Single Cell
Single Cell
Additional
1 Cement concrete batching plant Concrete Mixing cum/hou 175 per hour 5408
2 @175 cum/hr
Concrete joint cutting machine Joint sawing Rm/hour 200 per hour 216
3 Texturing machine Concrete texturing sqm/hour 500 per hour 162
4 Plate Compactor Compacting median soil cum/hour 3.5 per hour 76
* with escalation of 4% for the years 2002-03, 2003-04, 2004-05 & 2005-06.
AB 1 103.705 103.878 101.997 102.170 100.297 100.470 1.297 1.470 17.214 17.214 2.270
P1 104.372 104.545 102.664 102.837 100.964 101.137 1.964 2.137 17.214 17.214 2.165
P2 105.038 105.211 103.330 103.503 101.630 101.803 2.630 2.803 17.214 17.214 2.106
P3 105.705 105.878 103.997 104.170 102.297 102.470 3.297 3.470 17.214 17.214 2.069
P4 106.372 105.544 104.664 103.836 102.964 102.136 3.964 3.136 19.000 19.000 2.089
P5 107.038 107.211 105.330 105.503 103.630 103.803 4.630 4.803 19.000 19.000 2.043
P6 107.705 107.878 105.997 106.170 104.297 104.470 5.297 5.470 18.600 18.600 1.973
P7 108.371 108.544 106.663 106.836 104.963 105.136 5.963 6.136 18.600 18.600 2.048
P8 109.038 109.211 107.330 107.503 105.630 105.803 6.630 6.803 18.600 18.600 2.466
P9 109.705 109.878 107.997 108.170 106.297 106.470 7.297 7.470 18.600 18.600 3.384
P 10 110.371 110.544 108.663 108.836 106.963 107.136 7.963 8.136 24.070 24.070 2.590
P 11 111.038 111.204 109.330 109.496 107.630 107.796 8.630 8.796 24.070 24.070 2.439
P 12 111.620 111.744 109.912 110.036 108.212 108.336 9.212 9.336 24.070 24.070 2.577
P 13 112.037 112.117 110.329 110.409 108.629 108.709 9.629 9.709 24.070 24.070 2.302
P 14 112.288 112.325 110.580 110.617 108.880 108.917 9.880 9.917 24.070 24.070 2.486
RPI 112.371 112.371 110.663 110.663 108.963 108.963
RP2 112.371 112.371 110.663 110.663 108.963 108.963
RP3 112.371 112.371 110.663 110.663 108.963 108.963
RP4 112.371 112.371 110.663 110.663 108.963 108.963
RP5 112.371 112.371 110.663 110.663 108.963 108.963
P15 112.320 112.282 110.612 110.574 108.912 108.874 9.912 9.874 20.200 20.200 4.462
P16 112.114 112.032 110.406 110.324 108.706 108.624 9.706 9.624 20.200 20.200 2.829
P17 111.745 111.616 110.037 109.908 108.337 108.208 9.337 9.208 20.200 20.200 1.967
P18 111.202 111.038 109.494 109.330 107.794 107.630 8.794 8.630 20.200 20.200 1.988
P19 110.545 110.371 108.837 108.663 107.137 106.963 8.137 7.963 20.200 20.200 2.021
P20 109.878 109.705 108.170 107.997 106.470 106.297 7.470 7.297 20.950 20.950 2.285
P21 109.211 109.038 107.503 107.330 105.803 105.630 6.803 6.630 20.950 20.950 2.410
P22 108.545 108.371 106.837 106.663 105.137 104.963 6.137 5.963 20.950 20.950 2.726
P23 107.878 107.705 106.170 105.997 104.470 104.297 5.470 5.297 20.950 20.950 2.867
P24 107.212 107.038 105.504 105.330 103.804 103.630 4.804 4.630 18.500 18.500 2.840
P25 106.545 106.371 104.837 104.663 103.137 102.963 4.137 3.963 18.500 18.500 2.830
P26 105.878 105.705 104.170 103.997 102.470 102.297 3.470 3.297 18.500 18.500 2.980
P27 105.212 105.038 103.504 103.330 101.804 101.630 2.804 2.630 18.500 18.500 3.122
P28 104.545 104.372 102.837 102.664 101.137 100.964 2.137 1.964 18.500 18.500 3.195
AB 2 103.879 103.705 102.171 101.997 100.471 100.297 1.471 1.297 18.500 18.500 3.283
OVER BRIDGE OVER VYASARPADI UNDERPASS AT KM 4/3
OF GNT ROAD ( NH-5 )
Ground level to
bottom of pcc(Earth H
)
Right
2.027
2.058
2.109
2.160
2.160
2.128
1.981
1.890
1.800
1.863
2.030
1.933
2.041
2.091
2.041
3.907
2.349
1.953
1.916
1.933
2.277
2.178
2.745
2.861
2.850
2.914
2.979
3.048
3.118
3.186
NAME OF WORK : CONSTRUCTION OF UPGRADATION OF ROAD FROM KM 0.00 TO 70.00 OF NH 80 (MOK
DETAILED QUANTITYMUNGER) IN THE
ESTIMATION FORSTATE OF BIHAR
STRUCTURE MNR/14-3 AT CH 13+807
Dimensions
SL.
