12022-AMC-TIN-PRO-0019 Rev B Flexible Flowline Reel Loadout Procedure
12022-AMC-TIN-PRO-0019 Rev B Flexible Flowline Reel Loadout Procedure
Offshore Installation
12022
12022-AMC-TIN-PRO-0019
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 2 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
TABLE OF CONTENTS
1 PROJECT DESCRIPTION ................................................................................ 5
3 RESPONSIBILITIES ......................................................................................... 6
3.1 NOV SCOPE ................................................................................................................. 6
3.2 HLV SCOPE .................................................................................................................. 6
3.3 EMAS AMC SCOPE...................................................................................................... 7
5 REFERENCES.................................................................................................. 8
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 3 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 4 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
1 PROJECT DESCRIPTION
VAALCO Gabon (Etame), Inc. is expanding the development of the Etame-Marin field offshore Gabon,
West Africa. The Etame Expansion Project includes the transportation and installation of two (2) new
Etame & SEENT fixed platforms, subsea equipment including pipelines, flexible flowlines, tie-in spools
and Valve/WYE skids, and the relocation of four (4) existing flexible flowlines. The Etame-Marin Field
is located in the Gulf of Guinea, Offshore Gabon, West Africa in approximately 80 m water depth.
The new Etame WHP Platform will serve as a first stage processing facility for 1 future and up to 8 new
dry tree wells. Gas will be exported from the Etame Platform to an FPSO located approximately 2.4
km east of the platform. Likewise, the new SEENT WHP production platform will supply fuel gas to the
FPSO approximately 7.0 km to the north.
EMAS AMC has been awarded the installation contract for work packages 1 to 4 in the Etame /
SEENT development which include:
Page 5 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
2 SCOPE OF WORK
The purpose of this procedure is to detail the tasks associated with the mobilization and discharge of
the HLV MV Gloria and Installation Vessel, Lewek Express required for VAALCO Etame Campaign 1
Reel Lay Scope of Work. The HLV has been chartered for the transportation of a 10.2 m flexible reel
and ancillary equipment from Kalundborg, Denmark to the Port of Gentil, Gabon where she will offload
cargo directly to quayside. The reel and ancillary equipment will then be loaded by the Lewek Express
at a later date for transportation & installation activities in field.
The following summarizes the mobilization / demobilization activities associated with this procedure:
3 RESPONSIBILITIES
Responsibilites for loadout and discharging operations have been clearly identfied below:
Page 6 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 7 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
5 REFERENCES
All work covered in this document shall comply with the latest edition of the design codes, standards,
and regulations provided in the ETAME & SEENT Flexible Flowlines Installation Scope of Work. In
addition, all lifting and transportation shall be conducted in accordance with applicable industry
standards identified below:
Page 8 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 9 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
6 COMMUNICATIONS
6.1 Key Contacts – Reel Loadout in Kalundborg, Denmark
A pre-mobilization meeting will be held with EMAS-AMC project personnel, VAALCO personnel,
Marine Warranty Surveyor, NOV personnel and HLV Master to confirm lines of communications and
other requirements of personnel and equipment for loadout & seafastening of the Flexible Reel and
ancillary equipment.
All deck crane operations will be directed by the HLV Deck Foreman or his nominated personnel.
The EMAS AMC’ Loadout Engineer shall have the overall responsibility for the mobilization work. The
HLV Master and deck foreman shall liaise closely and advise the loadout engineer of vessel or crane
limitations that may otherwise impact loadout activities. The organization chart for loadout activities in
Kalundborg, Denmark can be found below.
The chart below describes the communication lines to be followed during mobilization and
demobilization activities.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 10 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
All deck crane operations will be directed by the Deck Foreman or his nominated personnel.
The EMAS AMC’ Loadout Engineer shall have the overall responsibility for the mobilization work. The
LEX Master and deck foreman shall liaise closely and advise the loadout engineer of vessel or crane
limitations that may otherwise impact loadout activities. The organization chart for loadout activities in
Port Gentil, Gabon can be found below.
The chart below describes the communication lines to be followed during mobilization and
demobilization activities.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 11 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
NOV Contacts
Brian Hansen Load Out Manager +45 3037 2876 N/A Brian.Hansen2@nov.com
Henrik Andersen Load Out Assistant +45 4191 4744 N/A Henrik.Andersen@nov.com
VAALCO Contacts
Craig Devenney Construction Manager +1 713 543 3406 +1 832 259 1544 CDevenney@vaalco.com
EMAS Contacts
Tom O’Malley EMAS Project Manager +1 713 904 2097 +1 713 591 9654 Tom.O'Malley@emas.com
Samuel Haas Flexible Package Lead +1 832 487 7263 +1 713 259 1892 Samuel.Haas@emas.com
Don Rose Operations Manager +1 832 487 7310 +1 832 232 1324 Don.Rose@emas.com
Gabon In-Country
Dirk Dutoit +1 281 605 3547 +241 04 88 68 62 Dirk.Dutoit_Contractor@emas.com
Manager
Alexis Adams SCM +1 832 487 7302 +1 713 494 9327 Alexis.Adams@emas.com
SAL Contacts
SAL Operations
Hauke Plaass +49 (40) 80380-259 +49 (171) 1074142 operating@sal-heavylift.com
Manager
Peter Gottwald SAL Project Engineer +49 (4621) 997487 N/A engineering@peter-gottwald.de
Fabian Obert SAL Project Manager +49 (40) 380380-232 +49 (170) 2273721 fabian.obert@sal-heavylift.com
Russell Wolfe SAL Houston Contact +1 281 207 7002 +1 713 409 3524 usa@sal-heavylift.com
lex.projeng1@emas.com
Project Engineer +1 713 948 1095 N/A
lex.projeng2@emas.com
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 12 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Shipping.dk Agency
Ronni Pedersen +4525292757 N/A rfp@shipping.dk
Manager
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 13 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Page 14 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 15 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
8 VESSEL PARTICULARS
8.1 Heavy Lift Vessel – MV Gloria
The heavy lift vessel, MV Gloria, has been chartered for the loadout, transportation and discharge of
flexible reel and ancillary equipment from Kalundborg, Denmark to Port Gentil, Gabon. Details of the
MV Gloria are presented below;
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 16 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 17 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
9 EQUIPMENT PARTICULARS
9.1.1 HLV Cargo to be Discharged in Port Gentil, Gabon
Mobilizaton of the HLV shall be performed at NOV facilities in Kalundborg Harbour, Denmark.
Equipment to be mobilized on the HLV includes a 10.2 m Flexible Reel and repair kit connex among
various other spare and service parts.
A comprehensive list of equipment to be mobilized on the HLV In Denmark can be found in Appendix
E: Equipment List. Prior to custody transfer, an overage, shortage, damage report will be conducted
to ensure all free-issued items are present and in good condition. Tabulated equipment is subject to
change; the Equipment list shall be maintained by the project team.
Table 9-1 CPI to be Loaded / Offloaded by the HLV (Kalundborg, Denmark to Port Gentil, Gabon)
Client Provided Qty Dimensions (m) Weight (mT) Shipping Delivery Provider
Items Method Location
10.2m Reel c/w
1 10.2 OD x 5.5 L 216 10.2m Reel Gabon NOV
Cradle & Tarp
Crates of Spares 3 TBD TBD Crates Gabon NOV
Flexible Outer
2.44 H x 2.44 W
Sheath Repair Kit 1 1.55 Container Gabon NOV
x 3.05 L
Container
Table 9-2 Equipment to be Offloaded from the LEX (Port Gentil, Gabon)
Item Description Qty Dimensions (m) Weight (mT) Shipping Delivery Provider
Method Location
Spool Kits for 8”
SEENT 2
1 7.3 x 2.4 x 1.2 TBD Half Height 1 Gabon EMAS
Flowline to Riser
Assembly
Spool Kits for 8”
SEENT 2 Wye 1 7.3 x 2.4 x 1.2 TBD Half Height 2 Gabon EMAS
Assembly
Spool Kits for 8”
SEENT 2
1 7.3 x 2.4 x 1.2 TBD Half Height 3 Gabon EMAS
Flowline to Wye
Assembly
Spool Kitsfor 4”
SEENT 1 1 7.3 x 2.4 x 1.2 TBD Half Height 4 Gabon EMAS
Assembly
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 18 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 19 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 20 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 21 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Max Chelers
Shipping Manager
m.chelers@necrotrans.com
+241 07 77 86 17
GETMA GABON
Zone Portuaire Oprag
PO Box 937
Port-Gentil, Gabon
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 22 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
11 HLV OPERATIONS
The Heavy Lift Vessel, MV Gloria, chartered by EMAS AMC will be used to transport a 10.2 m Flexible
Reel and Ancillary Equipment from Kalundborg, Denmark to Port Gentil, Gabon.
