QUANTITY CALCULATION I
Name of Project :Bhedetar-Mahabharat-Ahale-
Barahkshetra(Dhankuta Ch. 0+000 to 10+046) 0
Item Length Breadth Height
No. Description of works No. Quantity Unit
(m) (m) (m)
1 GENERAL Items
1.1 Insurance of works, plants, materials, loss and
damage to equipments, Contractor's workmen
and employees and third party insurance against
damage to other persons and property as per
GCC clause 13. 1 PS
1.2
Provision of Site Office at mid section of road
(two rooms Size: 3mx4m ) at location acceptable
to the project manager within the Contract
package with accommodation facilities.
1 month
1.3
Carry out additional tests for material and works
as required and instructed by the Engineer.
1 PS
1.4 Relocation of the utilities and services as
instructed by the Engineer 1 PS
1.5 Maintenance of the existing road to keep the road
serviceable throughout the contract period 1 month
1.6 Provide and maintain traffic safety, control
measures and temporary diversions during
construction as instructed by the Engineer. 1 month
2 SITE CLEARANCE WORK
2.1 Site Clearance : Clearing and Grubbing including
cutting of trees having girth of less than 30 cm
when measured at 1m above the ground. (Clause
No.: 1-1.5(a), 1-1.5(b) & 1-1.6) 0.5 18670.00 6.25 58343.75 Sqm
2.2
Cutting of trees having girth of above 30 cm when
measured at 1 m above the ground including the
removal of trunk, branches and stumps including
disposal up to a lead of 100 m for trees of sizes
:Clause no.: 1-1.5(c) & 1-1.6
1 of 313
Item Length Breadth Height
No. Description of works No. Quantity Unit
(m) (m) (m)
Excavation in roadway and drain including
removal and satisfactory disposal of all materials
up to a lead of 50m using excavator or breaker as
instructed by Engineer for different types of soils
as follows :
3.1 Ordinary soil #REF! cum
3.2 Hard soil #REF! cum
3.3 Ordinary rock #REF! cum
3.4 Medium rock #REF! cum
3.5 Hard rock (chiseling, wedging, tempering,
breaking by transport / hauling equipment etc) #REF! cum
Excavation for structures including cutting of
slopes, shoring, shuttering, planking, ordinary
sealing and disposal of materials upto a lead of
50m along the lead route using excavator or
breaker as instructed by Engineer for different
types of soils as follows :
3.5.1 Ordinary soil #REF! cum
3.5.2 Hard soil #REF! cum
3.5.3 Ordinary rock #REF! cum
3.5.4 Medium rock #REF! cum
3.5.5 Hard rock (chiseling, wedging, tempering,
breaking by transport / hauling equipment etc) #REF! cum
3.6
Construction of embankments, shoulders and
othermiscellaneous filling and backfilling as per
design and drawing as per DoR Standard
Specification for Road and Bridge Works
(SSRBW) July 2001,Spec Clause no:909 #REF! cum
3.7
Transportation of material beyond the initial lead
than specified in norms for every 1 km distance .
This includes carriage of material by Truck or
Tractor including loading, unloading and stacking
by manpoweror as instructed by the Engineer all
complete #REF! cum
4 STRUCTURAL WORKS
4.1 Gabion works
4.1.1
Supply machine made fabrication of gabion boxes
of different sizes with hexagonal mesh size of 100
mm x 120 mm including rolling, cutting and
weaving (mesh wire 3.0 mm, selvedge wire 3.9
mm, binding wire 2.4 mm, all heavy zinc coated
wires),assembling, placing in position, packing
and filling of gabion create with rubble stone and
tying by 2.4 mm binding wires all complete as per
DoLIDAR-Tech. Spec. for LBCWARR Clause No.
17-1.4, 17-5 & 17-6
7597.50 cum
Box size (2*1*1) 2279.00 Box
Box size (1.5*1*1) 2026.00 Box
4.1.2 Packing and filling of gabion crates with rubble
stones( DoLIDAR Spec Clause No.: 17-1.4,17-5
and 17-6) 7597.50 cum
4.1.3 Provide and place Geo-textile all complete as per
drawing and specifications as per (DOR-SSRBW
Section No.: 2404,3110) 4405.00 sq.m
4.2 Masonry Walls
2 of 313
Item Length Breadth Height
No. Description of works No. Quantity Unit
(m) (m) (m)
3 of 313
Item Length Breadth Height
No. Description of works No. Quantity Unit
(m) (m) (m)
At carriageway including extrawidening and
passing bays 1 18670 6.25 116687.5 Cu.m.
8 DAY WORKS
8.1 Cost for labour input during the construction
period as per preamble and as instructed by the
Engineer.
Unskilled labour 300.00 m/d
Skilled Labour 100.00 m/d
8.2
Cost of excavator for maintenance of road as
required and instructed by engineer
60.00 hrs
9 Bioengineering
9.1 Slope trimming work 1 15000 4 60000.00 sqm
9.2 Construction of Rip-rap drain with the stone
pitching work of 20 cm thick and 1.2 m wide. 2 189 378.00 Rm
9.3
Dry stone check/toe walls for segmentation and
support of slopes
2 315 Area 1.456 917.28 cum
9.4 Gabion check / toe wall for slope protection 218.19 cum
9.5 Brush layering work: including preparation of 2 1480.00 Rm
9.6 terraces rooted
Planting of 30 - 40
grass cmslips
wideon and laying<live
slopes 45˚ 2 80 20 3200.00 sqm
cuttings
including ofpreparation
selected species
oftree
slips along
onshrubtheOperation
site. terrace @
9.7 Planting
5 containerised
cm c/c digging
with 2/3planting
of cuttings and
in to seedlings,
and of 5 2 3000.00 Nos
includes
including pitting, holes
transplanting, to terrace
a maximum
composting and
leaving
cm depthone bud
with and
metal on up to 1/3
or hardwood of the cuttings
peg, depending
placing
sticking tree
beyondguards,
the toe
terrace of
edgeembankment slopes
onplain
in nature of soil.
areas, notofThe
less planting
than 8 mdrills
from should
the roadbe
( Cutting
spaced can be
10 cm apart. assuro,simali etc of 45 - 60 m
centre
length)line. Pit size 30 cm diameter×30 cm depth.
Compost volume ⅟₄ of the volume of pit, mixed
with original soil.
4 of 313
& Rehabilitation Sector Development Programme - 2
District Project Office, Kathmandu
UANTITY CALCULATION I
0
Remarks
5 of 313
Remarks
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6 of 313
Remarks
7 of 313
Remarks
HPB*30+
10
At Chainage
7+045,9+30
0
8 of 313
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Government of Nepal
Err:509
Central Level Project Implementation Unit (CLPIU)
Provide site office at mid-section of the road having rooms size: 3m*4m
1.2 each at location acceptable to the project manager within the contract 18 18 month
package with accommodation facilities as specified in special provision
Carry out additional tests for material and works as required and
1.3 1 1 PS
instructed by the Engineer.(GCC Clause No. 33.1)
Relocation of the utilities (water supply, telephone, etc,) and services as
instructed by the Engineer as per DoLIDAR-Technical Specifications for
1.4 1 1 PS
Labour Based Construction Work of Agricultural & Rural Roads (Tech.
Spec. for LBCWARR Clause No. G-10.
1.5 Err:509 18 18 month
Supply and provide rental Four Wheel Drive Double cap Pickup Vehicle
1.6 with full option including fuel, driver'wages, major & minor maintenances 18 18 month
etc for the Engineer for supervision works as specified
Provide and installation of project information board of size 1.80 mx1.2 m
along with iron posts including excavation, concreting, backfilling etc all
1.7 3 3 No.
complete as per DoR Standard Specification for Road and Bridge Works
(SSRBW) July 2001,Section-108
Provision and maintenance of labour camps payable monthly in equal
1.8 instalments as per DoR Standard Specification for Road and Bridge Works 18 18 month
(SSRBW) July 2001,Section-109 (3)
9 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Establish, maintain and operate labaratory at the site with equipments
1.9 furnishing required for testing specified quality of the materials as per DoR- 1 1 LS
SSRBW, Section-511
Err:509 Err:509 1 1 PS
Err:509 Err:509 1 1 PS
2 SITE CLEARANCE WORKS
Site Clearance : Clearing and Grubbing including cutting of all types of
plants as per DoLIDAR-Technical Specifcations for Labour Based
2.1 1 #REF! 4 #REF! Sqm
Construction of Agricultural and Rural Raods (Tech. Spec. for LBCWARR)
Clause No.: 1-1.5(a), 1-1.5(b) & 1-1.6
3 EARTHWORKS
Excavation in roadway and side drains in all types of soil materials and
rock including removal and satisfactory disposal of all materials at Including
3.1 #REF!
approved environmentally safe tipping area as per DoLIDAR-Tech. Spec. drains also
for LBCWARR Clause No. 2-1
3.1.1 Ordinary soil #REF! cum
3.1.2 Hard soil #REF! cum
3.1.3 Ordinary rock #REF! cum
Refer Sheet for earthwork Excavation
3.1.4 Medium rock #REF! cum
Hard rock (chiseling, wedging, tempering, breaking by transport / hauling
3.1.5 #REF! cum
equipment etc)
Excavation in foundation in all structures in all types of soil materials
Includes all
including removal and satisfactory disposal of all materials at approved
3.2 Err:509 the structure
environmentally safe tipping area as per DoLIdar-Tech. Spec, for
works
LBCWARR Clause No. 2-5
Transportation of material beyond the initial lead within 1 km distance with Both in road
3.4 #REF! cum
safe disposal sites as instructed by the engineer. and stru.
4 STRUCTURAL/ SIDE DRAIN/ CROSS DRAINAGE WORKS
Summary of Quantities of Above Structural Works
1 Earthwork excavation Err:509 cum
10 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Supply & place un-coursed random rubble stone masonry works in 1:4
cement sand mortar in the line & level all complete stone masonry work
including full compensation for all labour, materials and other incidentals
4 required to complete the work as per the specifications and drawings. It #REF! cum
includes full compensation for using specially dressed stones on the face
of wall with batter and provisions for weep hole as necessary as per
DoLIDAR-Tech. Spec. for LBCWARR Clause No. 8
Supply & place TMT high tensile strength steel reinforcement of specified
9 grade ( Fe 500) for RCC works including bending, centring & binding in #REF! kg
position as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 10
11 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Laying, fitting and fixing of hume pipe class NP3. It includes all operations
10 required to complete the work up to a trench depth of 2.2 m below the
ground level and the jointing of pipes with 1:2 cement sand mortar
a) 450mm pc 75.00 rm
b) 600mm pc #REF! rm
c) 900mm pc #REF! rm
Supply & place 110 mm Dia. HDPE Pipe for weep hole as per Nepal
11 Err:509 rm
Standard & directed by Engineer
Backfilling works with approved soil materials with compaction as per
12 #REF! cum
DoLIDAR-Tech. Spec. for LBCWARR Clause No-2.5.4
Preparation of bedding for causeway with granular material required to
13 0.00 cum
complete the work as per the specification and drawings
Structural Quantity Calculations In Detail
4.1 Gabion works
Supply machine made fabrication of gabion boxes of different sizes with
hexagonal mesh size of 100 mm x 120 mm including rolling, cutting and
weaving (mesh wire 3.0 mm, selvedge wire 3.9 mm, binding wire 2.4 mm,
Includes all gabion works in retaining wall
4.1.1 all heavy zinc coated wires),assembling, placing in position, packing and 7597.50 cum
abd outlet protection works of culverts.
filling of gabion create with rubble stone and tying by 2.4 mm binding wires
all complete as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 17-
1.4, 17-5 & 17-6
Provide and place Geo-textile all complete as per drawing and
4.1.2 4405.00 sq.m
specifications as per (DOR-SSRBW Section No.: 2404,3110)
4.2 Masonry Walls
Supply & place un-coursed random rubble stone masonry works in 1:4
cement sand mortar in the line & level all complete stone masonry work
including full compensation for all labour, materials and other incidentals
4.2.1 required to complete the work as per the specifications and drawings. It Refer Sheet for masonry wall 3947.91 Cu.m.
includes full compensation for using specially dressed stones on the face
of wall with batter and provisions for weep hole as necessary as per
DoLIDAR-Tech. Spec. for LBCWARR Clause No. 8
Supply & place P.C.C. works M 10/20 as per DoLIDAR-Tech. Spec. for
4.2.2 652.13
LBCWARR Clause No. 11
12 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Supply & place 110 mm Dia. HDPE Pipe for weep hole as per Nepal
4.2.3 1017.50 Rm
Standard & directed by Engineer
4.3 OPEN TRAPEZOIDAL SECTIONED SIDE DRAIN Refer sheets of side drainage
4.3.1 Earthwork in excavation for foundation in all kinds of soil 20205.08 Cu.m.
4.3.2 Stone masonary work in 1:4 C/S mortar 5366.98 Cu.m.
4.4 COVERED TRAPEZOIDAL SECTIONED SIDE DRAIN Refer sheets of covered side drainage
4.4.1 Earthwork in excavation for foundation in all kinds of soil Err:509 Cu.m.
4.4.2 Stone masonary work in 1:4 C/S mortar 70.20 Cu.m.
4.4.3 M20/20 PCC work for RCC cover 35.10 Cu.m.
4.4.4 Reinforcement work 2378.85 Kg
4.5 CROSS-DRAINAGE WORKS Refer sheets of cross drainage
4.5.1 Earthworks in excavation for foundation in all kinds of soil #REF! Cu.m.
4.5.2 Supply & place stone Soling #REF! Cu.m.
Preparation of bedding for causeway with granular material required to
4.5.3 0.00
complete the work as per the specification and drawings
Supply & place P.C.C. works M 10/20 as per DoLIDAR-Tech. Spec. for
4.5.4 #REF! Cu.m.
LBCWARR Clause No. 11
Supply & place P.C.C. works M 20/20 as per DoLIDAR-Tech. Spec. for
4.5.5 0.00
LBCWARR Clause No. 11
Supply & place local wood formwork as per DoLIDAR-Tech. Spec. for
4.5.6 #REF! Sq.m
LBCWARR Clause No. 9
Supply & place TMT high tensile strength steel reinforcement of specified
4.5.7 grade ( Fe 500) for RCC works including bending, centring & binding in #REF! Kg
position as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 10
Supply & place random rubble stone masonry in 1:4 C/S mortar as per
4.5.8 #REF! Cu.m.
DoLIDAR-Tech. Spec. for LBCWARR Clause No. 8
Supply, Laying, fitting and fixing of hume pipe class NP3. It includes all
operations required to complete the work and the jointing of pipes with 1:2
4.5.9
cement sand mortar as per DoLIDAR-Tech. Spec. for LBCWARR Clause
No. 15-5 and 15-6
a) 450 mm Dia. 75.00 Rm
b) 600 mm Dia. #REF! Rm
c) 900 mm Dia. #REF! Rm
13 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Supply & place 110 mm Dia. HDPE Pipe for weep hole as per Nepal
4.5.10 Err:509 Rm
Standard & directed by Engineer
Backfilling works with approved soil materials with compaction as per
4.5.11 #REF! Cu.m
DoLIDAR-Tech. Spec. for LBCWARR Clause No-2.5.4
Supply machine made fabrication of gabion boxes of different sizes with
hexagonal mesh size of 100 mm x 120 mm including rolling, cutting and
weaving (mesh wire 3.0 mm, selvedge wire 3.9 mm, binding wire 2.4 mm,
4.5.12 all heavy zinc coated wires),assembling, placing in position, packing and 0.00
filling of gabion create with rubble stone and tying by 2.4 mm binding wires
all complete as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 17-
1.4, 17-5 & 17-6
4.6 OUTLET PROTECTION WORKS IN C.D.
4.6.1 Outlet protection type I
a) Earth work excavation works Refer necessary sheet attached #REF! Cu.m
Supply machine made fabrication of gabion boxes of different sizes with
hexagonal mesh size of 100 mm x 120 mm including rolling, cutting and
weaving (mesh wire 3.0 mm, selvedge wire 3.9 mm, binding wire 2.4 mm,
b) all heavy zinc coated wires),assembling, placing in position, packing and Refer outlet protection work sheet #REF! Cu.m
filling of gabion create with rubble stone and tying by 2.4 mm binding wires
all complete as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 17-
1.4, 17-5 & 17-6
4.6.2 Outlet protection type II
a) Earth work excavation works #REF! Cu.m
Refer necessary sheet attached
b) Random rubble stone masonry work in 1:4 mortar #REF! Cu.m
Supply machine made fabrication of gabion boxes of different sizes with
hexagonal mesh size of 100 mm x 120 mm including rolling, cutting and
weaving (mesh wire 3.0 mm, selvedge wire 3.9 mm, binding wire 2.4 mm,
c) all heavy zinc coated wires),assembling, placing in position, packing and Refer outlet protection work sheet #REF! Cu.m
filling of gabion create with rubble stone and tying by 2.4 mm binding wires
all complete as per DoLIDAR-Tech. Spec. for LBCWARR Clause No. 17-
1.4, 17-5 & 17-6
14 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
5 PAVEMENT WORKS
Preparation of subgrade for rehabilitation works as per DoR-SSRBW
5.1 (Standard Specification for Road & Bridge Works, 2001) SECTION No.
1003
At carriageway including extrawidening and passing bays 1 18670.00 3.75 70012.50 Sqm
At shoulders 2 18670.00 0.75 28005.00 Sqm
Total 98017.50 Sqm
At carriageway including extrawidening and passing bays Refer pavement calculation sheet 18464.71 cum
At shoulder part of sub-base Refer pavement calculation sheet 18465.68 cum
Total 36930.39 cum
6 ROAD FURNITURE / TRAFFIC SIGN BOARD
Supplying and placing standard RCC kilometer post (place at each km) all
6.1 complete including painting, and writing etc. all complete as per 30000 1000 24.00 Nos
specification and drawings (DOR-SSRBW SECTION No. 1501)
15 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Supply & place un-coursed random rubble stone masonry works in 1:4
cement sand mortar in the line & level all complete stone masonry work
including full compensation for all labour, materials and other incidentals
6.5 required to complete the work as per the specifications and drawings. It For Stone Masonry Confidence Blocks #REF! cum
includes full compensation for using specially dressed stones on the face
of wall with batter and provisions for weep hole as necessary as per
DoLIDAR-Tech. Spec. for LBCWARR Clause No. 8
Supplying and erecting traffic sign in place including 50 mm dia steel tube,
2mm thick steel plate, cement concrete, painting, writing and supporting
6.6
steel angle nut and bolt etc complete as per DoR-SSRBW SECTION No.
1501)
60 cm dia circular, 60 cm equilateral triangle and 60 x 45 cm rectangular
a 120.00 Nos
shaped sign (Single post)
1.2m x 0.75 m size bigger traffic sign with back support and two or more
b 10.00 Nos
post
6.7 Provision of Project information board 2.00 Nos Start-End
7 BIO-ENGINEERING WORKS
7.1 Slope trimming works 1 400 20 8000.00 sqm
Supply & construction of Rip-rap drain with the stone pitching work of 20 one per 20m
7.2 1 400 400.00 Rm spacing
cm thick and 1.2 m wide.
Supply & construct dry stone check/toe walls for segmentation and
7.3 1 150 1.1 1.2 198.00 cum
support of slopes
7.4 Supply & construction of gabion check / toe wall for slope protection 1 30 2.5 75.00 cum
Supply & planting rooted grass slips on slopes < 45˚ including preparation
of slips on site. Operation includes digging planting holes to a maximum of
7.6 1 200 20 4000.00 sqm
5 cm depth with metal or hardwood peg, depending on nature of soil. The
planting drills should be spaced 10 cm apart.
16 of 313
DETAIL QUANTITY CALCULATION OF ALL ITEM OF WORKS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Item No. Description of works No. Length(m) Breadth(m) Height(m) Quantity Unit Remarks
Supply & planting containerised tree and shrub seedlings, including pitting,
transplanting, composting and placing tree guards, on toe of embankment
7.7 slopes in plain areas, not less than 8 m from the road centre line. Pit size 1 125.00 Nos
30 cm diameter×30 cm depth. Compost volume ⅟₄ of the volume of pit,
mixed with original soil.
8 DAY WORKS
Supply of labour as required as per preamble and as instructed by the
8.1
Engineer.
Unskilled labour 400.00 m/d
Skilled Labour 150.00 m/d
Supply of excavator for maintenance of road as required and instructed by
8.2 180.00 hrs
engineer
8.3 Provide Built up Drawing as completed 1 1.00 L.S.
17 of 313
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Government of Nepal
Err:509
Central Level Project Implementation Unit (CLPIU)
LPIU)
ure Works
Remarks
Includes retaining walls,crossdrains and outlet
protections
in slab culvert
in covered drain and slab culvert
in slab culvert
Government of Nepal
Ministry of Federal Affairs & Local Development
Earthquake Emergency Assistance Project
Central Level Project Implementation Unit
(CLPIU)
Ekantakuna,Jawalakhel,Lalitpur
ABSTRACT OF COST
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Sn Description of works Unit Quantity Rate(NRs) Amount (NRs) Remarks
1 GENERAL ITEMS
ENGINEER'S ESTIMATE
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Sn Description of works Unit Quantity Rate(NRs) Amount (NRs)
1 GENERAL ITEMS
Brush layering work: including preparation of terraces of 30 - 40 cm wide and laying live cuttings
of selected Species along the terrace @ 5 cm c/c with 2/3 of cuttings in to terrace and leaving
7.5 Rm 200.00 123.83 24766.14
one bud and up to 1/3 of the cuttings sticking beyond the terrace edge
( Cutting can be of assuro,simali etc of 45 - 60 m length) DoLIDAR Spec.Clause no.70-6.7 b
Planting rooted grass slips on slopes < 45˚ including preparation of slips on site. Operation
includes digging planting holes to a maximum of 5 cm depth with metal or hardwood peg,
7.6 sqm 3600.00 131.84 474624.00
depending on nature of soil. The planting drills should be spaced 10 cm apart as per Bio
engineering infoR.mation of DOR
Planting containerised tree and shrub seedlings, including pitting, transplanting, composting and
placing tree guards, on toe of embankment slopes in plain areas, not less than 8 m from the road
7.7 Nos 400.00 56.48 22592.00
centre line. Pit size 30 cm diameter×30 cm depth. Compost volume ⅟₄ of the volume of pit,
mixed with original soil as per Bio engineering infoR.mation of DOR
Sub-Total Err:509
Remark
Remark
Remark
SUM OF
ALL
SUBTOT
ALS
13% OF C
(C+D)
A/19.788
ABSTRACT OF COST
BIOENGINEERING WORKS
Slope trimming work DoLIDAR : 4 Spec.Clause No.: 2-1.3.2,2-1.8
1 Sq.m 200.00 79.10 15820.80
and 2-1.95
ABSTRACT OF COST
Remarks
30 of 313
जिल्ला आयोजना कार्यान्वयन इकाई म.ले.प.फारम नं: ५०१
धनकु टा
Cost Estimation
परियोजनाको नामः " स्तरउन्नति तथा पुनर्निर्माण गरिएको सडकको बाताबरण ब्यबस्थापन तथा सडक छेउ वृक्षारोपण आर्थिक वर्षः७७/७८
कार्यक्रम / योजनाको नाम र कार्यान्वयन हुने स्थलः
महाभारत-आहाले-बराहक्षेत्र-सडक बजेट उप शीर्षक नः
सम्पन्न हुने अनुमानित अवधिः...............................
Total
79.10 1.00 200.0 15,820.80
Quantity
Brush layering
work: including
preparation of
terraces of 30 - 40
cm wide and laying
live cuttings of
selected Species
along the terrace @
5 cm c/c with 2/3
of cuttings in to
terrace and leaving
one bud and up to
1/3 of the cuttings
sticking beyond the
terrace edge
( Cutting can be of
assuro,simali etc of
45 - 60 m length)
२ DoLIDAR
Spec.Clause no.70-
6.7 b
Total
RM 123.83 2.00 200.00 24766.14
Quantity
Planting rooted
grass slips on
slopes < 45˚
including
preparation of slips
on site. Operation
includes digging
planting holes to a
maximum of 5 cm
depth with metal or
hardwood peg,
depending on
nature of soil. The
planting drills
should be spaced 10
cm apart as per Bio
engineering
infoR.mation of sq.m
DOR
Total
131.84 1.00 3600.000 474624.00
Quantity
Planting
containerised tree
and shrub
seedlings, including
pitting,
transplanting,
composting and
placing tree guards,
on toe of
embankment slopes
in plain areas, not
less than 8 m from
the road centre line.
