INDWeLL CONSTrUCTIONS PrIVATe LIMITeD

Unit # 1x800 MW,Stage-V


Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 02 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 01/08/2017 35-130 003 1.00 12887.646 1.00 12887.646 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 12887.646 12887.646 0.000 0.000 0.000
1 01/08/2017 35-322 079 1.00 1420.460 1.00 1420.460 0.00 0.000 0.00 0.000 0.00 0.000
2 01/08/2017 35-322 093 1.00 477.890 1.00 477.890 0.00 0.000 0.00 0.000 0.00 0.000
3 01/08/2017 35-322 106 2.00 116.110 2.00 116.110 0.00 0.000 0.00 0.000 0.00 0.000
4 01/08/2017 35-322 107 3.00 219.610 3.00 219.610 0.00 0.000 0.00 0.000 0.00 0.000
5 01/08/2017 35-322 114 1.00 154.490 1.00 154.490 0.00 0.000 0.00 0.000 0.00 0.000
6 01/08/2017 35-322 120 1.00 171.380 1.00 171.380 0.00 0.000 0.00 0.000 0.00 0.000
7 01/08/2017 35-322 127 1.00 225.410 1.00 225.410 0.00 0.000 0.00 0.000 0.00 0.000
8 01/08/2017 35-322 141 1.00 100.700 1.00 100.700 0.00 0.000 0.00 0.000 0.00 0.000
9 01/08/2017 35-322 142 1.00 122.430 1.00 122.430 0.00 0.000 0.00 0.000 0.00 0.000
10 01/08/2017 35-322 143 1.00 97.420 1.00 97.420 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3105.900 3105.900 0.000 0.000 0.000
1 01/08/2017 35-452 006 1.00 2769.380 1.00 2769.380 0.00 0.000 0.00 0.000 0.00 0.000
2 01/08/2017 35-452 007 1.00 2049.900 1.00 2049.900 0.00 0.000 0.00 0.000 0.00 0.000
3 01/08/2017 35-452 013 1.00 1297.410 1.00 1297.410 0.00 0.000 0.00 0.000 0.00 0.000
4 01/08/2017 35-452 019 1.00 1409.650 1.00 1409.650 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 7526.340 7526.340 0.000 0.000 0.000
Day Total in MT 23.520 23.520 0.000 0.000 0.000
Total for the Month in MT 23.520 23.520 0.000 0.000 0.000
Cumulative Total in MT 1305.717 1305.717 656.342 257.002 0.000

Page 1 of 14
Wt. in Kgs

Page 2 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE03 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty Wt. in Kgs
1 02/08/2017 35-381 002 2.00 20.960 2.00 20.960 0.00 0.000 0.00 0.000 0.00 0.000
2 02/08/2017 35-381 003 4.00 795.680 4.00 795.680 0.00 0.000 0.00 0.000 0.00 0.000
3 02/08/2017 35-381 004 6.00 95.720 6.00 95.720 0.00 0.000 0.00 0.000 0.00 0.000
4 02/08/2017 35-381 005 3.00 60.801 3.00 60.801 0.00 0.000 0.00 0.000 0.00 0.000
5 02/08/2017 35-381 006 2.00 349.640 2.00 349.640 0.00 0.000 0.00 0.000 0.00 0.000
6 02/08/2017 35-381 008 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
7 02/08/2017 35-381 009 1.00 170.130 1.00 170.130 0.00 0.000 0.00 0.000 0.00 0.000
8 02/08/2017 35-381 014 1.00 165.400 1.00 165.400 0.00 0.000 0.00 0.000 0.00 0.000
9 02/08/2017 35-381 015 2.00 583.730 2.00 583.730 0.00 0.000 0.00 0.000 0.00 0.000
10 02/08/2017 35-381 016 2.00 602.220 2.00 602.220 0.00 0.000 0.00 0.000 0.00 0.000
11 02/08/2017 35-381 019 1.00 15.800 1.00 15.800 0.00 0.000 0.00 0.000 0.00 0.000
12 02/08/2017 35-381 020 1.00 170.595 1.00 170.595 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 3200.806 3200.806 0.000 0.000 0.000
1 02/08/2017 35-821 001 1.00 461.140 1.00 461.140 0.00 0.000 0.00 0.000 0.00 0.000
Sub Total 461.140 461.140 0.000 0.000 0.000
Day Total in MT 3.662 3.662 0.000 0.000 0.000
Total for the Month in MT 27.182 27.182 0.000 0.000 0.000
Cumulative Total in MT 1309.379 1309.379 656.342 257.002 0.000

Page 3 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 04 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 03/08/2017 35-381 005 12.00 243.205 12.00 243.205 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-381 007 6.00 112.930 6.00 112.930 0.00 0.000 0.00 0.000 0.00
Sub Total 356.135 356.135 0.000 0.000
1 03/08/2017 35-382 014 1.00 12.095 1.00 12.095 0.00 0.000 0.00 0.000 0.00
2 03/08/2017 35-382 017 1.00 164.825 1.00 164.825 0.00 0.000 0.00 0.000 0.00
3 03/08/2017 35-382 022 3.00 47.715 3.00 47.715 0.00 0.000 0.00 0.000 0.00
4 03/08/2017 35-382 024 1.00 170.005 1.00 170.005 0.00 0.000 0.00 0.000 0.00
5 03/08/2017 35-382 025 1.00 294.460 1.00 294.460 0.00 0.000 0.00 0.000 0.00
6 03/08/2017 35-382 026 1.00 264.410 1.00 264.410 0.00 0.000 0.00 0.000 0.00
Sub Total 953.510 953.510 0.000 0.000
1 03/08/2017 35-821 005 1.00 427.700 1.00 427.700 0.00 0.000 0.00 0.000 0.00
Sub Total 427.700 427.700 0.000 0.000
Day Total in MT 1.737 1.737 0.000 0.000
Total for the Month in MT 28.919 28.919 0.000 0.000
Cumulative Total in MT 1311.116 1311.116 656.342 257.002

