The document provides reinforcement quantity details for two tunnel sections:
1) The main NATM tunnel section which requires a total of 890.613 kg of reinforcement including longitudinal and transverse steel bars of 16mm and 10mm diameter.
2) The cross passage section requiring a total of 348.683 kg of reinforcement. Both sections list the bar diameters, lengths, spacing, numbers and volume of concrete.
The document provides reinforcement quantity details for two tunnel sections:
1) The main NATM tunnel section which requires a total of 890.613 kg of reinforcement including longitudinal and transverse steel bars of 16mm and 10mm diameter.
2) The cross passage section requiring a total of 348.683 kg of reinforcement. Both sections list the bar diameters, lengths, spacing, numbers and volume of concrete.
The document provides reinforcement quantity details for two tunnel sections:
1) The main NATM tunnel section which requires a total of 890.613 kg of reinforcement including longitudinal and transverse steel bars of 16mm and 10mm diameter.
2) The cross passage section requiring a total of 348.683 kg of reinforcement. Both sections list the bar diameters, lengths, spacing, numbers and volume of concrete.
The document provides reinforcement quantity details for two tunnel sections:
1) The main NATM tunnel section which requires a total of 890.613 kg of reinforcement including longitudinal and transverse steel bars of 16mm and 10mm diameter.
2) The cross passage section requiring a total of 348.683 kg of reinforcement. Both sections list the bar diameters, lengths, spacing, numbers and volume of concrete.
bar dia in Length in SNO Description Area in m2 Spacing in m Nos Volume m3 weight kg/m3 Weight kg mm m 1 NATM Quantity a Longitudinal Bars Outer 16 0.00020106193 0.125 8 11.0 0.01769345 7850 138.894 b Transverse bars Outer 10 7.85398163E-05 0.15 75 1 0.005890486 7850 46.240 c Longitudinal Bars Inner 16 0.00020106193 0.125 8 9.73 0.015650661 7850 122.858 d Transverse bars Inner 10 7.85398163E-05 0.15 66 1 0.005183628 7850 40.691 Total Weight in kg 348.683 c Concrete Volume for CP Section, m3 = 4.000 Reinforcement details kg/m3 = 90.000