Pit size 30 cm
diameter×30 cm
depth. Compost
volume ⅟₄ of the
volume of pit,
mixed with original
soil as per Bio
engineering Nos
infoR.mation of
DOR
Total
56.48 400.00 22592.00
Quantity
उद्देश्य
प्रत्येक निकायले गर्नुपर्ने निर्माण कार्यको विश्लेशणात्मक लागत अनुमान तयार गर्नु र कार्यलार्इ स्वीकृ त नर्म्समा सञ्चालन गर्ने उद्देश्यले लागत अनुमान फाराम तयार गरिएको छ । सार्वजनिक खरिद
कार्यविधिको पालना गर्ने
१
निर्माण कार्य तथा परामर्श सेवाको लागत अनुमान गर्नुपरेमा तथा पुनः लागत अनुमान संसोधन, समायोजन तथा भेरिएसन गर्नुपरेमा समेत यही फाराम प्रयोग गर्नुपर्दछ ।
२ निर्माण कार्य तथा परामर्श सेवाको लागत अनुमान गर्ने कार्यालय वा परियोजनाको नाम तथा सो कार्यान्वयन हुने स्थल लेख्नुपर्छ।
३ चालु आर्थिक वर्ष लेखेर कार्यालयको आर्थिक सङ्केत तथा वर्गीकरण र व्याख्याअनुसारको बजेट उपशीर्षक नं. लेख्नुपर्छ ।
४ महल १ मा सिलसिलेबार क्रम सङ्ख्या नं. लेख्नुपर्छ ।
५ महल २ मा काम वा सेवाको क्रमशः मुख्य क्रियाकलाप र सहायक क्रियाकलाप लेख्नुपर्छ ।
६
महल ३ मा मापनको एकाइ के हो सो उल्लेख गर्नुपर्छ । यसमा एकाइ भन्नाले घन मिटर, घन फिट, स्क्वायर मिटर, स्क्वायर फिट, आदि पर्दछन् ।
७ महल ४ मा मापन प्रति एकाइ मूल्य कति पर्छ सो उल्लेख गर्नुपर्छ ।
महल ५, ६ ७र ८ मा कामको आयाम (Volume/मापन) राखिन्छ । महल ५ मा लम्बाइ, महल ६ मा चौडाइ र महल ७ मा उचाइ राखिन्छ । साथै महल ८ मा अन्य मापन भए सो
८ मापन उल्लेख गर्नुपर्छ । फरक आयाम उल्लेख गर्न सकिने भएमा महल ८ मा सो कु रा खुलाई मापन राख्न सकिन्छ ।
९ महल ९ मा महल ४, ५, ६ र ७ मा खुलाइएको मापनको हिसाबबाट आउने क्षेत्रफल तथा परिमाण उल्लेख गर्नुपर्छ ।
१० महल १० मा महल ४ र महल ९ को गुणान गरी कु ल जम्मा लागत निकाल्नुपर्छ ।
११ महल ११ मा खर्च रकमको अनुमानित स्रोतको नाम लेख्नुपर्छ ।
१२ लागत अनुमान तयार गर्ने, जाँच गर्न तथा स्वीकृ त गर्नेले आफ्नो नाम, पद र मिति लेखेर हस्ताक्षर गर्नुपर्छ ।
१३ सार्वजिनक खरिद ऐन र नियमावलीको संशोधनबमोजिम यो फाराम परिवर्तन हुने छ ।
म.ले.प.फारम नं: ५०१
जिल्ला आयोजना कार्यान्वयन इकाई
धनकु टा
नापी किताब
नापी नं: १ सम्झौता विवरणः
उपभोक्ता समितीको नामः भेडेटार सडक भू-संरक्षण तथा बाताबरण संरक्षण समिती
योजनाको नामः " स्तरउन्नति तथा पुनर्निर्माण गरिएको सडकको बाताबरण ब्यबस्थापन तथा सडक छेउ वृक्षारोपण "
कार्य स्थलः महाभारत-आहाले-बराहक्षेत्र-सडक खण्ड
CH:0+050 2.00
CH:0+100 4.00
CH:2+200 8.00
CH:2+500 10.00
CH:3+200 10.00
CH:3+500 10.00
CH:4+200 12.00
CH:4+500 15.00
CH:6+100 25.00
CH:6+200 25.00
CH:7+100 25.00
CH:7+300 20.00
CH:7+400 25.00
CH:7+500 24.00
CH:8+200 30.00
CH:8+500 25.00
CH:8+800 25.00
CH:9+200 25.00
CH:9+300 35.00
CH:9+500 30.00
CH:9+800 15.00
नोटः कम्प्युटरबाट नापि किताब तयार गरिएमा प्रिन्ट गरी बाइन्डिङ गर्नु र नापी किताब नियन्त्रण खातामा चढाउनुपर्दछ।
उद्देश्य
निर्माण कार्यको नापीको परिमाण अभिलेख गर्न ।प्रत्येक निर्माण काम ढाँचामा नापी कितावमा अनिवार्य किसिमले राख्न लागउने, नापी किताबमा चढेबमोजिमको कामको मात्र ठेके दारलार्इ भुक्तानी खर्च वा अमानतबाट भएको कामको भुक्तानी ग
पाना नं:
परिमाण परिमाण
9 10 11 १२=१०*११
1.60
3.75
1.38
5.00
3.75
6.25
7.50
10.50
11.25
21.73
15.75
15.60
13.20
11.70
9.60
11.25
8.00
19.76
11.25
11.20
200.0 79.10 15821.99
2.00
5.00
7.00
5.00
5.50
5.00
6.00
8.40
9.00
7.00
8.20
7.10
9.00
9.20
11.00
5.00
9.00
9.00
9.60
9.60
13.00
12.20
11.00
9.00
8.20
200.00 123.83 24766.14
3.75
15.75
65.00
20.80
101.15
100.00
97.92
47.04
219.60
155.80
317.52
160.72
81.18
234.60
313.65
459.00
288.64
359.10
218.50
161.82
178.50
3600.0 131.84 474629.27
2.00
4.00
8.00
10.00
10.00
10.00
12.00
15.00
25.00
25.00
25.00
20.00
25.00
24.00
30.00
25.00
25.00
25.00
35.00
30.00
15.00
400.00 56.48 22592.00
537,809.40
खर्च वा अमानतबाट भएको कामको भुक्तानी गर्न यो फारमको मुख्य उद्देश्य रके को छ ।
विधि भए वा सेवासम्बन्धी कामको मापन लेख्न सकिने अवस्था भए सो फरक मापन लेख्नुपर्छ ।
जिल्ला आयो
ठे
योजनाको नामः" स्तरउन्नति तथा पुनर्निर्माण गरिएको सडकको बाताबरण ब्यबस्थापन तथा सडक छेउ वृक्षारोपण "
योजना कार्यान्वयन हुने स्थानः महाभारत-आहाले-बराहक्षेत्र-सडक खण्ड
उपभोक्ता समितीको नामः भेडेटार सडक भू-संरक्षण तथा बाताबरण संरक्षण समिती
नापी किताब नं 1
Slope trimming work DoLIDAR : 4 Spec.Clause No.: 2-1.3.2,2- Sq.m 200.00 79.10
१ 1.8 and 2-1.95
परिमाण सूची (BOQ) बमोजिमको भेरिएसन भएकोमा सो बमोजिमको हालसम्म अध्यावधिक काम भएको अघिल्लो बिलमा चढेको
जम्मा रकम परिमाण स्वीकृ त दर जम्मा रकम परिमाण जम्मा रकम परिमाण
६ ७ ८ ९ १० ११=५x१० १२
537,802.94 537,809.40
537,802.94 537,809.40
54,737.03 54,737.03
483,065.91 483,072.37
ब समेत गरी अभिलेख राख्न यो फाराम तर्जुमा गरिएको हो । निर्माण कार्यको ठेक्काको बिल तयार गर्नु
बाट अघिल्लो बिलहरूमा चढिसके को परिमाण (महल १२) घटाउँदा बाँकी हुन आउने खुद परिमाण लेख्नुपर्छ ।
जम्मा रकमबाट अघिल्लो बिलहरूमा चढेको जम्मा रकम (महल १४)को रकम घटाउँदा बाँकी रहने खुद जम्मा रकम लेख्नुपर्छ ।
0.00 537,809.40
537,809.40
0.00 54,737.03
483,072.37
रको बहाल रकम, अग्रीम आय कर रकम, धरौटी रकम र अन्य कट्टी हुने रकम पर्दछन् ।
जिल्ला आयोजना कार्यान्वयन
धनकु टा
कार्य स्वीकार
आयोजनाको नामः स्तरउन्नति तथा पुनर्निर्माण गरिएको सडकको बाताबरण ब्यबस्थापन तथा सडक छेउ वृक्षारोपण
लागत अनुमानको कु ल रकमः 553,937.03
खर्च भएको कु ल् रकमः 553,943.69
सुरु लागत अनुमान भन्दा घटी बढीको प्रतिशतः 0.00
भेरिएसनपछिको कु ल लागत अनुमान भन्दा घटी बढीको प्रतिशतः
कामको विवरण सुरु लागत अनुमानबमोजिमको भेरिएसन भएकोमा सोबमोजिमको कु ल लागत अनुमान
परिमाण दर जम्मा परिमाण दर
१ २ ३ ४ ५ ६
Brush layering work: including preparation
CH:8+500
of terraces of 30 - 40 cm wide and laying 200.00 79.10 15820.80
live cuttings of selected Species along the
terrace @ 5 cm c/c with 2/3 of cuttings in
to terrace and leaving one bud and up to
1/3 of the cuttings sticking beyond the
terrace edge
( Cutting can be of assuro,simali etc of 45
- 60 m length) DoLIDAR Spec.Clause
no.70-6.7 b 200.00 123.83 24766.14
स्वीकृ त लागत अनुमान, डिजाइन र स्पेसिफिके सनअनुसार काम भएको छ भनी सिफारिस गर्ने
मा सोबमोजिमको कु ल लागत अनुमान खुद भएको कामको फरक (सुरु लागत अनुमानको आधारमा) फरक (भेरिएसनपछिको लागत अनुमानको आधारमा)
जम्मा परिमाण दर जम्मा परिमाण दर जम्मा परिमाण दर
७ ८ ९ १० ११=२-८ १२=३-९ १३=११*१२ १४=५-८ १५=६-९
200.02 79.10 15821.99 -0.01 79.10 -1.19
उपर्युक्तबमोजिम भएको कार्य सुरु सम्झौताको स्वीकृ त डिजाइन र स्पेसिफिके सनबमोजिम भएको छ/छैन । भेरिएशन आदेश र सर्तहरूबमोजमि भए/नभएकोहुँदा उक्त कार्य सम्पन्न
भएको स्वीकार/ अस्वीकार गरिएको छ ।
जम्मा रकम लेख्नुपर्छ । उल्लिखित परिमाण र दर भेरिएसन भएको अवसथामा सोपछि कायम भएको दर र परिमाण सम्झनुपर्दछ ।
र १०) घटाउँदा आउने बाँकी फरक रकम क्रमशः परिमाण, दर र जम्मा रकम लेख्नुपर्छ ।
स्वीकृ त गर्ने
सहीः
कार्यलय प्रमुखको नामः
दर्जाः
मितिः
57 of 313
Government of Nepal
Central Level Project Implementation Unit (CLPIU)
District Level Project Implementation Unit (DLPIU)
DHANKUTA
drawing of DOLIDAR
2 P.C.C work in 20/20 in foundation bed & floors :
In upper part 1 0.35 0.15 0.5 0.026 cu.m
In lower part 1 0.50 0.35 0.60 0.105 cu.m
Total = 0.13
3 Reinforcement work wt/m
6mm 8 1.00 0.22 1.760 Kg
10mm 8 0.95 0.67 5.092 Kg
Total = 6.852 Kg
58 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
drawing of DOLIDAR
2 P.C.C work in M20/20
In upper part 1 0.5 0.2 1 0.100
In lower part 1 0.75 0.50 0.60 0.225 cu.m
Total = 0.325
3 Reinforcement work wt/m
8mm 10 1.40 0.394 5.516 Kg
10mm 10 1.45 0.617 8.947 Kg
Total = 14.463 Kg
59 of 313
Rural Reconstruction and Rehabiliation Sector Development Program (RRRSDP - 2)
DISTRICT RATES 2072/73 for Kathmandu
#REF!
Total quantity
Ch. Existing road width (m) Length (m) Remarks
(Sqm)
0+000 0+040 5 40.00 200.00 Exist conc pitch(old)
New Bit. Pitch
0+180 0+300 3.75 120.00 450.00 damaged
61 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
62 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 63 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
1+020 20.00 0.55 11
1+040 20.00 0.6 12
1+060 20.00 0.6 12
1+080 20.00 0.6 12
1+100 20.00 0.6 12
1+120 20.00 0.023 0.46
1+140 20.00 0 0
1+160 20.00 0 0
1+180 20.00 0.6 12
1+200 20.00 0.6 12
1+220 20.00 0.55 11
1+240 20.00 0.6 12
1+260 20.00 0.6 12
1+280 20.00 0.6 12
1+300 20.00 0.6 12
1+320 20.00 0.512 10.24
1+340 20.00 0.383 7.66
1+360 20.00 0.55 11
1+380 20.00 0.183 3.66
1+400 20.00 0.6 12
1+420 20.00 0.6 12
1+440 20.00 0.6 12
1+460 20.00 0.6 12
1+480 20.00 0.55 11
1+500 20.00 0.55 11
1+520 20.00 0.55 11
1+540 20.00 0.55 11
1+560 20.00 0.55 11
1+580 20.00 0.598 11.96
1+600 20.00 0.6 12
1+620 20.00 0.6 12
1+640 20.00 0.1 2
1+660 20.00 0.175 3.5
1+680 20.00 0.55 11
1+700 20.00 0.6 12
1+720 20.00 0.413 8.26
1+740 20.00 0.6 12
1+760 20.00 0.6 12
1+780 20.00 0.6 12
1+800 20.00 0.6 12
1+820 20.00 0.6 12
1+840 20.00 0.6 12
1+860 20.00 0.6 12
1+880 20.00 0.275 5.5
1+900 20.00 0.578 11.56
1+920 20.00 0.54 10.8
1+940 20.00 0.6 12
1+960 20.00 0.55 11
1+980 20.00 0.6 12
2+000 20.00 0.6 12
2+020 20.00 0.55 11
2+040 20.00 0.6 12
2+060 20.00 0.6 12
2+080 20.00 0.6 12
2+100 20.00 0.55 11
2+120 20.00 0.6 12
2+140 20.00 0.6 12
2+160 20.00 0.6 12
Page 64 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
2+180 20.00 0.6 12
2+200 20.00 0.55 11
2+220 20.00 0.525 10.5
2+240 20.00 0.55 11
2+260 20.00 0.6 12
2+280 20.00 0.333 6.66
2+300 20.00 0.55 11
2+320 20.00 0.6 12
2+340 20.00 0.6 12
2+360 20.00 0.6 12
2+380 20.00 0.55 11
2+400 20.00 0.6 12
2+420 20.00 0.6 12
2+440 20.00 0.6 12
2+460 20.00 0.55 11
2+480 20.00 0.55 11
2+500 20.00 0.55 11
2+520 20.00 0.55 11
2+540 20.00 0.335 6.7
2+560 20.00 0.595 11.9
2+580 20.00 0.6 12
2+600 20.00 1.1 22
2+620 20.00 0.6 12
2+640 20.00 0.55 11
2+660 20.00 0.55 11
2+680 20.00 0.55 11
2+700 20.00 0.55 11
2+720 20.00 1.15 23
2+740 20.00 1.05 21
2+760 20.00 1.17 23.4
2+780 20.00 0.248 4.96
2+800 20.00 0 0
2+820 20.00 0.755 15.1
2+840 20.00 1.15 23
2+860 20.00 1.1 22
2+880 20.00 1.1 22
2+900 20.00 0.91 18.2
2+920 20.00 0.95 19
2+940 20.00 0.325 6.5
2+960 20.00 0.668 13.36
2+980 20.00 1.2 24
3+000 20.00 1.1 22
3+020 20.00 0.66 13.2
3+040 20.00 0.73 14.6
3+060 20.00 0.543 10.86
3+080 20.00 0.6 12
3+100 20.00 0.475 9.5
3+120 20.00 0.55 11
3+140 20.00 0.6 12
3+160 20.00 0.55 11
3+180 20.00 0.6 12
3+200 20.00 0.6 12
3+220 20.00 0.6 12
3+240 20.00 0.55 11
3+260 20.00 0.55 11
3+280 20.00 0.6 12
3+300 20.00 0.6 12
3+320 20.00 0.6 12
Page 65 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
3+340 20.00 0.6 12
3+360 20.00 0.55 11
3+380 20.00 0.398 7.96
3+400 20.00 0.6 12
3+420 20.00 0.55 11
3+440 20.00 0.525 10.5
3+460 20.00 0.55 11
3+480 20.00 0.555 11.1
3+500 20.00 0.6 12
3+520 20.00 0.6 12
3+540 20.00 0.55 11
3+560 20.00 0.55 11
3+580 20.00 0 0
3+600 20.00 0.463 9.26
3+620 20.00 0.55 11
3+640 20.00 0.335 6.7
3+660 20.00 0.458 9.16
3+680 20.00 0.535 10.7
3+700 20.00 0.55 11
3+720 20.00 0.6 12
3+740 20.00 0.55 11
3+760 20.00 0.55 11
3+780 20.00 0.6 12
3+800 20.00 0.17 3.4
3+820 20.00 0.6 12
3+840 20.00 0.6 12
3+860 20.00 0 0
3+880 20.00 0.293 5.86
3+900 20.00 0.6 12
3+920 20.00 0.55 11
3+940 20.00 0.6 12
3+960 20.00 1.2 24
3+980 20.00 1.15 23
4+000 20.00 1.1 22
4+020 20.00 1.15 23
4+040 20.00 1.15 23
4+060 20.00 1.15 23
4+080 20.00 1.2 24
4+100 20.00 1.2 24
4+120 20.00 0.6 12
4+140 20.00 0.55 11
4+160 20.00 1.2 24
4+180 20.00 1.2 24
4+200 20.00 1.15 23
4+220 20.00 1.1 22
4+240 20.00 0.958 19.16
4+260 20.00 1.16 23.2
4+280 20.00 1.165 23.3
4+300 20.00 1.11 22.2
4+320 20.00 1.115 22.3
4+340 20.00 1.16 23.2
4+360 20.00 1.16 23.2
4+380 20.00 1.125 22.5
4+400 20.00 1.175 23.5
4+420 20.00 1.16 23.2
4+440 20.00 1.11 22.2
4+460 20.00 1.065 21.3
4+480 20.00 1.165 23.3
4+500 20.00 1.2 24
Page 66 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
4+520 20.00 1.165 23.3
4+540 20.00 1.118 22.36
4+560 20.00 1.165 23.3
4+580 20.00 1.067 21.34
4+600 20.00 1.15 23
4+620 20.00 1.1 22
4+640 20.00 1.2 24
4+660 20.00 0.55 11
4+680 20.00 0.558 11.16
4+700 20.00 0.6 12
4+720 20.00 0.55 11
4+740 20.00 0.6 12
4+760 20.00 0.515 10.3
4+780 20.00 0.278 5.56
4+800 20.00 0.113 2.26
4+820 20.00 0 0
4+840 20.00 0 0
4+860 20.00 0.525 10.5
4+880 20.00 0.6 12
4+900 20.00 0.55 11
4+920 20.00 0.55 11
4+940 20.00 0.6 12
4+960 20.00 0.6 12
4+980 20.00 0.6 12
5+000 20.00 0.6 12
5+020 20.00 0.305 6.1
5+040 20.00 0.59 11.8
5+060 20.00 0.453 9.06
5+080 20.00 0.335 6.7
5+100 20.00 0.175 3.5
5+120 20.00 0.53 10.6
5+140 20.00 0 0
5+160 20.00 0.138 2.76
5+180 20.00 0.518 10.36
5+200 20.00 0.55 11
5+220 20.00 0.55 11
5+240 20.00 0.6 12
5+260 20.00 0.55 11
5+280 20.00 0.55 11
5+300 20.00 0.6 12
5+320 20.00 0.55 11
5+340 20.00 0.55 11
5+360 20.00 0.55 11
5+380 20.00 0.55 11
5+400 20.00 0.6 12
5+420 20.00 0.55 11
5+440 20.00 0.55 11
5+460 20.00 0.6 12
5+480 20.00 0.55 11
5+500 20.00 1.15 23
5+520 20.00 1.2 24
5+540 20.00 1.15 23
5+560 20.00 1.15 23
5+580 20.00 1.2 24
5+600 20.00 1.2 24
5+620 20.00 1.1 22
5+640 20.00 0.6 12
5+660 20.00 0.6 12
Page 67 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
5+680 20.00 0.55 11
5+700 20.00 0.6 12
5+720 20.00 0.55 11
5+740 20.00 0.6 12
5+760 20.00 0.6 12
5+780 20.00 0.55 11
5+800 20.00 1.15 23
5+820 20.00 0.6 12
5+840 20.00 0.6 12
5+860 20.00 0.6 12
5+880 20.00 1.15 23
5+900 20.00 0.6 12
5+920 20.00 0.6 12
5+940 20.00 0.55 11
5+960 20.00 0.6 12
5+980 20.00 0.6 12
6+000 20.00 0.6 12
6+020 20.00 0.168 3.36
6+040 20.00 0.55 11
6+060 20.00 0.395 7.9
6+080 20.00 0.3 6
6+100 20.00 0.37 7.4
6+120 20.00 0.6 12
6+140 20.00 0.55 11
6+160 20.00 0.5 10
6+180 20.00 0.55 11
6+200 20.00 0.333 6.66
6+220 20.00 0.6 12
6+240 20.00 0.6 12
6+260 20.00 0.6 12
6+280 20.00 0.55 11
6+300 20.00 0.6 12
6+320 20.00 0.6 12
6+340 20.00 0.6 12
6+360 20.00 0.208 4.16
6+380 20.00 0.008 0.16
6+400 20.00 0.163 3.26
6+420 20.00 0.6 12
6+440 20.00 0.1 2
6+460 20.00 0.6 12
6+480 20.00 0.55 11
6+500 20.00 0.47 9.4
6+520 20.00 0.157 3.14
6+540 20.00 0.175 3.5
6+560 20.00 0.53 10.6
6+580 20.00 0.6 12
6+600 20.00 0.6 12
6+620 20.00 0.6 12
6+640 20.00 0.6 12
6+660 20.00 0.55 11
6+680 20.00 0.55 11
6+700 20.00 0.55 11
6+720 20.00 0.6 12
6+740 20.00 0.252 5.04
6+760 20.00 0.6 12
6+780 20.00 0.55 11
6+800 20.00 0.6 12
6+820 20.00 0.55 11
6+840 20.00 0.6 12
Page 68 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
6+860 20.00 0.55 11
6+880 20.00 0.55 11
6+900 20.00 0.6 12
6+920 20.00 0.55 11
6+940 20.00 0.55 11
6+960 20.00 0.57 11.4
6+980 20.00 0.518 10.36
7+000 20.00 0.025 0.5
7+020 20.00 0.01 0.2
7+040 20.00 0.578 11.56
7+060 20.00 0.6 12
7+080 20.00 0.6 12
7+100 20.00 0.6 12
7+120 20.00 0.6 12
7+140 20.00 0.55 11
7+160 20.00 0.55 11
7+180 20.00 0.6 12
7+200 20.00 0.598 11.96
7+220 20.00 0.55 11
7+240 20.00 0.6 12
7+260 20.00 0.6 12
7+280 20.00 0.6 12
7+300 20.00 0.6 12
7+320 20.00 0.445 8.9
7+340 20.00 0.433 8.66
7+360 20.00 0.6 12
7+380 20.00 0.523 10.46
7+400 20.00 0.533 10.66
7+420 20.00 0.55 11
7+440 20.00 0.6 12
7+460 20.00 0.6 12
7+480 20.00 0.55 11
7+500 20.00 0.56 11.2
7+520 20.00 0.6 12
7+540 20.00 0.58 11.6
7+560 20.00 0.6 12
7+580 20.00 0.55 11
7+600 20.00 0.55 11
7+620 20.00 0.6 12
7+640 20.00 0.6 12
7+660 20.00 0.502 10.04
7+680 20.00 0.42 8.4
7+700 20.00 0.55 11
7+720 20.00 0.6 12
7+740 20.00 0.6 12
7+760 20.00 0.523 10.46
7+780 20.00 0.55 11
7+800 20.00 0.6 12
7+820 20.00 0.595 11.9
7+840 20.00 0.39 7.8
7+860 20.00 0.6 12
7+880 20.00 0.6 12
7+900 20.00 0.36 7.2
7+920 20.00 0.59 11.8
7+940 20.00 0.6 12
7+960 20.00 0.538 10.76
7+980 20.00 0.6 12
8+000 20.00 0.6 12
Page 69 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
8+020 20.00 0.393 7.86
8+040 20.00 0.6 12
8+060 20.00 0.55 11
8+080 20.00 0.6 12
8+100 20.00 0.6 12
8+120 20.00 0.6 12
8+140 20.00 0.6 12
8+160 20.00 0.55 11
8+180 20.00 0.55 11
8+200 20.00 0.55 11
8+220 20.00 0.583 11.66
8+240 20.00 0.6 12
8+260 20.00 0.55 11
8+280 20.00 0.6 12
8+300 20.00 0.6 12
8+320 20.00 0.55 11
8+340 20.00 0.6 12
8+360 20.00 0.6 12
8+380 20.00 0.55 11
8+400 20.00 0.55 11
8+420 20.00 0.6 12
8+440 20.00 0.6 12
8+460 20.00 0.55 11
8+480 20.00 0.55 11
8+500 20.00 0.6 12
8+520 20.00 0.6 12
8+540 20.00 0.6 12
8+560 20.00 0.6 12
8+580 20.00 0.6 12
8+600 20.00 0.55 11
8+620 20.00 0.55 11
8+640 20.00 0.6 12
8+660 20.00 0.55 11
8+680 20.00 0.55 11
8+700 20.00 0.548 10.96
8+720 20.00 0.55 11
8+740 20.00 0.435 8.7
8+760 20.00 0.59 11.8
8+780 20.00 0.55 11
8+800 20.00 0.55 11
8+820 20.00 0.55 11
8+840 20.00 0.55 11
8+860 20.00 0.423 8.46
8+880 20.00 0.6 12
8+900 20.00 0.6 12
8+920 20.00 0.538 10.76
8+940 20.00 0.6 12
8+960 20.00 0.6 12
8+980 20.00 0.55 11
9+000 20.00 0.55 11
9+020 20.00 0.55 11
9+040 20.00 0.6 12
9+060 20.00 0.55 11
9+080 20.00 0.4 8
9+100 20.00 0.468 9.36
9+120 20.00 0.55 11
9+140 20.00 0.505 10.1
9+160 20.00 0.25 5
Page 70 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
9+180 20.00 0.505 10.1
9+200 20.00 0.6 12
9+220 20.00 0.6 12
9+240 20.00 0.6 12
9+260 20.00 0.6 12
9+280 20.00 0.55 11
9+300 20.00 0.24 4.8
9+320 20.00 0.6 12
9+340 20.00 0.55 11
9+360 20.00 0.6 12
9+380 20.00 0.6 12
9+400 20.00 0.585 11.7
9+420 20.00 0.55 11
9+440 20.00 0.55 11
9+460 20.00 0.6 12
9+480 20.00 0.4 8
9+500 20.00 0.57 11.4
9+520 20.00 0.6 12
9+540 20.00 0.548 10.96
9+560 20.00 0.58 11.6
9+580 20.00 0.6 12
9+600 20.00 0.6 12
9+620 20.00 0.6 12
9+640 20.00 0.6 12
9+660 20.00 0.6 12
9+680 20.00 0.6 12
9+700 20.00 0.6 12
9+720 20.00 0.6 12
9+740 20.00 0.6 12
9+760 20.00 0.6 12
9+780 20.00 0.51 10.2
9+800 20.00 0.55 11
9+820 20.00 0.425 8.5
9+840 20.00 0.398 7.96
9+860 20.00 0.428 8.56
9+880 20.00 0.42 8.4
9+900 20.00 0.528 10.56
9+920 20.00 0.405 8.1
9+940 20.00 0.53 10.6
9+960 20.00 0.6 12
9+980 20.00 0.6 12
10+000 20.00 0.6 12
10+020 20.00 0.6 12
10+040 20.00 0.55 11
10+060 20.00 0.488 9.76
10+080 20.00 0 0
10+100 20.00 0.383 7.66
10+120 20.00 0.55 11
10+140 20.00 0.6 12
10+160 20.00 0.6 12
10+180 20.00 0.55 11
10+200 20.00 0.6 12
10+220 20.00 0.55 11
10+240 20.00 0 0
10+260 20.00 0.6 12
10+280 20.00 0.6 12
10+300 20.00 0.55 11
10+320 20.00 0.6 12
Page 71 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
10+340 20.00 0.6 12
10+360 20.00 0.55 11
10+380 20.00 0.6 12
10+400 20.00 0.6 12
10+420 20.00 0.55 11
10+440 20.00 0.55 11
10+460 20.00 0.6 12
10+480 20.00 0.6 12
10+500 20.00 0.6 12
10+520 20.00 0.55 11
10+540 20.00 0.55 11
10+560 20.00 0.6 12
10+580 20.00 0.55 11
10+600 20.00 0.6 12
10+620 20.00 0.55 11
10+640 20.00 0 0
10+660 20.00 0.6 12
10+680 20.00 0.6 12
10+700 20.00 0.55 11
10+720 20.00 0.6 12
10+740 20.00 0.6 12
10+760 20.00 0.55 11
10+780 20.00 0.55 11
10+800 20.00 1.2 24
10+820 20.00 0 0
10+840 20.00 0.415 8.3
10+860 20.00 0 0
10+880 20.00 0.6 12
10+900 20.00 0.6 12
10+920 20.00 0.6 12
10+940 20.00 0.6 12
10+960 20.00 0.6 12
10+980 20.00 0.535 10.7
11+000 20.00 0.6 12
11+020 20.00 0.6 12
11+040 20.00 0.6 12
11+060 20.00 0.6 12
11+080 20.00 0.6 12
11+100 20.00 0.6 12
11+120 20.00 0.55 11
11+140 20.00 0.6 12
11+160 20.00 0.45 9
11+180 20.00 0.553 11.06
11+200 20.00 0.43 8.6
11+220 20.00 0.6 12
11+240 20.00 0.588 11.76
11+260 20.00 0.55 11
11+280 20.00 0.55 11
11+300 20.00 0.55 11
11+320 20.00 0.55 11
11+340 20.00 0.6 12
11+360 20.00 0.55 11
11+380 20.00 0.6 12
11+400 20.00 0.55 11
11+420 20.00 0.55 11
11+440 20.00 0.6 12
11+460 20.00 0.6 12
11+480 20.00 0.55 11
Page 72 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
11+500 20.00 0.55 11
11+520 20.00 0.6 12
11+540 20.00 0.6 12
11+560 20.00 0.6 12
