PAT Status:: Mobitel

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

T ircL6Tricri

MOBITEL
bite Huawei BTS PAT Document Page 1 of 14
w C:art, Aiwayx.

Ver. 2018-03-21
11-1 UA et 6ri
wivr)
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Preliminary Inspection
BTS Installation

INSPECTION DATE: 9_0)(1 I osh-e,


PAT REQUEST REFERENCE:

SITE ID: S WAT`


SITE NAME: Niqc+Lv.Ye" rJ,0-vv%,̀
c'N
SITE ADDRESS:

BTS TYPE: -Fp 31.s 260


BTS CONFIGURATION: Pr 4
FREQUENCY BAND: 0 900 MHz 2'1800 MHz 0 3G El/LTE

10157RRU TYPE:

BATTERY CAPACITY: iS k Ick '‘Ao_s

PAT TYPE: EKNew BTS 0 SWAP 0 DB Conversion


0 Band Conversion ❑ RRU Replacement 0 Expansion
0 TX Cabinet

PAT Status:
*Checked
• Pass 0
• Reject .................................
.......... C..1^-fr'VLI4P7'
Regional Operation Gampaha.
• Pass with Minor [DV Mobitel Reg

Remarks:

sk- lAktted 10 ._-1-342_,rj s, 9


4414
4-o c htt k Ate, fe,y Ar^r

tu.1°
kith II

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
ri Lanka
Te ecorn
,obite
MOBITEL
Huawei BTS PAT Document Page 2 of 14
We. Core_ Alw.,,,,

%oft
',me"' ,11111P.
Ver. 2018-03-21
H U4AVVE I .
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya
Major
ot
or OK Comment
NOK
Minor
1.00 Earthing
Feeder cable earth connected to ECB at 90 bend,
1.01 Major
within lm (Vertical rise)
Feeder cable earth within lm from bottom feeder
1.02 Major "1 tA
connector
If vertical feeder length >30m additional feeder
1.03 Major 0 /A
cable earth connected to ECB at every 30m level
Feeder cable earth within lm from top feeder
1.04 Major
connector 0/A
If horizontal feeder length >20m additional feeder
1.05 cable earth connected to ECB at every 20m Major a/ A
distance
1.06 TMA Earthing through proper clamping on tower Major or J A

1.07 Feeder earth kit sealing with self-bonding tape Major ft I 1


All GI pipes are earthed from one side (With nut &
bolt). Usually it should be from SPD end to the bus
1.08 bar (35mm2 cable and lug for power cable GI pipe Major 1 ,
grounding, 25mm2 cable and lug for El/FE cable
GI pipe grounding)
BTS cabinet is earthed using 35mm2 cable, lug and
1.09 washers. It must be to the bus bar at the side of the Major .‘,
cabinet plinth
AC power cable shield should be earthed using
1.10 Major V
35mm2 cable lug to ECB at the meter cubical
Patch panel and power distribution box (ACPDB)
1.11 at the BTS end are earthed to the main ECB using Major \v
35mm2 cable and lug
SPD should be installed at the meter cubical end
1.12 wherever possible and earthing to the nearest bus Major ‘,/
bar using 35mm2 cable and lug
SPD pole (If mounted to the plinth) should be
1.13 Major
earthed by 35mm2 Cu cable
SPD pole (If separate) should be earthed by
1.14 Major ,,, el,. (.5',1-c---
Cu tape
1.15 Steel plinths are earthed by Cu tape with nut & bolt Major ,/ e_4cS4-wl
Horizontal outdoor cable ladder should be earthed
1.16 Major ,,- e, ,0 fS 4-.1.1-5
using 35mm2 cable and lug
Outdoor cable ladder support should be earthed
1.17 using Cu tape. Support pole needs to be connected Major V e, )0 (s I.( vti ,
by nut & bolt

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Te 1 gicLan ka
MOBITEL
• ,, bite!
Huawei BTS PAT Document Page 3 of 14
We- Core_ Aisvey,r-

Ver. 2018-03-21
H UAVVE1
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

1.18 Tower ECBs are earthed using 35mm2 earth cable Major v--- efi s-SA--i ,
RRU DC power cable shield should be earthed at
1.19 Major 1-'"
the BTS end
RRU should be earthed using 16mm2 earth cable to
1.20 Major V"
ECB

2.00 Hardware Installation

Cabinet(s) bolted to plinth correctly with washers.


