(Seremban Sentral PR1MA Homes Phase 1, Negeri Sembilan)

Design and build a medium-cost apartments consist of 8 Blocks (25-story) and 5 level of
carpark.
Client : PR1MA Homes
Cost : Approximately 500 million

 Ensure periodic inspection of machineries, tools and plant conducted, recorded and safe
kept.
 Participation in ISO and OHSAS yearly audit (renewal)
 Arranged for SHASSIC - CIDB at respective project site
 Participation in client audit (Sime Darby & Pr1ma)
 Monthly monitoring of environmental (water, air & noise)
 Manage and liaise authority during inspection or visit (DOSH,MPS, KKM,
BOMBA,POLICE)
 Conduct weekly mega toolbox involve all trades
 Arrange and participate in monthly Safety and Health Committee meeting and site walk
 Preparation on Health, Safety & Environment campaign, training and awareness
program.
 Assist Safety and Health Officer (SHO)
 Advice site coordination team on daily basis
 Carry out duties as per stipulated in FMA, BOWEC regulation 25

Design and build a 12-story service apartments and office that consist of 3 blocks and 3
basement. 
Client : Sime Darby Property
Cost : Approximately 350 million

 Ensure periodic inspection of machineries, tools and plant conducted, recorded and safe
kept.
 Arranged for SHASSIC - CIDB at respective project site
 Participation in client audit (Sime Darby)
 Monthly monitoring of environmental (water, air & noise)
 Manage and liaise authority during inspection or visit (DOSH,MPS, KKM,
BOMBA,POLICE)
 Conduct weekly mega toolbox involve all trades
 Arrange and participate in monthly Safety and Health Committee meeting and site walk
 Preparation on Health, Safety & Environment campaign, training and awareness
program.
 Assist Safety and Health Officer (SHO)
 Advice site coordination team on daily basis
 Carry out duties as per stipulated in FMA, BOWEC regulation 25
(Oasis Autocity, Selangor)
Design and build a 6-story 5s car showroom that consist of 6 blocks and  2 blocks of 12-
story office.
Client : Sime Darby Property
Cost : Approximately 400 million

 Ensure periodic inspection of machineries, tools and plant conducted, recorded and safe
kept.
 Participation in ISO and OHSAS yearly audit (renewal)
 Arranged for SHASSIC - CIDB at respective project site
 Participation in client audit (Sime Darby)
 Monthly monitoring of environmental (water, air & noise)
 Manage and liaise authority during inspection or visit (DOSH, KKM, BOMBA,POLICE)
 Conduct weekly mega toolbox involve all trades
 Arrange and participate in monthly Safety and Health Committee meeting and site walk
 Preparation on Health, Safety & Environment campaign, training and awareness
program.
 Assist Safety and Health Officer (SHO)
 Advice site coordination team on daily basis
 Carry out duties as per stipulated in FMA, BOWEC regulation 25