11+580 20.00 0.6 12
11+600 20.00 0.6 12
11+620 20.00 0.6 12
11+640 20.00 0.6 12
11+660 20.00 0.6 12
11+680 20.00 0.55 11
11+700 20.00 0.55 11
11+720 20.00 0.55 11
11+740 20.00 0.6 12
11+760 20.00 0.55 11
11+780 20.00 0.6 12
11+800 20.00 0.6 12
11+820 20.00 0.6 12
11+840 20.00 0.6 12
11+860 20.00 0.6 12
11+880 20.00 0.55 11
11+900 20.00 0.6 12
11+920 20.00 0.6 12
11+940 20.00 0.55 11
11+960 20.00 0.6 12
11+980 20.00 0.6 12
12+000 20.00 0.55 11
12+020 20.00 0.6 12
12+040 20.00 0.6 12
12+060 20.00 0.6 12
12+080 20.00 0.6 12
12+100 20.00 0.55 11
12+120 20.00 0.55 11
12+140 20.00 0.55 11
12+160 20.00 0.6 12
12+180 20.00 0.6 12
12+200 20.00 0.6 12
12+220 20.00 0.54 10.8
12+240 20.00 0.598 11.96
12+260 20.00 0.6 12
12+280 20.00 0.6 12
12+300 20.00 0.6 12
12+320 20.00 0.6 12
12+340 20.00 0.55 11
12+360 20.00 0.6 12
12+380 20.00 0.595 11.9
12+400 20.00 0.6 12
12+420 20.00 0.55 11
12+440 20.00 0.55 11
12+460 20.00 0.6 12
12+480 20.00 0.55 11
12+500 20.00 0.6 12
12+520 20.00 0.55 11
12+540 20.00 0.55 11
12+560 20.00 0.55 11
12+580 20.00 0.6 12
12+600 20.00 0.55 11
12+620 20.00 0.55 11
12+640 20.00 0.6 12
Page 73 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
12+660 20.00 0 0
12+680 20.00 0.6 12
12+700 20.00 0.57 11.4
12+720 20.00 0.6 12
12+740 20.00 0.6 12
12+760 20.00 0.6 12
12+780 20.00 0.55 11
12+800 20.00 1.15 23
12+820 20.00 0.55 11
12+840 20.00 0.6 12
12+860 20.00 0.25 5
12+880 20.00 0.6 12
12+900 20.00 0.55 11
12+920 20.00 0.548 10.96
12+940 20.00 0.6 12
12+960 20.00 0.6 12
12+980 20.00 0.6 12
13+000 20.00 0.465 9.3
13+020 20.00 0.6 12
13+040 20.00 0.533 10.66
13+060 20.00 0.583 11.66
13+080 20.00 0.55 11
13+100 20.00 0.6 12
13+120 20.00 1.2 24
13+140 20.00 0.6 12
13+160 20.00 0.55 11
13+180 20.00 0.55 11
13+200 20.00 0.55 11
13+220 20.00 0.053 1.06
13+240 20.00 0.533 10.66
13+260 20.00 0.583 11.66
13+280 20.00 0.55 11
13+300 20.00 0.55 11
13+320 20.00 0.6 12
13+340 20.00 0.55 11
13+360 20.00 0.6 12
13+380 20.00 0.55 11
13+400 20.00 0.6 12
13+420 20.00 0.6 12
13+440 20.00 0.55 11
13+460 20.00 0.6 12
13+480 20.00 0.6 12
13+500 20.00 0.55 11
13+520 20.00 0.55 11
13+540 20.00 0.558 11.16
13+560 20.00 0.55 11
13+580 20.00 0.6 12
13+600 20.00 0.55 11
13+620 20.00 0.6 12
13+640 20.00 0.6 12
13+660 20.00 0.6 12
13+680 20.00 0.55 11
13+700 20.00 0.55 11
13+720 20.00 0.6 12
13+740 20.00 0.55 11
13+760 20.00 0.533 10.66
13+780 20.00 0.6 12
13+800 20.00 0.55 11
Page 74 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
13+820 20.00 0.57 11.4
13+840 20.00 0.563 11.26
13+860 20.00 0.572 11.44
13+880 20.00 0.55 11
13+900 20.00 0.6 12
13+920 20.00 0.488 9.76
13+940 20.00 0.55 11
13+960 20.00 0.6 12
13+980 20.00 0.6 12
14+000 20.00 0.55 11
14+020 20.00 0.55 11
14+040 20.00 0.6 12
14+060 20.00 0.6 12
14+080 20.00 1.003 20.06
14+100 20.00 1.2 24
14+120 20.00 1.15 23
14+140 20.00 0.55 11
14+160 20.00 0.6 12
14+180 20.00 1.15 23
14+200 20.00 1.2 24
14+220 20.00 0.975 19.5
14+240 20.00 1.15 23
14+260 20.00 1.15 23
14+280 20.00 1.2 24
14+300 20.00 1.2 24
14+320 20.00 1.1 22
14+340 20.00 1.2 24
14+360 20.00 1.09 21.8
14+380 20.00 1.033 20.66
14+400 20.00 0 0
14+420 20.00 0.598 11.96
14+440 20.00 0.6 12
14+460 20.00 0.6 12
14+480 20.00 0.6 12
14+500 20.00 1.2 24
14+520 20.00 0.6 12
14+540 20.00 0.55 11
14+560 20.00 0.6 12
14+580 20.00 0.6 12
14+600 20.00 0.55 11
14+620 20.00 0.55 11
14+640 20.00 0.6 12
14+660 20.00 0.55 11
14+680 20.00 0.6 12
14+700 20.00 0.55 11
14+720 20.00 0.6 12
14+740 20.00 0.6 12
14+760 20.00 0.6 12
14+780 20.00 0.6 12
14+800 20.00 0.6 12
14+820 20.00 0.55 11
14+840 20.00 0.55 11
14+860 20.00 0.6 12
14+880 20.00 0.55 11
14+900 20.00 0.6 12
14+920 20.00 0.6 12
14+940 20.00 0.6 12
14+960 20.00 0.55 11
Page 75 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
14+980 20.00 0.6 12
15+000 20.00 0 0
15+020 20.00 0 0
15+040 20.00 0.06 1.2
15+060 20.00 0.405 8.1
15+080 20.00 0.053 1.06
15+100 20.00 0 0
15+120 20.00 0.55 11
15+140 20.00 0.55 11
15+160 20.00 1.2 24
15+180 20.00 1.1 22
15+200 20.00 1.15 23
15+220 20.00 1.15 23
15+240 20.00 1.15 23
15+260 20.00 0.55 11
15+280 20.00 0.6 12
15+300 20.00 0.55 11
15+320 20.00 0.6 12
15+340 20.00 0.55 11
15+360 20.00 0.6 12
15+380 20.00 0.6 12
15+400 20.00 0.6 12
15+420 20.00 0.6 12
15+440 20.00 1.15 23
15+460 20.00 1.15 23
15+480 20.00 1.15 23
15+500 20.00 1.15 23
15+520 20.00 1.15 23
15+540 20.00 1.15 23
15+560 20.00 1.15 23
15+580 20.00 1.2 24
15+600 20.00 1.15 23
15+620 20.00 1.11 22.2
15+640 20.00 1.13 22.6
15+660 20.00 1.15 23
15+680 20.00 1.125 22.5
15+700 20.00 1.065 21.3
15+720 20.00 1.115 22.3
15+740 20.00 1.15 23
15+760 20.00 1.2 24
15+780 20.00 1.2 24
15+800 20.00 1.15 23
15+820 20.00 1.2 24
15+840 20.00 1.15 23
15+860 20.00 1.15 23
15+880 20.00 1.2 24
15+900 20.00 1.155 23.1
15+920 20.00 1.133 22.66
15+940 20.00 1.033 20.66
15+960 20.00 1.145 22.9
15+980 20.00 1.133 22.66
16+000 20.00 1.175 23.5
16+020 20.00 1.135 22.7
16+040 20.00 1.077 21.54
16+060 20.00 1.115 22.3
16+080 20.00 1.16 23.2
16+100 20.00 1.175 23.5
16+120 20.00 1.2 24
Page 76 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
16+140 20.00 1.15 23
16+160 20.00 0.6 12
16+180 20.00 0.55 11
16+200 20.00 0.6 12
16+220 20.00 0.6 12
16+240 20.00 1.2 24
16+260 20.00 0.55 11
16+280 20.00 0.6 12
16+300 20.00 0.45 9
16+320 20.00 0.6 12
16+340 20.00 0.55 11
16+360 20.00 0.55 11
16+380 20.00 0.55 11
16+400 20.00 0.55 11
16+420 20.00 1.15 23
16+440 20.00 1.15 23
16+460 20.00 0.55 11
16+480 20.00 0.55 11
16+500 20.00 0.6 12
16+520 20.00 0.55 11
16+540 20.00 0.6 12
16+560 20.00 1.1 22
16+580 20.00 1.2 24
16+600 20.00 0.71 14.2
16+620 20.00 0.6 12
16+640 20.00 0.55 11
16+660 20.00 0.55 11
16+680 20.00 0 0
16+700 20.00 0.55 11
16+720 20.00 0.55 11
16+740 20.00 0.55 11
16+760 20.00 1.2 24
16+780 20.00 0.3 6
16+800 20.00 1.15 23
16+820 20.00 0.6 12
16+840 20.00 0.6 12
16+860 20.00 0.6 12
16+880 20.00 1.2 24
16+900 20.00 0.683 13.66
16+920 20.00 1.2 24
16+940 20.00 0.6 12
16+960 20.00 1.118 22.36
16+980 20.00 1.115 22.3
17+000 20.00 1.082 21.64
17+020 20.00 0.518 10.36
17+040 20.00 1.11 22.2
17+060 20.00 1.067 21.34
17+080 20.00 1.125 22.5
17+100 20.00 1.118 22.36
17+120 20.00 0.6 12
17+140 20.00 0.6 12
17+160 20.00 0.55 11
17+180 20.00 0.6 12
17+200 20.00 0.6 12
17+220 20.00 0.55 11
17+240 20.00 0.55 11
17+260 20.00 0.298 5.96
17+280 20.00 0.55 11
Page 77 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
17+300 20.00 0.55 11
17+320 20.00 0.6 12
17+340 20.00 0.533 10.66
17+360 20.00 0.495 9.9
17+380 20.00 0.6 12
17+400 20.00 0 0
17+420 20.00 0 0
17+440 20.00 0 0
17+460 20.00 0 0
17+480 20.00 0.6 12
17+500 20.00 0 0
17+520 20.00 0 0
17+540 20.00 0.6 12
17+560 20.00 0.6 12
17+580 20.00 0.6 12
17+600 20.00 0.6 12
17+620 20.00 0.6 12
17+640 20.00 0.598 11.96
17+660 20.00 0.55 11
17+680 20.00 0.55 11
17+700 20.00 0.6 12
17+720 20.00 0.55 11
17+740 20.00 0.55 11
17+760 20.00 0 0
17+780 20.00 0 0
17+800 20.00 0.5 10
17+820 20.00 0.55 11
17+840 20.00 0.55 11
17+860 20.00 0.55 11
17+880 20.00 0.55 11
17+900 20.00 0.6 12
17+920 20.00 0 0
17+940 20.00 0 0
17+960 20.00 0 0
17+980 20.00 0 0
18+000 20.00 0.008 0.16
18+020 20.00 0.353 7.06
18+040 20.00 0.55 11
18+060 20.00 0.6 12
18+080 20.00 0.55 11
18+100 20.00 0 0
18+120 20.00 0 0
18+140 20.00 0 0
18+160 20.00 0.095 1.9
18+180 20.00 0.163 3.26
18+200 20.00 0.6 12
18+220 20.00 0.6 12
18+240 20.00 0.6 12
18+260 20.00 0.55 11
18+280 20.00 0.6 12
18+300 20.00 1.2 24
18+320 20.00 1.2 24
18+340 20.00 1.2 24
18+360 20.00 1.2 24
18+380 20.00 0.58 11.6
18+400 20.00 1.15 23
18+420 20.00 1.15 23
18+440 20.00 1.15 23
Page 78 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
18+460 20.00 1.15 23
18+480 20.00 1.2 24
18+500 20.00 0.55 11
18+520 20.00 1.15 23
18+540 20.00 1.15 23
18+560 20.00 1.118 22.36
18+580 20.00 1.16 23.2
18+600 20.00 1.072 21.44
18+620 20.00 1.2 24
18+640 20.00 1.15 23
18+660 20.00 1.067 21.34
18+680 20.00 1.087 21.74
18+700 20.00 1.13 22.6
18+720 20.00 1.085 21.7
18+740 20.00 1.15 23
18+760 20.00 0.9 18
18+780 20.00 0.6 12
18+800 20.00 0.6 12
18+820 20.00 0.55 11
18+840 20.00 0.55 11
18+860 20.00 0 0
18+880 20.00 0 0
18+900 20.00 0.268 5.36
18+920 20.00 0 0
18+940 20.00 0.36 7.2
18+960 20.00 0.55 11
18+980 20.00 0.6 12
19+000 20.00 0.6 12
19+020 20.00 0 0
19+040 20.00 0.6 12
19+060 20.00 0.6 12
19+080 20.00 0.55 11
19+100 20.00 0.55 11
19+120 20.00 0.6 12
19+140 20.00 0 0
19+160 20.00 0 0
19+180 20.00 0 0
19+200 20.00 0.57 11.4
19+220 20.00 0.6 12
19+240 20.00 1.1 22
19+260 20.00 1.1 22
19+280 20.00 1.1 22
19+300 20.00 1.2 24
19+320 20.00 1.2 24
19+340 20.00 1.1 22
19+360 20.00 0.228 4.56
19+380 20.00 1.035 20.7
19+400 20.00 0.55 11
19+420 20.00 0.6 12
19+440 20.00 0.6 12
19+460 20.00 0.55 11
19+480 20.00 0.6 12
19+500 20.00 0.55 11
19+520 20.00 0.6 12
19+540 20.00 0.55 11
19+560 20.00 0.55 11
19+580 20.00 0.6 12
19+600 20.00 0.55 11
19+620 20.00 1.15 23
Page 79 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
19+640 20.00 0.55 11
19+660 20.00 0.6 12
19+680 20.00 0.6 12
19+700 20.00 0.6 12
19+720 20.00 0.438 8.76
19+740 20.00 0.54 10.8
19+760 20.00 0.55 11
19+780 20.00 0.6 12
19+800 20.00 0.533 10.66
19+820 20.00 0.55 11
19+840 20.00 0.51 10.2
19+860 20.00 0.572 11.44
19+880 20.00 0 0
19+900 20.00 0.6 12
19+920 20.00 0.55 11
19+940 20.00 0.6 12
19+960 20.00 0.55 11
19+980 20.00 0.6 12
20+000 20.00 0.2 4
20+020 20.00 0.55 11
20+040 20.00 0.6 12
20+060 20.00 0.55 11
20+080 20.00 0.55 11
20+100 20.00 0 0
20+120 20.00 0.6 12
20+140 20.00 0.6 12
20+160 20.00 0.6 12
20+180 20.00 0.55 11
20+200 20.00 0.6 12
20+220 20.00 1.15 23
20+240 20.00 1.2 24
20+260 20.00 1.2 24
20+280 20.00 1.15 23
20+300 20.00 0.565 11.3
20+320 20.00 0 0
20+340 20.00 0 0
20+360 20.00 0 0
20+380 20.00 0 0
20+400 20.00 0.55 11
20+420 20.00 0.55 11
20+440 20.00 0.6 12
20+460 20.00 0.6 12
20+480 20.00 0.35 7
20+500 20.00 1.2 24
20+520 20.00 1.095 21.9
20+540 20.00 0.843 16.86
20+560 20.00 0.6 12
20+580 20.00 0.55 11
20+600 20.00 0.6 12
20+620 20.00 0.55 11
20+640 20.00 0.55 11
20+660 20.00 0.6 12
20+680 20.00 0.55 11
20+700 20.00 0.6 12
20+720 20.00 0.6 12
20+740 20.00 0.55 11
20+760 20.00 0.6 12
20+780 20.00 0.502 10.04
Page 80 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
20+800 20.00 0.6 12
20+820 20.00 0.42 8.4
20+840 20.00 0.6 12
20+860 20.00 0.39 7.8
20+880 20.00 0.163 3.26
20+900 20.00 0.55 11
20+920 20.00 0.6 12
20+940 20.00 0.55 11
20+960 20.00 0.585 11.7
20+980 20.00 0.6 12
21+000 20.00 0.6 12
21+020 20.00 0.55 11
21+040 20.00 0.6 12
21+060 20.00 0.55 11
21+080 20.00 0.55 11
21+100 20.00 0.6 12
21+120 20.00 0.55 11
21+140 20.00 0.598 11.96
21+160 20.00 0.325 6.5
21+180 20.00 0 0
21+200 20.00 0 0
21+220 20.00 0.6 12
21+240 20.00 0.55 11
21+260 20.00 1.2 24
21+280 20.00 1.2 24
21+300 20.00 1.2 24
21+320 20.00 1.1 22
21+340 20.00 1.2 24
21+360 20.00 0.6 12
21+380 20.00 0.55 11
21+400 20.00 0.55 11
21+420 20.00 0.6 12
21+440 20.00 0.6 12
21+460 20.00 0.6 12
21+480 20.00 0.55 11
21+500 20.00 0.55 11
21+520 20.00 0.6 12
21+540 20.00 0.55 11
21+560 20.00 0.6 12
21+580 20.00 0.6 12
21+600 20.00 0.6 12
21+620 20.00 0.6 12
21+640 20.00 0.55 11
21+660 20.00 0.55 11
21+680 20.00 0.6 12
21+700 20.00 0.6 12
21+720 20.00 0.6 12
21+740 20.00 0.6 12
21+760 20.00 0.18 3.6
21+780 20.00 0.6 12
21+800 20.00 0.6 12
21+820 20.00 0.6 12
21+840 20.00 0.55 11
21+860 20.00 0.6 12
21+880 20.00 0.55 11
21+900 20.00 0.6 12
21+920 20.00 0.6 12
21+940 20.00 0.55 11
Page 81 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
21+960 20.00 0.6 12
21+980 20.00 0.55 11
22+000 20.00 1.15 23
22+020 20.00 0.6 12
22+040 20.00 0.165 3.3
22+060 20.00 0.55 11
22+080 20.00 0.6 12
22+100 20.00 0.55 11
22+120 20.00 0.6 12
22+140 20.00 0.55 11
22+160 20.00 0.55 11
22+180 20.00 0.6 12
22+200 20.00 0.55 11
22+220 20.00 1.15 23
22+240 20.00 0.55 11
22+260 20.00 0.478 9.56
22+280 20.00 0.6 12
22+300 20.00 0 0
22+320 20.00 0.6 12
22+340 20.00 0.55 11
22+360 20.00 0.55 11
22+380 20.00 0.55 11
22+400 20.00 0.55 11
22+420 20.00 0.6 12
22+440 20.00 0.55 11
22+460 20.00 0.6 12
22+480 20.00 0.6 12
22+500 20.00 0.55 11
22+520 20.00 0.6 12
22+540 20.00 0.55 11
22+560 20.00 0 0
22+580 20.00 0.55 11
22+600 20.00 0.6 12
22+620 20.00 0.468 9.36
22+640 20.00 0.6 12
22+660 20.00 0.6 12
22+680 20.00 0.6 12
22+700 20.00 0.6 12
22+720 20.00 0.55 11
22+740 20.00 0.413 8.26
22+760 20.00 0.55 11
22+780 20.00 0.55 11
22+800 20.00 0.6 12
22+820 20.00 0.59 11.8
22+840 20.00 0.55 11
22+860 20.00 0.6 12
22+880 20.00 0.6 12
22+900 20.00 0.6 12
22+920 20.00 0.6 12
22+940 20.00 0.6 12
22+960 20.00 0.6 12
22+980 20.00 0.55 11
23+000 20.00 0.6 12
23+020 20.00 0.55 11
23+040 20.00 0.6 12
23+060 20.00 0.55 11
23+080 20.00 0.55 11
23+100 20.00 0.55 11
Page 82 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
23+120 20.00 0.55 11
23+140 20.00 0.55 11
23+160 20.00 0.55 11
23+180 20.00 0.6 12
23+200 20.00 0.55 11
23+220 20.00 0.6 12
23+240 20.00 0.6 12
23+260 20.00 0.6 12
23+280 20.00 0.6 12
23+300 20.00 0.6 12
23+320 20.00 0.6 12
23+340 20.00 0.55 11
23+360 20.00 0.55 11
23+380 20.00 0.6 12
23+400 20.00 0.55 11
23+420 20.00 0.55 11
23+440 20.00 0.6 12
23+460 20.00 0.6 12
23+480 20.00 0.347 6.94
23+500 20.00 0.55 11
23+520 20.00 0.6 12
23+540 20.00 0.6 12
23+560 20.00 0.55 11
23+580 20.00 0.6 12
23+600 20.00 0.6 12
23+620 20.00 0.6 12
23+640 20.00 0.6 12
23+660 20.00 0.6 12
23+680 20.00 0.6 12
23+700 20.00 0.55 11
23+720 20.00 0.6 12
23+740 20.00 0.6 12
23+760 20.00 0.6 12
23+780 20.00 1.2 24
23+800 20.00 0.6 12
23+820 20.00 0.6 12
23+840 20.00 0.42 8.4
23+860 20.00 0.578 11.56
23+880 20.00 0.55 11
23+900 20.00 0.6 12
23+920 20.00 0.6 12
23+940 20.00 0.6 12
23+960 20.00 1.095 21.9
23+980 20.00 0.86 17.2
24+000 20.00 1.15 23
24+020 20.00 1.1 22
24+040 20.00 0.55 11
24+060 20.00 0.6 12
24+080 20.00 0.55 11
24+100 20.00 0.038 0.76
24+120 20.00 0.083 1.66
24+140 20.00 0.6 12
24+160 20.00 0.6 12
24+180 20.00 0.55 11
24+200 20.00 0.6 12
24+220 20.00 0.6 12
24+240 20.00 0.55 11
24+260 20.00 0.6 12
Page 83 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
24+280 20.00 0.183 3.66
24+300 20.00 0.55 11
24+320 20.00 0.6 12
24+340 20.00 0.6 12
24+360 20.00 0.55 11
24+380 20.00 0.57 11.4
24+400 20.00 0 0
24+420 20.00 0.6 12
24+440 20.00 0.55 11
24+460 20.00 0.6 12
24+480 20.00 0.55 11
24+500 20.00 0.6 12
24+520 20.00 0.6 12
24+540 20.00 0.6 12
24+560 20.00 0.6 12
24+580 20.00 0.6 12
24+600 20.00 0.6 12
24+620 20.00 0.55 11
24+640 20.00 0.6 12
24+660 20.00 0.55 11
24+680 20.00 0.6 12
24+700 20.00 0.6 12
24+720 20.00 0.6 12
24+740 20.00 0.6 12
24+760 20.00 0.55 11
24+780 20.00 0.6 12
24+800 20.00 0.55 11
24+820 20.00 0.55 11
24+840 20.00 0.6 12
24+860 20.00 0.6 12
24+880 20.00 0.6 12
24+900 20.00 0.263 5.26
24+920 20.00 0 0
24+940 20.00 0.172 3.44
24+960 20.00 0.55 11
24+980 20.00 0.55 11
25+000 20.00 1.1 22
25+020 20.00 1.1 22
25+040 20.00 1.15 23
25+060 20.00 1.1 22
25+080 20.00 1.15 23
25+100 20.00 1.2 24
25+120 20.00 1.15 23
25+140 20.00 1.15 23
25+160 20.00 1.15 23
25+180 20.00 1.2 24
25+200 20.00 1.15 23
25+220 20.00 0.55 11
25+240 20.00 0.6 12
25+260 20.00 0.6 12
25+280 20.00 0.6 12
25+300 20.00 0.55 11
25+320 20.00 0.6 12
25+340 20.00 0.6 12
25+360 20.00 0.6 12
25+380 20.00 0.55 11
25+400 20.00 0.6 12
25+420 20.00 0.03 0.6
Page 84 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
25+440 20.00 0 0
25+460 20.00 0.6 12
25+480 20.00 0.6 12
25+500 20.00 0.6 12
25+520 20.00 0.6 12
25+540 20.00 0.6 12
25+560 20.00 0.6 12
25+580 20.00 0.6 12
25+600 20.00 0.6 12
25+620 20.00 0.55 11
25+640 20.00 0.6 12
25+660 20.00 0.6 12
25+680 20.00 0.6 12
25+700 20.00 0.55 11
25+720 20.00 0.55 11
25+740 20.00 0.55 11
25+760 20.00 0.55 11
25+780 20.00 0.55 11
25+800 20.00 0.55 11
25+820 20.00 0.55 11
25+840 20.00 0.543 10.86
25+860 20.00 0.55 11
25+880 20.00 0.6 12
25+900 20.00 0.55 11
25+920 20.00 0.6 12
25+940 20.00 0.55 11
25+960 20.00 0.6 12
25+980 20.00 0.6 12
26+000 20.00 0.6 12
26+020 20.00 0.6 12
26+040 20.00 0.55 11
26+060 20.00 0.6 12
26+080 20.00 0.6 12
26+100 20.00 0.6 12
26+120 20.00 0.6 12
26+140 20.00 0.6 12
26+160 20.00 0.6 12
26+180 20.00 0.6 12
26+200 20.00 0 0
26+220 20.00 0.55 11
26+240 20.00 0.55 11
26+260 20.00 0.6 12
26+280 20.00 0.083 1.66
26+300 20.00 0.6 12
26+320 20.00 0.55 11
26+340 20.00 0.55 11
26+360 20.00 0.505 10.1
26+380 20.00 0.55 11
26+400 20.00 0.55 11
26+420 20.00 0.55 11
26+440 20.00 0.55 11
26+460 20.00 0.55 11
26+480 20.00 0.6 12
26+500 20.00 0.6 12
26+520 20.00 0.55 11
26+540 20.00 0.55 11
26+560 20.00 0.55 11
26+580 20.00 0.6 12
Page 85 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
26+600 20.00 0.55 11
26+620 20.00 0.55 11
26+640 20.00 0.6 12
26+660 20.00 0.55 11
26+680 20.00 0.55 11
26+700 20.00 0.6 12
26+720 20.00 0.55 11
26+740 20.00 0.453 9.06
26+760 20.00 0.6 12
26+780 20.00 0.6 12
26+800 20.00 0.6 12
26+820 20.00 0.55 11
26+840 20.00 1.2 24
26+860 20.00 1.15 23
26+880 20.00 0.55 11
26+900 20.00 0.55 11
26+920 20.00 0.6 12
26+940 20.00 0.55 11
26+960 20.00 0.55 11
26+980 20.00 0.55 11
27+000 20.00 0.6 12
27+020 20.00 0.55 11
27+040 20.00 0.6 12
27+060 20.00 0.55 11
27+080 20.00 0.6 12
27+100 20.00 0.55 11
27+120 20.00 0.6 12
27+140 20.00 0.55 11
27+160 20.00 0.55 11
27+180 20.00 0.55 11
27+200 20.00 0.6 12
27+220 20.00 0.6 12
27+240 20.00 0.55 11
27+260 20.00 0.6 12
27+280 20.00 0.6 12
27+300 20.00 0.55 11
27+320 20.00 0.175 3.5
27+340 20.00 0.55 11
27+360 20.00 0.6 12
27+380 20.00 0.6 12
27+400 20.00 0.6 12
27+420 20.00 0.6 12
27+440 20.00 0.6 12
27+460 20.00 0.6 12
27+480 20.00 0.6 12
27+500 20.00 0.6 12
27+520 20.00 0.6 12
27+540 20.00 0 0
27+560 20.00 0.6 12
27+580 20.00 0.55 11
27+600 20.00 0.6 12
27+620 20.00 0.55 11
27+640 20.00 0.6 12
27+660 20.00 0.55 11
27+680 20.00 0.6 12
27+700 20.00 0.55 11
27+720 20.00 0.6 12
27+740 20.00 0.6 12
Page 86 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
27+760 20.00 0.55 11
27+780 20.00 0.6 12
27+800 20.00 0.55 11
27+820 20.00 0.6 12
27+840 20.00 0.6 12
27+860 20.00 0.5 10
27+880 20.00 0.03 0.6
27+900 20.00 0 0
27+920 20.00 0 0
27+940 20.00 0.08 1.6
27+960 20.00 0.55 11
27+980 20.00 0.6 12
28+000 20.00 0.55 11
28+020 20.00 0.55 11
28+040 20.00 0.6 12
28+060 20.00 0.55 11
28+080 20.00 0.55 11
28+100 20.00 0.6 12
28+120 20.00 0.55 11
28+140 20.00 0 0
28+160 20.00 0.358 7.16
28+180 20.00 0.55 11
28+200 20.00 0.55 11
28+220 20.00 0.55 11
28+240 20.00 0.6 12
28+260 20.00 0.6 12
28+280 20.00 0.6 12
28+300 20.00 0.55 11
28+320 20.00 0.6 12
28+340 20.00 0.55 11
28+360 20.00 0.6 12
28+380 20.00 0.6 12
28+400 20.00 0.55 11
28+420 20.00 0.6 12
28+440 20.00 0.55 11
28+460 20.00 0.55 11
28+480 20.00 0.6 12
28+500 20.00 0.6 12
28+520 20.00 0.6 12
28+540 20.00 0.55 11
28+560 20.00 0.55 11
28+580 20.00 0.6 12
28+600 20.00 0.595 11.9
28+620 20.00 0 0
28+640 20.00 0 0
28+660 20.00 0.6 12
28+680 20.00 0.6 12
