Boundary Wall

8.00 m
Top of Temporary Crane Pad covered with 1.2 m x 1.8 m x 15 cm (Thick)
RCC Block Filling with 15 x 15 x 15 cm Brick Bets
15 cm thick sand mix brick bets Water Level at Rainy Season (+5.7 M)

Bundle Anchor Post 5 nos.

7.62 m long driven Wooden Poles

Water Level at Dry Season (+2.2 M)

Draft available in dry season 2.5 m

Section Z-Z: Temporary Crane Pad

River Bed

Prepared by: Avant Logistics Ltd.


Project Name: Ghorashal Polash Urea Fertilizer Project
Drawing No.: TCP-02; Date: 12.08.2020