This proposal offers to supply and install the electrical load side system for a construction project for P254,000. The scope of work includes installing wiring and conduit for various pumps and tapping points on water supply lines. Payment terms are 30% downpayment, 60% progress billing, and 10% retention. Completion is estimated at 1-2 weeks upon receipt of payment.
This proposal offers to supply and install the electrical load side system for a construction project for P254,000. The scope of work includes installing wiring and conduit for various pumps and tapping points on water supply lines. Payment terms are 30% downpayment, 60% progress billing, and 10% retention. Completion is estimated at 1-2 weeks upon receipt of payment.
This proposal offers to supply and install the electrical load side system for a construction project for P254,000. The scope of work includes installing wiring and conduit for various pumps and tapping points on water supply lines. Payment terms are 30% downpayment, 60% progress billing, and 10% retention. Completion is estimated at 1-2 weeks upon receipt of payment.
P PRC ACCREDITED CPD PROVIDER LIC. NO. 2017-011 AND 2017-05
E-MAIL: rbrconsultants2015@gmail.com; Website: www.rbrconsultants.com Mobile No. 0956-7801281/ 0999-5996396 - Providing Design, Consulting, Construction and Training -
September 21, 2020 QUOTE NO. 2020-105
ENGR SYC JUDE CAYA
President CAYACON CONSTRUCTION CORP Cebu City
SUBJECT: PROPOSAL FOR THE SUPPLY AND INSTALLATION OF
ELECTRICAL SYSTEM-LOAD SIDE ONLY This is to submit our proposal for the above subject for your review and approval below scope of works; Scope Limit: 1. Installation for Load side provisions for electrical wiring and conduit only: a. Fire pump , 1 unit, 100 hp use 22 mm2 THHN wires x 3/6 or its completion with flexible liquid tight connector b. Jockey pump, 1 unit, 3 Hp use 3.5 mm2 RC 3 core or its completion with flexible liquid tight connector/rigid non metallic conduit c. Submersible pumps (4 units), 7.5 hp use 5.5 mm2 RC 3/4 core or its completion with flexible liquid tight connector/rigid non metallic conduit d. Submersible pumps (2 units), 3 hp use 3.5 mm2 RC 3 core or its completion with flexible liquid tight connector/rigid non metallic conduit 2. Tapping point of the water supply; a. Discharge line tapping of 4 inch waterlines ; b. Fire protection line, 6 inches-2 lines;
Total Cost for the above items -----------------------------------------------P 254,000.00
Terms: 30% downpayment and 60% progress billing and 10% retention. Completion: One to two (1-2) weeks upon receipt of payment Thank you for your kind approval. Sincerely yours,