Total Cost: Summar Y (Alegria NGCP)
Total Cost: Summar Y (Alegria NGCP)
Y NGCP)
LABOR 183595.55
EQPT RENTAL (20 days rental of zoomlion rig) 933333.4
MATERIAL
-fuel 97280
-direct materials and others 136454.05
MOBILIZATION/DEMOBILIZATION 590000
TOTAL COST ₱1,940,663.00
PILES
pc
3 s 21 m depth 63
pc
s m depth 0
63 lm
COST PER LM ₱30,804.17
SUMMARY (BALET)
LABOR 233991.64
(45 days rental of zoomlion rig and
EQPT RENTAL
1 month rental of mobile crane) 2750000.15
MATERIAL
-fuel 103680
-direct materials and others 175802
MOBILIZATION/DEMOBILIZATION 400000
LABOR COST FOR REBAR FABRICATION 619365
TOTAL COST ₱4,282,838.79
PILES
pc
6 s 40 m depth 240
4 pc 40
s m depth 160
400 lm
COST PER LM ₱10,707.10
LABOR 986,243.43
MATERIAL
-fuel 18,900.00
-accessories 137,323.40
-consumables 262,645.00
-tools 286,691.00
-others 0
MOBILIZATION/DEMOBILIZATION 232,000.00
PILES
2 pcs 40 m depth 80
320