TITLE PAGE NO. rate in %


CHAPTER NO.
CHAPTER-1 SURVEY,DRESSING AND TRIMMING 1 27

CHAPTER-2 EARTH WORKS INCLUDING FOUNDATION ACTIVITIES 2 22

CHAPTER-3 TRANSPORTATION OF MATERIAL 6 27

CHAPTER-4 LOADING AND UNLOADING OF MATERIAL 12 27

CHAPTER-5 ERECTION OF SUPPORTS & STAYS 13 27

CHAPTER-6 ASSEMBLY & INSTALLATION OF VARIOUS ITEMS 16 27


CHAPTER-7 STRINGING OF CONDUCTOR/ EARTH WIRE 27 27

CHAPTER-8 EARTHING OF LINE AND SUB-STATIONS 30 27

CHAPTER-9 METER AND SERVICE LINES 33 27

CHAPTER-10 ERECTION OF 33KV SUB-STATIONS & BUS BAR 38 27

CHAPTER-11 LAYING OF HT/LT CONTROL CABLE INSTALLATION OF C&R PANEL KIOSKS 40 27


BREAKERS ETC.
CHAPTER-12 PAINTING WORKS 47 27

CHAPTER-13 LIGHTING FIXTURES 48 27

CHAPTER-14 FABRICATION 49 27

CHAPTER-15 MAINTENANCE OF LINES 51 27

CHAPTER-16 MAINTENANCE OF 11/0.4KV SUB-STATION 62 27

CHAPTER-17 OPERATION AND MAINTENANCE OF 33/11 KV SUB-STATION 69 27

CHAPTER-18 FENCING WORKS 75 27

CHAPTER-19 (A) SUPPLY OF MATERIAL FOR KUTIR JYOTI/BPL CONNECTION IN RURAL AREA 76 27

CHAPTER-19 (B) TRANSPORTATION AND ERECTION FOR KUTIR JYOTI /BPLCONNECTION IN 78 22


RURAL AREA

CHAPTER-20 ERECTION AND COMMISSIONING OF CABLE 81 27 NO


CHANGE
FOR
CABLE
LAID BY
VERMIER

CHAPTER-21 ERECTION AND COMMISSIONING OF CAPACITOR AND CAPACITOR BANK 86 27

CHAPTER-22 LABOUR 88 27

CHAPTER-23(A) HIRE CHARGES OF PLANTS AND MACHINERIES WITH EXCLUDING FUEL 90 Under
Considera
tion
CHAPTER-23(B) HIRE CHARGES OF PLANTS AND MACHINERIES WITH INCLUDING FUEL 95 Under
Considera
tion
CHAPTER-24 REPLACEMENT OF 11 KV CT PT SETS 96 27

CHAPTER-25 (A) SUPPLY OF MATERIAL FOR HT METERING ON DISTRIBUTION 98 27


TRANSFORMER
CHAPTER-25 (B) TRANSPORTATION /ERECTION OF MATERIAL FOR HT METERING ON 100 22
DISTRIBUTION TRANSFORMER
STANDARD DATA 102
MEASURED WEIGHT OF MATERIAL 104

LIST OF NEW ITEMS INCORPORATED 104 ANNEXURE-A


ARC FOR THE YEAR 2019
JAIPUR DISCOM.
CHAPTER NO.1
SURVEY,DRESSING AND TRIMMING

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No
1 2 3 4
1.1 Conducting route survey as per approved route map and pegging of route Km. 203.70
with tee off point section point & double pole locations.
1.2 Grass cutting and surface dressing including removal of unwanted/rubbish Sq.Mtr 1.07
plants with roots from open ground /yard and other Nigam premises with
stacking of grass/plants at desired place near the ground.

1.3 Levelling of ground


1.3.1 Levelling of ground up to 30 cm.depth. with tractor and T&P required as Sq.Mtr 1.54
per condition of ground including removal of rubbish plants from ground &
marking of boundary with lime powder.(Including all lead & lifting)

1.3.2 Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P Sq.Mtr 6.87
required as per condition of ground including removal of rubbish plants
from ground & marking of boundary with lime powder.(Including all lead &
lifting)

1.4 Trimming of tree branches/plants and preparing route approchases for Per 30.57
proposed line. tree/plant

NOTE: The rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra
by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[1]
CHAPTER NO.2
EARTH WORKS INCLUDING FOUNDATION ACTIVITIES
Chapter DESCRIPTION OF WORK UNIT Rate /Unit
Code No
1 2 3 4
2.1 Excavation of pit in soil (ordinary) to erect various supports and stay sets
including stacking of excavated soil from the edge of excavation.
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
2.1.1 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep Pit 88.97
2.1.2 9 Mtr/ 1.2mx0.6mx1.50 m deep Pit 94.81
2.1.3 10/11 Mtr/ 1.2mx0.6mx1.65 m deep Pit 100.81
(B) Lattice Tower /Size of pit
2.1.7 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep Pit 311.13
2.1.8 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep Pit 328.84
(C)Stay set/Depth of pit
2.1.9 8'x 3/4" -0.75x0.5x1.6 m Pit 74.12
2.1.10 6'x 5/8" -0.75x0.5x1.35 m Pit 65.10
2.2 Excavation of pit in Hard soil
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
2.2.1 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep Pit 97.81
2.2.2 9 Mtr/ 1.2mx0.6mx1.50 m deep Pit 104.29
2.2.3 10/11 Mtr/ 1.2mx0.6mx1.65 m deep Pit 110.78
(B) Lattice Tower /Size of pit
2.2.7 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep Pit 342.26
2.2.8 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep Pit 361.85
(C)Stay set/Depth of pit
2.2.9 8'x 3/4" -0.75x0.5x1.6 m Pit 81.53
2.2.10 6'x 5/8" -0.75x0.5x1.35 m Pit 71.74
2.3 Excavation of pit in ordinary rock which does not require blasting to erect
various supports and stay sets including stacking of excavated muck from
the edge of excavation/pit.
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
2.3.1 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep Pit 245.87
2.3.2 9 Mtr/ 1.2mx0.6mx1.50 m deep Pit 260.73
2.3.3 10/11 Mtr/ 1.2mx0.6mx1.65 m deep Pit 278.42
(B) Lattice Tower /Size of pit
2.3.4 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep Pit 1336.17
2.3.5 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep Pit 1596.90

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[2]
Chapter DESCRIPTION OF WORK UNIT Rate /Unit
Code No
1 2 3 4
(C)Stay set/Depth of pit
2.3.6 8'x 3/4" -0.75x0.5x1.6 m Pit 237.02
2.3.7 6'x 5/8" -0.75x0.5x1.35 m Pit 213.31
2.4 Excavation of pit in Hard rock ( Where blasting is required) to erect various
supports and stay sets including stacking of excavated muck from the edge
of excavation/pit.

(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit


2.4.1 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep Pit 827.37
2.4.2 9 Mtr/ 1.2mx0.6mx1.50 m deep Pit 977.47
2.4.3 10/11 Mtr/ 1.2mx0.6mx1.65 m deep Pit 1157.62
(B) Lattice Tower /Size of pit
2.4.4 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep Pit 2703.16
2.4.5 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep Pit 2959.93
(C)Stay set/Depth of pit
2.4.6 8'x 3/4" -0.75x0.5x1.6 m Pit 676.94
2.4.7 6'x 5/8" -0.75x0.5x1.35 m Pit 600.77
2.5 Earth work excavation and foundation of platfrom of transformers and
brakers including dressing of sides and ramming of bottoms .Liftup to 1.5
Meter including taking out the excavated soil and depositing and refilling of
jhiri, watering and ramming and disposal of surplus excavated soil as
directed with in a lead of 50 Meter.

2.5.1 Soft /loose soil CUM 61.47


2.5.2 Hard /dense soil CUM 78.54
2.5.3 Hard soil mixed with boulders CUM 109.99
2.6 Providing and laying cement concrete including compaction etc, complete CUM 2417.62
using stone aggregate 40 mm nominal size (hand broken ) in foundation
plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate
mix.

Note
1 The rates are all lead of cement,lime,ballast, sand,surkhi and grit etc.at site
of work.
2 For all concrete work coarse sand shall be used no extra will be paid .
3 Concrete mix prepared by power driven mechanical mixer shall be used .

4 Under exceptional coditions, where mechanical mixer and vibrator are not
used(with the approval of Engineer Incharge reduced by 3% for mechanical
mixer and 2% for Vibrator

5 Thickness of the cement concrete should not exceeed 100 mm.


2.7 Plaster on new surface on walls in cement ,sand mortar 1:6 including Sq.M 130.83
racking of joint etc. complete fine finsh 25 mm thick.

Note
1 The rates for complete work including racking of
joints,curing,grinding,mixing and finishing T&P and scaffolding material and
cost of material with all lead and lift.

2 The rates cover protection of all place and things,requiring protection and
cleaing such places and thing of all droppings and splashes of mortar etc.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate /Unit
Code No
1 2 3 4
[3]

2.8 Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded
stone aggregate ) rounding off edges etc.but excluding cost of nosing of
steps etc. complete.
2.8.1 25 mm thick with 12.5 mm thick nominal size aggregate. SqM 170.66
2.8.2 75 mm thick with 20 mm thick nominal size aggregate. SqM 406.73
Note
1 The rates for all items inculde all form of work , laying ,curing and finishing
etc. The rates are for complete work at site, inclusive of all leads.
2 The rates cover the preparation and cleaing of all places
2.9 Providing and fixing of reinforced ferro cement drain cover designed for
Class -A leading duly marked on cover with adequate steel reinforced
cement having thickness 75 mm to 150 mm with anti corrosive bitumen
painted M.S. plate , Rim and M.S. lifting hooks addmixture like plasticizer
bond improving compound , shrinking resistance compound abrasion
resistant complete as per approved design etc with span 300 to 450 mm
and standard size 600x800 mm ( when trench is working as a culvert).

2.9.1 75 mm SqM 2275.41


2.9.2 100 mm SqM 2559.84
2.9.3 125 mm SqM 2844.26
2.9.4 150 mm SqM 3128.68
2.10 Supply & fixing of Fibre reinforced ferrocement drain cover (light duty) SqM 1111.01
designed for Road side drain for Class-B loading duly marked on cover with
adequate steel reinforcement having thickness 38 mm anti corrosive
bitumen painted M.S. Plate, rim and on M.S. lifting hooks, additives and
addmixture like plasticizer, shrinkage resistance compound,abrasion
resistance etc. as per approved drawing & design complete in all respect
with span 300 to 450 mm and standard size 600x1200 mm (when trench is
working as an ordinary trench).

2.11 Masonry for foundation and plinth


2.11.1 Randon Rubble stone masonry for foundation and plinth in cement sand Cum. 1962.53
mortar 1:6(1 Cement : 6 Sand) including labour charges.
2.11.2 Brick masonry for foundation and plinth in Cement sand mortar 1:6 Cum. 2872.70
( 1 Cement : 6 Sand ) including labour charges.
Note:
1 Rates provided are for the complete finished items inclusive of cost of water and
materials with all leads labour, all type of taxes, royalty, scaffolding curing, laying fixing,
finishing etc.hire charges for tools and plants templates and other appliance.

2 In case of non availability of stone header of proper size cement concrete header of mix
1:3:6(M-10) with 25 mm graded stone aggregate with smooth finish may be provided by
the contractor at no extra cost.

3 The rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[4]
CHAPTER NO.3
TRANSPORTATION OF MATERIAL

Chapter
DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4
3.1 Safe carriage of PCC poles including loading / un-loading
a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole
3.1.1 Within 10 Kms. Pole 236.27
3.1.2 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. Pole 4.84
3.1.3 Above 30 Kms. Add for each Kms. or part thereof. Pole 2.49
b) 8 Mtr. Long PCC pole
3.1.4 Within 10 Kms. Pole 160.70
3.1.5 Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof. Pole 4.84
3.1.6 Above 30 Kms. Add for each Kms. or part thereof Pole 2.49
c) 9 Mtr.long 200 Kg. PCC pole
3.1.7 within 10 Kms.- Pole 198.27
3.1.8 Above 10 Km. & upto 30 Km. add for each Km. or part thereof Pole 4.84
3.1.9 Above 30 Km. add for each Km. or part thereof Pole 2.49
3.2 Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails,
R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay
Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading
and unloading and stacking in Nigam store /at work site
3.2.1 Within 10 Kms. M.T. 332.02
3.2.2 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. M.T. 4.70
3.2.3 Above 30 Kms. Add for each Kms. or partthereof. M.T. 2.91
3.3 Safe Carriage of insulator, hardware, cable etc.including
loading/unloading and stacking in Nigam.stores etc.
3.3.1 Within 10 Kms. M.T. 397.93
3.3.2 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. M.T. 5.67
3.3.3 Above 30 Kms. Add for each Kms. or part thereof. M.T. 3.59
3.4 Safe carriage of fabricated lattice towers structures and sub-station
structures type AB, AB beams, isolators structures etc. including
loading/unloading and stacking in the Nigam. Stores / at work site.

3.4.1 Within 10 Kms. M.T. 484.00


3.4.2 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. M.T. 4.70
3.4.3 Above 30 Kms. Add for each Kms or part thereof. M.T. 3.59
3.5 Safe carriage of 11/.4 KV 3 Phase distribution transformer including
loading/unloading.from store to site
a) 10 & 16 KVA
3.5.1 Within 10 Kms. Nos. 200.35
3.5.2 Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof. Nos. 5.67
3.5.3 Above 30 Kms. Add for each Kms. or part thereof. Nos. 3.87
b) 25 & 40 KVA
3.5.4 Within 10 Kms. Nos. 243.18
3.5.5 Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof. Nos. 6.92
3.5.6 Above 30 Kms. Add for each Kms. or part thereof. Nos. 4.70

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter
Code No DESCRIPTION OF WORK UNIT Rate/Unit
1 2 3 4
[5]
Chapter
Code No DESCRIPTION OF WORK UNIT Rate/Unit
1 2 3 4
c) Above 40 KVA & upto 100 KVA
3.5.7 Within 10 Kms. Nos. 395.30
3.5.8 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. Nos. 6.92
3.5.9 Above 30 Kms. Add for each Kms. or part thereof. Nos. 4.70
c) Above 100 KVA & upto 315 KVA
3.5.7 Within 10 Kms. Nos. 907.06
3.5.8 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. Nos. 11.74
3.5.9 Above 30 Kms. Add for each Kms. or part thereof. Nos. 9.39
d) Above 315 KVA upto 500 KVA
3.5.10 Within 10 Kms. Nos. 1783.74
3.5.11 Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. Nos. 16.44
3.5.12 Above 30 Kms. Add for each Kms. or part thereof. Nos. 11.74
3.6 Safe Carriage of 6.35/0.24 KV Single phase distribution transformer
including loading /unloading from store to site.
16/25 KVA
3.6.1 Within 10 Kms. Nos. 200.35
3.6.2 Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof. Nos. 5.67
3.6.3 Above 30 Kms. Add for each Kms. or part thereof. Nos. 3.87
5 KVA
3.6.4 Within 10 Kms. Nos. 179.62
3.6.5 Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof. Nos. 5.52
3.6.6 Above 30 Kms. Add for each Kms. or part thereof. Nos. 3.59
3.7 Safe carriage of Damaged/repair distribution transformer from Acos to
repairing firm /repairing firm to Acos per transformer (upto 100 kVA, 3
Phase)/upto 25 KVA, 1 Phase.

3.7.1 Within 10 Kms Nos. 138.86


3.7.2 Above 10 Kms & upto 30 Kms Add for each Km or part thereof Nos. 4.43
3.7.3 Above 30 Kms & upto 50 Kms . Add for each Km or part thereof Nos. 3.59
3.7.4 Above 50 Kms . Add for each Km or part thereof Nos. 2.62
3.8 Safe carriage of Damaged/repair distribution transformer from Acos to
repairing firm /repairing firm to Acos per transformer (Above 100 KVA
to 315 KVA & 500 KVA)
3.8.1 Within 10 Kms Nos. 207.25
3.8.2 Above 10 Kms & upto 30 Kms Add for each Km or part thereof Nos. 6.63
3.8.3 Above 30 Kms & upto 50 Kms . Add for each Km or part thereof Nos. 5.25
3.8.4 Above 50 Kms . Add for each Km or part thereof Nos. 4.01
3.9 Safe Carriage of 33/11 KV Power Transformer
a) Upto 1.6 MVA
3.9.1 Within 10 Kms Nos. 3523.27
3.9.2 Above 10 Kms & upto 30 Kms . Add for each Km or partthereof Nos. 35.24
3.9.3 Above 30 Kms & upto 50 Kms . Add for each Km or partthereof Nos. 23.91
3.9.4 Above 50 Kms . Add for each Km or part thereof Nos. 12.44
b) Above 1.6 MVA & Upto 3.15 MVA
3.9.5 Within 10 Kms Nos. 4352.27
3.9.6 Above 10 Kms & upto 30 Kms . Add for each Km or partthereof Nos. 43.53
3.9.7 Above 30 Kms & upto 50 Kms . Add for each Km or partthereof Nos. 29.02
3.9.8 Above 50 Kms . Add for each Km or part thereof Nos. 14.51

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter
Code No DESCRIPTION OF WORK UNIT Rate/Unit
1 2 3 4

[6]
Chapter
Code No DESCRIPTION OF WORK UNIT Rate/Unit
1 2 3 4
c) 5.0 MVA
3.9.9 Within 10 Kms Nos. 5181.28
3.9.10 Above 10 Kms & upto 30 Kms . Add for each Km or part thereof Nos. 51.81
3.9.11 Above 30 Kms & upto 50 Kms . Add for each Km or part thereof Nos. 34.27
3.9.12 Above 50 Kms . Add for each Km or part thereof Nos. 16.58
3.10 Safe carriage of transformer from stores to stores( upto 100 KVA three
phase/upto 25 KVA single phase.)
3.10.1 Within 10 KMs. Nos. 138.86
3.10.2 Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof Nos. 4.43
3.10.3 Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof Nos. 3.59
3.10.4 Above 50 Kms.Add per each km,or part thereof Nos. 2.62
3.11 Safe carriage of transformers from stores to stores(Above 100 KVA
and upto 500 KVA)
3.11.1 Within 10 KMs. Nos. 207.25
3.11.2 Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof Nos. 6.63
3.11.3 Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof Nos. 5.25
3.11.4 Above 50 Kms.Add per each km,or part thereof Nos. 4.01
3.12 Safe carriage of breakers/kiosks etc. including loading/ unloading and
stacking in Nigam stores
3.12.1 Within 10 KMs. Nos. 907.06
3.12.2 Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof Nos. 11.74
3.12.3 Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof Nos. 9.39
3.12.4 Above 50 Kms.Add per each km,or part thereof Nos. 7.05
3.13 Safe carriage of panels including loading/ unloading and stacking in
Nigam stores
3.13.1 Within 10 KMs. Nos. 725.65
3.13.2 Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof Nos. 9.39

3.13.3 Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof Nos. 7.46
3.13.4 Above 50 Kms.Add per each km,or part thereof Nos. 5.53
3.14 Safe Carriage of 33/11 KV Power Transformer
3.14.1 8.0 MVA Nos.
3.14.2 Within 10 Kms Nos. 6525.62
3.14.3 Above 10 Kms & upto 30 Kms . Add for each Km or part thereof Kms. 65.25
3.14.4 Above 30 Kms & upto 50 Kms . Add for each Km or part thereof Kms. 42.79
3.14.5 Above 50 Kms . Add for each Km or part thereof Kms. 19.93
Transportation of Single phase Sub-Station Structure from sub-division Per 322.00
store to the site & Erect it on the existing pole at a height of 5 Mtr. From the Struct
3.15 ground level ure
Note:
1 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.

