2 →U6 Mill Rejection Sump Pit Pump daily running needed according to sump level.

3 →U6 KOBELCO COMPRESSOR SHOULD BE RUN ONLY ONE AT A TIME (FOR POWER HOUSE REQUIR
When any Mill is scheduled to be go for Prev. Maint or Internal checking or Roller seeting or RJA r
4
end of night shift of Previous day & allowed to cool down such that maintanance personnel can st
condition untill permit taken Maint dept.

When any BFP is scheduled to be go for Prev. Maint or alignment checking or oil lkg rectification o
5
should be stopped at the end of night shift of Previous day & allowed to cool down such that main
should be in available/standby condition untill permit taken Maint dept. Special isolation if any re

6 EMI & C&I SHOULD ATTEND 'PM FOR MILL', AFTER PM JOB COMPLETION OF BM.

Order Type Bas. start date Description


ZM03 18/02/2020 HEALTHINESS CHECK OF SPARE MOTORS (EMO)
ZM03 18/02/2020 PM: 5T HOIST-2 AT TH MB-2(CHE)
ZM03 18/02/2020 PM FOR N-PIT PUMP-B (P6B) (DM PLANT)(TM)
ZM03 18/02/2020 PM FOR N-PIT PUMP-B (P6B)(DM PLANT)(EMO)
ZM03 18/02/2020 MOT DRV FIRE BOOSTER PUMP AVAIL CHECKING
ZM03 18/02/2020 DE DRV BOOSTER PUMP AVAILABILITY CHECKIN
ZM03 18/02/2020 DE DRV HYDRANT PUMP AVAILABILITY CHECKIN
ZM03 18/02/2020 DE DRV HYDRANT PUMP AVAILABILITY CHECKIN
ZM03 18/02/2020 DE DRV SPRAY PUMP AVAILABILITY CHECKING
ZM03 18/02/2020 DE DRV SPRAY PUMP AVAILABILITY CHECKING
ZM03 18/02/2020 PM FOR U5 SADC &AUTO DRAIN VV CHECK(C&I)
ZM03 18/02/2020 PM FOR U5 SWAS SYSTEM DAILY CHECK (C&I)
ZM03 18/02/2020 PM FOR U5 SWAS SYSTEM DAILY CHECK (C&I)
ZM03 18/02/2020 PM FOR U6 SADC&AUTO DRAIN VV CHECK (C&I)
ZM03 18/02/2020 PM FOR ESP FLUIDIZING BLOWER-6A (AHM)
ZM03 18/02/2020 PM FOR AHP-6 FAE TOWER PULSE JET (C&I)
ZM03 18/02/2020 PM FOR U6 VAC PH LT PANEL CLEANING (AHE)
ZM03 18/02/2020 PM FOR SILO VENT FAN-6A (AHM)
ZM03 18/02/2020 PM FOR U6 SWAS SYSTEM DAILY CHECK (C&I)
ZM03 18/02/2020 PM FOR U6 CT FAN-4 (TM)
ZM03 18/02/2020 PM FOR U6 CT FAN-4 MTR & MCC (EMO)
ZM03 18/02/2020 PM FOR U6 CT FAN-4 HOT BASIN CLNING (TM)
ZM03 18/02/2020 PM FOR SEAL OIL VACUUM PUMP-6A (EMI)
ZM03 18/02/2020 PM FOR DG SET-1 AVAILABILITY CHECKING(WS
ZM03 18/02/2020 PM FOR DG SET-1 AVAILABILITY CHECKING(O)
ZM03 18/02/2020 PM FOR DG SET-2 AVAILABILITY CHECKING(WS
ZM03 18/02/2020 PM FOR DG SET-2 AVAILABILITY CHECKING(O)
ZM04 18/02/2020 BOP AREA CONDITION MONITORING ALL PUMPS
18/02/2020 MILL-6B HIGH REJECTION TROUBLESHOOTING
ZM03 18/02/2020 PM FOR I/C-2 OF ODE,ODET02 & U/S BK (AHE
ZM03 18/02/2020 PM FOR O/G TO ODET02 BKR TESTING (TST)
sump level.

FOR POWER HOUSE REQUIREMENT) .


ng or Roller seeting or RJA replacement etc by BM dept, the said Mill should be stopped at the
aintanance personnel can start the job by 8:00 am on date. But Mill should be in available

king or oil lkg rectification or PM/any job in AOP/ oil system etc by TM dept, the said BFP
to cool down such that maintanance personnel can start the job by 8:00 am on date. But BFP
pt. Special isolation if any required will be written beside as per reuirement of maint dept.

ON OF BM.
APM ON 18.02.2020
Planner group Description Of Functional Location Order No
EMO Santaldih Thermal Power Plant-2050 300080415
CHE Hoist-1 & 2 At track hopper MB-2 300088871
TM Neutralisation Pump P6B-P6B 300078587
EMO Neutralisation Pump P6B-P6B 300088805
F&S AC Driven Fire Booster Pump-BP1 300054716
CHO DE Driven Fire Booster Pump-BP2 300088838
CHO DG Driven Hydrant Pump-XDG 300088835
F&S DG Driven Hydrant Pump-XDG 300088834
F&S DE Driven Spray Pump-XDG 300088837
CHO DE Driven Spray Pump-XDG 300088836
C&I U#5 Area-U05 300088790
C&I U#5 SWAS Collection System-SWS 300088794
C&I U#5 SWAS Collection System-SWS 300081704
C&I U#6 Area -U06 300088791
AHM ESP Fluidizing Blower & Heater 6A-06A 300088793
C&I U#6 FAE tower instruments-INT 300088843
AHE U#6 FAE Vacuum Pump System-VPS 300088660
AHM U#6 Silo-2 Vent Filter System-VFS 300088806
C&I U#6 SWAS Collection System-SWS 300088792
TM U#6 CT Fan-4 Area-004 300088634
EMO U#6 CT Fan-4 Area-004 300088631
TM U#6 CT Fan-4 Area-004 300081716
EMI U#6 Oil Vacuum Pump- 1 System-001 300069389
CHO Diesel Generator System-01-001 300088816
OPN Diesel Generator System-01-001 300088864
CHO Diesel Generator System-02-002 300088817
OPN Diesel Generator System-02-002 300088865
TM SANTALDIH TPS Stage 2 400002244
BM Mill Group -6B System-06B
AHE U #5 Fly Ash MCC Bus Sec- B 300086854
TST U5 6.6KV Ash Handling Bus-OSR 300086855
REMARKS