2.01 Major 1/
Use 04 bolts & it must be GI
2.02 No obstruction at BTS fan & door filters cleaning Major 1- ---

2.03 Cabinet door can be opened and closed easily Major V-

2.04 Cabinet door can be locked and unlocked easily Minor t----
Power supply system is secured properly to the
2.05 Major v
floor or plinth
Battery terminal tightening is done during the PAT
2.06 using a torque wrench (Shoto: 9-11Nm, Major i"-
Leoch: 3.9-5.4Nm)
2.07 Battery breather lines are installed properly Major 1.- --
Battery system is installed properly. 35mm2 DC
2.j
08
cables from battery cabinet are secured with GI
Ma or t•
No. of batteries installed 4i5 "-°5
coated flexible PVC if less than 5m and GI pipe if
more than or equal 5m Battery type & capacity -teoCk UT

2.09 Battery parameter settings are done correctly Major ,-

2.10 No external damages in cabinets Major .-


Proper fastening of units inside the cabinet (BBU,
2.11 Maj or %/
sensors etc.)
Cable inlets and outlets are sealed properly in order
2.12 to be protected from water, humidity, dust, rodents Major
and insects
3.00 Cabling

3.01 Power and signalling cables are separated Minor '


Connections of RF cable to RFU are secured
3.02
properly
Major f.) /
DC power cable from the BTS cabinet to the
3.03 rectifier (+) bus bar and (-) bus bar are installed Major 1.7
correctly
Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
TeiSs-Lantripi
' :obit&
MOBITEL
Huawei BTS PAT Document Page 4 of 14
Vlit. f-dkra, Ai -

0
HUAWEI
el. Ver. 2018-03-21
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Feeder cable routing (Jumper cable is less than 3m


with drip loop. In case of more than 3m prior
3.04 Major rir i
approval shall be obtained in TSSR/Readymade
jumper cable must be used)
AC power cable from the meter cubical to the SPD
and from the SPD to the ACPDB are installed
3.05 properly. It should be 4x16mm2 armored cable Major by
secured with GI pipe and at the SPD fixing end
secured with GI coated flexible PVC
AC power cable from rectifier to the ACPDB is
3.06 installed properly. It should be 4x1Omm2 Major •/-
non-armored secured with GI coated flexible PVC
Proper installation of fibre cable from BTS to RRU
(Each fibre cable is secured separately using PVC,
fibre clamps are fixed at 2m intervals, top &
3.07 Major
bottom of PVC ends are sealed properly, bending
and tower top fibre cables are secured with GI
coated flexible PVC)
Suitable fibre length shall be selected and the extra
length shall be secured completely using a rubber
3.08 Major t/
harness or PVC casing and shall be tightened to the
cable ladder
El cable is connected properly at the BBU to the
3.09 TX devices (For NodeB, 8E1 cable must be laid Major hi I A
and connected to the BBU)
Alarm cables for sensors and alarm panel are
3.10 Major I/
installed properly
3.11 All cables are routed and labelled properly Major
Electrical wiring neatness (Proper securing with
3.12 Minor t.. -
buried GI & GI coated flexible PVC)
Using proper colour code & approved cables for
power connection (Including load cable, indoor &
3.13 outdoor) — Recommendation; Major i. -
L1,L2 & L3 colour - Brown, Black, Grey
N colour - Blue
AC power cables laying over the plinth should be
3.14 Major t..
i n 1.5 inch GI coated flexible PVC
DC power cables laying over the plinth should be
3.15 Minor t...
in 1 inch GI coated flexible PVC
3.16 Use two colour code for DC cable Minor f-/'
FE cable is connected from the BBU to the TX
devices properly and secured with PVC or GI pipe
3.17 (PVC is used when outdoor cable length is less Major 44' lh
than 5m, GI pipe is used when outdoor cable length
is more than 5m)
Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
Te isronm.

