Professional Documents
Culture Documents
9.2 ITP-Hoarding Al Waab PDF
9.2 ITP-Hoarding Al Waab PDF
9.2 ITP-Hoarding Al Waab PDF
1 Submittals
Shop Drawing containing all Review of QCS 2010 Section 16
details of material sizes, Documents & Part 1 / HC-P4-SD- Approved Shop
1.1 Every Submission N/A H H H
dimensions, connections, Approval from AW-GN-0003 Sheet Drawing
finishes etc. CEG/ASHGHAL. 02 of 02
Review of
QCS 2010 Section 16
Documents & Approved Method
1.2 Method of Statement Every Submission Part 1 / HC-P4-MS- N/A H H H
Approval from Statement
GN-0004
CEG/ASHGHAL.
2 Materials
Review of
QCS 2010 Section 16
Documents & It Approved Material
2.1 Framing (Post & Rail) Every Installation Part 2 / HC-P4-MS- N/A H H H
should comply with Submital
GN-0004
BS Standards 5950.
Review of
QCS 2010 Section 17
Documents & It Approved Material
2.2 Corrugated Sheeting Every Installation Part 1 / HC-P4-MS- N/A H H H
should comply with Submital
GN-0004
BS Standards 3083.
3 Execution
Visual check &
Reference point shall QCS 2010 Section 16
be agreed, joint Prior to Installation & Part 8 / HC-P4-SD- Approved Shop
3.1 Setting Out and Survey N/A H H S
Survey is required after installation AW-GN-0003 Sheet Drawing
before the start of 01 of 02
work.