Page 23 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
11.5 Reporting
A daily progress report shall be submitted to Contractor every 24 hours throughout the hiring period.
The format of the report shall be agreed in advance. As a minimum, the report shall include current
vessel location, ETA, weather and bunker details. The report shall be issued daily before 0800 hrs US
Central Time.
13 KEY DATES
Key mobilization and discharging dates and locations are presented in the table below. Dates are
preliminary and should be confirmed as mobilization activities near.
Description Location Dates
Notice of Pickup (30 Day) N/A Jan 9 , 2014
Flexible Reel Loadout (HLV) Kalundborg, Denmark Early Feb 2014
Discharging of Flexible Reel Port Gentil, Gabon Late Feb 2014
Flexible Reel Loadout
Port Gentil, Gabon Mar 1, 2014
(Express)
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 24 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
14 CONTINGENCY OPERATIONS
Should an undesired event occur during operations, contingency plans will be agreed upon by EMAS
Loadout Engineer, Vessel Master and Client Rep. If for any reason it is considered necessary to
deviate from the approved procedures, then the Management of Change process, Ref /2./, will be
followed.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 25 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Task Summary
1. Call in HLV and moor up to quay and deploy gangway
2. Familiarize personnel with upcoming mobilization operations
3. Inventory free-issued items and perform custody transfer
4. Lift reel and ancillary equipment onboard HLV
5. Deck crew to seafasten cargo
6. MWS to inspect all seafastening and lashings
7. Obtain sailaway certificate from MWS
8. Gangway up, HLV to transit to Port Gentil, Gabon
Operational Limitations
Weather – at the discretion of HLV Master
Other Information
10.2 m Reel Weight = 216 mT (includes reel, partition, flexibles, cradle) 10.2 m Reel Weight = 216 mT
Repair Kit Connex Weight = 1.55 mT
Safety Concerns
Simultaneous operations on deck
Pinch points
Trip hazards on deck
Initial Status
FAT of Flexible Flowlines is complete and Flexible lines have been spooled and secured to the reel.
Cradle is clipped or chained to the Reel for loadout.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 26 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
5. HLV Port Authority & vessel permit to work issued and signed off.
14. HLV HLV to open hatch and deploy stability pontoon, as required.
HLV to prepare lifting gear and connect to the crane.
15. HLV Note: SAL lifting gear will be used for all loadout and discharging activities
involving the HLV.
HLV crane to position reel spreaderbar over reel COG. SAL Rigging Crew to
16. HLV
direct crane as reel slings are guided over the trunions of the reel.
HLV crane to slowly take slack out of rigging. Shoreside crew to confirm rigging
17. HLV
is not twisted or tangled.
Lift Reel clear of the vessel cargo rail and slew load inboard. Deck crew to man
18. HLV
taglines to control the load.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 27 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
20. HLV HLV crane to land the reel in the hold, as directed by deck foreman.
24. MWS MWS to certify stowage and rigging plans and issue sail away certificate.
EMAS / EMAS loadout engineer to provide Vessel Master with manifest of all loaded
25. HLV equipment and confirmation of final discharging port.
26. HLV HLV crew to prepare the vessel for transit. Load the stability pontoon.
HLV crew to disconnect mooring lines and recover gangway. HLV to depart for
27. HLV
Port Gentil per SAL voyage plan.
HLV to provide daily progress report and Issue preliminary arrival notification to
28. HLV
EMAS personnel 48 hours prior to arrival in Port Gentil.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 28 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Task Summary
1. Call in HLV and moor up to quay and deploy Yokohama fenders
2. HLV to deploy gangway
3. Familiarize personnel with upcoming discharging operations
4. Deck crew to remove sea fastening and offload cargo
5. HLV Off-Hire
Operational Limitations
Weather – at the discretion of HLV Master
Other Information
10.2 m Reel Weight = 216 mT
Repair Kit Connex Weight = 1.55 mT
Safety Concerns
Simultaneous operations on deck
Pinch points
Trip hazards on deck
Initial Status
HLV enroute to Port Gentil, Gabon.
Clearance to leave reel on edge of quay has been granted by Port Authorities
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 29 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
3. HLV HLV logistics team to send inbound manifest to Gabon Customs Official.
5. HLV HLV to deploy Yokohama fenders at edge of quay where protection stops.
HLV berths portside along Port Gentil Commercial quay per discharging
arrangement shown in Ref Appendix C: Port Gentil Lift Plan / Arrangement
6. HLV
(LEX). Pilot to remain on board through out reel discharging activities. Quayside
personnel to assist with mooring lines, as required.
13. HLV HLV to open hatch and deploy stability pontoon, as required.
14. HLV SAL deck crew to remove seafastening and lashings from all cargo. .
HLV to prepare lifting gear and connect to the crane.
15. HLV Note: SAL lifting gear will be used for all loadout and discharging activities
involving the HLV.
HLV crane to position reel spreaderbar over reel COG. HLV deck crew to direct
16. HLV
the crane as slings are guided over the reel trunions.
17. HLV HLV crane to tension lift slings. Ensure slings are not twisted or tangled.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 30 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
HLV to lift and slew reel outboard. Reel to be landed within 30 m of the end of the
18. HLV quay per discharging drawing, Ref Appendix C: Port Gentil Lift Plan /
Arrangement (LEX).
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 31 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Task Summary
1. LEX to remove seafastening & offload (5) spool containers and ancillary equipment on quayside.
2. Welder to cut flexible reel free of cradle on quayside
3. Remove tarp from flexible reel on quayside
4. LEX to load & seafasten10.2 m flexible reel in RS4.
5. LEX load & seafasten repair kit container.
Operational Limitations
Weather – at the discretion of LEX Master
Other Information
10.2 m Reel Weight = 216 mT
Repair Kit Connex Weight = 1.55 mT
Safety Concerns
Simultaneous operations on deck
Pinch points
Trip hazards on deck
Initial Status
Job Safety Analysis (JSA) has been completed and reviewed by all relevant personnel
HIRA has been conducted and approved and a Toolbox talk (TBT) has been conducted with all
personnel involved in the operations. Preventative measures are implemented.
All lift plans have been completed and reviewed by pertinent parties
All required permits are in place
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 32 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
6. DF Attach taglines to each of the five (5) half height containers containing spool pipe.
Remove seafastening and offload half heights using 150 mT forward crane, as
7. DF
required.
9. DF Load spares & service part crates (x3) from quayside to back deck, as required.
Offload Concrete mattresses, as required. Lifting frame to remain on LEX
10. DF
following offloading activities.
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 33 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Slew LEX main crane main fall over to the 10.2 m flexible flowline reel on the
17. DF quayside and attach lift rigging, Ref Appendix C: Port Gentil Lift Plan /
Arrangement (LEX)
20. DF Remove rigging from flexible flowline reel once landed on deck.
Lay Operator to jack down RS4 & engage reel with the hub drive. RS4 to jackup
21. VLS
reel for transit.
23. MWS Marine Warranty Surveyor to sign off on the flexible flowline reel seafastening.
Load out remaining project material as directed by loadout Engineer.
24. DF/PE Note: Loadout engineer to maintain an updated list of equipment to be loaded on
board the LEX.
Complete sign-off for satisfactory completion of above tasks (LEX Mobilization).
