QMS/PROJ/PPM/R-03 dtd 01.08.

2020

sTIla AqaaOirTI AaOf [MiDyaa ilaimaToD


STEEL AUTHORITY OF INDIA LIMITED

baaokarao sTIla PlaaMT


BOKARO STEEL PLANT

saaPtaihk p`gait irpaoT-


WEEKLY PROGRESS REPORT
(Weekly Flash report incl. Status of schemes under Stage-II approval)
(As on 01.08.20)

k^arpaoroT str sao svaIkRt skIma ko ilae


FOR SCHEMES SANCTIONED AT CORPORATE LEVEL

Pairyaaojanaa p`Baaga
PROJECT DIVISION

p`aojao@T PlaainaMga evaM maaOinaTrIgaM ivaBaaga

1
QMS/PROJ/PPM/R-03 dtd 01.08.2020

INDEX

SN. SCHEMES PAGE NO


Highlights of the week 3
A. ONGOING SCHEMES
1. Schemes of CO&BPP 4-6
2. Schemes of RMHP & SP 7-15
3. Schemes of BF 16-20
4. Schemes of SMS 20-36
5. Schemes of HSM 37
6. Schemes of CRM 38-45
7. Schemes of Power 46
8. Schemes of Infrastructure 47
B. STATUS OF SCHEMES UNDER STAGE-II APPROVAL 48
C. SUMMARY OF PROJECTS 49-50

2
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Highlights of the week (26-07-2020 to 01-08-2020)

SN Name of Projects Highlight of the week

1. Pkg-4 - Power Supply system-SP-II  Erection & alignment of both side of track for EOT Rail Crane
completed.
2. Balance works for Repl. of Battery Cyclones with 06  Erection of lower column with bracing at Field no-1 & 2
Nos. Electrostatic Precipitators completed.
3. 6020: Up-gradation of 06 nos of ESP at RMP  ESP-5: Erection of TR set completed.
4. Pkg-2: 450 TPD Lime Shaft Kiln –SP-II  16T/64 T Erection of De-dusting bunker 1002 & Rejected Kiln
bunker 1001 done.
5. Pkg-4: Ladle furnace with associated facilities- SMS-I  HT Room Civil work & cable Trench completed.
nd
6. Pkg-5: Slab Caster with associated facilities SMS-I  EOT Crane 2 (100/20T) in QR bay: Load testing done.
 Load trail of cooling tower fans done.
7. Pkg-068: EHV Package  Stringing work between transmission tower AP06 &
AP07completed (Total 17/19 Span done).
8. Replacement of BTL Hydraulic station along with  Re- tendered NIT issued on 29/07/20 with TOD 27/08/20
value desk and accumulator in BF#4
9. Installation of Auto air fuel control system in Klin  NIT issued on 28/07/20 with TOD 03/09/20
No.-1,2,5,6 of RMP
10. Replacement of Central Air Conditioning  Tender opened on 30/07/20
Plants of RHF # 2, 3 & #4 of HSM.

Target for the next week

SN Name of Projects Target for the next week


1. Pkg-151: Replacement of Ammonium Sulphate plant for  FBD(Fluidised Bed drier) area civil work –8/8 nos.
BPP foundations to complete.
2. (Pkg-41)- Gas Holder, ESP & Booster Fan complex –SMS-II  Foundation work of HNRV (Hydraulic Non Return Valve) is to
be completed.
3. (Pkg-4) Ladle furnace with associated facilities- SMS-I  33KV transformer to be erected.
4. Balance works for Repl. of Battery Cyclones with 06 Nos.  Erection of upper column at field no.-2.
Electrostatic Precipitators

3
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Pkg-151: Replacement of Ammonium Sulphate plant for BPP


(Agency-M/s Bengal Tools)
Effective Date of Contract: 10.12.2011 Ord. Cost/ Package Cost: Rs. 88.25 Crs
Commissioning (Contractual) : Dec’13 Sanc. Cost/ Anticipated Cost: Rs. 88.25 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs.73.57 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: C S Azad, AGM(P)

SN Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
st nd rd th th
Mar’20 Start Compln Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A
Plan/Act Plan/Act Plan/Act Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
st
1 Design & Engg. Nos. 473 436 Dec’11 Nov’12 Jul’20 473 436 10  1 Engineer’s notice
issued on 22.02.20.
2 Civil Work
3
 Ercn. of Pump 42/48
Excavation m 15000 15000 Mar’12 Nov’12 May’16A 15000 15000
done.
3  Balance supply- Bucket
Concreting m 4600 4569 Jul’12 May’13 Jul’20 4600 4569 31
elevators, lighting fixture,
Instrumentation item etc.
3 Strl. Fabrication T 500 500 Jul’12 May’13 May’17A 500 500  Centrifuge bldg:
Finishing work in
Strl. Erection T 500 475 Feb’13 Jun’13 Jul’20 500 475 10
progress.
 Erection of Gas pipes –
4 Eqpt Supply T 800 752 Aug’12 Mar’13 Jul’20 800 752 8
(Mech+Elec) 900 /1000 M done.
5 Eqpt. Erecn T 800 735 Oct’12 Nov’13 Aug’20 800 735 8  Welding of gas pipe in
(Mech+Elec) progress.
6 Test & Comm. Dec’13 Dec’20  Erection of utility
pipeline 4.2 /7.5 Km
done.
 FBD(Fluidised Bed
drier) area civil work –
4/8 nos. foundations &
PCC completed.

4
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Project: Battery Proper (Pkg-1)- Rebuilding of CO Battery-8


(Agency-M/s Mecon)

Effective Date of Contract: 01.12.16 Ord. Cost/ Package Cost : Rs. 118.6 Crs
Commissioning (Contractual) :Jun’19 Sanc. Cost/ Anticipated Cost: Rs.118.6 Crs
Commissioning (Revised): May’21 Expenditure (Upto Jun’20) : Rs. 46.50 Crs
Commissioning (Target / Likely): May’21/May’21 Project Manager: CS Azad, AGM(P)

SN Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
st nd rd th th
Mar’20 Start Compln Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A
Plan/Act Plan/Act. Plan/Act Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg. Nos. 1282 1149 Nov’18 Jul’20 1282 1149 4  Silica brick lining 4P
3
2 Concreting RCC m 1580 680 May’19 Apr’21 1580 707 20 10 5/ 5/ 5/ 5/17 20 17 completed. 5P to 6P, 7P-
3 Strl. Fabrication T 975 650 Mar’19 Dec’20 975 736 16 80 12/ 12/ 12/ 12/6 48 6 10P, 11P-14P is in
Incl. TOPR progress.
4 Strl. Erection T 975 555 Apr’19 Jan’21 975 606 160 46 10/ 10/ 10/ 10/5 40 5  CO gas pipe Line 180M
shifted to cellar.
5 Mech Eqpt- T 2800 2100 Mar’19 Jan’21 2800 2280 200 145 10/ 10/ 10/ 10/35 40 35  Saddle work for BF line
Supply completed.
6 Elect Eqpt Supply T 100 55 100 55 4
 Endbench-14: 4/8 nos.
7 Refractory T 17082 Jan’21 17082 1950 500 546 300/ 300/200 300/ 300/350 1200 950
column foundation
Erection 150 250
completed.
8 Mech Eqpt ercn T 2800 488 May’19 May’21 2800 501 4 10 3/3 3 3
9 Elect Eqpt ercn 100 5 5
10 Test & Comm. Jun’20 May’21

5
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Project: Rebldg. of CO Battery-8


(Agency-Pkg 1&3-Mecon, Pkg 2- OCL, Pkg 4- BEC, Pkg 5-Paul Wurth India+ NP Const.)

S.N. Pkg Description Project Agency LOA Date Ordered cost Schdl. Likely Present Status
No. Manager / Expt. Till Compln. Compln.
Jun’20 (Crs)
1 02 Silica Brick Dipak Kr, OCL 04.11.16 41.48/ Aug’17 Dec’20  Estimate – Rs. 42.01 cr. L1: M/s OCL Rs. 41.48 Crs.
Sr Mgr(P) 37.5  LOA issued on 4.11.16. PO placed on 25.11.16.
 Supply of Silica brick completed.
 400 T /1220 T Silica Mortar supplied at site.
 Delay in supply due to self-life of mortar.
2 04 CO Machine Dipak Kr, BEC 04.11.16 22.6/ Feb’19 Nov’20  Design & Engg. - 162/166 nos submitted.
(Pusher Car-1 no. Sr Mgr(P) (Eff dt: 17.8  Pusher Car-1 no. Charging car-1 no. Guide car-1
Charging car-1 no. 03.12.16) no supplied at site.
Guide car-1 no.)  Front for erection for Pusher Car – 1 No. has been
given on 25/02/2020.
 Erection of Pusher car started on 24.03.20.
 Erection of 55 / 250T platform completed.
3 1A Coke Oven Door and Dipak Kr, Simplex 08.05.18 10.8/ Jun’20 Sep’20  LOA issued to M/s Simplex at Rs. 10.80 Crs. Net of
Door Frames Sr Mgr(P) (STA) 4.4 ITC on GST on 08.05.18 (estimate of Rs. 10.40 Crs.)
 Contract signed & Kick off meeting held on
Door- 152 01.08.18.
Frame- 142  140/152 nos. of doors & 142/142 nos. of Doors
Frame supplied.

6
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. Manager Date / Expt. Till Compln Compln
Jun’20 (Crs))
SP & RMHP
1 MEP Repl. of all 2 nos. Exhauster Vinay Kr, Bengal Tool+ 24-08-12 17.84/ Mar’14 Jul’20  Eqpt erection: 960/1000T done.
for Sinter Band no-1 AGM(P) Andrew Yule 10.58  Exhauster-1 put on operation on 29.10.17
after 80 Days of S/d for replacement of
exhauster no-1 by higher capacity
exhauster.
 Exhauster# 2: S/d received on 18.10.19.
 Hi-pot testing of motor done on 13/03/20.
 Connection of outlet duct of exhauster-2 to
common chimney of all exhauster done on
21&22.04.20.
 PLC expert awaited.
 Issue: Commissioning of Exhauster-2 is
linked with comm. of ESP-2 by M/s
Unicorn/ HNCPL

7
QMS/PROJ/PPM/R-03 dtd 01.08.2020
2 644 Balance works for Repl. of Vinay Kr, Unicon + 21.07.17 53.55/ Dec’19 Dec’20  D&E - 148/148 nos completed.
Battery Cyclones with 06 Nos. AGM(P) HNCPL 7.7  Strl Fabrication done-500/550T.
Electrostatic Precipitators on  ESP#2:
Divisible Turnkey basis  Shutdown received on 18.10.19. Work
started on 05.12.19.
 Battery cyclone-2: Dismantling completed.
 Civil foundation and Erection of Outlet
duct completed. Welding of Outlet duct
is in progress
 Erection of upper column with casing
completed at Field no.-5.
 Erection of bracing is in progress.
 Erection of lower column with bracing at
Field no-1 & 2 completed.
 Erection of column at Field no-3 & 4
completed.
 Commissioning of ESP 2 by Sep’20.
 Issue: 5 month S/d for each ESP.

