SCOPE OF WORK AREA (sq.m.) PRICE PER SQ.M.

TOTAL
1. Demolition 12 8,0000.00 96,000.00

2. Renovation 35 15,000.00 525,000.00

3. Ceiling Board-Up 90 1,000.000 90,000.00


(Note:Total Construction
Cost for Ceiling will vary as
per Owner or Contractor
hired.)
TOTAL 711,000.00

MARK-UP@10% 71,000.00

TOTAL PROJECT COST (+/-)782,000.00

FOR LABOR 90 35% OF 711,000.00 273 ,700.00


ESTIMATES FOR THE RENOVATION OF SARANGAY RESIDENCE