28+700 20.00 0.6 12
28+720 20.00 0.6 12
28+740 20.00 0.55 11
28+760 20.00 0.6 12
28+780 20.00 0.6 12
28+800 20.00 0.248 4.96
28+820 20.00 0.6 12
28+840 20.00 0.6 12
28+860 20.00 0.55 11
28+880 20.00 0 0
28+900 20.00 0 0
Page 87 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
28+920 20.00 0.55 11
28+940 20.00 0.6 12
28+960 20.00 0.6 12
28+980 20.00 0.6 12
29+000 20.00 0.6 12
29+020 20.00 0.6 12
29+040 20.00 0.55 11
29+060 20.00 0.6 12
29+080 20.00 0.6 12
29+100 20.00 0.6 12
29+120 20.00 0.55 11
29+140 20.00 0.275 5.5
29+160 20.00 0.55 11
29+180 20.00 0.595 11.9
29+200 20.00 0.55 11
29+220 20.00 0.55 11
29+240 20.00 0.6 12
29+260 20.00 0.6 12
29+280 20.00 0.6 12
29+300 20.00 0.27 5.4
29+320 20.00 0.55 11
29+340 20.00 0.6 12
29+360 20.00 0 0
29+380 20.00 0.6 12
29+400 20.00 0.6 12
29+420 20.00 0.6 12
29+440 20.00 0.55 11
29+460 20.00 0.6 12
29+480 20.00 0.6 12
29+500 20.00 0.6 12
29+520 20.00 0.55 11
29+540 20.00 0.6 12
29+560 20.00 0.118 2.36
29+580 20.00 0.54 10.8
29+600 20.00 0.55 11
29+620 20.00 0.55 11
29+640 20.00 0.55 11
29+660 20.00 0.6 12
29+680 20.00 0.55 11
29+700 20.00 0.6 12
29+720 20.00 0.55 11
29+740 20.00 0.6 12
29+760 20.00 0.55 11
29+780 20.00 0.6 12
29+800 20.00 0.55 11
29+820 20.00 0.55 11
29+840 20.00 0.55 11
29+860 20.00 0.6 12
29+880 20.00 0.55 11
29+900 20.00 0.55 11
29+920 20.00 0.55 11
29+940 20.00 0.6 12
29+960 20.00 0.6 12
29+980 20.00 0.6 12
30+000 20.00 0.55 11
30+020 20.00 0 0
30+040 20.00 0 0
30+060 20.00 0.55 11
Page 88 of 313
EARTHWORK CALCULATION SHEET FOR SIDE DRAINS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Chainage Length (m) Cut area (m2) Cut volume(m3) Remarks
30+080 20.00 0.55 11
30+100 20.00 0.6 12
30+120 20.00 0.55 11
30+140 20.00 0.6 12
30+160 20.00 0.418 8.36
30+180 20.00 0.4 8
30+200 20.00 0.6 12
30+220 20.00 0 0
30+240 20.00 0.55 11
30+260 20.00 0 0
30+280 20.00 0.42 8.4
30+300 20.00 0.86 17.2
30+320 20.00 0.86 17.2
30+340 20.00 0.6 12
30+360 20.00 0.6 12
30+380 20.00 1.03 20.6
30+400 20.00 0 0
30+420 20.00 0.55 11
30+440 20.00 0.6 12
30+460 20.00 0.6 12
30+480 20.00 0.238 4.76
30+500 20.00 0.233 4.66
30+520 20.00 0.6 12
30+540 20.00 0.6 12
30+560 20.00 0.55 11
30+575 15.14 0 0
Total 30575.14
Page 89 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 90 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 91 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 92 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 93 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 94 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 95 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 96 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 97 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 98 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
Page 99 of 313
PAVEMENT WORK QUANTITY CALCULATION
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Volume
Cum
###
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
12.46
12.46
10.5
12.24
12.24
14.4
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
14.4
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
10.5
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
Volume
Cum
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
Volume
Cum
10.5
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
Volume
Cum
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
12.46
10.5
12.46
12.46
10.5
10.5
12.46
14.4
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
14.4
12.46
14.4
12.46
12.46
10.5
12.24
12.24
12.24
10.5
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.24
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.24
12.46
12.46
12.24
12.24
12.46
12.24
12.46
12.46
12.46
12.24
12.24
12.24
12.46
12.46
12.46
12.46
12.46
Volume
Cum
10.5
12.46
10.5
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
10.5
12.46
10.5
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.24
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.24
12.46
12.46
12.46
10.5
10.5
10.5
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
10.5
12.46
12.46
10.5
12.24
12.24
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
12.46
12.46
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
10.5
12.46
10.5
12.46
12.46
12.24
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
Volume
Cum
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
12.46
12.24
12.24
12.24
12.24
10.5
10.5
10.5
12.46
12.24
12.24
14.4
12.24
12.46
12.46
10.5
10.5
10.5
Volume
Cum
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
10.5
10.5
12.46
10.5
10.5
10.5
12.46
12.46
12.46
14.4
14.4
14.4
14.4
12.46
14.4
14.4
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
14.4
12.46
12.24
12.46
12.46
Volume
Cum
12.24
12.46
14.4
12.46
14.4
14.4
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
14.4
14.4
12.46
12.46
Volume
Cum
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
14.4
14.4
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.24
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
10.5
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
10.5
12.46
12.46
12.24
10.5
12.46
12.46
12.46
12.24
10.5
10.5
10.5
10.5
10.5
12.24
12.24
10.5
12.46
12.46
12.46
10.5
10.5
12.46
10.5
10.5
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.24
12.46
10.5
12.46
12.46
12.46
10.5
10.5
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
10.5
12.46
10.5
10.5
10.5
10.5
12.46
12.46
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.24
Volume
Cum
12.46
12.24
12.24
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
10.5
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
10.5
12.24
12.24
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.24
12.46
12.46
12.24
12.24
12.24
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.24
12.46
12.46
12.46
12.24
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.24
12.24
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.46
10.5
10.5
12.46
12.46
12.24
12.46
12.46
10.5
10.5
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
Volume
Cum
12.46
12.46
12.46
12.46
12.24
12.24
12.46
12.46
12.46
12.46
12.46
12.24
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.24
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
10.5
10.5
Volume
Cum
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.4
14.4
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
14.18
14.18
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.46
12.24
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
12.46
12.46
12.24
12.24
Volume
Cum
12.46
12.46
10.5
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
12.24
12.46
12.46
12.46
12.46
10.5
12.24
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
12.46
10.5
10.5
10.5
10.5
10.5
10.5
14.4
12.46
12.46
12.46
12.46
12.46
14.4
14.4
14.4
10.9008
Volume
Cum
18,465.68
3+440 3 4.634 0 0 0 0 0
3+460 3 4.634 0 0 0 0 0
5+500 2 2.722 0 0 0 0
16+600 3 4.634 0 0 0 0
0.00 0 0 0 0 0
Actual percentage of the soil types= #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
160 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2+720 15 3 3.851 57.765 57.765 22.5 9.9 13.12 stone masonry wall type 2
2+740 20 3 3.851 77.02 77.02 30 13.2 17.49 stone masonry wall type 2
2+760 15 2.5 2.811 42.165 42.165 45 8.775 10.93 stone masonry wall type 2
Total 50 0 176.95 176.95 97.5 31.875 41.55
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Actual percentage of the soil types= #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total - - - - - - -
Remarks
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DRAIN DETAILS
Left Right Remarks
Chainage Drain Length Remarks
Dr.Type Dr.Type
0+000 10 open trap. Drain type 3
0+020 20 open trap. Drain type 3
0+040 20 open trap. Drain type 3
0+060 20 open trap. Drain type 3
0+080 20 open trap. Drain type 3
0+100 20 open trap. Drain type 3
0+120 20 open trap. Drain type 3
0+140 20 open trap. Drain type 3
0+160 20 open trap. Drain type 3
0+180 20 open trap. Drain type 3
0+200 20 open trap. Drain type 3
0+220 20 open trap. Drain type 3
0+240 20 open trap. Drain type 3
0+260 20 open trap. Drain type 3
0+280 20 open trap. Drain type 3
0+300 20 open trap. Drain type 3
0+320 20 open trap. Drain type 3
0+340 20 open trap. Drain type 3
0+360 20 open trap. Drain type 3
0+380 20 open trap. Drain type 3
0+400 20 open trap. Drain type 3
0+420 20 open trap. Drain type 3
0+440 20 open trap. Drain type 3
0+460 20 open trap. Drain type 3
0+480 20 open trap. Drain type 3
0+500 20 open trap. Drain type 3
0+520 20 open trap. Drain type 3
0+540 20 open trap. Drain type 3
0+560 20 open trap. Drain type 3
0+580 20 open trap. Drain type 3
0+600 20 open trap. Drain type 3
0+620 20 open trap. Drain type 3
0+660 20 open trap. Drain type 3
0+680 20 open trap. Drain type 3
0+700 20 open trap. Drain type 3 open trap. Drain type 3
0+720 20 open trap. Drain type 3
0+740 20 open trap. Drain type 3
0+780 20 open trap. Drain type 3
0+800 20 open trap. Drain type 3
0+820 20 open trap. Drain type 3
0+840 20 open trap. Drain type 3
0+860 20 open trap. Drain type 3
0+880 20 open trap. Drain type 3
0+900 20 open trap. Drain type 3
0+920 20 open trap. Drain type 3
0+940 20 open trap. Drain type 3
0+960 20 open trap. Drain type 3
0+980 20 open trap. Drain type 3
1+000 20 open trap. Drain type 3
1+020 20 open trap. Drain type 3
1+040 20 open trap. Drain type 3
1+060 20 open trap. Drain type 3
1+080 20 open trap. Drain type 3
1+100 20 open trap. Drain type 3
1+120 20 open trap. Drain type 3
1+180 20 open trap. Drain type 3
1+200 20 open trap. Drain type 3
1+220 20 open trap. Drain type 3
1+240 20 open trap. Drain type 3
1+260 20 open trap. Drain type 3
1+280 20 open trap. Drain type 3
1+300 20 open trap. Drain type 3
1+320 20 open trap. Drain type 3
1+340 20 open trap. Drain type 3
1+360 20 open trap. Drain type 3
1+380 20 open trap. Drain type 3
1+400 20 open trap. Drain type 3
1+420 20 open trap. Drain type 3
1+440 20 open trap. Drain type 3
1+460 20 open trap. Drain type 3
1+480 20 open trap. Drain type 3
1+500 20 open trap. Drain type 3
1+520 20 open trap. Drain type 3
1+540 20 open trap. Drain type 3
1+560 20 open trap. Drain type 3
1+580 20 open trap. Drain type 3
1+600 20 open trap. Drain type 3
1+620 20 open trap. Drain type 3
1+640 20 open trap. Drain type 3
1+660 20 open trap. Drain type 3
1+680 20 open trap. Drain type 3
1+700 20 open trap. Drain type 3
1+720 20 open trap. Drain type 3
1+740 20 open trap. Drain type 3
1+760 20 open trap. Drain type 3
1+780 20 open trap. Drain type 3
1+800 20 open trap. Drain type 3
1+820 20 open trap. Drain type 3
1+840 20 open trap. Drain type 3
1+860 20 open trap. Drain type 3
1+880 20 open trap. Drain type 3
1+900 20 open trap. Drain type 3
1+920 20 open trap. Drain type 3
1+940 20 open trap. Drain type 3
1+960 20 open trap. Drain type 3
1+980 20 open trap. Drain type 3
2+000 20 open trap. Drain type 3
2+020 20 open trap. Drain type 3
2+040 20 open trap. Drain type 3
2+060 20 open trap. Drain type 3
2+080 20 open trap. Drain type 3
2+100 20 open trap. Drain type 3
2+120 20 open trap. Drain type 3
2+140 20 open trap. Drain type 3
2+160 20 open trap. Drain type 3
2+180 20 open trap. Drain type 3
2+200 20 open trap. Drain type 3
2+220 20 open trap. Drain type 3
2+240 20 open trap. Drain type 3
2+260 20 open trap. Drain type 3
2+280 20 open trap. Drain type 3
2+300 20 open trap. Drain type 3
2+320 20 open trap. Drain type 3
2+340 20 open trap. Drain type 3
2+360 20 open trap. Drain type 3
2+380 20 open trap. Drain type 3
2+400 20 open trap. Drain type 3
2+420 20 open trap. Drain type 3
2+440 20 open trap. Drain type 3
2+460 20 open trap. Drain type 3
2+480 20 open trap. Drain type 3
2+500 20 open trap. Drain type 3
2+520 20 open trap. Drain type 3
2+540 20 open trap. Drain type 3
2+560 20 open trap. Drain type 3
2+580 20 open trap. Drain type 3
2+600 20 open trap. Drain type 3 open trap. Drain type 3
2+620 20 open trap. Drain type 3
2+640 20 open trap. Drain type 3
2+660 20 open trap. Drain type 3
2+680 20 open trap. Drain type 3
2+700 20 open trap. Drain type 3
2+720 20 covered trap. Drain type3 covered trap. Drain type3
2+740 20 covered trap. Drain type3 covered trap. Drain type3
2+760 20 covered trap. Drain type3 covered trap. Drain type3
2+780 20 covered trap. Drain type3 covered trap. Drain type3
2+800 20 covered trap. Drain type3 covered trap. Drain type3
2+820 20 covered trap. Drain type3 covered trap. Drain type3
2+840 20 covered trap. Drain type3 covered trap. Drain type3
2+860 20 covered trap. Drain type3 covered trap. Drain type3
2+880 20 covered trap. Drain type3 covered trap. Drain type3
2+900 20 covered trap. Drain type3 covered trap. Drain type3
2+920 20 covered trap. Drain type3 covered trap. Drain type3
2+940 20 covered trap. Drain type3 covered trap. Drain type3
2+960 20 covered trap. Drain type3 covered trap. Drain type3
2+980 20 covered trap. Drain type3 covered trap. Drain type3
3+000 20 covered trap. Drain type3 covered trap. Drain type3
3+020 20 covered trap. Drain type3 covered trap. Drain type3
3+040 20 covered trap. Drain type3 covered trap. Drain type3
3+060 20 open trap. Drain type 3
3+080 20 open trap. Drain type 3
3+100 20 open trap. Drain type 3
3+120 20 open trap. Drain type 3
3+140 20 open trap. Drain type 3
3+160 20 open trap. Drain type 3
3+180 20 open trap. Drain type 3
3+200 20 open trap. Drain type 3
3+220 20 open trap. Drain type 3
3+240 20 open trap. Drain type 3
3+260 20 open trap. Drain type 3
3+280 20 open trap. Drain type 3
3+300 20 open trap. Drain type 3
3+320 20 open trap. Drain type 3
3+340 20 open trap. Drain type 3
3+360 20 open trap. Drain type 3
3+380 20 open trap. Drain type 3
3+400 20 open trap. Drain type 3
3+420 20 open trap. Drain type 3
3+440 20 open trap. Drain type 3
3+460 20 open trap. Drain type 3
3+480 20 open trap. Drain type 3
3+500 20 open trap. Drain type 3
3+520 20 open trap. Drain type 3
3+540 20 open trap. Drain type 3
3+560 20 open trap. Drain type 3
3+580 20 open trap. Drain type 3
3+600 20 open trap. Drain type 3
3+620 20 open trap. Drain type 3
3+640 20 open trap. Drain type 3
3+660 20 open trap. Drain type 3
3+680 20 open trap. Drain type 3
3+700 20 open trap. Drain type 3
3+720 20 open trap. Drain type 3
3+740 20 open trap. Drain type 3
3+760 20 open trap. Drain type 3
3+780 20 open trap. Drain type 3
3+800 20 open trap. Drain type 3
3+820 20 open trap. Drain type 3
3+840 20 open trap. Drain type 3
3+860 20 open trap. Drain type 3
3+880 20 open trap. Drain type 3
3+900 20 open trap. Drain type 3
3+920 20 open trap. Drain type 3
3+940 20 open trap. Drain type 3
3+960 20 open trap. Drain type 3 open trap. Drain type 3
3+980 20 open trap. Drain type 3 open trap. Drain type 3
4+000 20 open trap. Drain type 3 open trap. Drain type 3
4+020 20 open trap. Drain type 3 open trap. Drain type 3
4+040 20 open trap. Drain type 3 open trap. Drain type 3
4+060 20 open trap. Drain type 3 open trap. Drain type 3
4+080 20 open trap. Drain type 3 open trap. Drain type 3
4+100 20 open trap. Drain type 3 open trap. Drain type 3
4+120 20 open trap. Drain type 3
4+140 20 open trap. Drain type 3
4+160 20 open trap. Drain type 3 open trap. Drain type 3
4+180 20 open trap. Drain type 3 open trap. Drain type 3
4+200 20 open trap. Drain type 3 open trap. Drain type 3
4+220 20 open trap. Drain type 3 open trap. Drain type 3
4+240 20 open trap. Drain type 3 open trap. Drain type 3
4+260 20 open trap. Drain type 3 open trap. Drain type 3
4+280 20 open trap. Drain type 3 open trap. Drain type 3
4+300 20 open trap. Drain type 3 open trap. Drain type 3
4+320 20 open trap. Drain type 3 open trap. Drain type 3
4+340 20 open trap. Drain type 3 open trap. Drain type 3
4+360 20 open trap. Drain type 3 open trap. Drain type 3
4+380 20 open trap. Drain type 3 open trap. Drain type 3
4+400 20 open trap. Drain type 3 open trap. Drain type 3
4+420 20 open trap. Drain type 3 open trap. Drain type 3
4+440 20 open trap. Drain type 3 open trap. Drain type 3
4+460 20 open trap. Drain type 3 open trap. Drain type 3
4+480 20 open trap. Drain type 3 open trap. Drain type 3
4+500 20 open trap. Drain type 3 open trap. Drain type 3
4+520 20 open trap. Drain type 3 open trap. Drain type 3
4+540 20 open trap. Drain type 3 open trap. Drain type 3
4+560 20 open trap. Drain type 3 open trap. Drain type 3
4+580 20 open trap. Drain type 3 open trap. Drain type 3
4+600 20 open trap. Drain type 3 open trap. Drain type 3
4+620 20 open trap. Drain type 3 open trap. Drain type 3
4+640 20 open trap. Drain type 3 open trap. Drain type 3
4+660 20 open trap. Drain type 3
4+680 20 open trap. Drain type 3
4+700 20 open trap. Drain type 3
4+720 20 open trap. Drain type 3
4+740 20 open trap. Drain type 3
4+760 20 open trap. Drain type 3
4+780 20 open trap. Drain type 3
4+800 20 open trap. Drain type 3
4+820 20 open trap. Drain type 3
4+840 20 open trap. Drain type 3
4+860 20 open trap. Drain type 3
4+880 20 open trap. Drain type 3
4+900 20 open trap. Drain type 3
4+920 20 open trap. Drain type 3
4+940 20 open trap. Drain type 3
4+960 20 open trap. Drain type 3
4+980 20 open trap. Drain type 3
5+000 20 open trap. Drain type 3
5+020 20 open trap. Drain type 3
5+040 20 open trap. Drain type 3
5+060 20 open trap. Drain type 3
5+080 20 open trap. Drain type 3
5+100 20 open trap. Drain type 3
5+120 20 open trap. Drain type 3
5+140 20 open trap. Drain type 3
5+160 20 open trap. Drain type 3
5+180 20 open trap. Drain type 3
5+200 20 open trap. Drain type 3
5+220 20 open trap. Drain type 3
5+240 20 open trap. Drain type 3
5+260 20 open trap. Drain type 3
5+280 20 open trap. Drain type 3
5+300 20 open trap. Drain type 3
5+320 20 open trap. Drain type 3
5+340 20 open trap. Drain type 3
5+360 20 open trap. Drain type 3
5+380 20 open trap. Drain type 3
5+400 20 open trap. Drain type 3
5+420 20 open trap. Drain type 3
5+440 20 open trap. Drain type 3
5+460 20 open trap. Drain type 3
5+480 20 open trap. Drain type 3
5+500 20 open trap. Drain type 3 open trap. Drain type 3
5+520 20 open trap. Drain type 3 open trap. Drain type 3
5+540 20 open trap. Drain type 3 open trap. Drain type 3
5+560 20 open trap. Drain type 3 open trap. Drain type 3
5+580 20 open trap. Drain type 3 open trap. Drain type 3
5+600 20 open trap. Drain type 3 open trap. Drain type 3
5+620 20 open trap. Drain type 3 open trap. Drain type 3
5+640 20 open trap. Drain type 3
5+660 20 open trap. Drain type 3
5+680 20 open trap. Drain type 3
5+700 20 open trap. Drain type 3
5+720 20 open trap. Drain type 3
5+740 20 open trap. Drain type 3
5+760 20 open trap. Drain type 3
5+780 20 open trap. Drain type 3
5+800 20 open trap. Drain type 3 open trap. Drain type 3
5+820 20 open trap. Drain type 3
5+840 20 open trap. Drain type 3