8
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-1 Sinter Plant-II
(Agency-M/s Ukripromez +BEC+ Trafalgar +Uralmas)
Effective Date of Contract: 11.05.15 Ord. Cost/ Package Cost : Rs. 653.85 Crs.
Commissioning (Contractual) :Nov’17 Sanc. Cost/ Anticipated Cost: Rs 653.85 Crs.
Commissioning (Revised) : Dec’21 Expenditure (Upto Jun’20) : Rs 250.08 Crs
Commissioning (Target / Likely): Dec’21/Dec’21 Project Manager: Uma Shankar, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Likely
Start Compl Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg.  BEC submitted revised
Basic Engg. Nos 161 161 May’15 Feb’16 Jan’17A 161 161 drg. of ESP on 13.07.20
in CET. Under approval.
Detail Engg. Nos. 2127 1244 Sep’15 Jan’17 Jul’21 2127 1251 15 7  Wind main of Sinter
2 Civil Work Machine Building (53M
3 height) : 300T / 900T
Excavation m 346439 300000 Nov’15 Jan’17 Jul’21 346439300000
erected till date.
3
Concreting m 71197 45469 Dec’15 Feb’17 Aug’21 71197 46146 360 397 68/56 68/74 68/82 70/150 274 362  Structural work of Flush
(PCC+RCC) secondary crusher in
3 Strl. Fabrication T 29478 5438 Dec’15 Mar’17 Aug’21 29478 6794 364 600/ 600 581 progress.
581  ER-02 (07 storey
4 Strl. Erection T 29478 4867 Mar’16 Apr’17 Sep’21 29478 5533 292 261 101/44 101/101 101/196 101/64 404 405 Building) Slab Casting of
th
4 floor is in progress.
5 Eqpt. Supply T 10476 1600 May’16 Jun’17 Jul’21 10476 1600 Casting Plan by
6 Eqpt. Erection T 10476
14.08.2020.
0 Jun’16 Aug’17 Nov’21 10476 5172

7 Testing & Aug’17 Nov’17 Dec’21


Commsng.

9
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-2: 450 TPD Lime Shaft Kiln –SP-II
(Agency-M/s AIFL + DUCON+ SIC, Italy)
Effective Date of Contract: Mar’16 Ord. Cost/ Package Cost : Rs. 84.51 Crs
Commissioning (Contractual): Mar’18 Sanc. Cost/ Anticipated Cost: Rs 84.51Crs
Commissioning (Revised): Mar’21 Expenditure (Upto Jun’20) : Rs 47.61 Crs
Commissioning (Target / Likely): Mar’21/Mar’21 Project Manager: Rakesh Kumar, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg.
Basic Engg. Nos 21 21 Mar’16 Sep’16 Completed 21 21  Civil foundation of Lime reject
Detail Engg. Nos 774 671 Mar’16 Jul’17 Aug’20 774 671 8 bunker, Lime stone storage
bunker, Dedusting bunker,
2 Civil Work
3 proper lime kiln, Gas booster
Excavation m 1130 9760 Apr’16 Jan’18 Aug’20 11300 9760 200
0 house, PCM & FO Tank done.
Concreting 3
4265  Blower house: Shuttering for
m 3389 Apr’16 Jan’18 Sep’20 4265 3389 40 35/ 35/ 35/ 35/ 175
(PCC+RCC) roof casting is in progress.
3 Strl. Fabrication T 1316 516 Jan’17 Nov’17 Sep’20 1316 516 200  Kiln Shell 1-5: Structural
erection 140 T done.
 16T/64 T Erection of De-
dusting bunker 1002 &
Rejected Kiln bunker 1001
done.
4 Strl. Erection T 1316 251 Oct’17 Dec’17 Dec’20 1316 407 20 140/ 16/16 156 156 Mech eqpt - 53/132 items
140 supplied &
Elect eqpt - 52/162 items
supplied at site.
5 Eqpt. Supply T 1800 1300 Aug’20 1800 1300 80 All imported equipment
received at site.
6 Eqpt. Erection T 1800 20 Jan’21 Dec’20 1800 20 20
7 Testing & Mar’18 Mar’21
Commsng.

10
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-3 Raw Material Handling system- SP-II
(Agency-M/s HN Singh + TRF)
Effective Date of Contract: 11.05.15 Ord. Cost/ Package Cost : Rs. 148.7 Cr
Commissioning (Contractual) :May’17 Sanc. Cost/ Anticipated Cost: Rs 148.7 Cr
Commissioning (Revised) : Mar’21 Expenditure (Upto Jun’20) : Rs 75.64 Crs
Commissioning (Target / Likely): Mar’21/Mar’21 Project Manager: Uma Shankar, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg.
Basic Engg. Nos 74 55 Jun’15 Jun’16 Jul’20 74 55
Detail Engg. Nos 701 605 Aug’15 Oct’16 Aug’20 701 605 8
2 Civil Work Conveyor (19 nos):
3
Excavation m 23500 23100 Jan’16 Jan’17 Jul’20 23500 23100 400 Civil fdn. of conveyor-
3
Concreting m 10950 9300 Feb’16 Feb’17 Aug’20 10950 9300 16/ 19 nos done.
Strl work-11/19 nos done.
3 Strl. Fabrication T 6000 5650 Nov’15 Dec’16 Aug’20 6000 5650 60 JH House (21 nos):
4 Strl. Erection T  Civil fdn of JH -16/21 nos
6000 5570 Mar’16 Mar’17 Sep’20 6000 5570 100
completed.
 Strl work-12/21 nos
5 Eqpt. Supply T 1500 800 Apr’16 Feb’17 Aug’20 1500 800 100
done.
6 Eqpt. Erection T 1500 460 Aug’16 Mar’17 Dec’20 1500 460 40  Colour coated sheet-
2
24000/40000 m done.
 Translucent sheet-
2
2650/3000 m done.
 Strl ercn at P16C21,
P16C2 -90 % done. S/d
awaited.
7 Testing & 13/17 lots of eqpt
Commsng. Mar’17 May’17 Mar’21 supplied & erected at
site.

11
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-4 -Power Supply system-SP-II
(Agency-M/s MECON)
Effective Date of Contract: 11.05.15 Ord. Cost/ Package Cost : Rs. 50.5 Crs
Commissioning (Contractual): Nov’16 Sanc. Cost/ Anticipated Cost: Rs 50.5 Crs
Commissioning (Revised): Feb’21 Expenditure (Upto Jun’20) : Rs 38.99 Crs
Commissioning (Target / Likely): Feb’21/Feb’21 Project Manager: Rupesh Kr, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance May’20 Jun ’20 Jun’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg.  EHV, Trench cutting &
Basic Engg. Nos 21 21 Jun’15 completed 21 21 construction is in progress.
(500/630 M done).
Detail Engg. Nos 294 294 Jun’15 Jun’16 Aug’19A 294 294
 Erection & alignment of
2 Civil Work
3 both side of track for EOT
Excavation M 6400 6150 Jul’15 Dec’15 Aug’20 6400 6150 20
3
Rail Crane completed.
Concreting M 2100 2098 Sep’15 Oct’16 Jul’20 2100 2098  Erection of cable trench is in
3 Strl. Fabn. T 150 120 Jan’16 Mar’16 Jul’20 150 120 4 progress.
4 Strl. Erection T 150 20 Feb’16 Apr’16 Aug’20 150 20 20  Civil work for Cable Gallery
from MSDS - 10 to 4RP in
progress.
 GIS panel to be erected
after completion of EOT
crane.
 All major eqpt. supplied &
erected.
5 Eqpt. Supply T 450 439 Sep’16 Jul’20 450 439 4  Balance supply- 132kv EHV
6 Eqpt. Erection T 450 402 Oct’16 Oct’16 Aug’20 450 402 2 cable, 132 KV Transmission
7 Testing & Nov’16 Feb’21 line Strs.
Commsng.  Order Placed by M/s Mecon
to M/s KEC for transmission
line work.

12
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: 6020- Up gradation of 06 nos. of ESP’s of Lime kiln
(Agency- M/s Thermax Ltd.)
Effective Date of Contract: 13.02.17 Ord. Cost/ Package Cost : Rs. 21.85 Cr
Commissioning (Contractual): Jun’19 Sanc. Cost/ Anticipated Cost: Rs 21.85 Crs
Commissioning (Revised): Dec’20 Expenditure (Upto Jun’20) : Rs. 11.63 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: A Mairh, Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd 4th Wk 5th Wk Plan Act ESP-6: Put in operation
Wk on 22.03.18. PAC issued
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
ESP-1: Exhauster started
05.07.20 12.07.20 19.07.20 26.07.20
on 22.1.19. Put in
11.07.20 18.07.2025.07.20 01.08.20
operation on 01.02.19,
1 Design & Engg.
under stabilization.
Basic Engg. Nos 24 23 24 23
 ESP-3: Kiln no-3 put in
Detail Engg. Nos 46 33 46 33 operation on 29.06.19.
3 Strl. Fabn. T 1000 666 1000 666 ESP-4:.Put in operation
on 16.01.20. PAC issued.
4 Strl. Erection T 1000 666 1000 666
ESP-5: S/D received on
5 Eqpt. Supply T 03.03.2020. Dismantling
work completed.
8 Eqpt. Erection T
 Erection of TR set
9 Testing & Jun’19 Dec’20 completed.
Commsng.  Mechanical Erection
100% completed.
Welding in progress.
 Cable laying &
termination in progress.
 Trial run of ESP-5 plan
by 12.08.2020
 ESP-2: S/D awaited.

13
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: CHSGP in BF-1,2&3
(Agency: Pkg-1:M/s Zuberi/HNSC, Pkg-2:IEEP, Pkg-3: TTTK)
Effective Date of Contract: 28.04.10 Ord. Cost/ Package Cost : Rs. 207.78 Crs
Commissioning (Contractual) : Oct’12 Sanc. Cost/ Anticipated Cost: Rs. 207.78 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs. 97.49 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: Ratan Kr, /AK Paswan

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance May’20 Jun ’20 Jun’20 Remarks/ Critical areas/ Reasons for
Mar’20 Actual / Cumulative delay
Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk P A
Start Compl Plan/Act Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 1.08.20
1 Design & Engg Pkg-1
Pkg-1 Nos 526 526 May’10 Apr’11 Sep’11A 526 526  CH -3-CC issued on 3.3.16.
Pkg-2 Nos 400 400 May’10 Apr’11 Feb’12A 400 400  CH-6- CC issued on 6.8.13.

Pkg-3 Nos 246 246 May’10 Apr’11 May’12A 246 246  CH-5- CC issued on 8.1.18.
 CH-4: CC issued on 05.01.20
Civil Work
2 Piling Pkg-1 Nos 762 762 May’12A 762 762
 CH-2: Testing & Trial run of
3 Excavation
individual eqpt in progress.
3
Pkg-1 M 26710 26710 Aug’10 Jul’12 Jun’13A 26710 26710
3
Pkg-2 M 5000 5000 Aug’10 Jul’12 Mar’12A 5000 5000  CH-1: Foundation fauling
Pkg-3 M
3
17000 14750 Aug’10 Jul’12 Aug’20 17000 14750 with existing electrical room &
4 Concreting storm water line under
3 examination by CET. CET has
Pkg-1 M 11020 10920 Aug’10 Jul’12 Jun’20 11020 10920
3
requested the party to submit
Pkg-2 M 700 700 Aug’10 Jul’12 Apr’12A 700 700
revised drawing for new
3
Pkg-3 M 5000 4500 Aug’10 Jul’12 Aug’20 5000 4500
foundation.
5 Strl. Fabn.

Pkg-1 T 1456 1456 Aug’10 Aug’11 Aug’12A 1456 1456 Pkg-3:


Pkg-3 T 5100 4800 Aug’10 Aug’11 Aug’20 5100 4800  11/31 nos conveyors
installed.
 5/15 nos. Jn. house done.