2 Above Charges will be 1.5 times for both sides for the items 3.5 & 3.6.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[7]
CHAPTER NO.4
LOADING AND UNLOADING OF MATERIAL

Chapter DESCRIPTION OF WORK UNIT Rate/


Code No Unit

1 2 3 4
4.1 Safe loading of steel fabricated / unfabricated conductor drum & M.T. 224.86
other line material.
4.2 Safe loading of power/ distribution transformer.
(A) 33/11 KV power transformer.
4.2.1 Upto 1.6 MVA Nos. 3240.32
4.2.2 Above 1.6 MVA & upto 3.15 MVA Nos. 3914.48
4.2.3 Above 3.15 MVA Nos. 5134.28
4.2.4 Above 5 MVA Nos. 7828.96
(B) 11/.4 KV Distribution Transformer
4.2.4 10 & 16 KVA Nos. 99.67
4.2.5 25 & 40 KVA Nos. 126.10
4.2.6 Above 40 KVA & upto 100 KVA Nos. 169.60
4.2.7 Above 100 KVA & upto 315 KVA Nos. 295.70
4.2.8 Above 315 KVA Nos. 635.05
(C ) 6.35/0.24 KV Transformer
4.2.9 25 KVA Nos. 126.10
4.2.10 Upto 16 KVA Nos. 87.59
4.3 Safe unloading of steel fabricated/ unfabricated conductor drum & M.T. 110.84
other line material.
4.3.1 Safe unloading of power/distribution transformers
a) 33/11 KV power transformer.
4.3.2 Upto 1.6 MVA Nos. 2620.52
4.3.3 Above 1.6 MVA & upto 3.15 MVA Nos. 3288.21
4.3.4 Above 3.15 MVA Nos. 4349.42
b) 11/.4 KV Distribution Transformer
4.3.5 10 & 16 KVA Nos. 45.31
4.3.6 25 & 40 KVA Nos. 56.18
4.3.7 Above 40 KVA & upto 100 KVA Nos. 86.85
4.3.8 Above 100 KVA & upto 315 KVA Nos. 242.70
4.3.9 Above 315 KVA Nos. 500.78
(c ) 6.35/0.24 KV Transformer

4.3.10 Upto 16 KVA Nos. 45.31


4.3.11 25KVA Nos. 56.18

NOTE:- The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[8]
CHAPTER-5
ERECTION OF SUPPORTS & STAYS

Chapter DESCRIPTION OF WORK UNIT Rate/


Code Unit
No
1 2 3 4
5.1 Erection of all type of steel supports in the excavated pit in alignment after
checking the same with plumb line including fixing of cross arms and top hamper
before erecting the supports. The support should be grouted and muffed in cement
concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be
back filled with soil. The nuts & bolts will be provided by the contractor as per
Nigam's specification for which payment will be made at the prevailing store issue
rates. The cost muffing and grouting will be paid extra.

5.1.1 R.S.Joists M.T. 1818.74


5.1.2 M.S.Rails M.T. 1774.36
5.1.3 Lattice Structure M.T. 4984.26
5.2 Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top
hampers as required in alignment after checking the same with plumb line. The
support is to be back filled with soil with proper ramming. The nuts & bolts are to
be provided by the contractor as per Nigam's specification for which the payment
will be made at the prevailing Discom store issue rates.

(A) IN URBAN AREA


5.2.1 PCC Poles 8 Mtr. Long (200Kg) Nos. 395.66
5.2.2 PCC Poles 9 Mtr. Long (400 Kg) Nos. 602.34
5.2.3 PCC Poles 11 Mtr. Long Nos. 685.46
5.2.4 PCC Poles 9 Mtr. Long (200Kg) Nos. 497.75
(B) IN RURAL AREA
5.2.5 PCC Poles 8 Mtr. Long (200Kg) Nos. 315.08
5.2.6 PCC Poles 9 Mtr. Long (400 Kg)/200 Kg Nos. 458.72
5.2.7 PCC Poles 10 / 11 Mtr. Long Nos. 529.20
5.2.8 PCC Poles 9 Mtr. Long(200Kg.) Nos. 386.35
5.3 Erection &assembly of 2 Pole structures of steel supports or PCC poles in
excavated pit in alignment after checking the same with plumb line.Including fixing
of top bracing of M.S.Channels with pilot plates and clamps.The support is to be
back filled with soil with proper ramming.The nuts &bolts are to be provided by the
contractor as per Nigams specfication for which the payment will be made at the
prevailing Discom store issue rates.

5.3.1 PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long Nos. 1323.22


5.3.2 PCC Poles 8 Mtr. Long /R.S. Joist Nos. 932.46
5.3.3 PCC Poles 9 Mtr. Long(200 Kg.) Nos. 1126.64
5.4 Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required
position and back filling with soil with proper ramming.The work includes fixing of
stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of
stay set/stay wire

5.4.1 8"x3/4" with 7/8 SWG stay wire Nos. 284.27


5.4.2 6"x5/8" with 7/10 SWG stay wire Nos. 246.04

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[9]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code Unit
No
1 2 3 4
5.5 Erection & fixing of steel struts in the excavated pit in position.The top end of the
strut will be properly holed/welded with the main support muffed in cement
concrete of ratio 1:3:6 as per item No.5.7.The nuts and bolts will be provided by
the contractor as per Nigams specification for which payment will be made at the
prevailing store issue rate.The cost of muffing and grouting will be paid extra.

5.5.1 R.S.Joists M.T. 1756.49


5.5.2 M.S.Rails M.T. 1590.27
5.5.3 Lattice Structure M.T. 3476.80
5.5.4 P.C.C Poles 8 Meter Nos. 377.96
5.5.5 P.C.C Poles 9 Meter(200Kg.) Nos. 426.64
5.6 Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river CUM 2879.19
sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according
to the size/type of supports/stay set including compaction/curing for 21days in steel
plates shuttering /farmer base.

5.7 Supplying and laying of randum rubble stone boulder having weight not less than CUM 471.83
20 kgs.
5.8 Fixing of all type of fabricated material on erected supports with nut & bolts as per MT. 3221.91
approved design & drawing of sub-station.

NOTE:-
1 The approved design of cement concrete work will be given by the AEn./Incharge of the works.

2 The payment of cement concrete work as per accurate measurement will be made in addition to
the work of support erection.

3 The rates are inclusive of all the material such as river send stone grit,water and T&P etc.unless
otherwise specified.
4 The quality of cement and other material shall be got checked and approved by the AEN.
Incharge,

5 The cement shall be supplied departmentally if avaiable otherwise contractor will have to arrange
the same at his level.

6 If the stay required to be grouted in cement then the rates as indicated in item 5.7 will be
applicable& paid in addition to above rates and the charges for back filling with soil will be
deducted @ 10.00 per cum.

7 If stay insulator is not availabe with the Nigam. Then the contractor will have to provide the same
as per Nigams Specification for which he will be paid in accordance with Prevailing Discom store
issue rates

8 Dismantling charges for all the items will be 60% of item Rates of erection charges . However
charges for transportation of the materialfrom works site in the sub-division store shall be paid
as item rate of chapter III (transportation of material).The payment will be made after issuance of
certificate by the AEn.concerned that all the dismantled material has been safely received in the
sub-divisional store.

9 The nuts and bolts will be privided/supplied by the contractor which will confirm to relevant ISS.

10 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra
by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/
Code Unit
No
1 2 3 4

[10]
CHAPTER-6
ASSEMBLY & INSTALLATION OF VARIOUS ITEMS
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.1 Fixing of cross arms with clamp on erected support as per design. The nuts
&bolts will be supplied by the contractor as per Nigams specification for
which payment will be made as per prevailing Discom store issue rates.

6.1.1 33 KV cross arms Nos. 52.93


6.1.2 11 KV cross arms Nos. 32.72
6.2 Fixing of top hampers with clamp on erected support as per design. The
nuts &bolts will be supplied by the contractor as per Nigams specification
for which payment will be made as per prevailing Discom store issue rates.

6.2.1 33 KV Top Hampers Nos. 15.16


6.2.2 11 KV Top Hampers Nos. 12.64
6.3 Fixing of LT brackets with clamp on erected support as per design. The
nuts &bolts will be supplied by the contractor as per Nigams specification
for which payment will be made as per prevailing Discom store issue rates.

a 4' long Nos. 20.22


b 2' long Nos. 17.70
6.4 Fixing of guarding Bracket arms with clamp on erected support as per
design. The nuts &bolts will be supplied by the contractor as per Nigams
specification for which payment will be made as per prevailing Discom store
issue rates.

6.4.1 33 KV line Nos. 50.42


6.4.2 11 KV line Nos. 27.66
6.4.3 L.T.Line Nos. 27.66
6.5 Fixing of earth wire clamp on erected support as per design. The nuts Nos. 12.64
&bolts will be supplied by the contractor as per Nigams specification for
which payment will be made as per prevailing Discom store issue rates.

6.6 Fixing of fabricated cantilever breacket on erected support as per design. Nos. 58.00
The nuts&bolts will be supplied by the contractor as per Nigams
specification for which payment will be made as per prevailing Discom store
issue rates,

6.7 Fixing and assembly of disc.point channel pair with pilot plates&clamps on
erected double pole structure as per design. The nuts &bolts are to be
provided by the contractor as per Nigams specification for which payment
will be made as per prevailing Discom store issue rates.

6.7.1 33 KV line Nos. 138.58


6.7.2 11 KV line Nos. 93.22

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[11]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.8 Fixing and assembly of disc.point channel pair with pilot plates top hampers
& clamps on erected single pole structure as per design. The nuts &bolts
are to be provided by the contractor as per Nigams specification for which
payment will be made as per prevailing Discom store issue rates,

6.8.1 33 KV line Nos. 83.12


6.8.2 11 KV line Nos. 60.53
6.9 Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit Nos. 47.88
consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of
hardware andstrips.
6.10 Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit Nos. 22.75
consiting of 1nos.disc.& 1set of H/ W ) on terminal point including fixing of
hardware and strips.
6.11 Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit Nos. 34.29
consiting of 2 nos.disc.& 1set of H/ W ) on terminal point including fixing of
hardware and strips.
6.12 Fixing of shackle insulator with hardware. Nos. 10.12
6.13 Fixing of 33kv pin insulator with pins. Nos. 15.16
6.14 Fixing of 11 KV pin insulator with pins. Nos. 10.12
6.15 Fixing of L T pin insulator with pins. Nos. 6.32
6.16 Assembly. Installation & commissioning of gang operated isolating switch
on erected structure with setting for accurate operation including fixing of
allied accessories completein all respect with post insulator and jumpering
on both ends for connection with the system. The nuts and bolts will be
supplied by the contractor for which payment will be made as per prevailing
Discom store issue rates.

(A)G.O. switch . with earthing blade.


6.16.1 33kv G.O.switch Set 1260.18
6.16.2 11kv G.O.switch Set 982.85
(B)G.O. switch . without earthing blade.
6.16.3 33kv G.O.switch Set 1134.07
6.16.4 11kv G.O.switch Set 882.04
6.16.5 11 KV SFU (three phase) Set 982.85
6.16.6 6.35 KV SFU (single phase) Set 491.91
6.17 Assembly and installation of Horn Gap fuse set (set of 3nos)on erected
structure as per design, complete in all respectwith post insulator including
jumpering on both ends for connection with the system. The nuts & bolts
will be supplied by the contractor for which payment will be made as per
prevailing Discom store issue rates.

6.17.1 33kv Horn Gap fuse set. Set 522.88


6.17.2 11kv Horn Gap fuse set. Set 453.67
6.18 Assembly and installation of 11 KV drop out cum Isolator on erected Set 230.00
structure as per design, complete in all respect including jumpering on
both ends for connection with the system. The nuts & bolts will be
supplied by the contractor for which payment will be made as per
prevailing Discom store issue rates.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[12]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.19 Installation of lightening arrestors on erected structure /support (set of 3
nos) including connection with earth by wire /strip as required and
jumpering etc. The nuts & boltswill be supplied by the contractor for which
payment will be made as per prevailing Discom store issue rates,

(A)sub-station type
6.19.1 33 KV L.A. set Set 174.29
6.19.2 11 KV L.A. set Set 151.22
(B)pole mounted type
6.19.3 11 KV L.A. set Set 42.83
6.20 Installation testing as per Nigams norm & commissioning of 11/0.4KV
distribution transformer on erected supports including fixing of base
channels as per requirment jumpering on HV&LV side, crimping of lugs/
clamping earth connections of body and neutral of transformer with wire
/strip (as already provided with earthing ) complete in all respect. The PG
clamps nuts & bolts will be supplied by the contractor for which payment
will be made as per prevailing Discom store issue rates,

6.20.1 10 and 16 KVA Nos 632.06


6.20.2 25 and 40 KVA Nos 633.17
6.20.3 Above 40 KVA & up to 100 KVA Nos 844.74
6.20.4 Above 100 KVA & up to 315 KVA Nos 959.78
6.20.5 Above 315 KVA Nos 1076.71
6.21 Installation testing as per Nigams norm & commissioning of 6.35/.24 KV
distribution transformer on erected supports including fixing of base
channels as per requirment jumpering on HV&LV side, crimping of lugs/
clamping earth connections of body and neutral of transformer with wire
/strip (as already provided with earthing ) complete in all respect. The PG
clamps nuts & bolts will be supplied by the contractor for which payment
will be made as per prevailing Discom store issue rates,

Upto 10 KVA Nos. 474.04


16/25 KVA Nos 633.17
6.22 Installation of LT MCB (Distribution Box) on sub -station structure .The nuts Nos 121.04
& bolts will be supplied by the contractor for which payment will be made
as per prevailing Discom store issue rates,including connection on both
ends with suitable lugs duly crimped (lugs & cable will be supplied by
Nigam)

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[13]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4

6.23 Erection of LT Distribution piller Boxes of 800/400/160/100 Amps.


Capacity.Each 37"x24" base as per JVVNL standard including
excavation,bricks,sand,cement masonary of size 4"x3"x10"and 3' in ground
and 1 1/2'above road level with muffing to support and mounting the
piller .Themasonary will have 4" X 4" opening 2"below ground level two in
the rear sideand one each in the remaining sides to facilitate entry and
exist of incomingand outgoing PVC cable.Earthing of the piller shall be
connected to DPearth with 7/10 SWG StayWire & lugs.

6.23.1 800 AMP. Nos 2520.33

6.23.2 400 AMP. Nos 2255.67


6.23.3 160 AMP. Nos 2255.67
6.23.4 100 AMP. Nos 2255.67
6.24 Laying of 1100 V, LT 3.5/4 core PVC/XLPE cable, of aluminiumconductor
and fixing with cable clamps making conections/jumpers by alluminium
lugs/ PG clamps of required size onLV side of distribution transformer/ LT
distribution mains onone end and with MCB with /with isolater unit/ pillar
box on theother end. Lugs should be crimped with crimping
tool.Lugs/P.G.clamps will by provided by the contractor ,for which payment
will be made as per prevalling Discom store issue rates.(outgoing feeder
cable will also be considered as circuit)

a) 25 Sq.mm per circuit 163.87


b) 35 Sq.mm per circuit 163.87
c) 50 Sq.mm per circuit 163.87
d) 70 Sq.mm per circuit 226.76
e) 95 Sq.mm per circuit 226.76
f) 120 Sq.mm per circuit 604.88
g)150 Sq.mm per circuit 604.88
h)185 Sq.mm per circuit 685.46
I) 240 Sq.mm per circuit 806.50
j) 300 Sq.mm per circuit 1058.54
k)400 Sq.mm per circuit 1058.54
6.25 Fixing of danger plates on supports/structure Nos 7.58
6.26 Fixing of a set of 4 Nos 11 KV V cross arms(Chakri) made of MS channel Set 181.41
with bracing of MS Flat.The nut and bolts shall be supplied by the
contractor for which payment will be made as per prevailing Discom store
issue rates.
6.27 Fixing of a set of 4 Nos 33 KV V cross arms(Chakri) made of MS channel Set 249.51
with bracing of MS Flat.The nut and bolts shall be supplied by the
contractor for which payment will be made as per prevailing Discom store
issue rates.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[14]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.28 (a) Fixing of PG clamp of Weasel /Rabbit Conductor Nos. 5.06
(b) Fixing of PG clamp of Dog /Racoon Conductor Nos. 5.06
( c) Fixing of PG clamp of Panther Conductor Nos. 8.06
6.29 Fixing of metering cum protection box on LT side of distribution transformer Nos. 40.30
at stores
6.30 Fixing of LT capacitors in metering cum protection box on LT side of Nos. 50.42
distribution transformer at site.
6.31 Tag Welding of Nuts and Bolts(with sealing bolts) at different 5 to 6 places Nos. 52.15
at welded strips already provided on M&P boxes fitted on 11/0.4 KV 3
phase 25/40/63 KVA transformers as per latest drawing and design of
Nigam in the stores for which adequate space and electricity will be
provided by Nigam and handling of tranformer will be done by Nigam.

6.32 Welding of door(s)(continuous welding of patties and tag welding of Nuts & Nos. 434.54
Bolts with sealing bolt ) of M&P box fitted on 11/0.4 KV,3 phase 25/40/63
KVA transformers at 5 to 6 places with two nos. patties at site(one made of
flat size 75x30x5 mm or 75x40x5 mm and other patti made of flat size
55x30x5 mm or 55x40x5 mm. These two patties will form one pair. Patti of
size 75x30x5 mm /75x40x5 mm is to be welded on side of the box and
other patti of size 55x30x5 mm or 55x40x5 mm is to be welded on door of
the box to form locking arrangement through Nuts & Bolts(size 1/2"x1 1/2")
as per latest drawinf and design of nigam.Patties and Nuts & Bolts will be
provided by Nigam.

6.33 Welding of single phase transformer(s)with base of transformer welded with Nos. 434.54
substation structure at four points.Tag welding of all bolts & nuts of
subatation structure,upper ring of transformer(s)and continuous welding of
upper lid of transformer at three places of 2" siz including material.In case
base of transformer with sub station structure and lid of transformer with
ring is welded with piecec of flat iron then the flat iron would be provided by
the Nigam.

6.34 Making Push-Fit type arrangement insheet metal single phase and three Nos. 26.08
phase meter boxes.
6.35 Assembly,installation & commisioning of 11 KV Roaster switchs on erected Nos. 1651.25
structures with stting for accurate operation including fixing of allied
accessories completed in all respect with post insulators and jumpering on
both ends for connection with systm.The nuts & bolts will be supplied by
contractor for which payment will be made as per prevailing Dicom store
issue rates.
6.36 Assembly,installation & commisioning of 33/11 KV gang operated isolating Nos. 1651.25
switch including installation and dismantling of fabricated steel required for
mounting of 33/11 KV Gang operated isolating switch for sectionalizing
33/11 KV lines with setting for accurate operation including fixing of allied
accesories complete in all respect with post insulator and jumpering on both
ends for connection with the system,.

AEN(TW) XEN(TW-II) A.O.(TW) SE(TW)

[15]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.37 Dismantling of existing 6.35/0.24 KV transformer and structure from 3 m Nos. 1390.52
height structure and installation, testing as per Nigam’s norms &
commissioning of 6.35/0.24 KV transformer on existing support and raising
height of structure from 3 m to 5 m from ground along with earth
connections from existing earthing, including welding of transformer with
base channels and by welding of Nuts and Bolts. (clamps of suitable size
and earth strip if required will be supplied by Nigam.)/existing S.F.U shall
also be lifted at proper place if possible otherwise same shall be deposited
in AEN store along with other removed material.

6.38(a) Tag Welding of single-phase transformer at different three places in Nos. 38.23
Nigam’s stores one (at welded strips already provided) +2(with
additional patties of size 55X30X5 mm)

(b) Providing of single phase CT meter in M&P box Nos. 38.68


( c) Fixing of MCCB in M&P box including clamping and making cable Nos. 31.45
connections.
(d) Welding of door(s)(continuous welding of patties and tag welding of Nuts & Nos. 413.84
Bolts with sealing bolt ) of M&P box fitted on 6.35KV /0.24 KV, single phase
transformer at 3 to 4 places with two nos. patties at site(one made of flat
size 75X30X5 mm or 75X40X5 mm and other made of flat size 55X30X5
mm or 55X40X5 mm. These two patties will form one pair. Patti of size
75X30X5 mm /75X40X5 mm is to be welded on side of the box and other
patti of size 55X30X5 mm or 55X40X5 mm is to be welded on door of the
box to form locking arrangement through Nuts & Bolts(size 1/2"x1.5") as per
latest drawing and design of Nigam. Patties and Nuts & Bolts will be
provided by Nigam.

(e) Tag Welding of Nuts and Bolts(with sealing bolts) at different 5 to 6 places Nos. 49.66
at welded strips already provided on M&P boxes fitted on 11/0.4 KV 3
phase 16/10KVA three phase transformers as per latest drawing and
design of Nigam in the stores for which adequate space and electricity will
be provided by Nigam and handling of tranformer will be done by Nigam.