Description Unit No Length Breadth in
No Depth in M
in M M
1
cum Total
2 Cement Concrete M10 using 40mm ISS HBG METAL including cost and
conveyance of all materials to site and cost of cement at site including cost of
formwork, lead for soft water, labour charges for mixing, transporting, laying and
curing concrete, working at depths, tools and plants and incidental charges such
as bailing out water, maintaing of protective bunds, coffer dams, shoring,
shuttering etc., complete as per relevant standard specification for Levelling
Curtain wall foundation at Upstream
Course. 1 26.21 1.50 0.10
a side
Curtain wall foundation at Downstream
1 26.21 1.85 0.10
b side
c Bed level, Rigid apron 1 22.91 4.48 0.10
Wing wall (Upstream side) 2 8.456 4.38 0.10
Wing wall (Downstream side) 2 8.456 4.38 0.10
d Toe wall 4 1.500 0.65 0.10
Total
3
Vibrated reinforced cement concrete M15using 40mm ISS HBG metal including
cost and conveyances of all materials to site and cost of cement at site inclusive
of unloading stacking and storage charges at site including cost of formwork,lead
for soft water, labour charges for mixinig, transporting, laying and curing concrete
working in heights an hire charges for tools and plants and all other incidental
charges, etc. complete as per relavant specification for base course.
Vibrated reinforced cement concrete M15using 20mm ISS HBG metal including
cost and conveyances of all materials to site and cost of cement at site inclusive
of unloading stacking and storage charges at site including cost of formwork,lead
for soft water, labour charges for mixinig, transporting, laying and curing concrete
working in heights an hire charges for tools and plants and all other incidental
charges, etc. complete as per relavant specification for base course.
4
Curtain wall foundation at Upstream
1 26.21 1.30 0.80
side
1 26.21 0.45 0.75
1 26.21 0.20 0.45
Curtain wall foundation at Downstream
1 26.21 1.65 0.55
side
1 26.21 0.75 0.75
1 26.21 0.45 0.75
1 26.21 0.20 0.45
Rigid apron (Average length) 2 22.91 3.50 0.30
Total
5 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial
size of coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706
of MORTH, Fourth revision, 2001 including cost and conveyance of all materials
to site and cost of cement at site but exlcuding cost and fabrication of steel but
including labour charges for mixing , cost of formwrok, transportiang, laying and
curing concrete, working at heights, hire charges for tools and plants, incluiding all
other incidental charges etc.,
Box portion
Bottom slab 1 12.00 2.20 0.300
External walls 2 12.00 0.30 1.500
shear key (Area) 2 2.20 0.95 0.700
Top slab 1 12.00 1.60 0.30
haunch portions 4 12.00 0.01 Area
4 12.00 0.01 Area
Brackets 2 12.00 0.29 0.3
Hand rail 2 0.26 Area 9.6
wing wall (bottom slab) 4 8.26 4.375 0.55
( wall) 4 8.26 0.4125 2.725
Total
6 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial
size of coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706
of MORTH, Fourth revision, 2001 including cost and conveyance of all materials
to site and cost of cement at site but exlcuding cost and fabrication of steel but
including labour charges for mixing , cost of formwrok, transportiang, laying and
curing concrete, working at heights, hire charges for tools and plants, incluiding all
other incidental charges etc.,
cum Total
8 Providing and laying of granular materials , fileter media satisfiying the
requirements laid douwn in clusae 2504.2.2 of MORTH specification to a