14
QMS/PROJ/PPM/R-03 dtd 01.08.2020
SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk P A
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
6 Strl. Erection

Pkg-1 T 1822 1807 Feb’11 Jun’12 Aug’20 1822 1807

Pkg-3 T 5100 4700 Feb’11 Jun’12 Aug’20 5100 4700


7 Eqpt. Supply T

Pkg-1 T Dec’10 Nov’11 Oct’12A

Pkg-2 Nos. 70 70 Dec’10 Nov’11 Jan’14A 70 70


Pkg-3 T Dec’10 Nov’11 Aug’20
8 Eqpt. Erection

Pkg-1 T Mar’11 Aug’12 Oct’20


Pkg-2 T 70 50 Mar’11 Aug’12 Oct’20 70 50 Pkg-2: PCC, MCC-2
nos. & 1.6MVA
Transformer-2 nos.
charged.
Pkg-3 T Mar’11 Aug’12 Oct’20
9 Testing &
Commsng.
BF-3 May’11 Oct’11 CH-6:Oct’12A
CH-5: Jan’18A
BF-2 Nov’11 Apr’12 CH3:Jul’13A
CH4:Jan’20A
BF-1 May’12 Oct’12 Nov’20

15
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-066C Augmentation/Upgradation of BF High line conveying system
(Agency-M/s BHEL)
Effective Date of Contract: 29.09.11 Ord. Cost/ Package Cost: Rs. 48.64 Crs
Commissioning (Contractual) : Apr’13 Sanc. Cost/ Anticipated Cost: Rs. 48.64 Crs
Commissioning (Revised) : Oct’20 Expenditure (Upto Jun’20) : Rs. 41.72 Crs
Commissioning (Target / Likely): Oct’20/ Oct’20 Project Manager: AK Sudhanshu, Mgr(P)

SN Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
st nd rd th th
Mar’20 Start Compln Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A
Plan/Act Plan/Act. Plan/Act Plan/ActPlan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Nos. 21 21 Nov’11 Jul’12 May’13A 21 21  43/47 nos. Conveyors
Engg.-Basic are upgraded and put
Detail Engg. 240 233 Jan’20* 240 233 to use & under
2 Civil Work commercial production.
3
Excavation m 400 400 Apr’12 Oct’12 Mar’13A 400 400
3
Concreting m 295 295 Apr’12 Oct’12 Dec’13A 295 295
4 Eqpt Supply- No 149 149 Jun’12 Dec’12 May’15 149 149
Mech & Elect A
5 Eqpt. Erecn- No 149 130 Jul’12 Mar’13 Jan’20* 149 130
Mech & elect
6 Test & Comm. Apr’13 Apr’13 Oct’20  Design Issue of space
constraint in balance 4
nos. of shuttle
Conveyors.
 Out of 4 remaining
Conveyors, 1 conveyor
will be erected subject
to availability of
Shutdown.

16
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: 5938-Up-gradation of Stoves of BF # 1
(Agency-M/s Paul Wurth +MCK Kutty)
Effective Date of Contract: 25.10.16 Ord. Cost/ Package Cost : Rs. 112.13 Crs
Commissioning (Contractual): Jan’18 Sanc. Cost/ Anticipated Cost: Rs 112.13 Crs
Commissioning (Revised): Jan’20 Expenditure (Upto Jun’20) : Rs 97.49 Crs
Commissioning (Target / Likely): Jan’20/ Jan’20 Project Manager: AK Paswan,

S.No Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
. Mar’20 Actual / Cumulative Reasons for delay
Start Compln Likely Plan Actual Plan Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg. Nos 414 414 May’17 Jul’19A 414 414  BF -1 Stove put in
th
2 Civil Work operation on 8
3 Jan’20.
Concreting M 500 485 Jul’17 Dec’19 500 485
 CC issued on
3 Strl. Fabrication T 1800 1800 Jul’17 Feb’19A 1800 1800 13.07.2020.
4 Strl. Erection T 1800 1800 Aug’17 Jul’19A 1800 1800
5 Refractory
work
De-bricking of T 19500 19500 Feb’17A 19500 19500
existing refract.
Refr. Supply T 7900 7900 Feb’19A 7900 7900
Refr. Lining T 7900 7900 Jul’19A 7900 7900
6 Eqpt. Supply- T Sep’17 Aug’19A
7 Eqpt. Erection T Oct’17 Aug’19A
8 Testing & Jan’18 Jan’20
Commsng.

17
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. No. Manager Date / Expt. Till Compln. Compln.
Jun’20 (Crs)
2 Pkg-1 Pig Casting Machine for A K Paswan Rotamech+ 06.05.17 15.46 / Jun’18 Dec’20  Design & Engg. - 79/80 nos. done.
PCM Up-gradation of PCM AGM(P) Geetanjali 10.29  Dismantling work of PCM-3 completed.
for BFs + HMTC  Civil foundation -22/22 nos. completed
 Structural work- 270/290 T done.
3
 Concreting- 100/200 m done.
 Crane erection – 2/5 nos. Crane telphers done.
 Erection of Roller in Progress.
 Supply of electrical is completed & work is yet
to be started.
3 Pkg-2 1 no. 10T Capacity DG A K Paswan Cranex 09.12.15 1.94/0.35 Jan’17 Nov’20  Contract signed on 07-03-16
(PCM) Electromagnet eqpt. AGM(P) Ltd. 12 Mths  Basic drgs -19/19 & Detail engg -73/73 nos.
EOT Crane in the Cold done.
Pig Yard and 1 no. 5T  Assembly & ercn of 5 T & 10T crane done.
Capacity Grab Bucket  Electrical work for 5Tcrane is in progress.
eqpt. Portal Crane over
the Lime Settling Pit

18
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: 5230-Provn. of ATC & OTC in Oxygen Plant
(Agency-M/s CKD Nove +Shriram EPC)
Effective Date of Contract : 03.05.06 Ord. Cost/ Package Cost : Rs. 63.24 Crore
Commissioning (Contractual): Jan’08 Sanc. Cost/ Anticipated Cost : Rs. 81.76 Crore
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs. 59.53Crore
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager : A Kumar, AM (P)

 Commissioning of OTC done in Aug’12. CC for OTC issued on 16.03.13.


 ATC: New Suction Air filter and Reactor for ATC supplied and erected. Commissioning of ATC to be started.
 PBG of M/s Howden CKD expired on 03.12.19 though they have extended the insurance upto 31.03.20.
 The party has been communicated about extension of PBG so that their LC could be opened, which is the pre-condition of the party before start of work.
 Issue: Opening of letter of credit (LC).

Project: Pkg-15* EOT Cranes for SMS-II (Group-I) (3 nos. 450T EOT Cranes)
(Agency-M/s HEC)

Effective Date of Contract: 02 Sep’08 Ord. Cost/ Package Cost : Rs 63.37 Crs
Commissioning (Contractual): Mar’10 Sanc. Cost/ Anticipated Cost: Rs. 63.37 Crs
Commissioning (Revised): Dec’20 Expenditure (Upto Jun’20) : Rs. 61.91 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: Arijit Ghosh, Sr Mgr(P)
S. N Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg. Nos 94 94 Oct’08 Jul’09 Dec’10A 94 94 1st Crane: Crane is
put to use for Hot
2 Eqpt Supply- Mech T 1758 1758 Apr’09 Jan’10 Jul’15A 1758 1758 Metal handling on
29.08.18.
- Elect T 133 133 Apr’09 Jan’10 Jul’15A 133 133 2nd Crane: 85%
Mechanical erection
3 Eqpt Erection T 1880 1000 Oct’09 Feb’10 Dec’201880 1000 400 400 done. Alignment work in
progress.
4 Trial Run & Comm. Mar’10 Mar’10 Dec’20  Electrical work to be
started.
19
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-15* EOT Cranes for SMS-II (Group-II) (EOT crane – 4 nos. & Under Slung crane- 7 nos.)
(Agency-M/s Anupam)

Effective Date of Contract: Oct’08 Ord. Cost/ Package Cost : Rs 22.85 Crs
Commissioning (Contractual): Feb’10 Sanc. Cost/ Anticipated Cost: Rs. 22.85 Crs
Commissioning (Revised): Dec’20 Expenditure (Upto Jun’20) : Rs. 13.61 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager: Arjit Ghosh/ Sr Mgr(P)

S.N Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical
Till Actual / Cumulative areas/ Reasons for
st nd rd th th
Mar’20 Start Compl Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk Plan Act delay
Plan/Act Plan/ActPlan/Act. Plan/ActPlan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Basic engg Drgs. Nos 26 26 Oct’08 Jul’09 Oct’10A 26 26  2 nos. of double
girder crane & 1 nos.
Detail engg Drgs. Nos 158 155 Nov’08 Jul’09 Dec’10A 158 155 under slung crane
erection completed.
2 Eqpt Supply- T 370 370 Apr’09 Dec’09 Jan’11A 370 370  Part PAC for Torpedo
Mech ladle repair shop
- Elect T 70 70 Apr’09 Dec’09 Mar’11A 70 70 crane (20/5T) issued.
 Erection is linked
3 Eqpt Erection- T 370 120 Oct’09 Feb’10 Nov’20 370 120 with completion of
Mech new torpedo bay
- Elect T 70 30 Oct’09 Feb’10 Dec’20 70 30 Pkg-20 & Tundish
deskulling shop Pkg-
4 Trial Run & Feb’10 Feb’10 Dec’20 32.
Commissioning  Issue: Party has
claimed for
additional repair &
refurbishing cost.

20
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-16* Torpedo Ladle Car (08 nos)
(Agency-M/s QQHI, China)
Effective Date of Contract: Sep’08 Ord. Cost/ Package Cost : Rs 40.77 Crs
Commissioning (Contractual): Aug’10 Sanc. Cost/ Anticipated Cost: Rs. 40.77 Crs
Commissioning (Revised): Dec’20 Expenditure (Upto Jun’20) : Rs. 30.54 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager:- A. Ghosh, Sr Mgr(P)
S.N Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical
Till Actual / Cumulative areas/ Reasons for
st nd rd th th
Mar’20 Start Compl Likely Schdl Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk Plan Act delay
Plan/Act Plan/ActPlan/Act. Plan/ActPlan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Basic Engg.Drgs Nos 13 13 Sep’08 Oct’10 Oct’10A 13 13  Supply of all 8 nos.
Torpedo Ladle
Detail Engg. Drgs Nos 29 29 Nov’08 Dec’08 Dec’10A 29 29 completed.
 Presently 02 nos
2 Eqpt Supply- Mech T 1312 1312 Jan’09 Dec’09 Sep’11A 1312 1312 Torpedo Ladle are
under operation
Refractory Supply T 1368 340 Jan’09 Dec’09 Oct’20 1368 340 and 2 nos. waiting
for de-bricking &
relining.
3 Eqpt Ercn- Mech T 1312 1312 Jan’10 Aug’10 Dec’11A 1312 1312  For Balance 04
nos Torpedo Ladle
Refractory Ercn T 1368 340 Jan’10 Aug’10 Nov’20 1368 340 refractory supply
and lining to be
4 Trial Run & Aug’10 Aug’10 Dec’20 done by party.
Commissioning  Party has claimed
escalation of 28%
for supply of
refractory.
 VC has been done
with the party &
has been asked to
start the work.

