Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
230/132 KV SUBSTATIONS
Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
132/33 KV SUBSTATIONS
Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
Total Capacity
Sl. No Name of Grid Substation Transformer Capacity (MVA) GMD Grid Circle
(MVA)
15 Siddhirganj 210 MW P/S - Haripur 1.5 1.5 Single ACSR 600 sq. mm.
16 Ashuganj - Sirajganj (2nd EWI) 144 288 Double Twin AAAC 37/4.176 mm.
18 Bheramara HVDC- Ishurdi 10.1 20.2 Double Twin AAAC 37/4.176 mm.
25 Aminbazar-Old Airport (O/H) 3.575 7.15 Double Twin Mallard 2x795 MCM
26 Aminbazar-Old Airport (U/G) 4.013 8.026 Double XLPE 2000 sq. mm.
22 Comilla(N) -Chandpur 77.5 77.5 Single Linnet + Grosbeak (336.4 + 636) MCM
122 Bogra Old-Bogra New 1.5 3 Double Twin AAAC 37/4.176 mm.
124 Khulna (S) - Gallamari 4.2 8.4 Double Grosbeak 636 MCM
132 Shiddhirganj to Siddhirganj Dutch Bangla PP 2.4 2.4 Single Grosbeak 636 MCM
line.
142 Old Airport-Cantonment (U/G) 6.99 13.98 Double XLPE 800 sq.mm
145 Old Airport-Sajmasjid (U/G) 8.294 16.588 Double XLPE 800 sq.mm
Dhaka Zone
Actual Actual
SL Name of Power Installed Derated Peak Peak
No. Station Capacity Capacity Day Evening
45MW(Aggreko)
335 MW GT
Chittagong Zone
Actual
SL Installed Derated Actua Peak
No Name of Power Capacit Capacit l Peak Evenin
. Station y y Day g
1,2,3,4,5
(Regent)
Comilla Zone
Actual
SL Installed Derated Actua Peak
No Name of Power Capacit Capacit l Peak Evenin
. Station y y Day g
Mymensigh Zone
Actual Actual
SL Name of Installed Derated Peak Peak
No. Power Station Capacity Capacity Day Evening
Sylhet Zone
S Installe Derate Actu Actual
L d d al Peak
N Capaci Capaci Peak Eveni
o. Name of Power Station ty ty Day ng
Khulna Zone
Actual Actual
SL Name of Power Installed Derated Peak Peak
No. Station Capacity Capacity Day Evening
Barisal Zone
110MW
Rajshahi Zone
Actual
SL Installed Derated Actua Peak
No Name of Power Capacit Capacit l Peak Evenin
. Station y y Day g
Rangpur Zone
ST 1
Total 95 0 0 0