thichness of 600 mm with smaller size toward the soil and bigger size toward the
wall over the entire surface behind abutment wing to a full height compacted to a
firm condition complete as per drawing and specification MORT 710.1.4 and IRC
78-200-13.10
10 Supply and fabrication of HYSD Fe 415 steel required for all RCC items of works
involved in the schedule, including cost of steel at site and cost of fabraction
labour charges for cleaning the roads straightening, cutting, bending, tying grills,
includin
MT
Quantity
93.58
28.812
134.34
6.756 span 1
43.78 side wall 0.3
64.83 sin 45 0.707 middle 0
129.65
62.40
166.33 8 mt 1.7
166.33 3 mt 0.6
861.22
862.00
3.93
wall avg
4.85
10.26
7.40
7.40
0.39
34.23
35.00
12.96
27.26
8.85
2.36
23.79
14.74
8.85
2.36
48.12
7.22
7.22
2.03
165.75
166.00
7.92
10.80
2.93 top
5.76 0.15
0.54 0.15
0.54
2.09
4.99
18.16
89.99
143.72
144.00
25.20
25.00
62.35
124.70
187.06
187.00
29.72
30.00
38.40
38.00
12.68
94.6
Vertical 1.5
Bottom 0.3
top 0.3
Deapth
0.8 3.7 0.8 1.6
0.35 1.2 0.3 0.2625 0.93125
6.2 1.1
2.15 4.375 0.55
0.575 0.25
0.4125
Bottom
0.15
0.15
300
5
2
8315
600
500
600
400
1600
1100
150
5
2
2200
350 7
150
300
13200
1
750
12000
5500
3
600
500
4 400
1600
1600
1100
5700
1
400
5000
3000
3
8 350
X 150 150 X 150
4 300
6300
600 2000
400
0
300
NAME OF WORK : CONSTRUCTION OF UPGRADATION OF ROAD FROM KM 0.00 TO 70.00 OF NH 80
(MOKAMAESTIMATION
DETAILED QUANTITY TO MUNGER)FOR
IN THE STATE OF 14-1
STRUCTURE BIHARAT CH 13+118
Dimensions
SL. No Description Unit No Length Breadth
in M in M
1
Earth work in excavation of foundation of structures as per drawing
and technical specification, including setting out, construction of
shoring and bracing,dewatering, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with
approved material. as per MORT & H No:304-12.1
cum
2 Cement Concrete M10 using 40mm ISS HBG METAL including cost and conveyance of
all materials to site and cost of cement at site including cost of formwork, lead for soft
water, labour charges for mixing, transporting, laying and curing concrete, working at
depths, tools and plants and incidental charges such as bailing out water, maintaing of
protective bunds, coffer dams, shoring, shuttering etc., complete as per relevant
standard specification for Levelling Course.
Curtain wall foundation at
1 48.46 1.50
a Upstream side
Curtain wall foundation at
1 48.46 1.85
b Downstream side
c Bed level, Rigid apron 1 25.16 5.27
Wing wall (Upstream side) 2 9.582 3.78
Wing wall (Downstream side) 2 9.582 3.78
d Toe wall 4 1.500 0.65
e below box 1 12.200 18.10
3
Vibrated reinforced cement concrete M15using 40mm ISS HBG metal including cost and
conveyances of all materials to site and cost of cement at site inclusive of unloading
stacking and storage charges at site including cost of formwork,lead for soft water,
labour charges for mixinig, transporting, laying and curing concrete working in heights an
hire charges for tools and plants and all other incidental charges, etc. complete as per
relavant specification for base course.
Vibrated reinforced cement concrete M15using 20mm ISS HBG metal including cost and
conveyances of all materials to site and cost of cement at site inclusive of unloading
stacking and storage charges at site including cost of formwork,lead for soft water,
labour charges for mixinig, transporting, laying and curing concrete working in heights an
hire charges for tools and plants and all other incidental charges, etc. complete as per
relavant specification for base course.