(f) Welding of door(s) (continuous welding of patties and tag welding of Nuts & Nos. 181.40
Bolts with sealing bolt ) of M&P box fitted on 11/0.4 KV, 3 phase 25/40/63
KVA transformer at 5 to 6 places with two nos. patties at Sub-Division Store
(one made of flat size 75x30x5 mm or 75x40x5 mm and other patti made of
flat size 55x30x5 mm or 55x40x5 mm is to bewelded on side of the box and
other patti of size 55x30x5 mm or 55x40x5 mm is to be welded on door of
the box to form locking arrangment through Nuts & Bolts (size 1/2"x1 1/2")
as per latest drawinf and design of nigam Patties and Nuts & Bolts will be
provided by Nigam

(g) Continuous welding of three sidessliding front cover of meter chamber (size Nos. 64.40
400x2+390=1190 MM) of M&P Box for 10/16/25/40 KVA for three phase
transformers including tag welding of 12 nos. nut & bolts used in TN-2217
and onwards.
6.39 Replacement of defevtive items in LT Pillar Boxes (Only Labour Vharges):-

(a) Knife Switches 200 A/400 A per set 186.94


(b) U- Contacts 200 A/400 A per set 71.43
( c) Insolator/ LBS/ Rotary Switch 200 A/400 A per set 204.47
(d) MCCB 160 A/ 200 A per set 87.63
(e) MCB 32 A/ 63 A (for LT Distribution Boxes) per set 46.74
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

1 2 3 4
6.40 Erection of 11 KV RMU complete with accessories on existing foundation Nos. 4142.54
including use of special tools & conducting all pre-commissioning test
before energization, connecting the cable ect. Complete in all respect with
erection & groutinh of structure (excluding civil works for which payment
shall be made extra as per clause No 2.6 of CLRC). The relays will be
tested by Discom.
6.41 Erection of 2 Plole & 4 Pole DT Structure of 11 KV RMU complete in all
respect (excluding civil works for which payment shall be made extra as per
clause No. 2.6 of CLRC).
(a) 2 Pole Structure (Approx 548 Kg) Nos. 996.65
(b) 4 Pole Structure (Approx 691 Kg) Nos. 1256.03
NOTE:-
1 Dismentling charges for all the items will be 60% of item rates of erection charges.However
charges for transportation of the material from works site to the sub-division store shall be
paid as item rate of chapter III(Transportation of material).The payment will be after issuance
of certificate by the AEn.concerned that all the dismentled material has been safelyreceived
in the sub-divisional store.

2 The Quality of the material supplied by the contractor be got checked and approved by the
Circle S.E.

3 The nuts & bolts provided / Supplied by the contractor will be confirm to relevant ISS.

4 In case of pole upper end of the G.I wire provided for earthing shall be bolted with crossarm

5 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[16]
CHAPTER-7
STRINGING OF CONDUCTOR/ EARTH WIRE

Chapter DESCRIPTION OF WORK UNIT Rate


Code /Unit
No
1 2 3 4
7.1 Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as
directed , using bolted type hardware including binding on pin insulators,jumpering on
section points with binding wire /P.G.clamps . Aluminium jointing sleeves will be used
for jointing the conductor.The line must stand at proper voltage on charging.The
contractor will be provide P.G.clamps for which payment will be made as per prevailing
Discom issue rate.

(A) IN URBAN AREA


7.1.1 ACSR PANTHAR km/cond. 8149.76
7.1.2 ACSR DOG km/cond. 2972.11
7.1.3 ACSR RACCOON km/cond. 2745.51
7.1.4 ACSR RABBIT km/cond. 2416.04
7.1.5 ACSR WEASEL km/cond. 1483.44
7.1.6 Insulated RABBIT HT/LT km/cond. 2972.11
(B) IN RURAL AREA
7.1.7 ACSR PANTHAR km/cond. 6964.01
7.1.8 ACSR DOG km/cond. 2634.90
7.1.9 ACSR RACCOON km/cond. 2555.89
7.1.10 ACSR RABBIT km/cond. 2249.18
7.1.11 ACSR WEASEL km/cond. 1338.54
7.1.12 Insulated RABBIT HT/LT km/cond. 2634.90
7.2 Laying, jointing,stringing,tensioning and clamping of ACSR PANTHAR with proper sag km/cond. 8523.94
as directed ,using compression type hardwares including binding on pin
insulators,jumpering on section points with compression type jumpering cones.

7.3 Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on


single/double pole by using earth clamps /nuts & bolts with washers and earth reel
etc.including proper binding at each end.The nuts and bolts will be supplied by the
contractor for which payment will be made as per prevailing Discom store issue rates.

(A) IN URBEN AREA


7.3.1 G.I.Earth wire 6 SWG km/wire 1043.38
7.3.2 G.I.Earth wire 8 SWG km/wire 872.10
7.3.3 G.I.Earth wire 10 SWG km/wire 866.87
(B) IN RURAL AREA
7.3.4 G.I.Earth wire 6 SWG km/wire 911.74
7.3.5 G.I.Earth wire 8 SWG km/wire 750.89
7.3.6 G.I.Earth wire 10 SWG km/wire 695.58

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[17]
Chapter DESCRIPTION OF WORK UNIT Rate
Code /Unit
No
1 2 3 4
7.4 Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road
crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire
laces at an interval of two meter each or required as per location using EYE bolt, nuts
and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts
will be provided by thecontractor for which payment will be made as per prevailing
Discom store issue rates.

(A) For 4 wire stringing


7.4.1 6 SWG with laces of 8 SWG span 861.66
7.4.2 8 SWG with laces of 10 SWG span 703.48
7.5 Fixing of G.I. Laces on Guard wire at an interval of one meter each or required as per
location using EYE bolt ,nuts and bolts with washers etc.including binding,if required
.The EYE bolts and other nuts and bolts will be provided by the contractor for which
payment will be made as per prevailing Discom store issue rates.

7.5.1 For 2 Guard wire Nos/Laces 30.34


7.5.2 For 3 Guard wire Nos/Laces 32.87
7.5.3 For 4 Guard wire Nos/Laces 36.83
7.6 Drawing of overhead ABC conductor (Areal bunched cable)on existing erected
pole/support including laying. Jointing,stringing complete in all respect.

a 1cX25 + 25 Sq mm Km 2107.91
b 3cx16+25 Sq mm Km 3161.87
c 3cx25 + 25 Sq mm Km 3688.85
d 3cx50 + 35 Sq mm Km 4637.41
7.7 Fixing of suspension clamps suitable for ABC cable set 52.62
7.8 Fixing of dead end clamps suitable for ABC cable set 52.62
7.9 Fixing of LT connectors type "A" suitable for ABC cable with cover.(including set 26.39
termination of service lines)
7.10 Fixing of LT connectors type "B" suitable for ABC cable(including cable termination) set 26.39

7.11 Laying of 11 KV AB Cable on existing erected pole/support including laying jointing


stringing including fixing of hardware /accessories complete in all respect

7.11.1 3C x 70/50 Sq.mm. Km 6745.33


7.11.2 1C x 70/50 Sq.mm. Km 5691.36
7.12 Fixing of D Loops using ,ACSR Weasel/Rabbit Conductor having 9"Long 4" Deep with Nos. 10.60
6" binding on each side with binding wire on erected conductor (Rs.1.50 for 1phase
service& Rs.3.00 for 3 phase service line will be paid extra for shifting of existing
service line on D-Loops.)

NOTE:-

1 Dismantling charges for all the items will be 50% of item rates of erection charges.However charges for
transportation of the material from works site to the sub-division store shall be paid as item rate of
chapter-III(Transportation of material ).The payment will be made after issuance of certificate by the
AEn. concerned that all the dismentled material has been safely received in the sub-divisional store.

2 The quality of material supplied by the contractor be got checked and approoved by the Circle S.E.

3 The nuts and bolts provided / supplied by the contractor will be confirmed to relevant ISS.

4 The nuts and bolts will be provided / supplied by the contractor for which payment will be made as per
prevailing Discom store issue rates.
5 The Rates are inclusive of all applicable Taxes/duty except service tax which will be paid extra by
Nigam if applicable.
Chapter DESCRIPTION OF WORK UNIT Rate
Code /Unit
No
1 2 3 4
AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[18]
CHAPTER-8
EARTHING OF LINE AND SUB-STATIONS

Chapter DESCRIPTION OF WORK UNIT Rate


Code No /Unit

1 2 3 4
8.1 Earthing of line for all type of supports as per REC construction Nos 341.79
standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia
each 3 meter long and driving into earth by mechanical means as per
approved design.Drawing &specification.All material except MS rod,MS
flat & stay wirewill be supplied by the contractor.If material is supplied
by the contractor ,the payment will be made as per prevailing
Discomstore issue rates.(In case of PCC poles earthing must be
connected with earthwire already available on PCC pole at bottom)

8.2 Earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces Per Trans. 229.02
of M.S.Rod 20mm dia each 3 meter long and driving them into earth by
mechanical means at a distance as per approved design & drawing &
specification.The work includes flattening of top ends of M.S.rod drilling
a hole of 9/16" dia.at flattened top and tightening of M.S.flat 50x6mm
(having 3 hole 2ends and 1mm middle) with nuts and bolts with
M.S.rods top end hole.The flat will also be welded with M.S.rod.The
end will be connected to equipments as under in sequence.

8.3 Mesh earthing for 33/11 kv sub-station as per approved map &design
usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at
the depth of 0.65 Mtrs.,welding & jointing at joints , structures &
equipments etc.asunder:
8.3.1 Excavation of trench of 0.65Mtrs.depth and 0.5Mtr.width
(a) Normal soil Cum 123.57
(b) Hard Soil Cum 155.65
(c) Ordinary rock ( where blasting is not required.) Cum 304.95
(d) Hard rock ( where blasting is required.) Cum 904.31
8.3.2 Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and Mtr. 26.23
welding of MS flat/rod continuosly with 100 mm overlaping for straight
joint including coating of MS flat joints with molten bitumen and
covering joint with bitumen impregnated tape to protect from rust.

8.3.3 Shaping of MS flat for connecting the equipments with earthmesh .The Mtr. 39.50
work includes the welding of MS flat with equipments/structure and
also with earth mesh.The work also includes coating of MS flat joint
with molten bitumen and covering jointwith bitumen impregnated tape
to protect from rust.

8.3.4 Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length


as per design and requirment to be driven in earth by mechanical
means and Providing & .fastening of suitable clampswith the M.S. Rod,
connection of earth wire/stay wire/MS flat in clamp depending on type
of soil:

(a) Where drilling is not required Per-Nos. 194.04


(b) Where drilling is required Per-Nos. 635.21

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[19]
1 2 3 4
8.3.5 Filling of trench with available excavated muck in layers of 20cm R.Mtr. 5.23
(Max.)consolidating each deposited layer by ramming & watering with
lead up to 50 Mtr, and lift up to 1.5 Mtr.
8.3.6 Painting of exposed portion of MS flat/rod with two coats of red-oxide Mtr. 7.27
primer and two coats of green enamel paint.including material.

8.4 Earthing on 6.35/.24 KV S/S made with 4 nos. MS Rod 20 mm Per.Trans. 249.74
dia,electrodes (black) of 3 Mtr. Length to be driven in earth by
mechanical means and jointing through transformers body, 11 KV
neutral ,LT neutral & LA with MS flat 40x5 mm ( black 32 mtr.) .The MS
Flat will be welded at the top of the electrode.
8.5 Earthing of new 33/11 KV S/S with bentonite compound (including Per earthing 5767.53
material ) involving following activities.
8.5.1 Digging of 10.5 ft. deep pit of 4 ' dia ( approx 132 cu.ft)
8.5.2 Supply of 2" G.I pipe with cap(including fabrication of 30 holes in the
periphery of pipe)
8.5.3 Making chamber for water pouring including cast iron manhole cover

8.5.4 Supply cost of 200 kg bentonite compound with making slurry


8.5.5 Supplu of black cotton soil approx 80 cu.ft.
8.5.6 Connecting electrode with Mesh Earthing
8.6 Pipe Earthing for Power Transformer as 33/11 KV S/S:- Supply & Per earthing 5217.32
erection of earthing elecctrode shall consist of G.I. Pipe 100 mm of 3
Mtr. Length. The electrode shall be buried as far as practicalbe 3 meter
below ground level. Wherever possible, earth electrodes shall be
located a near the water tab, water drain or near down take pipe, Earth
electrodes shall not be installed in proximlty to a metal fence. It shall be
kept clear of the building foundations and in no case it shall be nearer
than 2 meters from the outer face of the wall. The electrode shall be
surrounded with layer of charooal dust and salt mixture through out the
length. The 100 mm GI pipeshall be provided with holes of 12 mm dia
driled at 75 mm interval upto 2.5 meters length from bottom. The top of
the pipe shall be provided with a GI threaded cap for watering the earth
thourgh a pipe. A Clamp with Pati of 12" of MS Flat of size50s6 mm
shall be fixed (Bolted) on the top edge of the pipe which in turn shall be
connected to Neutral/ Body of the Power Transformer through MS Flat
size 50x6 mm. The GI cap over the GI pipe shall be housed in a
masonry chamber, approxmately 300 mm x 300 mm x 300 mm deep.
The masonry chamber shall be provided with a RCC inspection cover
resting over a RCC frame, embedded in masony.

Note:-

1 The quality of material supplied by the contractor be got checked and approved by the
Circle S.E.
2 The nuts and bolts provided / supplied by the contractor will be confirmed to relevant ISS.

3 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


1 2 3 4

[20]
CHAPTER-9
METER AND SERVICE LINES

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
9.1 Fixing of single phase meter box at the premises of existing/new consumer
with 4 Nos Anchor fastners of rust proof size M-6x50 mm on the wall as per
the position of the holes already provided on the meter box. The meter box
must be housed perfectly vertical/plumb line,anchor fasteners are to be
supplied/provided by the contractor (including self carriage from S/D store
to consumer's site)

9.1.1 IN URBAN AREA


(a) Plastic Box Nos 60.50
(b) Metal Box Nos 77.34
9.1.2 IN RURAL AREA
(a) Plastic Box Nos 78.71
(b) Metal Box Nos 100.53
9.2 Fixing of single phase meter cum meter box(complete unit) at the premises
of existing/new consumerwith 4 Nos Anchorfastners of rust proof size M-
6x50 mm on the wall as per the position of theholes already provided on the
meter box. The meter box mustbe housed perfectly vertical/plumb
line,anchor fasteners are to be supplied/provided by the
contractor(including selfcarriage from S/D store to consumer's site and
depositing removed meter and meter box if any in S/D Store.)

9.2.1 IN URBAN AREA Nos 77.50


9.2.2 IN RURAL AREA Nos 96.92
9.3 Fixing of three phase meter box size 340x750x240 mm at the premises of
existing/new consumers with 4 nos. Anchor fastners with rust proof size M-
6x50 mm on the wall as per the position of holes already provided on the
meter box. The meter box must be housed perfectly vertical/plumb
line,anchor fasteners are to be supplied/provided by the contractor

9.3.1 IN URBAN AREA


(a) Plastic Box Nos 84.72
(b) Metal Box Nos 108.96
9.3.2 IN RURAL AREA
(a) Plastic Box Nos 110.31
(b) Metal Box Nos 141.61
9.4 Fixing of three phase meter cum meter box(complete unit)at the premises
of existing/new consumerswith 4 Nos Anchor fastners with rust proof size
M-6x50 mm on the wall as per the positionof holes already provided on the
meter box. The meter box must be housed perfectly vertical/plumb
line,anchor fasteners are to be supplied/provided by the contractor including
safe carriage from S/D store to consumers site and depositing removed
meter and meter box if any in S/D store).

9.4.1 IN URBAN AREA Nos 106.55


9.4.2 IN RURAL AREA Nos 135.59

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[21]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
9.5 Fixing of single phase energy meter in meter box by providing machine
screws making holes on backelite sheet as per requirement & also making
connections at meter terminals and MCB using Thimbles(by crimping)
including providing M-seal compound inside meter box. The bakelite sheet
must be fixed properly with Screws to restrict the movements vertically or
horizontally. The meter is also required to be checked for proper functioning
after making connections of service lines with distribution mains by licenced
contractor only. The screws will be provided by contractor. Payment for lugs
will be made extra @ Rs.1.00 per wire for single phase connection if not
available with JVVNL& provided by contractor.(including safe carraige)

9.5.1 IN URBAN AREA Nos 38.68


9.5.2 IN RURAL AREA Nos 50.42
9.6 Fixing/installation of three phase energy meter in meter box by providing
machine screws making holes backelite sheet as per requirement & also
making connections at meter terminals and MCB using Thimbles(by
crimping) including providing M-seal compound inside meter box. The
bakelite sheet must be fixed properly with Screws to restrict the movements
vertically or horizontally. The meter is also required to be checked for
proper functioning after making connections of service lines with distribution
mains by licenced contractor only. The screws will be provided by
contractor. Payment for lugs will be made extra @ Rs.1.50 per wire for
single phase connection if not available with JVVNL & provided by
contractor.

9.6.1 IN URBAN AREA Nos 62.91


9.6.2 IN RURAL AREA Nos 81.87
9.7 Replacement of defective energy meter at consumer's premises including
fixing of screw and making connections at meter terminals with lugs(by
crimping) & ensuring proper supply and perfect working of the meter
installed. The work includes re-fixing of the meter box if not fixed properly
the screw will be provided by the contractor. Payment for lugs will be made
extra @ Rs. 1.00 per wire for single phase meter and @ Rs. 1.50 per wire
for 3 phase meter, if not available with Discom and provided by the
contractor. The removed meters shall be deposited with the concerned
Junior Engineer Incharge with complete details in prescribed Performa of
Discom.

9.7.1 IN URBAN AREA


(a) Single phase energy meter Nos. 38.68
(b) Three phase energy meter Nos. 62.91
9.7.2 IN RURAL AREA
(a) Single phase energy meter Nos. 50.42
(b) Three phase energy meter Nos. 81.86

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[22]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4

9.8 Laying of 1100 volt heavy duty armoured XLPE cable of aluminum coudctor
of following size conforming to IS: 7098 (Pt-I) (latest amended) overhead
service line from pole to meter terminals for release of new LT
connections/replacement of damaged/obsolete service line (except
agriculture one). The cable must be fixed on wall with clamps /hooks
properly at a interval of one meter.

a 2 Core 2.5/ 4/ 6 sq. Mm Meter 4.81


b 4 Core 6/10 sq. mm Meter 7.22
c 4 Core 16/25 sq. mm Meter 8.43
d 4 Core 50 sq. mm Meter 12.03
9.9 Removal of meter & meter box & service line of PDC consumers and
depositing in Nigam's store including transporation.
Three phase Per 234.92
connection
Single phase Per 217.91
connection
9.10 Fixing of spring load bus bar box with 4 Nos. anchor fastners of rust proof Pole
size M-8x75mm on the wall as per the position of the holes already
provided on the box. The bus bar box must be housed perfectly vertical/
plumb line, anchor fastners are to be provided / supplied by the contractor
( including self carriage from S/d. store to site) including making
terminations of the main cable from pole / tapping point to bus bar box and
consumer's service lines from box to meter.

a Single phase bus bar box No. 138.68


b Three phase bus bar box No. 160.58
9.11 Supply & fixing of cable holding lamp made of MS flat 30x4mm size, No. 105.34
200mm length in all ( 100+75+25mm) duly machined i.e. banding, drilling
etc. as per drawing and painted by synthetic enamel paint (traditional pink
colour) with 2nos. Anchor fastners of rust proof size M-6x65mm on the wall
as per route of the cable laid surface mounted on the wall. The clamp must
be installed perfectly in horizontal line anchor fastners are to be provided /
supplied by the contractor ( including self carriage from S/dn. store to site).

9.12 Supply & fixing of cable tray made of slotted anble painted by synthetic
enamel paint (traditional pink colour) with minimum 2nos. Anchor fastners
per meter length of rust proof size M-6x65mm on the wall as per rounte of
the cables / service line to laid surface mounted on the wall. The cable tray
must be installed perfectly in horizontal line, ancher fastners are to be
provided/ supply by the contractor( including self carriage from S/dn. store
to site)

a 40x40mm 20 SWG Meter 105.34

NOTE:-
1 The quality of material supplied by the contractor be got checked and approved by
the Circle S.E.
2 The nuts and bolts provided / supplied by the contractor will be confirmed to relevant
ISS.

3 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
[23]
CHAPTER-10
ERECTION OF 33KV SUB-STATIONS & BUS BAR

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
10.1 Erection of steel supports in the excavated pit in alignment after
checking then same with plumb line as per approved design and
drawing of 33/11KV Sub- station.The support should be grouted
and muffed in cement concrete ratio 1:3:6 as per chapter -5 code
No.5.7.The remaining portion of the pit will be back filled with
soil.The charges for grouting & muffing will be paid by extra as per
chapter code no 5.7 The nuts & bolts will be supplied by the
contractor for which payment will be made as per prevailing Store
issue rates.

