Igc3-The Health and Safety Practical Application

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 21

International General Candidate’s

Observation
Certificates Sheet
(2011 Specifaction)

IGC3-THE HEALTH AND


SAFETY PRACTICAL APPLICATION
sheet
number _01 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Workers carrying building Provision of suitable handling aid
rocks from dumping point to to carry the rocks to minimize One month
foundation basement the manual handling risk.
(distance 30 mtr approx) Provision of road facility closest
manually Increasing suck of point where the rocks are actually 01 week
manual handling will lead to required to eliminate or reduce
server beak enjoy over a manual handling.
period of time. WRuld
fatigue.
Workers were picking up the Sand to be unloaded on a hip-
second filled baskets in height platform to eliminate From next
stamping position for putting requirement of stooping while load
it in the cement mixer during lifting Tool box on correct lifting (01 day)
concrete work. Possible risk techniques and consequences of
of back pain and lower back continuous bad lifting to all
injury over a period of time. workers. 03 days
Hazard of ergonomics.
Workers ware required to Provide a handling aid to carry the
carry the sand from dumping sand baskets introduce 01 day
point to the cement mixer job rotations to control
which was 10 mtr away this risks of repetitive job.
repetitive work needing Plan the task in such a way that , 03 days
stooping and twisting sand , concrete, cement etc
continuously. Increasing risk Are to be unloaded very close
of severe back pain and To the position of the cement mixer
lower back injuries. to minimize manual handling risks

INTERNATIONAL GENERAL Candidate’s


observation
CERTIFICATE sheet
(2011 specification)
IGC3-THE HEALTH AND
SEFETY PRACTICAL APPLICATION sheet
number _02 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Two workers were doing hand Stop the work, and contractor to
drilling work platform without provide a suitable and safe work Immediate
guard work on a side wall at platform to recommence the work.
nearly 4 mtr height using a Inspection of all work platforms
badly constructed work and access equipments for safe 2 days
platform without guard rails construction.) Routine inspection regular
and toe boards possible for continues monitoring also
falling from height or regular to be ensured.
collapse of the plate form.

Plastering works on first floor Provide suitable guard reacts & toe
of the building. The workers boards to the scaffold provide 01 day
were standing on a scaffold safety net under the working
without guard tails and toe platform to reduce the injury of 01 week
boards. Risk of falling falling from height.
people and object from
height.
Workers carrying out firing of Provide safety harms to the works
wooden planks on an and ensure good supervision Immediate
unprotected edge at the
second floor of the building Provision of guard rails and toe
without any safety boards at the unprotected edge. A 01 week
precaution increased risk of suitable safety net also to be
people falling from height positoined to prevent falls from
causing serious injury or height.
death.

INTERNATIONAL GENERAL Candidate’s


Observation
CERTIFICATE sheet
(2011 specification)
IGC3-THE HEALTH AND
SEFETY PRACTICAL APPLICATION sheet
number _03 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185
Place inspected KARKON CONSTRUCTION COMPANY Date of inspection
03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Workers throwing debris from The workers are to be instructed to
rooftop of the there storied refrain from this unsafe act. Immediate
under construction building. A suitable debris chute should be
possible risk of serious head positioned to safe disposal of
injury to the people down rubbles from all the floors. One week
below.
Cement bags stacked Cement bags are to be rearrange
improperly on an over head properly and to be sacked as per 01 day
height .the poor stacking laid down standards.
can cause falling of heavy Tool box talk to all supervisors and 01 week
cement bags on the workers contractors on safe stacking
leading to serious injury. procedures.

Used wooden pieces with House keeping staff to be


rusted nails littered at the instructed to carry out Immediate
work site. thorough clean ship of the
Risk of penetration of rusted worksite on a regular basis.
nails leading piercing other ill 01 week
health effects of iron rust is Effective supervision of
tetanus. housekeeping activities fixed
routines to be promulgated.

INTERNATIONAL GENERALCandidate
Observation
CERTIFICATE sheet
(2011 specification)

IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION
sheet
number _04 of _17_
Student Name MUHAMMAD ASLAM ZEB Student number
00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Conveyor belt operator was Hard hat to be provided to the
without a hard hat. Risk of operator the reduce the risk Immediate
accidental hit of conveyor of head injury. (01 day)
basket leading to serious Toolbox talk on importance of
head injury. wearing personal protection 01 week
equipment while at work. ongoing
Regular work place inspection .

