LIST OF REQUIREMENTS SUBMITTED TO THE OFFICE OF THE BUILDING

OFFICIAL

BUILDING PERMIT APPLICATION


Accomplished Forms:
5 copies Architectural Permit
5 copies Civil/ Structural Permit
5 copies Mechanical Permit
5 copies Sanitary/ Plumbing Permit
5 copies Electronics Permits
5 copies Application for Building Permit Forms
5 copies Sign Permit
5 copies Excavation Permit
5 copies Demolition Permit

Building Plans:
8 sets Architectural Plans
8 sets Structural Plan
8 sets ECE Plan
8 sets Electrical Plan
8 sets Sanitary/ Plumbing Plan
8 sets Fire Protection Plan
8 sets Mechanical Plan
8 sets Architectural Specification
8 sets Electrical Specification
8 sets Fire Protection Specification
8 sets Sanitary / Plumbing Specification
8 sets Mechanical Specifications
2 sets Electrical Design Analysis
1 set General Notes and Specifications
1 set Structural Calculations

Other Requirements Submitted:

Certified True Copy of Title


Surveyed Plan signed and sealed by Geodetic Engineer
Tax Declaration from City Assessor’s Office
Latest quarter of the real property tax receipt
Clear latest picture of site/area
REQUIREMENTS THAT ARE YET TO BE SUBMITTED
SUBMISSION OF REVISED PLANS
During the process of Building Permit Application, Office of the Building Official the project designer to
change the roofing system of the upper roof deck in order to comply with imitations set by the local
building regulations. Hence, Sunly Properties is being required to submit revised plans.

Last January 9, 2020, Sunly Properties proposed for the reorientation of Foundation Profile due to site
condition. The proposal was immediately approved by Engr. Benjie Reyes of RSCaparros- Structural
Designer of the project.

Both matters mentioned above were discussed last January 14, 2020, during the Design Coordination
Meeting attended by Sunly Properties, AIDEA (Architectural Design Consultant), JJE – (Mechanical,
Plumbing and Fire Protection Consultant), and Albert Manla Consultancy Engineering – Electrical
Designer. All of the designers acknowledged the changes.

At this moment, Sunly is waiting for the revised plans which shall be given by the project designers.

FOR DOLE APPLICATION

The following documents has already been provided to Engr. Dan Haduca last December 13, 2019

1 copy Original Certificate of Award


3 copies Occupational Safety, Health, Environment and Security Program
1 copy OSH Certificate of Accreditation and PRC ID of Engr. Frumencio Tan
1 copy COSH Certificate of Engr. Mark Manuguid
4 copies CSHP Form
4 copies PCAB License
1 copy DOLE Registration of Sunly

SUBMISSION OF OTHER REQUIREMENTS


Accomplished Comprehensive CSHP Template from DOLE
Accomplished form of Occupational Safety and Health from DOLE

Last January 24, Mr. Bob Atayan requested Sunly to submit the following documents
SEC Certificate (for Corporations) or DTI Registration
Business Permit from the City or Municipality where the main office is located
TIN of the Company
Fire Inspection of the Establishment