BACHELOR OF QUANTITY SURVEYING

(HONS)

CONSTRUCTION TECHNOLOGY III


[BLD 60304]

STEEL SPACE FRAME ROOF

Presented by: Lecturer:

ERIC WEE 0329601 IR CHAI VOON CHIET


LIM XIAO SHI 0324410
LOH WEI TING 0328314
MELVIN TAN 0323938
Climber dome
SPACE FRAME

International Association for Shell and


Spatial Structures (IASS) :
a structural system, where linear elements are
assembled in a way that loads are transferred
in a three-dimensional manner
SPACE FRAME

Truss-like Rigid

Lightweight Interlocking
struts
Use of Application
London Stansted
Airport
Heydar Aliyev
Cultural Centre

Shah Alam Sports


Biosphere 2, Arizona Complex

Houston Astrodome,
Texas
Stadium Negara, Kuala
Lumpur
Type – curvature

Flat covers Barrel vault Spherical


dome
Type – number of grid layers

Double layer Triple layer


Single layer
Frame components

Mero KK node

Heydar Aliyev Cultural Centre


Frame components

Octatube node connector Triodetric connector

Multi hinge ‘nodeless’

Hemispherical dome connector


Erection method

Element or Block erection Scaffold Lift – up


CASE STUDIES
Cornwall,
England

EDEN PROJECT
Shah Alam,
Malaysia

SHAH ALAM SPORTS


COMPLEX
EDEN PROJECT
Multiple Greenhouse Complex

Size: 23,000 square metre/


247,480 square feet
Construction time: 2 ½ years
Completion: March 2001
Cost: then £86 million
Design team:
Architect: Nicholas Grimshaw
Structural Engineer: Anthony
Hunt and Associates
Main Contractor: McAlpine
Joint Venture
clayey quarry

soap bubbles
Geodesic dome

A braced dome in which the


elements forming the network are
lying on the great circle of a sphere
Why hexagonal?

Thickness Size

Strength Surface
Double layer geodesic dome
HEX-net

TRI-HEX-net
NODES & TUBES
Top chord

Top chord beams


- CHS tube diameter of 193.7mm
- Ends are cut rectangular and fixed to nodes
Mero NK Bowl Node - High pre-stressed bolts (M27 & M36) used
to connect beams to bowl nodes
- Cast iron (GGG40) and - Bolt M16 fix beam in right position &
galvanized transfer torsional moments
- Weight about 80kg
- Diameter of 400mm
NODES & TUBES

- CHS tube diameter


between 76.1mm and
168.3mm
Bottom chord & diagonals

Mero NK Bowl Node


ERECTION METHOD

STEP 1: Set-up of birdcage scaffolding of 60


metres high and 125 metres
ERECTION METHOD

STEP 2: Hexagons were put together on ground and then lifted up


by mobile crane and tower cranes on larger domes in the HTB,
starting from dome A of HTB to dome H of WTB.
ERECTION METHOD

STEP 3 Bolting of hexagon structure


Ethyltetrafluoroethylene

Movie: Die Another Day


SHAH ALAM SPORTS COMPLEX
SHAH ALAM SPORTS COMPLEX

Design team
Size: 155,000 sq ft Owner: State Government of
Capacity: 80,000 people Selangor
Construction cost: RM480 million Architect: Hijjaz Kasturi Associates
Construction begin: 1st January Sdn.Bhd
1990 German firms of Weidleplan and
Construction time: 4 years Consulting GmbH, and Schlaich,
Bergermann and Partners
SHAH ALAM SPORTS COMPLEX

Double Layer Barrel


Vault
Geometry
Support
Double layer barrel vault
Connectors
Erection method
THANK YOU!!!