Professional Documents
Culture Documents
Upto Interchange Level: Shear Ties Design
Upto Interchange Level: Shear Ties Design
Upto Interchange Level: Shear Ties Design
Pu of 1m strip = 1162.9 kN
2
M/fckbD = (514.28*10^6) / (fck*1000*300^2)
= 0.1633
= 0.1108
d' = 40
d'/D = 40/300 = 0.13 (SP16 Chart 37)
p/fck = 0.04
p (req) = 1.4 %
As (req) = 4200
Provide 14 bars of dia 20 per meter strip
As (prov) = 4398.23 mm2
p (prov) = 1.47 %
10-04-20