21
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-20*- Civil, Structural, Piping, Dismantling Rerouting Works of SMS-II
(Agency-M/s TTTK)

Effective Date of Contract: 25.08.08 Ord. Cost/ Package Cost: Rs 96.33 Crs
Commissioning (Contractual) : Apr’10 Sanc. Cost/ Anticipated Cost: Rs. 171.81 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs 134.56 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: Om Prakash, Sr Mgr(P)

S.N Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Mar’20 Actual / Cumulative areas/ Reasons for
st nd rd th th
Start Compln Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk Plan Act delay
Plan/Act Plan/Act Plan/ActPlan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20 HMDS Main
11.07.20 18.07.2025.07.20 01.08.20 bldg:-
1. Design & Engg Nos 257 257 Sep’08 May’09 May’11A 257 257  Balance structural
work in progress.
2. Piling Nos 1785 1785 Oct’09 Apr’17A 1785 1785
New Torpedo Bay
3. Excavation
3
m 127200 112750 Oct’08 Nov’09 Dec’20 127200 112750 (11m)
 8M wall completed.
4. Concreting
3
m 21027 18410 Nov’08 Jan’10 Dec’20 21027 18410 Balance work: civil
work for Pit, Bldg
5. Strl Fabn T 7800 6650 Oct’08 Oct’09 Dec’20 7800 6650 str fabrication &
erection.
6. Strl. Erection T 7800 5650 Dec’08 Nov’09 Dec’20 7800 5650 15 15

7. Railway Track R/ 8250 8000 Apr’10 Dec’20 8250 8000


M
8. Pipeline – supply R/ 5720 5720 Apr’10 May’10A 5720 5720
M
9. Pipeline – 5720 5720 Apr’10 May’10A 5720 5720
Erection

22
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-36*- Hot Metal De-Sulphurisation unit of SMS-II
(Agency-M/s Tata Project / Danieli)

Effective Date of Contract: 31-07-08 Ord. Cost/ Package Cost : Rs 58.50 Crs
Commissioning (Contractual): Apr’10 Sanc. Cost/ Anticipated Cost: Rs. 58.50 Crs
Commissioning (Revised): Dec’20 Expenditure (Upto Jun’20) : Rs. 67.82 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager: Sh. J Kumar, Sr Mgr(P)
S. No Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Mar’20 Actual / Cumulative areas/ Reasons for
Start Compln Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act delay
Plan/Act. Plan/Act. Plan/Act Plan/Act. Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg  PAC issued on
Nos 198 26/02/16.
Basic Engg 198 Dec’08 Jul’09 Nov’11A 198 198
 Meeting held at
Corporate Office on
Detail Engg Nos 304 304 Dec’08 Jul’09 Mar’12A 304 304
20/21.01.2020 to
resolve the issue
2 Bldg. Strs. Fabn T 528 528 Aug’09 Jan’10 Feb’12A 528 528 regarding the pre-
conditions raised by
the consortium for
Bldg. Strs.-Ercn T 528 528 Oct’09 Feb’10 Jan’13A 528 528
submission of revised
offer for
3 Tech Strs. Fabn T 1343 1343 Aug’09 Jan’10 May’12A 1343 1343 refurbishment jobs.
 Price variation
Tech Strs.-Ercn T 1343 1343 Oct’09 Feb’10 Aug’14A 1343 1343 payment to be made
to M/s TPL, before
actual issuance of CC.
4 Eqpt Supply- T 20 20 Sep’09 Mar’10 May’10A 20 20
 As discussed the CC
Mech Imported payment to be made
Eqpt Supply- T 942 942 Sep’09 Mar’10 Oct’12A 942 942 to M/s DCBV without
Indg. BG and Interest
5. bearing Advance for
Eqpt Erection- T 20 20 Sep’09 Apr’10 Oct’13A 20 20
Rs.5.0 Cr. to be made
Imported
to M/s TPL.
6 Eqpt Ercn –Indg. T 942 942 Sep’09 Mar’10 Sep’14A 942 942
 PV payment to be
made after actual
8 Trial Run & Mar’10 Apr’10 Dec’20 commissioning of
Commissioning the project.

23
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-40*- Extension of LD gas pipeline from SMS-II area to TPP area
(Agency-M/s UB Engg)
Effective Date of Contract: 06-04-11 Ord. Cost/ Package Cost : Rs 16.24 Crs
Commissioning (Contractual): Apr’12 Sanc. Cost/ Anticipated Cost: Rs. 16.24 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20): Rs 15.14 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager: Sh. RK Ojha, AGM(P)

S. N Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Mar’20 Actual / Cumulative areas/ Reasons for
st nd rd th th
Start Compl Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk Pla Act delay
Plan/Act Plan/Act. Plan/Act Plan/Act. Plan/Act n
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
 Design & Engg Nos 262 262 May’13A 262 262  All Civil, Structural,
Mechanical eqpt
 Piling 80 80 Jun’13A 80 80 along with Utility
Pipeline (Nitrogen
3
 Excavation m 6220 6220 Aug’13A 6220 6220 & Water) erection
 Concreting m
3
6030 6030 Aug’13A 6030 6030 completed.
 Strl Fabrication T 680 680 Apr’14A 680 680  Electrical and
instrumentation
 Strl. Erection T 680 660 Dec’15 680 660 work completed.
 Integrated testing
17 17 17 17 to be done at the
 Eqpt Supply- Nos Apr’13A
time of
Mech
29 29 29 29
commissioning of
 Eqpt Supply- Nos Mar’14A
gas holder.
Elect
 Eqpt Erection- Nos 17 17 Oct’17A 17 17
Mech
 Eqpt Erection-Elect Nos 29 21 Aug’20 29 21

 Trial Run & Apr’12 Dec’20


Commissioning

24
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-41*- Gas Holder, ESP & Booster Fan complex –SMS-II
(Agency-M/s Gillanders- MICCO/BBIL-CWG)
Effective Date of Contract: 02-08-08 Ord. Cost/ Package Cost : Rs 102.67 Crs
Commissioning (Contractual): Sep’10 Sanc. Cost/ Anticipated Cost: Rs. 102.67 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs 95.23 Crs
Commissioning (Target / Likely): Dec’20/Dec’20 Project Manager: Sh. RK Ojha, AGM(P)

S. No Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Start Compln Plan/Act Plan/Act. Plan/Act. Plan/Act. Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1. Basic Engg. Nos 10 10 Sep’08 Nov’09 Oct’10A 10 10  Gas Holder is ready for
charging. For regular
2. Detail Engg. Nos 630 630 Sep’08 Nov’09 Feb’12A 630 630 recovery of LD Gas,
compliance of
3. Piling Nos 120 120 Jan’09 Dec’09 Nov’10A 120 120 recommendation of
M/s NSC is to be done.
3 In-principle approval
4. Concreting m 1685 1685 Jan’09 Dec’09 Jan’13A 1685 1685
has been obtained and
is being executed
5. Strl Fabrication T 2791 2791 Apr’09 Apr’10 Mar’12A 2791 2791
through Works Divn.
 Procurement of sensors
6. Strl. Erection T 2791 2791 Apr’09 Jun’10 Mar’14A 2791 2791
& Gas Analyzer is in
process.
7. Eqpt Supply- Nos 75 75 Apr’09 Apr’10 Sep’13A 75 75  For trial testing of gas
Mech holder, recovery of
8. Eqpt Supply- Nos 20 20 Jun’09 Feb’10 Apr’14A 20 20 14000 m3 LD gas done
Elect on 30.01.2020 with
9. Eqpt Erection- Nos 75 75 Apr’09 Jul’10 Oct’17A 75 75 converter-2 of SMS-2.
Mech  Civil work of HNRV
10. Eqpt Erection-Elect Nos 20 20 Nov’09 Jul’10 Nov’17A 20 20 (Hydraulic Non Return
Valve) is in progress.
 Strl. Shop- Fabrication
11. Trial Run & Aug’10 Sep’10 Dec’20
/ Bending of plate in
Commissioning
progress.
 Fabrication of Outlet
duct in progress.

25
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project:26(AB)-Augmentation of water supply facilities at GCP, SMS & CCD shop
(Agency-M/s OEPC Pvt Ltd)
Effective Date of Contract: 29.10.12 Ord. Cost/ Package Cost : Rs. 31.18 Crs
Commissioning (Contractual) :May’14 Sanc. Cost/ Anticipated Cost: Rs 31.18 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs 18.00 Crs
Commissioning (Target / Likely): Dec’20 /Dec’20 Project Manager: MK Kaushik, Sr Mgr(P)

SN Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg.  GCP PH: Trestle fdn. 5/8
Basic Engg. Nos 9 8 Jul’20 9 8 nos done. Remaining
work in progress.
Detail Engg. Nos. 173 166 Aug’20 173 166 7
 Balance supply: Air
2 Civil Work
3
washer system, HT
Excavation M 3832 3665 Aug’20 3832 3665 40
cable, Soft water plant,
3
Concreting M 1500 1088 Aug’20 1500 1102 60 20/14 20/ 20/ 20/ 80 14 LT control cable,
(PCC+RCC)
Control valve & Elect
3 Strl. Fabrication T 185 86 Aug’20 185 86 20 cable tray.
4 Strl. Erection T 185 54 Oct’20 185 60 8 6 2/ 2/ 2/ 2/ 8
 Civilwork for Pump
5 Eqpt. Supply- Nos 27 19 Aug’20 27 19 4
Mech. house and cooling
Eqpt Supply- Nos. 30 17 Aug’20 30 17 8 Tower in progress.
Elect+Instmn
Pipe supply (DN RM 3654 3534 Aug’20 3654 3534 20  Piping work from pump
250 & above) house to cooling Tower
6 Eqpt. Erection Nos 57 5 Nov’20 57 5 12 is in progress.
Pipe laying RM 3654 689 Nov’20 3654 689 200

7 Testing & Dec’20


Commsng.

26
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N No. Manager Date (Crs)/Expt. till Compln. Compln.
Jun’20 (Crs)
Modernisation of SMS-II
1. 4* Under slung crane for CCS & R K Ojha Robin Engg. 11-06-11 0.51/ Nov’11 *  PBG not submitted. Party is not responding.
SMS-II complex (3 nos.) AGM(P)  To be closed by Dec’20.

2. 5* Freight cum passenger lift of J Kr ECE Industries 15-07-11 0.16/ Apr’12 *  Risk Purchase action dropped on request of
1.5 T cap. in CCD of SMS II (Sr. Mgr) Party in Apr'15. Again party is not responding
even after continuous follow up for starting
Design & Engg work.
 To be closed by Dec’20.
3. 6* Electrics for extn of CCD shop J. Kr. IEP, Kolkata 14-03-11 1.13/ Apr’13 Dec’20  Design & Engg -13/27 nos.
Sr Mgr(P) Issue: Front is dependent on completion of
Bldg. extn. of SMS II & CCD (under Pkg-7*).
 To be closed by Dec’20.
4. 7* Building extn of SMS-II& CCD Om Geetanjali 11-06-11 9.5/ Nov’12 Dec’20  Design & Engg in progress-66/70 nos.
Prakash 5.71  SMS-2: Piling –all 42 nos. completed.
Sr Mgr(P) Foundation work - 2/3 no. done.
 CCD: Piling -69/69 nos. done.
 To be foreclosed by Dec’20.
5. 17* Torpedo Ladle Heating, Drying, J Kr Ador 02-08-08 2.35/ Apr’09 Dec’20  Both heating stn 1 & 2 put in use on 22.08.18
Cooling System for SMS-II (Sr. Mgr.) Welding 2.12 & handed over to operation.
 Party is not responding for automation work.
M/s Ador is demanding refurbishment cost
and milestone payment for further work.
 Engineer’s notice issued on 21.03.20.

27
QMS/PROJ/PPM/R-03 dtd 01.08.2020

SN Pkg Description Project Agency LOA Date Ordered cost Schdl. Likely  Present Status
No. Manager (Crs)/Expt. till Compln. Compln.
Jun’20 (Crs)
6. 18* Ladle, Ladle Stand & Transfer R K Ojha Mukand, 02-08-08 27.84/ Dec’09 Dec’20  2/2 nos. Steel Ladle, 2/4 nos. Hot Metal Ladle
Car for SMS-II AGM(P) Thane 26.84 and 2/5 no. Ladle stand handed over to users
(L stand -5 nos, Tr. Car -4 nos, dept. & put to use.
Steel Ladle -2 nos.  Erection and trial run of 2/4 nos. of Hot
Hot Metal Ladle -4 nos.) metal Transfer Cars in HMDS done.
 Testing of Ladle tilter done on 12.10.18. Ladle
preparation done on 01.11.2018.
 Hot Metal Transfer Car.
 Both transfer car drive testing and trial run
done. Car#2 put to use on 29.08.18 for
transfer of Hot Metal ladle with load.
 Balance 2 nos. Transfer car and 1 no. Ladle
stand in New torpedo Bay.
 Refractory Lining of 02 no. Hot Metal ladle
completed.
 3/4 Ladle shifting done. Balance 1 no. Ladle
shifting is awaited.
7. 28* Steel ladle drier & cooler A Kumar, Wellman 06-01-10 2.14/ Feb’11 *  Design & Engg- 77/85 nos. done
AM(P) Wacoma 1.35  As Front could not be provided to party, Party
has gone for arbitration.
8. 21* Dismantling / Relocation of 4 R K Ojha. JK Entp, 01-08-08 4.59/ Feb’09 *  1 no. Nitrogen vessel from Strl Shop supplied
3
nos. of N2 Vessels (100 m ) for AGM(P) BS city 3.95 & erected at site.
SMS-II  All 3 nos tapping of N2 line completed during
S/d of SMS-II on 13.05.13.
 HP & LP nitrogen line under use and feeding
nitrogen in ID fan complex and gas holder.
 Under process for foreclosure.