. bite!
MOBITEL
Huawei BTS PAT Document Page 5 of 14
we ,-,e_ Aiwa,.

Ver. 2018-03-21
H IJAVVE I
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Fibre cable is connected from the BBU to the TX


devices properly and secured with PVC or GI pipe
3.18 (PVC is used when outdoor cable length is less Major AZ
than 5m, GI pipe is used when outdoor cable length
is more than 5m)
El cable is connected from the BBU to the TX
devices properly and secured with PVC or GI pipe
3.19 (PVC is used when outdoor cable length is less Major ,.i- 1 Ps
than 5m, GI pipe is used when outdoor cable length
is more than 5m)
All FE/El cables should be connected to relevant
3.20 Major (J.- i A
surge protecting boards in the BBU
Physically check the El from TX devices to the
3.21 Major ...'"
BTS
Use proper DC cable for connecting RF cabinet to NT IA
3.22 Major
TP cabinet (35mm2 or 2x16mm2 Black & Blue)
4.00 Antenna and Feeders

4.01 Feeder type (Size 7/8" , 1 5/8" or fibre) Minor ,/ F-;12e-(

4.02 Feeder/fibre length Minor -V 4go w Yk 3

Sector A/P/W .)zA


4.03 Top jumper type Minor t/ Sector B/Q/X ' Yi.,

Sector C/R/Y YL-

Sector A/P/W
4.04 Bottom jumper type Minor — ...
Sector B/Q/X

Sector C/R/Y

Sector A/P/W 3 -."


4.05 Top jumper length Minor v
Sector B/Q/X
v.^
Sector C/R/Y

Sector A/P/W —
4.06 Bottom jumper length Minor ,-
Sector B/Q/X

Sector C/R/Y
Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
sricLanka
Tei
e
'
'bttt
MO BITEL
Huawei BTS PAT Document Page 6 of 14

ar,
H WM/tie I
Ver. 2018-03-21
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Sector A/P/W
4.07 Feeder clamping (Distance < 1.5m) Major ,___
Sector B/Q/X

Sector C/R/Y

Sector A/P/W 't 172-


4.08 Fibre clamping (Distance < 2m) Major t.' [ V2,
Sector B/Q/X

Sector C/R/Y 14

V
Sector A/P/W
4.09Fveff-e-irb
fi re labelling Major 1,,- ti
Sector B/Q/X

Sector C/R/Y
Sector Al/P1/W1 v-
Um-der/fibre inlet & other cable openings are Sector A2/P2/W2 t7-•
4.10 sealed properly using durable UV-resistant Major 1/- Sector B1/Q1/X1 v-
products Sector B2/Q2/X2 ve—
Sector C1/R1/Y1 V
Sector C2/R2/Y2 17-
GPS antenna installation and cable routing are
4.11 done properly (Using clamps when fixing to tower Major ''.--
member and cable ladder)
c.4 i)0 -i- 4--
4.12 Antenna type & model (Manufacture Code No.) Major

Sector A/P/W t E 0 ..M


Antenna down tilt (Measure through digital tilt
4.13 Major %-/ Sector B/Q/X i-- E 0 ....M
meter)
Sector C/R/Y 4- E ....M

Sector A/P/W ,,,


Sector B/Q/X t/
4.14 Antenna at correct tower leg Major IZ
Sector C/R/Y 17

Sector A/P/W
4.15 Antenna at correct height Major it.7 Sector B/Q/X v/.
17
Sector C/R/Y

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
sr:icLanka
T i
.obitel
MOBITEL
Huawei BTS PAT Document Page 7 of 14
41'a. Carat_ Rlwayv_

01°4 Ver. 2018-03-21


H LJAVVE I
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Sector A/P/W ?---9


