W 0200m0 - Control Rod Assembly Throttle Valveactuator PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

GE Power

W 0200 M0
Control rod assembly/throttle valve/actuator

Maintenance work

© GE Jenbacher GmbH & Co OG


Achenseestr. 1-3
A-6200 Jenbach (Austria)
www.gejenbacher.com
W 0200 M0
Control rod assembly/throttle valve/actuator

1 Scope ...........................................................................................................................................................  1
2 Purpose .......................................................................................................................................................  1
3 Maintenance interval ...............................................................................................................................  1
4 Safety information....................................................................................................................................  3
5 Additional information.............................................................................................................................  3
6 Work steps .................................................................................................................................................  3
6.1 Inspecting and relubricating the control rod assembly.........................................................................................  3
6.2 Inspect throttle valve..............................................................................................................................................................  3
6.3 Replacing the actuator..........................................................................................................................................................  3
7 Revision code.............................................................................................................................................  3

The target recipients of this document are:


Customers, distribution partners, service partners, commissioning partners, subsidiaries/branches, Jenbach
location
GE Proprietary Information: CONFIDENTIAL!
The information contained in this document is General Electric Company proprietary information and is
disclosed in confidence. It is the property of GE and shall not be used, disclosed to others or reproduced
without the express written consent of GE. This includes but is not limited to use for the creation, manufacture,
development or derivation of any repairs, modifications, spare parts, designs or configuration changes, or for
obtaining government or regulatory approval to do so. If consent is given for reproduction in whole or in part,
this notice and the notice set forth on each page of this document shall appear in any such reproduction in
whole or in part.
UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY

1 Scope
This Maintenance Instruction (W) applies to the following Jenbacher Gas Engines:
• Type 2 engines
• Type 3 engines
• Type 4 engines (except versions B611, C611, E6XX and version D)

2 Purpose
This Maintenance Instruction (W) describes the maintenance interval.

3 Maintenance interval
Maintenance work Maintenance interval Carried out by *)
⇨ Inspecting and relubricating the control rod 2,000 Oh / 1,000 starts / 6
GE
assembly months
2,000 Oh / 1,000 starts / 6
⇨ Inspect throttle valve GE
months
⇨ Replacing the actuator 30,000 Oh GE

Valid for:
• Type 2: Maintenance schedule A
• Type 3: Maintenance schedule A
• Type 4: Maintenance schedule A

Author(s): Kecht S. Responsible: Madl W. Release date: 31/07/2018


Index: 6 Page No.: 1/4
GE proprietary information: CONFIDENTIAL! Use or disclosure of data contained on this sheet is subject to the restrictions on the cover or on the first page.
W 0200 M0
Control rod assembly/throttle valve/actuator

Maintenance work Maintenance interval Carried out by *)


⇨ Inspecting and relubricating the control rod
2,000 Oh GE
assembly
⇨ Inspect throttle valve 2,000 Oh GE
⇨ Replacing the actuator 30,000 Oh GE

Valid for:
• Type 2: Maintenance schedule B
• Type 3: Maintenance schedule B Maintenance schedule D
• Type 4: Maintenance schedule B Maintenance schedule D

Maintenance work Maintenance interval Carried out by *)


⇨ Inspecting and relubricating the control rod 3,333 Oh / 1,000 starts / 6
GE
assembly months
3,333 Oh / 1,000 starts / 6
⇨ Inspect throttle valve GE
months
⇨ Replacing the actuator 40,000 Oh GE

Valid for:
• Type 2: Maintenance schedule C
• Type 3: Maintenance schedule C

Maintenance work Maintenance interval Carried out by *)


⇨ Inspecting and relubricating the control rod 3,333 Oh / 1,000 starts / 6
GE
assembly months
3,333 Oh / 1,000 starts / 6
⇨ Inspect throttle valve GE
months
⇨ Replacing the actuator 30,000 Oh GE

Valid for:
• Type 4: Maintenance schedule E

*) Carried out by This column defines who carries out the maintenance work.
K This activity is to be carried out by the customer, GE or a company selected and author-
ised by GE to carry out this work.
GE This activity is to be carried out by GE or a company selected by GE authorised to carry
out this work.

Author(s): Kecht S. Responsible: Madl W. Release date: 31/07/2018


Index: 6 Page No.: 2/4
GE proprietary information: CONFIDENTIAL! Use or disclosure of data contained on this sheet is subject to the restrictions on the cover or on the first page.
W 0200 M0
Control rod assembly/throttle valve/actuator

4 Safety information

WARNING
Danger from unauthorised start-up!
Ø Shut down the engine as described in TA 1100-0105.
Ø Secure the engine against unauthorised restarting in accordance with TA 2300-0010.

5 Additional information

Relevant documents:
TA 1100-0105 – Engine shut-down
TA 2300-0005 – Safety instruction

6 Work steps

6.1 Inspecting and relubricating the control rod assembly


This activity is to be carried out by GE or a company selected by GE authorised to carry out this work.

6.2 Inspect throttle valve


This activity is to be carried out by GE or a company selected by GE authorised to carry out this work.

6.3 Replacing the actuator


This activity is to be carried out by GE or a company selected by GE authorised to carry out this work.

7 Revision code
Revision history
Index Date Description / Revision summary Expert
Auditor
6 31.07.2018 Strukturelle Anpassungen / Structural adaptions Raman V.
Anwendungsbereich auf Baureihe 2,3,4 erweitert / Scope Madl W.
extended to type 2,3,4
Standard Peaking Wartungsintervall ergänzt / Standard peaking
maintenance interval added

Author(s): Kecht S. Responsible: Madl W. Release date: 31/07/2018


Index: 6 Page No.: 3/4
GE proprietary information: CONFIDENTIAL! Use or disclosure of data contained on this sheet is subject to the restrictions on the cover or on the first page.
W 0200 M0
Control rod assembly/throttle valve/actuator

Revision history
5 09.01.2014 Verlängertes Wartungsintervall ergänzt / Extended service Bilek
interval supplemented Anderson
4 05.11.2012 Stellgerät tauschen / Actuator replace Bilek
Greuter
3 18.10.2012 neues Gasmischergehäuse Tlnr.656966, 656969, 656967 / New Schartner
gas mixer housing Part no.656966, 656969, 656967 Bilek
ersetzt / replaced Index: g
2 10.06.2010 Anpassung Schutzvermerk/Adjustment classification Schartner
Schartner
1 31.05.2010 Umstellung auf CMS / Change to Content Management System Provin
SprungMarke!!!45035996324072331
ersetzt / replaced Index: d Licht

Author(s): Kecht S. Responsible: Madl W. Release date: 31/07/2018


Index: 6 Page No.: 4/4
GE proprietary information: CONFIDENTIAL! Use or disclosure of data contained on this sheet is subject to the restrictions on the cover or on the first page.

You might also like