4
Curtain wall foundation at
1 48.46 1.30
Upstream side
1 48.46 0.45
1 48.46 0.20
Curtain wall foundation at
1 48.46 1.65
Downstream side
1 48.46 0.75
1 48.46 0.45
1 48.46 0.20
Rigid apron (Average length) 2 25.16 3.50
5 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial size of
coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706 of MORTH,
Fourth revision, 2001 including cost and conveyance of all materials to site and cost of
cement at site but exlcuding cost and fabrication of steel but including labour charges for
mixing , cost of formwrok, transportiang, laying and curing concrete, working at heights,
hire charges for tools and plants, incluiding all other incidental charges etc.,
Box portion
Bottom slab 1 12.00 17.90
External walls 2 12.00 0.35
Central wall 2 12.00 0.30
shear key (Area) 2 17.90 0.95
Top slab 1 12.00 17.30
haunch portions 6 12.00 0.01
6 12.00 0.01
Brackets 2 12.00 0.29
Hand rail 2 0.26 Area
wing wall (bottom slab) 4 9.38 3.775
( wall) 4 9.38 0.3875
6 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial size of
coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706 of MORTH,
Fourth revision, 2001 including cost and conveyance of all materials to site and cost of
cement at site but exlcuding cost and fabrication of steel but including labour charges for
mixing , cost of formwrok, transportiang, laying and curing concrete, working at heights,
hire charges for tools and plants, incluiding all other incidental charges etc.,
7 Providing and laying of granular materials /stone crushed aggregates satisfiying the
requirements laid douwn in clusae 2504.2.2 of MORTH specification to a thichness of
600 mm with smaller size toward the soil and bigger size toward the wall over the entire
surface behind abutment wing to a full height compacted to a firm condition complete as
per drawing and specification MORT 710.1.4 and IRC 78-200-13.10
cum
8 Providing and laying of granular materials , fileter media satisfiying the requirements laid
douwn in clusae 2504.2.2 of MORTH specification to a thichness of 600 mm with smaller
size toward the soil and bigger size toward the wall over the entire surface behind
abutment wing to a full height compacted to a firm condition complete as per drawing
and specification MORT 710.1.4 and IRC 78-200-13.10
4 9.382 0.6
cum
9 Earth work in filling with granular
soil in layers 300 thk to proctor
desity 98% and as per
specification.
1 10 18.10
10 Supply and fabrication of HYSD Fe 415 steel required for all RCC items of works
involved in the schedule, including cost of steel at site and cost of fabraction labour
charges for cleaning the roads straightening, cutting, bending, tying grills, includin
MT
2.10 173.02
51.064 5 6 5
2.50 248.38
7.882 span 0 Vertical
0.40 56.09 side wall 0.35 Bottom
0.75 114.89 sin 45 0.707 middle 0.3 top
0.75 229.79
1.50 358.80
2.10 163.31 6.5 mt 1.3 0.7
2.10 163.31 3 mt 0.6 0.35
1507.59 5
Total 1509.00 2.15
0.10 7.27
wall avg 0.525
0.10 8.97
0.10 13.27
0.10 7.23
0.10 7.23
0.10 0.39
0.10 22.08
66.44
Total 67.00
0.15 12.96
0.80 50.40
0.75 16.36
0.45 4.36
0.55 43.98
0.75 27.26
0.75 16.36
0.45 4.36
0.30 52.84
0.10 7.08
0.10 7.08
0.75 2.03
245.08
Total 245.00
0.400 85.92
3.900 32.76
3.900 28.08
0.700 23.81 top Bottom
0.55 114.18 0.15 0.15
Area 0.81 0.15 0.15
Area 0.81
0.3 2.09
24.30 12.64
0.5 18.76
3.95 148.24
468.09
Total 468.00
0.30 25.20
Total 25.00
0.750 112.42
0.750 224.84
337.26
Total 337.00
3.9 87.82
Total 88.00
1.2 217.20
Total 217.00
36.98
267.3
3.9
0.4
0.55
Deapth
3 0.7 1.1375
1.2 0.3 0.2625 0.7
1
3.775 0.5
0.25
0.3875
NAME OF WORK : CONSTRUCTION OF UPGRADATION OF ROAD FROM KM 0.00 TO 70.00 OF NH 80 (M
MUNGER)
DETAILED QUANTITY IN THEFOR
ESTIMATION STATE OF BIHAR 8/2 AT CH 7+944
STRUCTURE
Dimensions
SL.