28
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Pkg Description Project Agency LOA Date Ordered cost Schdl. Likely Present Status
N. No. Manager (Crs)/ Expt. till Compln. Compln.
Jun’20 (Crs)
9. 22* Electrics A Kumar IEP 29-08-08 2.64/ Jul’09 Dec’20  Torpedo ladle repair shop: Electric Work
AM(P) 2.22 of Torpedo Ladle repair shop is completed.
 Desulphurisation bay: Electric Work in
Desulphurization Bay -50% completed.
 Tundish repair shop: Electric work to be
started after completion of civil work of
TRS by M/s Geetanjali (Pkg-32*).
 New Torpedo bay: Electric work to be
started after completion of civil work of
NTB by M/s TTTPL (Pkg-20*).
10. 31* Tundish deskulling shop R K Ojha Graduate 11-06-11 8.53/ Jun’12 Jun’21  Design & Engg. -36/38 nos. approved.
AGM(P) Agro 9.56  All equipment supplied. [Tundish lifting
Transverse (2 no.), Rubbish container (3
nos.), 2 nos. Tundish lifting Transverse
stand-2 nos. and Tundish deskulling stand
along with Hydraulic system.
 Ercn of eqpt shall be done after
construction of Tundish Deskulling shop
(Pkg-32).
11. 32* Civil & Strl work for Tundish Om Prakash Geetanjali 11-06-11 8.78/ Jul’12 Dec’20  Design & Engg-70/75 nos. completed.
Deskulling shop Sr Mgr(P) 7.99  Piling- 180/180 nos. completed.
 Fabrication 1000/1200 MT completed,
 Structures ercn-800T done.
 Column erection 18/18 nos. and Crane
girder 16/16 nos. completed.
 Assembly of roof truss in progress. 5/17
nos roof truss erection completed.
 Engineers notice issued to party on
20.03.20.
 Fabrication work is in progress.

29
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. No. Manager Date / Expt. till Compln. Compln.
Jun’20(Crs)
12. 36A Supply & Erection of Om Prakash HN Const + 27.01.15 2.19 / Jun’15 Dec’20  Design & Engg completed.
Refractories & Auxiliaries for Sr Mgr(P) HN Refractory 2.08  Alumina bricks- 330000/330000 nos.
Protection Lining in HMDS & supplied.
New Torpedo Bay  Ref lining -240000/330000 nos done.
 Ref lining of pit -1 &2 in HMDS bay done
 Balance work- Ref lining in new torpedo
bay.
 Issue: Work is held up due to non-
availability of front at new torpedo bay.
13. 43* Extension of trollyline in M.K. Kaushik Sharmila 17-11-10 0.47/ Dec’11 Dec’20  Change order issued on 29.03.18 for extra
desulphurization bldg of Sr Mgr(P) Entp. 0.27 job. Isolator (channel fixing) work done.
SMS-II  Erection of Bus bar and DSL support done.
 Trial run of HMTC done.
 Copper Cable & Termination kit supplied
at site.
 All balance work completed. Ready for
commissioning.

30
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-3-Suppressed Combustion system with repl. of BOF converter- Modn of SMS-I
(Agency-M/s Primetals + L&T)
Effective Date of Contract: 01.07.15 Ord. Cost/ Package Cost : Rs. 444.7 Crs
Commissioning (Contractual) :Nov’17 Sanc. Cost/ Anticipated Cost: Rs 444.7 Crs
Commissioning (Revised) : Jun’20 Expenditure (Upto Jun’20) : Rs 377.28 Crs
Commissioning (Target / Likely): Jun’20/ Aug’20 Project Manager: Om Prakash, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
st
05.07.20 12.07.20 19.07.20 26.07.20  1 Heat from BOF converter
11.07.20 18.07.2025.07.20 01.08.20 done on 22.05.19.
1 Design & Engg.  No. of Heats: 205 nos.
Basic Engg. Nos 317 Jul’15 Jul’16  From 29.06.20, heats are
317 Feb’19A 317 317
being made in converter-5
Detail Engg. Nos 968 968 Oct’15 Apr’17 Apr’19A 968 968 but some major issue are
2 Civil Work creating hindrance in
3 continuous heat making i.e.
Excavation M 8300 8000 Oct’15 Mar’17 Mar’20 8300 8000 300 - Both gear boxes of Slag
3
Concreting M 13899 13830 Dec’15 Sep’17 Jul’20 13899 13830 40 10/ 10/ 10/ 10/ 40 pot transfer car (SPTC) failed
3 Strl. Fabn. T 3700 3700 May’16 Apr’17 May’18A 3700 3700 in the span of 3 days. These
were replaced by gear box
4 Strl. Erection T 3700 3670 Jan’16 May’17 Jun’20 3700 3670 30 of SPTC of Converter-1 &
5 Eqpt. Supply- T 5400 5400 Nov’15 Jul’17 Sep’19A 5400 5400 repaired gear boxes by
Indg.+Imp Shop.
6 Pipe laying RM 1130 1130 Nov’18A 1130 1130 - Slow flux addition.
(800M)  CO Network Piping from
7 Eqpt. Erection- T 5400 5300 Sep’16 Oct’17 Aug’20 5400 5300 Gas Holder up to Blast
Indg.+Imp furnace - 95% done.
8 Testing & Aug’17 Nov’17 Aug’20  Electrical work for Heat track
Commsng. is in progress.
 Convertor#1 Track work in
progress.
 Drainage work in progress.

31
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project:Pkg-4: Ladle furnace with associated facilities- SMS-I
(Agency- M/s SMS India Pvt.)
Effective Date of Contract: 02.09.16 Ord. Cost/ Package Cost : Rs. 95.23 Crs
Commissioning (Contractual) : May’18 Sanc. Cost/ Anticipated Cost: Rs 95.23 Crs
Commissioning (Revised) : Oct’20 Expenditure (Upto Jun’20) : Rs 54.97 Crs
Commissioning (Target / Likely): Oct’20/Oct’20 Project Manager: A Ghosh, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg. Nos  Cooling tower: construction of
Basic Engg. 170 filler beam, & baffle wall in
170 Oct’16 Apr’17 Feb’18A 170 170
progress.
Detail Engg. 219 210 Jan’17 Sep’17 Jul’20A 219 219 4 4 5/5 5 5  LF Proper: Mechanical erection
2 Civil Work done. Balance Piping &
100 50 electrical work.
3
Excavation M 6605 6400 Apr’17 Oct’17 Aug’20 6605 6450 200 25/ 25/ 50/50
 Erection & Alignment of
100 140 Primary Pump house done.
3
Concreting M 5459 4932 May’17 Nov’17 Aug’20 5459 5122 500 25/40 25/50 25/50 25/50
 Lab eqpt. Dust monitoring
3 Strl. Fabrication T 700 670 May’17 Nov’17 Aug’20 700 680 40 10 20/20 10/ 10/10 30 30 system supplied at site.
4 Strl. Erection T 700 600 Jun’17 Jan’18 Aug’20 700 640 100 40 15/20 15/ 15/ 15/20 60 20  Welding work of FAFA building
is in progress.
5 Eqpt. Supply T 600 540 May’17 Dec’17 Jul’20A 600 600 60 10/10 10/ 10/ 10/50 40 10  Secondary Pump house -
6 Eqpt. Erection T 600 470 Jun’17 Feb’18 Sep’20 600 520 100 20 20/30 20/ 20/ 20/20 80 50 Cable laying & Electrical work
is in progress.
7 Testing & May’18 Oct’20  Erection of material handling
Commsng. system in QR bay in progress.
 Concreting of Hydraulic Room,
nd
AHU Room 2 slab & Deck
slab completed.
 Panel Erection in MCC Room
completed.
 Transformer Alignment
done.
 HT Room- Civil work & Cable
trench completed.
 Duct Erection at PQ Cable
bay in progress.
32
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-5-Slab caster with associated facilities – Modn of SMS-I
(Agency-M/s Primetals +L&T)
Effective Date of Contract: 01.07.15 Ord. Cost/ Package Cost : Rs. 475.73 Crs
Commissioning (Contractual) :Nov’17 Sanc. Cost/ Anticipated Cost: Rs. 475.73 Crs
Commissioning (Revised) : Oct’20 Expenditure (Upto Jun’20) : Rs 426.91 Crs
Commissioning (Target / Likely): Oct’20/Oct’20 Project Manager: MK Kaushik, Sr Mgr(P)

SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Mar’20 Actual / Cumulative Reasons for delay
Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Ac
05.07.20 12.07.20 19.07.20 26.07.20  Oxygen line rerouting
11.07.20 18.07.2025.07.20 01.08.20 work completed on
1 Design & Engg. 13.02.2020.
Basic Engg. Nos 357 353 Jul’15 Aug’16 Oct’19A 357 357  Cable laying and

Detail Engg. Nos. 978 804 Dec’15 Jan’17 Jun’19A 978 978 termination -90% done.
 Dismantling of old
2 Civil Work
pipeline completed.
Piling Nos 745 745 Sep’15 Mar’17 Dec’17A 745 745  Erection of gable end
3
Excavation m 16000 14000 Sep’15 Mar’17 Jul’20 16000 15600 400 of PQ bay &
3
Concreting m 18627 11790 Dec’15 Sep’17 Jul’20 18627 18520 300 200 20/20 10/ 10/ 10/ 50 20 associated galleries in
3 Strl. Fabrication T 6500 6345 Mar’16 Apr’17 Dec19A 6500 6500 progress.
nd
 EOT Crane 2
4 Strl. Erection T 6500 4261 Apr’16 May’17 Jul’20 6500 6490 30 10 10/10 10/ 20 10 (100/20T) in QR bay:
5 Track Laying RM 3200 2641 Nov’15 Dec’16 Aug’20 3200 2800 Load testing done.
 Load trial of cooling
6 Eqpt. Supply- T 4600 3904 Dec’15 Jul’17 Mar’20A 4600 4600
(Indg. & Imp.) towers fans done.
 No load trial of COG
7 Eqpt. Erection- T 4600 855 Feb’16 Oct’17 Mar’20A 4600 4600
(Indg. & Imp.) booster done.
8 Testing & Aug’17 Nov’17 Oct’20  I/O checking for sand
Commsng. filter done.
 Utility Piping work -
128000 IM / 130000
IM done.