Antenna directions (According to Mobitel ,
4.16 Major Sector B/ /X i. c P
information, measure through cell alignment tool)
Sector C/R/Y Q--1. 0

Sector A/P/W 1,7


Feeder/fibre & jumper connectors are sealed ./
4.17 Major Sector B/Q/X
properly using durable UV-resistant products V
Sector C/R/Y
VSWR DTF/m
A1/P1/W1
VSWR Test (<1.4) A2/P2/W2
4.18 DTF Test (<1.05) Major BI/Q1/X1
B2/Q2/X2
Cl/R1/Y1
C2/R2/Y2
Sector A/P/W
4.19 Antenna pole must be vertical Major 4/ Sector B/Q/X
Sector C/R/Y
4.20 Ability to reach the antennas for O&M works Major 1.-
Lat: N
4.21 GPS verification (Check by LMT) Major t•----
Long: E
5.00 External Alarm Test

5.01 Intruder Alarm (Including battery cabinets) Major v/


Smoke Detector Alarm (Applicable for rectifier
5.02 Major vr.-
cabinet only)
5.03 Temperature Alarm (Including battery cabinets) Major
Water Leakage Alarm (Only applicable for battery
5.04 Major v-V
and RF cabinets)
5.05 Main AC Fault Alarm Major t.7

5.06 DC Under/Over Voltage Alarm Major

5.07 Battery Low Voltage Alarm Major

5.08 Fan Fault Alarm (Including battery cabinets) Major

5.09 Surge Arrester Alarm Major

5.10 DC Under Voltage Threshold (Value) Minor

Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
Te 1 gicLan ka
:obit&
MOBITEL
Huawei BTS PAT Document Page 8 of 14

await..
,INP,
Ver. 2018-03-21
H UAVVE I
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

5.11 AC Under Voltage Threshold (Value) Minor

5.12 Battery Circuit/Loop Broken Alarm Major lot .--,s.kut


6.00 RFU Power Output Test

6.01 RFU output sector Al Major Watts

6.02 RFU output sector A2 Major Watts

6.03 RFU output sector B1 Major Watts

6.04 RFU output sector B2 Major Watts

6.05 RFU output sector Cl Major Watts

6.06 RFU output sector C2 Ma' or Watts


7.00 Call Test

7.01 Mobile to Mobile Major

7.02 Mobile to Other Major

7.03 GPRS Testing Major

8.00 RF Cable Diagram for RFU


RFU RFU RFU RFU RFU RFU

9.00 BTS Inventory & Serial Numbers

Type V+5 2-c" S/N? 0\


Sao© 22
9.01 BTS/TX Cabinet
Type S/N
Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
S ri Lanka
Teiecom
.biei
MOBITEL
Huawei BTS PAT Document Page 9 of 14

Ver. 2018-03-21
0-1 LIAM/1E I
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

9.02 Battery Cabinet Type `- . S/N

9.03 RFU Type - . S/N


- -
9.04 RFU Type . S/N

9.05 RFU Type . S/N

9.06 RFU Type - . S/N

9.07 RFU Type . S/N


_ -
9.08 RFU Type . S/N
-
9.09 BBU Type - . S/N
Type . s/N -2-to231 04DILU U13014044
9.10 UPEU Type - . S/N
Type - . S/N

Type . S/N 2102311ct-} )c-trr713421'52+


9.11 FAN _
Type . S/N

9.12 GTMU Type - -


. S/N
_
9.13 WMPT Type . S/N
_
9.14 LMPT Type . S/N
2.I 03o S48S-6 JOY-- 20o 114-2
9.15 UMPT Type 10 -2- Yeg7740).?? •
. S/N /S1,47
Type - . S/N
9.16 WBBP Type - . S/N -
- -
Type . S/N

Type -'&3 . S/N 1030 6 -71Szt-lok_lool-452 e)


9.17 UBBP Type '' . S/N -'
Type *- . S/N

9.18 LBBP Type - . S/N


Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
Telg6Lanka

. bite!
MOBITEL
Huawei BTS PAT Document Page 10 of 14

OF Ver. 2018-03-21
N-1LJAVVE 1
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

