QUESTION BANK – SHIP KNOWLEDGE

01 Total no. Of DC lockers on board are 02 Tic kept in


(a) 8 (b) 9 (a) FRP Locker (b) HQII
(c) 10 (d) 11 (c) HQI (d) DC L locker
03 How many ATU . 04 Emergency Tel no. of HQ 1is:
(a) 120 (b) 100 (a) 2219 (b) 2444
(c) 74 (d) none (c) 2291 (d) none
05 Total no of boiler room on board are: 06 Total no of AFU’S on board are:
(a) 04 (b) 02 (a) 13 (b) 09
(c) 01 (d) 05 (c) 24 (d) 72
07 Location marking of HQ II is: 08 Total no of switch board on board is
(a) 4L (b) 5L (a) 05 (b) 07
(c) 4N (d) 5P0 (c) 08 (d) 09
09 What is major fire fighting system in 10 What is major fighting system in ASW
boiler room magazine
(a) C02 system (b) steam (a) Automatic sprinkling system
drenching system (b) C02 (c) Steam
(c) Helen (d) none (a) None
11 How many first aid box on board ship 12 Total no of compartment on board ship
is is:
(a) 70 (b) 71 (a) 1115 (b) 1200
(c) 75 (d) 80 (c) 1236 (d) 1226
13 How many section base on board is: 14 Total no. Of diesel tanks :
a) 10 b) 07 (a) 15 (b) 10
c) 06 d) 05 (c) 20 (d) 15
15 Total no of W/T sections does the 16 Total no of the frames the ship does
ship has: has:
(a) 18 (b) 20 (a) 178 (b) 250
(c) 16 (c) none (c) 228 (d) 298
17 Total no of fire sensors fitted on 18 In case of fire in HQ 1 which section
board: bas will take action:
(a) 298 (b) 354 (a) SB 1 (b) SB II
(c) 290 (d) 218 (c) SB III (d) SB IV
19 How many fire point at flight deck: 20 Total no of DA on board ship is:
(a) 10 (b) 15 (a) 05 (b) 06
(c) 20 (d) 26 (c) 04 (d) 07
21 Location marking of HQ I is: 22 What is major fire fighting system in DA
(a) 5L0 (b) 4H compartment:
(c) 4P (c) 4K (a) Helon (b) CO2 drenching system
(c) BTM (d) None
23 How many foam inlet tube on board 24 What is major fire fighting system in
ship is gunnery magazine
(a) 10 (b) 20 (a) CO2 (b) steam
(c) 22 (d) 25 (c) Foam tube (d) automatic
sprinkling system.
25 Total no of flood sensors on board 26 How many shelter station on board
ship is ship is
(a) 343 (b) 298 (a) 12 (b) 14
(c) 315 (d) none (c) 16 (d) 15
2

27 How many decks are : 28 How many feed water tanks are :
(a) 09 (b) 14 (a) 04 (b) 07
(c) 11 (d) 13 (c) 11 (d) 13
29 How many trimming tanks on board is 30 Section I liaise between frame station.
(a) 10 (b) 07 (a) 1-75 (b) 1-85
(c) 05 (d) 02 (c) 1-90 (d) 1-95
31 Total no of pumps on board ship. 32 How many ballast –pumps on board.
(a) 14 (b) 10 (a) 10 (b) 15
(b) 08 (d) 05 (c) 04 (d) 02
33 How many position of rewetting valve 34 How many exhaust fan fitted on board
fitted on board. ship.
(a) 15 (b) 22 (a) 60 (b) 65
(c) 20 (d) 25 (c) 70 (d) 80
35 How many ballast tank on board ship: 36 S B II liaise between frame station
(a) 08 (b) 10 (a) 85-100 (b) 18 –90
(c) 15 (d) 15 (c) 85 150 (d) 90 150
37 No. of megator pumps on board ship 38 No. of blowers fitted on board ship is.
(a) 32 (b) 30 (a) 75 (b) 100
(c) 25 (d) 20 (b) 80 (d) 90
39 Length of the ship is 40 Location of section base 1 is
(a) 745.9 ft (b) 750 ft (a) 4S (b) 4K
(c) 755 ft (d) 645 ft (c) 4C (d) 4N
41 No. of cleansing post on board ship 42 Total no of fire point in hanger
(a) 04 (b) 02 (a) 03 (b) 04
(c) 03 (d) 05 (c) 05 (d) 06
43 Total no of T A on board ship 44 Total no of E/R on board ship
(a) 05 (b) 04 (a) 04 (b) 02
(c) 03 (d) 03 (c) 06 (d) 05
45 Total no of FRP locker on board are 46 What is major fire fighting system in
(a) 09 (b) 20 bilges
(c) 08 (d) 11 (a) CO2 system (b) steam
drenching system
(c) foam inlet tube (d) none
47 What is major fire fighting system in 48 How many red zone compt.on board
hanger ship are
(a) Manual operating sprinkling (a) 300 (b) 386
system. (c) 346 (d) 340
(b) Foam sprinkler
(c) Fire main (d) None
3

49 How many FFO tanks. 50 Total no fresh water tanks.


(a) 20 (b) 38 (a) 10 (b) 07
(c) 25 (c) 15 (c) 04 (d) 11

51 How many AVCAT tanks on board. 52 Section base III laise between frame
(a) 07 (b) 05 station
(c) 04 (d) 02 (a) 140-220 (b)150-228
(c) 155-220 (d) 145-228

53 No. of sullage pumps on board ship 54 How many automatic emergency light
(a) 10 (b) 05 fitted on board
(c) 04 (d) 02 (a) 750 (b) 754
(c) 650 (d) 615

55 During hot work which distance 56 Which is consumption of AFFF liquid


additional extinguisher available by FB5(x) ltr/min
(a) 10 m (b) 15 m (a) 10 ltr (b) 05 ltr
(c) 20 m (d) none (c) 13.5 ltr (d) 15ltr

57 What is consumption of AFFF liquid 58 Red triangle on structure for marking of


by FB10(x) liter/min extinguisher size is
a) 20lt (b) 25 lt (a) 115 mm per side & 7mm border
c) 15 lt (d) 10 lt (b) 110x7mm
(c) 90mm x 7mm (d) None
59 Extinguisher marking letter size on 60 What is the duration of NICAD battery
red triangle is when fully charged of tic
(a) 20mm (b) 25mm (a) 30 min (b) 20 min
(c) 30mm (d) none (c) 50min (d) 40 min
61 How many AELs 62 What is the tonnage of the ship is
(a) 650 (b) 754 (a) 25000 tons (b) 28000 tons
(c) 450 (d) none (c) 2500 tons (d) None
63 How many boiler of the ship is 64 How many engine on board ship is
(a) 02 (b) 03 (a) 02 (b) 03
(c) 04 (d) none (c) 04 (d) none
65 What I the capacity of engine 66 TIC kept in
(a) 2000hp (b) 19000hp (a) FRP locker (b) HQ II
(c) 1900hp (d) none (c) HQ I (d) DC(L) locker
67 Total no of DC locker on board are 68 PQS stands for
(a) 08 (b) 09 (a) Personal qualification standards
(c) 10 (d) 11 (b) Pre qualification standards
(c) Post qualifying standards
(d) None of the above