Gas Installation: Mehfuz Rahman
Gas Installation: Mehfuz Rahman
Required Materials
Gas Installation
• Yellow Teflon tape
• Leak detector
• Flexible gas line
L.P.G / Bio-gas installations • Black iron pipe and fittings
location and layouts • Gas cock
• End connector fittings
Mehfuz Rahman
4
Mehfuz Rahman Automated Parking System
Gas Installation
• 1/2 in. dia. i.d. (inside diameter), sprinkler system, underground electric lines, oil tanks, well, invisible fence etc.)
• dryer connector is 3/8 in. dia. i.d. • provide any necessary permits or recorded easements.
2 5
Mehfuz Rahman Automated Parking System Mehfuz Rahman Automated Parking System
3. PRE-MARK
• Use yellow Teflon tape, intended for threaded gas connections, not white Teflon tape, which is
• identify the boundaries of excavation with white spray paint.
thinner.
4. DIG SAFE
• Test all the joints for leaks.
• identify, locate and mark underground utilities.
• It is strongly recommend to call the local gas company or plumbing inspector to check the
5. ROAD OPENING PERMIT
work.
• apply for city/town/state permit(s) (if applicable).
3 6
Mehfuz Rahman Automated Parking System Mehfuz Rahman Automated Parking System
09-05-2017
Gas Installation
7 10
Mehfuz Rahman Automated Parking System Mehfuz Rahman Automated Parking System
Gas Installation
8 11
Mehfuz Rahman Automated Parking System Mehfuz Rahman Automated Parking System
9 12
Mehfuz Rahman Automated Parking System Mehfuz Rahman Automated Parking System