33
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Pkgs of HSM

S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. No. Manager Date / Expt. till Compln. Compln.
Jun’20 (Crs)
5927 Modernization of
Cooling system of HSM
3 Pkg-1 Supply of Pump & Anish Gupta Xylem water 24.10.15 6.95/ Mar’17 Dec’20  Design & Engg. -90% completed.
Motor System for PH-9 SM(P) solution 2.86  4/5 nos pump & motors supplied.
th
 4 set of Pumps & Motor arrived at site on
16.03.20.
 Ercn is in scope of Pkg-5.
4 Pkg-2 Supply & Installation of S.P. Gupta Otoklin 24.10.15 2.68/ Jul’16 Aug’20  Design & Engg. - 41/41 nos approved.
Filters in Filter house# SM(P) Global 2.27  All 14 nos. Filters & 28 nos valves supplied.
1&3  Valves -18/28 nos. erected.
 FH-3: Erection of filters 5/10 nos. done.
Performance is under observation.
 FH-1: Erection of filters 4/4 nos. done.
Performance is under observation.
5 Pkg-3 15/3T EOT Crane in S.P. Gupta Intricate 24.10.15 0.245 Oct’16 Dec’20  3 Engg. notice is given to the party.
Pump House#9 SM(P) Engg.  RPN Action initiated in April 19.
 CET has approved 10/22 of submitted drgs.
6 Pkg-4 Instrumentation & S.P. Gupta Technisys 24.10.15 3.98/ Aug’16 Feb’21  Design & Engg completed.
Control System for SM(P) Engg. 2.66  Supply completed.
Pump House #9  Cubicle & Panels installed in PH-10, FH-1 &
FH-3.
 Erection in Filter House to be started.
7 Pkg-5 Piping & Electrics for Anish Geetanjali, 24.10.15 4.186/ Jan’17 Mar’21  Design & Engg -35/55 nos submitted.
Pump House #9 Gupta, Bokaro 0.98  All 3 nos motorized Valve supplied.
SM(P)  Wall casting of pipe tunnel: 5/5 lift casting
done.
nd
 Preparatory job of 2 pump & motor set
completed, waiting for shutdown, likely to be
held in Aug’20.
 Cable and Relay to be supplied at site before
obtaining shutdown.
34
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Project: Pkg-038: Construction of welfare & Canteen building


(Agency-M/s HSCL)
Effective Date of Contract: Jul’11 Ord. Cost/ Package Cost Rs. 10.97 Crs
Commissioning (Contractual) : Jan’13 Sanc. Cost/ Anticipated Cost: Rs 10.97Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs. 10.49 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager: S Kant, Sr Mgr(P)/Ratnesh Kr.

SN Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Till Actual / Cumulative areas/ Reasons for
st nd rd th th
Mar’20 Start Compln Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A delay
Plan/Act. Plan/Act Plan/Act Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.20 25.07.20 01.08.20
1 Design & Engg Nos. 207 196 Aug’11 Jan’12 Dec’19 207 196
st
2 Civil Work  Welfare Bldg:-1
nd
Piling No 152 152 Sep’11 Aug’12 Jan’13A 152 152 & 2 floor handed
over to CRM-3.
3
Excavation m 6997 6805 Dec’11 Sep’12 Dec’19 6997 6805  Approval of civil
deviation for fdn
3
Concreting m 6805 6000 Jan’12 Nov’12 Dec’19 6805 6000 obtained.
 Electrical deviation
2
3 Shuttering m 16000 13000 Jun’12 Jan’13 Dec’19 16000 13000 in-principal approval
for supply of lab
4 Hand over Jan’13 Dec’20 eqpt. obtained.
 Canteen building:
Inspection for
handing over of
canteen bldg with
temporary power
supply done.
 Sub-Station Bldg:
Balance supply-
cable, bus duct, VCB.
HT cable laying from
MSDS-9 to sub-stn
bldg in progress.

35
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Pkg-039: EOT Cranes & Telphers- CRM III Part A-(4 Cranes) &Part B- (19 Cranes)
(Agency-M/s WMI)

Effective Date of Contract: Feb’10 Ord. Cost/ Package Cost : Rs 91.30 Crs
Commissioning (Contractual): PartA: Oct’10, Part-B: Aug’11 Sanc. Cost/ Anticipated Cost: Rs. 91.30 Crs
Commissioning (Revised): Jun’20 Expenditure (Upto Jun’20) : Rs. 91.20 Crs
Commissioning (Target / Likely): Jun’20/Nov’20 Project Manager: Alok Kr, GM(P)/ Amit kr

S.N Activity Unit Scope Done Till L-1 Schedule Compln Performance jun’20 Jul’20 Jul’20 Remarks/ Critical
Mar’20 Actual / Cumulative areas/ Reasons for
Start Compln Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act delay
Plan/Act Plan/Act. Plan/Act Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg Nos 1145 1145 Apr’15A 1145 1145  21/23 cranes
commissioned.
2 Eqpt Supply- T 2980 2980 Apr’15A 2980 2980
Part A (580 T)  Cr No-9:
Part B (2400 T) Shutdown work
3 Eqpt Erection T 2980 2980 Oct’10 Nov’15A 2980 2980 completed.

4 Trial Run & Aug’11 Nov’20  Cr No-10:


Commissioning Shutdown
awaited

36
QMS/PROJ/PPM/R-03 dtd 01.08.2020

Project: Pkg-042 Effluent treatment and disposal system for New CRM
(Agency-M/s Voltas)

Effective Date of Contract: Feb’10 Ord. Cost/ Package Cost: Rs. 7.59 Crs
Commissioning (Contractual) :Aug’11 Sanc. Cost/ Anticipated Cost: Rs. 7.59 Crs
Commissioning (Revised) : Jun’20 Expenditure (Upto Jun’20) : Rs. 7.52 Crs
Commissioning (Target / Likely): Jun’20/Aug’20 Project Manager: Shashikant Kr., Sr Mgr(P)

SNo Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Till Actual / Cumulative areas/ Reasons for
Mar’20 Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk P A delay
Plan/Act. Plan/Act Plan/Act. Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg.  PAC issued in
Basic Nos. 19 19 Apr’10 May’10 Nov’11A 19 19 Mar’15.
 Put in use on
Detailed Nos. 237 237 May’10 Mar’11 Oct’14A 237 237 16.01.2020.
 Plant is being
2 Civil Work
made ready for
Excavation m3 8293 8221 Mar’10 May’11 May’19 8293 8221 treatment after
rectification of
Concreting m3 3200 3200 Jun’10 Aug’11 Jan’19A 3200 3200
pipe leakage.
3 Eqpt Supply Nos  Bacteria
136 136 Jun’10 Apr’11 Jul’15A 136 136
Mech. generation is
Eqpt Supply Nos 155 155 Jun’10 Apr’11 Jul’15A 155 155 under progress.
Elect.
4 Eqpt Erecn Nos 136 136 Aug’10 May’11 Jul’15A 136 136
Mech
Eqpt Erecn Elect Nos 155 155 Aug’10 May’11 Jul’15A 155 155

5 Test & Comm. May’11 Aug’11 Aug’20

37
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-099 Interplant and Inshop pipeline for CRM-III
(Agency-M/s ACE Pipeline)

Effective Date of Contract: 19.11.10 Ord. Cost/ Package Cost: Rs. 61.50 Crs
Commissioning (Contractual) : Mar’12 Sanc. Cost/ Anticipated Cost: Rs. 61.50 Crs
Commissioning (Revised) : Dec’20 Expenditure (Upto Jun’20) : Rs. 42.59 Crs
Commissioning (Target / Likely): Dec’20/ Dec’20 Project Manager: Shashikant Kr. Sr Mgr(P)

SNo Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’ 20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
Mar’20 Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk P A
Start Compl Plan/Act. Plan/Act. Plan/Act. Plan/Act Plan/Act
05.07.20 12.07.20 19.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg. Nos 402 377 Nov’10 Mar’11 402 377  Charging of Steam,
2 Civil Work Mixed gas, compressed
air, Nitrogen, Propane
Excavation m3 9000 7200 Jan’11 Jul’11 Oct’13* 9000 7200
for CRM-3 completed.
Concreting m3 4000 2590 Feb’11 Jul’11 Oct’13* 4000 2590
 Balance work- Walkway
3. Strl. Fabn. T 4650 2100 Apr’11 Dec’11 Oct’13* 4650 2100
for mixed gas line,
Strl. Erection T 4650 1759 May’11 Dec’11 Oct’13* 4650 1759
Electrical & instrumn
4 Eqpt Supply-
work for operation of
Indg
valves for CRM-3.
Valves Nos. 708 686 Jan’11 Jul’11 708 686
 Part CC (55%) given on
Pipes M 31610 28350 Jan’11 Jul’11 3161028350 12.09.15.
5 Eqpt. Erection  Balance Works:
Valves Nos. 708 185 Mar’11 Feb’12 708 185  Steam pipeline from
Pipes M 31610 23360 Oct’11 Feb’12 31610 23360 TPP : 2 km balance
 O2 & N2 line (for BF
6 Test & Comm. Jan’12 Mar’12 Dec’20
Area): 3 km balance.
 Work is stopped from
Aug’16.
 21/31 km pipeline
done.
 Pre-closure of the
contract is under
process.

38
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Other ordered Pkgs of CRM-III

S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. No. Manager Date (Crs)/ Expt. Till Compln Compln
Jun’20(Crs)
1 034B Installation of 5 Nos. Sashikant Confidence 19-06-12 2.62/ Jan’13 Dec’20  Vessel-5&6: Installation, Erection, testing and
Nitrogen Storage Vessels Sr Mgr(P) Petroleum 1.70 connection with pipes done.
for CRM-III (Vessel no-2, 3, 4,  Vessel-4 erection at site completed.
5 & 6)  Vessel-1,2 &3: Fabrication of vessels and its
Radiography test of joints completed.
 Rectification of defects noticed during
inspection is balance.
 Shifting and erection at site is balance.
 Connection with main pipes of N2 for Vessel 1,2,
3 & 4 & Shot blasting, degreasing and painting
of internal surface is balance.
 Contract of shot blasting under finalization
 CCOE clearance of vessel no 4,5&6 by Dec’20
after shot blasting and inspection by Mecon.
2 036C Laboratory eqpt.-37 Items Amit Kr Shiv M/c 17.6.15 18.99 / Nov’16 Dec’20  Basic engg- 23/25 nos. & Detail engg- 55/66 nos.
CRM III Sr Mgr(P) Tools 10.33  Supply -35/45 T done. Major items supplied at site.
 Balance supply: Radioactive material, coating
weight determinator etc. NOC awaited.
 Erection of CNC lathe m/c , Milling m/c , UTM &
Bending Folding m/c done. 02 nos. of Shearing
m/c and Sample punching m/c completed.
 Commissioning of UTM M/c 05T Capacity done
with temporary power supply arrangement.
 Electrical deviation under approval for power
supply.
3 039/ DSL Modification in ST Bay Amit Kr Abhay 14.11.19 0.233/ Feb’20 Sep’20  L1: 23.364 Lakhs net of ITC on GST, estimate
AP03 of CRM #3 along with Sr Mgr(P) Electricals Rs. 23.60 Lakhs. Completion Pd: 3M.
modification in existing 02  LOA issued on 14.11.19.
nos. Cranes  Contract signed on 22.01.2020.
 Billing schedule & QAP approved.
 Drg submitted by party for raising of inspection
call. Supply of materials to be started.

