Actual Status of Project Progress at Site Observed: Physical Progress of UGC/EWDS/Saline Embankment/MPCS)
Actual Status of Project Progress at Site Observed: Physical Progress of UGC/EWDS/Saline Embankment/MPCS)
Actual Status of Project Progress at Site Observed: Physical Progress of UGC/EWDS/Saline Embankment/MPCS)
Construction of
Multi –Purpose Yet work not started
2 - 0 0
Cyclone Shelter Tendering Stage
Structure
Letter to Proceed for
Narvel Benavale &
Saline
3 - 0 0 Kachli Pitkari works
Embankment
has been issued.
Vadhiv issued LoA.
4 Underground 1- Cumulative Laying and horizontal
Cabling Work 1 -160MM HDPE pipe laid for executed 160 drilling of HDPE pipe
(UGC) Revdanda feeder/usar /usar MM HPE pipe 160MM for
express feeder. laid length for underground cable
Revdanda and HT UG cable
2-22KV HT UG cable and feeder/usar /usar pulling work in
160mm HDPE pipe is being laid express is 612 progress.
for incoming express Alibaug meter
and Varsoli feeder for 22KV
feeder. 2-Cumulative
executed 22 KV
3- 22KV HT UG cable 3CX300 HT UG
SQMM and 3CX95 SQMM Out cable3CX300SQ
going chendhere feeder MM laid length
610 meter and
Alibag 160mmHDPE
pipe laid for
Alibaug and
Varsoli feeder for
22KV feeder
2956 meter
3-Cumulative
executed22 KV
3Cx300sqmm
cable 155 meter
and 3Cx95sqmm
448 meter and
160mm HDPE
pipe pulling 538
meter
Satpati 1- LT UG cable is being laid 1- Cumulative HDPE pipe 160MM
3.5C*70sqmm,3.5Cx35sqmm3.5 LTUG cable 3.5 pulling work in
CX300sqmm from Radhakrishna CX70 SQMM laid progress
DTR to Maliaghar satpati DTR length 2800
and Smarak DTR to macchimaar meter,3.5cx35sq
mm 3300 meter
and 3.5cx300
2-HT UG cable3CX300SQMM sqmm 3.500
with HDPE pipe id being laid meter
From Radhakrishna DTR to
Satpati Maliaghar. And 2-Cumulataive
Maliaghar DTr to Nisarg resort HTUG cable with
HDPE
3CX300sqmm
laid length
-2250meter
2.Cumulative
2- Ratnagiri/11KV SHIRGAON executed 11 KV
FEEDER HT/ LT UG cable
length is 6749
meter Approx
3.Cumulative
3- Ratnagiri/11KV Bhagwati executed 11 KV
Feeder HT/ LT UG cable
length is 2123
meter Approx
Design and
Drawings to be
5 Preliminary - 0 0
received.
Services
6 Supply of Materials Alibag MS BARRICADE (2.5MTR - Supply of material LT
LONG X 2MTR HIGHT), 22KV and HT is in progress
CABLE WARNING TAPE, 415 C
CABLE WARNING TAPE, LED
STRIP Light. PROJECT
INFORMATION BOARD AND
Provision, installation of
cautionary/warning
signage and diversion
boards as per IRC
specifications (SP:55 –
2014)
PVC Pipe 50MM and LED Supply of material LT
Satpati -
STRIP Light and HT is in progress
RCC Half Round & PVC Pipe 50 7690 Nos and Supply of cables( LT
Ratnagiri
mm dia 10757 Meters and HT) is delayed
Excavation 290
Cu.M +filling in
column pits
excavated
material 210
Plinth Beam 95% completed + Cu.M +M10 PCC
Construction of PCC & Base Slab of Cable below footing
7 Alibag Work in progress
switching station Trench completed + Brick 14.18 Cu.M
Masonry 905 completed +Reinforcement
3.42 MT +RCC
M20 Concrete 43
Cu.M+ Brick
Masonary 10
Cu.m.