Observation
Certificates Sheet
(2011 Specifaction)
Plastering works on first floor Provide suitable guard reacts & toe
of the building. The workers boards to the scaffold provide 01 day
were standing on a scaffold safety net under the working
without guard tails and toe platform to reduce the injury of 01 week
boards. Risk of falling falling from height.
people and object from
height.
Workers carrying out firing of Provide safety harms to the works
wooden planks on an and ensure good supervision Immediate
unprotected edge at the
second floor of the building Provision of guard rails and toe
without any safety boards at the unprotected edge. A 01 week
precaution increased risk of suitable safety net also to be
people falling from height positoined to prevent falls from
causing serious injury or height.
death.
INTERNATIONAL GENERALCandidate
Observation
CERTIFICATE sheet
(2011 specification)
Empty and foul gas cylinders Empty and failed gas cylinder is to
are kept in one place. be separated and to be chained 01 day
the place is not marked upright.
increased risk of fire hazard. A friends and open area storage 01 week
place to be designated with
suitable gate with lock this to be
marked and signed appropriately.
Arrangement sufficient water Good practice to be Maintained
points with 20 ltr water On going
dispenser made throughout Monitoring
the work site.
INTERNATIONAL GENERALCandidate’s
observation
CERTIFICATE sheet
(2011 specification)
INTRODUCTION :-
The inspection was made on 03 march 2014 to assess the risk and hazards
arising daring various construction activities and the adequacy of the control
measures taken in the construction site.
Around 150 workers and 40 contractors were working towards building a three
storied commercial shopping complex of 8713 sq.ft on the banks of the busy
state highway.
There I had meet with M.Nouman the site engineer who provided a had full of help
to complete this assessment.
EXECUTIVE SUMMARY :-
The main topics outlined below and a detailed description is placed in the main
body of this report.
Student number
00224185
Risk of people and objects bulling from height due to working with
improper work
Platforms and badly maintained access equipments were clearly visible during the
Inspection.
Site provision and usage of appropriate clothing and PPEs are found essential to
minimize the ill-health effects to workers.
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
Student number
00224185
Risk of electrocution and electrical fire due to sparks from defective or poorly
maintained
A number of breaches of legislation rules related to variable to various issues also noticed
and mentioned in the man body the good practices mentioned in the observation are to be
acknowledged and appreciated.
INTERNATIONAL GENERAL
Candidate
report template
CERTIFICATE
(2011 specification)
Student number
00224185
Working at height . Working at height always involves potential risk of serious injury or
fatality to the workers. Many of the working platforms and access equipments in the
work site were prone to this highly
Alerted risk due to either improper design or poor maintenance. Some of the elevated work
platforms are in badly maintained condition. But still in use and not provided with guard rails
and toe boards these represent infringement of ‘Rule 5(2)’ of Regulation of Employment and
condition and workers Act 1996 by Republic of Indian Immediate attention required on
following points:
2,70,000 inr
(a) Musculoskeletal hazards :- The tasks involving carrying load manually to
longer distance and repetitive stooping 01 twisting motion are prone to
various musculoskeletal disorders like back injury , tendon and ligament
injurious wruld etc These risks are to be eliminated or minimized by
proper planning of posting for unloading construction materials and ways
of appropriate handling and following actions are strongly recommended
Proper planning and supervision to ensure the material or unloaded at the
possible nearest
Point where the items are actually required
Provision of adequate and suitable handling aids for conveying goods.
Estimated cost for above remedial action would be 50,000 inr
(b) Falling of objects from height Is a common hazards in any construction site.
Also, deliberately throwing debris and rubbles
from
heighted floors to ground might increase the risk
to the
INTERNATIONAL GENERAL
Candidate
report template
CERTIFICATE
(2011 specification)
STUDENT NUMBER
00224185
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 Specification)
Student number
00224185
3 FIRE SAFTY:
The inspection reveals some of the fire hazards and risks arising from
improper storage of gas cylinders inflammable fuels etc. and accumulation of paper
wastage due for poor housekeeping Non-availability of designated storage place for
storing the gas and inflammable fuel containers are they key issues which required
immediate attention . Lack of effective supervision on housekeeping activities also
ignites the fire risk. Under mentioned prevention measures accorded priority to
reduce occurrence and spread if fire in the work site.
Keeping gas slanders this area to be marked with proper sign and warning boards.
Empty and
Another safe stowage area for keeping the liquid fuel containers also to
be earmarked.
Procurement of new first aid fire extinguishers.
Ensure good supervision on housekeeping routines for timely clearance
of dustbins and other waste materials.
Estimated cost for these control measures would be 1, 00,000 inr.
3 MACHINE / VECHICLE SAFTY :-
During the assessments, some points related to machine and vehicle
safety did also
Come in light usage of rotating machineries without proper guards and protective
covers
Was observed. This could lead to serious injurious fractures due to entanglement,
INTERNATIONAL GENERAL
(a) All motors, cog wheel chairs and friction gearing, fly
Mechanical power) and steam pipes are securely fenced or lagged: (b) the
fencing of
Over loading of power sockets and using of electrocution and fire to be heavy
sparked the following corrector are to be implemented to eliminate / reduce
these risks:
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
STUDENT NUMBER
00224185
STUDENT NUMBER
00224185
IMPLICATION
1 .SAFETY OF PERSONEL
Replenishment of scaffolds 1,50,000 INR HIGH 10 March
& other elevated platforms 2014
Replenishment/Repair of 40,000 INR HIGH
defective access 10 March
50,000 INR HIGH 2014
equipments
Procurement of 50.000 INR MEDIUM 10 March
safety helmets aids 20,000 INR HIGH
2014
Procurement of handling
aids 25 March
Implanting of debry chute 2014
10 March
2014
2. Hazardous substances safety
Purchase of gloves, over 50,000 INR HIGH 10 March
all, gum boots and 2014
filtering face piece 20,000 INR MEDIUM
respirators 25 March
Health Surveillance for no are very MEDIUM 2014
worker by approved low external
cost 20 March
medical practitioners 2014
Training Sessions on
awareness of ill-health
effect of Hazardous
substances.
3. FIRE SAFETY
Arrangement of 30,000 INR HIGH 06 March
designated Stowage area 2014
for inflammable Materials 70,000 INR HIGH
Recruitment of new fire 06 March
extinguishers 20,000 INR MEDIUM 2014
Training and mock
Drills with fire station 20 March
2014