Professional Documents
Culture Documents
07 - Press Adj PDF
07 - Press Adj PDF
Dynamic
Acera
Kobelco Construction
Machinery America LLC
6. ADJUSTMENT 2nd STAGE MAIN RELIEF WITH “HEAVY LIFT SWITCH ON”............................ 7
A. Machine Preparation Procedures ................................................................................................. 7
B. 2nd Stage Main Relief Valve Adjustment ...................................................................................... 7
WARNING PILOT
CONTROL
• BE EXTREMELY CAUTIOUS WHILE RELEASING
FOR BUCKET
HYDRAULIC TANK PRESSURE OR REMOVING AND BOOM
LINES AND FITTINGS, VAPORS AND OIL MAY BE
EXTREMELY HOT.
• WEAR APPROVED SAFETY CLOTHES, SHOES, FIGURE 6.1
GLOVES AND HARD HAT WHEN PERFORMING
ANY MAINTENANCE OR TEST PROCEDURES.
a p p r o x i m a t e l y OC 4 0 ~ 1 0 0
(OF104~212).
e. Maintenance connector is in the
release position.
Note :
f. High Idle RPM is proper per ma- HEAVY LIFT
chine being tested. SWITCH
"ON"
NOTE •
Turning Heavy lift Power Boost Adjusting Screw HEAVY LIFT
FIGURE 9.4
Dynamic Acera 01/02
Page 7-7
ADJUSTMENT MAIN RELIEF WITH "HEAVY LIFT SWITCH OFF”
WARNING
• MAKE CERTAIN THERE ARE NO OBJECTS
IN THE PATH OF THE BOOM
FIGURE10.4
Dynamic Acera 01/02
Page 7-8
SWING CIRCUIT
8. SWING CIRCUIT
NOTE
The following procedures are provided for refer-
ence only. Attachment Port Relief Valves are fac-
tory preset and should not be field adjusted.
FIGURE 11.4
Dynamic Acera 01/02
Page 7-9
SWING CIRCUIT
WARNING
• PRECISE ADJUSTMENT OF THE MACHINE'S
ATTACHMENT PORT RELIEF VALVES IS
NOT POSSIBLE ON THE MACHINE.
• SHOULD A PROBLEM BE FOUND WITH THE
ATTACHMENT PORT RELIEF VALVES, IT IS
RECOMMENDED TO REPLACE FAULTY ATTACH-
MENT PORT RELIEF VALVES.
SUCH ADJUSTMENT COULD VOID WARRANTY.
FIGURE 12.1
C. Swing Over Load Relief Valve Pres-
sure Adjustment
Machine Preparation Procedures
1. Confirm that the following is proper be- LEFT
fore proceeding to step 2. SLEWING
a. KPSS is in “M” mode OR5
b. Heavy lift switch off.
c. Hydraulic oil is approximately OC
45~55 (OF113~145). •
d. Engine water temperature is •
RIGHT
a p p r o x i m a t e l y OC 4 0 ~ 1 0 0
SLEWING
(OF104~212). OR6
e. Maintenance connector is in the
release position.
f. High Idle RPM is proper per ma-
chine being tested.
g. Bucket teeth penetrate soil approxi-
mately 305mm (12"). Figure 12.1. FIGURE 12.2
2. Locate Swing Left overload relief OR5,
loosen 24mm locknut.See Figure12.2
3. Operate swing control to the left and
hold, stalling swing. Adjust pressure
to specific machine using 700kg/cm2
(10,000 psi) Pressure Gauge installed
to test port a2 on P2 Main Pump. See
Figure 12.3 a1 PORT
4. After correct pressure is obtained
tighten adjusting screw locknut to ;
2.8 ~3.2 kgfm2 (20~30 ft.lb). Verify
a2 PORT
pressure after tightening locknut.
5. Locate Swing Right overload relief
OR6, loosen 24mm locknut. Operate FIGURE 12.3
swing control to the right and hold, stall-
ing swing. Adjust pressure to specific
machine using 700kg/cm2 (10,000 psi) NOTE
Pressure Gauge installed to test port
Turning Normal Adjusting Screw Clockwise One
a2 on P2 Main Pump.
turn
6. After correct pressure is obtained
tighten adjusting screw locknut to ; Increases Pressure Approximately
2.8 ~3.2 kgfm2 (20~30 ft.lb). Verify 108 kgf/cm2 21 (300 psi)
pressure after tightening locknut.
NOTE
Turning Over Load Adjusting Screw
Clockwise One turn
Increases Pressure Approximately
108 kgf/cm2 180 (2560 psi)
Figure 14.28 *
* Note: Swing Priority not shown
Dynamic Acera 01/02
Page 7-12
OVER LOAD RELIEF VALVES
WARNING
• PRECISE ADJUSTMENT OF THE MACHINE'S OVER Nega-Con
back press.
LOAD RELIEF VALVES IS
circuit
NOT POSSIBLE ON THE MACHINE. Tn1
• SHOULD A PROBLEM BE FOUND WITH THE
OVER LOAD RELIEF VALVES, IT IS
RECOMMENDED TO REPLACE FAULTY
OVER LOAD RELIEF VALVES.
SUCH ADJUSTMENT COULD VOID WARRANTY.
WARNING CONFIGURATION
FOR SK210 THRU
• MAKE CERTAIN SPECIAL TOOL IS SEATED SK330 PLACE
THROTTLE
A G A I N S T C R AW L E R F R A M E A N D B E T W E E N CONTROL
SPROCKET TEETH. NEVER ALLOW SPECIAL TOOL IN "LOW"
TO REST AGAINST CRAWLER FRAME CORNER RE-
INFORCEMENTS. ENGAGE TRAVEL SLOWLY &
CAREFULLY UNTIL TOOL IS POSITIONED COR- KPSS
IN "M" • •
RECTLY
MODE