9.19 UTRP Type _


— . S/N

9.20 UEIU Type . S/N


Type — . S/N
9.21 UELP/UFLP/ULIG
Type _
. S/N

9.22 SLPU Type — . S/N

9.23 DCPDU Type . s/N.9_1 o2-19-0 7 310-j 5902-g 3

9.24 RRU Type .3 9 s 3t, . sa\T .2,1623111)614.rcIlbo6b ) 1.1

9.25 RRU Type 3 ci -5 '''-i . S/N 7_162_3 1 rDB/4- 10 5 600 0 /let


9.26 RRU Type 3q S3 k-.1 . S/N a-) 62-1"6/` / "to 6o ) C 3
9.27 RRU —
Type — . S/N
_
9.28 RRU Type . S/N
__
9.29 RRU Type . S/N
_ —
9.30 RRU Type . S/N
--
x
9.31 RRU Type . S/N

9.32 RRU Type — . S/N


— _
9.33 RRU Type . S/N

9.34 RRU Type . S/N


_
9.35 RRU Type . S/N

Type (2- les500 . S/N 2.k0.9 3! 01017L-A3 K300 I, i b


Type ?-• 1- 5 50 A) . S/N 2-102-310`1G13 L i.2 k 0074-9.
9.36 PSU
_
Type . S/N
Type - . S/N —

9.37 Monitoring Module (SMU) Type t'l° c'213 . S/N '24 02-3 le)&12->C/31-J43c)(7-27 /3

9.38 User Interface Module (UIM) Type — . S/N No Se-y;ekt


Major — Affects human safety, equipment safety, sery ce quality and long term operations
Minor — Does not affect human safety and/or equipment
a
Te lecom
,obitel
MOBITEL
Huawei BTS PAT Document Page 11 of 14

„go__
......
HLIAWEI
Ver. 2018-03-21
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Type $S Po-Y .\-- . . S/N t I 56 ° 6.1-51


Type i ?°1̀( A- . S/N 1 6) * ° c`c) 4`-6 ; ;
Type 1 i)cd . S/N 1 9.- ° ° 0 lo -7 g
Type . r?l f' . S/N P-I 2 70r051.0 IZ.11260S1 9 0
9.39 Antenna Type - . S/N
Type . S/N
Type . S/N -
Type . S/N
Type - . S/N

Type .S/N 1•1 67 14 060.21-


Type . s/N 1iqC-1 /4 coatgo
Type . S/N 61 eg) 1 t 00 o 2- if
Type .S/N Cts 6) 11e)6 6 1-C 1
Type . s/N. 4. j edl ) 4 00 0 1---C 5
Type . S/N. 7,1 C'Z li? 0 0 0 • 6 2
Type . S/N & ( i5 iset- fro° 1 sl
9.40 Battery
Type . S/N (61°61- 14Mbe) 277..2,
Type . S/N
Type . S/N
Type . S/N —
Type . S/N ----
Type . S/N --
,--
Type . S/N
Type ,--
. S/N
Type —
. S/N

10.00 Miscellaneous

10.01 Black UV-resistant ties are used for outdoor Minor


cable fastening
10.02 Site is clean Minor t .

10.03 Retain the additional engineering materials Minor ---- Bonding tapes, insulation tapes etc.
for future use

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
sricLanka
Tei
.obitel
MOBITEL
Huawei BTS PAT Document Page 12 of 14

VI KA Ver. 2018-03-21
HILJAWEI
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