10.1.1 R.S.Joists M.T. 1653.29


10.1.2 Fabricated structure AB type M.T. 1905.50
10.1.3 Fabricated structure AB-1 type M.T. 1905.50
10.1.4 Isolator / C.T.structure M.T. 1905.50
10.2 Erection of PCC poles in excavated pit in alignment after checking
the same with plumb line as per approved design & drawing of
33/11kv sub-station.The pit should be back filled with the soil with
proper ramming below 30cm ground level and then muffed above
15cm average ground level with cement concrete ratio1:3:6.The
charges for muffing will be paid extra as per chapter code no 5.7
The nuts & bolts will be supplied by the contractor for which
payment will be made at the prevailing store issue rates.

(A) IN URBAN AREA


10.2.1 PCC Poles 8 Mtr. Long Nos. 359.66
10.2.2 PCC Poles 9 Mtr. Long Nos. 547.63
10.2.3 PCC Poles 10/11 Mtr. Long Nos. 623.18
(B) IN RURAL AREA
10.2.4 PCC Poles 8 Mtr. Long Nos. 286.39
10.2.5 PCC Poles 9 Mtr. Long Nos. 417.00
10.2.6 PCC Poles 10/11 Mtr. Long Nos. 481.11
10.3 Laying / stringing of bus bar with ACSR Dog & jumper connection
using tie rod ,33KV /11KV insulator strings,required
hardware,P.G.clamps/T clamps etc.as per requirement including Y-
connections at bus bar jumpering point as per the direction of
engineer in-charge.

10.3.1 ACSR PANTHER Mtrs. 30.99


10.3.2 ACSR DOG/RABBIT Mtrs. 23.93
10.4 Supply, stacking & spreading of stone boulders 40 mm. Mono size. Cum. 1009.49
(Less voids 17%)
Note:
1 The quality of material supplied by the contractor shall be got checked & approved
by the circle SE.
The nuts & bolts provided / supplied by the contractor will confirm to relevant ISS.
2

The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
3
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[24]
CHAPTER-11
LAYING OF HT/LT CONTROL CABLE INSTALLATION OF C&R PANEL KIOSKS BREAKERS ETC.

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No
1 2 3 4
Laying of HT/LT control cable installation of C&R panel Kiosks Breakers
etc.
11.1 Erection of OCB/Kiosk/VCB complete with accessories including use of special
tools & conducting all pre-commissioning test before energization,filling oil etc.
complete in all respect with erection & grouting of structure (excluding civil
works). The relays will be tested by Discom.

11.1.1 33 KV OCB Nos. 5112.15


11.1.2 33 KV VCB/SF-6 Breaker Nos. 5112.15
11.1.3 11 KV OCB/KIOSK Nos. 4142.54
11.1.4 11 KV VCB (Outdoor ) Nos. 5112.15
11.1.5 11 KV VCB (Indoor ) Nos. 4142.54

11.2 Installation of control panel including checking of wiring and conducting all pre-
commissioning tests before energization, satisfactory operation of all equipment
existing thereof. ( The relay will be tested by Discom ).

11.2.1 33 KV Control Panel Nos. 1261.10


11.2.2 11 KV Control Panel Nos. 1261.10

11.3 Installation of current/potential transformers on supporting structure including


checking of wiring & conducting all pre-commissioning tests before energization
& satisfactory operation in all respect (The CT/PT set will be tested by Discom).

11.3.1 33 KV CT(1 set of 3 Nos. ) OR PT Set Set 1261.10


11.3.2 11 KV CT(1 set of 3 Nos.) OR PT Set Set 1261.10

11.4 Erection & commissioning of battery set and battery charger including all
required connection/wiring from battery set to battery charger and A.C.mains
complete in all respect.

11.4.1 110 Volts D.C. Set 1261.10


11.4.2 24 Volts D.C. Set 1261.10

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[25]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4
11.5 Laying, testing termination of control cable 1100 volts PVC insulated including
supply and installation of ferrules to designate various cores of control cables
by terminal Nos. of identification including utilization of cable gland. The control
cable should be clearly arranged in trenches avoiding crossings including
clamping of control cable at regular interval and providing identify tags.

11.5.1 2x2.5 Sq.mm. Mtr. 13.69


11.5.2 3x2.5 Sq.mm. Mtr. 16.10
11.5.3 4x2.5 Sq.mm. Mtr. 18.35
11.5.4 5x2.5 Sq.mm. Mtr. 20.63
11.5.5 10x2.5 Sq.mm. Mtr. 22.88
11.5.6 12x2.5 Sq.mm. Mtr. 25.13
11.5.7 4x4 Sq.mm. Mtr. 20.63
11.5.8 6x4 Sq.mm. Mtr. 25.13
11.6 Supply andFixing of metallic junction box size 450x300x250 mm outdoor type Nos. 2593.69
floor mounting fabricated out of cold rolled steel sheet 16 SWG with required
branching and support of M.S. Angle 45x45x5mm The box should be printed
with the coat of Zinc Chromate primer and 2 coats of light grey paint. Removal
of gland plate of 3 mm. Thickness with rubber gasket for cable entry at bottom
gland plate should be spacious to fix 6 Nos. cable glands of 25mm size double
hinged door with pad lock provision should be gasket with foam & rubber to
make junction box dust & water proof supply of junction box will include
following items.

(A) The top cover of junction box should have slope of 10 mm so that water is not
collected on top of the box.
(B) 18 Nos. terminal blocks of 30 Amp. Bolted type with end plate and screws fixed
on 36 cm mounting channel for terminal block with bolts & nuts of 25x9
Sq.mm.on side support inside junction box. The terminal blocks should be
detachable type, which can be removed or added individually and suitable for
4/6 Sq.mm.coppers lugs. The terminal blocks should be preferably of
GEC/Alsthom/ Essun/Malamin PVC or equivalent make.

(C) The supports of junction box made of M.S.Angle size 45x45x5mm with cleat
having 1.2 meter length of each support should be grouted in cement concrete
ratio 1:3:6.
11.7 Laying, connecting, testing and commissioning of 1100 Volt PVC cable at 33/11
KV Sub-Station including connections of leads cutting stripping of cable
insulation providing compression type terminals fixing of cable glands crimping
of lugs clamping of cable cores etc. complete in all respect as per requirement
of Engineer Incharge. PVC cable size.

11.7.1 4 Core 6 Sq.mm. to 25 Sq.mm. Mtr. 16.10


11.7.2 3.5 Core 50 Sq.mm.to 95 Sq.mm. Mtr. 34.32

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[26]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4
11.8 Supply,transportation and laying of sand layer of 75 mm below the power cable
and 75 mm above the same alongwith using 200x100x75 mm size Class-II
bricks in channel shape comprising of following sizes as under the back filling in
the layer of compacted 100 mm thick earth,. Cable will be laid as per the
methods of IS:1255 and details in 11.13

11.8.1 For Single Power Cable, the trench width will be 350 mm using 20 Nos of bricks Mtr. 83.08
of above specification.
11.8.2 For Double Power cable, the trench width will be 470 mm using 35 Nos of Mtr. 139.35
bricks of above specification.
11.8.3 For Triple Power Cable, the trench width will be 590 mm using 50 Nos of bricks Mtr. 195.33
of above specification.
11.9 Laying energisation & commissioning of underground cable for working voltage
of 11 KV/33 KV Aluminium conductor ,Power cable XLPE/PILCA armoured in
RCC class NP-2 Non-pressure pipes of sizes mentioned against each refilling
of earth in the remaining excavated area making necessary connection
including testing etc. as required (It includes providing, laying & jointing RCC
class NP-2 Non-pressure pipes conforming to IS:458 of approved make with
collars, jointed with CM 1:20 depth of cable shall be 1.2 meter. (Cable shall be
provided by the Nigam).

(A) 33 KV Cable
11.10.1 3x185 sq. mm in pipe of dia 300 mm Mtr. 549.89
11.10.2 3x300 sq. mm in pipe of dia 300 mm Mtr. 549.89
(B) 11 KV Cable
11.10.3 3x150 sq. mm in pipe of dia 250 mm Mtr. 412.34
11.10.4 3x185 sq. mm in pipe of dia 250 mm Mtr. 412.34
11.10.5 3x240 sq. mm in pipe of dia 300 mm Mtr. 549.89
11.10.6 3x300 sq. mm in pipe of dia 300 mm Mtr. 549.89
11.10.7 3x400 sq. mm in pipe of dia 300 mm Mtr. 549.89
11.11 Providing and fixing of G.I. Pipe B-Class (IS:1239 marks) at the starting and
finishing point of 33 & 11 KV under ground cables and to lay & clamp vertically
with the existing support including labour charges.

11.11.1 Providing and fixing of G.I. Pipe of 125 mm diameter. B-Class (IS:1239 mark),at Mtr. 1402.26
the starting and finishing point of 11 KV under ground cables and to lay &
clamp vertically with the existing support including labour charges.

11.11.2 Providing and fixing of G.I. Pipe of 150 mm diameter. B-Class (IS:1239 mark),at Mtr. 1590.07
the starting and finishing point of 33 KV under ground cables and to lay &
clamp vertically with the existing support including labour charges.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4

[27]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4
11.12 Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S. Nos 20162.64

The installation work to be carried out as per drawing/design, under the


supervision of concerned Assistant Engineer
(a) Mounting structure
The requisite steel members will be supplied by contractor including the
hardware. Contractor shall joint/weld the members to form the mounting
structure as per drawing. Necessary tools, welding, machines, lifting devices
etc. shall be arranged by contractor.

(b) Civil works


Erection of lattices in alignment including excavation and concreting of structure
foundation including cement, sand and grit 20 mm size (crusher broken) having
ratio 1:3:6 and grit 40 mm size for ratio 1:5:10 and curing for period as required
(21 days). Area of concreting will be as per the drawing.

(c) Metering Equipments:


The requisite metering equipments (CTPT set, meter,meter box & suitable
conductors for jumpers), will be provided by the concerned Assistant Engineer
in healthy condition at site. The cables from CTPT set to meter box laid down in
50 mm GI pipe with suitable bends & nipples, shall be provided by contractor
alongwith the consumable items such as PVC tapes, petroleum jelly etc. The
cable should be PVC multi strand copper 4 core 2.5/4 Sq. mm ISI marked and
firm & tight connections shall be made by suitable connector e.g. at CTPT sets
by using clamps and at meter/TTB by suitable lugs etc. The CTPT sets so
installed shall be earthed by means of the MS Flat (size 50x6 mm) by joining it
with the nearest earthing available at the sub-station. Requisite earthing
material shall be made available by the contractor.

(d) Meter:
Meters should be fixed firmly inside the tamper proof box, as per drawing. All
the meter fixture will be provided by contractor including all consumables.

(e) Meter Box


The meter box shall be provided by the concerned Assistant Engineer.
However, hardware or any other items required to fix the meter inside the meter
box will be provided by contractor. The meter box will be fixed firmly with
sufficient strength at a place as per drawing. The test terminal block(TTB) link
type shall be provided by contractor in the meter box.

(f) Painting:
All surfaces interior and exterior of lattice structure shall be white aluminum
painted.
(g) Commissioning of Metering Equipments:
Installed meters inside the box and metering equipments duly mounted on the
mounting structure will be powered up by connecting load in the presence of
the concerned Assistant Engineer who will arrange the necessary shut down.
The completion certificate shall be furnised by contractor.be filled accordingly.
Since the work involves higher A.C. voltage level, the contractor shall take full
care regarding safety norms, so as to avoid any accidental hazards.

NOTE: The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No
1 2 3 4
[28]
CHAPTER-12
PAINTING WORKS

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
12.1 Painting with priming coats or ready mixed red-oxide paint 2 coats of
approved make on steel works after cleaning with wire brush / sand
paper.(including cost of red oxide)
12.1.1 On new surface sq.mtr. 33.11
12.1.2 On old surface sq.mtr. 24.83
12.2 Painting with aluminium paint of approved brand and manufacturer to
give an even surface.(including cost aluminium paint)

12.2.1 On new works with two coats. sq.mtr. 49.66


12.2.2 On old works with one coats. sq.mtr. 35.22
12.3 Spary painting on old surface with synthetic enamel paint (ICI sq.mtr. 113.77
Asian,Burger or equivalent make) to give an even shade (minimum
two coats) with preparation of surface by rubbing applying primer
coats and putty etc.complete in all respect on steel works /
equipments.(including cost of paint)

NOTE:-
1 Rates are inclusive of paints brush ,sand paper spray gun and any
scaffolding material,if required.
2 Rates are inclusive of cleaning ,stains ,smear splashing and dropping
of every kind from such places and things/equipments.

3 The quality of material supplied by the contractor be got checked and


approoved by the Circle S.E.

NOTE: The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[29]
CHAPTER-13
LIGHTING FIXTURES

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
13.1 Instalation and commisioning of the following type of new fixtures
including wiring and required connections to connect all allied
accessories fixtures as required but without material.

13.1.1 HPMV/HPSV lighting fixtures Nos. 182.69


13.1.2 Halogen lamps/ flood light fixtures Nos. 147.03
13.1.3 Tube light fixtures Nos. 104.73
13.2 Supply and fixing of material as indicated here under:-
13.2.1 PVC wire 2.5 sq.mm singal core aluminium Mtrs. 8.88
13.2.2 G.I.pipe bracket 40mm dia of required size and shape including Mtrs. 305.35
clamp of MS flat 40x4sq.mm with MS nuts & bolts and washers for
HPMV / HPSV lighting fixtures.
13.2.3 G.I. bracket 30mm dia of required size and shape including clamp of Mtrs. 271.78
MS flat 40x4sq.mm with MS nuts & bolts and washers for HPMV /
HPSV lighting fixtures.

13.2.4 G.I.pipe bracket 16mm dia of required size and shape including Mtrs. 184.81
clamp of MS flat 40x4sq.mm with MS nuts &bolts and washers for
HPMV / HPSV lighting fixtures.

13.3 Maintenance of existing lighting fixtures including replacement of all


defective spares & wire if required and commissoning thereof.

13.3.1 HPMV/HPSV lighting fixtures Nos. 198.35


13.3.2 Halogen lamps/ flood light fixtures Nos. 113.61
13.3.3 Tube light fixtures Nos. 66.82
Note:-
All spare parts / accessories required to be replaced will be provided
by the Nigam.

NOTE:
1 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[30]
CHAPTER-14
FABRICATION

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
14.1 Fabrication of steel structures of M.S angle ,M.S.channel &
M.S.Flat including cutting ,drilling as per design and drawing.

14.1.1 11/0.433 KV Substation Structure(185.83 Kg) MT 3505.20


14.1.2 33 KV Line D.P.sets (142.314 Kg) MT 3505.20
14.1.3 11 KV Line D.P.sets (100.493 Kg) MT 3505.20
14.1.4 1.8 Mtr Channel Bracket with clamp (19.271 Kg) MT 3505.20
14.1.5 1.4 Mtr Channel Bracket with clamp (14.462 Kg) MT 3505.20
14.1.6 33/11 KV Rural Sub-Station Structure (4086.879 Kg) MT 3505.20

14.2 Fabrication of steel structures of M.S angle ,M.S.channel &


M.S.Flat including cutting ,drilling and continunous welding joint
as per design and drawing.

14.2.1 33 KV Cross Arm (Angle ) with clamp and Top Hamper with MT 4514.70
clamp (22.849 Kg)
14.2.2 33 KV Cross Arm (channel) with clamp and Top Hamper (26.831 MT 4514.70
Kg)

14.2.3 11 KV Cross Arm angle with clamp and Top Hamper (13.797 Kg) MT 4514.70

14.2.4 33 KV D/C Lattice Structures (42' height)(508.06 Kg) MT 4514.70


14.2.5 LT Cross Arm 2' Long with clamp (4.12 Kg) MT 4514.70
14.2.6 LT Cross Arm 4' Long with clamp (7.27 Kg) MT 4514.70
14.2.7 Other steel items MT 4514.70
14.3 Cuting of steel article by using gas cutter / hacksaw blades. MT
(A) MS Rails cm depth of 3.30
14.3.1 90 Lbs.rail
14.3.2 75 Lbs.rail
(B) R.S.Joist cm depth of 3.30
14.3.3 200x100mm
14.3.4 116x100mm
14.4 Drilling of holes in MS Channel / Angle /Flat
14.4.1 15/16" dia holes(23.81 mm dia.) Nos. 6.62
14.4.2 13/16" dia holes(20.63 mm dia.) Nos. 4.37
14.4.3 11/16" dia holes(17.46 mm dia.) Nos. 4.37
14.5 Drilling of holes in MS Rails / Joists.
14.5.1 11/16" dia(17.46 mm dia.) holes in MS Rails Nos. 15.50
14.5.2 11/16" dia (17.46 mm dia.) holes in R.S.Joist Nos. 10.98
NOTE:
1 The rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.
2 If fabrication work done in stores Primises. Free accomodation and free electricity will
be supplied by Nigam.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[31]
CHAPTER-15
MAINTENANCE OF LINES
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
Note: Incharge Assistant/Junior Engineer after necessary inspection
testing & checking will identify the maintenance works which will be
categorised as below.

15.1 Joint inspection & patrolling of lines,feeder wise for identification of Km. 77.34
maintenance work to be carried out.
15.2 Removal of Bird's nest & foreign material from line.
(a) For Jaipur city circle Km. 618.20
(b) For other District Headquarter Km. 397.44
(c) For others Km. 176.68
15.3 (A)-Providing of numbering on single pole or double pole structure, Nos. 15.50
feeder wise with good quality enamel paint as per requirement.

(B)-Providing consumer coding feederwise/Transformerwise with Nos. 10.98


good quality of paint as per requirement.
15.4 Resagging of conductor section including binding/re-binding of
conductor and providing of jumpers at the ends.
15.4.1 With ACSR 'Panther'. Kms./Cond. 1766.31
15.4.2 With ACSR 'DOG'. Kms./Cond. 971.41
15.4.3 With ACSR 'Rabbit' / 'Racoon' Kms./Cond. 816.87
15.4.4 With ACSR 'Weasel/AAC'ANT. Kms./Cond. 507.90
15.5 Resagging of earth wire including removing & fixing the wire in the
earth clamps.

15.5.1 G.I. Wire 6 SWG Kms./Cond. 375.32


15.5.2 G.I. Wire 8 SWG Kms./Cond. 265.02
15.5.3 G.I.Wire 10 SWG Kms./Cond. 242.89
15.6 Replacement of earth wire including fixing/ replacement of earth
reels & clamps, if required. Replacement of reels and clamps will be
provided by the contractor .
15.6.1 G.I. Wire 6 SWG Kms./Cond. 949.44
15.6.2 G.I. Wire 8 SWG Kms./Cond. 838.98
15.6.3 G.I. Wire 10 SWG Kms./Cond. 728.52
15.7 Replacement of old conductor including binding of wire and
providing jumpers at the ends.
15.7.1 With ACSR 'Panther'. Kms./Cond. 7506.74
15.7.2 With ACSR 'DOG Kms./Cond. 2892.42
15.7.3 With ACSR 'Rabbit' / 'Racoon'. Kms./Cond. 2804.23
15.7.4 With ACSR 'Weasel/AAC'ANT. Kms./Cond. 1457.20
15.8 Replacement of defective/damaged pin insulators including binding
rebinding of wire & replacement of pin if required.

15.8.1 33 KV Pin Insulators. Nos. 26.49


15.8.2 11 KV Pin Insulators. Nos. 19.86
15.8.3 LT Pin Insulators. Nos. 10.98

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
[32]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
15.9 Replacement of defective/damaged 11 KV Disc Insulators including
removing/providing jumpers with line conductor.

15.9.1 With ACSR 'DOG' Nos. 326.71


15.9.2 With ACSR'RACOON/RABBIT' Nos. 253.88
15.9.3 With ACSR 'Weasel/'Squirrel'/ AAC'ANT Nos. 163.28
15.9.4 If an additional disc is provided in case of 11 KV lines:
(I) B&S type Nos. 24.23
(ii) T&C type Nos. 17.61
15.10 Replacement of defective/damaged LT Shackle insulators including Nos. 48.60
removing/providing jumpers.
15.11 Straightening of cross arms with clamp including tightening of nuts
&bolts.
15.11.1 33 KV cross arms Nos. 57.33
15.11.2 11 KV cross arms Nos. 37.47
15.11.3 LT Cross arms Nos. 17.61
15.12 Change/replacement of cross arms with clamp including removing
fixing of insulators, binding of wires & re-jumpering.
15.12.1 33 KV cross arms Nos. 176.68
15.12.2 11 KV cross arms Nos. 88.34
15.12.3 LT Cross arms Nos. 33.11
15.13 Straightening/replacement of top hampers including removal/fixing
of pin insulators, tightening nuts & bolts with binding etc.

