On-going EPC & HAM Projects - Division-wise status - Progress as on month ending September 2020

NH Division MSRDC (Ltd.) Camp Office Nashik.

Progress details [As


Cumulative Length completed (km) [As per MPR] per MPR of Authority's Engineer] Hindrances NSV

Revised Likely date of


Sr. completion Total
No. Name of project Job No. date as per completion of
the project
expenditure
approved EOT Exenditure incluidng LA, Total length of
Sub-grade GSB DLC DBM / BC PQC Total (km) PQC + Length of 2L / 2L+PS length Length of 4-lane length completed Physical Financial against contract utility, hindrances as on Length of NSV done
DBM/BC completed (km) (km) progress % Progress % price(Cr.) contingency, 30.04.20 (km)
agency charges
etc (Cr.)

PQC length PQC length


1 2 3 4 5 6 7 8 9 10 11 BC length (km) (km) BC length (km) (km) 16 17 18 19 20 21

Rehabilitation and Up-gradation of 2.45 (Forest Length)


Pahur-Jamner- Bodwad-Muktainagar- + 2.128 Ha. Private
Barhanpur Road NH-753L two lane with NH-753(L) MAH- land required to be
2016-17-
1 paved shoulders. 1099,Dt.27.01.20
31.12.2020 31.12.2020 32.298 31.298 31.14 0 30.805 30.805 0 30.805 0 0 68.82 61.06 95.59 105.36 aquired for 0
Section - I Km. 0/0 to 44/760 17 additional width for
toll plaza outside
ROW.

Rehabilitation and Upgradation of " Pahur 1.8 Ha. Private land


- Jamner - Bodhwad- Muktainagar - NH- required to be
753L_MAH_2016_ aquired for
2 Barhanpur road, NH- 753L Two lane with 17_1081 31.03.2020 30.09.2020 33.385 33.385 33.385 0 33.385 33.385 0 31.155 0 2.23 100 92.74 133.48 150.71 additional width for 0
paved shoulder. Section - II Km 44/760 Dt.24/01/2017 toll plaza outside
Km. 78/145. ROW.

Rehabilitation & Up-gradation of Sakari –


Pimpalner - Satana – Deola – Chandwad–
Manmad – Yewala - Kopargaon upto 0.300 Km
Shirdi Road (NH- 752G) to Two LA for Additional
3 NH-752G-MAH- 14.07.2021 14.07.2021 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 - width required for 0
Lanes /Four lane with paved 2018-19-08 Toll Plaza outside
shoulder in the Stateof Maharashtra. ROW .
Section - Chandwad - Manmad
km.104+600 to 128+650

Rehabilitation and Up-gradation of


Nandurbar (Kolde) Prakasha- Sahada-
Khetia (NH 752G, SH4 & SH5) State
Highway from existing km 50+260 of SH
NH-752G-MAH- 7.1 KM Hindrance &
4 5, (Kolde)To km 99+220 (Khetia) [Design 2016-17-1138, dt- 31.12.2020 31.03.2021 42.130 41.940 41.42 0 40.08 40.08 0 34.66 0 5.42 70.68 69.14 206.1 212.906 Land Acquisition in 0
km 50+200 to km 98+800] to Two lane 24.01.2017 pending
with paved shoulders/4 lane in the state of
Maharashtra by Two-Laing/Four Laing
with Paved shoulder] on Engineering,
Procurement, Construction (“EPC”) basis.
EPC - HAM - works - Status of progress of project facilities and structure works
Major junctions
Truck lay-byes (Nos.)
Major bridges (Nos.) Minor bridges (Nos.) VUPs (Nos.) ROB (Nos.) Crash barriers (m) Toll plazas (Nos.) Bypasses (Nos.) Bus-bays (Nos.) Road safety audit (km) NSV survey (km)
(Nos.) [With NH, SH &
Sr.
Name of project MDR]
No.
Completed Total Total Total Total Completed Total Completed Total Completed Total Completed Total Completed Total Total Completed Total Completed Total
Total as per upto completed as Total as per Completed completed as Total as per Completed completed as Total as per Completed completed Total as upto completed Total as upto completed as Total as per upto completed as Total as upto complete Total as upto completed Total as Completed completed as Total as per upto completed as Total as per upto completed as
scope scope upto 31.03.20 scope upto 31.03.20 scope upto 31.03.20 per scope per scope scope per scope d as on per scope per scope upto 31.03.20 scope scope
31.03.20 on date on date on date as on date 31.03.20 as on date 31.03.20 on date 31.03.20 on date 31.03.20 date 31.03.20 as on date on date 31.03.20 on date 31.03.20 on date