____________________ ______
MWS Date
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 34 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Task Summary
1. LEX to offload concrete mattress lifting frame to quayside
Operational Limitations
Weather – at the discretion of LEX Master
Other Information
10.2 m Reel Weight = 216 mT
Repair Kit Connex Weight = 1.55 mT
Crate Weight = TBD
Safety Concerns
Simultaneous operations on deck
Pinch points
Trip hazards on deck
Initial Status
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 35 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 36 of 44
SAL STOWAGE PLAN
REF SAL # OPM 2013 f307 598 INPG
SAL DISCHARGING PLAN GABON
REF SAL # OPM 2013 f307 598 INPG
SAL LOADOUT ARRANGEMENT
REF SAL # OPM 2013 f307 598 INPG
SAL SEAFASTENING PLAN
REF SAL # OPM 2013 f307 598 INPG
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 37 of 44
VESSEL ON‐HIRE FORM
VESSEL OFF‐HIRE FORM
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 38 of 44
NOTES:
AMCLYDE 400mT CRANE LOAD CAPACITY
CHART - MAIN FALL
BOOM ANGLE 2@8 PART 2@6 PARTS
RADIUS (m)
(DEG) CROSS ANGLE CROSS ANGLE
Position 2 Work Radius SWL @ Work radius: Max Load height: Max hook height:
@ quayside: 360 mT 22.59 m 47.42 m
15 m from crane pedestal (when reel is being (above LEX deck)
2@6 Parts Cross Angle 1 lifted over LEX wing
degree wall)
Position 3 Work Radius SWL @ Work radius: Max Load height: Max hook height:
@ quayside: 400 mT 35.25 m 60.08 m
10.3 m from crane pedestal (when reel is being (above LEX deck)
2@8 Parts Cross Angle 1 lifted over LEX wing
degree wall)
COMMUNICATIONS:
Communications available: UHF / VHF Communication checks:
Primary (VHF): Secondary (UHF): Other:_ _ Primary checked: Secondary checked:
LIFTING EQUIPMENT & LIFTING ACCESSORIES TO BE USED: (Specify type, SWL and configuration)
Rigging checks by EMAS AMC
STEP BY STEP DETAILS OF LIFTING OPERATION:
Loading Flexible Flowline Reel into RDS4
1 Attach tag lines to Flexible Flowline Reel.
2 Ensure cradles have been disconnected from reel.
3 Confirm rigging is correctly assembled.
4 Connect main block of Crane 1 to crown rigging of spreader bar.
5 Crane to lift spreader bar and bring above reel.
6 Rigging to be connected to the reel lift points.
7 Crane to lift reel clear of the cradle.
8 Crane to knuckle in and slew bringing the reel into the RDS4.
9 Crane to lower reel into RDS4 cradle.
10 Rigging to be disconnected and removed.
LIFT PLAN
(TO BE COMPLETED BY THE COMPETENT PERSON)
HAS A TECHNICAL REVIEW BEEN CONDUCTED:
DETAILS ATTACHED:
yes /no
SKETCH OF INITIAL PICK UP LOCATION, LOAD PATH AND
SKETCH DETAILING THE RIGGING UP OF
LAY DOWN AREA: (Include any obstructions or
THE LIFTING EQUIPMENT AND LIFTING
equipment clashes that may occur and how they will be
ACCESSORIES: (Optional)
avoided)
DEBRIEF AND LEARNING POINTS (Did the lift go as planned or are changes to the lift plan required?)
Appendix:
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 39 of 44
LEWEK Express Flexible Flowline Reel Lift 11/12/2013
Vaalco (ETAME) Gabon Rigging Design
Calculations
References
[1] - 0027/ND Guidelines for Marine Lifting Operations, Rev. 9
[2] - 3769-DWG-Reel-100, GA Drawing Reel, Rev. A
[3] - 3769-DOC-ENG-701, 3769 Vaalco Etame Project, 3 off 5" ID Production Flowlines, Rev. 00
[4] - 3769-DWG-EF-100, GA Drawing 5" PF End Fitting, Rev. A
[5] - Flexible Flowline Lift Rigging Drawing
[6] - Crosby Catalog
[7] - Hollaway Houston Catalog
[8] - Dwg No. S-501, Cal Dive International 320 S. Ton Spreader Bar
Color Codes
The following codes are used for input and output boxes
Design Load
Weight
Description
(mT)
NOV Reel 38
NOV Cradle 2.3
Partition 4.5
Pipe incl. all equipment 165.1
Packing 6
Total weight 215.9
Hook Load, FHL DAF λsh WFFR λCF See Ref [1]
Section 6.1
for Hook Load
FHL 332 tonnef
T3 FHL
T1 166tonnef
T2 T1
FSL T1
Sling Loads,
Rigging Calculations between Wide Body Shackle & Wire Rope Sling
Rigging Assumptions
200Te Wide Body Shackle Crosby G-2160E Wide Body Shackle
6" OD x 18' Wire Rope Sling HHI, HH-1905E 9-Part Wire Rope Sling
0.5
BEFWRS 1
DWBS
d WRS
FSL
Actual Wire Rope Sling Design Load w/ BEF, FAWRSDL
BEFWRS
CMBLWRS
FoSWRS See Ref. [1]
Factor of Safety for Wire Rope Sling, FAWRSDL Section 5.13.2
FoSWRS 4.542
FoSWRS 2.25
ND Requirement, Section 5.13.2,
FMBLWBS
Factor of Safey Check of Wide Body Shackle, FoSC
FoSWBS
Use 200Te Crosby G-2160E Wide Body Shackle, 219mm Bow Dia. w/ Safety Factor of
5:1
3
Minimum Breaking Load for Wide Body FMBLWBS 1 10 tonnef
Shackle,
Weight of Wide Body Shackle, WWBS 182kg
Rigging Calculations between Wide Body Shackle & Wire Rope Sling
Rigging Assumptions
200Te Wide Body Shackle Crosby G-2160E Wide Body Shackle
3" OD x 60' (Basketed) Wire Rope Sling HHI, HH-105-EE, Eye & Eye Wire Rope Sling
0.5
BEFBWRS 1
DWBSB
d BWRS
FSL
Actual Basketed Wire Rope Sling FABWRSDL
Design Load w/ BEF, BEFBWRS
FoSWRS 4.542
FoSWRS 2.25
ND Requirement, Section 5.13.2,
Rigging Calculations between Wire Rope Sling & Lifting Points on Reel
Rigging Assumptions
88.58" Outside Diameter Lifting Point on
Reel
3" Diameter x 60' (Basketed) Wire Rope See HHI, HH-105-EE, Eye & Eye Wire Rope
Sling Sling
Calculate Bending Efficiency Factor,
FSL
Actual Wire Rope Sling (Basketed) FAWRSBDL
Design Load w/ BEF, BEFWRSB
CMBLWRSB
FoSWRSB See Ref. [1]
Factor of Safety for Wire Rope Sling, FAWRSDL Section 5.13.2
FoSWRSB 2.453
FoSWRSB 2.25
ND Requirement, Section 5.13.2,
Wire Rope Sling Specification for Basketing over Lifting Points on Reel
Calculated Min. Breaking Load for 3" Dia. CMBLWRSB 698.55 tonnef
HH-105-EE Wire Rope Sling
Use 3in (76.2mm) diameter x 60' Length (Basketed Sling) HHI, HH-105-EE, Eye & Eye Wire
Rope Slings, w/ Safety Factor of 5:1
The purpose of this document is to check the capacity of the 290 mT Spreader Bar.