Description Unit No Length Breadth in
No
in M M
1
cum
2 Cement Concrete M10 using 40mm ISS HBG METAL including cost and
conveyance of all materials to site and cost of cement at site including cost of
formwork, lead for soft water, labour charges for mixing, transporting, laying and
curing concrete, working at depths, tools and plants and incidental charges such
as bailing out water, maintaing of protective bunds, coffer dams, shoring,
shuttering etc., complete as per relevant standard specification for Levelling
Curtain wall foundation at Upstream
Course. 1 30.26 1.50
a side
Curtain wall foundation at Downstream
1 30.26 1.85
b side
c Bed level, Rigid apron 1 30.71 7.23
Wing wall (Upstream side) 2 12.356 4.38
Wing wall (Downstream side) 2 12.356 4.38
d Toe wall 4 1.500 0.65
3
Vibrated reinforced cement concrete M15using 40mm ISS HBG metal including
cost and conveyances of all materials to site and cost of cement at site inclusive
of unloading stacking and storage charges at site including cost of formwork,lead
for soft water, labour charges for mixinig, transporting, laying and curing concrete
working in heights an hire charges for tools and plants and all other incidental
charges, etc. complete as per relavant specification for base course.
Base course for approach slab cum 2 12.00 3.60
Vibrated reinforced cement concrete M15using 20mm ISS HBG metal including
cost and conveyances of all materials to site and cost of cement at site inclusive
of unloading stacking and storage charges at site including cost of formwork,lead
for soft water, labour charges for mixinig, transporting, laying and curing concrete
working in heights an hire charges for tools and plants and all other incidental
charges, etc. complete as per relavant specification for base course.
4
Curtain wall foundation at Upstream
1 30.26 1.30
side
1 30.26 0.45
1 30.26 0.20
Curtain wall foundation at Downstream
1 30.26 1.65
side
1 30.26 0.75
1 30.26 0.45
1 30.26 0.20
Rigid apron (Average length) 2 30.71 3.50
5 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial
size of coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706
of MORTH, Fourth revision, 2001 including cost and conveyance of all materials
to site and cost of cement at site but exlcuding cost and fabrication of steel but
including labour charges for mixing , cost of formwrok, transportiang, laying and
curing concrete, working at heights, hire charges for tools and plants, incluiding all
other incidental charges etc.,
Box portion
Bottom slab 1 12.00 11.30
External walls 2 12.00 0.45
Central wall 1 12.00 0.40
shear key (Area) 2 11.30 0.95
Top slab 1 12.00 10.70
haunch portions 4 12.00 0.01
4 12.00 0.01
Brackets 2 12.00 0.29
Hand rail 2 0.26 Area
wing wall (bottom slab) 4 12.16 4.375
( wall) 4 12.16 0.4125
6 Vibrated reinforced cement concrete M25 (Design mix) using maximum nominial
size of coarse aggregate as 20mm ISS HBG metal as per CI 1704.2 and CI.1706
of MORTH, Fourth revision, 2001 including cost and conveyance of all materials
to site and cost of cement at site but exlcuding cost and fabrication of steel but
including labour charges for mixing , cost of formwrok, transportiang, laying and
curing concrete, working at heights, hire charges for tools and plants, incluiding all
other incidental charges etc.,
cum
8 Providing and laying of granular materials , fileter media satisfiying the
requirements laid douwn in clusae 2504.2.2 of MORTH specification to a
thichness of 600 mm with smaller size toward the soil and bigger size toward the
wall over the entire surface behind abutment wing to a full height compacted to a
firm condition complete as per drawing and specification MORT 710.1.4 and IRC
78-200-13.10
4 12.156 0.6
cum
9 Earth work in filling with granular soil in
layers 300 thk to proctor desity 98%
and as per specification.
