Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

CB CB
DS DS
TO
CB PUBLIC
DS SD SEWER CR 4

PRODUCED BY AN AUTODESK STUDENT VERSION


SD
PRODUCED BY AN AUTODESK STUDENT VERSION

FD

FD
AV FD
FD
BEDROOM 1 FD

FD
TERRACE SD
CO GARAGE BEDROOM 3 TO SD

SEPTIC
UP TO SD DN UP VAULT DN
SEPTIC
SD

SEPTIC VAULT TO
PUBLIC
VAULT TO
SEWER

LEGEND: SERVICE
PUBLIC
SEWER
SD

SD

AREA TO FD

PUBLIC FD
SEWER
GAMING AREA
FD - FLOOR DRAIN
BEDROOM 2
BEDROOM 4
SD - SHOWER DRAIN
LIVING
AREA UTILITY ROOM
CO - CLOSE OUT KITCHEN

AV - AIR VENT PORCH

CB - CATCH BASIN MASTER


DINING BEDROOM
RU - RISER UP AREA
BEDROOM 5
RD - RISER DOWN
OFFICE WALK-IN BEDROOM 6
DS - DOWN SPOUT
CLOSET
CB
DS

LANAI / GARDEN

TO TO
PUBLIC PUBLIC
SEWER SEWER

P GROUND FLOOR SEWER LINE LAYOUT P SECOND FLOOR SEWER LINE LAYOUT P THIRD FLOOR SEWER LINE LAYOUT
3 3 3

PROJECT TITLE : SHEET CONTENTS : DATE :

SEWER LINE LAYOUT


PLUMBING NOTES:
FEB. 18, 2020

1. ALL SIZES AND LOCATIONS ARE SUBJECT TO CHANGE TO SUIT FIELD


CONDITIONS.
2. THE DESIGNER SHALL NOT BE LIABLE FOR ANY ALTERATION/REVISION ON THE SHEET NO. :
LOCATION : PLANS/DRAWINGS AND SPECIFICATIONS IMPROVED BY THE AUTHORIZED
SUPERVISING ENGINEER DONE WITHOUT THEIR KNOWLEDGE THAT MAY IMPAIR
THE STRENGTH OF THE PROJECT.

PRODUCED BY AN AUTODESK STUDENT VERSION CHECKED BY: ENGR. KRISTINE CERVANCIA DESIGNER :
ALVAREZ, BRAYAN
CUAN, CZAR KENNETH R. P-3
DE ALDAY, CARL KENRICK LEIGH C.

You might also like