References
Pipe Properties
lbm kg
Density ρ 490 ρ 7849
3 3
ft m
Diameter of Pipe OD 18in OD 457.2 mm
3
Length of Pipe L 20.09ft L 6.123 10 mm
Page 1 of 3
LEWEK Express Vaalco (ETAME) 290mT Spreader Bar Check By: DMD
Gabon Date: 11/11/13
OD
Centroid c c 9 in c 228.6 mm
2
Moment of Inertia I
π OD ID
4 4 3
I 1.8 10 in
4
I 763832296 mm
4
64
Section Modulus S
π OD ID
4 4 S 203.9 in
3
S 3341349 mm
3
32 OD
2 2
OD ID
Radius of r r 6 in r 153.5 mm
Gyration 4
3 3
OD ID 3 3
Plastic Section Z Z 273.3 in Z 4479207 mm
Modulus 6 6
r ri
π 4 4 3 4 4
Polar Moment of Inertia J J 3.7 10 in J 1527664592 mm
2 o
E
Shear Modulus G G 11154 ksi G 76903 MPa
2 ( 1 ν)
OD
Width-Thickness Ratio 19.19
WT
3300
Limiting Width- ksi 78.6
Thickness Ratio Fy
Page 2 of 3
LEWEK Express Vaalco (ETAME) 290mT Spreader Bar Check By: DMD
Gabon Date: 11/11/13
Fe
π2E 179.745 ksi ( E3 4 )
Critical Stress for Compression Members 2
k L
r
( E3 2 )
Ωc 1.67
Fy
Fe
Fcr 0.658 Fy
Fcr 38.087 ksi
Fcr A 3
Fa 1.147 10 kip ( E3 1 )
Ωc
α atan
15.35
Refer to: Ref. 2 & 3 62.005 deg
8.16
Fmax
UCSF
Compression Stress Acceptance Fa
Criteria (Unit Check Safety Factor)
UCSF 0.15
UCSF 1
Fmax Fa
Page 3 of 3
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 40 of 44
HLV Mobilization – Kalundborg Harbour, Denmark
Item Serial # Equipment Description Qty Recv’d Dims Gross Comment
Weight
(m) (mT)
Reel #1
3769NKT001 5” ID x 860 m Production Flowline 3 10.2 m OD x 5.5 m L 216
1. 3769NKT002 5” ID x 590 m Production Flowline
3769NKT003 5” ID x 170 m Production Jumper
Y
Spares & Service Crates #1,2,3
AR
2. 10790941-001 EF Ser 5” PF, 3769SER001-003 1
3. 10790209.-001 Ring Joint Gasket, BX 169 Incoloy 825 12
4. 10790285-001 Stud Bolt 1-1/8” x 385 c/w SS Nuts PTFE TB3.1 87
2
5. 383014951 Cable for Anode 500 mmx16mm 6
IN
6. 383014422 DIN 912, M12x16mm, B7m-3.1 6
NOV Repair Container
IM
7. N/A Cable – 40 m – 220 Volt 1
8. N/A Grinding Machine 1
9. N/A Miller for Grinding Machine 1
EL
10. N/A Electric Plane 220 V 1
11. N/A Blades for Electric Plane 2
PR
Y
27. N/A Adaptor 240 V 1
28. N/A Plug 1
AR
29. N/A Socket 1
30. N/A Welding Machine for Extruder 2
31. N/A Teflon Welding Shoe 10
IN
32. N/A Plastic Welding Torch / Heat Gun 2
33. N/A Welding Nozzle for Plastic Welding Torch 3
IM
34. N/A Complete Temperature Sensor 2
35. N/A Extra Batteries for Temperature Sensor 6
36. N/A Lorry Straps 4
EL
37. N/A Valve/Regulator for Gas Cylinder 1
38. N/A Gas Hose 1
39. N/A Regulation Lever with Valve 1
PR
Y
54. N/A Cloths 5
55. N/A Slide Fastener for Canusa Wrap 1
AR
56. N/A Black Tape 25 mm 5
57. N/A Elephant Tape 25 mm 5
58. N/A Elephant Tape 50 mm 18
IN
59. N/A Fluff-free Paper 1
60. N/A Paint Bins 0.75 L Empty 3
IM
61. N/A Brass Foil 1
62. N/A Sheet 6x4 m 1
63. N/A Cutting Compound 1
EL
64. N/A Emery Corn 150 1
65. N/A Emery Corn 60 1
66. N/A Coroplast 0.2x 70x30 m 18
PR
Y
81. N/A Silicium Carbide Stone 1
82. N/A Gouges 6-8 10-12 1
AR
83. N/A File, 8” 1
84. N/A Electric Torch/Flashlight 1
85. N/A Batteries for Flashlight 2
IN
86. N/A Hacksaw 1
87. N/A Blades for Hacksaw 10
IM
88. N/A Padlocks 6
89. N/A Spark Igniter 1
90. N/A Ziehblade/Scraper 2
EL
91. N/A Small Plane 1
92. N/A Side Cutter 1
93. N/A Plastic Hammer, 40 mm 1
PR
Y
108. N/A Combination Wrench 6-32 mm 1
109. N/A Tape Measure 1
AR
110. N/A ¼” Screw Tap NPT Thread 1
111. N/A ¼” NPT Thread Screw Plug 5
112. N/A ¼” Unbracotop 1
IN
113. N/A Pocket Calculator 1
114. N/A Drill 8.5 mm + 10 mm Tap 2
IM
115. N/A Drill 10.2 mm + 12 mm Tap 2
116. N/A Tap Holder 1
117. N/A 4 mm Tab 1
EL
118. N/A Bit Set 1
119. N/A Outer Sheath for Repair Kit HOLD
120. N/A Canusa Wrap 1
PR
Spool Half Heights
1 1 EA Equipment Management Services 4" ETAME 3 Spool Kit Half Height 8'x24'x4' with Certified Rigging 7.32x2.44x1.22 USA AMCUS‐PO‐14‐000476 EMS ‐ Cargo Baskets Rev 0
2 1 EA EMAS End Kit 1 ‐ 4" ETAME 3 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
3 1 EA EMAS End Kit 2 ‐ 4" ETAME 3 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
4 1 EA EMAS Met Kit 3 ‐ 4" ETAME 3 Spool Kit w/ 4" WN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
5 1 EA EMAS Met Kit 4 ‐ 4" ETAME 3 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
6 1 EA EMAS SPL Kit 14 ‐ 4" ETAME 3 Spool Kit w/ 4" WN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
7 1 EA EMAS SPL Kit 15 ‐ 4" ETAME 3 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
8 2 EA EMAS Straight Joints ‐ Drawn 19'‐0" ‐ 4" ETAME 3 Spool Kit USA
9 1 EA EMAS 90 Deg Bends ‐ 19'x5' ‐ 4" ETAME 3 Spool Kit USA
10 1 EA EMAS 90 Deg Bends ‐ 19'x4'‐10.5" ‐ 4" ETAME 3 Spool Kit USA
11 1 EA Turner 4‐inch, 90‐degree Spare Bend USA
12 1 EA Turner 4‐inch, 30‐degree Spare Bend USA
13 1 EA Turner 4‐inch, 41‐degree Spare Bend USA
14 1 EA Equipment Management Services 8" SEENT 2 Flowline to Riser Spool Kit Half Height 8'x24'x4' with Certified Rigging 7.32x2.44x1.22 USA AMCUS‐PO‐14‐000476 EMS ‐ Cargo Baskets Rev 0
15 1 EA EMAS End Kit 5 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
16 1 EA EMAS End Kit 8 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
17 1 EA EMAS Met Kit 6 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" WN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
18 1 EA EMAS Met Kit 7 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
19 1 EA EMAS SPL Kit 18 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" WN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
20 1 EA EMAS SPL Kit 19 ‐ 8" SEENT 2 Flowline to Riser Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
Y
21 3 EA EMAS Straight Joints ‐ Drawn 25'‐4.88" ‐ 8" SEENT 2 Flowline to Riser Spool Kit USA
22 2 EA EMAS 90 Deg Bends ‐ 18'x6'‐7.13" ‐ 8" SEENT 2 Flowline to Riser Spool Kit USA
23 1 EA EMAS 62.3 Deg Bends ‐ 19'x5' ‐ 8" SEENT 2 Flowline to Riser Spool Kit USA
24 1 EA Turner 8‐inch, 90‐degree Spare Bend USA
25 1 EA Turner 8‐inch, 62.33‐degree Spare Bend USA
AR
26 1 EA Turner 8‐inch, 30‐degree Spare Bend USA
27 1 EA Equipment Management Services 8" SEENT 2 Flowline to Wye Spool Kit Half Height 8'x24'x4' with Certified Rigging 7.32x2.44x1.22 USA AMCUS‐PO‐14‐000476 EMS ‐ Cargo Baskets Rev 0
28 1 EA EMAS End Kit 9 ‐ 8" SEENT 2 Flowline to Wye Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
29 1 EA EMAS End Kit 10 ‐ 8" SEENT 2 Flowline to Wye Spool Kit w/ 8" x 10 Deg Misalignment Flange (MAF) ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
30 1 EA EMAS Met Kit 6 ‐ 8" SEENT 2 Flowline to Wye Spool Kit w/ 8" WN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
31 1 EA EMAS Met Kit 7 ‐ 8" SEENT 2 Flowline to Wye Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
32 3 EA EMAS Straight Joints ‐ Drawn 18'‐1.63" ‐ 8" SEENT 2 Flowline to Wye Spool Kit USA
33 1 EA EMAS 90 Deg Bends ‐ 18'‐1.63"x6'‐7.13" ‐ 8" SEENT 2 Flowline to Wye Spool Kit USA
34 1 EA EMAS 90 Deg Bends ‐ 18'x6'‐7.13" ‐ 8" SEENT 2 Flowline to Wye Spool Kit USA
35 1 EA Equipment Management Services 4" SEENT 1 Spool Kit Half Height 8'x24'x4' with Certified Rigging 7.32x2.44x1.22 USA AMCUS‐PO‐14‐000476 EMS ‐ Cargo Baskets Rev 0
IN
36 1 EA EMAS End Kit 11 ‐ 4" SEENT 1 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
37 1 EA EMAS End Kit 12 ‐ 4" SEENT 1 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