11.00 Material Quantity Confirmation


Item
Description Qty Brand Capacity/Specification New/Existing
No
11.01 SPD 0)
11.02 ACPDB 0 1
11.03 Meter cubical -
11.04 32A/40A 4P breaker 0 1
11.05 DC breaker -
11.06 4x16mm2 AC cable •
11.07 4x1Omm2 AC cable .-
11.08 GI pipe length
_
11.09 Additional cabinet
11.10 SPD pole -
11.11 Feeder earth kit -
11.12 Eeeider-length/fibre length 8o,--, A
11.13 Peeder--cia-
np/fibre clamp -7 o
11.14 RRU DC power cable -
11.15 TMA -
11.16 GSM antenna bracket
11.17 GPS antenna 0 i
11.18 GI plinth _
11.19 Conversion plate ©1
11.20 Cable ladder -
11.21 Cable extension bar
11.22 35mm2 earth cable __,
11.23 25mm2 earth cable 0 .6--
11.24 16mm2 earth cable i ©r,,
11.25 35mm2 DC cable
11.26 25mm2 DC cable -
11.27 16mm2 DC cable 4-
11.28 Bus bar (Inside cabinet) --
11.29 Cu tape -
11.30 ECB
11.31 GI coated flexible PVC 30 ,AA
11.32 PVC pipe length Si\--
11.33 IF cable
Major - Affects human safety, equipment safety, service quality and long term operations
Minor - Does not affect human safety and/or equipment
Tel S ricLanka
MOBITEL
,obitel Huawei BTS PAT Document Page 13 of 14
w.. C,r, Aiwa,-

Ver. 2018-03-21
H LSAVVE I
Site ID P roject Stage
Regional 0 & M Head: Ramesh Sanjaya

12.00 Site BOQ

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
Te 1 gicLanka
.obitel
MOBITEL
Huawei BTS PAT Document Page 14 of 14
We- Cart, Aiwa,-

Ver. 2018-03-21
H UA El
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

BTS check list shall be verified and attached with this document.

Preliminary Acceptance Test for BTS installation has passed.

Following conditions will be checked before issuing the FAC other than the contractual FAC obligations.
+ Battery performance test will be carried out by Mobitel after 2 months period and if the
performances are low, Huawei is responsible to address the issues
+ If the Bit Error Rate too high appears in 2 months period because of the El cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
+ If the Packet Loss too high appears in 2 months period because of the FE cable from TX
devices to BBU, then Huawei is responsible to address the issue (Mobitel will perform the
test for fault identification)
+ The values of VSWR & DTF between 1.3-1.4 & 1.04-1.05 respectively will be re-tested by
Mobitel after 2 months period and if the values are further increased, Huawei is responsible
to clear issues related to VSWR & DTF at that time
+ External Alarm Test should be according the finalization monitoring solution
+ The period is calculated from the date of the accepted PAT

Site ID: al w pri I


Site Name: Wo01/\ k"-reA-g c"—"

BTS Type: ril'gr-

Frequency Band: L1
Date: 2_4:10) 1 0512

t.„,c0,17
For Mobitel For-iftravrer Pio1 6c-E For Sub Contractor
Name: Name: Do W) Name: j . .5 at es ;tifre

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
w AT
Telecom MOBITEL
Mobitel Huawei NodeB/eNodeB PAT Document 1 of 3
We Care. Always.

"SO
HuAvve s
67th \NAT ) $ 4i Ver. 2018-03-21
Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

NodeB/eNodeB Integration Test

Test Record
SN Item Sub Item Actual Record (If no test, please
Requirements
remark)
Phase to Neutral
Turn off the power for the cabinet and 9- 3 0 .V
AC power on securely fix all boards. Power on AC
power switch Neutral to Earth
C)- 1 .V

Load BBU .5 ,) ''2- V

Equipment 1. Measure the supply voltage before


1 Load RRU_1 U/L..1:--., '222- V
power on connecting the power cord to the —
equipment (-43.2V to -55.2VDC) Load RRU_2 U/L 5 3 ' 7- V
RRU and BBU Load RRU 3 U/L 53'1" V
power on
2. Measure the supply voltage after BBU V
connecting the power cord to the RRU 1 U/L V
equipment (-43.2V to -55.2VDC <BBU>
RRU 2 U/L V
<RRU>) —
RRU 3 U/L V
If using SO U/L I° 1 0 VSWR
VSWR test by The value should be less than or
fire
b S1 U/L / '16 VSWR
LMT equal to 1.3
otical
p
S2 U/L / -1 ° VSWR

