Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

.

New text

Drilling
12:55:51

Date: 18 Mar. 2018

Bit Depth (m):

Total Depth (m):

Lagged Total Depth (m):

Lag Time(min):

Hook Height (m): 19:00

Weight On Hook (t):

Weight On Bit Driller (t):

pc 940.20
WOB Computed (t):
19:15

Flow Pumps (L/min): (gpm): (L/min):

DHT RPM (1/min):

Averaged TopDrive Speed (1/min):


19:30

Stand Pipe Pressure (psi):


STING IN

TopDrive Torque (kN.m):

ROP (m/h): 19:45


PJSM
INS ROP (m/h): RESET VOL +/-

Total Gas Out 1 (%):

20:00
Geoservices

GWD_QC (Euc):

TripTank Volume 1 (m3):

TripTank Volume 2 (m3):

20:15
Sum Active Pits (m3):
Pump Speed 1(1/min): Drag or OVP(klbm):
Total Rotary Time (h):
Vol [Trip ] +/- Open (m3): Pump Speed 2(1/min):
Stand Counter (Euc):
Pump Speed 3 (1/min): Rotary Time On Bottom(h):
Sum TTK (m3): Total Rev [Surface + DHM] (Euc):
Cum Pump Strk A (Euc): Total Rev On Bottom:
Cum Pump Strk B (Euc): Flow Out Paddle (%): 20:30
Stroke Down (Euc): Bit TIME
Lagged Bit Depth (m):
Theo Inside String Vol (m3):

Stroke B/U (Euc): Pump Time(h):


Theo Annulus Vol @ BD (bbl): Well Head Pressure (psi):

20:45
Hook Height (m): 20:45

Weight On Hook (t):

Weight On Bit Driller (t):

WOB Computed (t):


21:00

Flow Pumps (L/min): (gpm): (L/min):

DHT RPM (1/min): PUMP FRESH WATER AS A SPACER


Averaged TopDrive Speed (1/min):
21:15

Stand Pipe Pressure (psi):

Geoservices
TopDrive Torque (kN.m):
PUMP LEAD SLURRY

ROP (m/h): 21:30

INS ROP (m/h):

Total Gas Out 1 (%):

21:45

GWD_QC (Euc):

TripTank Volume 1 (m3):

TripTank Volume 2 (m3):

22:00
Sum Active Pits (m3):
Pump Speed 1(1/min): Drag or OVP(klbm):
Total Rotary Time (h):
Vol [Trip ] +/- Open (m3): Pump Speed 2(1/min):
Stand Counter (Euc):
Pump Speed 3 (1/min): Rotary Time On Bottom(h):
Sum TTK (m3): Total Rev [Surface + DHM] (Euc):
Cum Pump Strk A (Euc): Total Rev On Bottom:
Cum Pump Strk B (Euc): Flow Out Paddle (%): 22:15
Stroke Down (Euc): Bit TIME
Lagged Bit Depth (m):
Theo Inside String Vol (m3):

Stroke B/U (Euc): Pump Time(h):


Theo Annulus Vol @ BD (bbl): Well Head Pressure (psi):

22:30
Geoservices

CONT,, CEMENT JOB

22:45

23:00

23:15
Hook Height (m): 23:15

Weight On Hook (t):

Weight On Bit Driller (t):

WOB Computed (t):


23:30

Flow Pumps (L/min): (gpm): (L/min):

DHT RPM (1/min):

Averaged TopDrive Speed (1/min):


23:45

Stand Pipe Pressure (psi):

Geoservices
TopDrive Torque (kN.m):

ROP (m/h): 00:00 18 March 2018

INS ROP (m/h):

Total Gas Out 1 (%):

00:15

GWD_QC (Euc):

TripTank Volume 1 (m3):


CONT,, CEMENT JOB
TripTank Volume 2 (m3):

00:30
Sum Active Pits (m3):
Pump Speed 1(1/min): Drag or OVP(klbm):
Total Rotary Time (h):
Vol [Trip ] +/- Open (m3): Pump Speed 2(1/min):
Stand Counter (Euc):
Pump Speed 3 (1/min): Rotary Time On Bottom(h):
Sum TTK (m3): Total Rev [Surface + DHM] (Euc):
Cum Pump Strk A (Euc): Total Rev On Bottom:
Cum Pump Strk B (Euc): Flow Out Paddle (%): 00:45
Stroke Down (Euc): Bit TIME
Lagged Bit Depth (m):
Theo Inside String Vol (m3):

Stroke B/U (Euc): Pump Time(h):


Theo Annulus Vol @ BD (bbl): Well Head Pressure (psi):

01:00

CONT,, TRF F/ACTV T/ RESV


Geoservices

01:15

01:30

01:45
Hook Height (m): 01:45

Weight On Hook (t):

Weight On Bit Driller (t):

WOB Computed (t):


02:00

Flow Pumps (L/min): (gpm): (L/min):

DHT RPM (1/min):

Averaged TopDrive Speed (1/min): STING OUT


02:15

Stand Pipe Pressure (psi):

Geoservices
TopDrive Torque (kN.m):

RESET VOL +/-


ROP (m/h): pc 940.20 02:30

INS ROP (m/h): FLUSH STRING

Total Gas Out 1 (%):


FILL UP TTK 02:45

GWD_QC (Euc):

TripTank Volume 1 (m3):

TripTank Volume 2 (m3): POOH 5" DP STD # 32

Sum Active Pits (m3):


Pump Speed 1(1/min): Drag or OVP(klbm):
Total Rotary Time (h):
Vol [Trip ] +/- Open (m3): Pump Speed 2(1/min):
Stand Counter (Euc):
Pump Speed 3 (1/min): Rotary Time On Bottom(h):
Sum TTK (m3): Total Rev [Surface + DHM] (Euc):
Cum Pump Strk A (Euc): Total Rev On Bottom:
Cum Pump Strk B (Euc): POOH 5" DP STD # 30
Flow Out Paddle (%):
Stroke Down (Euc): Bit TIME
Lagged
LINE UP TTK & RESET VOLBit Depth
+/- (m):
Theo Inside String Vol (m3):

Stroke B/U (Euc): Pump Time(h):


Theo Annulus Vol @ BD (bbl): Well Head Pressure (psi):
CLEAN CELLAR AREA WITH WATER FROM TTK
800.00
Geoservices

You might also like