INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE03 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 02/08/2017 35-381 002 2.00 20.960 2.00 20.960 0.00 0.000 0.00 0.000 0.00 0.000
2 02/08/2017 35-381 003 4.00 795.680 4.00 795.680 0.00 0.000 0.00 0.000 0.00 0.000
3 02/08/2017 35-381 004 6.00 95.720 6.00 95.720 0.00 0.000 0.00 0.000 0.00 0.000
4 02/08/2017 35-381 005 3.00 60.801 3.00 60.801 0.00 0.000 0.00 0.000 0.00 0.000
5 02/08/2017 35-381 006 2.00 349.640 2.00 349.640 0.00 0.000 0.00 0.000 0.00 0.000
6 02/08/2017 35-381 008 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
7 02/08/2017 35-381 009 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
8 02/08/2017 35-381 014 1.00 165.400 1.00 165.400 0.00 0.000 0.00 0.000 0.00 0.000
9 02/08/2017 35-381 015 2.00 583.730 2.00 583.730 0.00 0.000 0.00 0.000 0.00 0.000
10 02/08/2017 35-381 016 2.00 602.220 2.00 602.220 0.00 0.000 0.00 0.000 0.00 0.000
11 02/08/2017 35-381 019 1.00 15.800 1.00 15.800 0.00 0.000 0.00 0.000 0.00 0.000
12 02/08/2017 35-381 020 1.00 170.595 1.00 170.595 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3200.806 3200.806 0.000 0.000 0.000
1 02/08/2017 35-821 001 1.00 461.140 1.00 461.140 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 461.140 461.140 0.000 0.000 0.000
Day Total in MT 3.662 3.662 0.000 0.000 0.000
Total for the Month in MT 27.182 27.182 0.000 0.000 0.000
Cumulative Total in MT 1309.379 1309.379 656.342 257.002 0.000
Page 3 of 12
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 04 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 03/08/2017 35-381 005 12.00 243.205 12.00 243.205 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-381 007 6.00 112.930 6.00 112.930 0.00 0.000 0.00 0.000 0.00
Sub Total 356.135 356.135 0.000 0.000
1 03/08/2017 35-382 014 1.00 12.095 1.00 12.095 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-382 017 1.00 164.825 1.00 164.825 0.00 0.000 0.00 0.000 0.00
3 03/08/2017 35-382 022 3.00 47.715 3.00 47.715 0.00 0.000 0.00 0.000 0.00
4 03/08/2017 35-382 024 1.00 170.005 1.00 170.005 0.00 0.000 0.00 0.000 0.00
5 03/08/2017 35-382 025 1.00 294.460 1.00 294.460 0.00 0.000 0.00 0.000 0.00
6 03/08/2017 35-382 026 1.00 264.410 1.00 264.410 0.00 0.000 0.00 0.000 0.00
Sub Total 953.510 953.510 0.000 0.000
1 03/08/2017 35-821 005 1.00 427.700 1.00 427.700 0.00 0.000 0.00 0.000 0.00
Sub Total 427.700 427.700 0.000 0.000
Day Total in MT 1.737 1.737 0.000 0.000
Total for the Month in MT 28.919 28.919 0.000 0.000
Cumulative Total in MT 1311.116 1311.116 656.342 257.002
Page 4 of 12
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Page 5 of 12
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 05 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 04/08/2017 35-382 001 1.00 1348.480 1.00 1348.480 0.00 0.000 0.00 0.000 0.00
2 04/08/2017 35-382 012 1.00 981.420 1.00 981.420 0.00 0.000 0.00 0.000 0.00
Sub Total 2329.900 2329.900 0.000 0.000
Day Total in MT 2.330 2.330 0.000 0.000
Total for the Month in MT 31.249 31.249 0.000 0.000
Cumulative Total in MT 1313.446 1313.446 656.342 257.002
Page 6 of 12
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
Page 7 of 12
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 07 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 05/08/2017 35-382 031 1.00 2015.440 1.00 2015.440 0.00 0.000 0.00 0.000 0.00
Sub Total 2015.440 2015.440 0.000 0.000
Day Total in MT 2.015 2.015 0.000 0.000
Total for the Month in MT 33.265 33.265 0.000 0.000
Cumulative Total in MT 1315.462 1315.462 656.342 257.002
Page 8 of 12
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
Page 9 of 12
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 08 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 07/08/2017 35-382 048 1.00 1624.420 1.00 1624.420 0.00 0.000 0.00 0.000 0.00
Sub Total 1624.420 1624.420 0.000 0.000
Day Total in MT 1.624 1.624 0.000 0.000
Total for the Month in MT 34.889 34.889 0.000 0.000
Cumulative Total in MT 1317.086 1317.086 656.342 257.002
Page 10 of 12
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT
NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
Page 11 of 12
INDWeLL CONSTrUCTIONS PVT LIMITeD
APGENCO, STAGE-V, 1 X 800 MW, Dr.NTTPS IBRAHIMPATNAM
DAILY PROGRESS REPORT(SUMMARY)
Report Date: 17-Oct-20
Erected on: 16-Oct-20
1 Staff 20 19 1
2 Foremen 3 3 0
3 Skilled 49 40 9
4 Semi Skilled 18 16 2
5 Un skilled 8 7 1
6 Operators 10 8 2
Total 108 93 15