Transmit output Sector 0 U/L dBm


power test by Sector 1 U/L dBm
LMT
Local Sector 2 U/L dBm
2
debugging
Sector 0 A U/L VSVVR

If there is 7/8" or Sector 0 B U/L VSWR


1 5/8" feeder
Sector 1 A U/L VSWR The value should be less than or
cable, check
equal to 1.4
VSWR by using Sector 1 B U/L VSWR
SiteMaster
Sector 2 A U/L VSWR

Sector 2 B U/L VSWR

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
iLrita
Telecom
MOBITEL
Mobitel Huawei NodeB/eNodeB PAT Document 2 of 3
Ws. Cara. Always.

4,164A,

%lir
* ... ... Ver. 2018-03-21
H ILJAWE I Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

At UE connection mode and near the site Measure from INOC or RNC
(NodeB): CPICH_RSCP > -85 dBm remotely dBm

At UE connection mode and near the site Measure from INOC or RNC
Signal quality (NodeB): CPICH_Ecno > -8 dB remotely dB
(Optional)
At UE connection mode and near the site
(eNodeB): RSRP > -90 dBm Measure remotely .....dBm

At UE connection mode and near the site


(eNodeB): SINR > 19 dB Measure remotely .. dB

Check whether the UE location update is


successful

Call flow, (Voice service) That the mobile phone


Services calls mobile phone is normal or not
3 location update,
test
service quality
(VP service) Calling party/called party is
normal or not
PS service is normal or not

Alarm Check whether there are existing major This is to confirm that the
4 Alarm query
query alarms in NodeB/eNodeB NodeB/eNodeB alarms are visible

Check Sector 0 U/L '2=6 7 ,


Primary
5 network Check actual information
information
scrambling code Sector 1 U/L 9-6
Sector 2 U/L '26 ei
Check Check battery
6
battery Status V

Check Check PSU


7
rectifiers status

Major — Affects human safety, equipment safety, service quality and long term operations
Minor — Does not affect human safety and/or equipment
l Sri Lanka.
Teiecom MOBITEL
Ntobitel Huawei NodeB/eNodeB PAT Document 3 of 3
Wv Cara. Always.

40 Ver. 2018-03-21
14'
...
HuAwei Site ID Project Stage
Regional 0 & M Head: Ramesh Sanjaya

Major or
OK Not OK Comment
Minor
8.00 External Alarm Test by LMT

8.01 Intruder Alarm (Including battery cabinets) Major


Smoke Detector Alarm (Applicable for rectifier
8.02 Major
cabinet only)
8.03 Temperature Alarm (Including battery cabinets) Major
Water Leakage Alarm (Only applicable for
8.04 Major
battery and RF cabinets)
8.05 Main AC Fault Alarm Major oi°"'

8.06 DC Under/Over Voltage Alarm Major

8.07 Battery Low Voltage Alarm Major

8.08 Fan Fault Alarm (Including battery cabinets) Major

8.09 Surge Arrester Alarm Major

8.10 Battery Circuit/Loop Broken Alarm Major 1. lo,e_ c• -,2tte4


Integration Test for NodeB/eNodeB installation has passed.
Site ID: 6,11-1 'vo )
Site Name: v•30.)-1-v-^sclev--- C.\
BTS Type:
Frequency Band: LTI E
Date: -3-e, t ai [0512,c

(PL
For Mobitel For 1avoci P1 0 ) cc4 For Sub Contractor
Name: Name: rDv\--:)-v,,J,‘"\ Name:4 . ow s iK2Z, ' Q_

Major - Affects human safety, equipment safety, service quality and long term operations
Minor - Does not affect human safety and/or equipment
S Lanka
Te ecom
Direct Implementation Project - Equipments Inventory

Removal (R) New installation( N )


Date 26) 9 lo 5 )2c,
Site ID ,-
Ce)MwAT )
Site Name '''''' V\I Wk-Vv\ -Y 610\ w)(3•
Region r'v Otaw-, poll c•-•