38 1 EA EMAS Met Kit 3 ‐ 4" SEENT 1 Spool Kit w/ 4" WN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
39 1 EA EMAS Met Kit 4 ‐ 4" SEENT 1 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
40 1 EA EMAS SPL Kit 16 ‐ 4" SEENT 1 Spool Kit w/ 4" WN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
41 1 EA EMAS SPL Kit 17 ‐ 4" SEENT 1 Spool Kit w/ 4" SWN FLG ANSI #1500 RTJ, ASME B16.5, ASTM A694 GR F52 USA
42 2 EA EMAS Straight Joints ‐ Drawn 19'‐9.5" ‐ 4" SEENT 1 Spool Kit USA
IM
43 1 EA EMAS 90 Deg Bends ‐ 18'x4' 10.5" ‐ 4" SEENT 1 Spool Kit USA
44 1 EA EMAS 41 Deg Bends ‐ 18'X‐5' ‐ 4" SEENT 1 Spool Kit USA
45 1 EA Equipment Management Services 8" SEENT 2 Wye to Avouma Spool Kit Half Height 8'x24'x4' with Certified Rigging 7.32x2.44x1.22 USA AMCUS‐PO‐14‐000476 EMS ‐ Cargo Baskets Rev 0
46 1 EA EMAS End Kit 10 ‐ 8" SEENT 2 Wye to Avouma Spool Kit w/ 8" x 10 Deg Misalignment Flange (MAF) ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
47 1 EA EMAS End Kit 13 ‐ 8" SEENT 2 Wye to Avouma Spool Kit w/ 8" SWN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
48 1 EA EMAS Met Kit 6 ‐ 8" SEENT 2 Wye to Avouma Spool Kit w/ 8" WN FLG, ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
49 1 EA EMAS Met Kit 7 ‐ 8" SEENT 2 Wye to Avouma Spool Kit w/ 8" x 10 Deg Misalignment Flange (MAF) ANSI #900 RTJ, ASME B16.5, ASTM A694 GR F52 USA
50 3 EA EMAS Straight Joints ‐ Drawn 18' ‐ 8" SEENT 2 Wye to Avouma Spool Kit USA
51 1 EA EMAS 90 Deg Bends ‐ 18'‐1.63"x6'‐7.13" ‐ 8" SEENT 2 Wye to Avouma Spool Kit
EL USA
Dive Support Tooling Container
52 1 EA EMAS Marine Base DSV Tooling Container 3.0x2.4x2.4 3.05x2.44x2.44 USA Free‐Issued EMAS Marine Base
Studs, Nuts, Gaskets & Flange Skillets
53 150 EA Petroleum Accessories Hydratight Stud Bolts, 1‐3/8" Dia x 20" Long, ASTM A193 GR B7M, PTFE Coated (RED) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
54 300 EA Petroleum Accessories 1‐3/8" Heavy Hex Nuts w/ Tommy Bar Holes, ASTM GR. 2HM, PTFE Coated (RED) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
55 195 EA Petroleum Accessories Hydratight Stud Bolts, 1‐1/8" Dia X 18" Long, ASTM A193 GR B7M, PTFE Coated (GREEN) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
56 390 EA Petroleum Accessories 1‐1/8" Heavy Hex Nuts w/ Tommy Bar Holes, ASTM GR. 2HM, PTFE Coated (GREEN) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
57 150 EA Petroleum Accessories Hydratight Stud Bolts, 1‐1/4" Dia X 18", ASTM A193 GR B7M, PTFE Coated (YELLOW) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
PR
Y
110 10 EA TBD Plastic Vernier Caliper 200mm USA LEX Consumables
111 2 EA 150 ft‐lb Torque Wrench? USA Existing in EMB from Tamar?
112 25 EA Tommy Bars? USA RFQ with PAI
113 Flexible Pigs? USA Weatherford?
AR
Consumables
114 100 EA Gas & Supply 12 hour Glow Sticks ‐ Yellow USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
115 100 EA Gas & Supply 12 hour Glow Sticks ‐ Pink USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
116 50 EA Gas & Supply Brillo Pads USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
117 3 BOX Gas & Supply VHF Radio with battery ‐ Motorola USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
118 25 EA Gas & Supply 4" x 25' Ratchet Straps w/ Double J‐Hook USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
119 3 BOX Gas & Supply 16 mm Polyrope, 100 m Spool USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
120 3 EA Gas & Supply 22 mm Polyrope, 100 m Spool USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
121 3 EA Gas & Supply 6 mm Polyrope, 100 m Spool USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
122 1 EA Gas & Supply Spray Paint ‐ Flourescent Yellow USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
123 1 EA Gas & Supply Spray Paint ‐ Flourescent Pink USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
IN
124 1 EA Gas & Supply Spray Paint ‐ Flourescent Green USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
125 1 EA Gas & Supply Spray Paint ‐ White USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
126 1 EA Gas & Supply Spray Paint ‐ Red USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
127 20 EA Gas & Supply Paint Stick ‐ Red USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
128 20 EA Gas & Supply Paint Stick ‐ Black USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
129 20 BOX Gas & Supply Paint Stick ‐ White USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
130 5 EA Gas & Supply Paint Marker ‐ Red USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
IM
131 5 EA Gas & Supply Paint Marker ‐ White USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
132 5 ROLL Gas & Supply Paint Marker ‐ Black USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
133 1 EA Gas & Supply WD40 USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
134 25 EA Gas & Supply Duct Tape USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
135 5 EA Gas & Supply Tie‐wraps, 5mmx500mm (pk 50) USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
136 5 EA Gas & Supply Tie‐wraps, 5mmx250mm (pk 100) USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
137 5 EA Gas & Supply Tie‐wraps, 5mmx150mm (pk 100) USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
138 4 PCK Gas & Supply Wire Brush USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
139 10 EA Gas & Supply 10 mT MBL D‐Rings
EL USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
140 10 EA Gas & Supply 45 mT MBL D‐Ring USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
141 2 EA Gas & Supply Emory Cloth Roll USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
142 4 EA Gas & Supply 3/4" x 3' All Thread Rod USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
143 1 EA Gas & Supply Nut & Washer to Fit 3/4" Diameter All Thread USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
144 2 EA Gas & Supply 3/8" Galvanized Lacing Cable USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
145 2 EA Gas & Supply 3/8" Wire Clips (bags of 50) USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
146 1 BOX Gas & Supply 3/8" Steel Thimbles (bag of 80) USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
147 2 ROLL Gas & Supply Wire Cutters USA AMCUS‐PO‐14‐000686 Gas and Supply DSV Consumables Rev 1
PR
Y
198 1 EA EMAS Marine Base Concrete Mattress Lifting Beam USA Concrete Mat
199 600 FT Industrial Material Corporation W14x90 WF Strongback I‐Beam USA AMCUS‐PO‐14‐000820 IMC Rev 0
200 400 FT Industrial Material Corporation W8x24 WF Strongback I‐Beam USA AMCUS‐PO‐14‐000820 IMC Rev 0
201 5 EA Waskey Bridges, Inc. 8' W x 20' L x 12" H Concrete Mattress with a non‐abrasive boots 6.1x2.4x0.23 USA AMCUS‐PO‐14‐000757 Concrete Mat Waskey Rev 0
202 10 EA TBD Poly Plank 2" x 24" x 108", 4 lb Density USA LEX Consumables
AR
203 3 EA TBD Foam Blocks 36" x 36" x 60"; 2 lb density 1x1x1.5 USA LEX Consumables
204 1 EA Avouma Ball Valve USA
205 8 EA Tenaris 4" Bare Pipe Joint for Weld Procedure Qualifications Mexico
206 8 EA Tenaris 8" Bare Pipe Joint for Weld Procedure Qualifications Mexico
Will be cut into spool kit parts, excess to