5+860 20 open trap. Drain type 3
5+880 20 open trap. Drain type 3 open trap. Drain type 3
5+900 20 open trap. Drain type 3
5+920 20 open trap. Drain type 3
5+940 20 open trap. Drain type 3
5+960 20 open trap. Drain type 3
5+980 20 open trap. Drain type 3
6+000 20 open trap. Drain type 3
6+020 20 open trap. Drain type 3
6+040 20 open trap. Drain type 3
6+060 20 open trap. Drain type 3
6+080 20 open trap. Drain type 3
6+100 20 open trap. Drain type 3
6+120 20 open trap. Drain type 3
6+140 20 open trap. Drain type 3
6+160 20 open trap. Drain type 3
6+180 20 open trap. Drain type 3
6+200 20 open trap. Drain type 3
6+220 20 open trap. Drain type 3
6+240 20 open trap. Drain type 3
6+260 20 open trap. Drain type 3
6+280 20 open trap. Drain type 3
6+300 20 open trap. Drain type 3
6+320 20 open trap. Drain type 3
6+340 20 open trap. Drain type 3
6+360 20 open trap. Drain type 3
6+380 20 open trap. Drain type 3
6+400 20 open trap. Drain type 3
6+420 20 open trap. Drain type 3
6+440 20 open trap. Drain type 3
6+460 20 open trap. Drain type 3
6+480 20 open trap. Drain type 3
6+500 20 open trap. Drain type 3
6+520 20 open trap. Drain type 3
6+540 20 open trap. Drain type 3 open trap. Drain type 3
6+560 20 open trap. Drain type 3
6+580 20 open trap. Drain type 3
6+600 20 open trap. Drain type 3
6+620 20 open trap. Drain type 3
6+640 20 open trap. Drain type 3
6+660 20 open trap. Drain type 3
6+680 20 open trap. Drain type 3
6+700 20 open trap. Drain type 3
6+720 20 open trap. Drain type 3
6+740 20 open trap. Drain type 3
6+760 20 open trap. Drain type 3
6+780 20 open trap. Drain type 3
6+800 20 open trap. Drain type 3
6+820 20 open trap. Drain type 3
6+840 20 open trap. Drain type 3
6+860 20 open trap. Drain type 3
6+880 20 open trap. Drain type 3
6+900 20 open trap. Drain type 3
6+920 20 open trap. Drain type 3
6+940 20 open trap. Drain type 3
6+960 20 open trap. Drain type 3
6+980 20 open trap. Drain type 3
7+000 20 open trap. Drain type 3
7+020 20 open trap. Drain type 3
7+040 20 open trap. Drain type 3
7+060 20 open trap. Drain type 3
7+080 20 open trap. Drain type 3
7+100 20 open trap. Drain type 3
7+120 20 open trap. Drain type 3
7+140 20 open trap. Drain type 3
7+160 20 open trap. Drain type 3
7+180 20 open trap. Drain type 3
7+200 20 open trap. Drain type 3
7+220 20 open trap. Drain type 3
7+240 20 open trap. Drain type 3
7+260 20 open trap. Drain type 3
7+280 20 open trap. Drain type 3
7+300 20 open trap. Drain type 3
7+320 20 open trap. Drain type 3
7+340 20 open trap. Drain type 3
7+360 20 open trap. Drain type 3
7+380 20 open trap. Drain type 3
7+400 20 open trap. Drain type 3
7+420 20 open trap. Drain type 3
7+440 20 open trap. Drain type 3
7+460 20 open trap. Drain type 3
7+480 20 open trap. Drain type 3
7+500 20 open trap. Drain type 3
7+520 20 open trap. Drain type 3
7+540 20 open trap. Drain type 3
7+560 20 open trap. Drain type 3
7+580 20 open trap. Drain type 3
7+600 20 open trap. Drain type 3
7+620 20 open trap. Drain type 3
7+640 20 open trap. Drain type 3
7+660 20 open trap. Drain type 3
7+680 20 open trap. Drain type 3
7+700 20 open trap. Drain type 3
7+720 20 open trap. Drain type 3
7+740 20 open trap. Drain type 3
7+760 20 open trap. Drain type 3
7+780 20 open trap. Drain type 3
7+800 20 open trap. Drain type 3
7+820 20 open trap. Drain type 3
7+840 20 open trap. Drain type 3
7+860 20 open trap. Drain type 3
7+880 20 open trap. Drain type 3
7+900 20 open trap. Drain type 3
7+920 20 open trap. Drain type 3
7+940 20 open trap. Drain type 3
7+960 20 open trap. Drain type 3
7+980 20 open trap. Drain type 3
8+000 20 open trap. Drain type 3
8+020 20 open trap. Drain type 3
8+040 20 open trap. Drain type 3
8+060 20 open trap. Drain type 3
8+080 20 open trap. Drain type 3
8+100 20 open trap. Drain type 3
8+120 20 open trap. Drain type 3
8+140 20 open trap. Drain type 3
8+160 20 open trap. Drain type 3
8+180 20 open trap. Drain type 3
8+200 20 open trap. Drain type 3
8+220 20 open trap. Drain type 3
8+240 20 open trap. Drain type 3
8+260 20 open trap. Drain type 3
8+280 20 open trap. Drain type 3
8+300 20 open trap. Drain type 3
8+320 20 open trap. Drain type 3
8+340 20 open trap. Drain type 3
8+360 20 open trap. Drain type 3
8+380 20 open trap. Drain type 3
8+400 20 open trap. Drain type 3
8+420 20 open trap. Drain type 3
8+440 20 open trap. Drain type 3
8+460 20 open trap. Drain type 3
8+480 20 open trap. Drain type 3
8+500 20 open trap. Drain type 3
8+520 20 open trap. Drain type 3
8+540 20 open trap. Drain type 3
8+560 20 open trap. Drain type 3
8+580 20 open trap. Drain type 3
8+600 20 open trap. Drain type 3
8+620 20 open trap. Drain type 3
8+640 20 open trap. Drain type 3
8+660 20 open trap. Drain type 3
8+680 20 open trap. Drain type 3
8+700 20 open trap. Drain type 3
8+720 20 open trap. Drain type 3
8+740 20 open trap. Drain type 3
8+760 20 open trap. Drain type 3
8+780 20 open trap. Drain type 3
8+800 20 open trap. Drain type 3
8+820 20 open trap. Drain type 3
8+840 20 open trap. Drain type 3
8+860 20 open trap. Drain type 3
8+880 20 open trap. Drain type 3
8+900 20 open trap. Drain type 3
8+920 20 open trap. Drain type 3
8+940 20 open trap. Drain type 3
8+960 20 open trap. Drain type 3
8+980 20 open trap. Drain type 3
9+000 20 open trap. Drain type 3
9+020 20 open trap. Drain type 3
9+040 20 open trap. Drain type 3
9+060 20 open trap. Drain type 3
9+080 20 open trap. Drain type 3
9+100 20 open trap. Drain type 3
9+120 20 open trap. Drain type 3
9+140 20 open trap. Drain type 3
9+160 20 open trap. Drain type 3
9+180 20 open trap. Drain type 3
9+200 20 open trap. Drain type 3
9+220 20 open trap. Drain type 3
9+240 20 open trap. Drain type 3
9+260 20 open trap. Drain type 3
9+280 20 open trap. Drain type 3
9+300 20 open trap. Drain type 3
9+320 20 open trap. Drain type 3
9+340 20 open trap. Drain type 3
9+360 20 open trap. Drain type 3
9+380 20 open trap. Drain type 3
9+400 20 open trap. Drain type 3
9+420 20 open trap. Drain type 3
9+440 20 open trap. Drain type 3
9+460 20 open trap. Drain type 3
9+480 20 open trap. Drain type 3
9+500 20 open trap. Drain type 3
9+520 20 open trap. Drain type 3
9+540 20 open trap. Drain type 3
9+560 20 open trap. Drain type 3
9+580 20 open trap. Drain type 3
9+600 20 open trap. Drain type 3
9+620 20 open trap. Drain type 3
9+640 20 open trap. Drain type 3
9+660 20 open trap. Drain type 3
9+680 20 open trap. Drain type 3
9+700 20 open trap. Drain type 3
9+720 20 open trap. Drain type 3
9+740 20 open trap. Drain type 3
9+760 20 open trap. Drain type 3
9+780 20 open trap. Drain type 3
9+800 20 open trap. Drain type 3
9+820 20 open trap. Drain type 3
9+840 20 open trap. Drain type 3
9+860 20 open trap. Drain type 3
9+880 20 open trap. Drain type 3
9+900 20 open trap. Drain type 3
9+920 20 open trap. Drain type 3
9+940 20 open trap. Drain type 3
9+960 20 open trap. Drain type 3
9+980 20 open trap. Drain type 3
10+000 20 open trap. Drain type 3
10+020 20 open trap. Drain type 3
10+040 20 open trap. Drain type 3
10+060 20 open trap. Drain type 3
10+100 20 open trap. Drain type 3
10+120 20 open trap. Drain type 3
10+140 20 open trap. Drain type 3
10+160 20 open trap. Drain type 3
10+180 20 open trap. Drain type 3
10+200 20 open trap. Drain type 3
10+220 20 open trap. Drain type 3
10+260 20 open trap. Drain type 3
10+280 20 open trap. Drain type 3
10+300 20 open trap. Drain type 3
10+320 20 open trap. Drain type 3
10+340 20 open trap. Drain type 3
10+360 20 open trap. Drain type 3
10+380 20 open trap. Drain type 3
10+400 20 open trap. Drain type 3
10+420 20 open trap. Drain type 3
10+440 20 open trap. Drain type 3
10+460 20 open trap. Drain type 3
10+480 20 open trap. Drain type 3
10+500 20 open trap. Drain type 3
10+520 20 open trap. Drain type 3
10+540 20 open trap. Drain type 3
10+560 20 open trap. Drain type 3
10+580 20 open trap. Drain type 3
10+600 20 open trap. Drain type 3
10+620 20 open trap. Drain type 3
10+660 20 open trap. Drain type 3
10+680 20 open trap. Drain type 3
10+700 20 open trap. Drain type 3
10+720 20 open trap. Drain type 3
10+740 20 open trap. Drain type 3
10+760 20 open trap. Drain type 3
10+780 20 open trap. Drain type 3
10+800 20 open trap. Drain type 3 open trap. Drain type 3
10+840 20 open trap. Drain type 3
10+880 20 open trap. Drain type 3
10+900 20 open trap. Drain type 3
10+920 20 open trap. Drain type 3
10+940 20 open trap. Drain type 3
10+960 20 open trap. Drain type 3
10+980 20 open trap. Drain type 3
11+000 20 open trap. Drain type 3
11+020 20 open trap. Drain type 3
11+040 20 open trap. Drain type 3
11+060 20 open trap. Drain type 3
11+080 20 open trap. Drain type 3
11+100 20 open trap. Drain type 3
11+120 20 open trap. Drain type 3
11+140 20 open trap. Drain type 3
11+160 20 open trap. Drain type 3
11+180 20 open trap. Drain type 3
11+200 20 open trap. Drain type 3
11+220 20 open trap. Drain type 3
11+240 20 open trap. Drain type 3
11+260 20 open trap. Drain type 3
11+280 20 open trap. Drain type 3
11+300 20 open trap. Drain type 3
11+320 20 open trap. Drain type 3
11+340 20 open trap. Drain type 3
11+360 20 open trap. Drain type 3
11+380 20 open trap. Drain type 3
11+400 20 open trap. Drain type 3
11+420 20 open trap. Drain type 3
11+440 20 open trap. Drain type 3
11+460 20 open trap. Drain type 3
11+480 20 open trap. Drain type 3
11+500 20 open trap. Drain type 3
11+520 20 open trap. Drain type 3
11+540 20 open trap. Drain type 3
11+560 20 open trap. Drain type 3
11+580 20 open trap. Drain type 3
11+600 20 open trap. Drain type 3
11+620 20 open trap. Drain type 3
11+640 20 open trap. Drain type 3
11+660 20 open trap. Drain type 3
11+680 20 open trap. Drain type 3
11+700 20 open trap. Drain type 3
11+720 20 open trap. Drain type 3
11+740 20 open trap. Drain type 3
11+760 20 open trap. Drain type 3
11+780 20 open trap. Drain type 3
11+800 20 open trap. Drain type 3
11+820 20 open trap. Drain type 3
11+840 20 open trap. Drain type 3
11+860 20 open trap. Drain type 3
11+880 20 open trap. Drain type 3
11+900 20 open trap. Drain type 3
11+920 20 open trap. Drain type 3
11+940 20 open trap. Drain type 3
11+960 20 open trap. Drain type 3
11+980 20 open trap. Drain type 3
12+000 20 open trap. Drain type 3
12+020 20 open trap. Drain type 3
12+040 20 open trap. Drain type 3
12+060 20 open trap. Drain type 3
12+080 20 open trap. Drain type 3
12+100 20 open trap. Drain type 3
12+120 20 open trap. Drain type 3
12+140 20 open trap. Drain type 3
12+160 20 open trap. Drain type 3
12+180 20 open trap. Drain type 3
12+200 20 open trap. Drain type 3
12+220 20 open trap. Drain type 3
12+240 20 open trap. Drain type 3
12+260 20 open trap. Drain type 3
12+280 20 open trap. Drain type 3
12+300 20 open trap. Drain type 3
12+320 20 open trap. Drain type 3
12+340 20 open trap. Drain type 3
12+360 20 open trap. Drain type 3
12+380 20 open trap. Drain type 3
12+400 20 open trap. Drain type 3
12+420 20 open trap. Drain type 3
12+440 20 open trap. Drain type 3
12+460 20 open trap. Drain type 3
12+480 20 open trap. Drain type 3
12+500 20 open trap. Drain type 3
12+520 20 open trap. Drain type 3
12+540 20 open trap. Drain type 3
12+560 20 open trap. Drain type 3
12+580 20 open trap. Drain type 3
12+600 20 open trap. Drain type 3
12+620 20 open trap. Drain type 3
12+640 20 open trap. Drain type 3
12+660 20 open trap. Drain type 3
12+680 20 open trap. Drain type 3
12+700 20 open trap. Drain type 3
12+720 20 open trap. Drain type 3
12+740 20 open trap. Drain type 3
12+760 20 open trap. Drain type 3
12+780 20 open trap. Drain type 3
12+800 20 open trap. Drain type 3 open trap. Drain type 3
12+820 20 open trap. Drain type 3
12+840 20 open trap. Drain type 3
12+860 20 open trap. Drain type 3
12+880 20 open trap. Drain type 3
12+900 20 open trap. Drain type 3
12+920 20 open trap. Drain type 3
12+940 20 open trap. Drain type 3
12+960 20 open trap. Drain type 3
12+980 20 open trap. Drain type 3
13+000 20 open trap. Drain type 3
13+020 20 open trap. Drain type 3
13+040 20 open trap. Drain type 3
13+060 20 open trap. Drain type 3
13+080 20 open trap. Drain type 3
13+100 20 open trap. Drain type 3
13+120 20 open trap. Drain type 3 open trap. Drain type 3
13+140 20 open trap. Drain type 3
13+160 20 open trap. Drain type 3
13+180 20 open trap. Drain type 3
13+200 20 open trap. Drain type 3
13+220 20 open trap. Drain type 3
13+240 20 open trap. Drain type 3
13+260 20 open trap. Drain type 3
13+280 20 open trap. Drain type 3
13+300 20 open trap. Drain type 3
13+320 20 open trap. Drain type 3
13+340 20 open trap. Drain type 3
13+360 20 open trap. Drain type 3
13+380 20 open trap. Drain type 3
13+400 20 open trap. Drain type 3
13+420 20 open trap. Drain type 3
13+440 20 open trap. Drain type 3
13+460 20 open trap. Drain type 3
13+480 20 open trap. Drain type 3
13+500 20 open trap. Drain type 3
13+520 20 open trap. Drain type 3
13+540 20 open trap. Drain type 3
13+560 20 open trap. Drain type 3
13+580 20 open trap. Drain type 3
13+600 20 open trap. Drain type 3
13+620 20 open trap. Drain type 3
13+640 20 open trap. Drain type 3
13+660 20 open trap. Drain type 3
13+680 20 open trap. Drain type 3
13+700 20 open trap. Drain type 3
13+720 20 open trap. Drain type 3
13+740 20 open trap. Drain type 3
13+760 20 open trap. Drain type 3
13+780 20 open trap. Drain type 3
13+800 20 open trap. Drain type 3
13+820 20 open trap. Drain type 3
13+840 20 open trap. Drain type 3
13+860 20 open trap. Drain type 3
13+880 20 open trap. Drain type 3
13+900 20 open trap. Drain type 3
13+920 20 open trap. Drain type 3
13+940 20 open trap. Drain type 3
13+960 20 open trap. Drain type 3
13+980 20 open trap. Drain type 3
14+000 20 open trap. Drain type 3
14+020 20 open trap. Drain type 3
14+040 20 open trap. Drain type 3
14+060 20 open trap. Drain type 3
14+080 20 open trap. Drain type 3 open trap. Drain type 3
14+100 20 open trap. Drain type 3 open trap. Drain type 3
14+120 20 open trap. Drain type 3 open trap. Drain type 3
14+140 20 open trap. Drain type 3
14+160 20 open trap. Drain type 3
14+180 20 open trap. Drain type 3 open trap. Drain type 3
14+200 20 open trap. Drain type 3 open trap. Drain type 3
14+220 20 open trap. Drain type 3 open trap. Drain type 3
14+240 20 open trap. Drain type 3 open trap. Drain type 3
14+260 20 open trap. Drain type 3 open trap. Drain type 3
14+280 20 open trap. Drain type 3 open trap. Drain type 3
14+300 20 open trap. Drain type 3 open trap. Drain type 3
14+320 20 open trap. Drain type 3 open trap. Drain type 3
14+340 20 open trap. Drain type 3 open trap. Drain type 3
14+360 20 open trap. Drain type 3 open trap. Drain type 3
14+380 20 open trap. Drain type 3 open trap. Drain type 3
14+400 20 open trap. Drain type 3
14+420 20 open trap. Drain type 3
14+440 20 open trap. Drain type 3
14+460 20 open trap. Drain type 3
14+480 20 open trap. Drain type 3
14+500 20 open trap. Drain type 3 open trap. Drain type 3
14+520 20 open trap. Drain type 3
14+540 20 open trap. Drain type 3
14+560 20 open trap. Drain type 3
14+580 20 open trap. Drain type 3
14+600 20 open trap. Drain type 3
14+620 20 open trap. Drain type 3
14+640 20 open trap. Drain type 3
14+660 20 open trap. Drain type 3
14+680 20 open trap. Drain type 3
14+700 20 open trap. Drain type 3
14+720 20 open trap. Drain type 3
14+740 20 open trap. Drain type 3
14+760 20 open trap. Drain type 3
14+780 20 open trap. Drain type 3
14+800 20 open trap. Drain type 3
14+820 20 open trap. Drain type 3
14+840 20 open trap. Drain type 3
14+860 20 open trap. Drain type 3
14+880 20 open trap. Drain type 3
14+900 20 open trap. Drain type 3
14+920 20 open trap. Drain type 3
14+940 20 open trap. Drain type 3
14+960 20 open trap. Drain type 3
14+980 20 open trap. Drain type 3
15+000 20 open trap. Drain type 3
15+020 20 open trap. Drain type 3
15+040 20 open trap. Drain type 3
15+060 20 open trap. Drain type 3
15+080 20 open trap. Drain type 3
15+120 20 open trap. Drain type 3
15+140 20 open trap. Drain type 3
15+160 20 open trap. Drain type 3 open trap. Drain type 3
15+180 20 open trap. Drain type 3 open trap. Drain type 3
15+200 20 open trap. Drain type 3 open trap. Drain type 3
15+220 20 open trap. Drain type 3 open trap. Drain type 3
15+240 20 open trap. Drain type 3 open trap. Drain type 3
15+260 20 open trap. Drain type 3
15+280 20 open trap. Drain type 3
15+300 20 open trap. Drain type 3
15+320 20 open trap. Drain type 3
15+340 20 open trap. Drain type 3
15+360 20 open trap. Drain type 3
15+380 20 open trap. Drain type 3
15+400 20 open trap. Drain type 3
15+420 20 open trap. Drain type 3
15+440 20 open trap. Drain type 3 open trap. Drain type 3
15+460 20 open trap. Drain type 3 open trap. Drain type 3
15+480 20 open trap. Drain type 3 open trap. Drain type 3
15+500 20 open trap. Drain type 3 open trap. Drain type 3
15+520 20 open trap. Drain type 3 open trap. Drain type 3
15+540 20 open trap. Drain type 3 open trap. Drain type 3
15+560 20 open trap. Drain type 3 open trap. Drain type 3
15+580 20 open trap. Drain type 3 open trap. Drain type 3
15+600 20 open trap. Drain type 3 open trap. Drain type 3
15+620 20 open trap. Drain type 3 open trap. Drain type 3
15+640 20 open trap. Drain type 3 open trap. Drain type 3
15+660 20 open trap. Drain type 3 open trap. Drain type 3
15+680 20 open trap. Drain type 3 open trap. Drain type 3
15+700 20 open trap. Drain type 3 open trap. Drain type 3
15+720 20 open trap. Drain type 3 open trap. Drain type 3
15+740 20 open trap. Drain type 3 open trap. Drain type 3
15+760 20 open trap. Drain type 3 open trap. Drain type 3
15+780 20 open trap. Drain type 3 open trap. Drain type 3
15+800 20 open trap. Drain type 3 open trap. Drain type 3
15+820 20 open trap. Drain type 3 open trap. Drain type 3
15+840 20 open trap. Drain type 3 open trap. Drain type 3
15+860 20 open trap. Drain type 3 open trap. Drain type 3
15+880 20 open trap. Drain type 3 open trap. Drain type 3
15+900 20 open trap. Drain type 3 open trap. Drain type 3
15+920 20 open trap. Drain type 3 open trap. Drain type 3
15+940 20 open trap. Drain type 3 open trap. Drain type 3
15+960 20 open trap. Drain type 3 open trap. Drain type 3
15+980 20 open trap. Drain type 3 open trap. Drain type 3
16+000 20 open trap. Drain type 3 open trap. Drain type 3
16+020 20 open trap. Drain type 3 open trap. Drain type 3
16+040 20 open trap. Drain type 3 open trap. Drain type 3
16+060 20 open trap. Drain type 3 open trap. Drain type 3
16+080 20 open trap. Drain type 3 open trap. Drain type 3
16+100 20 open trap. Drain type 3 open trap. Drain type 3
16+120 20 open trap. Drain type 3 open trap. Drain type 3
16+140 20 open trap. Drain type 3 open trap. Drain type 3
16+160 20 open trap. Drain type 3
