EPC - HAM Progress As On 30.09.2020
EPC - HAM Progress As On 30.09.2020
Job No.NH-753L-MAH-2016-17-1099
dt.27/01/2017
Job No.NH-753L-MAH-2016-17-1081
dt.24/01/2017
Job No.NH-752G-MAH-2018-19-09
dt.09/03/2019
Scheduled
Sr. Name of Project NH No. Length (km) TPC (Rs. Cr.) Contractor / Concessionaire Appointed completion Date of PCOD Date of COD
No. date date / EOT
Approved
Job No.NH-752G-MAH-2018-19-09
dt.09/03/2019
Rehabilitation and Up-gradation of
Nandurbar (Kolde) Prakasha-
Sahada- Khetia (NH 752G, SH4
& SH5) State Highway from
existing km 50+260 of SH 5,
(Kolde)To km 99+220 (Khetia) 26.07.2019
3 [Design km 50+200 to km 752 G 48.6 298.11 M/s. H.G.Infra Engineering Ltd. 27.07.2017 /
98+800] to Two lane with paved 31.12.2020
shoulders/4 lane in the state of
Maharashtra by Two-Laing/Four
Laing with Paved shoulder] on
Engineering, Procurement,
Construction (“EPC”) basis.