Construction Project Time Line w

Sidewalk, Drainage & Road improvem


Contract Packa

Item Apr-20 May-20 Jun-20 Jul-20 Augs


Name of Work
No. 1 4 8 12 16 20 24 28 30 1 4 8 12 16 20 24 28 31 1 4 8 12 16 20 24 28 30 1 4 8 12 16 20 24 28 31 1 4 8
Shutter making
Name of
project : 1 × Construction of Swimming & Survival pool

Pile casting
Pile curing
Pile layout & drive
Load test
Earth Excavation
Plie Breaking
Shore Pile For site protection
Water drying
C.C. casting
M/S J R ENTERPRISE

Reinforcement cutting, Placing and binding binding

R.C.C casting
E/M portion
Filtration media
Site Cleaning and Hande Over
me Line with Proposed Bar Chart
mprovement for Pedestrian Mobility in
act Package NO.

Augst-2020 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21


12 16 20 24 28 31 1 4 8 12 16 20 24 28 30 1 4 8 12 16 20 24 28 31 1 4 8 12 16 20 24 28 30 1 4 8 12 16 20 24 28 31 1 4 8 12 16 20 24 28 31 1 4 8 12 16
Feb-21 Mar-21 Apr-21 May-21
20 24 28 1 4 8 12 16 20 24 28 31 1 4 8 12 16 20 24 28 30 1 4 8 12 16 20 24 28 31
M/S J R ENTERPRISE

Name of
project : 1 ×
Construction of
Swimming & Survival
pool

SL NO Name of WorksDuration of Works


1 Shutter making 20.06.2020
2 Pile casting 02.07.2020
3 Pile curing 28.07.2020
4 Pile layout & drive 10.09.2020
5 Load test
6 Earth Excavation
7 Plie Breaking
8 C.C. casting
9 Rod binding
10 R.C.C casting
11 E/M portion
12 Filtration media
13
14
15
16
Finishedwork
30.06.2020
27.07.2020
26.08.2020
20.10.2020