15.13.1 33 KV top hampers Nos. 28.74


15.13.2 11 KV top hampers Nos. 21.97
15.14 Straightening of support/pole in alignment after removing the soil
and checking the same with plumb line, refilling and ramming etc.
PCC pole/M.S. rail/R.S.Joist.

15.14.1 9 Mtr long & above. Nos. 192.18


15.14.2 Upto 8 Mtr long. Nos. 125.81

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
[33]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
15.15 Replacement of broken/damaged poles in between the line with
excavation of pit in alignment after checking the same with plumb
line, re-fixing of cross arm bracket, top hampers, clamps insulators &
binding/jumpering etc. and removal of broken pole.

(A) 33 KV line support


15.15.1 Double Circuit/Lattice Tower Nos. 2210.10
15.15.2 Single Circuit Nos. 1605.12
(B) 11 KV line support
15.15.3 Double Circuit Nos. 1205.43
15.15.4 Single Circuit Nos. 1017.91
(C) L.T. line support
15.15.5 Single phase line Nos. 867.73
15.15.6 Three phase line Nos. 980.29
Note: Charges for excavation in ordinary /hard rock shall be paid as
per item No. 2.2 & 2.3 of Chapter No.2.after deducting cost of
excavation in ordinary soil.Civil work if required cost will be
paid as per chapter No.5.7.

15.16 Replacement/providing of broken damaged tension / cut point


support with excavation of pit in alignment after checking the same
with plumb line and re-fixing of cross arm/bracket, top hamper
clamp,insulators & stays etc. with resagging of conductor, binding
and jumpering including removal of broken pole.

15.16.1 33 KV line support with ACSR PANTHER


(a) Double Circuit Nos. 5740.44
(b) Single Circuit Nos. 4791.00
15.16.2 33 KV line support with ACSR 'DOG'/ 'RACOON'
(a) Double Circuit Nos. 4636.60
(b) Single Circuit Nos. 3532.60
15.16.3 11 KV line support with ACSR 'DOG'/ 'RACOON'
(a) Double Circuit Nos. 4592.35
(b) Single Circuit Nos. 3334.10
15.16.4 11 KV line support with ACSR WEASEL
(a) Double Circuit Nos. 2234.32
(b) Single Circuit Nos. 1909.72
15.16.5 LT line support Three Phase line
(a) Double Circuit Nos. 1653.73
(b) Single Circuit Nos. 1508.05
15.16.6 LT line support Single Phase line Nos. 1307.01

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[34]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
15.17 Replacement/ Fixing of stay wire including guy insulator & stay
clamp.
15.17.1 G.I. Stay wire 7/8 SWG Nos. 342.37
15.17.2 G.I. Stay wire 7/10 SWG Nos. 245.15
15.18 Replacement/ providing of stay set including excavation of pit &
back filling with soil & proper ramming fastening clamping of stay
wire with stay insulators.

15.18.1 G.I. Stay set 8'x3/4" Nos. 461.40


15.18.2 G.I. Stay set 6'x5/8" Nos. 384.20
15.19 Replacement/tightening of jumpers on cut points and re-binding
including fixing/replacement of P.G. clamps which will be provided
by the contractor for which payment will be made as per prevailing
store issue rates.

15.19.1 33 KV line Nos. 39.73


15.19.2 11 KV line Nos. 39.73
15.19.3 L.T.line Nos. 17.61
15.20 Repair, jointing of damaged conductor with repair sleeves including
resagging (section to section), binding and making jumpers at end
points.

15.20.1 With ACSR 'Panther'. Per joint 7506.74


(a) For additional joint on the same conductor Per joint 441.54
15.20.2 With ACSR 'DOG' Per joint 1192.17
(a) For additional joint on the same conductor Per joint 110.31
15.20.3 With ACSR 'Rabbit'/ 'Racoon' Per joint 1104.00
(a) For additional joint on the same conductor Per joint 110.31
15.20.4 With ACSR 'Weasel/AAC'ANT. Per joint 640.19
(a) For additional joint on the same conductor Per joint 110.31
15.21 Binding of conductor on pin insulators.
15.21.1 33 KV pin insulators Nos. 13.24
15.21.2 11 KV pin insulators Nos. 8.88
15.21.3 L.T. pin insulators Nos. 4.37

15.22 Fixing of line spacer on LT line conductor.(For LT lines having span


upto 40 Meters at two appropriate places and for LT lines above 40
Meters span at three appropriate places spacers are to be installed)

a Single phase 2- wire (1 spacer 15") Nos 9.34


b Three phase 4- wire (1 spacer 21") Nos 18.21
c Three phase 4- wire (4 spacer 15") Nos 21.97
15.23 Fixing of extension pieces/ brackets for raising of pole height
including fixing of pin insulators with pins & rebinding etc.

15.23.1 33 KV line Nos. 309.11


15.23.2 11 KV line Nos. 242.89
15.23.3 LT line Nos. 110.31

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[35]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
15.24 Sectionalising of existing line including replacement of
bracket,insulators with pin/hardware's providing of stay sets with
stay wire and stay insulators, jumpering & binding etc.
15.24.1 33 KV line S/C with ACSR 'Dog'/ 'Racoon'. Nos. 2759.83
15.24.2 11 KV line S/C with ACSR 'Dog'/ 'Racoon'. Nos. 2671.50
15.24.3 11 KV S/C line with ACSR 'Weasel'. Nos. 1545.54
15.24.4 LT line three phase Nos. 684.42
15.24.5 Lt line single phase Nos. 635.82
15.25 Replacement of defective/ danaged overhead ABC conductor (Areal
bunched cable) on existing erected pole/ support using Suspension
& Dead End Clamps icludinglaying, Jointing, stringing complete in
all respect & dismentalling of old ABC Conductor (Aerial Bunched
Cable)and depositing it to concern ACOS. If in any case new
Suspension? Dead End Clamps/ connectors are requiredthen same
may be dealt with item No. 7.7, 7.8, 7.9 & 7.10 (The payment shall
be made in accordance with the quantity mentioned in the MCN.
Since the qty in the MCN is by weight, as such for converting into
KM refer Measured Weight of Meterial of CLRC). Reats are
Inclusive of dismentalling charges.

15.25.1 1Cx25 + 25 Sq mm Per Km 2634.89


15.25.2 3Cx16 + 25 Sq mm Per Km 3952.33
15.25.3 3Cx25 + 25 Sq mm Per Km 4611.06
15.25.4 3Cx50 + 35 Sq mm Per Km 5796.75
15.26 Carrying out petrolling on 11 KV Feeder/ LT Feeder and also to
Provide Single Line Diagram along with Pole Schedule indicating
the following activities:- (1 Skilled (ITI Holder) & 2 Semi Skilled
persons are to be engaged for this purpose).
15.26.1 LT Line:- Per Span 36.80
A Condition of Pole i.e Tilled/ Broken
B Condition of Stay Sets e.i Loose/ Broken/ Without Guy Insulator/
Proper Clamping with Pole or any additional requirement of Stay
Sets (if required).
C Position of Fixtures i.e Crodd Arm/ Top Hamper/ Channal Bracket/
Angle Bracket ect. Whether Tilled or Properly Mounted.

D Position of Insulators along with Hardwares i.e Pin Insulators/


Shackel Insulators.
E Position of Jumpering/ Binding/ PG Clamps (where required)/ D
Loope (Required in LT Line) Pin Insulators.
F Position of Sag of Conductor & its clearance from the Ground Level/
Adjoining Conductor/ Line.
G Indicating the Kacha/ Pacca Road on the Single Line Diagram and
ground Clearance of every span from the Ground Level.
H Condition of Conductor and Size/ Type of Conductor used in the
Feeder.
I Distance between consecutive poles.
J Condition of Aerial Bunched Cable/ Insulated Rabbit Conductor and
their Hardware accessories along with pin pointing the cut in AB
Cable.
K Identifying the High Risk Points like 220 KV/ 132 KV Crossing,
Highway Crossings/ Railway Crossings/ Double Current (feeder
Single pole from Two Different Sources).
L Position of Earth wire/ Neutral Wire/ Guarding.
15.26.2 HT Line:- Per Span 46.00
A Condition of Pole i.e Tilled/ Broken
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
B Condition of Stay Sets e.i Loose/ Broken/ Without Guy Insulator/
Proper Clamping with Pole or any additional requirement of Stay
Sets (if required).
C Position of Fixtures i.e Crodd Arm/ Top Hamper/ Channal Bracket/
Angle Bracket ect. Whether Tilled or Properly Mounted.

D Position of Insulators along with Hardwares i.e Pin Insulators/ Disc


Insulators ect.
E Position of Jumpering/ Binding/ PG Clamps (where required)/ on
Disc Insulators/ Pin Insulators.
F Position of Sag of Conductor & its clearance from the Ground Level/
Adjoining Conductor/ Line.
G Indicating the Kacha/ Pacca Road on the Single Line Diagram and
ground Clearance of every span from the Ground Level.
H Condition of Conductor and Size/ Type of Conductor used in the
Feeder.
I Distance between consecutive poles.
J Condition of Aerial Bunched Cable/ Insulated Rabbit Conductor and
their Hardware accessories along with pin pointing the cut in AB
Cable.
K Posotion of 11/0.4 KV or 6.35/0.24 KV DP Stucture (Position of GO /
DO / Horgap Fuse Set/ Jumpering/ LA/ Piller Box/Earthing (Neuteal/
Body/LA) along with measurement of earth resistance detailed as
below for which charges shall be paid extra, if applicable:-

L Hight of Single Phase Transformer


M Identifying the High Risk Points like 220 KV/ 132 KV Crossing,
Highway Crossings/ Railway Crossings/ Double Current (feeder
Single pol\e from Two Different Sources).
N Position of Earth wire/ Neutral Wire/ Guarding.
O Position of Line GO & its Jumpering.
P Condition of Distribution Transformer like oil leakage, Jumper
condition on HV/ LV side, sillca gel etc.
15.27 To repair the cut in AB Cable/unsealed points by using m-seal/ self Per Locaton 46.00
amalgamation tape (material shall be provided by conyractor)
Details are to be Provided to concerned JEN/ AEN alongwith site
location.
15.27.1 Providing and fixing of M-seal compound on consumer's tapping
(single phase as well as three phase) In the case of overhead LT
lines. The location shall be identified/decided by the AEN/JEN
concerned.
a Single phase tapings Per Locaton 27.60
b 3-Phase tapings Per Locaton 50.60
15.27.2 Fixing of M-seal compond on consumer's tapping (single phase as
well as three phase) in the case of overhead LT lines. The location
shall be indentified/decided by the AEN/JEN Concerned.

a Single phase tapings Per Locaton 9.20


b 3-Phase tapings Per Locaton 23.00
15.28 To Supply & Replace the damaged/ defective parts of 11 KV GO
switch (Proper shut down will be providedby Nigam). Rates are
inclusive of material.
A 11 KV GO (400 Amps)
i Contracts/ Jaws with Terminal Plate. Nos. 488.52
ii Centre Blade/ Pipe. Nos. 1056.16
iii Post Insulator (12 KV). Nos. 219.88
iv PG Clamp. Nos. 92.92
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
15.29 Identifiying the unused material erected/ tying in the field,
dismentallingfrom site, their safe carriage including loading & un-
loading and deposition of samein concerded ACOS of S/ Dn (PCC
poles shall beposited with concerned Sub-Division or Receipt of
concerned AEN for PCC poles.
(a) PCC Poles (All Sizes)
(i) Within 10 Kms. Per pole 404.68
(ii) Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof. Per pole 5.03

(iii) Above 30 Kms. Add for each Kms. of part thereof. Per pole 2.59
(b) Steel (Fabricated and unfabricated) i.e MS Rails, RS Joists, MS
Channels, MS Angles, MS Flat and GI Stay sets, Gi Stay Wire, Gi
Wire Nut & Bolts, ACSR Conductor, Insulators (usaable),
Hardwares, cables etc.
(i) Within 10 Kms. MT 1436.87
(ii) Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof. MT 4.89

(iii) Above 30 Kms. Add for each Kms. of part thereof. MT 3.03
( c) Fabricated lattice towers Structures and sub-station structures type
AB, AB beams, isolators, Line Structure ect.
(i) Within 10 Kms. MT 3494.39
(ii) Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof. MT 4.89

(iii) Above 30 Kms. Add for each Kms. of part thereof. MT 3.74

Note:-
1 The quality of material supplied by the contractor shall be got checked & approved by the
circle SE.
2 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.

Note:- Since only the Nigam empolyee is empower to work on live line? Equpment thus the
Executive Engineer shall ensure the following from the contractor whileengaging Pvt.
Person (ITI Holder) for working on Live Line/ Equipments:-

1 At the Joining the contractor should submit Accidental Insurance Cover in advancefor One
Year for the engaged person.

2 The Contractor Should submit age proof, copy of ITI Certificate for the engaged person.

3 The Contractor should submit proof of deduction of PF (if Applicable) and deposition of
samewith PF department along with bill otherwise submitecemption certificate for the
engaged person.
4 The person should submit work experience for live line workor should submit a certificate
to be issued from Electrical Inspector for working on Live Line.

5 Identity Card with Photo for the deployed person should issued by Circle SE and proper
record of it should be maintain at circle level.

6 Monthly/ Routine verification of the deployed person should be done by circle office.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


CHAPTER-16
MAINTENANCE OF 11/0.4KV SUB-STATION

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
16.1 General maintenance of distribution transformer as under:- C
1 Cleaning of dust and oil scale deposits outside the body of transformer with
detergent and water.
2 Tightening all nut and bolts.

3 Tightening of bushing rod from outside.


4 Replacement of jumpers and fixing connectors.
5 Checking and maintenace of breather and explosion.
6 Making of oil level with tested transformer oil.
16.1.1 Up to 40 KVA transformer Nos. 204.37
16.1.2 Above 40 KVA and Up to 100 KVA transformer Nos. 307.76
16.1.3 Above 100 KVA transformer up to 315 KVA Nos. 408.87
16.1.4 Above 315 KVA transformer up to 630 KVA Nos. 489.70
16.1.5 Above 630 KVA Nos. 588.57
16.2 Providing and replacement of damaged L.T. side bushing rod made of brass
on the various size of distribution transformer as under:

(a) 25 to 160 KVA 12 mm Nos. 134.84


(b) 200 to 315 KVA 20mm Nos. 298.88
(c) abobe 315 KVA 30mm Nos. 298.88
16.3 Providing and replacement of damaged HT side bushing rod made of brass
on the various size of distribution transformer as under:

(a) 25 to 750 KVA Nos. 130.33


16.4 Providing and replacement of damaged LT side porcelain bushing on the
various size of distribution transformer as under:
(a) 25 to 160 KVA 1.1 KV 250 Amp. Nos. 26.95
(b) 200 to 315 KVA 1.1 KV 630 Amp. Nos. 33.71
(c) abobe 315 KVA 1.1 KV 1000 Amp. Nos. 33.71
16.5 Providing and replacement of damaged HT side Porcelain bushing on the
various size of distribution transformer as under:

(a) 25 to 750 KVA 11 KV 250 Amp. Nos. 146.12

16.6 Providing and replacement of damaged rubberized cork gasket washer on


bushing on the various size of distribution transformer as under:

(a) LT side Set 33.71


(b) HT side Set 56.13
16.7 Providing and fixing silica gel breather with coupling on the various size of
distribution transformer ,if not available as under.

(a) Up to 160 KVA Each 247.10


(b) More Then 160 KVA Each 269.52

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4

[37]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
16.8 Providing and replacement of damaged top cover tank rubberized cork
gasket on the various size of distribution transformer as under:

(a) 25 KVA Set 67.42


(b) 40 KVA Set 78.55
(c) 63 KVA Set 89.84
(d) 100 KVA Set 89.84
(e) 160 KVA Set 134.84
(f) 200 KVA Set 134.84
(g) 250 KVA Set 168.41
(h) 315 KVA Set 898.57
(I) 500 KVA Set 1011.00
(j) 630KVA Set 1011.00
(k) 750 KVA Set 2246.52
16.9 Providing and replacement of defective drain valve made of gun metal on the
various size of distribution transformer as under:

(a) 1/4" Each 224.68


(b) 1" Each 336.94
16.10 Providing and fixing of 'L' type connectors made of copper flat (size 50x6) Each 202.26
having a size 9" suitable bend to connect on the LT side of the transformer
and should have at least 2 Nos.of hole to connect two no of LT Cable.

16.11 Providing and filling of transformer oil top up in the transformer where the oil Per Litre 58.38
value are within permissible limits(Oil level should not be below the core of
the transformer.

16.12 Providing and replacement of transformer oil in those transformer where the
oil value are not within permissible limits.
(a) Fresh oil as per IS:335 Per Litre 58.38
(b) Buy back price of the oil taken out from the such transformer. Per Litre 22.42
16.13 Rapairs and maintenance of 11 KV isolators including replacement of Set 307.76
damaged post insulator G.O.jaws/blades, clamps and checking of operating
mechanism with oiling /greasing for smooth operation.

16.14 Maintenace of 11 KV Horn gap fuse set including replacement of parts post Set 128.06
insulator etc.

16.15 Replacement / fixing of complete 11 KV isolator /G.O.switch with all Set 921.14
accessories including jumpers.

16.16 Replacement /fixing of 11 KV horn gap fuse set(3limbs) in place of damaged Set 512.27
H.G.fuse set /D.O.fuse set including modification of the structure etc..

16.17 Replacement / fixing of 11 KV lightening arrestors including jumpers and Nos. 56.13
earth connections.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4

[38]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
16.18 Replacement of damaged distribution transformer by new / repaired
transformer including making connections on HV and LV side body and
neutral earthing & testing & commissionig of the transformer.The above
work includes lifting of transformer from sub-divisional store and
transportation upto site and also depositing damaged / removed transformer
in sub-divisional store.

16.18.1 Up to 40 KVA Nos. 1564.00


16.18.2 Above 40 KVA and up to 100 KVA Nos. 1921.12
16.18.3 Above 100 KVA and up to 315 KVA Nos. 2485.15
16.18.4 Above 315 KVA and up to 630 KVA Nos. 4221.66
16.18.5 Above 630 KVA Nos. 4915.86
16.19 Repair and maintenance of LT piller box,Knife switch etc. including Nos 357.11
replacement of damaged bus bars, fuse units,U contact and insulators etc.

16.20 Replacement of L.T.fuse board / I.C.T.P/MCB.switch with clamp including Nos 31.45
Clamping & making cable connections complete in all respect.
16.21 Measurement of load during peak hours on each phase on L.V side of Nos 76.45
distribution transformer on outgoing feeders. by clip on Ammeter/Tong tester.