Conveyor belt operator was Frequent breaks and job rotation to


sitting on hand seat : fully reduce the effects of vibration . 01 day
exposed to total vibration of Seat is to be modified to a more
the machine. Possible risk of comfortable seat preferably with 01 weak
serious nerve or joint cushion to minimize the exposure
damage and muscle of vibration.
weakening due to long them
exposing to vibration.
One window in the work site All the obstructed materials ore to
office was blocked by card be rumored and properly cleaned 01 day
board boxes and stationeries, thoroughly.
in the office increased. risk Empty card boards and concern 01 week
of fatigue and drowsiness packing materials are to be stored
due to thermal stress & lack in separate location.
of oxygen supply to the
brain.
INTERNATIONAL GENERAL
Candidate’s observation
CERTIFICATE sheet
(2011 specification)

IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION
sheet number _05 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Time scale


Hazards and Immediate and longer
consequences terms action
Site Supervisor’s computer Monitor to be adjusted to bring it in
screen is not in line with the line of the eye. 01 day
eye sight. Ergonomically safe chair with
Risk of Musculoskeletal height suitable system is to be
hazard and can lead to neck purchased to all computers users. 01 month
and back pain and eye strain.

Cement unpacking labors Gum boots, overall and gloves to


standing bore footed. be provided to the worker. 01 day
Risk of dermatitis and other Training session to all workers on
ill-health effects due to all health effects of exposure to 01 week
irritant behavior of dry dry and wet cement.
cements.

Plastering labor including Provide overall, gloves, filtering


women helpers fully Exposed face piece respirators and gum 02 day
to dry and wet cement. boots to reduce the all health
Increased risk of dermatitis effects.
and corrosive burns following Training session on different ill- 01 week
long terms expose to dry and health consequences of long term
wet cement. exposure to dry and wet cement.
INTERNATIONAL GENERAL Candidate’s
observation
CERTIFICATE sheet
(2011 specification)

IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet
number _06 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Filled cans of petrol and Petrol and diesel are to be
diesel are kept in the office removed from office space and to 01 day
space risk of fire hazard. Also be kept in a safer place.
risk of ill-health effects Designated storage area for 01 week
creating the fumes of the inflammable fuel to be
improperly stowed petrol and implemented as per land down
diesel standards.

Empty and foul gas cylinders Empty and failed gas cylinder is to
are kept in one place. be separated and to be chained 01 day
the place is not marked upright.
increased risk of fire hazard. A friends and open area storage 01 week
place to be designated with
suitable gate with lock this to be
marked and signed appropriately.
Arrangement sufficient water Good practice to be Maintained
points with 20 ltr water On going
dispenser made throughout Monitoring
the work site.

INTERNATIONAL GENERAL Candidate’s


observation
CERTIFICATE sheet
(2011 specification)

IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet
number _07 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
Dustbin in the site super Housekeeping staff to be
visors office is overflowing instructed for clearance of the dust Immediate
increased risk of fire bin.
hazard: Biological hazard, 01 day
Burn injuries Properly, Effective supervision of
damage. housekeeping staff for timely
clearance of all dustbins.
Protective cover of concert Operator to be instructed to close
conveyor machine was kept the machine covers to eliminate Immediate
open. Increased risk of the entanglement hazard.
entanglement or drawing in Tool box talk to all machine 01 week
by the machine will lead to operators on risks and
serious injuries. consequences of hazards
associated with running machines.
Cement mixer was positioned Cement mixer to be repositioned
on road side very near to a to a safer place. Immediate
busy state, highway junction Proper barricading and Or 01 hour
without any precautionary suitable signage’s to be
measures. provided. 01 week
Increased risk of high Proper planning on positioning
speeding valances hitting the of equipments for work provision
workers. hi- vis jackets to workers.

INTERNATIONAL GENERALCandidate’s
observation
CERTIFICATE sheet
(2011 specification)

IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet
number _08 of _17_

Student Name MUHAMMAD ASLAM ZEB Student number


00224185

Place inspected KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

Observation Control Measures Timescale


Hazards and Immediate and longer
consequences terms action
The plug sockets on Stop work and provide a new
extension board used to extension board to recommence Immediate
operate the drilling machine the work.
was broken and in very badly Tool box talk to contractors & 03 day
maintained condition. workers on precautionary
Increased risk of electrocute measures while working on
and fire from electrical electrical eqvipments.
spark .
5 Amps power supply sockets Additional plugs are to be
in the office is using by disconnected from the socket. Immediate
03 users. Appropriately rated extension
Risk of over loading the board to be used for meeting the
socket leading to heavy requirement 01 week
spark and fire also risk Provision of sufficient power
of electric shock. supply sockets in the office to
avoid
overloading of single socket.
Emergency contact numbers Contact numbers of nearby fire
not available in the site office station, hospital, and ambulance 01 day
or site supervision. service, police station to be
It will lead to panic situation collected and displayed. 01 month
in case of emergency. Mock drills with emergency
services to be carried out.

