 415 3 1.00 1.00 0.70 1.50 1.50 1.50 0.90 0.80 1.88 1.69 16 27
14 Centrifuge Back drive 1 1 2 415 3 5.00 5.00 0.70 7.20 7.50 7.50 0.90 0.80 9.38 8.44 16 135
15 Centrifuge Front Drive 1 1 2 415 3 15.00 15.00 0.70 21.50 22.50 22.50 0.90 0.80 28.13 25.31 16 405
16 Air blower for sludge sump 1 1 2 415 3 2.50 2.50 0.85 3.00 3.00 3.00 0.90 0.80 3.75 3.38 20 67.5
17 Ligting for buildings 1 0 1 415 3 2.70 2.70 0.90 3.00 3.00 3.00 0.90 0.80 3.75 3.38 8 27
18 Instruments 1 0 1 415 3 0.90 0.90 0.90 1.00 1.00 1.00 0.90 0.80 1.25 1.13 4 4.5
19 UPS 1 0 1 415 3 1.80 1.80 0.90 2.00 2.00 2.00 0.90 0.80 2.50 2.25 8 18
20 Plant Lighting 1 0 1 415 3 1.80 1.80 0.90 2.00 2.00 2.00 0.90 0.80 2.50 2.25 8 18
21 Misc 1 0 1 415 3 0.90 0.90 0.90 1.00 1.00 1.00 0.90 0.80 1.25 1.13 8 9
TOTAL 227.75 2312.84
Page 45
MECHANICAL LIST
SBR Works
Mechanized sluice CI sluice gates Motarized, 2.00 Nos 285000.00 570000.00
gates 500mm Wide X 500mm
1 Depth
Fine bubble diffusers PU/EPDM Tubular fine 1.00 Lot 15500000.00 15500000.00
2 bubble diffusers (2 Basins)
Air grid piping Fixed type PVC/UPVC air 1.00 Lot
grid main heador and
distrubutor
inside the SBR basin in
main react zone
Coarse bubble fixed type
grid selector zone
3
Decanter Electro-Mechanical 1.00 Lot
operated decanter along
with VFD, minimum 1 each
4 per basin
SBR Basin 1 No DO, 1 LT & 1 LS per 1.00 Lot 800000.00 800000.00
5 Instruments each basin
Page 46
MECHANICAL LIST
PLC Panel & SCADA PLC panel along with scada 1.00 Lot 1800000.00 1800000.00
full plant automation, Non
redundant PLC system
along with all VFDs
6
Air blowers 1400 Nm3/hr, 0.65 kg/cm2 3.00 Nos 550000.00 1650000.00
twin lobe/trilobe air blowers
and motors & VFD along
with acoustic hood along
7 MS air main
EOT crane for blowers EOT crane 3-ton along with 1.00 Lot 185000.00 185000.00
8 srurctural steel
RAS pump 65 m3/hr, 5m WC, Non 3.00 Nos 115000.00 345000.00
clog Submersible pump
along with chain lifting
9 system
SAS/WAS pump 80 m3/hr, 10m head, Non 3.00 Nos 150000.00 450000.00
clog submersible pump
along with chain lifting
10 system
Sludge Dewatering
Centrifuge feed pump Positive displacement 2.00 Nos 150000.00 300000.00
pump, 5 m3/hr, 15m head
to handle sludge with
1 consistency aboout 1%
Centrifuge Solid bowl centrifuge 8 2.00 Nos 2250000.00 4500000.00
2 m3/hr
Air blowers for sludge 50 m3/hr, 0.35 kg/cm2 2.00 Nos 100000.00 200000.00
3 sump root blowers
Coarse grid piping in PVC coarse grid piping in 1.00 Lot 50000.00 50000.00
4 sludge sump sludge sump
Top mounted agitator, 1.00 Nos 150000.00 150000.00
SS304 along with motor
5 Poly dosing agitator and local control panel
6 Poly dosing pump Dosing pump 350 LPH 2.00 Nos 85000.00 170000.00
EOT crane for centrifuge 2 1.00 Nos 175000.00 175000.00
7 EOT crane Ton
Chlorination System
Vaccum gas chlorination, 1.00 Lot 1500000.00 1500000.00
1.5 Kg/hr (1W+1S), along
with toner 2 Nos. Lead
detection and absorption
Chlorine dosing system, booster pumps and
1 system accessories
2 ton EOT crane along with 1.00 Lot 175000.00 175000.00
2 EOT crane structural steel
Page 47
MECHANICAL LIST
Additional
5 m3/hr, 10m head clear 2.00 Nos 40000.00 80000.00
water pump along with
1 Service pumps chain and lifting system
1.00 Lot 2400000.00 2400000.00
Interconnection piping Interconnection piping and
2 and valves valves etc for inside STP
Pipe line between 1.00 Lot 250000.00 250000.00
decanter outlet and RCC NP3 pipe, 50m,
3 CCT 400mm dia
Laboratory All lab equipments for multi 1.00 Lot 1500000.00 1500000.00
4 equipmentss paratmeter testing
Fire fighting system for 1.00 Lot 100000.00 100000.00
5 Fire fighting system plant and buidlings
Electrical
1.00 Lot 1000000.00
2pole/4pole structure along
1000000.00
with Las, Isolator, DO fuse
1 11 KV Electrical adn other accessoris etc
1.00 Lot 1000000.00
HT panel, siwtch gear panel 1000000.00
2 HT Panel along with metering cubicle
275 KVA power 1.00 Lot 1500000.00
1500000.00
3 Transformer transformer, oil cooled
1.00 Lot 1200000.00
LT Panels, MCC
1200000.00
Panels & PMCC panel,
4 LT distrubution panel As per requirement
DG Set with AMF 1.00 Lot 1500000.00
1500000.00
5 Panel 150 KVA DG Set
Power cables, Instrument 1.00 Lot 750000.00
750000.00
6 Cables cables & cable trays
Earthing of electrical 1.00 Lot 150000.00 150000.00
7 Earthing protection equipments
8 Plant lighting As per requirement 1.00 Lot 200000.00 200000.00
Exhaust and ventilaton 1.00 Lot 100000.00 100000.00
9 Exhaust & ventiilaton system for Buildings
All instruments required for 1.00 Lot 850000.00 850000.00
10 Instruments automation
Others
Installation & 1.00 Job 1500000.00 1500000.00
Installation& Commissioning of
1 commissioning equipments
TOTAL 46750000.00