39
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
N. No. Manager Date (Crs)/ Expt. Till Compln Compln
Jun’20(Crs)
4 037C Balance civil works for CRM- Sunil Kumar HN 25.03.15 48.88/ Dec’15 Oct’20  Design & Engg -131/131 nos submitted.
III AGM(P) construction 50.26  Concreting -16000/16000 m3 done
 Toilet Blocks : 05/11 handed over.
 Cycle Sheds : 11/11 handed over.
 Storm Water line : 80% completed.
 Surface drain : 100% completed.
 Store bldg elect work, Balance faecal line,
seepage area in tunnel, Sealing work of CRM-
III can be done after deviation approval.
5 042A Tertiary Treatment Plant – Sunil Kumar S.R 12.03.15 32.5/ Jul’16 Aug’20  Basic engg-40/45nos. Detail engg- 300/378 nos.
CRM III AGM(P) Paryavaran 28.44  Eqpt Ercn -150/150 T done.
 Facility is ready for commissioning.
Commissioning of TTP will be done after
receiving input from ETP.
6 045 Telecom inside New CRM Rajiv Ranjan BNA 17-09-12 0.998/ Jul’13 Dec’20  LSIS system installed-130/194 nos.
complex (LSIS, VHF Voice Sr Mgr(P) Technology, 0.74  Telephone connection given for 154/154 nos for
Communication & Bangalore new exchange.
Telephone Cable Network  VHF set-94 nos. supplied and is under operation.
System Facility)  Party is being called for early completion of
remaining work.
7 046A Misc. Strl Items- Racks, Store Amit Kr UR Engg. 26.03.15 8.1/ Oct’15 Dec’20  Eqpt supply- 720/800 T and, Ercn-600/800 T
Box - CRM I042II Sr Mgr(P) Dewas 6.76 done.
 Eqpt. Supply- Fixed coil saddle, Sleeve, Scrap
Box etc have been supplied.
 Balance supply: C-hook, PU Pads, Removable
coil Saddle, Commissioning spares etc. Fixed coil
saddle, Sleeve, Scrap Box erected.
 Issue: No work at site since more than 2 yrs.
 Notice for contractors default issued. RPN
Action initiated. Balance work TS yet to be
submitted by MECON. MECON has raised the
additional claim for preparation of TS and
Estimate for balance work.

40
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S.N. Pkg Description Project Agency LOA Ordered cost Schdl. Likely Present Status
No. Manager Date (Crs)/ Expt. Till Compln Compln
Jun’20 (Crs)
8 102 HT Cable Tunnel Amit Kumar Maxflow 16-11-12 1.2/ Apr’13 Dec’20  Design & Engg– 100/102 nos done.
Ventilation Sr Mgr(P) 0.68  Eqpt. Supply- Tube Axial flow supply fan with motor,
Tube Axial flow exhaust fan with motor, PDB, Support
Structure, Dry Panel Filter etc have been supplied.
 Balance supply: Control and Power Cable, Cable
Accessories and Earthing material, Earth Pit Material
like GI Earth Strips and GI Wires.
 Erection: Tube Axial flow supply fan with motor, Tube
Axial flow exhaust fan with motor (24/34 Nos.), PDB
(6/7 Nos.) has been erected as per availability of front.
Balance Activities: Erection of Balance fans, PDB. Also,
Cabling work is required for running of fans, Drainage
pumps etc.
 3rd Engr Notice issued. Letter initiated to Mecon for
RPN TS. Party agreed to start the work.
 Drawings for control cable submitted by M/s Max
Flow. Under approval by Mecon. Mecon is treating this
as extra work and claiming extra payment.
 Mecon has given comments on submitted drgs. But
due to Covid-19 lockdown party is unable to re-
submit drgs. after incorporation of comments.

41
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-068 EHV Pkg
(Agency-M/s Siemens)
Effective Date of Contract: 11.09.08 Ord. Cost/ Package Cost : Rs.178.54 Crs
Commissioning (Contractual) : Jun’10 Sanc. Cost/ Anticipated Cost: Rs. 178.54 Crs
Commissioning (Revised): Aug’20 (Cat-c) Expenditure (Upto Jun’20) : Rs. 146.29 Crs
Commissioning (Target / Likely): Aug’20 (Catg-C)/Aug’20 Project Manager: Rajiv Ranjan Sr Mgr(P)

SNo Activity Unit Scope Done L-1 Schedule Compln Performance jun’20 Jul’20 Jul’20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
Mar’20 Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act.Plan/Act Plan/Act. Plan/Act P/A
05.07.20 12.07.2019.07.20 26.07.20  Category-C:
11.07.20 18.07.2025.07.20 01.08.20  MSDS-1 commissioned
1 Design & Engg on 29.11.19.
a Basic Drgs. nos 311 311 Dec’08 Sep’09 Mar’12A 311 311 Transmission Line from
MRS to MSDS-8:
b Detail Drgs. nos 1173 1173 Feb’09 Jun’09 Mar’12A 1173 1173
 Tower erection: 19/19
3 Excavation M
3
45760 38850 Mar’09 May’10 Mar’12* 45760 38850 nos. completed.
3  Stringing work between
4 Concreting M 7500 7400 May’09 May’10 Dec’19 7500 7400
transmission tower AP06
5 Strl Fabn T 1500 1480 Dec’19 1500 1480 & 07 completed (Total
6 Strl ercn T 1500 1100 Dec’19 1500 1100 17/19 Span done).
7 Eqpt. Supply T 2500 2500 Jun’08 Jan’10  Meeting with DVC held
Mar’19 2500 2500
on 18.03.2020 for
8 Eqpt. Ercn T 2500 2485 Mar’10 Dec’19 2500 2485
crossing clearance as
9 Testing & Apr’10 Jun’10 Aug’20 well as line shutdown.
Comm. (Catg-C)*  Crossing clearance at
DVC end awaited.
 Charging of line after
CEA clearance.
 Change order was issued to M/S Primetal Technology for EHV Pkg on 07.01.14. The contract has been segregated to 5 categories:
 Catg-A: CC issued wef Jan’14. Catg-B: CC issued wef Dec’14. Category D (MSDS-8) –Deleted.
Category E (Supervision services for charging of MRS from 220kv DVC source when available) –compln time -2M: Transmission line from MRS to MSDS-1 charged on
29.11.16.

42
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Pkg-6150: Development of Alternate System for Drawal of Raw Water from Damodar River for Bokaro Steel Plant and Township
(Agency-M/s Zuberi Engg. + HNCPL)
Effective Date of Contract: 16.01.19 Ord. Cost/ Package Cost : Rs.69.3 Crs
Commissioning (Contractual) : Mar’20 Sanc. Cost/ Anticipated Cost : Rs. 69.3 Crs
Commissioning (Revised): Nov’20 Expenditure (Upto Jun’20) : Rs.12.80 Crs.
Commissioning (Target / Likely): Nov’20/Nov’20 Project Manager: A Das / R Ranjan

SNo Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical areas/
Till Actual / Cumulative Reasons for delay
Mar’20 Start Compl Likely Sch Actl Sch Actl 1st Wk 2nd Wk 3rd Wk 4th Wk 5th Wk Plan Act
Plan/Act. Plan/Act Plan/Act. Plan/Act P/A
05.07.20 12.07.20 19.07.20 26.07.20  Wrapping & coating of pipes
11.07.20 18.07.20 25.07.20 01.08.20 : 470/4160M done.
1 Design & Engg Nos 304 178 Feb’19 Jul’19 Aug’20 304 178 30  Pipe (1000 & 1400 dia)
Civil Work Apr’19 Jan’20 laying - 170/4160 M done.
3
 Electrical Sub-station: Roof
2 Excavation M 66500 11000 Aug’20 66500 14720 400 slab done. Balance Brick
3
3 Concreting M 10300 300 Sep’20 10300 660 200 work and finishing.
(PCC+RCC)  Permission for controlled
4 Eqpt. Supply- T May’19 Dec’19 Aug’20 blasting obtained from DC
Bokaro on 20.07.2020.
5 Eqpt. Erection T Jun’19 Feb’20 Oct’20  Joint site visit carried out
with Railway Engineers and
6 Testing & Feb’20 Mar’20 Nov’20 contractors on 25.07.2020
Comm. for jack pushing under
railways lines. (Contract was
signed on 16/06/20)
 Survey work to be started for
obtaining individual Plot no.
Power Supply by DVC (Rs.
7.08 Crs)
 Site handed over by M/s
DVC on 21.11.19.
 Erection of 2/16 four pole
done.

43
QMS/PROJ/PPM/R-03 dtd 01.08.2020
Project: Pkg-051A Construction of Rly. Track inside the Plant Premises in new CRM area
(Agency-M/s ARSS)
Effective Date of Contract: Jun’10 Ord. Cost/ Package Cost: Rs. 23.73 Crs
Commissioning (Contractual) : Dec’11 Sanc. Cost/ Anticipated Cost: Rs. 23.73 Crs
Commissioning (Revised) : Expenditure (Upto Jun’20) : Rs. 19.83 Crs
Commissioning (Target / Likely): /* Project Manager: Vinay Kr, AGM(P)
SNo Activity Unit Scope Done Till L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Mar’20 Actual / Cumulative areas/ Reasons for
st nd rd th th
Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A delay
Start Compl Plan/Act. Plan/Act.Plan/Act. Plan/Act Plan/Act
05.07.20 12.07.20 19.07.2026.07.20
11.07.20 18.07.20 25.07.2001.08.20
1 Design & Engg. Nos. 10 10 Complete 10 10  Work stopped from
Jun-15. Balance
2 Supply of rails KM 16.2 15.7 Jul’16 16.2 15.7
work is under RPN.
Under arbitration.
3 Laying of Rail KM 16.2 14.0 Dec’17 16.2 14.0

4 Handover of 16.2 Dec’11 * 16.2


Track

Project: Pkg-053 Rehabilitation & Upgradation of existing Tracks inside the Plant premises
(Agency-M/s ARSS)
Effective Date of Contract: Jun’10 Ord. Cost/ Package Cost: Rs. 43.1 Crs
Commissioning (Contractual): Jun’12 Sanc. Cost/ Anticipated Cost: Rs. 43.1 Crs
Commissioning (Revised) :* Expenditure (Upto Jun’20) : Rs. 39.59 Crs
Commissioning (Target / Likely) :*/* Project Manager: Vinay Kr, AGM(P)
SN Activity Unit Scope Done L-1 Schedule Compln Performance Jun’20 Jul ’20 Jul’20 Remarks/ Critical
Till Actual / Cumulative areas/ Reasons for
st nd rd th th
Mar’20 Start Compl Likely Sch Actl Sch Actl 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk P A delay
Plan/Act Plan/Act Plan/ActPlan/ActPlan/Act
05.07.20 12.07.2019.07.20 26.07.20
11.07.20 18.07.2025.07.20 01.08.20
1 Design & Engg. Nos. 11 11 Completed 11 11 Completed.
2 Supply-Rails Km 43.5 41.1 Aug’10 Apr’12 Jul’16 43.5 41.1 Balance work is under
RPN. Under arbitration.
3 Laying-Rails Km 43.5 30 Oct’10 May’12 Jul’16 43.5 30
Recover Process (RP)
4 Hand Over of Km 43.5 13 Jun’12 Jun’12 * 43.5 13 action is being
Track initiated.
44
QMS/PROJ/PPM/R-03 dtd 01.08.2020
B. Balance Pkgs of Phase I Expansion (Rs. 6325 Crs.)

SN Scheme/Package NIT TOD Bidders PBO Status as on date


1. Secondary Emissions Control in  Revised TS awaited from Mecon.
BOF area (Pkg-25*)
2. Pkg-065: Area repair Shop  Eligibility criteria, cost estimate & commercial volume
awaited from Mecon.
3. Pkg-048: Furniture for Welfare  Proposal to be processed in LTE. Under approval.
& Canteen bldg.
4. Pkg-034B/AP02: Shot Blasting 15.04.20 21.05.20 1. Neeraj Enterprises  On due date 04 offers received and tender opened. Out of
& Degreasing of N2 Storage 2. Binod & Company 04 bids, 01 bid of M/s S S Projects, Bhilai was rejected. 03
Vessels in CRM-III 3. P R Enterprises bids are under evaluation at MECON.
4. S S Projects  Final TER awaited.