Good general lighting and Good practice to be maintained


comfortable temperature On going
level and office space is Monitoring
observed .

INTERNATIONAL GENERAL Candidate


report template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number
_09 of _17_
Student number
00224185
LOCATION KARKON CONSTRUCTION COMPANY Date of
inspection 03/03/014
REPORT ON RISK ASSEMENT MADE AT CONSTRUCTION

SITE OF MANZIL CONSTRUCTION

INTRODUCTION :-

This is a precise report on risk assessments carried out in a building


construction site of

KARKON construction at KDA road, Karak (kpk)

The inspection was made on 03 march 2014 to assess the risk and hazards
arising daring various construction activities and the adequacy of the control
measures taken in the construction site.

Around 150 workers and 40 contractors were working towards building a three
storied commercial shopping complex of 8713 sq.ft on the banks of the busy
state highway.

There I had meet with M.Nouman the site engineer who provided a had full of help
to complete this assessment.

EXECUTIVE SUMMARY :-

The inspection focuses mainly on health and safety hazards


associated with various constructions activates at the work associated with various
construction activities at the work site.

The main topics outlined below and a detailed description is placed in the main
body of this report.

Few points related to lack of emergency procedures which required attention


were also mentioned
INTERNATIONAL GENERAL Candidate report
template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number
_10 of _24_

Student number
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
.

(A) PERSONNEL SAFETY

Risk of people and objects bulling from height due to working with
improper work

Platforms and badly maintained access equipments were clearly visible during the

Inspection.

Musculoskeletal hazards of excessive manual handling due to improper lifting


techniques and continuous stopping and twisting motions were also assessed.

(A) HAZARDOUS SUBTANCE SAFTY :-

Risk of continuous and long team exposure to hazardous clearly


noticeable in the work

Site provision and usage of appropriate clothing and PPEs are found essential to
minimize the ill-health effects to workers.

INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION
sheet number _11 of _17_

Student number
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of inspection


03/03/014

(B) FIRE SAFTY :-


Presence of fire hazardous materials and improper storage of inflammable
materials

Increasing the risk to maximum tolerable extend. These are to be controlled by


designating suitable stowage area and necessary precautionary measures.

MACHINE AND VECHILE SAFTY :-

Risk of entanglement due to improper usage of rotating machineries is


need to be

controlled by importing training and effective supervision working in close


prominently

to vehicle road traffic should be avoided to possible extend if unavoidable ,


adequate safety measures are to be adopted .

(C) ELECTRICAL SAFETY :-

Risk of electrocution and electrical fire due to sparks from defective or poorly
maintained

Electrical equipment / fittings exist in the site.

These are to be addressed and necessary corrective measures are needed.

A number of breaches of legislation rules related to variable to various issues also noticed
and mentioned in the man body the good practices mentioned in the observation are to be
acknowledged and appreciated.

These are to be maintained through continuous monitoring.

MAIN FINDINGS :--


The inspection highlighted many issues relating to health and safety hazards
associated with various construction activities at the worksite. They are persuaded below
in details

INTERNATIONAL GENERAL
Candidate
report template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number _12
of _17_

Student number
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
1 . Safety of people

Working at height . Working at height always involves potential risk of serious injury or
fatality to the workers. Many of the working platforms and access equipments in the
work site were prone to this highly
Alerted risk due to either improper design or poor maintenance. Some of the elevated work
platforms are in badly maintained condition. But still in use and not provided with guard rails
and toe boards these represent infringement of ‘Rule 5(2)’ of Regulation of Employment and
condition and workers Act 1996 by Republic of Indian Immediate attention required on
following points:

 Replacing of poorly designed and badly maintained scaffolds and


elevated platforms
 Provision of suitable guard rails and toe boards to the unprotected edger and
work platforms.
 Routinely inspection and periodic maintenance of scaffolds work
platforms and access equipments
 Provision of sufficient number of safety harness and other Protective
equipments and proper supervision to ensure corrector usage of PPES.

