Professional Documents
Culture Documents
Gujarat Int'l Financial Tax City (GIFT City)
Gujarat Int'l Financial Tax City (GIFT City)
GIFT City is an integrated development on 886 acres of land with 62 million sq. ft. of Built Up area which
includes Office spaces, Residential Apartments, Schools, Hospital, Hotels, Clubs, Retail and various
Recreational facilities, which makes this City a truly “Walk to Work” City. GIFT City consist of a
conducive Multi-Service SEZ (Special Economic Zone) and an exclusive Domestic Area.
This City is a Vertical City which will optimize land area consumption for development. The City is located
on the bank of river Sabarmati connecting the Business capital (Ahmedabad) and Political capital
(Gandhinagar) of Gujarat State- The Growth Engine of India. GIFT City is a new Financial & Technology
Gateway of India for the World.
Infrastructure in GIFT City
Water Supply & Sewerage System:
Water Sources:
o Narmada Main canal
o Recycling and Reuse of Wastewater
o Rainwater Harvesting
24 x 7 Water Supply
Concept of Zero Discharge City
Perennial Water Front ensured through construction of three barrages on river Sabarmati
Proposed landscaped promenade at the river bank along GIFT City.
Water Body of 750,000 m3 capacity to enhance aesthetics and for water sports activity.
Power Infrastructure:
GIFT Power Company Ltd., 100% subsidiaries of GIFTCL is Power distribution licensee for GIFT
Projected Power demand of GIFT is 610 MVA.
220/33KV Receiving Stations with Dual source of Power.
Initially 66/33KV receiving station with Dual source of Power.
33 kV dual feed cable distribution in Utility Tunnel to all the packages.
Centralised Backup power feed through same network.
State-of-the-art automation setup for Substation, Distribution, Lighting and distribution network with
real time monitoring and control.
Gas Insulated Switchgears (GIS) substation for Sub-transmission and Distribution within GIFT city
Building level Switching panel room with GIS switchgear inside utility tunnel connecting each
package
Dual 33KV feed to every building from Switching panel room
Complete Electrical infrastructure of building shall be developed and maintained by developer
Solid Waste Management:
Automated Waste Collection System (AWS) through chute system
Minimum Human Intervention
Minimize space requirement
Minimize impact on health
Waste sucked through pipes at a speed of 90 km/hr
Waste Treatment through Plasma Technology