Collected From Installed At / Returned to


Item Serial number
WH Site ID WH Site ID
Shelter removal(Yes/No)
Cabinetl pc)) ci3Doois5 2.2 V _ - 6)1v) wAT/
RF Cabinet
Cabinet2 _
Cabinetl -
Power Cabinet
Cabinet2 -

RRU/MRFUl /
RRU/MRFU2
RRU/MRFU3
RRU/MRFU 900
RRU/MRFU4
RRU/MRFU5
RRU/MRFU6
RRU/Mikftll 'v - @irit-JA7)
-
RRU/M-RFI42 ?. - - Gal v-ihrf)
RRU/MR-F-V3 t--- -- - ti M w 411
RRU/tilkfti 1800
RRU/MRFU4 -
_
RRU/MRFU5
RRU/MRFU6 —
BBU1 210 23/DL-IsfeieTT gq32733 L-- ._ -- CI rl (x44-7-I
BBU
BBU2 _

CC1 -
CC
CC2 -
FS1
FS
FS2
UBPG1
UBPG ___
UBPG2
_
BPC BPC1
BPC2
BPL
_
BPL1

BPL2

Item Removal Inventory Page 1 of 3


Sri Lanka
Te ecom
abitel Direct Implementation Project - Equipments Inventory

Qpi per& G4:11 -zioso 5itss.o6y.20./i zo_ t, ._ <- or) will)


GTMU
GTMU2
'.,/ b OF uPAP, —
WBBP1 3 2.1 ,r) o5-7151401,-/o 0 At 4s2- 7 V --- GIrPV`i KT )
f313-13
WBBP2 -
DTMU DTMU1 -
Collected From Installed At/Returned to
Item Serial number
WH Site ID WH Site ID
DDPU1
DDPU2
DDPU3
DDPU 900
DDPU4
DDPU5
DDPU6 /

DDPU1
DDPU2
DDPU3
DDPU 1800
DDPU4
DDPU5
DDPU6 /
BBU 3806
WRFU
PSU
Mw IDU
Other
Tc3 u . ic) 2lati7 3 wriscro 24 3 6 t--- — — 611-1,-341 ,
AN 2)0 2.31.c w te.41 1.6c1'2 IS 21 -, -
1- ''' 0-qtri (A) AI)
P-11-6 5 0 0 alo 1-3 iero)Luv,3000 di 6 L'' "-- ,--- 61 M Ls; AI 1

pA.A. So N 2i D2_3 (0 161,VIAAL4ot o 7 1-1) — kicriKI,


'''-- -
tv‘U Gr,r1u 02_5 2102:6 recto: PXSTic_;e. b 27t3 Iv" - -- ,/,' P1 ,1/4-^t11 i
U p E \..i 21.23 105F 1-‘. Lu 71.0 )40.9-1. v - - ei rl WKI‘
kw-O-es/V..4 (4 S rule jr, ea 6 0 L et 5 1 V '---
r"
C in 40 AI 1
113ocbo •o'''633 v-- '----
/
r"-1' Arc )
113 e'c-) 0 g.0 -7 e6 --/ _ ,- 6,i in c,,,, ifi)
_ ---
C<IPs Psi4< i,,v1,- 21 27 o 112 5 94 3 R:7 8 "57 get k°7 61 in ariSel1

Item Removal Inventory Page 2 of 3


S • Lanka
Te ecom
Direct Implementation Project - Equipments Inventory

Remarks
e._ -• A vt.,\--e_v,

Regina! Officer Site Engineer - Project Sub Contractor

.--'-
Removal Name '
,-----'-'

Signature

Date

New installation Name eAtAktlyerctl 9‘. 1) %Av, \ ,.....,_ ..^, ,y .67 s fi i az : v151441
etatoifot
Signature 1/4,
e-keLet-.2.--
---'=c1c---
_-__,----,-------
Date n ci 1, I® 5-- Ili ,-)._c:11 109 1,2.6 aotc‘ Icts 12.45
,

Item Removal Inventory Page 3 of 3

You might also like