Estimated cost for the above control measures would be

2,70,000 inr
(a) Musculoskeletal hazards :- The tasks involving carrying load manually to
longer distance and repetitive stooping 01 twisting motion are prone to
various musculoskeletal disorders like back injury , tendon and ligament
injurious wruld etc These risks are to be eliminated or minimized by
proper planning of posting for unloading construction materials and ways
of appropriate handling and following actions are strongly recommended
 Proper planning and supervision to ensure the material or unloaded at the
possible nearest
Point where the items are actually required
 Provision of adequate and suitable handling aids for conveying goods.
 Estimated cost for above remedial action would be 50,000 inr
(b) Falling of objects from height Is a common hazards in any construction site.
Also, deliberately throwing debris and rubbles
from
heighted floors to ground might increase the risk
to the

INTERNATIONAL GENERAL
Candidate
report template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number _13
of _17_

STUDENT NUMBER
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
People below strict measures to be implemented to control these unsafe
acts following action are required.
 Contractors and labor are to be clearly instructed not to throw rubbles
from roof floors to ground.
 Suitable debry chute to be imported for safe disposal of rubbles from
every floors to ensure safety of people below it also comply with rule 52
of Indian building and construction workers central rules 1998 which says
the employer shall ensure at a construction site of a building or other
construction work that (a) debris are handled and disposed of by a
method which does not cause danger to the safety of a person and (b)
debris are not thrown inside or outside from any height of such building
or other construction work.
 Hard hats are to be made mandatory by internal laws to comply with the
rule 54 of Indian Building construction workers central rule which says
the employer shall ensure that all persons who are performing any work
or services at a building or other construction work wear safety shoes
and helmets conforming to the national standards
Estimated cost for the above control measures is 30,000 inr
The stacking of cement bags was found improper and appropriate
corrective actions to be taken as per standard codes in place.
This should comply ‘Rule 51 ‘ of Indian building construction worker’s
central rules 1998 which says the employer shall ensure at a construction
site of a building that all building materials are stored or stacked in a safe
and orderly manner to avoid obstruction and danger to any passageway
or place of work.
2 Hazardous Substance Safety :
Cement and sand dust are the most common health hazards in a construction
work site. Direct and long term exposure to dry and wet cement might cause
series ill-health effects like dermatitis and corrosive burns to workers.
Following control measures are to be implemented urgently to minimize these
effects:
 Provision of gloves, overalls, gum boots and filtering face piece
respirator to all personnel exposed to hazardous substances like cement,
metal, sand etc .
 Health surveillance of these workers is to be conducted and details to be
recorded.

INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 Specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number
_14 of _17_

Student number
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014

 Training sessions for creating awareness among workers on ill health


effects of various hazardous substances
 Estimated cost for these control measures would be 40,000 inr

3 FIRE SAFTY:
The inspection reveals some of the fire hazards and risks arising from
improper storage of gas cylinders inflammable fuels etc. and accumulation of paper
wastage due for poor housekeeping Non-availability of designated storage place for
storing the gas and inflammable fuel containers are they key issues which required
immediate attention . Lack of effective supervision on housekeeping activities also
ignites the fire risk. Under mentioned prevention measures accorded priority to
reduce occurrence and spread if fire in the work site.

 Arrangement of safe, suitable and dedicated storage aria with proper


fencing and lockable gate

Keeping gas slanders this area to be marked with proper sign and warning boards.
Empty and

Filled cylinders are to be stored separately and to be chained upright an inspection


schedule of this storage area by competent personnel also to be promulgated and
ensured.

 Another safe stowage area for keeping the liquid fuel containers also to
be earmarked.
 Procurement of new first aid fire extinguishers.
 Ensure good supervision on housekeeping routines for timely clearance
of dustbins and other waste materials.
Estimated cost for these control measures would be 1, 00,000 inr.
3 MACHINE / VECHICLE SAFTY :-
During the assessments, some points related to machine and vehicle
safety did also

Come in light usage of rotating machineries without proper guards and protective
covers

Was observed. This could lead to serious injurious fractures due to entanglement,

Entrapment or drawing in this represents clear infringement of ‘Rule 37’ of Indian

INTERNATIONAL GENERAL

Candidate report template


CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION sheet number _15
of _17_
Student number
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
Building and construction workers central rules 1998 which says An Employer shall

Ensure at a construction site;

(a) All motors, cog wheel chairs and friction gearing, fly

Wheels, shafting, dangerous and moving parts of machinery (whether or not


driven by

Mechanical power) and steam pipes are securely fenced or lagged: (b) the
fencing of

Dangerous ports of machinery is not removed while such machinery is in close


proximately to the vehicular traffic was not addressed at all and it indicates clear
breach of ‘Rule ‘48’ of Indian Building and construction Workers’ central rules 1998
which says ‘whenever a building or construction work is being carried on or is
located in close proximity to a road or any other place where any vehicular traffic
may cause danger to building workers the employer shall ensure that such building
or other construction work is barricaded and suitable warning signs and lights
displaced or erected to prevent such danger and if necessary he may make a
request in writing to the concerned authorities to control such traffic.