1 10 11.3
10 Supply and fabrication of HYSD Fe 415 steel required for all RCC items of works
involved in the schedule, including cost of steel at site and cost of fabraction
labour charges for cleaning the roads straightening, cutting, bending, tying grills,
includin
MT
2.10 108.04
32.862
2.50 155.09
10.656 span
0.40 92.55 side wall
0.75 73.94 sin 45 0.707 middle
0.75 147.88
1.50 220.35
2.10 241.26 8 mt
2.10 241.26 3 mt
1280.37
Total 1281.00
0.10 4.54
0.10 5.60
0.10 22.22
0.10 10.81
0.10 10.81
0.10 0.39
54.37
Total 55.00
0.15 12.96
0.80 31.47
0.75 10.21
0.45 2.72
0.55 27.46
0.75 17.02
0.75 10.21
0.45 2.72
0.30 64.50
0.10 10.64
0.10 10.64
0.75 2.03
202.58
Total 203.00
0.450 61.02
5.400 58.32
5.400 25.92
0.700 15.03
0.45 57.78
Area 0.54
Area 0.54
0.3 2.09
17.7 9.20
0.55 26.74
4.675 227.32
484.50
Total 485.00
0.30 25.20
Total 25.00
0.750 71.46
0.750 142.93
214.39
Total 214.00
5.4 157.54
Total 158.00
1.2 135.60
Total 136.00
38.25
194.7
4.7 Vertical 5.4
0.45 Bottom 0.45
0.4 top 0.45
Deapth
1.7 0.8 3.7 0.8 1.6
0.6 0.35 1.2 0.3 0.2625 0.93125
6.2 1.1
2.15 4.375 0.55
0.4125
top Bottom
0.15 0.15
0.15 0.15
Two Laning of Mokama - Munger Section of NH-80 ( Km 0.00 to 70.00 ) Bill of Quantity
Estimation
Chainage 7+944 13+118 13+807
Description Total quantity
Item Unit Quantity Quantity Quantity
1
Earth work in excavation of foundation of
structures as per drawing and technical
specification, including setting out, construction
of shoring and bracing,dewatering, removal of cum 1409.10 1659.90 948.20 4017.20
stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved
material. as per MORT & H No:304-12.1
3
Vibrated reinforced cement concrete M15using
40mm ISS HBG metal including cost and
conveyances of all materials to site and cost of
cement at site inclusive of unloading stacking
and storage charges at site including cost of
formwork,lead for soft water, labour charges for cum 14.26 14.26 14.26 42.77
mixinig, transporting, laying and curing concrete
working in heights an hire charges for tools and
plants and all other incidental charges, etc.
complete as per relavant specification for base
course.
5
Vibrated reinforced cement concrete M25
(Design mix) using maximum nominial size of
coarse aggregate as 20mm ISS HBG metal as
per CI 1704.2 and CI.1706 of MORTH, Fourth
revision, 2001 including cost and conveyance of
all materials to site and cost of cement at site but
exlcuding cost and fabrication of steel but
cum 533.50 514.80 158.40 1206.70
including labour charges for mixing , cost of
formwrok, transportiang, laying and curing
concrete, working at heights, hire charges for
tools and plants, incluiding all other incidental
charges etc.,
6
Vibrated reinforced cement concrete M25
(Design mix) using maximum nominial size of
coarse aggregate as 20mm ISS HBG metal as
per CI 1704.2 and CI.1706 of MORTH, Fourth
revision, 2001 including cost and conveyance of
all materials to site and cost of cement at site but
exlcuding cost and fabrication of steel but
cum 27.50 27.50 27.50 82.50
including labour charges for mixing , cost of
formwrok, transportiang, laying and curing
concrete, working at heights, hire charges for
tools and plants, incluiding all other incidental
charges etc.,
7
Providing and laying of granular materials /stone
crushed aggregates satisfiying the requirements
laid douwn in clusae 2504.2.2 of MORTH
specification to a thichness of 600 mm with
smaller size toward the soil and bigger size
toward the wall over the entire surface behind
cum 235.40 370.70 205.70 811.80
abutment wing to a full height compacted to a
firm condition complete as per drawing and
specification MORT 710.1.4 and IRC 78-200-
13.10
9
Earth work in filling with granular soil in layers
300 thk to proctor desity 98% and as per cum 149.60 238.70 41.80 430.10
specification.