New AMR Schemes

SN Scheme/ Package NIT TOD Bidders PBO Status as on date


1. 6138: Pkg-1 (Main Package) 11.09.18 09.10.18 1.Thermax Ltd  Retendering of the case is being considered with revised
of “Installation of ESPs for 14.11.18 2.Unicon Engrs with Eligibility Criteria.
area dedusting of Machine 08.12.18 HNCPL
building (Sinter Band 1,2 & 3) 3. Andrew Yule
along with Material
Distribution Plant (MDP) of
Sinter Plant
2. 6206: Upgradation of Looper 09.07.19 06.08.19 1 Sunag Engg.  Approval was obtained for opening of <(x+2) available
#1 & #2 of Pickling Line -1 of (GTE) 05.09.19 2 SMS Group offers. Tender opened on 29.06.2020.
CRM – 1 &2 06.11.19  Offers under evaluation.
21.12.19  TER awaited.
28.02.20
29.06.20
3. 6233: Installation of an 08.08.19 04.10.19  All bidders have requested for 30 months completion
Oxygen Plant of 2000 TPD (GTE) 15.11.19 time instead of 23 months approval by SAIL, Board.
production capacity at Bokaro 20.12.19  Proposal for extending implementation period from 23
Steel Plant on Build Own 20.02.20 months to 30 month has been processed for approval of
Operate (BOO) basis 02.04.20 competent authority.
30.05.20  TOD extended upto 17.08.2020.
45
QMS/PROJ/PPM/R-03 dtd 01.08.2020
30.06.20
31.07.20
17.08.20
4. Up-gradation of Automation 29.08.19 03.10.19 1 Primetals  Tender opened on 03.07.2020. Under evaluation by
System, of Finishing Mill of 20.02.20 2 SMS consultant.
HSM, BSL 29.02.20
07.03.20
03.07.20
5. 6260: Power supply 17.03.20 23.04.20 1. Siemens Ltd.  Tender opened on 15.07.2020. Under evaluation by
arrangement for proposed 30.05.20 2. ABB Power Products consultant.
2000 TPD oxygen plant (MS) 30.06.20 & Systems India
15.07.20 3. JSP Projects Pvt.
Ltd.

46
QMS/PROJ/PPM/R-03 dtd 01.08.2020
C. SUMMARY OF EXPANSION SCHEMES As on 01-08-2020
S.N. Description Agency Ordered Cost Commissioning
(Rs. in Crs) Date
1. On-going Projects
1.1 Approved prior to 07-12-06 (ATC/OTC & ESP) 129.34
1.2 Expansion Schemes- Phase-I Expn. of Rs 6325 Crs. 5114.62
2. Balance Pkgs under Tendering (Phase-I Expansion) 210.38
3. Schemes completed
A Schemes completed (2007-08)
1. Up-gradation of Automation System of TM-2 Jun’07
2. CHSGP in BF-4 Jul’07
3. Rebuilding of CO Battery-5 Sep’07
4. HCL Regeneration Plant CRM-I Sep’07
5. EDT Machine in RGBS of CRM-1 Mar’08
B Schemes completed (2008-09)
1. 50 MW Power supply facilities for 1250 TPD O2 Plant 26.38 Jun’08
2. Revamping of Mae-West Blocks of Finishing Stands-HSM 91.86 Jul’08
3. Installation of 1250TPD Oxygen Plant- BOO basis BOO Dec’08
4. Computerized Process control system in SMS II 27.33 Mar’09
MEP 5. Pkg-27*: UPS system at CCD complex- SMS II Hi-Rel Electronic 1.65 Mar’09
MEP 6. Pkg-9*: Geo Tech Survey-SMS-II Drilltech 0.09
MEP 7. Enabling Pkgs under Phase-I Expansion (5 Pkgs)
C Schemes completed (2009-10)
1. HT Sub-Station at CO&BPP 11.07 Sep’09 (PAC issued)
2. Augmentation of coking coal storage facilities at CO&BPP 134.32 Aug’09
3. Up gradation of BF-3 Stoves 52.07 Nov’09
4. Covered Slag yard SMS-II 29.84 Dec’09
D Schemes completed (2010-11)
1. BF-2 Up-gradation 892.32 Jul’10
2. Infra-structure facilities for SMS-III- Balance Boundary Wall 6.35 KM 3.02 Jul’10 (except 2 nos
opening on hold)
3. CDI in BF-2&3 133.92 Dec’10
nd
4. Installation of 2 LHF in SMS-II 96.96 Sep’10
MEP 5. Pkg-122B: Development of Additional siding 10A & 10B HSCL 11.05 Oct’10

47
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S.N. Description Agency, M/s Ordered Cost Commissioning
(Rs. in Crs.) Date
MEP 6. Pkg-38*: 102T Slab Car-SMS-II Simplex Engg. 11.22 Nov’10
MEP 7. Pkg-126 : Additional Enabling work for CRM-III Geetanjali 1.51 Dec’10
MEP 8. Pkg-123B: Const. & Drinking Water System for CRM -III HN Const. 0.968 Jan’11
MEP 9. Pkg-127: Track modification work in CRM-III HSCL 1.08 Mar’11
E Schemes completed (2011-12)
MEP 1. Balance work of leveling works for new MRS near Gate No-3 0.699 Apr’11
2. Rebuilding of CO Battery-1&2 MECON 417.74 Batt-1:Jun’11
Batt-2: Feb’12
3. Turbo Blower-8 Nicco 102.84 Mar’12
MEP 4. BF-5 Stoves (7 Pkgs) Evotech 63.05 Mar’12
F Schemes completed (2012-13)
MEP 1. Pkg-031: Coil Packaging Line-CRM III ITW, Hyderabad 42.00 Jun’12
MEP 2. Pkg-30*: De-bricking Machine- SMS-II Gradall Inds. 2.09 Nov’12
3. SPU Bettiah ITL Industries/ 116.23 Dec’12
Cecon
G Schemes completed (2013-14)
MEP 1. Pkg-069: HV Package Primetals 38.38 Jun’13
MEP 2. Pkg-2*: Hydraulic Shovel- SMS-II Telcon 1.05 Jun’13
MEP 3. Pkg-010: CA Station – CRM III BOC 17.08 Sep’13
MEP 4. Pkg-10*: Power Distribution – SMS-II ABB 16.45 Oct’13
MEP 5. Pkg-058A: Dumper cum Skip loader CRM-III JMA Stores 1.04 Dec’13
MEP 6. Pkg-058B: Trucks & Dumpers- CRM III Ashok Leyland 0.623 Dec’13
/ JMA stores
H Schemes completed (2014-15)
1. Pkg-1: Geo Tech Investigation & Survey work-SMS-I CJR Consultant 7.38 lakh Apr’14
MEP 2. Pkg-037D: Strl work for New CRM- Roll Grind shop & Misc. Strs HSCL 30.93 Jul’14
MEP 3. Pkg-1: HCL Regeneration Plant for conversion of Sulphuric acid PL to HCL PL ISSI 40.89 Sep’14
CRM-I
MEP 4. Revamping of Sinter Machine no-1 TPE 75.16 Jan’15
MEP 5. Pkg-121: Slag Filling leveling & grading of (SMS-III) site & Geotech soil BKB Transport, 39.09 Mar’15
investigation survey Ranchi
I Schemes completed (2015-16)
1. Pkg-6: Geotech Investigation- COB-8 CEG test House 8.34 lakh Apr’15
48
QMS/PROJ/PPM/R-03 dtd 01.08.2020
S.N. Description Agency, M/s Ordered Cost Commissioning
(Rs. in Crs.) Date
MEP 2. Pkg-044: HRCC- CRM III Primetals 68.85 May’15
MEP 3. Pkg-032: Acid regeneration plant- CRM III ISSI 59.61 Jul’15
MEP 4. Pkg-026: PLTCM- CRM III Primetals 694.31 Jul’15
MEP 5. Pkg-037A: Civil work- CRM-III L&T 260.90 Jul’15
MEP 6. Pkg-033: Roll Shop- CRM III Pomni/Rccum 107.92 Aug’15
7. Enabling works (Pkg-2)- Modernization of SMS-1 HN Const. 9.25 Oct’15
MEP 8. Conversion of sulphuric acid to HCL Pickling -CRM-I Tenova 62.14 Jan’16
MEP 9. Up gradation of Roughing stand area Danieli 498.97 Jan’16
J Schemes completed (2016-17)
MEP 1 Pkg-037B: Structural works for CRM-III Era Infra 126.29 Jul’16
MEP 2 Power supply at 220 KV level from CTPS, Chandrapura to MRS, BSL DVC 17.45 Aug’16
MEP 3 Pkg-027: Skin Pass Mill- CRM III Danieli 107.23 Oct’16
MEP 4 Civil work of RHF-1 (Pkg-2) BSBK 10.15 Dec’16
MEP 5 Pkg-018: Server based telephone exchange Wipro 3.66 Feb’17
MEP 6 Pkg-029: ECL- CRM-III Primetals ECL: Mar’17
K Schemes completed (2017-18)
1 Repl. of Converter Shell, Trunion Ring, Pedestal Assembly of Converter-2 Azovmash+ Ultratest 42.42 Jul’17
+ Kineta Global
2 Replacement of 150 tpd Sulphuric acid Plant–CO&BPP Neuberg Engg. 14.9 Aug’17
MEP 3 Revamping of existing Control Room of RHF–1 of HSM SK Entp. 0.294 Oct’17
MEP 4 Repl. of Pusher type RHF-1 by walking beam type furnace (Pkg-1) Fivestein Euro 25.81 Lakh + Jan’18
INR 50.7 Crs
5 Pkg-5-Coal handling & Coke sorting plant -Rebldg. of CO Battery-8 Paulwurth+ 16.17 Jan’18
NP const.
MEP 6 Pkg-035: Transfer cars- CRM III Graduate Agro 10.775 Jan’18
MEP 7 Pkg-42*: ID Fan Complex-SMS-II SMS- Siemag + 83.13 Jan’18
Gillanders
MEP 8 Pkg-098-Propane storage installation for CRM-III Confidence 7.68 Feb’18
Petroleum
9 Pkg-1: Rebuilding of CO Battery-7 MECON 122.68 Mar’18
L Schemes completed (2018-19)
MEP 1 Pkg-034A: Hydrogen Generation Plant- CRM-III Airox Nigen 20.42 Apr’18
MEP 2 Pkg-028: Bell Annealing Furnace- CRM-III Rad-Con+ 132.94 Apr’18
49
QMS/PROJ/PPM/R-03 dtd 01.08.2020
MICCO+ Sunag
3 Pkg-03: Quenching system (Rebldg. of CO Battery-8) Mecon 16.73 May’18
MEP 4 Pkg-029: HDGL (CRM-III) S-VAI/ Andritz 486.3 HDGL: Jun’18
MEP 5 Tension leveling, Inspection and Recoiling lines- CRM III Tenova 93.01 Oct’18

6 Revamping of CNC-8 Roll Grinding Machine of RGBS-HSM Waldrich Siegen 21.7 Nov’18
GMBH
MEP 7 Pkg-33*: Tractor & Trailer -SMS-II MAFI 2.2 Dec’18
MEP 8 Pkg-043: Water supply system for CRM III Ion Exchange 68.40 Jan’19

M Schemes completed (2019-20)

MEP 1 059B: Fire fighting facilities for New CRM Tri-Parulex 9.696 Sep’19

2 Pkg-6-132/33KV Power supply system- Modn of SMS-I Sterling Wilson + 30.87 Nov’19
Crompton Greaves
MEP 3 Pkg-066: RMHS Zuberi/HNCPL/TRF 107.35 Nov’19
MEP 4 B320: 3 nos. New Roll Grinding machines in RGBS for HSM Praise Machinery, 71.33 Feb’20
Taiwan +Sunag
MEP 5 Building illumination, earthing, area lighting & bus bars (Pkg-041) GE/Sharmila 9.1 Mar’20
6 Alternate Gas Network Tata Projects 222.59 Mar’20
7 Provn. of Hydraulic Mudgun cum drill machine for BF-1 PaulWurth India 26.023 Mar’20
(STE)
N Schemes completed (2020-21)

1 5938-Up-gradation of Stoves of BF # 1 Paul Wurth +MCK 112.13 Jul’20


Kutty

50