16+180 20 open trap. Drain type 3
16+200 20 open trap. Drain type 3
16+220 20 open trap. Drain type 3
16+240 20 open trap. Drain type 3 open trap. Drain type 3
16+260 20 open trap. Drain type 3
16+280 20 open trap. Drain type 3
16+300 20 open trap. Drain type 3
16+320 20 open trap. Drain type 3
16+340 20 open trap. Drain type 3
16+360 20 open trap. Drain type 3
16+380 20 open trap. Drain type 3
16+400 20 open trap. Drain type 3
16+420 20 open trap. Drain type 3 open trap. Drain type 3
16+440 20 open trap. Drain type 3 open trap. Drain type 3
16+460 20 open trap. Drain type 3
16+480 20 open trap. Drain type 3
16+500 20 open trap. Drain type 3
16+520 20 open trap. Drain type 3
16+540 20 open trap. Drain type 3
16+560 20 open trap. Drain type 3 open trap. Drain type 3
16+580 20 open trap. Drain type 3 open trap. Drain type 3
16+600 20 open trap. Drain type 3 open trap. Drain type 3
16+620 20 open trap. Drain type 3
16+640 20 open trap. Drain type 3
16+660 20 open trap. Drain type 3
16+700 20 open trap. Drain type 3
16+720 20 open trap. Drain type 3
16+740 20 open trap. Drain type 3
16+760 20 open trap. Drain type 3 open trap. Drain type 3
16+780 20 open trap. Drain type 3 open trap. Drain type 3
16+800 20 open trap. Drain type 3 open trap. Drain type 3
16+820 20 open trap. Drain type 3
16+840 20 open trap. Drain type 3
16+860 20 open trap. Drain type 3 open trap. Drain type 3
16+880 20 open trap. Drain type 3 open trap. Drain type 3
16+900 20 open trap. Drain type 3 open trap. Drain type 3
16+920 20 open trap. Drain type 3 open trap. Drain type 3
16+940 20 open trap. Drain type 3 open trap. Drain type 3
16+960 20 open trap. Drain type 3 open trap. Drain type 3
16+980 20 open trap. Drain type 3 open trap. Drain type 3
17+000 20 open trap. Drain type 3 open trap. Drain type 3
17+020 20 open trap. Drain type 3 open trap. Drain type 3
17+040 20 open trap. Drain type 3 open trap. Drain type 3
17+060 20 open trap. Drain type 3 open trap. Drain type 3
17+080 20 open trap. Drain type 3 open trap. Drain type 3
17+100 20 open trap. Drain type 3 open trap. Drain type 3
17+120 20 open trap. Drain type 3
17+140 20 open trap. Drain type 3
17+160 20 open trap. Drain type 3
17+180 20 open trap. Drain type 3
17+200 20 open trap. Drain type 3
17+220 20 open trap. Drain type 3
17+240 20 open trap. Drain type 3
17+260 20 open trap. Drain type 3
17+280 20 open trap. Drain type 3
17+300 20 open trap. Drain type 3
17+320 20 open trap. Drain type 3
17+340 20 open trap. Drain type 3
17+360 20 open trap. Drain type 3
17+380 20 open trap. Drain type 3
17+480 20 open trap. Drain type 3
17+540 20 open trap. Drain type 3
17+560 20 open trap. Drain type 3
17+580 20 open trap. Drain type 3
17+600 20 open trap. Drain type 3
17+620 20 open trap. Drain type 3
17+640 20 open trap. Drain type 3
17+660 20 open trap. Drain type 3
17+680 20 open trap. Drain type 3
17+700 20 open trap. Drain type 3
17+720 20 open trap. Drain type 3
17+740 20 open trap. Drain type 3
17+800 20 open trap. Drain type 3
17+820 20 open trap. Drain type 3
17+840 20 open trap. Drain type 3
17+860 20 open trap. Drain type 3
17+880 20 open trap. Drain type 3
17+900 20 open trap. Drain type 3
18+000 20 open trap. Drain type 3
18+020 20 open trap. Drain type 3
18+040 20 open trap. Drain type 3
18+060 20 open trap. Drain type 3
18+080 20 open trap. Drain type 3
18+100 20 open trap. Drain type 3
18+120 20 open trap. Drain type 3
18+140 20 open trap. Drain type 3
18+160 20 open trap. Drain type 3 open trap. Drain type 3
18+180 20 open trap. Drain type 3
18+200 20 open trap. Drain type 3
18+220 20 open trap. Drain type 3
18+240 20 open trap. Drain type 3
18+260 20 open trap. Drain type 3
18+280 20 open trap. Drain type 3
18+300 20 open trap. Drain type 3 open trap. Drain type 3
18+320 20 open trap. Drain type 3 open trap. Drain type 3
18+340 20 open trap. Drain type 3 open trap. Drain type 3
18+360 20 open trap. Drain type 3 open trap. Drain type 3
18+380 20 open trap. Drain type 3 open trap. Drain type 3
18+400 20 open trap. Drain type 3 open trap. Drain type 3
18+420 20 open trap. Drain type 3 open trap. Drain type 3
18+440 20 open trap. Drain type 3 open trap. Drain type 3
18+460 20 open trap. Drain type 3 open trap. Drain type 3
18+480 20 open trap. Drain type 3 open trap. Drain type 3
18+500 20 open trap. Drain type 3 open trap. Drain type 3
18+520 20 open trap. Drain type 3 open trap. Drain type 3
18+540 20 open trap. Drain type 3 open trap. Drain type 3
18+560 20 open trap. Drain type 3 open trap. Drain type 3
18+580 20 open trap. Drain type 3 open trap. Drain type 3
18+600 20 open trap. Drain type 3 open trap. Drain type 3
18+620 20 open trap. Drain type 3 open trap. Drain type 3
18+640 20 open trap. Drain type 3 open trap. Drain type 3
18+660 20 open trap. Drain type 3 open trap. Drain type 3
18+680 20 open trap. Drain type 3 open trap. Drain type 3
18+700 20 open trap. Drain type 3 open trap. Drain type 3
18+720 20 open trap. Drain type 3 open trap. Drain type 3
18+740 20 open trap. Drain type 3 open trap. Drain type 3
18+760 20 open trap. Drain type 3 open trap. Drain type 3
18+780 20 open trap. Drain type 3
18+800 20 open trap. Drain type 3
18+820 20 open trap. Drain type 3
18+840 20 open trap. Drain type 3
18+900 20 open trap. Drain type 3
18+920 20 open trap. Drain type 3
18+940 20 open trap. Drain type 3
18+960 20 open trap. Drain type 3
18+980 20 open trap. Drain type 3
19+000 20 open trap. Drain type 3
19+020 20 open trap. Drain type 3
19+040 20 open trap. Drain type 3
19+060 20 open trap. Drain type 3
19+080 20 open trap. Drain type 3
19+100 20 open trap. Drain type 3
19+120 20 open trap. Drain type 3
19+200 20 open trap. Drain type 3
19+220 20 open trap. Drain type 3
19+240 20 open trap. Drain type 3 open trap. Drain type 3
19+260 20 open trap. Drain type 3 open trap. Drain type 3
19+280 20 open trap. Drain type 3 open trap. Drain type 3
19+300 20 open trap. Drain type 3 open trap. Drain type 3
19+320 20 open trap. Drain type 3 open trap. Drain type 3
19+340 20 open trap. Drain type 3 open trap. Drain type 3
19+360 20 open trap. Drain type 3 open trap. Drain type 3
19+380 20 open trap. Drain type 3 open trap. Drain type 3
19+400 20 open trap. Drain type 3
19+420 20 open trap. Drain type 3
19+440 20 open trap. Drain type 3
19+460 20 open trap. Drain type 3
19+480 20 open trap. Drain type 3
19+500 20 open trap. Drain type 3
19+520 20 open trap. Drain type 3
19+540 20 open trap. Drain type 3
19+560 20 open trap. Drain type 3
19+580 20 open trap. Drain type 3
19+600 20 open trap. Drain type 3
19+620 20 open trap. Drain type 3 open trap. Drain type 3
19+640 20 open trap. Drain type 3
19+660 20 open trap. Drain type 3
19+680 20 open trap. Drain type 3
19+700 20 open trap. Drain type 3
19+720 20 open trap. Drain type 3
19+740 20 open trap. Drain type 3
19+760 20 open trap. Drain type 3
19+780 20 open trap. Drain type 3
19+800 20 open trap. Drain type 3
19+820 20 open trap. Drain type 3
19+840 20 open trap. Drain type 3
19+860 20 open trap. Drain type 3
19+880 20 open trap. Drain type 3
19+900 20 open trap. Drain type 3
19+920 20 open trap. Drain type 3
19+940 20 open trap. Drain type 3
19+960 20 open trap. Drain type 3
19+980 20 open trap. Drain type 3
20+000 20 open trap. Drain type 3
20+020 20 open trap. Drain type 3
20+040 20 open trap. Drain type 3
20+060 20 open trap. Drain type 3
20+080 20 open trap. Drain type 3
20+100 20 open trap. Drain type 3
20+120 20 open trap. Drain type 3
20+140 20 open trap. Drain type 3
20+160 20 open trap. Drain type 3
20+180 20 open trap. Drain type 3
20+200 20 open trap. Drain type 3
20+220 20 open trap. Drain type 3 open trap. Drain type 3
20+240 20 open trap. Drain type 3 open trap. Drain type 3
20+260 20 open trap. Drain type 3 open trap. Drain type 3
20+280 20 open trap. Drain type 3 open trap. Drain type 3
20+300 20 open trap. Drain type 3
20+380 20 open trap. Drain type 3
20+400 20 open trap. Drain type 3
20+420 20 open trap. Drain type 3
20+440 20 open trap. Drain type 3
20+460 20 open trap. Drain type 3 open trap. Drain type 3
20+480 20 open trap. Drain type 3 open trap. Drain type 3
20+500 20 open trap. Drain type 3 open trap. Drain type 3
20+520 20 open trap. Drain type 3 open trap. Drain type 3
20+540 20 open trap. Drain type 3 open trap. Drain type 3
20+560 20 open trap. Drain type 3
20+580 20 open trap. Drain type 3
20+600 20 open trap. Drain type 3
20+620 20 open trap. Drain type 3
20+640 20 open trap. Drain type 3
20+660 20 open trap. Drain type 3
20+680 20 open trap. Drain type 3
20+700 20 open trap. Drain type 3
20+720 20 open trap. Drain type 3
20+740 20 open trap. Drain type 3
20+760 20 open trap. Drain type 3
20+780 20 open trap. Drain type 3
20+800 20 open trap. Drain type 3
20+820 20 open trap. Drain type 3
20+840 20 open trap. Drain type 3
20+860 20 open trap. Drain type 3
20+880 20 open trap. Drain type 3
20+900 20 open trap. Drain type 3
20+920 20 open trap. Drain type 3
20+940 20 open trap. Drain type 3
20+960 20 open trap. Drain type 3
20+980 20 open trap. Drain type 3
21+000 20 open trap. Drain type 3
21+020 20 open trap. Drain type 3
21+040 20 open trap. Drain type 3
21+060 20 open trap. Drain type 3
21+080 20 open trap. Drain type 3
21+100 20 open trap. Drain type 3
21+120 20 open trap. Drain type 3
21+140 20 open trap. Drain type 3
21+160 20 open trap. Drain type 3
21+180 20 open trap. Drain type 3
21+200 20 open trap. Drain type 3
21+220 20 open trap. Drain type 3
21+240 20 open trap. Drain type 3
21+260 20 open trap. Drain type 3 open trap. Drain type 3
21+280 20 open trap. Drain type 3 open trap. Drain type 3
21+300 20 open trap. Drain type 3 open trap. Drain type 3
21+320 20 open trap. Drain type 3 open trap. Drain type 3
21+340 20 open trap. Drain type 3 open trap. Drain type 3
21+360 20 open trap. Drain type 3
21+380 20 open trap. Drain type 3
21+400 20 open trap. Drain type 3
21+420 20 open trap. Drain type 3
21+440 20 open trap. Drain type 3
21+460 20 open trap. Drain type 3
21+480 20 open trap. Drain type 3
21+500 20 open trap. Drain type 3
21+520 20 open trap. Drain type 3
21+540 20 open trap. Drain type 3
21+560 20 open trap. Drain type 3
21+580 20 open trap. Drain type 3
21+600 20 open trap. Drain type 3
21+620 20 open trap. Drain type 3
21+640 20 open trap. Drain type 3
21+660 20 open trap. Drain type 3
21+680 20 open trap. Drain type 3
21+700 20 open trap. Drain type 3
21+720 20 open trap. Drain type 3
21+740 20 open trap. Drain type 3
21+760 20 open trap. Drain type 3
21+780 20 open trap. Drain type 3
21+800 20 open trap. Drain type 3
21+820 20 open trap. Drain type 3
21+840 20 open trap. Drain type 3
21+860 20 open trap. Drain type 3
21+880 20 open trap. Drain type 3
21+900 20 open trap. Drain type 3
21+920 20 open trap. Drain type 3
21+940 20 open trap. Drain type 3
21+960 20 open trap. Drain type 3
21+980 20 open trap. Drain type 3
22+000 20 open trap. Drain type 3 open trap. Drain type 3
22+020 20 open trap. Drain type 3
22+040 20 open trap. Drain type 3
22+060 20 open trap. Drain type 3
22+080 20 open trap. Drain type 3
22+100 20 open trap. Drain type 3
22+120 20 open trap. Drain type 3
22+140 20 open trap. Drain type 3
22+160 20 open trap. Drain type 3
22+180 20 open trap. Drain type 3
22+200 20 open trap. Drain type 3
22+220 20 open trap. Drain type 3 open trap. Drain type 3
22+240 20 open trap. Drain type 3
22+260 20 open trap. Drain type 3
22+280 20 open trap. Drain type 3
22+300 20 open trap. Drain type 3
22+320 20 open trap. Drain type 3
22+340 20 open trap. Drain type 3
22+360 20 open trap. Drain type 3
22+380 20 open trap. Drain type 3
22+400 20 open trap. Drain type 3
22+420 20 open trap. Drain type 3
22+440 20 open trap. Drain type 3
22+460 20 open trap. Drain type 3
22+480 20 open trap. Drain type 3
22+500 20 open trap. Drain type 3
22+520 20 open trap. Drain type 3
22+540 20 open trap. Drain type 3
22+560 20 open trap. Drain type 3
22+580 20 open trap. Drain type 3
22+600 20 open trap. Drain type 3
22+620 20 open trap. Drain type 3
22+640 20 open trap. Drain type 3
22+660 20 open trap. Drain type 3
22+680 20 open trap. Drain type 3
22+700 20 open trap. Drain type 3
22+720 20 open trap. Drain type 3
22+740 20 open trap. Drain type 3
22+760 20 open trap. Drain type 3
22+780 20 open trap. Drain type 3
22+800 20 open trap. Drain type 3
22+820 20 open trap. Drain type 3
22+840 20 open trap. Drain type 3
22+860 20 open trap. Drain type 3
22+880 20 open trap. Drain type 3
22+900 20 open trap. Drain type 3
22+920 20 open trap. Drain type 3
22+940 20 open trap. Drain type 3
22+960 20 open trap. Drain type 3
22+980 20 open trap. Drain type 3
23+000 20 open trap. Drain type 3
23+020 20 open trap. Drain type 3
23+040 20 open trap. Drain type 3
23+060 20 open trap. Drain type 3
23+080 20 open trap. Drain type 3
23+100 20 open trap. Drain type 3
23+120 20 open trap. Drain type 3
23+140 20 open trap. Drain type 3
23+160 20 open trap. Drain type 3
23+180 20 open trap. Drain type 3
23+200 20 open trap. Drain type 3
23+220 20 open trap. Drain type 3
23+240 20 open trap. Drain type 3
23+260 20 open trap. Drain type 3
23+280 20 open trap. Drain type 3
23+300 20 open trap. Drain type 3
23+320 20 open trap. Drain type 3
23+340 20 open trap. Drain type 3
23+360 20 open trap. Drain type 3
23+380 20 open trap. Drain type 3
23+400 20 open trap. Drain type 3
23+420 20 open trap. Drain type 3
23+440 20 open trap. Drain type 3
23+460 20 open trap. Drain type 3
23+480 20 open trap. Drain type 3
23+500 20 open trap. Drain type 3
23+520 20 open trap. Drain type 3
23+540 20 open trap. Drain type 3
23+560 20 open trap. Drain type 3
23+580 20 open trap. Drain type 3
23+600 20 open trap. Drain type 3
23+620 20 open trap. Drain type 3
23+640 20 open trap. Drain type 3
23+660 20 open trap. Drain type 3
23+680 20 open trap. Drain type 3
23+700 20 open trap. Drain type 3
23+720 20 open trap. Drain type 3
23+740 20 open trap. Drain type 3
23+760 20 open trap. Drain type 3
23+780 20 open trap. Drain type 3 open trap. Drain type 3
23+800 20 open trap. Drain type 3
23+820 20 open trap. Drain type 3
23+840 20 open trap. Drain type 3
23+860 20 open trap. Drain type 3
23+880 20 open trap. Drain type 3
23+900 20 open trap. Drain type 3
23+920 20 open trap. Drain type 3
23+940 20 open trap. Drain type 3
23+960 20 open trap. Drain type 3 open trap. Drain type 3
23+980 20 open trap. Drain type 3 open trap. Drain type 3
24+000 20 open trap. Drain type 3 open trap. Drain type 3
24+020 20 open trap. Drain type 3 open trap. Drain type 3
24+040 20 open trap. Drain type 3
24+060 20 open trap. Drain type 3
24+080 20 open trap. Drain type 3
24+100 20 open trap. Drain type 3
24+120 20 open trap. Drain type 3
24+140 20 open trap. Drain type 3
24+160 20 open trap. Drain type 3
24+180 20 open trap. Drain type 3
24+200 20 open trap. Drain type 3
24+220 20 open trap. Drain type 3
24+240 20 open trap. Drain type 3
24+260 20 open trap. Drain type 3
24+280 20 open trap. Drain type 3
24+300 20 open trap. Drain type 3
24+320 20 open trap. Drain type 3
24+340 20 open trap. Drain type 3
24+360 20 open trap. Drain type 3
24+380 20 open trap. Drain type 3
24+400 20 open trap. Drain type 3
24+420 20 open trap. Drain type 3
24+440 20 open trap. Drain type 3
24+460 20 open trap. Drain type 3
24+480 20 open trap. Drain type 3
24+500 20 open trap. Drain type 3
24+520 20 open trap. Drain type 3
24+540 20 open trap. Drain type 3
24+560 20 open trap. Drain type 3
24+580 20 open trap. Drain type 3
24+600 20 open trap. Drain type 3
24+620 20 open trap. Drain type 3
24+640 20 open trap. Drain type 3
24+660 20 open trap. Drain type 3
24+680 20 open trap. Drain type 3
24+700 20 open trap. Drain type 3
24+720 20 open trap. Drain type 3
24+740 20 open trap. Drain type 3
24+760 20 open trap. Drain type 3
24+780 20 open trap. Drain type 3
24+800 20 open trap. Drain type 3
24+820 20 open trap. Drain type 3
24+840 20 open trap. Drain type 3
24+860 20 open trap. Drain type 3
24+880 20 open trap. Drain type 3
24+900 20 open trap. Drain type 3
24+920 20 open trap. Drain type 3
24+940 20 open trap. Drain type 3
24+960 20 open trap. Drain type 3
24+980 20 open trap. Drain type 3
25+000 20 open trap. Drain type 3 open trap. Drain type 3
25+020 20 open trap. Drain type 3 open trap. Drain type 3
25+040 20 open trap. Drain type 3 open trap. Drain type 3
25+060 20 open trap. Drain type 3 open trap. Drain type 3
25+080 20 open trap. Drain type 3 open trap. Drain type 3
25+100 20 open trap. Drain type 3 open trap. Drain type 3
25+120 20 open trap. Drain type 3 open trap. Drain type 3
25+140 20 open trap. Drain type 3 open trap. Drain type 3
25+160 20 open trap. Drain type 3 open trap. Drain type 3
25+180 20 open trap. Drain type 3 open trap. Drain type 3
25+200 20 open trap. Drain type 3 open trap. Drain type 3
25+220 20 open trap. Drain type 3
25+240 20 open trap. Drain type 3
25+260 20 open trap. Drain type 3
25+280 20 open trap. Drain type 3
25+300 20 open trap. Drain type 3
25+320 20 open trap. Drain type 3
25+340 20 open trap. Drain type 3
25+360 20 open trap. Drain type 3
25+380 20 open trap. Drain type 3
25+400 20 open trap. Drain type 3
25+420 20 open trap. Drain type 3
25+440 20 open trap. Drain type 3
25+460 20 open trap. Drain type 3
25+480 20 open trap. Drain type 3
25+500 20 open trap. Drain type 3
25+520 20 open trap. Drain type 3
25+540 20 open trap. Drain type 3
25+560 20 open trap. Drain type 3
25+580 20 open trap. Drain type 3
25+600 20 open trap. Drain type 3
25+620 20 open trap. Drain type 3
25+640 20 open trap. Drain type 3
25+660 20 open trap. Drain type 3
25+680 20 open trap. Drain type 3
25+700 20 open trap. Drain type 3
25+720 20 open trap. Drain type 3
25+740 20 open trap. Drain type 3
25+760 20 open trap. Drain type 3
25+780 20 open trap. Drain type 3
25+800 20 open trap. Drain type 3
25+820 20 open trap. Drain type 3
25+840 20 open trap. Drain type 3
25+860 20 open trap. Drain type 3
25+880 20 open trap. Drain type 3
25+900 20 open trap. Drain type 3
25+920 20 open trap. Drain type 3
25+940 20 open trap. Drain type 3
25+960 20 open trap. Drain type 3
25+980 20 open trap. Drain type 3
26+000 20 open trap. Drain type 3
26+020 20 open trap. Drain type 3
26+040 20 open trap. Drain type 3
26+060 20 open trap. Drain type 3
26+080 20 open trap. Drain type 3
26+100 20 open trap. Drain type 3
26+120 20 open trap. Drain type 3
26+140 20 open trap. Drain type 3
26+160 20 open trap. Drain type 3
26+180 20 open trap. Drain type 3
26+200 20 open trap. Drain type 3
26+220 20 open trap. Drain type 3
26+240 20 open trap. Drain type 3
26+260 20 open trap. Drain type 3
