Engineering Standard
ESC 240
BALLAST
Version 2.4
Disclaimer
This document was prepared for use on the RailCorp Network only.
RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be
sufficient to ensure safe systems or work or operation. It is the document user’s sole responsibility to ensure that the
copy of the document it is viewing is the current version of the document as in use by RailCorp.
RailCorp accepts no liability whatsoever in relation to the use of this document by any party, and RailCorp excludes
any liability which arises in any manner by the use of this document.
Copyright
The information in this document is protected by Copyright and no part of this document may be reproduced, altered,
stored or transmitted by any person without the prior consent of RailCorp.
Document control
© RailCorp Page 2 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Contents
2 References ...............................................................................................................................4
4 Approved Configurations.......................................................................................................5
6 Damage Limits.......................................................................................................................11
6.2 Strength/Stiffness....................................................................................................................11
7 Repair standards...................................................................................................................11
© RailCorp Page 3 of 11
It is applicable to all RailCorp main line and siding tracks and shall be applied to the
design of new trackwork, track renewal, reconditioning and ballast cleaning.
2 References
2.4 Definitions
Ballast : Ballast is a free draining coarse aggregate or metallurgical slag
used to support railway tracks.
Nominal Size : The designation of an aggregate which gives an indication of the
largest size particle present.
Loading
Materials
© RailCorp Page 4 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
Support Requirements
Performance requirements
4 Approved Configurations
For existing applications, detailed in ESC 200, all ballast shall meet the material and
grading requirements of RailCorp Specification SPC 241.
Ballast Grade
Standard Fine
Sieve
Nominal size (mm)
size
60 50
(mm)
(graded ballast) (graded aggregate)
% passing by mass
63.0 100 –
53.0 85 – 100 100
37.5 50 – 70 70 – 100
26.5 20 – 35 –
19.0 10 – 20 40 – 60
13.2 2 – 10 –
9.50 0–5 20 – 30
4.75 0–2 10 – 20
2.36 – 5 - 10
Table 1 - Ballast grading
© RailCorp Page 5 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
1
Ballast
Formation
Ballast Depth
Main line
CWR and LWR 400 700
Siding
CWR and LWR 400 700
Loose Rail 300 700
Table 2 - Ballast Shoulder width
Ballast Shoulder width is measured from the extreme end of the sleeper, not the visible
end when the track is fully ballasted.
The ballast shoulder should extend horizontally from the sleeper end. It is, however,
acceptable for the ballast shoulder to be profiled in the plane of the sleeper for a normal
ballast shoulder width (nominally 400mm) to suit ballast regulators. Any extended
shoulders, such as on bridges, should be horizontal.
© RailCorp Page 6 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
Design ballast shoulder width is one factor that contributes to overall track lateral stability.
Additional ballast shoulder width above the minimum and a ballast windrow up to rail
height outside the sleeper may be necessary in areas of poor track lateral stability to
provide adequate resistance to track buckling on sharp curves where design radius is
outside normal limits.
Location of
Rail Level ballast windrow
Gauge
Face
On superelevated track, the depth of ballast is measured from under the low rail.
Ballast depth shall be either "High" or "Medium" or "Low" in accordance with the existing
or proposed track structure class detailed in RailCorp standard ESC 200 and as detailed
in Table 3 and Table 4.
Design Ballast
Category depth(mm)
Minimum Maximum
High H 350 500
Medium M 300 500
Low L 250 500
L(150) 150 500
L(100) 100 500
L(Nom) Nominal 500
Table 3 - Ballast depth categories
© RailCorp Page 7 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
New Existing
Main line
Passenger Main Line Medium duty concrete
L Timber L
Heavy duty concrete
Mixed Passenger Medium duty concrete
Freight Main Line M Timber M
Heavy duty concrete
Light Line NA Timber L
Heavy Freight Option Heavy duty concrete H Heavy duty concrete H
Sidings
(1)
General Yard Medium duty concrete L Timber L(150)
Passenger
operations/ or Medium duty concrete L Timber L(150)
maintenance
Passenger Siding Timber L(100) Timber L(100)
Engineering
Timber L(Nom) Timber L(Nom)
Maintenance Siding
Table 4 - Ballast height
Note: 1. Full ballast depth in existing track includes ballast that is not free draining
Free draining ballast may include ballast with fines such as sand, brake dust and
other fine material that does not restrict water flow.
2. Existing track may not necessarily achieve the target ballast depth.
3. Use of the design ballast depths with poor subgrades may still cause the
subgrade to be over stressed. Detailed investigation and analysis of the whole
track structure including the substructure condition may be necessary in these
problem situations. It can equally be demonstrated that in areas with very good
subgrades (natural or designed) it is possible to provide adequate support to the
track structure with lower ballast depths than those specified in Table 4. The
design ballast depth is based on the formation design model detailed in
Section 4.2.6.
Through turnouts the minimum ballast depth under turnout bearers is to be maintained by
lowering the formation level as required. The change in level of the formation is to be
ramped off as follows:
© RailCorp Page 8 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
2. Ballast shoulder width may be increased (eg for walkways or examination areas)
provided that alternative arrangements are made for drainage of water from the
formation.
© RailCorp Page 9 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
Track
Sleeper Min Ballast Depth Recommended Ballast Mat Stiffness
Category
(Note 1) Type (exc. mat) Range
High Heavy duty > 300 and < 600 mm Ballast mat (cstat = 0.15 N/mm3)
(H) concrete 250 -300 mm Ballast mat (cstat = 0.10 N/mm3)
(Note 2)
< 250 mm but > 200 mm Ballast mat (cstat = 0.10 N/mm3)
Medium Heavy or > 250 and < 600 mm Ballast mat (cstat = 0.15 N/mm3)
(M) Medium
200 -250 mm Ballast mat (cstat = 0.10 N/mm3)
duty (Note 2)
concrete < 200 mm but > 150 mm Ballast mat (cstat = 0.10 N/mm3)
Low Medium > 200 and < 600 mm Ballast mat (cstat = 0.15 N/mm3)
(L) duty
150 -200 mm Ballast mat (cstat = 0.10 N/mm3)
concrete (Note 2)
< 150 mm but > 100 mm Ballast mat (cstat = 0.10 N/mm3)
Note: 1. Operating Class: Main Line – refer to Table 4 for definition of Track Category
2. Should consider case by case
5 Acceptance Standards
All work involving the laying of ballast as part of new track installation or track renewal
shall meet the following acceptance requirements:
© RailCorp Page 10 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4
Superseded by T HR TR 00192 ST RailCorp Engineering Standard — Track
Ballast ESC 240
6 Damage Limits
6.1 Contamination
Ballast shall be considered to have failed to meet functional requirements when the
Fouling Index >40.
6.2 Strength/Stiffness
To be determined
6.3 Profile
To be determined
7 Repair standards
Recycled ballast
© RailCorp Page 11 of 11
Issued April 2013 UNCONTROLLED WHEN PRINTED Version 2.4