16.22 To supply & replace burnt/ damaged flexible PVC Wire, Lugs and Bakelite
Sheet in M&P Box of different ratings to Three Phase & Single Phase
transformer in Nirgam Store:- Note:- (Our going cables is also to be
connected on the output terminals duty tigtened & crimped properly for out
goingconnections for which required cable shall be provided by Nigam
MCCB shall be provided by Nigam.
A Three Phase Transformer:-
i 25/ 40 KVA (PVC Wire: 25 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 1444.40
Backalite Sheet) Transformer
ii 10/ 16 KVA (PVC Wire: 16 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 995.44
Backalite Sheet) Transformer
B Single Phase Transformer:-
i 25 KVA (PVC Wire: 70 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 603.52
Backalite Sheet) Transformer
ii 16 KVA (PVC Wire: 35 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 410.32
Backalite Sheet) Transformer
iii 10 KVA (PVC Wire: 25 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 340.40
Backalite Sheet) Transformer
iv 5 KVA (PVC Wire: 25 Sq mm Lugs: As per Drawing (Annecsure- I) & Per 195.96
Backalite Sheet) Transformer
16.23 Spary painting on the surface with synthetic enamel paint (ICI Asian, Burger
or equivalent make) to give an even shade (minimum two coats)with
oerparation of surface by rubbing applying primercoats of red oxide
(minimum by coats) and putty etc. complete in all respect on M&P Boxes of
Transformers (including cost of paint & reg oxide)
(i) Three Phase Transformer:-
(a) 10 KVA & 16 KVA
On new surface Per Box 175.52
On old surface Per Box 165.62
(b) 25 KVA & 40 KVA
On new surface Per Box 239.71
On old surface Per Box 226.19
(ii) Single Phase Transformer:-
(a) 5/10/16/25 KVA
On new surface Per Box 67.56
On old surface Per Box 63.76
NOTE:-
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
Rates are inclusive of paints brush sand paper spray gun and any scaffolding
material, if required and also inclusive of cleaning stains smear splashingand
dropping of every kind from such places and things/ equipments. The quality
of material supplied by the contractor be got checked and apptoved by the
Circle SE.
16.24 (A) To supply iron Cilts made of Flat size 90 mm x 90 mm x 3 mm thik & weld it Per 430.10
continiously, 3 Nos on each side (Total Six Nos) in case of Three Phase Transformer
Transformer except bottom side of M&P Box in Nigam Store.
16.24 (B) Per 215.07
To supply iron Cilts made of Flat size 90 mm x 90 mm x 3 mm thik & weld it Transformer
continiously, 1 Nos on each side (Total Three Nos) in case of Three Phase
Transformer except bottom side of M&P Box in Nigam Store.
16.25 To Supply and install/ Weld the Meter cover on Three Phase Transformer in
Nigam Store.
A Rating: 10 KVA & 16 KVA
The cover shall be supplied with assessories (Cover Size 650x550, Glass, Per 854.09
Kabja, LED, Fabrication Charges, Paints, Shocker, Lock) along with iron clits Transformer
made of Flat size 90 mm x 90 mm x 3 mm thick (clits should be welded
continiously) 2 Nos on each side (Total Six Nos) except bottom side of M&P
Box of Three Phase Transformer.
B Rating: 25 KVA & 40 KVA
The cover shall be supplied with assessories (Cover Size 810x685, Glass, Per 1014.27
Kabja, LED, Fabrication Charges, Paints, Shocker, Lock) along with iron clits Transformer
made of Flat size 90 mm x 90 mm x 3 mm thick (clits should be welded
continiously) 2 Nos on each side (Total Three Nos) except bottom side of
M&P Box of Single Phase Transformer.
16.26 To Supply and install/ Weld the Meter cover on Single Phase Transformer in
Nigam Store.
A Rating: 5 KVA/ 10 KVA/ 16 KVA/ 25 KVA
The cover shall be supplied with assessories (Cover Size 220x370, Glass, Per 382.36
Kabja, LED, Fabrication Charges, Paints) along with iron clits made of Flat Transformer
size 90 mm x 90 mm x 3 mm thick (clits should be welded continiously) 1
Nos on each side (Total Three Nos) except bottom side of M&P Box of
Single Phase Transformer.
16.27

Replacement of damaged distribution/ pillar boxes duly painted paintingwith


priming coats or ready mixed red-oxide paint 2 coats of approved make on
steel works after cleaning with wire brush/ sand paper (including cost of red
oxide), paintingwith aliminium paint of approved brand and manufacturer to
give an even surface (including cost aiuminium paint), Spary painting on old
surface with sythetic enamel paint (ICI Asian, Burger of equlvalent make) to
give an even shade (minimum two coats) with perparation of surface by
rubbing applying primer coats coats and putty etc. complete in all respect on
steel works/ equipments (including cost of paint).
16.27.1 Cost of 18 gauge doors with installation & paint/ Sq Ft Sq. Ft. 64.40
16.27.2 Cost of Hinges with installation/ piece Piece 14.72
16.27.3 Cost of Rivet (Kundah) with installation/ piece Piece 12.88
16.28 Perparation of spikes made of MS Rod of 20 mm dia and 3.0 mtr. Long Nos.
length as per design and requirement to be driven in earth by mechanical
means and providing & fastening of suitable clamps with the MS Rod
connection of earth wire/ stay wire/ MS flat in Clamp depending on soll (refer
clause 8.3.4)
16.28.1 Where drilling is not required Nos. 152.78
16.28.2 Where drilling is required Nos. 500.17

Note:
1 The quality of material supplied by the contractor shall be got checked & approved by the circle
SE.
2 The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra by
Nigam if applicable.
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


CHAPTER-17
OPERATION AND MAINTENANCE OF 33/11 KV SUB-STATION

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
Note: Incharge Assistant/Junior Engineer after necessary inspection
testing& checking will identify the maintenance work which will be
categorised as below:
17.1.1 Labour charges for over all inspection of sub-station with two per trans. 903.55
transformer for job requiring works analysis and testing of dielectric
strength of oil, insulation resistance value and earth resistivity etc.

17.1.2 Add for each power transformer. per trans. 302.04


17.2 Labour charges for opening the transformer tank top cover(if per trans. 4407.55
required to facilitate maintenance of transformer) after removing
required accessories.Including all required T&P Up to 5 MVA
transformer.
17.3 Preventing oil leakage by changing main gasket with material after
removing cover.
17.3.1 Upto 1.6 MVA transformer per trans. 1544.93
17.3.2 Above 1.6 MVA & upto 3.15 MVA transformer. per trans. 1915.13
17.3.3 Above 3.15 MVA & upto 5 MVA transformer. per trans. 2115.59
17.4 Change of HV/LV bushing gasket ring and rubber washers including Nos. 1101.88
supply of required material & draining /re-filling of oil as required.

(a) For additional HV/LV bushing work. Nos. 198.35


* This amount will not be payable incase the work of removing
of Top cover gasket is also awarded in the same order.

17.5 Change of gaskets of valves/radiator / Buchhloze's Relay including


cost of gaskets etc.
17.5.1 Valve's/Buchhloze's Relay Nos. 123.41
17.5.2 Radiator Valves. Nos. 295.26
17.6 Providing & Fixing (including replacement) of HV/LV bushing of
reputed make & bushing rod of brass matel including cost of gasket
& rubber rings .Gasket makes are TABROSS,TIGER, ZEBRA and
any other reputed make.

HV Side
17.6.1 Upto 1.6 MVA transformer Nos. 1357.56
17.6.2 Above 1.6 MVA & upto 3.15 MVA transformer. Nos. 2591.58
17.6.3 Above 3.15 MVA & upto 5 MVA transformer. Nos. 2591.58
LV Side
17.6.4 Upto 1.6 MVA transformer Nos. 531.09
17.6.5 Above 1.6 MVA & upto 3.15 MVA transformer. Nos. 1820.32
17.6.6 Above 3.15 MVA & upto 5 MVA transformer. Nos. 1820.32
17.7 Dehydration/Filteration and reconditioning of transformer oil Ltr. 4.37
(electricity shall be supplied by deptt.) as per norms and testing
thereof in presence of sub-station Incharge.
17.8 Cleaning of oil scale deposits over the body and radiators of power
transformer with thinner/detergent and de-rusting in perfect manner.

17.8.1 Upto 1.6 MVA transformer Nos. 1068.93


17.8.2 Above 1.6 MVA & upto 3.15 MVA transformer. Nos. 1324.46
17.8.3 Above 3.15 MVA & upto 5 MVA transformer. Nos. 1547.04

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
[40]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
17.9 Replacement of oil temperature indicator, Winding temperature
indicator,silica gel container ,Presser relief device ,Magnetic oil level
gauge,.Gas operated Buchhloz relay (including all required
accessories.)

(a) Oil temperature indicator Nos. 2093.62


(b) WindingTemperature indicator Nos. 2093.62
( c) Silica gel container Nos. 2093.62
(d) Presser relief device Make ATBUS Nos. 5729.75
(e) Magnetic oil level gauge.Make ATBUS Nos. 4627.87
(f) Gas operated Buchhloz relay( Double floating type make ATBUS) Nos. 4627.87

17.10 Spray Painting of the power transformer from out side with two
coats of synthetic enamel paint of required shade after cleaning the
body and radiators with preparation of surface by rubbing &
applying primer coats and putty etc. and making smooth surface
with the fine emary cloth including required material and tools.

(a) 5 MVA Transformer Per Nos. 3305.66


(b) 2.5MVA/3.15 MVA Transformer Per Nos. 2754.71
( c) 1.6 MVA Transformer Per Nos. 2424.09
17.11 Checking, tightening & replacement of jumpers, clamps connectors
of bus bar including transformer & equipments of sub-
station.Material to be provided by Nigam ,If required.
17.11.1 33/11 KV S/S with 1 power transformer Nos. 1242.90
17.11.2 33/11 KV S/S with 2 power transformer Nos. 1643.95
17.11.3 33/11 KV S/S with 3 power transformer Nos. 2117.84
17.12 Replacement of damaged bus bar conductor including re-jumpering
etc.
17.12.1 Bus Bar with ACSR PANTHER Per Wire 652.37
17.12.2 Bus Bar with ACSR DOG/RACOON Per Wire 425.44
17.13 Replacement of damaged pin/post insulators including re-binding
and jumpering etc.
17.13.1 33 KV Pin/Post Insulator Nos. 17.61
17.13.2 11 KV Pin/Post Insulator Nos. 13.24
17.14 Replacement of damaged disc insulator with hardware, if required
including jumpering etc.
17.14.1 On 33 KV side Per string 158.63
17.14.2 On 11 KV side Per string 108.05
17.15 Replacement of damaged jumpers including fixing P.G. clamps, 'T'
clamps and connectors at both ends. Including proper tightaning of
M.S. Nuts & Bolts.
17.15.1 ACSR PANTHER Nos. 83.66
17.15.2 ACSR DOG/RACOON Nos. 37.47

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[41]
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
17.16 Replacement of 33 KV/11 KV lightening arrestors including
jumpering and earth connections etc. in all respect.
17.16.1 33 KV L.A. Nos. 167.49
17.16.2 11 KV L.A. Nos. 55.08
17.17 Repair & maintenance of 33 KV/11 KV Isolator/ G.O. Switch for
smooth operation including replacement of G.O. clamps, jaws,
blades & post insulators etc. and checking of operating mechanism,
oiling/greasing complete in all respect.
17.17.1 33 KV Isolator/ G.O. Switch Nos. 451.78
17.17.2 11 KV Isolator/ G.O. Switch Nos. 302.04
17.18 Welding of fabricated MS Sheet box of 2 mm thickness for locking
arrangement of power transformer valves to curb transformer oil
having dimensions
17.18.1 200x160x180 mm for filter valve of Power Transformer per valve 451.47
17.18.2 160x100x120 mm for conservator drain valve per valve 305.49
17.18.3 40x 50x40 mm for radiator air release cap per valve 99.32
17.18.4 60x 50x60 mm for conservator cap per valve 103.83
Removing of unwanted grass/ small plants from the 33/ 11 KV sub-
17.19 Station.
(a) From gravelled land/ area. Per 100 Sq Mtr 201.66
(b) From un-gravelled land/ area. Per 100 Sq Mtr 131.01
17.20 Mesurment of earth resistance:-
(a) By providing earth resistance tester by contractor. Per Location 23.00
(b) By providing earth resistance tester by Nigam. Per Location 18.40
Carrying our following activities at 33/ 11 KV S/s The necessary
material. T&P & safety devicesreruired fro maintenance shall be
provided by Nigam. Applicable statuary deductions shall be made
17.21 as per rules.
Providing one skilled person (ITI holder) for shift duty (per shift of 8 Per Shift 233.00
Hrs.) Note:- Engagement of Skilled person is subject to fulfilment of
i note conditions 1 to 4 given below the chapter.
Providing 1 semi-skilled labour for shift duty (Per shift of 8 Hrs.) for Per Shift 223.00
assisting in performing the activities as below. Note:-
Engagement of Semi-skilled person is subject to fulfilment of note
ii conditions 1&3 given below the chapter.
To ensure un interrupted power supply during Block hours on the
feeders eminating from GSS as directed by AEN/ JEN and to
A maintain porper Log Sheet.
To register ON/ OFF timmings of 33 KV feeder in the Log Sheet.
B
To ensure the Breaker OFF position, Isolation of 11 KV GO, Switch
& Proper earthing by earthing chain before permitting the Shut
C Down of 33 KV/ 11 KV feeders.
Maintain the 33/ 11 KV S/S like repairing the jumpers, change of
faulty Disc/ Pin Insulator cleaning of Switch Yard, watering the
D earthing pits cleaning & caring the equipments.
Replacing the burnt Fuse during Single Phase & Three Phase
E supply.
To record the tripping for the & type of fault occurred in any 33 KV/
11 KV feeder and give a try for restoring the supply, if the breaker
does not hold i.e feeder remain faulty then message should nbe
immediately conveyed to the Line Man of respective feeder and also
F to concerned officer.
If any defect has been observed in the installed equipments at the
S/S, then message should be immdiatelyconveyed to the concerned
G JEN/ AEN.
Keeping watch & ward of Nigam material lying at the Permisis of
H S/S.
Chapter DESCRIPTION OF WORK UNIT Rate/Unit
Code No

1 2 3 4
Properly hand over the shift to next shift duty staff indicating the
I position of all equipment/ feeders.
To Supply & Replace the damaged/ defective parts of 33 KV GO
switch (Proper shut down will be provided by Nigam). Rates are
17.22 inclusive of material.
A 33 KV GO (800 Amps)
i Contacts/ Jaws with Terminal Plate Nos. 1391.96
ii Center Blade/ Pipe Nos. 2640.40
iii Post Insulator (24 KV) Nos. 354.20
iv PG Clamp Nos. 256.68
To Supply & Replace the damaged/ defective parts of 11 KV
Roaster Switch (Proper shut down will be provided by Nigam).
17.23 Rates are inclusive of material.
a Contacts/ Jaws with Terminal Plate Nos. 488.52
b Center Blade/ Pipe Nos. 672.52
c Post Insulator (12 KV) Nos. 219.88
d PG Clamp Nos. 92.92

NOTE:The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra
by Nigam if applicable.

Note:- Since only the Nigam empolyee is empower to work on live line? Equpment thus the
Executive Engineer shall ensure the following from the contractor whileengaging Pvt.
Person (ITI Holder) for working on Live Line/ Equipments:-

1 At the Joining the contractor should submit Accidental Insurance Cover in advancefor One
Year for the engaged person.

2 The Contractor Should submit age proof, copy of ITI Certificate for the engaged person.

3 The Contractor should submit proof of deduction of PF (if Applicable) and deposition of
samewith PF department along with bill otherwise submitecemption certificate for the
engaged person.
4 The person should submit work experience for live line workor should submit a certificate
to be issued from Electrical Inspector for working on Live Line.

5 Identity Card with Photo for the deployed person should issued by Circle SE and proper
record of it should be maintain at circle level.

6 Monthly/ Routine verification of the deployed person should be done by circle office.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


CHAPTER-18

FENCING WORKS

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
18.1 Providing and fixing 180 cm high fencing with angle iron post size Running 720.85
50x50x6mm placed at every 3 meters apart and 45cm in ground meter
embedded in cement concrete 1:3:6 (30x30x60cm) corner and every
10th.post to the strutted with 50x50x6 mm angle iron provided with 6
horizontal lines and 2diagonals of G.I. barbed wire between two post
fitted and fixed with G.I. Staples including each works in excavation
etc. complete.

18.2 Providing and fixing 150 cm high fencing with angle iron post size Running 514.68
50x50x6mm placed at every 3 meters apart and 45cm in ground meter
embedded in cement concrete 1:3:6 (30x30x60cm) corner and every
10th post to the strutted with 50x50x6 mm angle iron provided with 6
horizontal lines and 2diagonals of G.I. barbed wire between two post
fitted and fixed with G.I. Staples including each works in excavation
etc. complete.

18.3 Providing and fixing 120 cm high fencing with angle iron post size Running 481.56
50x50x6mm placed at every 3 meters apart and 45cm in ground meter
embedded in cement concrete 1:3:6 (30x30x60cm) corner and every
10th.post to the strutted with 50x50x6 mm angle iron provided with 6
horizontal lines and 2diagonals of G.I. barbed wire between two post
fitted and fixed with G.I. Staples including each works in excavation etc.
complete.

18.4 Structural steel work riveted, bolted or welded in built up sections, per Kg 64.40
trusses and framed work, including cutting, hoisting (height upto 10 m),
fixing in position and applying a priming coat of approved steel primer
all complete:
18.5 Providing and fixing welded mesh/expanded metal mesh in frame work,
flat iron beading 20x3mm including top cross laps inside and out sides
elding, iron bolts, crews, clips etc. complete (excluding frame work) of
size.
18.5.1 Expended metal size 20-25 mm size 18SWG per Sq.M 651.36
18.5.2 Welded mesh 50 mm x 25 mm x 2.1 mm per Sq.M 603.52
18.5.3 Welded mesh 25 mm x 25 mm x 2.1 mm per Sq.M 627.44
18.5.4 Welded mesh 50 mm x 50 mm x 2.1 mm per Sq.M 579.60

NOTE:-The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[43]
CHAPTER-19 (A)
SUPPLY OF MATERIAL FOR KUTIR JYOTI /BPLCONNECTION IN RURAL AREA

CHAPTER DESCRIPTION OF WORK UNIT Rate/


CODE NO. Unit

1 2 3 4
19.1 Supply of
19.1.1 Surface type teak wood Board with varnish and entire treatment
including fixing gutties etc.For installation of cut-outs holders and bulb
and on-off switch.

Size250x300mm Nos. 55.23


19.1.2 240 volt kit kat fuse 5 amp.porcelain base with copper contact on Nos. 21.37
existing Board including making connections etc.as required .
MAKE:KENBAR/CROMPTON/GEC/PHILIPS.

19.1.3 5 amp.porcelain base single pole tumber switch IS-3854 including Nos. 16.26
making connection etc.as required make:-
SK/555,RK/555,KINJAL,EMPERIOR.
19.1.4 Brass batten/Angle/pendent holder any ISI approved make including Nos. 34.76
making connections etc.as required.
19.1.5 Bulb 40/60 watt make PHILIPS/BAJAJ/GEC. Nos. 15.80
19.1.6 10 Amp. 240 Volts ISI mark MCB. Nos 102.64
19.1.7 CFL 14 W ISI mark Nos. 105.34
19.2 Supply with 4 Sq.mm. T/C XLPE armoured cable of aluminium meters 49.21
conductor confirming to IS (latest amendment) procured as per
specification of Nigam and approved vendor of Jaipur Discom.
19.2.1 Supply of 2.5 mm2 T/C XLPE armoured cable of aluminium conductor meters 36.87
confirming to ISS (latest amendment) procured as per specification of
Nigam and from the approved vendor of Jaipur Discom

19.3 Supply of PVC insulated solid aluminum conductor cable 1.5sq.mm. Meters 4.66
single core 1100V. Grade (IS.694) of standard quality and approved
Makes.
19.4 Supply of Angle 50x50x6 mm for supporting service line with nuts& Nos 142.21
bolts. (2' long)
19.5 Supply of 16 mm Dia MS Rod 2 Meter long along with GI. Wire 10SWG Nos 205.42
with nut& bolts.

NOTE:- The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[44]
CHAPTER-19 (B)
TRANSPORTATION /ERECTION FOR KUTIR JYOTI / BPL CONNECTION IN RURAL AREA

CHAPTER DESCRIPTION OF WORK Unit Rate/Unit


CODE NO.
1 2 3 4
19.1 Transportation & Fixing of
19.1.1 Surface type teak wood Board with varnish and entire treatment
including fixing gutties etc.For installation of cut-outs holders and bulb
and on-off switch.
Size250x300mm Nos. 5.67
19.1.2 240 volt kit kat fuse 5 amp.porcelain base with copper contact on Nos. 3.73
existing Board including making connections etc.as required .
MAKE:KENBAR/CROMPTON/GEC/PHILIPS.
19.1.3 5 amp.porcelain base single pole tumber switch IS-3854 including Nos. 2.35
making connection etc.as required make:-
SK/555,RK/555,KINJAL,EMPERIOR.
19.1.4 Brass batten/Angle/pendent holder any ISI approved make including Nos. 5.67
making connections etc.as required.
19.1.5 Fixing of 10 Amp. 240 Volts ISI mark MCB. Nos 18.92
19.2 Wiring service line from LT Pole to meter of the consumer with 4 meters 4.97
Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming
to IS (latest amendment) procured as per specification of Nigam and
approved vendor of Jaipur Discom duly clipped/hocked and insulating
tape complete in all respect.

19.2.1 Wiring service line from LT Pole to meter of the consumer with 2.5 meters 3.46
Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming
to IS (latest amendment) procured as per specification of Nigam and
approved vendor of Jaipur Discom duly clipped/hocked and insulating
tape complete in all respect.