26+280 20 open trap. Drain type 3
26+300 20 open trap. Drain type 3
26+320 20 open trap. Drain type 3
26+340 20 open trap. Drain type 3
26+360 20 open trap. Drain type 3
26+380 20 open trap. Drain type 3
26+400 20 open trap. Drain type 3
26+420 20 open trap. Drain type 3
26+440 20 open trap. Drain type 3
26+460 20 open trap. Drain type 3
26+480 20 open trap. Drain type 3
26+500 20 open trap. Drain type 3
26+520 20 open trap. Drain type 3
26+540 20 open trap. Drain type 3
26+560 20 open trap. Drain type 3
26+580 20 open trap. Drain type 3
26+600 20 open trap. Drain type 3
26+620 20 open trap. Drain type 3
26+640 20 open trap. Drain type 3
26+660 20 open trap. Drain type 3
26+680 20 open trap. Drain type 3
26+700 20 open trap. Drain type 3
26+720 20 open trap. Drain type 3
26+740 20 open trap. Drain type 3
26+760 20 open trap. Drain type 3
26+780 20 open trap. Drain type 3
26+800 20 open trap. Drain type 3
26+820 20 open trap. Drain type 3
26+840 20 open trap. Drain type 3 open trap. Drain type 3
26+860 20 open trap. Drain type 3 open trap. Drain type 3
26+880 20 open trap. Drain type 3
26+900 20 open trap. Drain type 3
26+920 20 open trap. Drain type 3
26+940 20 open trap. Drain type 3
26+960 20 open trap. Drain type 3
26+980 20 open trap. Drain type 3
27+000 20 open trap. Drain type 3
27+020 20 open trap. Drain type 3
27+040 20 open trap. Drain type 3
27+060 20 open trap. Drain type 3
27+080 20 open trap. Drain type 3
27+100 20 open trap. Drain type 3
27+120 20 open trap. Drain type 3
27+140 20 open trap. Drain type 3
27+160 20 open trap. Drain type 3
27+180 20 open trap. Drain type 3
27+200 20 open trap. Drain type 3
27+220 20 open trap. Drain type 3
27+240 20 open trap. Drain type 3
27+260 20 open trap. Drain type 3
27+280 20 open trap. Drain type 3
27+300 20 open trap. Drain type 3
27+320 20 open trap. Drain type 3
27+340 20 open trap. Drain type 3
27+360 20 open trap. Drain type 3
27+380 20 open trap. Drain type 3
27+400 20 open trap. Drain type 3
27+420 20 open trap. Drain type 3
27+440 20 open trap. Drain type 3
27+460 20 open trap. Drain type 3
27+480 20 open trap. Drain type 3
27+500 20 open trap. Drain type 3
27+520 20 open trap. Drain type 3
27+540 20 open trap. Drain type 3
27+560 20 open trap. Drain type 3
27+580 20 open trap. Drain type 3
27+600 20 open trap. Drain type 3
27+620 20 open trap. Drain type 3
27+640 20 open trap. Drain type 3
27+660 20 open trap. Drain type 3
27+680 20 open trap. Drain type 3
27+700 20 open trap. Drain type 3
27+720 20 open trap. Drain type 3
27+740 20 open trap. Drain type 3
27+760 20 open trap. Drain type 3
27+780 20 open trap. Drain type 3
27+800 20 open trap. Drain type 3
27+820 20 open trap. Drain type 3
27+840 20 open trap. Drain type 3
27+860 20 open trap. Drain type 3
27+880 20 open trap. Drain type 3
27+900 20 open trap. Drain type 3
27+920 20 open trap. Drain type 3
27+940 20 open trap. Drain type 3
27+960 20 open trap. Drain type 3
27+980 20 open trap. Drain type 3
28+000 20 open trap. Drain type 3
28+020 20 open trap. Drain type 3
28+040 20 open trap. Drain type 3
28+060 20 open trap. Drain type 3
28+080 20 open trap. Drain type 3
28+100 20 open trap. Drain type 3
28+120 20 open trap. Drain type 3
28+140 20 open trap. Drain type 3
28+160 20 open trap. Drain type 3
28+180 20 open trap. Drain type 3
28+200 20 open trap. Drain type 3
28+220 20 open trap. Drain type 3
28+240 20 open trap. Drain type 3
28+260 20 open trap. Drain type 3
28+280 20 open trap. Drain type 3
28+300 20 open trap. Drain type 3
28+320 20 open trap. Drain type 3
28+340 20 open trap. Drain type 3
28+360 20 open trap. Drain type 3
28+380 20 open trap. Drain type 3
28+400 20 open trap. Drain type 3
28+420 20 open trap. Drain type 3
28+440 20 open trap. Drain type 3
28+460 20 open trap. Drain type 3
28+480 20 open trap. Drain type 3
28+500 20 open trap. Drain type 3
28+520 20 open trap. Drain type 3
28+540 20 open trap. Drain type 3
28+560 20 open trap. Drain type 3
28+580 20 open trap. Drain type 3
28+600 20 open trap. Drain type 3
28+660 20 open trap. Drain type 3
28+680 20 open trap. Drain type 3
28+700 20 open trap. Drain type 3
28+720 20 open trap. Drain type 3
28+740 20 open trap. Drain type 3
28+760 20 open trap. Drain type 3
28+780 20 open trap. Drain type 3
28+800 20 open trap. Drain type 3
28+820 20 open trap. Drain type 3
28+840 20 open trap. Drain type 3
28+860 20 open trap. Drain type 3
28+920 20 open trap. Drain type 3
28+940 20 open trap. Drain type 3
28+960 20 open trap. Drain type 3
28+980 20 open trap. Drain type 3
29+000 20 open trap. Drain type 3
29+020 20 open trap. Drain type 3
29+040 20 open trap. Drain type 3
29+060 20 open trap. Drain type 3
29+080 20 open trap. Drain type 3
29+100 20 open trap. Drain type 3
29+120 20 open trap. Drain type 3
29+140 20 open trap. Drain type 3
29+160 20 open trap. Drain type 3
29+180 20 open trap. Drain type 3
29+200 20 open trap. Drain type 3
29+220 20 open trap. Drain type 3
29+240 20 open trap. Drain type 3
29+260 20 open trap. Drain type 3
29+280 20 open trap. Drain type 3
29+300 20 open trap. Drain type 3
29+320 20 open trap. Drain type 3
29+340 20 open trap. Drain type 3
29+360 20 open trap. Drain type 3
29+380 20 open trap. Drain type 3
29+400 20 open trap. Drain type 3
29+420 20 open trap. Drain type 3
29+440 20 open trap. Drain type 3
29+460 20 open trap. Drain type 3
29+480 20 open trap. Drain type 3
29+500 20 open trap. Drain type 3
29+520 20 open trap. Drain type 3
29+540 20 open trap. Drain type 3
29+560 20 open trap. Drain type 3
29+580 20 open trap. Drain type 3
29+600 20 open trap. Drain type 3
29+620 20 open trap. Drain type 3
29+640 20 open trap. Drain type 3
29+660 20 open trap. Drain type 3
29+680 20 open trap. Drain type 3
29+700 20 open trap. Drain type 3
29+720 20 open trap. Drain type 3
29+740 20 open trap. Drain type 3
29+760 20 open trap. Drain type 3
29+780 20 open trap. Drain type 3
29+800 20 open trap. Drain type 3
29+820 20 open trap. Drain type 3
29+840 20 open trap. Drain type 3
29+860 20 open trap. Drain type 3
29+880 20 open trap. Drain type 3
29+900 20 open trap. Drain type 3
29+920 20 open trap. Drain type 3
29+940 20 open trap. Drain type 3
29+960 20 open trap. Drain type 3
29+980 20 open trap. Drain type 3
30+000 20 open trap. Drain type 3
30+020 20 open trap. Drain type 3
30+040 20 open trap. Drain type 3
30+060 20 open trap. Drain type 3
30+080 20 open trap. Drain type 3
30+100 20 open trap. Drain type 3
30+120 20 open trap. Drain type 3
30+140 20 open trap. Drain type 3
30+160 20 open trap. Drain type 3
30+180 20 open trap. Drain type 3
30+200 20 open trap. Drain type 3
30+220 20 open trap. Drain type 3
30+240 20 open trap. Drain type 3
30+260 20 open trap. Drain type 3
30+280 20 open trap. Drain type 3 open trap. Drain type 3
30+300 20 open trap. Drain type 3 open trap. Drain type 3
30+320 20 open trap. Drain type 3 open trap. Drain type 3
30+340 20 open trap. Drain type 3 open trap. Drain type 3
30+360 20 open trap. Drain type 3 open trap. Drain type 3
30+380 20 open trap. Drain type 3 open trap. Drain type 3
30+420 20 open trap. Drain type 3
30+440 20 open trap. Drain type 3
30+460 20 open trap. Drain type 3
30+480 20 open trap. Drain type 3
30+500 20 open trap. Drain type 3
30+520 20 open trap. Drain type 3
30+540 20 open trap. Drain type 3
30+560 17.57 open trap. Drain type 3
30+575 7.57 open trap. Drain type 3
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
QUANTITY CALCULATION FOR TRAPEZOIDAL (Side drain D1) COVERED SIDE DRAIN(PER 20 Rm.)
#REF!
Item Quantity Per Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Unit
No. meter 20 meter
Drain-D1
1 Stone masonary work in 1:4 c/s mortar 1 1.0 0.135 0.135 2.7 cu.m
2 M20 Pcc work in Bed 1 1 1.125 0.1 0.113
3 M20 Pcc work on top(Road side) 1 1 0.013 0.013
Total 0.126 2.513
Precast RCC Cover(0.5x1.125x0.12)
1 PCC work for RCC in M20/20 in cover 1 0.5 1.125 0.120 0.068 2.700 cu.m
Wt (Kg) per Weight per no
2 Reinforcement Work meter of cover
12 mm dia Bottom Main bars @ 15 cm c/c (Bottom) 3 1.125 0.888 2.996 kg
8 mm dia Distribution bars @ 15 cm c/c (Bottom) 8 0.5 0.395 1.578 kg
Total 4.575 182.988 kg
3 Formwork for cover 2 0.5 1.125 0.12 0.390 15.600 sqm
194 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
195 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
QUANTITY CALCULATION FOR TRAPEZOIDAL(Side Drain D1) OPEN SIDE DRAIN(PER 20Rm.)
#REF!
Item Length Breadth Height Quantity Per Quantity per
Description of works No. Unit
No. (m) (m) (m) Rm 20 m
1 Stone masonary work in 1:4 c/s mortar 1 1 0.159375 0.159375 3.1875 cu.m
2 M20 Pcc work in Bed 1 1 1.125 0.1 0.1125 2.25
3 M20 Pcc work on top(Road side) 1 1 0.013125 0.013125 0.2625
Total Pcc work 2.5125
197 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Remarks
A=0.3*0.25+1/2*(0.275+0.4)*0.25
A=1/2*(0.25+0.275)*0.05
198 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
QUANTITY CALCULATION FOR TRAPEZOIDAL (Side Drain D3) COVER FOR SIDE DRAIN (PER no.)
#REF!
Item No. Description of works No. Length (m) Breadth (m) Height (m) Quantity Per no
For Cover Works(1.2m x 0.5m x 0.125m) 1 no.
1 PCC work for RCC in M20/20 in cover 1 0.5 1.200 0.125 0.075
Wt(Kg) per Wt(Kg) per Rm
2 Reinforcement Work meter span
12 mm dia Bottom Main bars @ 15 cm c/c (Top & Bottom) 4 1.150 0.887 4.080
10 mm dia Distribution bars @ 20 cm c/c (Top & Bottom) 6.75 0.450 0.62 1.883
Total 5.963
3 Formwork
For cover 1 0.5 1.200 0.125 0.425
QUANTITY CALCULATION FOR TRAPEZOIDAL (Side Drain D1) COVER FOR SIDE DRAIN (PER no.)
#REF!
Item No. Description of works No. Length (m) Breadth (m) Height (m) Quantity Per no
For Cover Works(1.2m x 0.5m x 0.125m) 1 no.
1 PCC work for RCC in M20/20 in cover 1 0.5 1.125 0.125 0.070
Wt(Kg) per Wt(Kg) per Rm
2 Reinforcement Work meter span
12 mm dia Bottom Main bars @ 15 cm c/c (Top & Bottom) 4 1.075 0.887 3.814
10 mm dia Distribution bars @ 20 cm c/c (Top & Bottom) 6.375 0.450 0.62 1.779
Total 5.593
3 Formwork
For cover 1 0.5 1.125 0.125 0.406
Government of Nepal
Ministry of Federal Affairs & Local Development
Earthquake Emergency Assistance Project
Central Level Project Implementation Unit
(CLPIU)
Ekantakuna,Jawalakhel,Lalitpur
QUANTITY CALCULATION FOR TRAPEZOIDAL (Side drain D3) COVERED SIDE DRAIN(PER 20 Rm.)
#REF!
Quantity Quantity
Length Breadth Height
Item No. Description of works No. Per per 20 Unit
(m) (m) (m)
meter meter
Drain-D3
1 Stone masonary work in 1:4 c/s mortar 1 1.0 0 0 0 cu.m
2 M20 Pcc work in Bed 1 1 1.2 0.1 0.12 2.4
3 M20 Pcc work on top(Road side) 1 1 0.013125 0.013125 0.2625
Total 2.6625
Cover
2 PCC work for RCC in M20/20 in cover 1 1.0 1.200 0.120 0.14 2.88 cu.m
Weight
Wt per
3 Reinforcement Work per Rm
meter
span
12 mm dia Bottom Main bars @ 15 cm c/c (Bottom) 7 1.200 1.000 0.887 7.45 kg
8 mm dia Distribution bars @ 15 cm c/c (Bottom) 8 1.0 1.200 0.394 3.15 kg
Total #REF! #REF! kg
4 Formwork for cover 2 0.5 1.2 0.12 1.816 36.32 sqm
#REF!
#REF!
#REF!
#REF!
#REF!
1 Stone masonary work in 1:4 c/s mortar 1 1 0.135 0.135 2.7 cu.m
202 of 313
20Rm.)
Remarks
Qty per
rm=0.1*1.125*1+1/2*1*0.2*1.125+1/2*
(0.25+0.275)*0.05
203 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total no of Quantity per
SN Description of works Unit Total Quantity Rate(NRs) Amount (NRs)
culverts no
1 Earthwork in excavation in foundation cu.m. 10 6.41 64.05 Err:509 Err:509
3 Random rubble stone masonry in 1:4 c/s mortar cu.m. 10 3.16 31.57 Err:509 Err:509
5 Earthwork in backfill with earthmass from near by area L.S 10 1.47 14.70 Err:509 Err:509
6 110mm Dia. HDPE Pipe at weep holes Rm 10 Err:509 Err:509 Err:509 Err:509
#REF!
Height of catch pit wall= 0.7 m Dia of pc= 30 cm
Quantity Total
Sn
Description of Works unit No Length (m) Width (m) Height (m) per no Total no Quantity Remarks
1 Earthwork in Foundation
Excavation in Hard soil Cum
a Catch Pit Cum 2 1.3 1.5 0.7 2.73
c Pipe Line Cum 1 7.5 0.7 0.7 3.675
Total 6.405 0 0
2 Stone soling works Cum
a Catch Pit Cum 2 1.3 1.5 0.1 0.39
c Pipe Line Cum 1 7.5 0.7 0.15 0.7875
Total 1.1775 0 0
3 PCC M10/20
a Catch Pit Cum 2 1.3 1.5 0.1 0.39
Total 0.39 0 0
4 RRM in 1:4 cement mortar
a Catch Pit
Base Cum 2 1.3 1.5 0.3 1.17
Head wall Cum 2 1.3 0.4 0.7 0.73
Side wall Cum 4 0.7 0.3 0.7 0.59
Wall at hill side u/s Cum 2 1.3 0.4 0.7 0.73
Total 3.21
Deduction
b (0.95*PI()*(
Pipe portion Catch Pit Cum 2 0.40 0.07065 0.06 D2)/4)
Total Deduction 0.06
Total after deduction 3.16 0.00 0
Transportation and Laying
5
of Hume Pipe Rm 1 7.5 7.5 0.00 0
About
6 Back filling work including 40%of
compaction Cum 1 7.5 0.7 0.7 1.47 0.00 0 excavation
254 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3 Random rubble stone masonry in 1:4 c/s mortar cu.m. #REF! 12.43 #REF! Err:509
5 Earthwork in backfill with earthmass from near by area L.S #REF! 4.45 #REF! Err:509
6 110mm Dia. HDPE Pipe at weep holes Rm #REF! 3.56 #REF! 426.00
255 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount (NRs)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
256 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
`
Height of Head wall= 2m Dia of pc= 30 cm Ht of Tail wall= 2.5 m
Quantity Total
Sn
Description of Works unit No Length (m) Width (m) Height (m) per no Total nos. Quantity Remarks
Earthwork in
1 Foundation
Excavation in Hard
soil Cum
a Catch Pit wth head wall Cum 1 2.45 2.35 2 11.515
b Tail wall Cum 1 1.5 1.575 2.5 5.90625
c Pipe Line Cum 1 6.05 1.15 1.6 11.132
Total 28.55325 #REF! #REF!
2 Stone soling works Cum
a Catch Pit Cum 1 2.45 2.35 0.1 0.57575
b Tail Wall Cum 1 1.5 1.575 0.1 0.23625
c Pipe Line Cum 1 6.05 1.15 0.1 0.69575
Total 1.50775 #REF! #REF!
3 PCC M10/40 Cum
a Catch Pit Cum 1 2.45 2.35 0.1 0.58
b Tail Wall Cum 1 1.5 1.575 0.1 0.23625
c Pipe Line Cum 1 6.05 1.15 0.25 1.74
Total 2.55 #REF! #REF!
4 RRM in 1:3 cement
mortar Cum
a Catch Pit
Base Cum 1 0.9 0.8 0.3 0.22
Head wall 1 Cum 2 1.5 0.3 2 1.80
Wedge 2 2.000 Area = 0.5 2.00
Side wall Cum 2 0.8 0.3 2 0.96
SW Wedge 2 Cum 2 1.900 Area = 0.5 1.90
Parapet Cum 1 1.5 0.3 0.3 0.14
b Tail wall Cum 1 1.5 0.9875 2.5 3.70
Total 10.71
Deduction
a (0.95*PI()*
Pipe portion catch pit Cum 1 0.40 0.07065 0.03 (D2)/4)
b (0.95*PI()*
Pipe portion tail wall Cum 1 0.99 0.07065 0.07 (D2)/4)
c Inlet Drain Cum 2 0.3 0.45 0.6 0.162
Total Deduction 0.26
Total after deduction 10.45 #REF! #REF!
4 Granular Filter Material C
F um 0.30
5 Supply and Laying of
Geo- Textile Sqm 1.50
Transportation and
5
Laying of Hume Pipe
Rm 1 7.5 7.5 #REF! #REF!
6 About
Back filling work 40%of
including compaction Cum 1 6.05 1.15 1.6 4.45 #REF! #REF! excavation
7 110mm Dia. HDPE
Pipe at weep holes Rm 2.96 #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
`
Height of Head wall= 2m Dia of pc= 45 cm Ht of Tail wall= 2.5 m
Quantity Total
Sn
Description of Works unit No Length (m) Width (m) Height (m) per no Total nos. Quantity Remarks
Earthwork in
1 Foundation
Excavation in Hard
soil Cum
a Catch Pit wth head wall Cum 1 2.6 2.5 2 13
b Tail wall Cum 1 1.65 1.575 2.5 6.496875
c Pipe Line Cum 1 6.05 1.15 1.6 11.132
Total 30.628875 #REF! #REF!
2 Stone soling works Cum
a Catch Pit Cum 1 2.6 2.5 0.1 0.65
b Tail Wall Cum 1 1.65 1.575 0.1 0.259875
c Pipe Line Cum 1 6.05 1.15 0.1 0.69575
Total 1.605625 #REF! #REF!
3 PCC M10/40 Cum
a Catch Pit Cum 1 2.6 2.5 0.1 0.65
b Tail Wall Cum 1 1.65 1.575 0.1 0.259875
c Pipe Line Cum 1 6.05 1.15 0.25 1.74
Total 2.65 #REF! #REF!
4 RRM in 1:3 cement
mortar Cum
a Catch Pit
Base Cum 1 1.05 0.95 0.3 0.30
Head wall 1 Cum 2 1.65 0.3 2 1.98
Wedge 2 2.150 Area = 0.5 2.15
Side wall Cum 2 0.95 0.3 2 1.14
SW Wedge 2 Cum 2 2.050 Area = 0.5 2.05
Parapet Cum 1 1.65 0.3 0.3 0.15
b Tail wall Cum 1 1.65 0.9875 2.5 4.07
Total 11.84
Deduction
a (0.95*PI()*
Pipe portion catch pit Cum 1 0.40 0.1589625 0.06 (D2)/4)
b (0.95*PI()*
Pipe portion tail wall Cum 1 0.99 0.1589625 0.16 (D2)/4)
c Inlet Drain Cum 2 0.3 0.45 0.6 0.162
Total Deduction 0.38
Total after deduction 11.46 #REF! #REF!
4 Granular Filter Material C
F um 0.33
5 Supply and Laying of
Geo- Textile Sqm 1.65
Transportation and
5
Laying of Hume Pipe
Rm 1 7.5 7.5 #REF! #REF!
6 About
Back filling work 40%of
including compaction Cum 1 6.05 1.15 1.6 4.45 #REF! #REF! excavation
7 110mm Dia. HDPE
Pipe at weep holes Rm 3.26 #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
`
Height of Head wall= 2m Dia of pc= 60 cm Ht of Tail wall= 2.5 m
Sn Quantity Total
Description of Works unit No Length (m) Width (m) Height (m) per no Total nos. Quantity Remarks
Earthwork in
1 Foundation
Excavation in Hard
soil Cum
a Catch Pit wth head wall Cum 1 2.75 2.65 2 14.575
b Tail wall Cum 1 1.8 1.575 2.5 7.0875
c Pipe Line Cum 1 6.05 1.15 1.6 11.132
Total 32.7945 #REF! #REF!
2 Stone soling works Cum
a Catch Pit Cum 1 2.75 2.65 0.1 0.72875
b Tail Wall Cum 1 1.8 1.575 0.1 0.2835
c Pipe Line Cum 1 6.05 1.15 0.1 0.69575
Total 1.708 #REF! #REF!
3 PCC M10/40 Cum
a Catch Pit Cum 1 2.75 2.65 0.1 0.73
b Tail Wall Cum 1 1.8 1.575 0.1 0.2835
c Pipe Line Cum 1 6.05 1.15 0.25 1.74
Total 2.75 #REF! #REF!
4 RRM in 1:3 cement
mortar Cum
a Catch Pit
Base Cum 1 1.2 1.1 0.3 0.40
Head wall 1 Cum 2 1.8 0.3 2 2.16
Wedge 2 2.300 Area = 0.5 2.30
Side wall Cum 2 1.1 0.3 2 1.32
SW Wedge 2 Cum 2 2.200 Area = 0.5 2.20
Parapet Cum 1 1.8 0.3 0.3 0.16
b Tail wall Cum 1 1.8 0.9875 2.5 4.44
Total 12.98
Deduction
a (0.95*PI()*
Pipe portion catch pit Cum 1 0.40 0.2826 0.11 (D2)/4)
b (0.95*PI()*
Pipe portion tail wall Cum 1 0.99 0.2826 0.28 (D2)/4)
c Inlet Drain Cum 2 0.3 0.45 0.6 0.162
Total Deduction 0.55
Total after deduction 12.43 #REF! #REF!
Transportation and
5
Laying of Hume Pipe
Rm 1 7.5 7.5 #REF! #REF!
About
6 Back filling work 40%of
including compaction Cum 1 6.05 1.15 1.6 4.45 #REF! #REF! excavation
7 110mm Dia. HDPE
Pipe at weep holes Rm 3.56 #REF! #REF!
259 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
3 Random rubble stone masonry in 1:4 c/s mortar cu.m. #REF! 47.15 #REF! Err:509 #REF!
-
Laying, fitting and fixing of hume pipe class NP3. It includes all
operations required to complete the work up to a trench depth of
2.2 m below the ground level and the jointing of pipes with 1:2
4 cement sand mortar Rm #REF! 7.50 #REF! Err:509 #REF!
5 Earthwork in backfill with earthmass from near by area L.S #REF! 4.05 #REF! Err:509 #REF!
6 110mm Dia. HDPE Pipe at weep holes Rm #REF! 7.74 #REF! 426.00 #REF!
7 Course sand filling works cum #REF! 3.11 #REF! Err:509 #REF!
(TOTAL) #REF!
260 of 313
Rural Reconstruction & Rehabilitation Sector Development Programme - 2
Err:509
ABSTRACT OF COST
4 Random rubble stone masonry in 1:4 c/s mortar cu.m. 108.22 Err:509 Err:509
7 Earthwork in backfill with earthmass from near by area L.S 88.31 Err:509 Err:509
ABSTRACT OF COST
#REF!