207 11 EA Tenaris 4" FBE Coated Joints for Spool Kit Fabrication
loaded as spare for Gabon
Mexico
Will be cut into spool kit parts, excess to
208 14 EA Tenaris 8" FBE & GSPU Insulated Joints for Spool Kit Fabrication
loaded as spare for Gabon
Mexico
IN
Shoreside Gabon Container
205 1 EA Shoreside Gabon Container 3.0x2.4x2.4 3.05x2.44x2.44 USA Free‐Issued EMAS Marine Base
206 7 EA 4.5" Spool Anodes USA
207 6 EA 12.65" Spool Anodes USA
208 200 EA Gas & Supply 2" x 10' Ratchet Straps w/ Double J‐Hook USA DSV Rigging & Consumable Part I
209 LOT Insulation Half Shells USA
210 LOT Heat Shrink Sleeve USA
IM
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 10.4m) ‐ EIPS IWRC (Tagged ETAME 3 FL‐A)
Sling 2 = 1" Wire Rope (Length = 8.1m) ‐ EIPS IWRC (Tagged ETAME 3 FL‐B)
Sling 3 = 1" Wire Rope (Length = 8.3m) ‐ EIPS IWRC (Tagged ETAME 3 FL‐C)
Sling 4 = 1" Wire Rope (Length = 10m) ‐ EIPS IWRC (Tagged ETAME 3 FL‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2009‐01 Rev A
211 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
EL
Sling 1 = 1" Wire Rope (Length = 10.2m) ‐ EIPS IWRC (Tagged ETAME 3 RISER‐A)
Sling 2 = 1" Wire Rope (Length = 8.4m) ‐ EIPS IWRC (Tagged ETAME 3 RISER‐B)
Sling 3 = 1" Wire Rope (Length = 8.2m) ‐ EIPS IWRC (Tagged ETAME 3 RISER‐C)
Sling 4 = 1" Wire Rope (Length = 10m) ‐ EIPS IWRC (Tagged ETAME 3 RISER‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2004‐01 Rev A
212 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
PR
Sling 1 = 1" Wire Rope (Length = 11.75 m) ‐ EIPS IWRC (Tagged SEENT 2 RISER‐A)
Sling 2 = 1" Wire Rope (Length = 9.9 m) ‐ EIPS IWRC (Tagged SEENT 2 RISER‐B)
Sling 3 = 1" Wire Rope (Length = 8.8 m) ‐ EIPS IWRC (Tagged SEENT 2 RISER‐C)
Sling 4 = 1" Wire Rope (Length = 9.9 m) ‐ EIPS IWRC (Tagged SEENT 2 RISER‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2005‐01 Rev A
213 1 USA Spool Lift Rigging
Sling 5 = 1" Wire Rope (Length = 11.5 m) ‐ EIPS IWRC (Tagged SEENT 2 RISER‐E)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2005‐01 Rev A
214 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 13.0 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐A)
Sling 2 = 1" Wire Rope (Length = 10.3 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐B)
Sling 3 = 1" Wire Rope (Length = 9.3 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐C)
Sling 4 = 1" Wire Rope (Length = 9.6 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐D)
Sling 5 = 1" Wire Rope (Length = 9.2 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐E)
Sling 6 = 1" Wire Rope (Length = 14.0 m) ‐ EIPS IWRC (Tagged SEENT 2 FL‐F)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2010‐01 Rev A
215 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 16.2 m) ‐ EIPS IWRC (Tagged SEENT 2 WYE‐A)
Sling 2 = 1" Wire Rope (Length = 11.4 m) ‐ EIPS IWRC (Tagged SEENT 2 WYE‐B)
Sling 3 = 1" Wire Rope (Length = 7.8 m) ‐ EIPS IWRC (Tagged SEENT 2 WYE‐C)
Sling 4 = 1" Wire Rope (Length = 10.56 m) ‐ EIPS IWRC (Tagged SEENT 2 WYE‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2006‐01 Rev A
216 1 USA Spool Lift Rigging
Sling 5 = 1" Wire Rope (Length = 12.46 m) ‐ EIPS IWRC (Tagged SEENT 2 WYE‐E)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2006‐01 Rev A
217 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 11.2 m) ‐ EIPS IWRC (Tagged SEENT 1 FL‐A)
Sling 2 = 1" Wire Rope (Length = 7.8 m) ‐ EIPS IWRC (Tagged SEENT 1 FL‐B)
Sling 3 = 1" Wire Rope (Length = 9.0 m) ‐ EIPS IWRC (Tagged SEENT 1 FL‐C)
Sling 4 = 1" Wire Rope (Length = 10.76 m) ‐ EIPS IWRC (Tagged SEENT 1 FL‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2011‐01 Rev A
218 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 10.1 m) ‐ EIPS IWRC (Tagged SEENT 1 RISER‐A)
Sling 2 = 1" Wire Rope (Length = 8.2 m) ‐ EIPS IWRC (Tagged SEENT 1 RISER‐B)
Sling 3 = 1" Wire Rope (Length = 8.4 m) ‐ EIPS IWRC (Tagged SEENT 1 RISER‐C)
Sling 4 = 1" Wire Rope (Length = 9.8 m) ‐ EIPS IWRC (Tagged SEENT 1 RISER‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2007‐01 Rev A
219 1 USA Spool Lift Rigging
A‐345 1‐3/4” MasterLink Assembly (SWL 38.6 mT)
Sling 1 = 1" Wire Rope (Length = 11.4 m) ‐ EIPS IWRC (Tagged SEENT 2 AVOUMA‐A)
Sling 2 = 1" Wire Rope (Length = 9.6 m) ‐ EIPS IWRC (Tagged SEENT 2 AVOUMA‐B)
Sling 3 = 1" Wire Rope (Length = 7.8 m) ‐ EIPS IWRC (Tagged SEENT 2 AVOUMA‐C)
Sling 4 = 1" Wire Rope (Length = 12.9 m) ‐ EIPS IWRC (Tagged SEENT 2 AVOUMA‐D)
Reference Dwg 12022‐AMC‐TIN‐DTL‐2008‐01 Rev A
Y
220 1 USA Spool Lift Rigging
221 12 3m Endless Round Sling (SWL = 14.1Te Vertical) USA Spool Lift Rigging
222 146 G‐2130 Shackle (SWL = 9.5Te) USA Spool Lift Rigging
223 10 G‐2130 Shackle (SWL =17Te) USA Spool Lift Rigging
224 18 2.55m Endless Round Sling (SWL = 9.1 Te Choked) USA Spool Lift Rigging
AR
225 30 4.6m Endless Round Sling (SWL = 9.1 Te Choked) USA Spool Lift Rigging
226 38 L‐320R ROV Eye Hook with Release Wire (SWL = 11.5Te) USA Spool Lift Rigging
227 225 Split Pins to Fit 9.5 Te Crosby G‐2130 Shackle USA Spool Lift Rigging
228 50 Split Pins to Fit 17 Te Crosby G‐2130 Shackle USA Spool Lift Rigging
229 135 EA Hydratight Stud Bolts, 1‐3/8" Dia x 20" Long, ASTM A193 GR B7M, PTFE Coated (RED) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
230 270 EA Petroleum Accessories 1‐3/8" Heavy Hex Nuts w/ Tommy Bar Holes, ASTM GR. 2HM, PTFE Coated (RED) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
231 80 EA Petroleum Accessories Hydratight Stud Bolts, 1‐1/4" Dia X 18", ASTM A193 GR B7M, PTFE Coated (YELLOW) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
232 160 EA Petroleum Accessories 1‐1/4" Heavy Hex Nut w/ Tommy Bar Holes, ASTM GR. 2HM, PTFE Coated (YELLOW) USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
233 18 EA Petroleum Accessories Gasket, Ring Joint, 4” ANSI #1500, No. R39, Oval, 316 SS USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
234 12 EA Petroleum Accessories Gasket, Ring Joint, 8” ANSI #900, No. R49, Oval, 316 SS USA AMCUS‐PO‐14‐000356 Studs, Nuts, Gaskets ‐ PAI Rev 0
IN
235 4 Petroleum Accessories 4" 1500# RTJ BL F52 Center drill & tap 1" NPT ASME B16.20, ASTN A694 USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Hydrotest
236 4 Federal Flange 8" 900# RTJ BL F52 Center drill & tap 1" NPT ASME B16.20, ASTMA694 USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Hydrotest
237 2 Federal Flange 4" 1500# RTJ WN F52ASME B16.5, ASTM A694 GR F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
238 1 Federal Flange 4" 1500# RTJ Swivel WN F52ASME B16.5, ASTM A694 GR. F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
239 1 Federal Flange 4 1/16" 5K WN .337"wt 4130ASTM A322 API 4130 (F60) (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
240 1 Federal Flange 4 1/16" 5K Swivel .337"wt 4130BTM 0.337" WT, ASTM A322 API 4130 (F60) (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
241 2 Federal Flange 5 1/8" Swivel ring RTJ flange, API 17D SV 10K PSI BTM 0.864 WT. ASTM A322, AISI 4130 F60 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
IM
242 3 Federal Flange 8" 900# RTJ WN F52ASME B16.5, ASTM A694 GR F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
243 1 Federal Flange 8" 900# RTJ Swivel F52ASME B16.5, ASTM A694 GR. F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