Following corrective measure is to be implemented with immediate effect:-

 Ensure availability of guards and protective covers while running any


rotating machinery
 Barricading , signage boards and hi-vis jackets white working in close
proximity to road or any vehicular traffic
 Information , instruction , training and proper supervision while working with
rotating machines
 Estimated cost for these preventive measures is 30,000 inr
4 Electrical Safety :_-
Poor maintenance and unsafe working practice with electrical in the
work site.

Over loading of power sockets and using of electrocution and fire to be heavy
sparked the following corrector are to be implemented to eliminate / reduce
these risks:

INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)

UNITE IGC3-THE HEALTH AND


SEFETY PRACTICAL APPLICATION
sheet number _16 of _17_

STUDENT NUMBER
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
 Poor maintenance and unsafe working piracies with electrical circuits were
observe during assessments inspection in the work site over loading of
power sockets and using badly maintained extension boards were possible
risks of electrocution and fire due to heavy spark. the following corrective
measures are to be implemented to eliminate reduce these risks.
 Poor maintenance of all electrical equipments and tools by equipments
 Instruction and training on safe working practices with electrical
equipments and super vision
 Estimated cost for these remedial action is 30,000 inr
CONCLUSION: _-
In any work place or organization the health and safety culture should
be visible from top of the management level the employer , manager ,
supervisors , contractors should give adequate preference and importance to
safety related issues to maintain an accident free and healthy working
environment in the site .
The finding and the remedial actions mentioned will definitely help to
improve the health and safety environment in the workers.
The hazards and unsafe practices identified during the inspection might lead
to ill-health problems and serious injuries to workers.
These can cost the management and many direct and direct ways the
financial implication mention will surly cost lesser then these exposes that
might occur following an untoward incident some clear examples of good
practices like provision of sufficient whole some water to all personnel and
good general lighting in common areas were acknowledged .The report also
indicates a number of breaches of national legislation rules, which may invite
enforcement action and other consequences including heavy lines in the
criminal courts.
Above all human life is the most precious and safety of that should be given
the topmost priority.
INTERNATIONAL GENERAL

Candidate report template


CERTIFICATE
(2011 specification)
UNITE IGC3-THE HEALTH AND
SEFETY PRACTICAL APPLICATION sheet number
_17 of _17_

STUDENT NUMBER
00224185

LOCATION KARKON CONSTRUCTION COMPANY Date of


inspection 03/03/014
RECOMMENDATIONS:-
The recommendations suggested for control meaning of the risks and
hazards identified are on follows.

RECOMMENDATIONS LIKELY TARGET


RESOURCE PRIORITY DATE

IMPLICATION
1 .SAFETY OF PERSONEL
 Replenishment of scaffolds 1,50,000 INR HIGH 10 March
& other elevated platforms 2014
 Replenishment/Repair of 40,000 INR HIGH
defective access 10 March
50,000 INR HIGH 2014
equipments
 Procurement of 50.000 INR MEDIUM 10 March
safety helmets aids 20,000 INR HIGH
2014
 Procurement of handling
aids 25 March
 Implanting of debry chute 2014
10 March
2014
2. Hazardous substances safety
 Purchase of gloves, over 50,000 INR HIGH 10 March
all, gum boots and 2014
filtering face piece 20,000 INR MEDIUM
respirators 25 March
 Health Surveillance for no are very MEDIUM 2014
worker by approved low external
cost 20 March
medical practitioners 2014
 Training Sessions on
awareness of ill-health
effect of Hazardous
substances.
3. FIRE SAFETY
 Arrangement of 30,000 INR HIGH 06 March
designated Stowage area 2014
for inflammable Materials 70,000 INR HIGH
 Recruitment of new fire 06 March
extinguishers 20,000 INR MEDIUM 2014
 Training and mock
Drills with fire station 20 March
2014

You might also like