19.3 Drawing PVC insulated solid aluminum conductor cable 1.5sq.mm. Meters 1.52
single core 1100V. Grade (IS.694) of standard quality and approved
Makes duly clipped on wooden bottom.
19.4 Fixing of Angle 50x50x6 mm for supporting service line with nuts& Nos 18.92
bolts in cements Mortor. (2' long)
19.5 Fixing of single phase meter box at the premises of existing/new
consumer with 4 Nos Anchor fastners of rust proof size M-6x50 mm
on the wall as per the position of the holes already provided on the
meter box. The meter box must be housed perfectly vertical/plumb
line.
(a) Plastic Box Nos 61.77
(b) Metal Box Nos 78.89
19.6 Fixing of single phase energy meter in meter box by providing Nos 39.52
machine screws making holes on backelite sheet as per requirement
& also making connections at meter terminals and MCB using
Thimbles(by crimping) including providing M-seal compound inside
meter box. The bakelite sheet must be fixed properly with Screws to
restrict the movements vertically or horizontally. The meter is after
making connections of service lines with distribution mains by licenced
contractor only. The screws will be provided by contractor. Payment
for lugs will be made extra @ Rs.1.00 per wire for single phase
connection if not available with JVVNL & provided by contractor.

Note: Meter & Meter Box will be provided by JVVNL

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[45]
CHAPTER DESCRIPTION OF WORK Unit Rate/Unit
CODE NO.

19.7 Earthing with 16 mm Dia MS Rod 2 Meter long and driven them into Nos 47.54
earth by mechanical means.The work including flattening of top end
of MS rod drilling a hole at flattened end and tightening of earth
electrods I.e. G.I. Wire 10SWG with nut& bolts the other end will be
connected to the earth terminal provided at meter board.
19.8 Fixing of AC Static Energy meter 5-30 Amp. With LCD Display with Nos 94.93
moulded box (complete unit ) at the consumer's premises with 4 No.
Anchor Fasterners of rust proof size M-6X50 mm on the wall as per
the position of the holes provided on the meter box.The meter box
must be housed perfectly vertical/plumb line.

NOTE:- The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[46]
CHAPTER - 20
ERECTION & COMMISSIONING OF CABLE

Chapter DESCRIPTION OF WORK UNIT Rate/


Code No Unit
1 2 3 4
20.1 Laying of 11 KV, XLPE, Cable (Aluminium conductor) underground as per relevant
IS/JVVNL standards including excavation of 30 cm x 120 cm deep trench in Kaccha land
25 cm thick under layer of sand. 'A' class beicks covering refilling soil in the
remaining(Including fixing of G.I.Pipe of required size at both end with 3 Mtr projected
above the ground surface & 0.3 Mtr. below ground level)

a) 3x35 Sq mm to 3x185 Sq mm Mtr. 97.45


b) 3x240 Sq mm to 3x400 Sq mm Mtr. 109.65
Note: per meter shall be paid extra for excavation in Pakka Road. Mtr. 51.41
20.2 Laying of two (D/C) 11 KV, XLPE, Cable (Al. conductor) underground cable w/o
overlapping as per relevant IS/JVVNL standards including excavation of 50 cm width x120
cm deep trench in Kaccha land, 25 cm thick under layer of sand. 'A' class bricks or
concrete block covering refilling soil in the remaining portion and providing/fixing cable
route indicators at every 30Mtr.of cable and at every turn.

a) 3x35 Sq mm to 3x185 Sq mm Mtr. 170.60


b) 3x240 Sq mm to 3x400 Sq mm Mtr. 193.08
Note: per mtr shall be paid extra for excavation in Pakka Road. Mtr. 91.14
20.3 Installation of cable termination / straight through joints on 11KV Aluminium conductor
XLPE /PILCA Cable with outdoor/ indoor termination end and /or straight through joint
including required excavation / remoral/ fixing / refixing/ testing etc. as required
A) (I) Outdoor end terminal 3x35 Sq mm to 3x185 Sq mm Nos 1053.17
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 1228.68
B) (I) Indoor end terminal 3x35 Sq mm to 3x185 Sq mm Nos 965.43
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 1179.82
C) (I) Straight through joint 3x35 to 3x185 Sq mm Nos 2193.95
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 2559.71

20.4 Laying of 33 KV XLPE Cable ( Aluminium Conductor ) underground as per relevant ISS /
JVVNL standard including excavation of 30 cm width x120 cm deep trench in Kaccha land
25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in
the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable
and at every turn.

A) 3x50 Sq mm to 3x185 Sq mm Mtr. 121.86


B) 3x240 Sq mm to 3x400 Sq mm Mtr. 134.09
Note:- Per mtr. Rate shall be paid extra for excavation of puccka road Mtr. 51.77

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[47]
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

20.5 Laying of two ( D/C) 33KV, XLPE (Aluminium conductor) undrground cables w/o
overlapping as per relevant IS/ JVVNL standard including excavation of 50 cm width x 120
cm deep trench in Kaccha land.25 cm thick under layer of sand. 'A' class bricks or
concrete block covering refilling soil in the remaining portion and providing/fixing cable
route indicators at every 30Mtr.of cable and at every turn.
A) 3x50 Sq mm to 3x185 Sq mm Mtr. 214.54
B) 3x 240 Sq mm to 3x400 Sq mm Mtr. 234.06
Note:- per meter shall be paid extra for excavation in Pakka Road. Mtr. 91.14
20.6 Installation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable
type) as per manufacturer's kit guidance and direction including preparation of cable and
testing refilling etc as required.(Including crimping of lugs)
A) (I) Outdoor end terminal 3x50 Sq mm to 3x185 Sq mm Nos 1316.43
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 1608.89
B) (I) Indoor end termination 3x50 Sq mm to 3x185 Sq mm Nos 1053.14
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 1287.07
C) (i) Straight through joint 3x50 Sq mm to 3x185 Sq mm Nos 2964.35
(ii) 3x240 Sq mm to 3x400 Sq mm Nos 3432.32
Note:- Rate shall be reduced by 20% for "Push On" typekit
20.7 Laying of 33 KV & 11KV XLPE cable without Road cutting i.e. through burrowing machine
"VERMIER".(120 cm deep).Use of this technology must be restricted to the situation like:-

(i) When the passages available for laying the proposed cable is totally a metal or cement
concrete road.
(ii) When the road cutting is not permitted by the local administration.
A) 33 / 11 KV 3C x 300 Sq.mm cable Mtr. 308.20
B) 33 / 11 KV below 3C x 300 Sq.mm cable Mtr. 289.80
C) LT 3.5 Core 95 Sq.mm and above Mtr. 289.80
(iii)When cable laid in a HDPE pipe
33 / 11 KV 3C x 300 Sq.mm cable Mtr. 391.00
Add Cost of 200 HDPE pipe
(a) PN4 HDPE pipe(IS-4984) Mtr. 364.32
(b) HDPE DWC pipe(IS-14930) Mtr. 227.70
33/11 KV below 3X300 Sq.mm cable Mtr. 351.44
LT 3.5 core Sq qmm. Mtr. 352.36
Add Cost of 200 HDPE pipe
(i)PN4 HDPE pipe(IS-4984) Mtr. 250.47
(ii)HDPE DWC pipe(IS-14930) Mtr. 163.94
When cable laying through manual trench less (Bogie)
(i) 33/11 KV 3CX300 Sqmm. Cable Mtr. 223.48
(ii)33/11 KV below 3CX300 Sqmm. Mtr. 186.24
(iii) LT 3.5 core 95 Sqmm and above Mtr. 186.24
Cost of pipe shall be extra as above
20.8 Laying of under ground LT XLPE cable including excavation of 30cmx120cm.deep trench
in Kachha land and refilling by 25 cm thick layer of sand 'A' class bricks covering refiling
soil in the remaining portion.

a) 3.5 C x 300 sq. mm Mtr. 82.77


b) 3.5 C x120-185 sq. mm Mtr. 67.72
c) 4 C-25/50 sq. mm Mtr. 37.62
d) 4 C-up to 16 sq. mm Mtr. 22.58
e) 2C- up to 6 sq. mm Mtr. 18.06
Note:- Per mtr. Rate shall be paid extra for excavation of puccka road Mtr. 51.77
20.9 Under Ground Cable Fault location Machine Charges (Per Fault)
A FOR HT CABLES
20.9.1 For 33 KV/ 11 KV cable fault pin pointing (Within JCC) Per Fault 15180.00
20.9.2 For 33 KV/ 11 KV cable fault pin pointing (Other then JCC) Per Fault
20.9.3 For 33 KV/ 11 KV cable fault pressure testing (Within JCC) Per Fault 10120.00
20.9.4 For 33 KV/ 11 KV cable fault pressure testing (Other then JCC) Per Fault
B FOR LT CABLES Per Fault 15180.00
Chapter DESCRIPTION OF WORK UNIT Rate/
Code No Unit

20.10 Installation of cable termination/ straight through joints on LT XLPE/ PVC insulated Cable
with outdoor or straight through joint including required excavation/ remoral/ fixing/ refixing/
testing etc. as required.
A) (i) Outdoor and terminal 3.5 C/ 4 C x 50 Sq mm to 3.5 C/ 4 C x 185 Sq mm Nos 702.12
(ii) 3.5 C/ 4 C 240 Sq mm to 3.5 C/ 4 C x 400 Sq mm Nos 819.12
B) (i) Straight through 3.5 C/ 4 C x 50 Sq mm to 3.5 C/ 4 C x 185 Sq mm Nos 1462.63
(ii) 3.5 C/ 4 C 240 Sq mm to 3.5 C/ 4 C x 400 Sq mm Nos 1706.47
20.11 Installation of out door cable termination on 11 KV Aerial Bunched Cable including
requiredremoval/ fixing/ refixing/ testing etc. as required.
A Outdoor and terminal 50 Sq mm to 95 Sq mm Nos 351.05
20.12 Installation of straight through joints on HT XLPE Insulated Cable with straight through joint
including required remoral/ fixing/ refixing/ testing etc. as required. (Without excavation)

A For 11 KV:-
i Straight through joint 3x35 to 3x185 Sq mm Nos 1316.46
ii 3x240 Sq mm to 3x400 Sq mm Nos 1535.85
B For 33 KV:-
i Straight through joint 3x50 to 3x185 Sq mm Nos 1645.53
ii 3x240 Sq mm to 3x400 Sq mm Nos 2011.11
20.13 For assisting in cable fault location detailed as below by engaging the services of skilled Per 8 Hrs. 230.00
person on cable fault locating machine.
20.13 For Extra Loop (Ghera) to be provided near the pole on termination point and the length
ofcable along the pole for mounting of cable jointing kit.
a 11 KV Cable:-
3x35 Sq mm to 3x185 Sq mm Per Mtr 93.47
3x240 Sq mm to 3x400 Sq mm Per Mtr 105.16
b 33 KV Cable:-
3x50 Sq mm to 3x185 Sq mm Per Mtr 210.31
3x240 Sq mm to 3x400 Sq mm Per Mtr 227.84

Note:- 1. The rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra by
Nigam if applicable.
2. If the Cable Jointing Kits of HT/ LT are not available with Nigam, then the unit officer will obtain NAC
from ACOS & the contractor will supply the same as per latest SIR plus 10 % (profit) of approved vendors.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[48]
CHAPTER-21
ERECTION AND COMMISSIONING OF CAPACITOR AND CAPACITOR BANK

Chapter DESCRIPTION OF WORK UNIT Rate/


Code No Unit

1 2 3 4
ELECTRICAL & MECHANICAL WORK( Capacitor Bank)
21.1 Installation of control panel including wiring to the required equipments Nos. 1883.68
and conducting all precommissioning tests before energization
satisfactory operation in all respect existing thereof.

21.2 Erection and assembly of capacitor bank, with RTV, Series Reactor on Set 10776.59
the structure as per approved drawing and installation,commssioning of
capacitor units, SR & RTV on erected structure including connections
and accessories, jumpering etc. as per approved drawing.

21.3 Laying, testing, termination of control cable, 1100 Volt PVC installed
supply and providing of ferrules and copper lugs to designate various
cores of control cable by terminal numbers for identification including
utilization of cable glands. The control cable should be neatly arranged
in trenches avoiding crossings, including clamping of control cable in
rubber battons at regular interval and providing identity tages.

21.3.1 a) 2x2.5 Sq.mm. X 6 Nos. Mtr. 14.75


21.3.2 b) 4x4 Sq.mm. X 2 Nos. Mtr. 21.97
21.3.3 c) 4x2.5 Sq.mm. X 1 No. Mtr. 19.56
21.3.4 d) 12x2.25 Sq.mm. Mtr. 26.95
21.4 Fixing & commissioning of ISI mark capacitor at Distribution
Transformer/LT Pole including bracket & clamp ( 25x25x2mm) of Angle
& ('35x6mm) flat with connecting on wire of 16 Sq.mm.3 core cable 2.5
meter with lugs & nut, bolt ,transportation at site

21.4.1 6 KVAR per 504.29


unit
21.4.2 9 KVAR per 552.00
unit
21.4.3 12 KVAR per 601.35
unit
Fixing of 3 phase LT shunt capacitor (3/6/9/12 KVAR) near starter of
motor for agriculture consumers to be fixed with MS clamp of Shape of
size 2x10mm having two nos. holes for fixing of LT capacitors besides
starter of consumer with the help of two no. machine screw. The Starter
shall be connected using PVC sheathed single core of 4 sq.mm AI.
cable conforming to relevant IS. The wire shall be cut in three pieces
21.5 which shall be used for extending existing wire with making proper joint Nos. 92.00
and joint shall be taped with MS compound/PVC tape roll The ends of
wire shall be properly crimped with lugs/thimble etc. All material shall
be supplied by the contractor except lt shunt capacitor (The LT shunt
capacitor shall be supplied by Nigam)

NOTE: The rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid
extra by Nigam if applicable.
AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[49]
CHAPTER-22
LABOUR

Chapter DESCRIPTION OF WORK UNIT Rate/Unit


Code No

1 2 3 4
1 Distribution of Energy bills (DL, NDS, Street light SIP, mix load & Ag)

Urban 1.51
Rural 1.95
2 Distribution of DC. Notices
Urban 2.41
Rural 6.02
NOTICE: Contractor should take receipt from consumers with dated
Signature for which book will be supplied by Nigam.

3 Photo state copies, (Including paper, ink & operator).(If contractor install his
m/c inside Nigam's Premises free accomodation and free electricity will be
provided by Nigam.

(I) Size- A-4 Jaipur 0.77


Size- A-4 Circle head quarters other than Jaipur. 0.90
(2) Size A-5 Jaipur 0.90
Size- A-5 Circle head quarters other than Jaipur. 1.03
4 To take reading of Energy Meter Installed at 11/ 0.4 KV ot 6.35/ 0.23 KV Per Meter 27.60
distribution Transformer at sifferent locations using Ladder/ Channel. The
reading should be taken Manually
5 To verify reading of Enrrgy Meter Installed at 11/ 0.4 KV or 6.35/ 0.23 KV Per Meter 46.00
Distribution Transformer at different locations using Ladder/ Channel. The
reading should Incariably be taken along with verification of load as well as
cindition od transformer should also be reported Proof of readingbe evinced
with photograph (Camera will be provided by Contracto).

6 Disconnection/ Reconnection:-
(i) From Pole:- Per 41.40
Connection
(ii) From Meter:- Per 18.40
Connection
7 Site survey for preparing the estimate along details of connected Per 92.00
connections with their load and preparation of single line diagram. Connection
8 Energy Meter reading
8.1 Taking meter reading without photo Per Meter 3.53
8.2 Verification of meter reading with capturing photo of meter dial Per Meter 3.68
22.5 Identification numbering on support pole/structure/transformer/other
equipment/Warning instruction of availability of two sources of supply on
same structure, at source sturcture, at cut points, properly labelled using
yellow base and black indication marks (number or digits) 40/50 mm height
digits/ words should be used for this purpose. Base shall be made using 2
new or more coats of yellow enamel paint till good surface finish. Base
painting and marking of digits should be performed by a skilled and trained
painter using branded enamel paint.
Engineer- Incharge shall approve type and brand of enamel
paint.
22.5.1 In urban area Nos. 9.20
22.5.2 In rural area Nos. 11.04
Note:-The rates are inclusive of all applicable Taxes/ Duty except service tax which will be paid extra by
Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[50]
CHAPTER-23(A)
HIRE CHARGES OF PLANTS AND MACHINERIES

Chapter Name of machine For Deptt. Work


Code without Idle
No. P.O.L. Rs. Rs.
1 2 3 4
NOTE: Hire charges per day for 8 hours
23.1 ROLLERS
23.1.1 Diesel Road roller 8-10 Ton. 417.25 202.07
23.1.2 Tractor mounted/vibratory 6-8 Ton 319.52 162.97
23.1.3 Vibratory Computer 10 Tons. 1492.85 306.42
23.1.4 Steam Road roller 286.87 189.09
23.1.5 Sheep foot rollers 20.81 2.58
23.1.6 Smooth hand roller 1/2 Ton. 15.63 2.58
23.1.7 Smooth hand roller 1Ton. 15.63 2.58
23.1.8 Compactor rollers 5 Tons. 45.64 6.55
23.2 TRUCK & TRAILOR
(which ever is higher)
23.2.1 Tractor Trailer 20 Tons 1941.87 521.53
15.42/-per Km.
23.2.2 Truck 3-5 Tons 521.23 195.57
5.91/-per Km
23.2.3 Tipper trucks 3-5 Tons 645.41 215.11
5.91/-per Km
23.2.4 Truck 7-10 Tons 717.10 286.87
7.11/-per Km
23.2.5 Tipper trucks 7-10 Tons 782.30 352.06
8.31/-per Km
23.2.6 Trucks mounted water tank/bitumen tank 834.44 325.96
8.31/-per Km
23.3 TRACTORS & TROLLEY
23.3.1 Tractors 25 HP 286.87 130.38
23.3.2 Tractor 26-40 HP 319.46 130.38
23.3.3 Tractor 41-50 HP 404.20 143.43
23.3.4 Tractor trolley 4 Wheel 36.51 6.50
23.3.5 Tractor trolley 2 Wheel 28.68 6.50
23.3.6 Water tanker trailor 42.99 9.15
23.4 MIXERS & PLANTS
23.4.1 Hot mix plant 6-10 tons per hour 534.58 234.73
23.4.2 Bitumen mixer 10-14 cft. 286.87 123.88
23.4.3 Bitumen mixer 5-7 cft. 202.07 108.25
23.4.4 C.C.Mixer 10-14 cft 189.09 104.34
23.4.5 C.C.Mixer 7-10 cft. 162.97 104.34
23.4.6 C.C.Mixer 5-7 cft. 143.43 104.34
23.4.7 Morter mixers 159.07 104.34
23.5 TAR BOILER & STORAGE
23.5.1 Bitumen storage tanks 3 ton 71.69 0.00
23.5.2 Tar boiler 1.5 tonne 71.69 28.68

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[51]
Chapter Name of machine For Deptt. Work
Code without Idle
No. P.O.L. Rs. Rs.
1 2 3 4
23.6 STONE CRUSHERS & GRANULATORS
23.6.1 Stone Crusher 30"x16" 847.49 286.87
23.6.2 Stone Crusher 16"x9" 534.58 234.66
23.6.3 Granulator 16"x5" 515.03 234.66
23.7 WATER PUMPS
23.7.1 Pumping set 5-9 HP 123.86 97.78
23.7.2 Pumping set 10-19 HP 143.42 104.30
23.7.3 Pumping set 20-30 HP 143.42 104.30
23.7.4 Pumping set above 30 HP 345.52 130.38
23.8 GENERATORS
23.8.1 Generating set upto 5 KVA 162.97 104.28
23.8.2 Generating set 5-15 KVA 202.07 117.33
23.8.3 Generating set above 15 KVA but below 50 KVA 345.51 130.38
23.9 AIRCOMPRESSORS
23.9.1 Aircompressor upto 115 cfm 378.10 143.43
23.9.2 Air compressor above 115 cfm. 417.25 143.43
23.10 BORING MACHINE
23.10.1 Boring machine other than diamond core 286.87 189.09
23.10.2 Diamond core drilling m/d 932.23 606.26
23.11 OTHER MACHINES
23.11.1 Mobile Crane 3 ton 801.85 273.82
23.11.2 Power winch 273.82 123.88
23.11.3 Front end loader 573.67 234.66
23.11.4 Hydraulic scraper 273.82 189.09
23.11.5 Chainpulley Block 13.05 2.58
23.11.6 Grouting machine 52.14 0.00
23.11.7 Vibrators 104.28 104.03
23.12 HIRE CHARGES OF EARTH MOVING
MACHINERY HOURLY BASIS
23.12.1 Bull Dozer 180/200 HP 444.48/p.hr. 207.43/p.hr.