Page 4 of 14
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 5 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 05 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 04/08/2017 35-382 001 1.00 1348.480 1.00 1348.480 0.00 0.000 0.00 0.000 0.00
2 04/08/2017 35-382 012 1.00 981.420 1.00 981.420 0.00 0.000 0.00 0.000 0.00
Sub Total 2329.900 2329.900 0.000 0.000
Day Total in MT 2.330 2.330 0.000 0.000
Total for the Month in MT 31.249 31.249 0.000 0.000
Cumulative Total in MT 1313.446 1313.446 656.342 257.002

Page 6 of 14
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000

Page 7 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 07 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 05/08/2017 35-382 031 1.00 2015.440 1.00 2015.440 0.00 0.000 0.00 0.000 0.00
Sub Total 2015.440 2015.440 0.000 0.000
Day Total in MT 2.015 2.015 0.000 0.000
Total for the Month in MT 33.265 33.265 0.000 0.000
Cumulative Total in MT 1315.462 1315.462 656.342 257.002

Page 8 of 14
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000

Page 9 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 08 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 07/08/2017 35-382 048 1.00 1624.420 1.00 1624.420 0.00 0.000 0.00 0.000 0.00
Sub Total 1624.420 1624.420 0.000 0.000
Day Total in MT 1.624 1.624 0.000 0.000
Total for the Month in MT 34.889 34.889 0.000 0.000
Cumulative Total in MT 1317.086 1317.086 656.342 257.002

Page 10 of 14
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000

Page 11 of 14
INDWeLL CONSTrUCTIONS PrIVATe LIMITeD
Unit # 1x800 MW,Stage-V
Dr. Narla Tatarao Thermal Power Station,Vijayawada, Andhra Pradesh,
DAILY PROGRESS REPORT
DATE: 09 Aug 2017
Pre-Assembly Plcmnt in Position Alignment Weld/bolt/fix NDT/SR/HT
Srl Date ON PgmaNo DuNo
Qty Wt. in Kgs Qty Wt. in Kgs. Qty Wt. in Kgs Qty Wt. in Kgs Qty
1 08/08/2017 35-111 002 1.00 7760.224 1.00 7760.224 0.00 0.000 0.00 0.000 0.00
Sub Total 7760.224 7760.224 0.000 0.000
1 08/08/2017 35-121 002 1.00 7760.224 1.00 7760.224 0.00 0.000 0.00 0.000 0.00
Sub Total 7760.224 7760.224 0.000 0.000
1 08/08/2017 35-130 010 1.00 12887.646 1.00 12887.646 0.00 0.000 0.00 0.000 0.00
Sub Total 12887.646 12887.646 0.000 0.000
1 08/08/2017 35-140 031 1.00 5193.460 1.00 5193.460 0.00 0.000 0.00 0.000 0.00
Sub Total 5193.460 5193.460 0.000 0.000
1 08/08/2017 35-150 030 1.00 5193.460 1.00 5193.460 0.00 0.000 0.00 0.000 0.00
Sub Total 5193.460 5193.460 0.000 0.000
1 08/08/2017 35-512 004 1.00 3288.350 1.00 3288.350 0.00 0.000 0.00 0.000 0.00
2 08/08/2017 35-512 005 1.00 3288.350 1.00 3288.350 0.00 0.000 0.00 0.000 0.00
Sub Total 6576.700 6576.700 0.000 0.000
Day Total in MT 45.372 45.372 0.000 0.000
Total for the Month in MT 80.261 80.261 0.000 0.000
Cumulative Total in MT 1362.458 1362.458 656.342 257.002

Page 12 of 14
ONSTrUCTIONS PrIVATe LIMITeD
it # 1x800 MW,Stage-V
l Power Station,Vijayawada, Andhra Pradesh,
LY PROGRESS REPORT

NDT/SR/HT
Wt. in Kgs
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Page 13 of 14
INDWeLL CONSTrUCTIONS PVT LIMITeD
APGENCO, STAGE-V, 1 X 800 MW, Dr.NTTPS IBRAHIMPATNAM
DAILY PROGRESS REPORT(SUMMARY)
Report Date: 17-Oct-20
Erected on: 16-Oct-20

WEIGHT AS THS MONTH


WEIGHT
PER CUMMULATIVE
Sl.No CATEGORY UPTO LAST
CONTRACT IN MT
MONTH MONTH
(MT) DAY WISE
WISE

1 Structures 12673.71 1282.197 45.372 80.261 1362.458


2 Pressure Parts 11635.47 0 0 0.000
3 Non-Pressure Parts 4973.2 0 0 0.000
4 Rotating Equipments 1992.64 0 0 0.000
Rotating Machine Handling
5 45.1 0 0 0.000
Equipments
Grand Total 31320.12 1282.197 45.372 80.261 1362.458
Note:
1 Proper road approach is required in site for marching hydra
2 Area Is not avialble for pre assembly
3 Area not provided to tie gai rope for column alignment
2 Erection Progress affected due to heavy rain on 20.07.2017 from 6:00 PM to 7:30 PM

MANPOWER REPORT AS ON 09.08.2017

Sl.No Designation Total Workmen Present Absent

1 Staff 26 20 6
2 Foremen 3 3 0
3 Skilled 68 45 23
4 Semi Skilled 24 16 8
5 Un skilled 10 8 2
6 Operators 10 9 1
Total 141 101 40