Wiring Diagram Transformer Bank: - Company

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

50

1 2
3 4
5 6

@ 100 % D.F.

It = 44.78(100%)
= 44.78 AMP.
@ 80 % D.F.
I = 44.78(80%)
= 35.82 AMP.

USE:

50
1 2
3 4
5 6

@ 100 % D.F.
It = 49.57(100%)
= 49.57 AMP.

USE:

It = Iab(1.732) + I3phase + HML(25%) @100% D.F.


= 440.77(1.732) + 913 + 83(25%) It = 1759.66 AMP
= 1759.66 AMP
USE:

@ MCB_2
80 @ 23 % D.F. KVA FOR GENERATOR

2 It = 1109.75( 1.732 ) (23%) @ MCB_1


1
3 4 = 442.08 AMP.
5 6 It = Iab(1.732) + I3phase + HML(25%) @100% D.F.
USE:
7 8 = 413.05(1.732) + 913 + 83(25%) It = 1649.152 AMP
PIPE
10 = 1649.152 AMP
9

KVA = (I ab + I 3 )(230) @125% Safety Factor


= (413.05 + 913)(230)(1.25)

KVA = 381.24

USE: 500 KVA - 3 GENERATOR SET

@ 100 % D.F.
It = 76.96(100%)
= 76.96 AMP.

USE:

175
1 2 LINE 1
3 4
5
LINE 2
LINE 3
NEUTRAL LINE 1 LINE 2 LINE 3
@ 100 % D.F.

It = 136.96(100%)
LINE 1 LINE 2 LINE 3
= 136.96 AMP.
A B C
USE:

A B C

TOP VIEW FRONT VIEW

WIRING DIAGRAM TRANSFORMER BANK


IT = MCB1 + MCB2
= 1759.66 + 442.08
= 2201.74 AMP

KVA RATING FOR TRANSFORMER

KVA = IT VT / 1000 ( 1.732 )


= 2201.74 (230) / 1000 ( 1.732 )

KVA = 292.38 KVA

USE: 3 - 500 KVA - 1 TRANSFORMER BANK

ISABELA STATE UNIVERSITY SUBJECT: TITLE: OWNER: DESIGNED BY: APPROVED BY: SHEET CONTENT: SHEET NO.

DEPT. OF ELECTRICAL ENGINEERING TRASFORMER BANK,


PROPOSED 17 STOREY
-
ELECTRICAL
SYSTEM DESIGN
RESIDENTIAL /
COMMERCIAL ______________
COMPANY JOSEPH B. SIERRA JR
ENGR. F. O. ORPERIA
WIRING DIAGRAM,
LOAD OF SCHEDULE 5
ILAGAN
CAMPUS

CITY OF ILAGAN, ISABELA


BUILDING (BSEE - V) (INSTRUCTOR)
7