Name of Works: Masanory Box Culvert
262 of 313
Rural Reconstruction & Rehabilitation Sector Development Programme - 2
#REF!
5 P.C.C. work in 1:1.5:3 in RCC slab 1 7.50 1.70 0.20 2.55 cu.m 1 2.55
263 of 313
Rural Reconstruction & Rehabilitation Sector Development Programme (RRRSDP)
#REF!
3 Gabion work
Fabrication, weaving and assembling of
gabion
3.1 boxes of Size (2X1X1) 9.00 Box 1 9
3.2 Filling of gabion crates with rubble stone
Bedding in between 1 5.10 1.66 0.50 4.23 cu.m
Apron 2 2.00 2.67 0.50 5.34 cu.m.
Cut off Walls (U/S & D/S) 2 4.17 1.00 1.00 8.34 cu.m.
Total = 17.91 cu.m. 1 17.913
264 of 313
Item Length Breadth Height Unit Total
Description of works No. Quantity Unit Number
No. (m) (m) (m) Quantity
6 mm dia bar in RCC post @150 c/c 28 0.89 5.61 Kg
Total = 559.57 Kg 1 559.5739
7 Local wood Formwork
Slab Bottom 1 1.90 5.100 9.69 sq.m
Slab Edge 2 2.65 0.25 1.33 sq.m
Kerb Outer side 2 2.65 0.5 2.65 sq.m
Kerb inner side inclined portion 2 2.65 0.29 1.55 sq.m
Kerb inner side vertical portion 2 2.65 0.25 1.33 sq.m
Abutment Cap outer side 2 5.10 0.59 6.02 sq.m
Abutment Cap inner side 2 5.10 0.59 6.02 sq.m
Abutment Cap side Horizontal 4 0.30 0.3 0.36 sq.m
Abutment Cap side vertical 4 0.25 0.29 0.29 sq.m
RCC Post 4 1.00 0.7 2.80 sq.m
Total = 32.02 sq.m 1 32.0212
265 of 313
Rural Reconstruction & Rehabilitation Sector Development Programme - 2
Kathmandu District
#REF!
Total
Item Unit Quantity
Description of works No. Length Breadth Height Quantity Unit
No. Number
(m) (m) (m)
1 Earthwork in excavation in foundation for:
Abutment Wall 2 5.10 2.40 1.50 36.72 cu.m.
Wing Walls 4 2.27 1.53 1.50 20.77 cu.m.
Bedding in between Abutments 1 5.10 -0.20 1.50 -1.53 cu.m.
U/S & D/S Apron 2 1.60 1.77 0.50 2.83 cu.m.
Cut off Walls (U/S & D/S) 2 2.77 0.50 1.00 2.77 cu.m.
Total = 61.56 cu.m. 2 123.13
2 P.C.C work in 1:2:4 in
2.1 Foundation bed & floors :
Abutments 2 5.10 2.30 0.20 4.69 cu.m
Wing Walls 4 2.17 1.43 0.10 1.24 cu.m
2.2 RCC Post 4 1.00 0.20 0.15 0.12 cu.m
Total = 6.05 cu.m. 2 12.10
3 Gabion work
266 of 313
Total
Item Unit Quantity
Description of works No. Length Breadth Height Quantity Unit
No. Number
(m) (m) (m)
7 Local wood formwork
Slab Bottom 1 1.40 5.100 7.14 sq.m
Slab Edge 2 2.15 0.25 1.08 sq.m
Kerb Outer side 2 2.15 0.5 2.15 sq.m
Kerb inner side inclined portion 2 2.15 0.29 1.25 sq.m
Kerb inner side vertical portion 2 2.15 0.25 1.08 sq.m
Abutment Cap outer side 2 5.10 0.55 5.61 sq.m
Abutment Cap inner side 2 5.10 0.55 5.61 sq.m
Abutment Cap side Horizontal 4 0.30 0.3 0.36 sq.m
Abutment Cap side vertical 4 0.25 0.25 0.25 sq.m
RCC Post 4 1.00 0.7 2.80 sq.m
Total = 27.32 sq.m 2 54.65
8 100mm Dia. HDPE Pipe Weep Holes Nos.
Abutments 2 0.68 5.000 6.80 rm.
Wing walls 4 0.67 9.000 24.00 rm.
Total = 30.80 rm. 2 61.60
267 of 313
Rural Rehabilitation Reconstruction Sector Development Program -2
Err:509
ABSTRACT OF COST
269 of 313
Rural Rehabilitation Reconstruction Sector Development Program -2
Lalitpur District
ABSTRACT OF COST
271 of 313
Rehabilitation Sector Development Programme - 2
Lalitpur District
Unit
cu.m.
cu.m.
cu.m.
cu.m.
Kg
Kg
cu.m.
Box
272 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
273 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
ABSTRACT OF COST
Name of Works: Maintenance of existing 6m Slab Culvert with RCC Post Railing
#REF!
SN Description of works Unit Quantity Rate(NRs) Amount (NRs)
1 Earthwork in excavation in foundation cu.m 165.08 Err:509 Err:509
2 P.C.C work in 1:2:4 in foundation bed & floors : cu.m 9.62 Err:509 Err:509
Fabrication, weaving and assembling of gabion
3 boxes of Size (2X1X1) Box 29.00 Err:509 Err:509
4 Filling of gabion crates with rubble stone cu.m 57.27 Err:509 Err:509
5 Stone masonry work in 1:4 c/s mortar cu.m 28.49 Err:509 Err:509
6 PCC work for RCC in 1:1.5:3 cu.m 5.27 Err:509 Err:509
7 Reinforcement Work kg 107.86 Err:509 Err:509
8 Local wood formwork sq.m 43.88 Err:509 Err:509
9 100mm Dia. HDPE Pipe rm 90.72 426.00 38646.72
Heavy Duty GI pipe(dia 40mm) for railing @
10 two row in each side rm 48.00 398.00 19104.00
Total Cost: Err:509
276 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
277 of 313
QUANTITY ESTIMATE OF 2m SPANNED SLAB CULVERT(per no.)
###
H1= 3 Span= 2 `
D= 1.55
D1= 3 L= 3.3 T= 0.25
Lw= 6 Bw1 1.8 T1= 0.2
B= 1.875 Bw2 0.96 T2= 0.12
F1= 5.16 A 0.65
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
9 Form Work Sqm
Slab Sqm 1 6.05 Perimeter= 6.05 36.60
Side of Slab transverse to road Sqm 2 6.05 0.25 3.03
Side of Slab along the road Sqm 2 3.3 0.75 4.95
Abutment Cap Sqm 2 6.05 0.5 6.05
Total 50.63 #REF! #REF!
10 Back filling
a Main Abutment Cum 2 6.05 2.275 1.45 15.96595
b Wing Walls Cum 4 6 1.8 1.45 25.056
Total 41.02 #REF! #REF!
11
110mm Dia. HDPE Pipe at weep holes
Abutments Rm 2 10.5 21
Wingwall Rm 4 28.6 114.4
Total 135.40 #REF! #REF!
278 of 313
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
1 Earthwork in Foundation
Excavation in Hard soil Cum
a Main Abutment Cum 2 6.05 2.9 1.45 79.134
b Wing Walls Cum 4 8 2.4 1.45 111.36
c Cutoff Wall Cum 2 12.8432 0.3 1 7.71
c Bed
under slab Cum 1 6.05 4.4 0.5 13.31
U/s and d/s under slab Cum 2 10.4216 6.88 0.5 71.70
Total 283.21 #REF! #REF!
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
9 Form Work Sqm
Slab Sqm 1 6.05 Perimeter= 6.05 36.60
Side of Slab transverse to road Sqm 2 6.05 0.42 5.08
Side of Slab along the road Sqm 2 6.54 0.92 12.03
Abutment Cap Sqm 2 6.05 0.84 10.16
Total 63.88 #REF! #REF!
10 Back filling
a Main Abutment Cum 2 6.05 2.9 1.45 20.3522
b Wing Walls Cum 4 8 2.4 1.45 44.544
Total 64.90 #REF! #REF!
110mm Dia. HDPE Pipe at weep
11
holes
Abutments Rm 2 16.5 33
Wingwall Rm 4 39 156
Total 189.00 #REF! #REF!
Government of Nepal
Ministry of Federal Affairs & Local Development
Earthquake Emergency Assistance Project
Central Level Project Implementation Unit
(CLPIU)
Ekantakuna,Jawalakhel,Lalitpur
7 Supply of machine made gabion boxes for u/s and d/s protections cum 0.00 Err:509 Err:509
Total Err:509
Government of Nepal
Ministry of Federal Affairs & Local Development
Earthquake Emergency Assistance Project
Central Level Project Implementation Unit
(CLPIU)
Ekantakuna,Jawalakhel,Lalitpur
#REF!
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity Unit
No. Unit
Earthwork in excavation
1 in foundation 1 8 6.26 0.45 22.54 - cu.m.
7 Supply of machine made gabion boxes for u/s and d/s protections cum 0.00 Err:509 Err:509
Total Err:509
Government of Nepal
Ministry of Federal Affairs & Local Development
Earthquake Emergency Assistance Project
Central Level Project Implementation Unit
(CLPIU)
Ekantakuna,Jawalakhel,Lalitpur
#REF!
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity Unit
No. Unit
Earthwork in excavation
1 in foundation 1 15 6.26 0.45 42.26 - cu.m.
TOTAL QUANTITY ESTIMATE FOR CASCADE INLET WORK (TYPE III)IN CULVERTS
Name of Road : Kuntabesi-Nayagaun-Nagarkot Road
Total
Length Breadth Height Quantity Total
S.N Descriptions of works No No of protection Unit Remarks
(m) (m) (m) per unit Quantity
work
1 Earthwork in excavation
B=1.5*D+
Chute 1 7.00 2.00 0.60 8.40 Cu.m 2*0.3
Apron: Gabion Matress 1 3.00 2.00 0.50 3.00 Cu.m
Cut off wall 1 2.00 0.50 1.00 1.00 Cu.m
Total= 12.40 #REF! #REF! Cu.m
2 Stone Masonry work in 1:4 C/S mortar
Chute Base 1 7.00 2.00 0.40 5.60 Cu.m
Chute side wall 2 10.00 0.30 1.00 6.00
n 1 2.00 0.50 0.60 0.60 Cu.m
side wall 2 2.00 0.30 0.60 0.72 Cu.m
Steps 15 2.00 0.04 0.04 0.05 Cu.m
Total= 12.97 #REF! #REF! Cu.m
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
1 Earthwork in Foundation
Excavation in Hard soil Cum
a Main Abutment Cum 2 6.05 3.2125 1.45 97.5335625
b Wing Walls Cum 4 9 2.7 1.45 140.94
c Cutoff Wall Cum 2 14.8236 0.3 1 8.89
c Bed
under slab Cum 1 6.05 5.4 0.5 16.34
U/s and d/s under slab Cum 2 11.9118 7.74 0.5 92.20
Total 355.90 #REF! #REF!
287 of 313
QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT(per no.)
###
H1= 4.5 Span= 6 `
D= 3.05
D1= 4.5 L= 8.4 T= 0.46
Lw= 9 Bw1 2.7 T1= 0.2
B= 2.8125 Bw2 0.96 T2= 0.2
F1= 7.74 A 0.77
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no Total no
Quantity
8 Granular Filter Material Filling
Abutment Cum 2 6.05 0.25 1.5 4.54
Wing wall Cum 4 9 0.25 1.05 9.45
Total 13.99 #REF! #REF!
288 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
289 of 313
TOTAL QUANTITY ESTIMATE OF 2m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 1.5 Span= 2 Total Width of road = 6.05
D= 0.05
D1= 1.5 L= 3.3 T= 0.25
Lw= 3 Bw1 0.9 T1= 0.2
B= 0.9375 Bw2 0.96 T2= 0.12
F1= 2.58 A 0.65
#REF!
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Total 509.01 ### #REF!
7 2mm thick Tartfelt Sheet Sqm 2 6.05 0.45 5.45
Total 5.45 ### #REF!
8
Granular Filter Material Filling
Abutment Cum 2 6.05 0.25 1.5 4.54
Wing wall Cum 4 3 0.25 1.05 3.15
Total 7.69 ### #REF!
290 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
291 of 313
TOTAL QUANTITY ESTIMATE OF 3m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 1.5 Span= 3 Total Width of road = 6.05
D= 0.05
D1= 1.5 L= 4.54 T= 0.3
Lw= 3 Bw1 0.9 T1= 0.2
B= 0.9375 Bw2 0.96 T2= 0.15
F1= 2.58 A 0.77
#REF!
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
6 Reinforcement Steel Fe500 Length kg/m
292 of 313
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
Pushpalal (Midhill) Highway Project (Western Sector)
9. Filter Material behind wall structure 1 10.00 0.25 1.80 4.50 #REF! #REF! m³
293 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2 Stone work in 1:4 C/S mortar Cu.m #REF! Err:509 Err:509 cum
3 Gabion work in scouring protection matress Cu.m #REF! Err:509 Err:509 cum
Total cost Err:509
294 of 313
Rural Rehabilitation Reconstruction Sector Development Program -2
Kathmandu District
ABSTRACT OF COST
295 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
296 of 313
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
297 of 313
Page 298 of 313
Government of Nepal
Central Level Project Implementation Unit (CLPIU)
District Level Project Implementation Unit (DLPIU)
DHANKUTA
Government of Nepal
Central Level Project Implementation Unit (CLPIU)
District Level Project Implementation Unit (DLPIU)
DHANKUTA
Item no.
Clause no. 70-6.7 b
Work: Brush layering work: including preparation of terraces of 30 - 40 cm wide and laying live cuttings of
selected species along the terrace @ 5 cm c/c with 2/3 of cuttings in to terrace and leaving one bud and
Analyzed for:up1mto 1/3 of the cuttings sticking beyond the terrace edge
( Cutting can be of assuro,simali etc of 45 - 60 m length)
Norms no. Description Unit Input Rate NRs. Amount NRs. Tools/Equipment
A. Labors Pick and shovel
Skilled Md
Unskilled Md 0.17 640.00 108.80
Sub-total A. 108.80
70-6.7 b B.Materials
DoLIDAR Hardwood cuttings no. 21.00 0.56 11.77
Sub-total B. 11.77
Grand-Total A+B 120.57
Total rateincluding equipents(3% of
labour cost) 123.83
Description of item: Carrying out the routine maintenance of the existing road during Defect Liability Period.
unit: 3 km/day
Rate in Amount
S.No. Description Unit Quantity Remarks
NRs in NRs
1.00 Labour
Unskilled md 1.00 640.00 640.00
Sub Total Labor 640.00 640.00
2.00 Tools / Equipment
12% of Total
,@ 3% of labour 76.80
Labour cost
Sub Total Tool/Equipment 76.80
Sub Total (Labor+Tool/Equipment) -I 716.80
Contractor Over head 15% of I 107.52
Total rate per m3 824.32
NB: As per DOR Maintenance Norms Say NRs. per 3km/da X = 824.32
NRs. Per1km/Day Y=X/3= 274.77
Say NRs. per 1km/moZ=Y*30= 8243.20
unit: 2 km/day
Rate in Amount
S.No. Description Unit Quantity Remarks
NRs in NRs
1.00 Labour
Unskilled md 1.00 640.00 640.00
Sub Total Labor 640.00 640.00
2.00 Tools / Equipment
12% of Total
,@ 3% of labour 76.80
Labour cost
Sub Total Tool/Equipment 76.80
Sub Total (Labor+Tool/Equipment) -I 716.80
Contractor Over head 15% of I 107.52
Total rate per m3 824.32
NB: As per DOR Maintenance Norms Say NRs. per 2km/da X = 824.32
NRs. Per1km/Day Y=X/2= 412.16
Say NRs. per 1km/moZ=Y*30= 12364.80
303 of 313
Government of Nepal
Central Level Project Implementation Unit (CLPIU)
District Level Project Implementation Unit (DLPIU)
DHANKUTA
RATE ANALYSIS OF ROADWORK ITEMS
Name of Project :Bhedetar-Mahabharat-Ahale-Barahkshetra(Dhankuta Ch. 0+000 to 10+046)
Supply machine made(mechanically selvaged double twist wire mesh) fabrication of gabion of
1 Unit : 1 cum
different size including filling Gabion crates in line and level with stone all complete
Total
Total
a Gravel size:5-40mm up
m3 Diesel Ltr 0.7456 68.58407 Bull Dozer 100-150 HP Hr 0.0115 1800.00
Total
Total
a Gravel size:40-70mm up
m3 Diesel Ltr 2.2596 68.58407 Bull Dozer 100-150 HP Hr 0.0348 1800.00
Total
a Gravel size:70-100mm up
m3 Diesel Ltr 5.0841 68.58407 Bull Dozer 100-150 HP Hr 0.0783 1800.00
Total
Norms for collection of materials by labour
Total
Amount
89.16
37.20
1.86
128.22
54.41
33.36
0.83
88.60
71.84
44.04
1.10
116.97
66.72
1.67
177.19
217.61
200.16
6.67
424.44
489.63
450.36
15.01
955.00
collection of materials by labour
Amount
659.2
Government of Nepal
Central Level Project Implementation Unit (CLPIU)
District Level Project Implementation Unit (DLPIU)
DHANKUTA
1.a. Excavated earth work (Soil Material) Average Speed of the Vehicle in E/W Road = 10 km/hr In Black Top = 25 km/hr Unit :1 cu.m
Unskilled labour skilled labour Diesel Truck
Description Cost Remark
unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity Rate Amount
First one km md 0.4 640.00 256 ltr 0.40 76.00 30.40 hr 0.14 550.00 78.38 364.78
First two km md 0.4 640.00 256 ltr 0.80 76.00 60.80 hr 0.17 550.00 94.88 411.68 46.90
First three km md 0.4 640.00 256 ltr 1.20 76.00 91.20 hr 0.20 550.00 111.38 458.58 46.90
First four km md 0.4 640.00 256 ltr 1.60 76.00 121.60 hr 0.23 550.00 127.88 505.48 46.90
First five km md 0.4 640.00 256 ltr 2.00 76.00 152.00 hr 0.26 550.00 144.38 552.38 46.90
RA No. : 31
Description of item : Haulage of excessive cut materials using Machinary beyond 1 km length
Sub - total (A) 0.00 Sub - total (B) 0.00 Sub total (c) 46.90
NB: Transportation Cost As per clause 8.04.03 1(a) as shown in transportation rate chart for additional km/cum Direct Cost (A+B+C) = NRs. 46.90
Contractor's Overhead @ 15 % of (A+B+C) = NRs. 7.04
The rate has been calculated by deducting total transportation cost from origin up to two km and up to 1km respectively , to find out the haulage cost
beyond 1 km. Total Item Rate = NRs. 53.94
Say NRs. per cu.m. 54.00
Labour
Earthen Km Gravel Km Blacktop Km Total Travel Fuel Fuel, Truck Load / Truck, Total Transportation
Material Type Unit Remarks
(10 kmph) (20 Kmph) (40 kmph) Time (T) Coef. Ltr. Coef. Unload Time Hr. Cost per unit
Unskilled Skilled
4) Boulder, Cobbles, quarry stone m3 5.00 0.50 0.50 0.00 2.70 1.35 0.21 0.75 0.26 556.96 Quarrysite at chainage 3+000
5)Dressed Stone m3 5.00 0.50 0.60 0.00 2.60 1.30 0.20 0.75 0.25 610.65 Quarrysite at chainage 3+000
6)Bricks 1000 nos 29.00 100.00 7.90 0.60 0.00 4.00 31.60 0.31 0.75 2.68 4026.08 Morang
7)Cement t 29.00 100.00 7.90 0.40 0.00 1.50 11.85 0.12 0.75 1.04 1639.62 Morang
8)Reinforcement Steel and gabion wire t 0.00 75.00 3.75 0.60 0.00 1.50 5.63 0.12 0.75 0.54 1066.78 Morang
gabion wire t 29.00 100.00 7.90 0.60 0.00 1.50 11.85 0.12 0.75 1.04 1767.62 Morang
9) Bitumen 1000 lit 29.00 100.00 7.90 1.00 0.00 2.60 20.54 0.20 0.75 1.73 3000.21 Morang
10) GI, CI, Pipe and fittings t 29.00 100.00 7.90 1.00 0.00 1.50 11.85 0.12 0.75 1.04 2023.62 Morang
11)Timber for temporary works m3 29.00 100.00 7.90 0.30 0.00 1.40 11.06 0.11 0.75 0.95 1473.86 Morang
12) Fabricated Structural Timber m3 29.00 100.00 7.90 0.50 0.00 2.00 15.80 0.15 1.25 1.37 2158.50 Morang
13) Fabricated Structural Steel t 29.00 100.00 7.90 4.00 0.40 1.50 11.85 0.12 1.25 1.10 4336.62 Morang
14)RCC Precast Element t 29.00 100.00 7.90 1.00 0.00 1.50 11.85 0.12 0.75 1.04 2023.62 Morang
15)Equiptment & accessoriesetc. requiring
truck 29.00 100.00 7.90 20.00 4.00 13.00 102.70 1.00 1.75 9.65 28751.08 Morang
careful handling
16) RCC hume pipe Morang
a) 900mm dia m 29.00 100.00 7.90 0.40 0.04 0.78 6.16 0.06 1.75 0.58 1033.06 Morang
b) 450 mm dia m 29.00 100.00 7.90 0.18 0.01 0.51 4.03 0.05 1.75 0.48 665.90 Morang
c) 600mm dia m 29.00 100.00 7.90 0.25 0.02 0.60 4.74 0.05 1.75 0.48 768.46 Morang
17) Water 1000 lit 29.00 100.00 7.90 0.10 0.01 1.50 11.85 0.12 0.50 1.01 1440.12 Morang
18) Petrol / Diesel / Kerosene 1000 lit 29.00 100.00 7.90 0.10 0.01 1.50 11.85 0.12 0.50 1.01 1440.12 Morang
Fuel =Total Travel Time (T)*Fuel Coefficient
Truck, Hr.=Truck Coefficient *(Total Travel Time (T)+Load / Unload Time)
Total Transportation Cost per unit = Labour, md. * Labour Rate + Fuel, Ltr.* Fuel Rate + Truck, Hr.* Truck Rate
District rate : Materials (Dhankuta/Morang)
District Collection Royalty ( Transportation Total Rate
S.N. Description Unit Remarks
Rate (D) Rate (C) R ) Rate ( Tp ) ( C + R + Tp)
1 Screened Gravel
1.a (40-70mm ) m3 1680.00 424.44 502.01 926.45
1.b ( 20- 40 mm) m 3
1900.00 116.97 502.01 618.98
1.c ( 10 - 20 mm) m3 2100.00 177.19 502.01 679.20
1.d ( 5 - 10mm) m3 2150.00 177.19 502.01 679.20
2 Crushed Aggregates
2.a ( 20-40 mm) m3 2000.00 116.97 502.01 618.98
2.b ( 10-20 mm) m3 2600.00 177.19 502.01 679.20
2.c (6-10 mm) m3 3000.00 177.19 502.01 679.20
2.d ( <6 mm) m3 3000.00 177.19 502.01 679.20
Granular sub base material m3 3000.00 88.60 502.01 590.61
Base course material m3 3000.00 116.97 502.01 618.98
3 Sand m3 1500.00 128.22 339.67 467.89
4 Brick nos. 1700.00 4.03 1704.03
5 Wood .
5.a wood Local m3 19080.00 1473.86 20553.86
5.b Sal wood m3 31800.00 1473.86 33273.86
6 Stone dust m 3
31000.00 31000.00
machine made wire mesh for m2 includin
205.50 6.19 239.21
gabion gVAT
7 Rubble m3 1900.00 659.20 556.96 1216.16
8 Cement mt. 15000.00 1639.62 16639.62
9 Water lt. 0.50 0.50
10 Bitumen 80/100 lit. 85.00 3.00 88.00
11 Reinforcement (Tor Steel)
11.a 8 mm dia mt. 73950.00 1066.78 75016.78
11.b 10 ,12,16,20,25 mm dia mt. 70950.00 1066.78 72016.78
11.c 28,32 mm dia mt. 73950.00 1066.78 75016.78
11.d 4.75 - 7 mm dia mt. 73250.00 1066.78 74316.78
12 Binding Wire mt. 83520.00 1.77 83521.77
13 G.I Wire heavy coated
13.a 8 gauge kg 80.00 1.77 81.77
13.b 10 gauge kg 80.00 1.77 81.77
13.c 12 gauge kg 81.00 1.77 82.77
14 RCC Hume Pipes(Np3)
300mm diameter m 2767.00 665.90 3432.90
14.a 450mm diameter m 3969.00 665.90 4634.90
14.b 600 mm diameter m 5192.00 768.46 5960.46
14.c 900 mm diameter m 8316.00 1033.06 9349.06
15 Jute kg 115.00 115.00
16 Nails kg 81.00 81.00
17 Ply wood
17.a plywood 3 mm m2 310.00 6.48 316.48
17.b plywood 4 mm m2 326.09 8.63 334.72
17.c plywood 6 mm m2 597.83 12.95 610.78
17.d plywood 8 mm m2 706.52 17.27 723.79
17.e plywood 12 mm m2 891.30 25.90 917.20