23.12.2 Bull Dozer 100/110 HP 296.33/p.hr. 112.63/p.hr.


23.12.3 Motor Graders 94.80/p.hr. 35.54/p.hr.
23.12.4 Drum Mix Plant 40-60 TPH 1789.80/p.hr. 432.63/p.hr.

23.12.5 Paver Finisher 75 TPH 385.22/p.hr. 177.80/p.hr.


23.12.6 Generating Set 125 KVA 225.20/p.hr. 118.53/p.hr.
23.12.7 JCB Excavator cum loader 521.52/p.hr. 248.93/p.hr

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[52]
Chapter Name of machine For Deptt. Work
Code without Idle
No. P.O.L. Rs. Rs.
1 2 3 4
23.13 Jeep/Bolero/max Mahindra/ Ambassador and equivalent
with the cubic capacity of at least 1800 CC, diesel version
without A.C with driver and R&M with a minimum average of
12 Kms. per litre excluding diesel oil and lubricant ( 1 litre oil
for 1000 Km).Vehicle should not be more than 5 year old
(designation up to Executive Engineer).

For 12 hours Per day 450.00


For 24 hours Per day 550.00
23.14 Swift Dezire /Indica / Indigo & equivalent with the cubic
capacity of at least 1200 CC, diesel version with A.C with
driver and R&M with a minimum average of 15 Kms. per litre
excluding diesel oil and lubricant ( 1 litre oil for 1000 Km)
Vehicle should not be more than 5 year old. (designation
Superintending Engineer and above).

For 12 hours Per day 450.00


For 24 hours Per day 550.00
23.15 LCV 3T with driver without P.O.L (minimum avg.6 Km/Litre
and 1 litre oil for every 1000 Km)

(a) For 24 Hrs. a day 819.62


(b) For 12 Hrs. a day 680.91
(c) For 8 Hrs. a day 567.43
23.16 LCV below 3T with driver without P.O.L (minimum avg.8
Km/Litre and 1 litre oil for every 1000 Km)
(a) For 24 Hrs. a day 693.52
(b) For 12 Hrs. a day 504.38
(c) For 8 Hrs. a day 441.33
23.17 Night halt charges for vehicles engaged on 12 hrs.basis per 85.97
night . (Jeep/Bolero/Ambassador/Indica Car etc.)

23.18 hiring of Tempo vehicle like TATA ACE above 800 CC etc.
Without POL.
(a) For 24 Hrs. a day 567.42
(b) For 12 Hrs. a day 327.85
(c) For 8 Hrs. a day 315.23

NOTE: -The Rates are inclusive of all applicable Taxes/ Duty except service tax which will be
paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter Name of machine For Deptt. Work
Code without Idle
No. P.O.L. Rs. Rs.
1 2 3 4

[53]
CHAPTER-23(B)
HIRE CHARGES OF PLANTS AND MACHINERIES

Chapter Name of machine For Deptt. Work


Code with Idle
No. P.O.L. Rs. Rs.
1 2 3 4
NOTE: Hire charges per day for 8 hours
23.B GENERATORS 63 KVA(With Fuel & Operator)

23.B.1 Idle 2079.21


23.B.2 Stand by on NO load
(a) Rent 2079.21
(b) Running Charges 221.80
23.B.3 On Load
(a) Rent 2079.21
(b) Running Charges 346.54
23B..2 Crane with driver and P.O.L (Per Hrs.)
(a) 3T 625.43
(b) 18 T 1072.20
(c) 12 T 893.49
(d) 20 T 1131.77

NOTE: -The Rates are inclusive of all applicable Taxes/ Duty except service tax
which will be paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


Chapter Name of machine For Deptt. Work
Code with Idle
No. P.O.L. Rs. Rs.
1 2 3 4
[54]
CHAPTER-24

REPLACEMENT OF 11 KV CT PT SETS

Chapter DESCRIPTION OF WORK UNIT Rate/


Code No Unit

1 2 3 4

24.1 Safe Loading of new/old 11 KV CT PT sets (all sizes) Set 117.89

24.2 Safe unloading of new /old 11 KV CT PT set (all sizes ) Set 52.66

24.3 Installation , testing as per Nigams norms & Set 689.06


commissioning of new 11KV CT PT set (all sizes) on
erected supports including jumpering,crimping of lugs/
clamping earth connection of body &conducting pre
commissioning test before energization and satisfactory
operation in all respect

24.4 Removal of damaged 11 KV CT PT Set from existing Set 482.29


structures

24.5 Replacement of defective/ burnt 33 KV or 11 Kv


CT/PT/CTPT Set (All size) at 33/11 KV S/S it includes
installation, Crimping oglugs/ clamoing earth connection
of body)
(a) 33 KV or 11 KV CT/PT/ CTPT set Nos. 1171.35
(b) 33 KV CT/PT/ CTPT set Nos. 1171.35
24.6 Transportation of 33 KV of 11 KV CT/PT/CTPT Set (All
size) for replacement at 33/11 KV S/S along with their
loading & unloading.
(a) 33 KV or 11 KV CT/PT/ CTPT set Nos. 178.65
(b) Above 10 Kms. & upto 30 Kms. Add for each Km of part Kms. 5.11
thereof.
(c) Above 30 Kms. Add for each Km of part thereof. Kms. 3.46

NOTE: The Rates are inclusive of all applicable Taxes/ Duty except service tax which
will be paid extra by Nigam if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[55]
CHAPTER-25 (A)
SUPPLY OF MATERIAL OF HT METERING ON DISTRIBUTION TRANSFORMER

Chapter Description of work Unit Rate/


Code No. Unit

25.1 Supply of PVC ISI mark 1100 V 12x2.5 mm 2 solid copper armoured control Mtr. 218.69
cable including lugs & fersules and laying of cable along the DP structure
binding with wire at regular interval and making connections from CTPT
secondary terminals to TTB. Including utilization of cable gland

25.2 Supply of fabricated steel item of MS Channel/Angle/Flat. Kg. 59.73


25.3 Supply of MS nuts & bolts Kg. 84.07
25.4 Supply of meter box of size 525x300x150 mm made by deep drawn method Nos 1328.59
from steel sheet of thickness 1.0 mm duly grey colour powder coated. The
viewing window shall be provided with toughened glass of 5 mm thickness of
size 120x140 mm. The cover of meter box shall be fixed on inside hinges. The
cover shall be provided with neoprene rubber gasket lining fixed with adhessive.
Backelite sheet of size 450x275x2 mm for mounting of HTTVM and TTB shall be
provided. 4 nos. fixing clamps welded at top of rear face of the meter box of size
50x120x6 mm with 80 mm projection with a rectanguler slot of 17.5mmx50mm.
2 nos. clampsof 50x6mm alongwith nuts, bolts & washers should also provided
for fixing the box on pole/joist. 2 nos. welded sealing bolts with nuts and
washers should be provided for sealing the box . One hole with matel gland for
cable size of 12core 2.5 mm2 control cable should be provided in the center of
bottom. The meter box should consist of one 3 phase 4 wire link type meter test
termianl block of IMP/CAPITAL make rated for atleast 10 A with cover mounted
in the box. Earthing arrangement should be provided one meter box.

Note:-
1 The Concerned Assistant Engineer will arrange the necessary shut down for starting the
work. The installed meter inside the meter box and metering equipments duly mounted on the
mounting structure will be powered up by connecting load in the presence of Assistant
Engineer (O&M). Since the work invloves higher A/C voltage level the contractor shall take
fulcare regarding safety nors so as to avoid any accidental hazards

2 For the work under this chapter conductor, clamps & lugs for jumpring shall be provided by
contractor for which payment shall be made as per latest store

3 The rates are inclusive of all applicable taxes/duty except service tax which will be paid extra
by Nigam, if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[56]
CHAPTER-25 (B)
TRANSPORTATION /ERECTION OF MATERIAL OF HT METERING ON DISTRIBUTION TRANSFORMER

Chapter Description of work Unit Rate/


Code No. Unit

1 2 3 4
25.1 Safe carriage of CT/PT set (all size) including loading and unloading from Nigam
store to site
25.1.1 (a) Within 10 Kms. Nos 178.65
25.1.2 (b) Above 10 Km upto 30 Km. Add for each Km. or part there off Nos 5.11
25.1.3 (c) Above 30 Km. Add for each Km. or part there off Nos 3.46
25.2 Installation, testing as per Nigam norms and commissioning of new CT/PT set on Nos 521.03
erected supports including jumpering wiring crimping of lugs clamping earth
connection of body and conducting pre commissioning test before energisation and
satisfactory operation in all respect. CTPT set shall be provided by Nigam from
concern sub-div stores.
25.3 Fixing of PVC ISI mark 1100 V 12x2.5 mm2 solid copper armoured control cable Mtr. 39.94
including lugs & fersules and laying of cable along the DP structure binding with wire
at regular interval and making connections from CTPT secondary terminals to TTB.
Including utilization of cable gland
25.4 Transportation and Fixing of fabricated steel item of MS Channel/Angle/Flat. Kg. 2.76
25.5 Transportation and Fixing MS nuts & bolts Kg. 2.76
25.6 Transportation and Fixing of meter box of size 525x300x150 mm made by deep Nos 205.59
drawn method from steel sheet of thickness 1.0 mm duly grey colour powder coated.
The viewing window shall be provided with toughened glass of 5 mm thickness of size
120x140 mm. The cover of meter box shall be fixed on inside hinges. The cover shall
be provided with neoprene rubber gasket lining fixed with adhessive. Backelite sheet
of size 450x275x2 mm for mounting of HTTVM and TTB shall be provided. 4 nos.
fixing clamps welded at top of rear face of the meter box of size 50x120x6 mm with 80
mm projection with a rectanguler slot of 17.5mmx50mm. 2 nos. clampsof 50x6mm
alongwith nuts, bolts & washers should also provided for fixing the box on pole/joist.
2 nos. welded sealing bolts with nuts and washers should be provided for sealing the
box . One hole with matel gland for cable size of 12core 2.5 mm2 control cable
should be provided in the center of bottom. The meter box should consist of one 3
phase 4 wire link type meter test termianl block of IMP/CAPITAL make rated for
atleast 10 A with cover mounted in the box. Earthing arrangement should be provided
one meter box.

25.7 Transportation and Installation of HTTVM in the meter box and making connection Nos 64.38
from TTB to HTTVM by 2.5 Sq. mm flexible ISI mark PVC wire (the flexible wire of
length 2 Mtr. for each HTTVM & TTB connection is to be supplied by the
contractor).HTTVM shall be provided by Nigam from concern stores.

Note:- The rates are inclusive of all applicable taxes/duty except service tax which will be paid extra by
Nigam, if applicable.

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[57]
STANDARD DATA

S.No. CATEGORY OF STEEL WEIGHT IN K.G PER METER

1 M.S.Angle 75x75x6 mm 6.80


2 M.S.Angle 65x65x6 mm 5.80
3 M.S.Angle 65x65x5 mm 4.90
4 M.S.Angle 50x50x6 mm 4.50
5 M.S.Angle 50x50x5 mm 3.80
6 M.S.Angle 45x45x5 mm 3.40
7 M.S.Angle 40x30x5 mm 2.80
8 M.S.Flat 50x6 mm 2.36
9 M.S.Flat 50x10 mm 3.90
10 M.S. Channel 100x50x6 mm 9.56
11 M.S. Round 6mm dia 0.20
12 M.S. Round 12 mm dia 0.90
13 M.S. Round 16 mm dia 1.60
14 R.S. Joist 175x90x6 mm 19.30
15 R.S.Joist 200x100x6 mm 25.40
16 R.S.Joist 116x100x6 mm 23.00
17 R.S.Joist 150x75x6 mm 15.00
18 M.S. RAIL 105 Lbs 51.80
19 M.S. RAIL 90 Lbs 44.61
20 M.S.RAIL 75 Lbs 37.13
21 M.S. RAIL 60 Lbs. 29.76
22 G.I.Stay Wire 7/8 SWG 686.98 Kg /Km
23 G.I.Stay Wire 7/10 SWG 428.19 Kg/Km
24 G.I.Wire 6 SWG/5 mm 154.12 Kg/Km
25 G.I.Wire 8 SWG /4 mm 98.14 Kg /Km
26 G.I.Wire 10 SWG /3.15 mm 61.17
27 33 KV Cross arm(angle) 75x75x6 mm weight (per cross arm) 18.197
28 33 KV Cross Arm (Channel) 100x50x6 mm 22.179
29 11 KV Cross Arm(angle) 65x65x6 mm weight (per cross arm) 8.874
30 L.T.Cross Arm 50x50x6mm weight (per cross arm length 1200mm) 6.30
31 L.T.Cross Arm 50x50x6mm weight (per cross arm length 600 mm) 3.15
32 33 KV Top Hamper (per Top Hamper) 2.825
33 11 KV Top Hamper (per Top Hamper) 2.983
34 33 KV Clamp (per Clamp) 1.827
35 Clamp for 11 KV cross Arm and bottom nracket of LT Line (per Clamp) 0.97

36 Stay Clamp 50x6 mm (per Clamp) 1.685

S.No. CEMENT CONSUMPTION No. of Bags(50 Kg. Each)


1 20 MM thick cement plaster 1:6 0.11 bag per Sqm,
2 Cement concrete flooring 25 mm thick 0.16 bag per Sqm,
3 Stone Masonary in cement mortar 1:8 1.25 bag per Sqm,
4 Neat Cement Punning 0.04 bag per Sqm,
5 C.C. 1:2:4 6.44 bag per Sqm,
6 C.C. 1:3:6 4.50 bag per Sqm,
7 C.C. 1:5:10 2.80 bag per Sqm,

AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)


[61]
JAIPUR VIDYUT VITRAN NIGAM LIMITED
Measured Weight of Material

S.No. Name of Items Unit Weight (each item)


1 33KV Pin insulator Kg. 7.75Kg/per piece
2 33KV GI pin Kg. 2.00Kg/per piece
3 11KV Pin insulator Kg. 1.40Kg/per piece
4 11KV GI pin Kg. 1.00 Kg/per piece
5 11KV Disc Insulator (T&C) type Kg. 4.25 Kg/per piece
6 11KV H/W(T&C) type Kg. 1.225Kg
7 11KV Disc insulator (B&S) type Kg. 5.0 Kg/per piece
8 11KV H/W (B&S) type Kg. 3.0 Kg
9 LT Pin Insulator Kg. 0.400 Kg/per piece
10 LT Shackle Insulator Kg. 0.480 Kg/per piece
11 LT Shackle H/W Kg. 0.500Kg
12 LT GI Pin Kg. 0.480 Kg/per piece
13 33KV Stay Insulator Kg. 1.200 Kg/per piece
14 11 KV LT stay Insulator Kg. 0.840 Kg/per piece
15 Single Phase AB Cable Kg. 197 Kg./Km.
16 Three Phase AB Cable Kg. 340 Kg./Km.
17 2Cx4 Sq.mm armoured cable Kg. 405 Kg./Km.
18 Single Phase Switch Fuse Unit Kg. 55 Kg./Set
19 Three phase Switch Fuse Unit Kg. 108 Kg./Set
20 Rostering Switch Kg. 155 Kg./Set
21 11KV Isolator (GO) Kg. 45 Kg./Set
22 33KV Isolator (GO) Kg. 135 Kg./Set
23 11KV Horn Gap Fuse Set Kg. 15 Kg./Set
24 33 KV Horn Gap Fuse Set Kg. 70 Kg./Set
25 12 KV Post Insulator Kg. 6 Kg/per piece
26 24 KV Post Insulator Kg. 6.5 Kg/per piece
27 Suspension Clamp with Eye Hook Kg. 2.50 Kg/per piece
28 Dead End Clamp with Eye Hook Kg. 2.50 Kg/per piece
29 MS Rod type Earthing Sets Kg. 8 Kg/per piece
30 Pipe type Earthing Sets Kg. 9 Kg/per piece
31 Single phase Meter with Box Kg. 1.25 Kg/per piece
32 Three Phase Meter W/O Box Kg. 0.900 Kg/per piece
33 LT piercing connector ‘A’ type / ‘B’ type Kg. 0.10 Kg/per piece
34 11KV L.A. Kg. 13 Kg/per piece
35 33KV L.A. Kg. 20 Kg/per piece
36 ACSR Rabbit conductor Kg. 215 Kg/per piece
37 ACSR Insulated Rabbit Conductor Kg. 319 Kg./ Km.
38 PG clamp for Dog Kg. 0.700 Kg/per piece
39 PG clamp for Rabbit Kg. 0,225 Kg/per piece
40 PG clamp for weasel Kg. 0.200 Kg/per piece
41 GI Stay Wire 7/10 SWG Kg. 428.19Kg./Km.
42 GI Stay Wire 7/8 SWG Kg. 686.98 Kg. / Km.
43 GI Earth Wire 6 SWG Kg. 154Kg/Km.
44 GI Earth Wire 8 SWG Kg. 98 Kg./Km.
45 11KV GI stay sets 16x1800mm Kg. 9.5Kg./Sets
46 33KV GI Stay sets 20x2400mm Kg. 14 Kg./Sets
47 Sub-station structure sets Single Phase (One pole) Kg. 34 Kg./Sets
48 Sub-station structure sets Single Phase (two pole) Kg. 145 Kg./Sets
49 Sub-station structure sets Single Phase (three pole) Kg. 67 Kg./Sets
50 LT AB Cable 1 C x 25+25 Kg. 124 Kg.Km (Approx)
51 LT AB Cable 3 C x 16+25 Kg. 196 Kg.Km (Approx)
52 LT AB Cable 3 C x 25+25 Kg. 264 Kg.Km (Approx)
53 LT AB Cable 3 C x 50+35 Kg. 464 Kg.Km (Approx)
AEN-TW XEN(TW-II) Sr. A.O.(TW) SE(TW)

[62]
Rates of CLRC increased as per variation in the labour index as per detail as
under

S.No. Labour Index Minimum wages of labour Total Average

unskilled Semi- Skilled


skillled
1 May.08 (effective from 100 107 115 322 107.33
March.08 to Dec.10)

2 Dec.10 (effective from 135 145 155 435 145.00


1.1.11 )

Factor= [0.2+0.05*(42.90/36.92)+0.75*(145/107.33)]
= 1.271
Say 27.1 % increase
Variation taken 75 % on labour charges ,20 % fixed charges and 5% on
transpotation charges

Variation in Deisel rates


Dec.09 36.92
June.11 42.9

Factor= [0.2+0.35*(42.90/36.92)+0.45*(145/107.33)]
= 1.215
Say 21.5 % increase
Variation taken 35% on Deisel charges ,20 % fixed charges and 45% on
labour charges
Rates of CLRC increased as per variation in the labour index as per detail as
under

S.No. Labour Index Minimum wages of labour Total Average

unskilled Semi- Skilled


skillled
1 May.08 (effective from 100 107 115 322 107.33
March.08 to Dec.10)

2 Dec.10 (effective from 135 145 155 435 145.00


1.1.11 )

Factor= [0.2+0.10*(42.90/36.92)+0.70*(145/107.33)]
= 1.262
Say 26.2% increase
Variation taken 70 % on labour charges ,20 % fixed charges and 10% on
transpotation charges

Variation in Deisel rates


Dec.09 36.92
June.11 42.9

Factor= [0.2+0.4*(42.90/36.92)+0.4*(145/107.33)]
= 1.205
Say 20.5 % increase
Variation taken 40% on Deisel charges ,20 % fixed charges and 40% on
labour charges
Rates of CLRC increased as per variation in the labour index as per detail as under

S.No. Labour Index Minimum wages of labour Total Average

unskilled Semi-skillled Skilled


1 May.08 (effective from 100 107 115 322 107.33
March.08 to Dec.10)

2 Dec.10 (effective from 135 145 155 435 145.00


1.1.11 )

Factor= [0.1+0.15*(42.90/36.92)+0.75*(145/107.33)]
= 1.288
Say 28.8 % increase
Variation taken 75 % on labour charges ,10 % fixed charges and 15% on
transpotation charges

Variation in Deisel rates


Dec.09 36.92
June.11 42.9

Factor= [0.1+0.45*(42.90/36.92)+0.45*(145/107.33)]
= 1.231
Say 23.1 % increase
Variation taken 45% on Deisel charges ,10 % fixed charges and 45% on labour
charges

In case of inspection vehicles since diesel is being provided by the Nigam as such no variation for
diesel prices can be allowed the factor therefore works out as under:

Factor = [0.1+0.45+0.45*(145/107.33)]
= 1.1579

Say 15.79 % increase