lead for
Lead
1 Km
0-10 Km 5.75
10-20 Km 4.80
20-40 Km 4.15
40-80 Km 3.30
Above 80Km 2.90
Loading 14.40
Unloading 14.40
44+1
Name of the road : Proviging ROB at vysarpadi under pass at Km 3/7 - 5/4 of GNT Road (NH5)
COST OF MATERIAL
Name of the road : Proviging ROB at vysarpadi under pass at Km 3/7 - 5/4 of GNT Road (NH5)
Lead Conveyance Total
Sl.no Description Unit Basic Cost Stacking TO CMP TO SITE TO TO SITE AT CMP AT SITE
CMP
1 53 mm to 26.5 mm metal Cum 540.00 - 44 38 201.70 180.2 741.70 720.00
2 26.5 mm to 4.25 mm metal Cum 510.56 - 44 38 201.7 180.20 712.26 691.00
3 2.36 mm metal below Cum 331.00 - 44 38 201.7 180.20 532.70 511.00
4 93 mm IRC metal Cum 243.00 - 44 38 201.7 180.20 444.70 423.20
5 75mm IRC metal Cum 272.00 - 44 38 201.7 180.20 473.70 452.20
6 63mm IRC metal Cum 350.00 - 44 38 201.7 180.20 551.70 530.20
7 53mm IRC metal Cum 425.00 - 44 38 201.7 180.20 626.70 605.20
8 46.5mm IRC metal Cum 571.00 - 44 38 201.7 180.20 772.70 751.20
9 45mm IRC metal Cum 571.00 - 44 38 201.7 180.20 772.70 751.20
10 37.5mm Crushed IRC metal Cum 583.00 - 44 38 201.7 180.20 784.70 763.20
11 26.5mm Crushed IRC metal Cum 550.00 - 44 38 201.7 180.20 751.70 730.20
12 25.0mm Crushed IRC metal Cum 550.00 - 44 38 201.7 180.20 751.70 730.20
13 22.40mm IRC metal Cum 800.00 - 44 38 201.7 180.20 1001.70 980.20
14 13.2 mm IRC metal Cum 739.00 - 44 38 201.7 180.20 940.70 919.20
15 11.2 mm IRC metal Cum 503.00 - 44 38 201.7 180.20 704.70 683.20
16 6.70 mm IRC metal Cum 374.00 - 44 38 201.7 180.20 575.70 554.20
17 6.00 mm IRC metal Cum 374.00 - 44 38 201.7 180.20 575.70 554.20
18 5.60 mm IRC metal Cum 374.00 - 44 38 201.7 180.20 575.70 554.20
19 4.75 mm and Below Cum 331.00 - 44 38 201.7 180.20 532.70 511.20
20 Quarry Dust Cum 73.00 - 44 38 201.7 180.20 274.70 253.20
21 40 mm ISS metal Cum 560.00 - 38 180.20 740.20
22 20 mm ISS metal Cum 780.00 - 38 180.20 960.20
23 10 mm ISS metal Cum 530.00 - 38 180.20 710.20
24 Bond Stone Cum 360.00 - 38 180.20 540.20
25 R.R.Masonary Stone Cum 262.00 - 38 180.20 442.20
26 Rubble Stone (coursed) Cum 210.00 38 180.20 390.20
27 Soling Stone (Unblasted) Cum 68.00 - 38 180.20 248.20
28 Rough stone for revetment Cum 68.00 - 38 180.20 248.20
29 Stone Dust Cum 73.00 - 38 180.20 253.20
30 Stone Boulders Cum 68.00 - 38 180.20 248.20
31 Gravel Cum 97.00 - 18 95.9 192.90
32 Sand for Filling Cum 110.00 - 33 159.45 269.45
33 Sand for Mortar Cum 110.00 - 33 159.45 269.45
34 Soling Stone (Unblasted) Cum 68.00 - 38 180.20 248.20
35 Rough stone for revetment Cum 228.00 - 38 180.20 408.20
36 Stone Dust Cum 73.00 - 38 180.20 253.20
37 Stone Boulders Cum 68.00 - 38 180.20 248.20
38 Cement MT 4400.00 220 4620.00
53 mm to 26.5 mm 720.00
26.5 mm to 4.25 mm Metal 691.00
NON BITUMINOUS MATERIAL 45 mm to 22.4 mm Metal 791.00
22.4 mm to 2.36 mm Metal 679.00
25 mm to 10 mm 850.00
BITUMINOUS MATERIAL 13.2 mm to 10 mm 823.00
10 mm to 5 mm 593.00
5 mm below 533.00
EDUCA TRANSP
TION ORTATIO
EXCISE CESS N
BASIC STORAGE
DUTY 14 ON VAT CHARGE Total
RATE 5%
% EXCISE S FROM
DUTY 3 CPCL TO
% CMP
Emulsion (MT)( VAT 12.5 % ) 21358.00 2990.12 89.70 3054.73 1067.90 89.93 28650.38
Bulk Bitumen Gr. 60/70 (MT) 26770.00 3747.80 112.43 1225.21 1338.50 71.95 33265.89
Cement (MT) 4400.00 220.00 - 4620.00
Steel (MT) 45000.00 2250.00 - 47250.00
Modified Bitumen CRMB 55 25690.00 3596.60 107.90 1175.78 1284.50 89.93 31944.71
Cost of binding wire 40
Admixture at 4% of cement 2.65