REPAIR/REHABILITATION OF UNIVERSITY GRANDSTAND

CONSTRUCTION SCHEDULE 30 DAYS


  CATCH UP PLAN
WORK DESCRIPTION WEEK 1 WEEK 2 WEEK 3 WEEK 4
REPAIR/REHAB. OF UNIVERSITY ATHLETIC GRANDSTAND                                                        
ITEM NO.                                                          
1002(5) PLUMBING FIXTURES                                                        
1018 CERAMIC TILES                                                        
1010 WOODEN DOORS AND WINDOWS                                                        
1100(1A) CONDUITS BOXES AND FITTINGS                                                        
1101(8) WIRES AND WIRING DEVICES                                                        
1102(1)A1 PANEL BOARD WITH MAIN AND BRANCH BREAKERS,PLUG IN FLUSH TYPE                                                        
1103(1) LIGHTING FIXTURES                                                        
1027(1) CEMENT PLASTER FINISH                                                        
1021(1)A CEMENT FLOOR FINISH,PLAIN                                                        
1018(2) UNGLAZED TILES                                                        
1018(1) GLAZED TILES AND TRIMS                                                        
1010(2)B DOORS (WOOD PANEL)                                                        
1043(2) PVC DOORS AND FRAME                                                        

WEEKLY TARGET

WEEK 1 = 2.13 %

WEEK 2 = 1.7%

WEEK 3 = 4.29 %

WEEK 4 = 5.2 %

TOTAL TARGET OF ACCOMPLISHMENT = 13.32 %