Rehabilitation and Up-gradation of


Pahur-Jamner- Bodwad-Muktainagar-
Barhanpur Road NH-753L two lane
with paved shoulders.
1 Section - I Km. 0/0 to 44/760
2 0 0 7 2 3 0 0 0 0 0 0 2860 0 0 1 0 0 0 0 0 4 0 0 12 0 0 5 0 0 44.76 0 0 44.76 0 0

Job No.NH-753L-MAH-2016-17-1099
dt.27/01/2017

Rehabilitation and Upgradation of "


Pahur - Jamner - Bodhwad-
Muktainagar - Barhanpur road, NH-
753L Two lane with paved shoulder.
2 Section - II Km 44/760 Km. 78/145.
0 0 0 9 9 9 0 0 0 0 0 0 1000 300 950 1 0 0 Nil Nil Nil 4 4 4 12 9 12 4 0 4 33.385 0 0 33.385 0 0

Job No.NH-753L-MAH-2016-17-1081
dt.24/01/2017

Rehabilitation & Up-gradation of Sakari


– Pimpalner - Satana – Deola –
Chandwad– Manmad – Yewala -
Kopargaon upto Shirdi Road (NH-
752G) to Two Lanes /Four lane with
paved shoulder in the Stateof 5 (widening) As per
3 Maharashtra.
0 0 0 + 1 (retain 0 0 0 0 0 0 0 0 requirem 0 0 1 0 0 0 0 0 0 0 0 6 0 0 4 0 0 24.05 0 0 24.05 0 0
with repair) ents
Section - Chandwad - Manmad
km.104+600 to 128+650

Job No.NH-752G-MAH-2018-19-09
dt.09/03/2019

Rehabilitation and Up-gradation of


Nandurbar (Kolde) Prakasha-
Sahada- Khetia (NH 752G, SH4 &
SH5) State Highway from existing
km 50+260 of SH 5, (Kolde)To km
99+220 (Khetia) [Design km 50+200
4 to km 98+800] to Two lane with
1 0 0 11 9 9 0 0 0 0 0 0 12.14 km 6.17 7.12 1 0 0 Nil 0 0 1 0 0 11 0 0 3 1 0 48.6 0 0 48.6 0 0
paved shoulders/4 lane in the state of
Maharashtra by Two-Laing/Four
Laing with Paved shoulder] on
Engineering, Procurement,
Construction (“EPC”) basis.
Division-wise details of PCOD / COD issued since 1st January 2015 - EPC & HAM Projects

Scheduled
Sr. Name of Project NH No. Length (km) TPC (Rs. Cr.) Contractor / Concessionaire Appointed completion Date of PCOD Date of COD
No. date date / EOT
Approved

Rehabilitation and Up-gradation of


Pahur-Jamner- Bodwad-Muktainagar-
Barhanpur Road NH-753L two lane
SCIW-Gangamai (JV) 31.05.2020
with paved shoulders.
1 753 L 44.760 193.46 01.06.2018 /
Section - I Km. 0/0 to 44/760 Aurangabad 31.12.2020
Job No.NH-753L-MAH-2016-17-
1099 dt.27/01/2017

Rehabilitation and Upgradation of "


Pahur - Jamner - Bodhwad-
Muktainagar - Barhanpur road, NH-
2 753L Two lane with paved shoulder.
753 L 33.385 178.26 M/s.Saraswati Construction Co. 27.07.2017 26.07.2019
/
Section - II Km 44/760 Km. 78/145. Adipur (Kutch) 31.03.2020
Job No.NH-753L-MAH-2016-17-
1081 dt.24/01/2017

Rehabilitation & Up-gradation of


Sakari – Pimpalner - Satana – Deola –
Chandwad– Manmad – Yewala -
Kopargaon upto Shirdi Road (NH-
752G) to Two Lanes /Four lane M/s. Altis Holding Coprporation
3
with paved shoulder in the Stateof
752 G 24.05 168.45 and M/s.V.P.Sethi Constructions 15.01.2020 14.07.2021
Maharashtra. and M/s.Mehra & Company
Section - Chandwad - Manmad (JV) Jalna
km.104+600 to 128+650

Job No.NH-752G-MAH-2018-19-09
dt.09/03/2019
Rehabilitation and Up-gradation of
Nandurbar (Kolde) Prakasha-
Sahada- Khetia (NH 752G, SH4
& SH5) State Highway from
existing km 50+260 of SH 5,
(Kolde)To km 99+220 (Khetia) 26.07.2019
3 [Design km 50+200 to km 752 G 48.6 298.11 M/s. H.G.Infra Engineering Ltd. 27.07.2017 /
98+800] to Two lane with paved 31.12.2020
shoulders/4 lane in the state of
Maharashtra by Two-Laing/Four
Laing with Paved shoulder] on
Engineering, Procurement,
Construction (“EPC”) basis.