244 1 Federal Flange 8" x 10deg WE X RTJ MAF 900# F52 weld end to match 8.625" X.50"WT pipe ASME B16.5, ASTM A694, GR. F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
245 2 Federal Flange 6" 1500# RTJ WN 4.897"ID A694 F52 (SPARE) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4 Spares
246 2 Federal Flange Weld Test Ring for 6" WN (6.625x4.897x12.00) USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4
247 2 Federal Flange Test Ring for weld testing 4.5"OD x 3.826"ID x 12.00" OAL 4130 5k USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4
248 2 Federal Flange Test Ring for weld testing 8.625" OD x 7.625"ID x 12.00" OAL A694 F52 USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4
249 2 Federal Flange Test Ring for weld testing 6.728"OD x 5" ID x 12.00" OAL AISI 4130 F60 10K USA AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4
250
251
2
15 EA
Federal Flange
Federal Flange
Test Ring for weld testing 4.50"OD x 3.826"ID x 12.00"OAL A694 F52
4” wooden flange protector ¾” thick + 1/4” thick neoprene + Epoxy Bond
EL USA
USA
AMCUS‐PO‐14‐000082 Federal Flange ‐ Flanges and Test Rings Rev 4
AMCUS‐PO‐14‐000823 WPM Rev 0
252 15 EA FAB ‐ WPM Technologies 8” wooden flange protector ¾” thick + 1/4” thick neoprene + Epoxy Bond USA AMCUS‐PO‐14‐000823 WPM Rev 0
253 1 EA FAB ‐ WPM Technologies SIGNODE PRHR‐114 USA
254 1 EA Manual Band‐It Tool ( for 1 ¼” wide band and Crimp seal) USA
255 3 Roll Stainless Steel Bands 1 ¼” x 0.030” USA
256 1 Box Stainless Steel Crimp Seal 1 ¼” USA
257 120 EA Locktite RTV Silicone sealant (300ml Packs) USA
258 4 EA Caulking‐Gun ( for 300 ml silicone cartridge) USA
PR
10.2 m Flexible Reel
1 1 EA NOV 10.2 m Flexible Reel ########## 10.2x5.5x5.0
2 1 EA NOV 5” ID x 860 m Production Flowline
3 1 EA NOV 5” ID x 590 m Production Flowline
4 1 EA NOV 5” ID x 170 m Production Jumper
NOV Repair Container
5 1 EA NOV NOV Repair Container 3.0x2.4x2.4 $1,550.00 3.05x2.44x2.44
Spares & Service Crates #1,2,3
6 1 EA NOV EF Ser 5” PF, 3769SER001‐003
7 12 EA NOV Ring Joint Gasket, BX 169 Incoloy 825
8 87 EA NOV Stud Bolt 1‐1/8” x 385 c/w SS Nuts PTFE TB3.1
9 6 EA NOV Cable for Anode 500 mmx16mm2
10 6 EA NOV DIN 912, M12x16mm, B7m‐3.1
NOV Repair Kit
11 1 EA NOV Cable – 40 m – 220 Volt
12 1 EA NOV Grinding Machine
13 1 EA NOV Miller for Grinding Machine
14 1 EA NOV Electric Plane 220 V
15 2 EA NOV Blades for Electric Plane
16 1 EA NOV Milling Machine
Y
17 3 EA NOV Miller for Milling Machine 60
18 1 EA NOV Miller for Milling Machine 90
19 1 EA NOV Miller for Milling Machine Radius 6
20 1 EA NOV Miller for Milling Machine Radius 8
21 1 EA NOV Miller for Milling Machine Radius 10
AR
22 2 EA NOV Drilling Machine
23 1 EA NOV Drill Cassette 1‐13 mm
24 1 EA NOV Compass Saw 220 V
25 10 EA NOV Blades for Compass Saw
26 1 EA NOV Socket Wrench Set
27 1 EA NOV Angle Grinder 220 Volt
28 10 EA NOV Blades for Angle Grinder
29 10 EA NOV Slide Blades for Angle Grinder 1.6 mm
30 5 EA NOV Grind Blades for Angle Grinder
31 1 EA NOV Adaptor 240 V
IN
32 1 EA NOV Plug
33 1 EA NOV Socket
34 2 EA NOV Welding Machine for Extruder
35 10 EA NOV Teflon Welding Shoe
36 2 EA NOV Plastic Welding Torch / Heat Gun
37 3 EA NOV Welding Nozzle for Plastic Welding Torch
38 2 EA NOV Complete Temperature Sensor
IM
39 6 EA NOV Extra Batteries for Temperature Sensor
40 4 EA NOV Lorry Straps
41 1 EA NOV Valve/Regulator for Gas Cylinder
42 1 EA NOV Gas Hose
43 1 EA NOV Regulation Lever with Valve
44 1 EA NOV Blowpipe
45 2 EA NOV Torch for Blowpipe
46 1 EA NOV Ultrasonic Detector
47
48
1
1
EA
EA
NOV
NOV
Micrometer Gauge
Heating Furnace
EL
49 2 EA NOV Lorry Straps 5 m
50 1 EA NOV Welding Wire MDPE
51 2 EA NOV Blue Safety Helmet
52 4 EA NOV Safety Glasses
53 2 EA NOV Yellow Wet Suit
54 10 EA NOV Dustmasks with Valve
55 24 EA NOV Fabric Gloves
PR
56 10 EA NOV Gloves
57 2 EA NOV Yellow Epoxy Suit
58 5 EA NOV Cloths
59 1 EA NOV Slide Fastener for Canusa Wrap
60 5 EA NOV Black Tape 25 mm
61 5 EA NOV Elephant Tape 25 mm
62 18 EA NOV Elephant Tape 50 mm
63 1 EA NOV Fluff‐free Paper
64 3 EA NOV Paint Bins 0.75 L Empty
65 1 EA NOV Brass Foil
66 1 EA NOV Sheet 6x4 m
67 1 EA NOV Cutting Compound
68 1 EA NOV Emery Corn 150
69 1 EA NOV Emery Corn 60
70 18 EA NOV Coroplast 0.2x 70x30 m
71 8 EA NOV Tape Nitto 2x150x10 m
72 12 EA NOV Tape Nitto 2x50x10 m
73 1 EA NOV Screw Driver 10
74 3 EA NOV Chisel
75 3 EA NOV Blades for Plane
76 1 EA NOV Bench/Hand Hammer No. 3
77 1 EA NOV Multigrip Pliers
78 1 EA NOV Adjustable Wrenches 4”
79 1 EA NOV Adjustable Wrenches 6”
80 1 EA NOV Adjustable Wrenches 8”
81 1 EA NOV Adjustable Wrenches 10”
82 2 EA NOV Brushes
83 1 EA NOV Steel Brushes
84 2 EA NOV Hobby Knife with Screw Lock
85 1 EA NOV Silicium Carbide Stone
86 1 EA NOV Gouges 6‐8 10‐12
87 1 EA NOV File, 8”
88 1 EA NOV Electric Torch/Flashlight
89 2 EA NOV Batteries for Flashlight
90 1 EA NOV Hacksaw
91 10 EA NOV Blades for Hacksaw
92 6 EA NOV Padlocks
93 1 EA NOV Spark Igniter
94 2 EA NOV Ziehblade/Scraper
95 1 EA NOV Small Plane
96 1 EA NOV Side Cutter
97 1 EA NOV Plastic Hammer, 40 mm
98 1 EA NOV Allen Wrenches
99 3 EA NOV Scraping Knife
100 3 EA NOV Blades for Scraping Knife
101 1 EA NOV Folding Rule
102 1 EA NOV Screw Drivers
103 1 EA NOV Torx for Screw Driver 10
104 2 EA NOV Black Ink
105 1 EA NOV Blades for Hobby Knife
106 1 EA NOV Slide Gauge 150 mm
107 1 EA NOV File, 6
108 1 EA NOV Rasp
109 2 EA NOV Blade for Rasp
110 1 EA NOV Flashlight
111 4 EA NOV Batteries for Flashlight
Y
112 1 EA NOV Combination Wrench 6‐32 mm
113 1 EA NOV Tape Measure
114 1 EA NOV ¼” Screw Tap NPT Thread
115 5 EA NOV ¼” NPT Thread Screw Plug
116 1 EA NOV ¼” Unbracotop
AR
117 1 EA NOV Pocket Calculator
118 2 EA NOV Drill 8.5 mm + 10 mm Tap
119 2 EA NOV Drill 10.2 mm + 12 mm Tap
120 1 EA NOV Tap Holder
121 1 EA NOV 4 mm Tab
122 1 EA NOV Bit Set
123 TBD EA NOV Outer Sheath for Repair Kit
124 1 EA NOV Canusa Wrap
125 1 EA NOV Heating Oven
IN
NOV Reel Ancillaries
126 1 EA NOV NOV Transportation Cradle $1,550.00 3.05x2.44x2.44
127 1 EA NOV 10.2 m Reel Tarp
Turninig Bollards for Flex Lay
128 4 EA OIS 40 x 25 kg sand bags double bagged in 1 Te FIBC Bulk Bag $1,000.00 AMCUS‐PO‐14‐000542 ‐ OIS ‐ Grout Bags Rev 0
IM
EL
PR
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 41 of 44
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-4-1
PY
DESCRIPTION: 3 X 60 Ft HH-105EE EYE & EYE WIRE ROPE SLING WITH STANDARD EYES
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-4-2
PY
DESCRIPTION: 3 X 60 Ft HH-105EE EYE & EYE WIRE ROPE SLING WITH STANDARD EYES
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-4-3
PY
DESCRIPTION: 3 X 60 Ft HH-105EE EYE & EYE WIRE ROPE SLING WITH STANDARD EYES
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-4-4
PY
DESCRIPTION: 3 X 60 Ft HH-105EE EYE & EYE WIRE ROPE SLING WITH STANDARD EYES
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-5-1
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 8/26/2013
SERIAL #: 518603-5-2
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER
As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is solely
responsible for the usability and suitability of these products.
CERTIFICATE OF TEST
DATE: 10/1/2013
RODNEY ELKINS
This certifies the described products meet the above specifications. Load measuring instrument is accurate +/- 1% of
reading as specified by ASTM E-4. Upon conclusion of testing no obvious defects were noted.
DISCLAIMER As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is
solely responsible for the usability and suitability of these products.
PRE AND POST-MT EXAMINATION REPORT
DATE: 8/30/2013
CUSTOMER: EMAS -AMC INC
PURCHASE ORDER: AMCUS-PO-11-002214
HHI ORDER: 518603
QUANTITY: 2
SERIAL #:SB-001-300 AND SB-002-300 TEST ID #: H518603-1-1PM AND 2PM
COMMENTS:
INSPECTED BY:
DISCLAIMER As the use of these products are beyond the control of Holloway Houston, Inc., the purchaser and/or end user is
solely responsible for the usability and suitability of these products.
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 42 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 43 of 44
HLV & Express Mobilization / Demobilization Procedure12022-AMC-TIN-PRO-0019 Rev. B
Printed names in the signature boxes confirm that the document has been approved
Paper copies of this document are UNCONTROLLED. Please refer to the EMAS Document Management System for the current version.
Page 44 of 44
JOB SAFETY ANALYSIS FORM
Hazards
Initial Remaining
(Source of possible harm / damage) Responsi
No Description of Activity Hazard Effect / Impact Risk = Existing / Planned Control Measures Risk =
People, Environment, Equipment, and bility
L. M. H. L. M. H.
Reputation
1. Job Planning Inadequate planning Injury to workers L Toolbox talk with all involved Deck L
Lack of communication personnel foreman
Damage to
Lack of understanding JSA Review Crane
equipment
Lift Plan review Op.
Do not walk/stand underneath load! Injury to personnel
All Stop to be utilized!
Hazards
Initial Remaining
(Source of possible harm / damage) Responsi
No Description of Activity Hazard Effect / Impact Risk = Existing / Planned Control Measures Risk =
People, Environment, Equipment, and bility
L. M. H. L. M. H.
Reputation
3. Connect Spreader bar to crane and rig to Shifting load Injury to personnel H DO NOT walk under Spreader DECK L
reel Damage to Crane or Load bar while suspended FMN
Manual handling Damage to cargo Good Comms with crane driver
Pinch points or equipment Deck Foreman in control of CRANE
Prepare to lift load operation OP
Miscommunications
Schedule Delay Use safe Rigging practices
Dropped objects
100% tie off if working aloft P/E
Excessive load on crane
Use taglines on Block if
Swinging Crane block
required
Always remember: NEVER STAND/WALK Rigging failure
UNDERNEATH THE LOAD! Sufficient personnel
Snagging
Utilize Stop Work Authority Correct PPE
Inspect rigging and lift points
before use
Certified rigging
Check rigging for snag points
Check for loose objects
Taglines on rigging to locate it
onto trunnions
Lift plan reviewed prior to
Hazards
Initial Remaining
(Source of possible harm / damage) Responsi
No Description of Activity Hazard Effect / Impact Risk = Existing / Planned Control Measures Risk =
People, Environment, Equipment, and bility
L. M. H. L. M. H.
Reputation
commencing ops and rigging
drawing confirmed correct
Ensure load is secure and
weight is known.
Ensure all sea fastening and
lashings are fully removed.
Ensure planned escape route
at all times
All personnel not involved in
the lift to be clear of deck.
Monitor for approaching
squalls, thunder storms or high
winds
Ensure cradle does not snag
when reel lifted
Slew slowly to allow vessel to
ballast as needed
Ensure reel landed out in
correct location and orientation
per stowage plan.
4. Lift reel from Quayside to HLV Deck. Dropped objects Injury to personnel H Assess weather/Sea/Quay DECK L
Pinch points conditions before lifting FMN
Manual handling Damage to Do Not walk under Reel when
equipment suspended CRANE
Swinging Crane block
Clear communications and OP
Rigging failure
direct instructions
Personnel caught between load Schedule delay
Deck Foreman in control of P/E
Snagging operation
Miscommunications Man overboard
Use suitable tag lines
Vessel Movement Ensure load path is kept clear
Severe Weather Conditions of personnel
Use only certified rigging
Form No. AMC-XXX-HSE-FRM-00002 Rev.: 0 Page: 3 of 5
Parent Doc. AMC-XXX-HSE-PRO-00002
JOB SAFETY ANALYSIS FORM
Hazards
Initial Remaining
(Source of possible harm / damage) Responsi
No Description of Activity Hazard Effect / Impact Risk = Existing / Planned Control Measures Risk =
People, Environment, Equipment, and bility
L. M. H. L. M. H.
Reputation
_________________________
Authorized by
Risk Assessment Matrix
SEVERITY CRITERIA PROBABILITY FOR POTENTIAL SEVERITY
Identify task to be analyzed (1) (2) (3) (4) (5)
Described activity – Break down into manageable sections Operations Very Unlikely Unlikely Possible Likely Very
Personnel Asset Damage Environmental Reputation but possible though but unusual not Likely
Identify hazards / source of possible harm / damage Downtime under extreme conceivable surprising almost no
circumstance doubt
Identify hazard effect / impact (1) (1) (1) (1)
First Aid Slight Slight Local 1 2 3 4 5
Assess the initial risk (<$1,000) (8 hours) (< 5 Gallons / 20 liters) exposure
(2) (2) (2) (2)
Identify existing / planned control measures Medical Minor Minor State
2 4 6 8 10
Treatment (<$10,000) (< 42 Gallons / 155 liters) exposure
Assign responsible persons if / as appropriate (< = 1 day)
(3) (3) (3) (3)
Re-evaluate the risk Lost Time/ Medium Medium National
3 6 9 12 15
Rest. Injury (<$100,000) (< 420 Gallons/1550 liters) exposure
( > 1 day)
(4) (4) (4) (4)
Remember Hierarchy of Controls: Single Major Major Regional
4 8 12 16 20
Fatality (<$1,000,000) (< 4,200 Gallons / 15,500 exposure
(>1week) liters)
Eliminate, (5) (5) (5) (5)
Substitute, Multiple
Fatality
Extensive
(>$1,000,000)
Massive
(> 4,200 Gallons / 15,500
International
exposure
5 10 15 20 25
Administrative Controls, 1-6 Low Risk May be acceptance; however, review task to see if risk can be reduced further.
Job should only proceed with appropriate authorization after consultation with HSE specialist personnel and assessment team. Where possible, the
PPE. 7 - 14 Medium Risk job shall be redefined to take account of the hazards involved or risk shall be reduced further prior starting the job. If applicable, a Permit-to-Work
shall be obtained.
The job must not proceed until it has been redefined or further control measures put in place to reduce risk. The controls shall be re-assessed for
15 - 25 High Risk
adequacy prior to starting the job.